Asbestos Management Plan

Page 2: Asbestos Management Plan - Norwood UK Management Plan.pdf · Asbestos cement products are a mixture predominantly of cement and asbestos that has been compressed or moulded to a high

2

Management Plan Statement The following management plan has been produced and will be implemented so that the risks associated with known or presumed asbestos containing materials may be reduced to a minimum and that all persons whether employed by, subcontracted to or visitors to Norwood are protected from the risk or exposure to airborne asbestos fibres. This management plan has been produced with reference to the following HSE’s publication

Control of Asbestos at Work Regulations (CAWR) 2002

Asbestos (Licensing) Regulations 1983 as amended 1999

Hazardous Waste Regulations 1996 It is the attention of Norwood that, where Asbestos Containing Materials (ACM’s) exist within or upon property or properties whether owned or under the control of this company that the following regulations, where applicable, will be adhered to:

Control of Asbestos at Work Regulations (CAWR) 2002

Asbestos (Licensing) Regulations 1983 as amended 1999

Construction Design Management Regulations 1994

Special Waste Regulations 1996

Areas within a property or properties belonging to or under the control of Norwood, where, asbestos containing materials in a poor condition are present and where it is not possible or practicable to implement actions to repair and seal or remove them, will have access to them denied until actions as detailed in appendix B can be implemented. Type of Asbestos Recognised in this Report Crocidolite – Blue Asbestos Amosite – Brown Asbestos Chrysotile – White Asbestos Removal

All ACM's that are either in a poor condition and that cannot be safely or satisfactorily repaired and/or encapsulated will be removed.

ACM's within a location where, the nature of work within that location has caused damage to or is likely to cause damage to the ACM's and where such materials cannot be satisfactorily protected, will be removed.

Prior to any works, be it routine or incidental maintenance, planned refurbishment or other works, a risk assessment will be carried out to establish the likelihood of disturbance of any ACM's that may give rise to airborne asbestos fibres. Where there is a likelihood of disturbance to ACM's

Page 3: Asbestos Management Plan - Norwood UK Management Plan.pdf · Asbestos cement products are a mixture predominantly of cement and asbestos that has been compressed or moulded to a high

3

and no methods of protection are available, the susceptible ACM's will be removed prior to the works being carried out. The removal of ACM's as designated by the Health and Safety Executive (HSE) as being licensed materials will be carried out by an HSE licensed removal contractor. All contractors will be required to show evidence of -

A valid HSE issued license to carry out such works

All relevant insurance for this type of work

Proof of training and health monitoring of all operatives employed by the removal contractor during the removal project on this organisations site/sites

Membership to a recognised trade organisation The removal of non-licensed materials The removal of non-licensed materials (see appendix E) may where possible be carried out by employees of Norwood. All removal will be carried out in line with the Control of Asbestos at Work Regulations (CAWR) 2002 and using the guidance of the HSE’s "Working with Asbestos Cement" (HSG189/2). An assessment of the risk of airborne fibre likely to be produced will be carried out prior to the work. Where necessary, air monitoring will be carried during the removal work or results from air monitoring during similar works may be used to endorse the assessment

Repair/remedial Works

All work will be undertaken in compliance with the Control of Asbestos at Work Regulations 2002 and if applicable the Asbestos (Licensing) Regulations 1983, as amended 1998.

An HSE licensed removal contractor will be contracted to carry out work if the material is Asbestos Insulation Board (A.I.B), asbestos pipe lagging, asbestos sprayed laggings or coatings, textured ceiling coating, textured wall coating, or any material which work upon is regulated by the Asbestos (Licensing) Regulations 1996.

Management of ACM's (Where leave in situ and manage is advised)

This refers to the monitoring and or implementation of any control measures concerning materials that are found to contain asbestos.

Materials, which, are deemed to be in a good condition and are unlikely to be disturbed/damaged during normal day to day activities, may be left in situ but will be periodically inspected for signs of damage, wear or dilapidation. Periodic inspection of all ACM's identified within the survey report. During the re-inspection, further risk assessments of ACM's will be carried out. Any findings during the re-inspection that differ from the original survey will be included within the re-inspection report.

