asme viii_comparisons.xls
DESCRIPTION
ComparisonTRANSCRIPT
![Page 1: ASME VIII_comparisons.xls](https://reader035.vdocuments.us/reader035/viewer/2022072107/55cf9b10550346d033a494ea/html5/thumbnails/1.jpg)
TOPIC / SUBJECT Div 1 Div 2
1 SNT-TC-1A 1996, Addenda '98 1996, Addenda '98
2 CP-189 ACCP 1995 Rev 3, Nov. 97 1995 Rev 3, Nov. 97
3 NDT Method as per ASME Sec V ASME Sec V
4 Vision Test J2 J2
5 MPE
6 LPE
7
8
9 Not specified separately. Not specified separately.
10
SR. NO.
Wherever MPE is described in this division it shall be done as per Appendix - 6
Appendix - 9 & Article 9.3 (Article 7 of Section V) provides detail requirements in methods and procedures and the additional requirements specified in the appendix. MPE shall be performed as per written procedure certified by manufacturer.
Wherever LPE is described in this division it shall be done as per Appendix - 8
Appendix - 9 & Article 9.2 (Article 6 of Section V) provides detail requirements in methods and procedures and the additional requirements specified in the appendix. LPE shall be performed as per written procedure certified by manufacturer.
Role of LEVEL-1 Qualification
Not specified separately. Manufacturer's written practice (as per SNT-TC-1A) shall be followed.
Not specified separately. Manufacturer's written practice (as per SNT-TC-1A) shall be followed.
Qualification of persons - Level III
By Nomination, by examination Specific exam can be waived off for ASNT qualified person
By Nomination, by examination Specific exam can be waived off for ASNT qualified person
Qualification to perform other NDE methods
Verification of NDE personnel certification
Not specified separately. As per Sec V requirements shall be meet. Manufacturer shall certify that personnel performing and evaluating NDE by this division have been qualified and certified in accordance with their employer's written practice, SNT-TC-1A
Manufacturer shall certify that personnel performing and evaluating UT by this division have been qualified and certified in accordance with their employer's written practice, SNT-TC-1A shall be used as guideline.
![Page 2: ASME VIII_comparisons.xls](https://reader035.vdocuments.us/reader035/viewer/2022072107/55cf9b10550346d033a494ea/html5/thumbnails/2.jpg)
11 RT - TechniqueASME Sec V article 2
Ug not mandatory Ug not mandatory
12
13
14 Forgings SA 388 SA 388
15 UT welds
16 weld buidlup areas UT not mandatory UT not mandatory
Article I-3 pf Div 2 Article I-5 Div 2 - Acceptance criteria
RT - Record Maintenance
Radiographs to be retained till Manufacturer's Data Report (MDR) signed by AI
As per I-5, Div 2, Sec VIII AI-501, a written procedure of RT not required
NDT of plain & clad plates for special
application (Normal Beam)
Sa 578 Level B (by default) Extent: not 100% (by grid lines)
Sa 578 Level B (by default) Extent: not 100% (by grid lines)
Article 4 of Sec V, Appendix 12 of Sec Viii Div 1 Extent: UW- 11 of Sec VIII Div 1
Article 4 of Sec V Article 1 Extent: Article 1
![Page 3: ASME VIII_comparisons.xls](https://reader035.vdocuments.us/reader035/viewer/2022072107/55cf9b10550346d033a494ea/html5/thumbnails/3.jpg)
Div 3
1996, Addenda '98 + Article KE-1 of Div 3 (KE-112 to 115)
1995 Rev 3, Nov. 97
ASME Sec V + modifications as per Article KE-1
J1 for VT J2 for other NDT methods
According to ASME sec V, Article - 7. IF prod method used, procedure shall also contain steps to be taken to prevent are strikes & steps to be taken to prevent arc strikes & steps to remove arc strikes which may occur. That affected material has been removed. See KE - 210 / After Hydro all pressure boundary components need to be wet MPI tested
LPE shall be in accordance with Sec V, Article 6./ After Hydro, all pressure boundary components
A level - 1 individual shall be qualified to perform specified set-up, calibrations and tests and to record & evaluate data by comparison with specific acceptance criteria defined in written instructions. The Level - 1 individual shall implement these.
