assembling a circular life

77
Flexible and circular conversion of a vacant office building in Amstel III Assembling a circular life Qi Gao 4739183 P5 28/06/2019 Architecture tutor: Mauro Parravicini Research tutor: Pieter Stoutjesdijk Building technology tutor: Engbert van der Zaag

Upload: others

Post on 23-Feb-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Assembling a circular life

Flexible and circular conversion of a vacant office building in Amstel III

Assembling a circular life

Qi Gao 4739183

P5 28/06/2019

Architecture tutor: Mauro Parravicini

Research tutor: Pieter Stoutjesdijk

Building technology tutor: Engbert van der Zaag

Page 2: Assembling a circular life

IntroductionContext/ problemGoals/opportunityResearch /principles

DesignConstruction strategyProgramsInfill modules Façade system Building climateCirculation and space

CONTENTS

Page 3: Assembling a circular life

IntroductionContext/ Problem

Goals/opportunity

Research /principles

Page 4: Assembling a circular life

Map of Amsterdam

Amstel III

1km

City center

Flexible and Circular Infill /724

Page 5: Assembling a circular life

Problem

Assembling a circular life

Vacant office floor space by municipality, 2017

Office vacancy has been a large problem in the Netherlands.

/765

Page 6: Assembling a circular life

Context

Assembling a circular life

Amstel III is also under this threat.

Vacancy intensive map of Amstel III

/766

Page 7: Assembling a circular life

Problem

Assembling a circular life

Main causes:Old buildings are out of date.

Building fit-outs are not suitable for new groups of people.

Visited vacant office building in Amstel III

/767

Page 8: Assembling a circular life

Opportunity

Assembling a circular life

Visited vacant office building in Amstel III

Opportunity:Transformation of office building• reduce the demolition waste• save the embodied energy for new structures

Attract new groups of people to this area• change the monofunctional situation• be pioneers of a change and promote circular concept in larger scale

/768

Page 9: Assembling a circular life

A solution for young students

at5.nl

at5.nl

advalvas.vu.nl

nu.nl

Assembling a circular life /769

Page 10: Assembling a circular life

Student house lacking in Amsterdam

Greater independence

More students

Higher rent

52% of total students have left Their parental home. Students seek greater independence as they get

older. The number for last period was 48%.

Over the past eight years, the number of students of colleges and universities has Increased by 21%.

Amsterdam student rooms are the most expensive in the Netherlands: an average of 35 euros per m2.

Source: ABF Research, 2018

Assembling a circular life /7610

Page 11: Assembling a circular life

Education and research facilities around Amstel III

1. Amsterdam Health & Technology Institute (AHTI )2. Amsterdam Medical Center (AMC )

University of Amsterdam (UvA), Faculty of Medicine3. European Bartender School4. Amsterdam University of Applied Sciences (HvA), Economics and

Management domain5. ROC vocational training institution, Business, IT, Security

2

13

4 5

Project site

Assembling a circular life /7611

Page 12: Assembling a circular life

Accessibility

Car Bicycle Walking Public transport

Station Bijlmer ArenA 04 minutes 14 minutes

Station Utrecht Central 20 minutes

Schiphol Airport 16 minutes 17 minutes

Amsterdam-Centre 15 minutes 30 minutes 20 minutes

Highway A1, A2, A9, A10 05 minutes

Assembling a circular life /7612

Page 13: Assembling a circular life

Preliminary goal

Transforming an office building in Amstel III into a student apartment

Assembling a circular life /7613

Source: thestudenthotel.com

Page 14: Assembling a circular life

Is this enough?

Assembling a circular life

Second waste: some newly tranformed projects on site have short lives.• Changeable ownership• Land leasing contracts• Area development plans

Blue-grey student apartmentStart: 2014Life: 15 years

How to turn this short-term renovation mode into a long-term strategy?

/7614

Page 15: Assembling a circular life

Goal

Transforming an office building in Amstel III into a student apartment

Assembling a circular life

A flexible systemto fit the changing needs and achieve circularity

Involving users to circular construction and lifestyle

/7615

Page 16: Assembling a circular life

Research Objective

How can a flexible infill system help the conversion of vacant office building in a circular and user involvement way?

Sub questions: 1. How to increase the technical flexibility of building system? 2. How to involve users to flexibility and circularity?

Assembling a circular life /7616

Page 17: Assembling a circular life

How to increase the technical flexibility of building system?