Manage also refers to the protection of people from the risk associated with ACM'S. This includes maintenance personnel (internal and/or external) other personnel working, visitors and members of the public.

The following methods may be implemented to achieve this:-

Page 4: Asbestos Management Plan - Norwood UK Management Plan.pdf · Asbestos cement products are a mixture predominantly of cement and asbestos that has been compressed or moulded to a high

4

Informing all relevant personnel of the location of ACM's and instructing them not to disturb the material/s

Labelling ACM's with warning labels

Enforcing a permit to work system

Ensuring ease of access to the survey report via holders of the report

Where it is recommended that remedial work be carried out on ACM's, control measures may be enforced to protect personnel from associated risks until the work has been carried out, such as restricting access to key personnel only. Re-evaluation of materials risk assessments will be carried out if a change of use is applied either to the material or its surrounding.

The management process will also ensure that any work on ACM's and or its disposal is carried out in line with all relevant regulations. Licensed Materials Any asbestos containing material having a density less than 1 tonne per cubic metre are classed by the HSE as licensed material. (See appendix E) Asbestos insulation, asbestos coatings and A.I.B are classed as licensed materials and work on these materials is regulated by the Asbestos (Licensing) Regulations 1983 as amended 1999. The Asbestos (licensing) Regulations 1983 as amended 1999 ban anyone from carrying out work with asbestos insulation, asbestos coatings and A.I.B unless they hold a license granted by the HSE. (See the Asbestos (licensing) Regulations 1983 regulations for exemptions to this rule)

Non Licensed Materials

Asbestos containing materials with a density greater than 1 tonne per cubic metre are classed by the HSE as non-licensed material.

Asbestos cement products are a mixture predominantly of cement and asbestos that has been compressed or moulded to a high density and in a dry state has a density greater than 1 tonne per cubic metre. Products made from asbestos cement include corrugated and flat sheet, rainwater gutters and down pipes and W.C. cisterns.

Work on asbestos cement products is not regulated by the Asbestos (licensing) Regulations 1983 as amended 1999, nor are articles made from rubber, plastic, resin or bitumen, but which also contain asbestos (e.g. vinyl floor tiles, electric cables, roofing felt etc). Other exemptions include ACM’s used at high temperature but which have no insulation purpose, such as gaskets, washers, ropes and seals. Work done on any material containing asbestos must conform to the Control of Asbestos at Work Regulations 2002.

Page 5: Asbestos Management Plan - Norwood UK Management Plan.pdf · Asbestos cement products are a mixture predominantly of cement and asbestos that has been compressed or moulded to a high

5

Hazardous Waste Any material that has an asbestos content greater that 0.1% by weight will be disposed of (when removed) as hazardous waste in accordance with the Hazardous Waste Regulations 2005

Page 6: Asbestos Management Plan - Norwood UK Management Plan.pdf · Asbestos cement products are a mixture predominantly of cement and asbestos that has been compressed or moulded to a high

6

Appendix A

List of Asbestos Containing Materials,

Their Location and Risk Category (in order of risk)

as Identified in the Asbestos Inspection Report

Page 7: Asbestos Management Plan - Norwood UK Management Plan.pdf · Asbestos cement products are a mixture predominantly of cement and asbestos that has been compressed or moulded to a high

7

High Risk – Immediate Attention Required

Location Material Description Asbestos

Type Comments

Page 8: Asbestos Management Plan - Norwood UK Management Plan.pdf · Asbestos cement products are a mixture predominantly of cement and asbestos that has been compressed or moulded to a high

8

Medium Risk – Encapsulate/Remedial Works/Remove

Location Material Description Asbestos

Type Comments

Page 9: Asbestos Management Plan - Norwood UK Management Plan.pdf · Asbestos cement products are a mixture predominantly of cement and asbestos that has been compressed or moulded to a high

