asia pacific asia pacific flight procedure flight … pbn tf6 fpp...asia pacific flight procedure...

30
1 Asia Pacific Flight Procedure Programme A A sia sia P P acific acific F F light light P P rocedure rocedure P P rogramme rogramme David VanNess ICAO Flight Procedure Programme Manager

Upload: hoangtuong

Post on 08-Aug-2018

234 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Asia Pacific Asia Pacific Flight Procedure Flight … PBN TF6 FPP...Asia Pacific Flight Procedure Programme Asia Pacific Flight Procedure Programme David VanNess ICAO Flight Procedure

1

Asia PacificFlight Procedure

Programme

AAsia sia PPacificacific

FFlight light PProcedurerocedure

PProgrammerogramme

David VanNess

ICAO Flight Procedure Programme Manager

Page 2: Asia Pacific Asia Pacific Flight Procedure Flight … PBN TF6 FPP...Asia Pacific Flight Procedure Programme Asia Pacific Flight Procedure Programme David VanNess ICAO Flight Procedure

2

Our LogoOur LogoOur Logo

Page 3: Asia Pacific Asia Pacific Flight Procedure Flight … PBN TF6 FPP...Asia Pacific Flight Procedure Programme Asia Pacific Flight Procedure Programme David VanNess ICAO Flight Procedure

3

ContentsContents

Part I

FPP update

Future plans

Immediate plans

Part II

FPP office

Training

Part IPart I

FPP updateFPP update

Future plansFuture plans

Immediate plansImmediate plans

Part IIPart II

FPP officeFPP office

TrainingTraining

Page 4: Asia Pacific Asia Pacific Flight Procedure Flight … PBN TF6 FPP...Asia Pacific Flight Procedure Programme Asia Pacific Flight Procedure Programme David VanNess ICAO Flight Procedure

4

Since PBN TF/5 (1)Since PBN TF/5 (1)

State Letter inviting States to express their intent to participate in the FPP

�Sent 26 June 2009. follow-up sent 29 July 2009

�8 responses – 6 Yes/2 No

�Australia proposal for funding FPP budget

APANPIRG/20 (7-11 Sept 2009)

�Side meeting with States that intend to participate

�Briefed delay in establishment of FPP

�Discussed and decided to go with the “Australia”proposal

State Letter inviting States to express their intent to State Letter inviting States to express their intent to

participate in the FPPparticipate in the FPP

��Sent 26 June 2009. followSent 26 June 2009. follow--up sent 29 July 2009up sent 29 July 2009

�� 8 responses 8 responses –– 6 Yes/2 No6 Yes/2 No

��Australia proposal for funding FPP budgetAustralia proposal for funding FPP budget

APANPIRG/20 (7APANPIRG/20 (7--11 Sept 2009)11 Sept 2009)

��Side meeting with States that intend to participateSide meeting with States that intend to participate

��Briefed delay in establishment of FPPBriefed delay in establishment of FPP

��Discussed and decided to go with the Discussed and decided to go with the ““AustraliaAustralia””

proposalproposal

Page 5: Asia Pacific Asia Pacific Flight Procedure Flight … PBN TF6 FPP...Asia Pacific Flight Procedure Programme Asia Pacific Flight Procedure Programme David VanNess ICAO Flight Procedure

5

Australia proposalAustralia proposal

Core group of APAC States fund FPP budget –“Active Participating States”

All States in region could use “free” services of FPP – “User States”

Additional “fee” services on a cost recovery basis

Steering Committee composed of funding States

�Develop work plan in coordination with FPP Manager

�Prioritize work

�Consider safety priorities

Core group of APAC States fund FPP budget Core group of APAC States fund FPP budget ––

““Active Participating StatesActive Participating States””

All States in region could use All States in region could use ““freefree”” services of services of

FPP FPP –– ““User StatesUser States””

Additional Additional ““feefee”” services on a cost recovery basisservices on a cost recovery basis

Steering Committee composed of funding StatesSteering Committee composed of funding States

��Develop work plan in coordination with FPP ManagerDevelop work plan in coordination with FPP Manager

��Prioritize workPrioritize work

��Consider safety prioritiesConsider safety priorities

Page 6: Asia Pacific Asia Pacific Flight Procedure Flight … PBN TF6 FPP...Asia Pacific Flight Procedure Programme Asia Pacific Flight Procedure Programme David VanNess ICAO Flight Procedure

6

What will it cost?What will it cost?