By examination only ASNT L-iii specific compulsory with 80 % marks Employer has to ensure the above.
NDE methods not covered by the referenced qualification document, personnel shall be qualified to comparable levels of competency by subjection to comparable examination on the particular method involved. The emphasis shall be on the individual's ability.
The certificate holder has the responsibility to verify the qualification and certification of NDE personnel employed by material manufacturers and material suppliers and subcontractors who provide NDE services to them.
![Page 4: ASME VIII_comparisons.xls](https://reader035.vdocuments.us/reader035/viewer/2022072107/55cf9b10550346d033a494ea/html5/thumbnails/4.jpg)
Ug mandatory
SA 388 + KE-232
mandatory UT
ASME Sec V Article - 2 + Article KE-1 of Div 3/ Root geometric indications acceptable if density variation is not abrupt
Radiographs to be retained till Manufacturer's Data Report (MDR) signed by AI NDE procedures, Records of procedure qualification, Records of personnel qualification, NDE reports & as built sketches showing all relevant indication
SA-578 Article KE-2, KE-222 Extent 100% Stringent than level B but liberal compared to level C of SA578
UT is mandatory,Article 4 & 5 of Sec V & KE-3 of Div 3 Extent: 100 At A, B, C & D.CC2235 not applicable.However TOFD can be used for planar defects for Thk.>51mm welds.
![Page 5: ASME VIII_comparisons.xls](https://reader035.vdocuments.us/reader035/viewer/2022072107/55cf9b10550346d033a494ea/html5/thumbnails/5.jpg)
Code comparision-related to U3.
Issue ASME SEC I ASME SEC VIII –DIV.1 ASME SEC VIII – DIV.2
Name Power Boilers
Stamp S U U2
Not addressed
form-U1,U1-A form-AI
Form-P4/P4M form-U2,U2-A form-A2
Form-P6 form-U4 form-A3
Rules for construction of Pressure vessel
Rules for construction of Pressure vessel design-Alternative rules
Hydro test Pr. Gauge / Transducer limitation
1.5 to 4 times of test pressure in dial gauges and No limit in Pressure transducers
1.5 to 4 times of test pressure in dial gauges and No limit in Pressure transducers
1.5 to 4 times of test pressure in dial gauges and No limit in Pressure transducers
Hydro test witnessing
PG-99: At Maximum allowable working pressure after holding at test pressure
UG-99: At At Test pressure divided by 1.3 after Holding at test pressure
ART :T-3 AT-355 At ¾ th of test pressure or Design pressure whichever greater after holding at Test pressure
Pneumatic witnessing
UG-100 :At Test pressure divided by 1.1 after Holding at test pressure
Art:AT-4 :AT-423 At ¾ th of test pressure or Design pressure, whichever greater after holding at Test pressure
Data reports-Final
form-P2/P2M/P2A/P2AM/P2B/P2BM/P3/P3M/P3A/P3AM ***
Partial data report
Supplement form
Transfer of Job within different units of same Co.
Permitted with out Partial data report, Quality system to address that
Permitted with out Partial data report, Quality system to address that
Permitted with out Partial data report, Quality system to address that
![Page 6: ASME VIII_comparisons.xls](https://reader035.vdocuments.us/reader035/viewer/2022072107/55cf9b10550346d033a494ea/html5/thumbnails/6.jpg)
ASME SEC VIII - -DIV.3
U3
Not addressed
form-K1, K1-M
form-K2, K2-M
form-K3
Not addresses in the code
Rules for construction of Pressure vessel design-Alternative rules-High pressures
1.5 to 4 times of test pressure in dial gauges as well as Pressure transducers
Art KT-3 : KT-330 During pressure raising it self verify pressure drops. If satisfactory, witness test at design pressure after satisfactory holding in test pressure.