9

Low Risk – Manage: Plan Remedial Works/Encapsulate/Removal

Location Material Description Asbestos

Type Comments

Page 10: Asbestos Management Plan - Norwood UK Management Plan.pdf · Asbestos cement products are a mixture predominantly of cement and asbestos that has been compressed or moulded to a high

10

Very Low Risk – Manage

Location Material Description Asbestos

Type Comments

Page 11: Asbestos Management Plan - Norwood UK Management Plan.pdf · Asbestos cement products are a mixture predominantly of cement and asbestos that has been compressed or moulded to a high

11

Appendix B

Asbestos Containing Materials and Actions Required

Following Initial Inspection

Page 12: Asbestos Management Plan - Norwood UK Management Plan.pdf · Asbestos cement products are a mixture predominantly of cement and asbestos that has been compressed or moulded to a high

12

Asbestos Containing Materials and Actions Required

Following Initial Inspection

Area/Room

Number

Material Description

(and location where applicable) Ris

k

Cat

egory

Action Required Date

Required

Date

Carried Out

New

Ris

k

Cat

egory

Page 13: Asbestos Management Plan - Norwood UK Management Plan.pdf · Asbestos cement products are a mixture predominantly of cement and asbestos that has been compressed or moulded to a high

13

Asbestos Containing Materials and Actions Required

Following Initial Inspection

Area/Room

Number

Material Description

(and location where applicable) Ris

k

Cat

egory

Action Required Date

Required

Date

Carried Out

New

Ris

k

Cat

egory

Page 14: Asbestos Management Plan - Norwood UK Management Plan.pdf · Asbestos cement products are a mixture predominantly of cement and asbestos that has been compressed or moulded to a high

14

Appendix C

Asbestos Containing Materials and Actions Required

Following Periodic Inspection

Page 15: Asbestos Management Plan - Norwood UK Management Plan.pdf · Asbestos cement products are a mixture predominantly of cement and asbestos that has been compressed or moulded to a high

15

Asbestos Containing Materials and Actions Required

Following Periodic Inspection

Date of Inspection…………………………

Area/Room

Number Material Description

Ris

k

Cat

egory

Action Required Date Work

Required

Date Work

Carried

Out

New

Ris

k

Cat

egory

Page 16: Asbestos Management Plan - Norwood UK Management Plan.pdf · Asbestos cement products are a mixture predominantly of cement and asbestos that has been compressed or moulded to a high

16

Date of Inspection…………………………

Area/Room

Number Material Description

Ris

k

Cat

egory

Action Required Date Work

Required

Date Work

Carried

Out

New

Ris

k

Cat

egory

Page 17: Asbestos Management Plan - Norwood UK Management Plan.pdf · Asbestos cement products are a mixture predominantly of cement and asbestos that has been compressed or moulded to a high

Issue Date 07/03/2017 Issue 1 Document No: 011 Uncontrolled when copied

Pag

e17

Appendix D

Work Log

Page 18: Asbestos Management Plan - Norwood UK Management Plan.pdf · Asbestos cement products are a mixture predominantly of cement and asbestos that has been compressed or moulded to a high

Issue Date 07/03/2017 Issue 1 Document No: 011 Uncontrolled when copied

Pag

e18

Work Log

Location

Date

Material reference and its location:-

Action Required :-

Description of Work :-

Method Statement :-

Work Authorised

by

Work Carried out

by

Date Work Started Date Work

Finished

Further Actions Required :-

Page 19: Asbestos Management Plan - Norwood UK Management Plan.pdf · Asbestos cement products are a mixture predominantly of cement and asbestos that has been compressed or moulded to a high

Issue Date 07/03/2017 Issue 1 Document No: 011 Uncontrolled when copied

Pag

e19

Appendix E

Pre-Work Flow Chart

(Example)

Page 20: Asbestos Management Plan - Norwood UK Management Plan.pdf · Asbestos cement products are a mixture predominantly of cement and asbestos that has been compressed or moulded to a high