Type of connections

accessory external connection or connection system

direct connectionwith additional xing devices

direct intergral connectionwith inserts (pin)

direct integral connection

accessory internal connection

lled soft chemical connection

lled hard chemical connection

direct chemical connection

1.0

0.8

0.6

0.5

0.4

0.2

0.1

0.1

For one credit the following minimum scores need to be achieved for each layer:• “space plan”: average minimum of 0,7• “services”: average minimum of 0,7• “skin”: average minimum of 0,6• “structure”: average minimum of 0,4

Source: A Framework For Circular Buildings, CIRCLE ECONOMY, 2018

fixed

flexible

Assembling a circular life /7617

Source: Brand (1994)

strategies• detachment of structure and infill• installations separated from structure• reversible connections

Page 18: Assembling a circular life

A system that suits surrounding structures

Assembling a circular life

3

1

4

2

/7618

Page 19: Assembling a circular life

Structure grid sizes

Assembling a circular life

1 Hessenbergweg 109

Grids size: 5400*7200Void height: 3300 Void height: 3100 Void height: 3100 Void height: 2900

2 Hettenheuvelweg 12

Grids size: 7200*7200

3 Hogehilweg 6

Grids size: 6000*6000

4 Hettenheuvelweg 45

Grids size: 6000*6000

/7619

Page 20: Assembling a circular life

Preliminary strategy

Assembling a circular life /7620

Page 21: Assembling a circular life

How to involve users to flexibility and circularity?

Assembling a circular life

To build a circular future needs more user involvement

Linear construction Tested practices Needs for larger scale implement

/7621

Page 22: Assembling a circular life

Typology of user needs driven flexibility

Source: Ten FoldSource: PKMN Architectures Source: Patch 22 Source: Circle House, GXN

Adjustable

Flexible for task

Versatile

Flexible for space

Refitable

Flexible for performance

Movable

Flexible for LocationNeeds of change

Flexibility types

Assembling a circular life /7622

Page 23: Assembling a circular life

Typology of user needs driven flexibility

Adjustable

Flexible for task

Flexible Demountable

Reduce RecycleReuse

Versatile

Flexible for space

Refitable

Flexible for performance

Movable

Flexible for Location

Flexible Capacity

Circular Capacity

Assembling a circular life /7623

Page 24: Assembling a circular life

Linear business models in traditional building worldEnd-User

Administrator/Commissioner

Designer/Consultant

Builder/Service provider

Industry/Materials

Materials

Products

Wholesale

Elements

Builder

Developer

Investor

End-User

Demolition

Administrator

Architect

Building physicsStructural engineer

Service consultant Construction costs

Service provider

Re-use

Bank/finance

Source: Zuidema, Remko H, 2015

Assembling a circular life /7624

Page 25: Assembling a circular life

What materials and technical solution

Assembling a circular life

can provide renovating flexibility and involve users in self-building ?

Case study

Cine LidiaTechnical solution: traditional craftArchitect: Núria Salvadó y David TapiasYear: 2011

Comfort CabinTechnical solution: digital fabricationArchitect: TheNewMakersYear: 2016

Liina Transitional ShelterTechnical solution: prefab SIPsArchitect: Aalto University Wood ProgramYear: 2011

/7625

Page 26: Assembling a circular life

What materials and technical solution

Assembling a circular life

can provide renovating flexibility and involve users in self-building ?

Introduce small scale industry

CNC prefabrication

Plastic recycling

/7626

Page 27: Assembling a circular life

What materials and technical solution

Assembling a circular life

can provide renovating flexibility and involve users in self-building ?

Introduce small scale industry

CNC prefabrication

Plastic recycling

Materials• Recycled material from community and demolished building

waste• Wood-based materials

/7627

Page 28: Assembling a circular life

Concept

Accommodates changing spatial configuration for changing occupant behavior, adding different users, functions and potential upgrades.

Circularity

End-user

Flexibility

Promotion in larger scale

Assembling a circular life /7628

The dynamic total of associated processes, materials and stakeholders that accommodate circular flows of building materials and products at optimal rates and utilities.

The type of end-users will depend on the use class of a building, i.e. an individual who uses the building as a residence on a permanent or long-term basis.