3-year tentative budget $514,600

�Cost for each State normally depends on how

many States participate as part of “Core

Group”

�To allow States to plan, the initial 1st-year

contribution set at:

$16,000

33--year tentative budget $514,600year tentative budget $514,600

��Cost for each State normally depends on how Cost for each State normally depends on how

many States participate as part of many States participate as part of ““Core Core

GroupGroup””

��To allow States to plan, the initial 1To allow States to plan, the initial 1stst--year year

contribution set at: contribution set at:

$16,000$16,000

Page 7: Asia Pacific Asia Pacific Flight Procedure Flight … PBN TF6 FPP...Asia Pacific Flight Procedure Programme Asia Pacific Flight Procedure Programme David VanNess ICAO Flight Procedure

7

Advantages of being a Core Group“Active Participating State”

Advantages of being a Core Group“Active Participating State”

Membership in Steering Committee

Voice in work plans of FPP

Voice in priorities

Contribute to Flight Safety in the region

States can still join the FPP at any time!

Either as User or Active Participating State

Membership in Steering CommitteeMembership in Steering Committee

Voice in work plans of FPPVoice in work plans of FPP

Voice in prioritiesVoice in priorities

Contribute to Contribute to Flight SafetyFlight Safety in the regionin the region

States can still join the FPP at any time!States can still join the FPP at any time!

Either as User or Active Participating StateEither as User or Active Participating State

Page 8: Asia Pacific Asia Pacific Flight Procedure Flight … PBN TF6 FPP...Asia Pacific Flight Procedure Programme Asia Pacific Flight Procedure Programme David VanNess ICAO Flight Procedure

8

Contributions to FPPContributions to FPP

Significant off-budget resources being provided:

China: 5 people, office, equipment

U.S. FAA: funding FPP Manager position

French DGAC/ENAC: FPD Software and training

Airbus: Other start-up costs associated with FPD software implementation

Hong Kong CAD: 1 procedure design instructor

Jeppesen providing aeronautical data

Other offers of in-kind or cash contributions

Significant offSignificant off--budget resources being provided:budget resources being provided:

China: 5 people, office, equipmentChina: 5 people, office, equipment

U.S. FAA: funding FPP Manager positionU.S. FAA: funding FPP Manager position

French DGAC/ENAC: FPD Software and trainingFrench DGAC/ENAC: FPD Software and training

Airbus: Other startAirbus: Other start--up costs associated with FPD up costs associated with FPD

software implementationsoftware implementation

Hong Kong CAD: 1 procedure design instructorHong Kong CAD: 1 procedure design instructor

Jeppesen providing aeronautical dataJeppesen providing aeronautical data

Other offers of inOther offers of in--kind or cash contributionskind or cash contributions

Page 9: Asia Pacific Asia Pacific Flight Procedure Flight … PBN TF6 FPP...Asia Pacific Flight Procedure Programme Asia Pacific Flight Procedure Programme David VanNess ICAO Flight Procedure

9

“Free” services“Free” services

Assist State procedure designers in developing their procedures

Assist State with Quality Assurance (QA)

Provide OJT to procedure designers

Provide formal training as required

As part of the services provided above, the Programme would:

Provide States access to server-based procedure design software applications

Provide States access to server-based electronic terrain and obstacle data storage

Provide packed procedures for a limited choice of avionics, for use during the pre-publication ground and flight validation

Assist State procedure designers in developing their proceduresAssist State procedure designers in developing their procedures