![Page 7: ASME VIII_comparisons.xls](https://reader035.vdocuments.us/reader035/viewer/2022072107/55cf9b10550346d033a494ea/html5/thumbnails/7.jpg)
SL.NO. TOPIC / SUBJECT
1 PQR, Qualificatiom UW, 28 ASME Sec.IX AF- 210, ASME Sec.IX
2 PTC requirements UNF-95, UHA-52
3
4
5
ASME Sect.VIII Div.1 ( Published in
1940)
ASME Sect.VIII Div.2 ( Published in
1968)
Procedure qualification test plate & vessel test plate shall be as per AT-200. One PTC for each weld procedure used for Catagory A & B with execptions as per AT-203.1(b) No. Of vessel test plate shall be as per AT-203.1. Location, orientation, temperatur
Welders & welding operator's qualification requirments
UW-29 Welders & welding operators for pressure parts & load carrying NPP to PP attachments shall be qualified as per ASME Sect. IX.
AF-210 Welders & welding operators for pressure parts & load carrying NPP to PP attachments shall be qualified as per ASME Sect. IX.
Repair of weld joints & their requirements
UW-38 : Defects such as cracks, pinholes and incomplete fusion detected visually or by the hydrostatic test or pneumatic test or by examinations prescribed in UW-11 shall be removed by mechanical means or by thermal gouging process. After which the weld s shall be re welded
AF_250, AF-253, Weld repair shall be reexamined a by the method of original examination for the weld
Repair base material & their requirements
UG-78 : Repair of defective aterial shall be repaired provided aacceptance by the Inspector is first obtained for the method and extent of repair.
Repair of defective base material shall be done as per requirements of AF-104. LPE/MPE after removal of defects & acceptance as per Art. 9.1 & 9.2. If repaired by welding then procedure & weld shall be qualified as per Sect. IX, AF- 104.3 If depth of repair is less than 100 PT/MT is required. IF depth exceed either 10mm or 1/2 T, RT is required.
![Page 8: ASME VIII_comparisons.xls](https://reader035.vdocuments.us/reader035/viewer/2022072107/55cf9b10550346d033a494ea/html5/thumbnails/8.jpg)
ASME Sect.VIII Div.3 ( Published in 1997)
KF-214, Qualification as per Sex.IX with measurement of YS as required for base metal.
KT-2 : Impact testing of the welded vessels., KT-230 : Impact test of production test plates Each welding procedure used for the production. I
KF-215, ASME sex. IX and KT-2. Mechanical testing is required for Performance qualification.Qualification By NDE is not permitted
KF-710 Material repair where repair by welding is restricted. KE-2 requiremetns of examination and repair of base material .
KF-240 , KF-1170, shall be used for repair of the welding. KE- 211 Removal of defect by grinding. KF-212- Removal of defect by weldind. KE- 212.4- If depth of repair is less than 100 PT/MT is required. IF depth exceed either 10mm or10% of section thk. T, UT as per KE-102 & KE-333 is required.
![Page 9: ASME VIII_comparisons.xls](https://reader035.vdocuments.us/reader035/viewer/2022072107/55cf9b10550346d033a494ea/html5/thumbnails/9.jpg)
SL.NO. TOPIC / SUBJECT
1 No Change No Change
2 Not Specified Same as Div 3
3 KF- 120 Material Forming No Change No Change
4 No Change No Change
5 No Change No Change
6 No Change No Change
7 No Change No Change
8 No Change No Change
9 No Change No Change
10 No Change No Change
11 No Change
12 No Change
13 No Change No Change
14 No Change No Change
ASME Sect.VIII Div.1(Published in 1940)
ASME Sect.VIII Div.2 (Published in 1968)
KF-112: Material Identification
KF-601: Marking on plates & other materials (Q&T Steel)
KF-121 Material PreparationKF-121.1 Examination of Materials
KF-121.3 Finish of exposed inside edge of nozzles
KF-130 Tolerances on Cylindrical & Spherical Shells & HeadsKF- 131 Cylindrical shells (Ovality)
KF- 132 Spheriacl shells& Formed heads
KF-204 Final Weld Bead Finish
KF-614 Final Weld Bead Finish
KF-215 Test of Welders & Welding operators
KF-232 Cleaning of Surfaces to be welded.