Definition source: Geldermans, B., designingbuildings.co.uk

Page 29: Assembling a circular life

Principles

• digital fabrication• standardized and modular dimensions• detachment of structure and infill• installations under raised floors or in walls• reversible connections• components to fit in elevator

Technical flexibility

• reuse existing structure• recycle existing materials• improve building sustainability • design new components for

disassembly

Circularity

• visible process and result• self-built construction• customizable space• promote circular user habits

User involvement

Assembling a circular life /7629

Page 30: Assembling a circular life

DesignConstruction strategy

Programs

Infill modules

Façade system

Building climate

Circulation and space

Page 31: Assembling a circular life

Apply principles into context

Hessenbergweg 109-117 Built year: 1999Total area: 2520 m2

Building height: 14 mAssembling a circular life /7631

Page 32: Assembling a circular life

Current Situation

Floor height: 3.3 mAssembling a circular life /7632

Page 33: Assembling a circular life

Structure: support layer

14400mm

Prefab concrete slab

Structural wall element

Column & beam

65750mm

3500mm

Grid: 5400mm

• Keep main structure for saving energy

Flexible and Circular Infill /7633

Area(m2) Embodied Energy (MJ) Embodied Carbon (kg CO2)2,500 3,282,500 197,500

Source: Griffin, C.T., Bynum, L., 2013

Page 34: Assembling a circular life

Urban strategy: introduce public green space

Relationship with future park and high-rises

Assembling a circular life /7634

Page 35: Assembling a circular life

Open old lobby to exterior

Assembling a circular life /7635

Showing a scenery of the transformation

Page 36: Assembling a circular life

Structure: reuse existing and recycle demolished part

Assembling a circular life /7636

recyclable glass and aluminum panels

Reusable glass(m2) Embodied Energy (MJ) Embodied Carbon (kg CO2)392 62,230 4,410

Page 37: Assembling a circular life

Construction strategy

Assembling a circular life

1 Old wall and facade treated by skilled labours

2 Flexible components produced in ground floor with user involvement

3 Flexible infill built by unskilled users

4 Users can further participate in recycling, maintenance and disassembly

/7637

Page 38: Assembling a circular life

Program

Assembling a circular life

32 rooms-28 single room-4 double rooms

Shared kitchen and living space

Restaurant, fitness, etc.

Production and business

Circulation and technical space

Total

apartment

restaurant and service small scale industry

apartment

apartment

apartment

480 m2

650 m2

360 m2

360 m2

240 m2

2100 m2

/7638

Page 39: Assembling a circular life

Building system: interior and exterior

Assembling a circular life

Existing facade

Balcony buffer space

New facade

Interior system

/7639

Exterior system

Page 40: Assembling a circular life

Interior system

Assembling a circular life

Floor module wall module Furniture and utilities

+ +

/7640

Page 41: Assembling a circular life

Interior system:floor module

Assembling a circular life

450 × 450 mmMaterial: recycled polypropyleneSource: collected from Amstel III community

Property: stable/recyclable/waterproof/Can be accurately shaped by molding or CNC millingoffers a good balance of thermal, chemical and electrical properties with moderate strength.

Fabrication method: injectionAdvantage: fast, one time mold cost, customizable patterns and colors

/7641

Page 42: Assembling a circular life

Interior system:wall module

Assembling a circular life

Material: OSB board (mainly 18mm)

Property: • stable• low footprint• low cost• quick

Fabrication method: CNC milling Advantage: fast, accurate, customizable

/7642

Page 43: Assembling a circular life

Interior system:wall module

Assembling a circular life /7643

Page 44: Assembling a circular life

Interior system:wall configuration

Assembling a circular life

900*900 grids

/7644

Page 45: Assembling a circular life

Interior system:corners

Assembling a circular life

900*900 gridsL900 + L780

/7645

Page 46: Assembling a circular life

Interior system:cross corners

Assembling a circular life

900*900 grids

/7646

Page 47: Assembling a circular life

Interior system:furniture and utilities

Assembling a circular life /7647

bed flexible furniture kitchen bathroom

Page 48: Assembling a circular life

Interior system:furniture module

Assembling a circular life /7648

Page 49: Assembling a circular life

Interior system:furniture module

Assembling a circular life /7649

Page 50: Assembling a circular life

Interior system:utilities

Assembling a circular life /7650

Page 51: Assembling a circular life

Interior system:room types

Assembling a circular life

Single rooms Double rooms

/7651

Page 52: Assembling a circular life

Interior system:room transition

Assembling a circular life

2 single rooms 1 double room

/7652

Page 53: Assembling a circular life

Façade system

Assembling a circular life

Existing facade

Balcony buffer space

New facade

Interior system

/7653

Facade system

Page 54: Assembling a circular life

Façade system: new façade and balcony space

Assembling a circular life

Existing facade

/7654

Page 55: Assembling a circular life

Façade system: treating existing façade

Assembling a circular life

Disadvantages:• Static• No related with interior function• Need better climate performance