Assist State with Quality Assurance (QA)Assist State with Quality Assurance (QA)

Provide OJT to procedure designersProvide OJT to procedure designers

Provide formal training as requiredProvide formal training as required

As part of the services provided above, the Programme would:As part of the services provided above, the Programme would:

Provide States access to serverProvide States access to server--based procedure design based procedure design

software applicationssoftware applications

Provide States access to serverProvide States access to server--based electronic terrain and based electronic terrain and

obstacle data storageobstacle data storage

Provide packed procedures for a limited choice of avionics, for Provide packed procedures for a limited choice of avionics, for

use during the preuse during the pre--publication ground and flight validationpublication ground and flight validation

Page 10: Asia Pacific Asia Pacific Flight Procedure Flight … PBN TF6 FPP...Asia Pacific Flight Procedure Programme Asia Pacific Flight Procedure Programme David VanNess ICAO Flight Procedure

10

“Fee” services“Fee” services

Develop procedures for States

Provide QA

Assist with ground and flight validation

Assist with data origination

Develop procedures for StatesDevelop procedures for States

Provide QAProvide QA

Assist with ground and flight validationAssist with ground and flight validation

Assist with data originationAssist with data origination

Page 11: Asia Pacific Asia Pacific Flight Procedure Flight … PBN TF6 FPP...Asia Pacific Flight Procedure Programme Asia Pacific Flight Procedure Programme David VanNess ICAO Flight Procedure

11

Since PBN TF/5 (2)Since PBN TF/5 (2)

46th DGCA (12-16 Oct 2009)

�Briefed DGs on the FPP

�Revised budget

�Fixed contribution at $16,000

State Letter invited States to join the FPP (Nov 2009)

�14 responses so far

�8 Active Participating States

�5 User States

�1 negative response

4646thth DGCA (12DGCA (12--16 Oct 2009)16 Oct 2009)

��Briefed DGs on the FPPBriefed DGs on the FPP

��Revised budgetRevised budget

�� Fixed contribution at $16,000Fixed contribution at $16,000

State Letter invited States to join the FPP (Nov 2009)State Letter invited States to join the FPP (Nov 2009)

�� 14 responses so far14 responses so far

�� 8 Active Participating States8 Active Participating States

�� 5 User States5 User States

�� 1 negative response1 negative response

Page 12: Asia Pacific Asia Pacific Flight Procedure Flight … PBN TF6 FPP...Asia Pacific Flight Procedure Programme Asia Pacific Flight Procedure Programme David VanNess ICAO Flight Procedure

12

Active Participating States/Administrations

Active Participating States/Administrations

China

Hong Kong, China

Macau, China

French Polynesia (France)

ROK

DPRK

Mongolia

Singapore

ChinaChina

Hong Kong, ChinaHong Kong, China

Macau, ChinaMacau, China

French Polynesia (France)French Polynesia (France)

ROKROK

DPRKDPRK

MongoliaMongolia

SingaporeSingapore

Page 13: Asia Pacific Asia Pacific Flight Procedure Flight … PBN TF6 FPP...Asia Pacific Flight Procedure Programme Asia Pacific Flight Procedure Programme David VanNess ICAO Flight Procedure

13

User StatesUser States

Bangladesh

Cambodia

Malaysia

Myanmar

Nepal

BangladeshBangladesh

CambodiaCambodia

MalaysiaMalaysia

MyanmarMyanmar

NepalNepal

Page 14: Asia Pacific Asia Pacific Flight Procedure Flight … PBN TF6 FPP...Asia Pacific Flight Procedure Programme Asia Pacific Flight Procedure Programme David VanNess ICAO Flight Procedure

14

What can the States do now?What can the States do now?