No Change (1" on either side)
KF-234 Allignment tolerances for edges to be Butt Welded
Long-Seam (1/4t - 10mm max)
Circ-seam (1/4t to 19mm max)
1:3 taper
KF-236 Removal of temp. attachments & arc strikes
KF-238 Identification marking or Records for Welders & Welding operators
![Page 10: ASME VIII_comparisons.xls](https://reader035.vdocuments.us/reader035/viewer/2022072107/55cf9b10550346d033a494ea/html5/thumbnails/10.jpg)
15
16
Repair of weld joints & their requirements
UW-38 : Defects such as cracks, pinholes and
incomplete fusion detected visually or by the hydrostatic test or
pneumatic test or by examinations prescribed in UW-11 shall be removed
by mechanical means or by thermal gouging process.
After which the weld s
Weld repair shall be examined after surface
preparation by LPE / MPE as per Article 9.1 & 9.2 and
then after repair welding RT in accordance with
Article I-5 where dept of weld deposition is > 10 mm or one half of the material
thk.If any repair after PWHT
Repair base material & their requirements
UG-78 : Repair of defective aterial shall be repaired
provided approval of inspector is first obtained for method and extent of repairs. UF-37: Forged construction material :
Surface defects, such as chip marks, blemishes or
other irregularities shall be
Repair of defective base material shall be done as per requirements of AF-
104. LPE/MPE after removal of defects &
acceptance as per Art. 9.1 & 9.2. If repaired by
welding then procedure & weld shall be qualified as per Sect. IX, If BM require
Impact test
![Page 11: ASME VIII_comparisons.xls](https://reader035.vdocuments.us/reader035/viewer/2022072107/55cf9b10550346d033a494ea/html5/thumbnails/11.jpg)
Low stress punch to be used. Stamping to be omitted on plates less than 13mm thk.
No Change - Grind - M.T. / P.T.
ASME Sect.VIII Div.3(Published in 1997)
NO ChangeOriginal marking / Transferred Marking / Coded Marking Acceptable
NO ChangeProcess should not impair the mechanical properties
NO Change : Cut edges Thk >= 1 1/" (38mm) MT/PTAdded: U.T. on Nozzle opening area
NO Change Inside edge of Nozzles (flush with shell) - radius of t/4 or 3/4" (19mm) whichever is smallerProtruding Nozzles - radius on inner & outer surface of the neck - tn/4 or 3/8" (10mm) whichever is smaller
NO Change: 1% of Nominal Diameter
NO Change Inner surface of spherical shells & formed heads shall not exceed +1 1/4% & -5/8% of the nominal vessel I.D.
AddedFinish welds shall be ground or machined to blend with the surface of the part being joined. Both the blend radii & the surface finifh of the weld deposit shall be inspected to ensure they comply to the design requirements of the engineering design-- Design to specify weld finish
NO Change All wek\ld depoisits shall merge smoothly into base matal without abrupt transitions
AddedMechanical testing required for welder qualification
Changed : Detrimental oxide shall be removed from the weld metal contact area for a distance of atleast 2 in. (51mm) from WEP
Changed : Long-Seam (t/5 - 2.4mm max)Circ-seam (t/5 to 6mm max) 1:3 taper
No Change - @ 3 feet for thk over 6mmRecord keeping also acceptable.
![Page 12: ASME VIII_comparisons.xls](https://reader035.vdocuments.us/reader035/viewer/2022072107/55cf9b10550346d033a494ea/html5/thumbnails/12.jpg)
KF-240 , KF-1170, shall be used for repair of the welding.
KF-710 Material repair where repair by welding is restricted. KE-2 requiremetns of examination and repair of base material .