Issue Date 07/03/2017 Issue 1 Document No: 011 Uncontrolled when copied

Pag

e20

Pre-Work Flow Chart

Operative/Supervisor

Name

Operative/Supervisor

Signature

Contractors Name Works Manager Name

Location / Building No

Works Manager

Signature

Nature/Description of

Work

Date

A) Has the building, structure or area where the work is

planned been inspected or surveyed for Asbestos Containing

Materials (ACM)

Y If Yes – Go to B)

If No an inspections or survey must be carried out prior to the

work commencing N

B) Is the proposed work being carried out on or within building,

structure or area identified in the survey/ inspection report as

containing ACM’s

Y If Yes – Go to C)

If No – The proposed work may be carried out N

C) Has the operative or supervisor viewed the asbestos report

covering the working area?

Y If Yes – Go to D)

If No – the named Operative/Supervisor must view the

asbestos survey report. After reading the report go to D) N

D) Does the asbestos survey report identify any asbestos

containing materials within this area?

Y If Yes – Go to E)

If No – The proposed work may be carried out. N

E) Is the proposed work liable to disturb this material? Y If Yes – Go to F)

If No – The proposed work may be carried out. N

F) Can the asbestos containing material be protected from the

work so that any damage/disturbance will be prevented

Y If Yes the work may be carried out after a detailed method

statement for the protection of the material has been created

and approved.

If No – Go to G) N

G) Are the asbestos containing materials classed as HSE

licensed materials? (See list of licensed and unlicensed

materials in Appendix E)

Y

If Yes - Contact Norwood asbestos management plan manager.

The work must not be carried out without the permission of this

person.

If No – Go to H) N

H) Will or is the damage/disturbance of the non-licensed

ACM’s likely to produce debris or give rise to airborne

asbestos fibres

Y If Yes – Go to I)

If No – The work may be carried out, but proof will be required.

Background air testing during the work is advised or the results

of air tests conducted during previous work carried out on a

similar material using the same method of work should be

referred to.

N

I) If Yes – Has the operative received guidance on working

with these types of material, including methods of dust

suppression, use of Personal Protective Equipment (PPE) &

Respiratory Protective Equipment (RPE) and the disposal of

Hazardous waste materials.

Y If Yes – The proposed work may be carried out using

appropriate control measures

If No – guidance/training must be carried out prior to this work

being carried out. Referral should be made to the “Working

with asbestos containing materials which do not require a

license”

N

Page 21: Asbestos Management Plan - Norwood UK Management Plan.pdf · Asbestos cement products are a mixture predominantly of cement and asbestos that has been compressed or moulded to a high

Issue Date 07/03/2017 Issue 1 Document No: 011 Uncontrolled when copied

Pag

e21

The signature of the operative at the top of this page is to signify that all the necessary sections above

have been addressed and complied with

Page 22: Asbestos Management Plan - Norwood UK Management Plan.pdf · Asbestos cement products are a mixture predominantly of cement and asbestos that has been compressed or moulded to a high

Issue Date 07/03/2017 Issue 1 Document No: 011 Uncontrolled when copied

Pag

e22

Appendix F

HSE Licensed Asbestos Materials in Buildings

Page 23: Asbestos Management Plan - Norwood UK Management Plan.pdf · Asbestos cement products are a mixture predominantly of cement and asbestos that has been compressed or moulded to a high

Issue Date 07/03/2017 Issue 1 Document No: 011 Uncontrolled when copied

Pag

e23

HSE LICENSED ASBESTOS MATERIALS IN BUILDINGS

Sprayed coatings applied in the UK were typically a mixture of hydrated asbestos cement containing up to 85% asbestos, mainly Amosite but Crocidolite and mixtures have been used. Primarily used for anti-condensation and acoustic control and fire protection to structural steelwork. It is likely to release fibres, if disturbed especially during repair and maintenance work. As it ages the binding medium of sprayed asbestos may degrade with the consequent release of more fibres.