State PBN implementation plans

Decide implementation priorities

Ensure WGS-84 survey data is available for

priority airports

Ensure terrain and obstacle data that will be

required for priority procedures is available,

preferably ETOD

State PBN implementation plansState PBN implementation plans

Decide implementation prioritiesDecide implementation priorities

Ensure WGSEnsure WGS--84 survey data is available for 84 survey data is available for

priority airportspriority airports

Ensure terrain and obstacle data that will be Ensure terrain and obstacle data that will be

required for priority procedures is available, required for priority procedures is available,

preferably ETODpreferably ETOD

Page 15: Asia Pacific Asia Pacific Flight Procedure Flight … PBN TF6 FPP...Asia Pacific Flight Procedure Programme Asia Pacific Flight Procedure Programme David VanNess ICAO Flight Procedure

15

Future PlansFuture Plans

Include entire Instrument Flight Procedure

process:

�Assist with WGS-84 survey where

necessary

�Assist with validation

Expand FPP concept to other regions

Include entire Instrument Flight Procedure Include entire Instrument Flight Procedure

process:process:

��Assist with WGSAssist with WGS--84 survey where 84 survey where

necessarynecessary

��Assist with validationAssist with validation

Expand FPP concept to other regionsExpand FPP concept to other regions

Page 16: Asia Pacific Asia Pacific Flight Procedure Flight … PBN TF6 FPP...Asia Pacific Flight Procedure Programme Asia Pacific Flight Procedure Programme David VanNess ICAO Flight Procedure

16

Immediate Plans for FPPImmediate Plans for FPP

Develop FPP processes

Develop FPP staff

Develop and offer basic and advanced training

for procedure designers

Develop FPP processesDevelop FPP processes

Develop FPP staffDevelop FPP staff

Develop and offer basic and advanced training Develop and offer basic and advanced training

for procedure designersfor procedure designers

Page 17: Asia Pacific Asia Pacific Flight Procedure Flight … PBN TF6 FPP...Asia Pacific Flight Procedure Programme Asia Pacific Flight Procedure Programme David VanNess ICAO Flight Procedure

17

Flight Procedure Programme (FPP)

Office and Training

FFlight light PProcedure rocedure PProgramme rogramme

(FPP)(FPP)

Office and TrainingOffice and Training

Mike TAMMike TAM

Page 18: Asia Pacific Asia Pacific Flight Procedure Flight … PBN TF6 FPP...Asia Pacific Flight Procedure Programme Asia Pacific Flight Procedure Programme David VanNess ICAO Flight Procedure

18

ContentContentContent

FPP Office

Training Facilities

Training Pipeline

Procedure Design Courses

Instructors’ Background

FPP OfficeFPP Office

Training FacilitiesTraining Facilities

Training PipelineTraining Pipeline

Procedure Design CoursesProcedure Design Courses

InstructorsInstructors’’ BackgroundBackground

Page 19: Asia Pacific Asia Pacific Flight Procedure Flight … PBN TF6 FPP...Asia Pacific Flight Procedure Programme Asia Pacific Flight Procedure Programme David VanNess ICAO Flight Procedure

19

FPP OfficeFPP OfficeFPP Office

Location

In the Center of Aviation Safety Technology

(CAST) Building

Chaoyang District, Northeast Corner of Third

Ring, Beijing

Mid-way between the Capital Airport and City

Centre

LocationLocation

In the In the CCenter of enter of AAviation viation SSafety afety TTechnology echnology

((CASTCAST) Building) Building

Chaoyang District, Northeast Corner of Third Chaoyang District, Northeast Corner of Third

Ring, BeijingRing, Beijing

MidMid--way between the Capital Airport and City way between the Capital Airport and City

CentreCentre

Page 20: Asia Pacific Asia Pacific Flight Procedure Flight … PBN TF6 FPP...Asia Pacific Flight Procedure Programme Asia Pacific Flight Procedure Programme David VanNess ICAO Flight Procedure

20

FPP OfficeFPP OfficeFPP Office

CCenter of enter of AAviation viation SSafety afety TTechnology (echnology (CASTCAST))

Page 21: Asia Pacific Asia Pacific Flight Procedure Flight … PBN TF6 FPP...Asia Pacific Flight Procedure Programme Asia Pacific Flight Procedure Programme David VanNess ICAO Flight Procedure

