1 Presentation title - edit in the Master slide
AMEC Clean Energy;A natural partner for
your low carbon future
Planning for new nuclear build‘The first three years are critical’
Ash TownesBusiness Unit Director – New Nuclear BuildNuclear Generation and DefenceAMEC Clean Energy - Europe
2
AMEC at a Glance FTSE 100 company Market cap c.£3.4 billion
Revenues Some £4.2 billion
Employees ~30 000
Working in Around 40 countries
*As at 14 August 2012
AMEC is one of the world’s leading engineering, project management and consultancy companies
We design, deliver & maintain strategic assets for our customers, offering services which extend from environmental and front-end engineering design before the start of a project to decommissioning at the end of an asset’s life
Clean EnergyNuclear
Renewables/Bioprocess
Power
Transmission & Distribution
Mining Environment & InfrastructureWater/Municipal
Transportation/Infrastructure
Government Services
Industrial/Commercial
Oil & GasConventional and unconventional
2
3
AMEC Nuclear Pedigree. . . . 3000 nuclear professionals . . . .
. . . . a Nuclear New Build partner for 60yrs . . . .
1955
1990
1980
1970
1960
2000
2010EDF Partnership
Sizewell B
NSS/NCL Canada
AMEC Romania & Czech Republic
NCI South Africa
AMEC Slovakia
Growth in Clean-Up
NMP Sellafield
AGR Station Design & Construction
Magnox Station Design & Construction Including Tokai 1
Sizewell B PWR
Heysham 1 AGR
Dungeness A - Magnox
Sellafield
Bruce CANDA
Tokai 1
. . a strategic role on every NPS ever built in the UK . .
. . 19 of the last 20 reactors licensed in the US.
3
4
NNB organisational spectrumMulti-package
Owner-operator
Internalised D&B
Island model
Smaller number of EPC-type Contracts
Turnkey
Single EPC Contract
Turnkey +
Operate and/or own
Transfer of ‘Risk’ to EPC support orgn.
Whatever the approach, the client and the extended supply chain need to be truly intelligent customers and intelligent deliverers across critical core nuclear skill-sets
Presentation title - edit in Header and Footer4
5
UK Context (1 of 3)
5
UK Central Electricity Generating Board (CEGB)
Owner’s Construction Unit
(Includes Project Board)
Procurement&
ProjectManagement
Major Nuclear
Euip.
NSSS &AuxiliarySystems
Owner / Operator
AE Level
1
AE Level
2/3
AMEC*Safety & ReferenceDesign/Licenses
Civils Design Turbines Radwaste Main Civils
* By National Nuclear Corporation (NNC) subsequently acquired by AMEC
AMEC* / Westinghouse JV
SGs:BabcockVessel Head:FramatomeRCS/RCP & Reactor Systems:Westinghouse
Nuclear Design Associates McAlpine TWC
GEC Alstom Davy McKee J Laing
Sizewell B NPS (1995)Delivery organisation based on a small number of main EP / EPC Contracts
6
UK Context (2 of 3)EDF Genco
Part of EDF Energy
EDF DIN (France)
Major Nuclear
Euip.NSSS
Owner / Operator
AE
Suppliers
Sofinel EDF/AMEC AREVA
Manufacture AREVA
Hinkley C NPS (Ongoing)Delivery organisation based on multiple E, P and C Contracts
EDF SA
TurbinesMain Civils
NSSS Design
Site prepn:Kier/BAMMain Civils:Bouyges TP / Laing O’RourkeMarine works:Costain
Site Licensee, project manager, Intelligent Customer, Site Prep/Off site Engineering
Responsible Designer, Level 1 Engineering
BNI Level 2 Engineering
BOP Level 2 Engineering
Manufacture Alstom
Technical surveillance
Commercial
Presentation title - edit in Header and Footer6
7
UK Context (3 of 3)
Horizon Nuclear Power
HGNE
Owner / Operator
FEED
EPC
Established Design s/c
UK Context Support
Wylfa and Oldbury NPS (Ongoing)Delivery organisation based on Turnkey EPC
Site Licensee, project manager, Intelligent Customer, Site Prep/Off site Engineering
Responsible Designer, Level 1/2 EngineeringGDA Requesting PartyLevel 1/2
EngineeringLevel 1/2 Engineering
Technical surveillance
Commercial
GE
80.01% 19.99%
100% Hitachi
EPC Option 1
EPC Option 2
EPC Option 3
HGNE / EPC Partner JV
HGNE
NSSSEPC
HGNE + EPCm
Partner
Presentation title - edit in Header and Footer7
8
Open Questions. . . . in determining operating model and support requirements:
How much knowledge must the owner have and how much can the plant designer be relied on?
What information does the public need and when?
How much work can be done locally?
What is the best contracting and finance model?
Does “best” mean most certain...
...or lowest construction cost...
...or lowest through-life cost...
...or minimum ‘initial’ client equity?
Presentation title - edit in Header and Footer8
9
Supporting the NNB project through 3 core skill-sets
Engineering & Safety Case
Nuclear and non-nuclear engineering, technical and subject
matter experts
Programme Management
Office
Project / Procurement/ Construction
Management & Controls
Licensing & Regulatory Support
Project feasibility, risk reduction, integrated support: pre-licence, licensing, permits &,
Regulatory relationships
IAEA Status Assessment• Nuclear Safety• Management• Human Resource Development• Stakeholder involvement• Site & supporting facilities• Security & physical protection• Safeguards
• Environmental protection
• Nuclear fuel cycle• Radioactive waste
• Electrical grid• Emergency planning• Industrial
involvement• Procurement
• National position• Funding and financing• Legislative framework• Regulatory framework• Radiation protection
9
10
. . . through the whole project lifecycle
Engineering & Safety Case
Nuclear and non-nuclear engineering,
technical and subject matter
experts
Programme Management
Office
Project / Procurement/ Construction
Management & Controls
Licensing & Regulatory Support
Project feasibility, risk reduction, integrated support: pre-licence, licensing, permits &,
Regulatory relationships
Flexibility to service each step of the project lifecycle
1 2 3IAEA Milestone 1:Ready to make a knowledgeable commitment to a nuclear programme
IAEA Milestone 2:Ready to invite bids for the first nuclear power plant
IAEA Milestone 3:Ready to commission and operate the first nuclear power plant
IAEA NG-T-3.10 Intelligent Customer
Specify the scope and standard of a product / service
Assess whether the supplied product / service meets the requirements.
The product / service includes Nuclear Power Plant Fuel and fuel cycle Waste management Decommissioning provisions Independent technical support and services Through-life support from the original supply
chain Operation and Maintenance arrangements Grid Connection Associated Development Security arrangements Environmental studies and analysis
10
11
3 core skill-sets through lifecycle Flexibility to service each step of the project lifecycle
EPC / implementation resources
NNB support resources
Thin IC
Thick IC
11
12
Summary• NNB projects internationally have many different configurations of client, suppliers and
(therefore) differing support requirements
• All NNB stakeholders must have a basic capability and capacity across the three critical core skill-sets
• NNB Support service organisations must be adaptable; to project procurement strategy, phases of the project, client thick/thin ‘IC’ role
• IC role needs support to varying degrees during the transients in the project lifecycle; interface management is a critical focus area
• Flexibility is needed within the NNB support service provider and the commercial arrangements to optimise delivery of the service
• Its important that local suppliers are embedded into the NNB support infrastructure; lasting legacy in operations
Presentation title - edit in Header and Footer12