Remove windows and sills, open concrete walls

Existing facade

/7655

Page 56: Assembling a circular life

Façade system: treating old façade

Assembling a circular life

lightweight transparent mobile panel

recycle windows as guardrails for balcony and winter gardenrecycle other glass for new façade windows

/7656

Page 57: Assembling a circular life

Façade system: new façade and balcony space

Assembling a circular life

New facade

/7657

Page 58: Assembling a circular life

Façade system: façade module

Assembling a circular life

Treated 18mm plywood panels

Double glass window made from recycled glass

Wood wool insulation

/7658

Page 59: Assembling a circular life

Façade system: façade module

Assembling a circular life /7659

Page 60: Assembling a circular life

Façade system: façade module

Assembling a circular life /7660

Page 61: Assembling a circular life

Façade system: façade module

Assembling a circular life /7661

Page 62: Assembling a circular life

New façade: how to fit heights

Assembling a circular life

suitable height: 3300 → 3100 mm suitable height: 3300 → 2900 mm

/7662

Page 63: Assembling a circular life

Climate principle: providing various climate conditions

Assembling a circular life

SUMMER• protection by the overhang from direct sunlight exposure• plants become another sun shading layer• open greenhouses allow natural ventilation through the

buffer zone• natural thermal regulation from the green roof

/7663

Page 64: Assembling a circular life

Climate principle: providing various climate conditions

Assembling a circular life

SPRING/FALL• insulated windows open for fresh natural air and

comfortable temperature• greenhouse can provide basic weather and noise

protection• natural thermal regulation from the green roof

/7664

Page 65: Assembling a circular life

Climate principle: providing various climate conditions

Assembling a circular life

WINTER• buffer zone naturally heated by the solar radiation• natural ventilation through the pre-heated buffer zone

combined with heat recovering units and floor heating• leaves fall off, plants as sun shade become open• natural thermal regulation from the green roof

/7665

Page 66: Assembling a circular life

Building climate: plant shading

Assembling a circular life

hosta longipesfragrant plantainliriope platyphylla

/7666

WinterSummer

Page 67: Assembling a circular life

Building installations: water

Assembling a circular life /7667

Page 68: Assembling a circular life

Building installations: ventilation and heating

Assembling a circular life /7668

Page 69: Assembling a circular life

Room installations

Assembling a circular life

VENTILATION-individual installations-adjustable mechanical ventilation by heat recovery units

FLOOR HEATING-piping of heating in 0.3 m grids under floor modules

/7669

Page 70: Assembling a circular life

Circulation and spaces

Assembling a circular life /7670

vertical circulation

Page 71: Assembling a circular life

Ground floor

Assembling a circular life

1 plastic collecting and recycle2 digital maker space3 toilets4 office5 mailbox and laundry6 bar and restaurant7 kitchen8 co-studying meeting room9 fitness room10 installation room

/7671

Page 72: Assembling a circular life

Ground floor

Assembling a circular life

1 plastic collecting and recycle2 digital maker space3 toilets4 office5 mailbox and laundry6 bar and restaurant7 kitchen8 co-studying meeting room9 fitness room10 installation room

/7672

Plastic collectingpoint

Page 73: Assembling a circular life

Flowing corridor space

Assembling a circular life /7673

Shared living space with different characteristics

intimate /solitude symmetrical/organicmusic/meditation

Connected with a flowing corridor

Page 74: Assembling a circular life

Shared living space

Assembling a circular life /7674

kitchen and dining presentation space

Personal balcony

music

meditation

lounge

Customized floor plan and space

Page 75: Assembling a circular life

Assembling a circular life /7675

Page 76: Assembling a circular life

Conclusion

Assembling a circular life

1 Dynamic redevelopment of vacant structures

4 Users continue contributing to circular transition

2 Design for disassembly and recycle waste materials

3 Customized floor plan and space

/7676

Page 77: Assembling a circular life

Thanks!Questions/Discussion

06.28.2019

Qi Gao