Thermal insulation to boilers, vessels, pipe work, valves, pumps etc also known as hand applied lagging. Lagging may have a protective covering of cloth, tape, paper, metal or a surface coating of cement. All types of asbestos may be found in lagging and the content can vary between 15 and 85% asbestos with the protective papers being up to 100% Chrysotile. The likelihood of fibre release depends upon its composition, friability and state of repair, but it is particularly susceptible to damage and disturbance through maintenance work or the action of water leaks. Asbestos insulating boards usually contain between 16 to 45% Amosite, although boards may be found to contain other types of asbestos and in other quantities. As insulation board is semi-compressed it is more likely to release fibres as a result of damage or abrasion. Work on asbestos insulation board can give rise to high levels of asbestos fibre. Millboard, paper and paper products usually have an asbestos content approaching 100% with all three types of asbestos being used in their manufacture. They were used for insulation of electrical equipment and for thermal insulation. Asbestos paper has been used as a laminate for fireproofing to various fibre panels. Textiles for insulation Ropes, ccloth and yarns etc that have been used for insulation purposes, are usually high in asbestos content, approaching 100% and all three types of asbestos have been used in their manufacture. Examples;

Asbestos rope or cloth wrapped around an engine exhaust pipe for the protection against the heat especially in an enclosed space

Asbestos rope or cloth wrapped around a heating pipe for insulation Heat/fire resistant packing materials in boilers

Textured coatings. Decorative coatings on walls and ceilings usually contain less than 2% Chrysotile. Fibre release may occur when subjected to fine abrasion.

NON-LICENSED ASBESTOS MATERIALS IN BUILDINGS

Asbestos cement products as in roofing sheets, wall cladding, permanent shuttering, flue, rain water and vent pipes generally contain 10 to 15% of white asbestos fibre bounded in Portland Cement. All three types of asbestos have been used in the manufacture of asbestos cement. The asbestos fibres in asbestos cement are usually firmly bound in the cement matrix and will be released only if the material is mechanically damaged or as it deteriorates with age. Textiles non-insulation Ropes, ccloth and yarns used as gasket material (where their thermal value is incidental to their use) are usually high in asbestos content, approaching 100% and all three types of asbestos have been used in their manufacture. Examples;

Pipe jointing and gaskets and flue pipe seals Fire blankets, mattresses and protective curtains, gloves, aprons, overalls

Page 24: Asbestos Management Plan - Norwood UK Management Plan.pdf · Asbestos cement products are a mixture predominantly of cement and asbestos that has been compressed or moulded to a high

Issue Date 07/03/2017 Issue 1 Document No: 011 Uncontrolled when copied

Pag

e24

Seals to oven doors Gaskets between sections in a sectional boiler

The risk of fibre release depends upon the structure of the material, bonded gasket material is unlikely to release asbestos but an un-bonded woven material may give rise to high fibre release especially if when damaged or frayed. Bitumen felts and coatings may contain asbestos either bound in the bitumen matrix or as an asbestos paper liner. Thermoplastic floor tiles can contain up to 25% asbestos usually Chrysotile, PVC vinyl floor tiles and un-backed PVC flooring normally 7-10% Chrysotile and asbestos paper backed PVC flooring the paper backing may contain up to 100% Chrysotile.

Mastics, sealants, putties and adhesives may contain small amounts of asbestos. The only possible risk is from sanding of hardened material when appropriate precautions should be taken.

Reinforced plastic and resin composites, used for toilet cisterns, seats, banisters, window seals, lab

bench tops, brakes and clutches in machines. The plastics usually contain 1-10% Chrysotile and were

used in for example car batteries to improve the acid resistance. Resins may contain between 20 and

50% Amosite, but because of its composition fibre release is likely to be low, even during cutting.

The above is not intended to be an exhaustive or definitive list

Page 25: Asbestos Management Plan - Norwood UK Management Plan.pdf · Asbestos cement products are a mixture predominantly of cement and asbestos that has been compressed or moulded to a high

Issue Date 07/03/2017 Issue 1 Document No: 011 Uncontrolled when copied

Pag

e25

Appendix G

Method statements, notification documents,

air clearance certificates and waste disposal forms (section 62)

and other forms created during the

removal of and/or other works involving ACM’s Signed for and on behalf of the company Jo Shuttlewood – HR Director