21

Training FacilitiesTraining FacilitiesTraining Facilities

In the CAST Building

Classrooms

GeoTITAN Procedure Design Software

Other suitable classroom facilities in

Beijing

In the CAST Building In the CAST Building

ClassroomsClassrooms

GeoTITAN Procedure Design SoftwareGeoTITAN Procedure Design Software

Other suitable classroom facilities in Other suitable classroom facilities in

BeijingBeijing

Page 22: Asia Pacific Asia Pacific Flight Procedure Flight … PBN TF6 FPP...Asia Pacific Flight Procedure Programme Asia Pacific Flight Procedure Programme David VanNess ICAO Flight Procedure

22

Training FacilitiesTraining FacilitiesTraining Facilities

Page 23: Asia Pacific Asia Pacific Flight Procedure Flight … PBN TF6 FPP...Asia Pacific Flight Procedure Programme Asia Pacific Flight Procedure Programme David VanNess ICAO Flight Procedure

23

Training PipelineTraining PipelineTraining Pipeline

PANS-OPS Procedure Design Initial Course

PBN Procedure Design Course

Procedure Design On-the-job Training

Advanced Courses:-RNP AR Procedure Design Course-Quality Assurance for Regulators

Frequency of the Frequency of the

Courses is based Courses is based

on on DemandDemand in the in the

Region and Region and

Available Available

ResourcesResources

Page 24: Asia Pacific Asia Pacific Flight Procedure Flight … PBN TF6 FPP...Asia Pacific Flight Procedure Programme Asia Pacific Flight Procedure Programme David VanNess ICAO Flight Procedure

24

Procedure Design CoursesProcedure Design CoursesProcedure Design Courses

PANS-OPS Procedure Design Initial Course

Basic PANS-OPS Criteria (Doc 8168)

Tentative Date: April 2010

4-5 weeks

Max 15 Students

PANSPANS--OPS Procedure Design Initial CourseOPS Procedure Design Initial Course

Basic PANSBasic PANS--OPS Criteria (Doc 8168)OPS Criteria (Doc 8168)

Tentative Date: April 2010Tentative Date: April 2010

44--5 weeks5 weeks

Max 15 StudentsMax 15 Students

Page 25: Asia Pacific Asia Pacific Flight Procedure Flight … PBN TF6 FPP...Asia Pacific Flight Procedure Programme Asia Pacific Flight Procedure Programme David VanNess ICAO Flight Procedure

25

Procedure Design CoursesProcedure Design CoursesProcedure Design Courses

PBN Procedure Design Course

Basic Concepts in PBN, RNP APCH, Baro-VNAV,

RNAV-1, Basic RNP-1

Tentative Date: Jun 2010

2-3 weeks

Max 15 Students

PBN Procedure Design CoursePBN Procedure Design Course

Basic Concepts in PBN, RNP APCH, BaroBasic Concepts in PBN, RNP APCH, Baro--VNAV, VNAV,

RNAVRNAV--1, Basic RNP1, Basic RNP--11

Tentative Date: Jun 2010Tentative Date: Jun 2010

22--3 weeks3 weeks

Max 15 StudentsMax 15 Students

Page 26: Asia Pacific Asia Pacific Flight Procedure Flight … PBN TF6 FPP...Asia Pacific Flight Procedure Programme Asia Pacific Flight Procedure Programme David VanNess ICAO Flight Procedure

26

Procedure Design CoursesProcedure Design CoursesProcedure Design Courses

Procedure Design On-the-job Training (Manual)

Performing real procedure design work

3 weeks

In the FPP Office

3 Students (Coaching Approach)

Procedure Design OnProcedure Design On--thethe--job Training (Manual)job Training (Manual)

Performing real procedure design workPerforming real procedure design work

3 weeks3 weeks

In the FPP OfficeIn the FPP Office

3 Students (Coaching Approach)3 Students (Coaching Approach)

Page 27: Asia Pacific Asia Pacific Flight Procedure Flight … PBN TF6 FPP...Asia Pacific Flight Procedure Programme Asia Pacific Flight Procedure Programme David VanNess ICAO Flight Procedure

27

Advanced Courses

RNP AR Procedure Design Course

Procedure Design Automation

Procedure Design OJT (Automated)

Quality Assurance in the Procedure Design Process

Quality Assurance for Procedure Design Service

Provider Regulators

Advanced CoursesAdvanced Courses

RNP AR Procedure Design CourseRNP AR Procedure Design Course

Procedure Design AutomationProcedure Design Automation

Procedure Design OJT (Automated)Procedure Design OJT (Automated)

Quality Assurance in the Procedure Design ProcessQuality Assurance in the Procedure Design Process

Quality Assurance for Procedure Design Service Quality Assurance for Procedure Design Service

Provider RegulatorsProvider Regulators

Procedure Design CoursesProcedure Design CoursesProcedure Design Courses

Page 28: Asia Pacific Asia Pacific Flight Procedure Flight … PBN TF6 FPP...Asia Pacific Flight Procedure Programme Asia Pacific Flight Procedure Programme David VanNess ICAO Flight Procedure

28

Procedure Design CoursesProcedure Design CoursesProcedure Design Courses

Frequency of the Courses is based on Demand in the Region and Available Resources

Prerequisite

Pre-course Assignment

Individual AssessmentProgress Test

Group Project and Presentation

Document Achievement

Training MaterialsNational Course Materials provided by the States in the region

ENAC, The French Civil Aviation University in Toulouse, France

Frequency of the Courses is based on Frequency of the Courses is based on DemandDemand in the in the Region and Region and Available ResourcesAvailable Resources

PrerequisitePrerequisite

PrePre--course Assignmentcourse Assignment

Individual AssessmentIndividual AssessmentProgress TestProgress Test

Group Project and PresentationGroup Project and Presentation

Document AchievementDocument Achievement

Training MaterialsTraining MaterialsNational Course Materials provided by the States in the regionNational Course Materials provided by the States in the region

ENAC, ENAC, The French Civil Aviation University in Toulouse, The French Civil Aviation University in Toulouse, FranceFrance

Page 29: Asia Pacific Asia Pacific Flight Procedure Flight … PBN TF6 FPP...Asia Pacific Flight Procedure Programme Asia Pacific Flight Procedure Programme David VanNess ICAO Flight Procedure

29

Instructors’ BackgroundInstructorsInstructors’’ BackgroundBackground

Pool of Instructors from China, HK China, India and Pakistan

All are experienced Procedure Designers and most have

previous Procedure Design Instructor experience

Completed a series of instructor training in the PBN

Procedure Design Instructor Course organised by ENAC in

August 2009

Strong background in terms of Procedure Design Knowledge

and Teaching

Guest Instructors from the region, U.S., Europe etc.

Pool of Instructors from China, HK China, India and PakistanPool of Instructors from China, HK China, India and Pakistan

All are All are experienced Procedure Designersexperienced Procedure Designers and most have and most have

previous previous Procedure Design InstructorProcedure Design Instructor experienceexperience

Completed a series of instructor training in the PBN Completed a series of instructor training in the PBN

Procedure Design Instructor Course organised by ENAC in Procedure Design Instructor Course organised by ENAC in

August 2009August 2009

Strong background in terms of Strong background in terms of Procedure Design KnowledgeProcedure Design Knowledge

and and TeachingTeaching

Guest Instructors from the region, U.S., Europe etc.Guest Instructors from the region, U.S., Europe etc.

Page 30: Asia Pacific Asia Pacific Flight Procedure Flight … PBN TF6 FPP...Asia Pacific Flight Procedure Programme Asia Pacific Flight Procedure Programme David VanNess ICAO Flight Procedure

30

Thank You

FPPFPPFPP