BACKGROUND
Telephonics customer base is increasingly requiring by
contract that Telephonics provide full AS9102 First
Article documentation. In order to comply with this
requirement Telephonics must pass the same
requirement to our suppliers, to be certain of obtainingall required certifications, test reports and other
documentation to pass on to our customers. In the
same manner Telephonics suppliers must pass the
requirement to their suppliers to be certain of obtaining the needed documents for their AS9102 First
Article.
7/22/2019 AS9102 FAI Guidelines
http://slidepdf.com/reader/full/as9102-fai-guidelines 3/27
-3
WHY WE ARE HERE
The following presentation is an attempt to identify and
offer an explanation of the requirements of the AS9102specification. Often at first glance the requirements of
the specification look somewhat onerous and maybe a
little scary. It is hoped that this presentation will offer
clarification and a better understanding of how to
approach the First Article process.
7/22/2019 AS9102 FAI Guidelines
http://slidepdf.com/reader/full/as9102-fai-guidelines 4/27
-4
AS9102 First Article Inspection
Elements of this presentation
Quality Clause 2.5.1
Quality Clause 6.9
SOW requirements
Definitions
Evaluation Activities
Partial or re-accomplishment of the FAI
Forms
Form 1
Form 2
Form 3
7/22/2019 AS9102 FAI Guidelines
http://slidepdf.com/reader/full/as9102-fai-guidelines 5/27
-5
Quality Clause 2.5.1
Quality Clause 2.5.1
2.5.1 SAE AS9102, First Article Inspection (FAI) is required prior
to the first delivery of the product baseline configuration. FAI shall be
performed on the first unit/assembly produced and shall be
performed in accordance with all the requirements defined SAE
AS9102 (latest revision). Telephonics‟ Quality Assurance shall reviewthe FAI during the source inspection of the first Production unit(s).
Partial and/ or re-accomplishment of the FAI shall be required as per
specification. Telephonics will either review FAI activity, subsequent
to the accepted baseline FAI, during the applicable Source Inspection
or the FAI report will be sent to Telephonics for review. Telephonics
Quality Assurance reserves the right to perform some or all aspects
of the FAI activities at the supplier‟s or Telephonics‟ facilities.
Telephonics disclaims responsibility for material delivered prior to
first article approval. . (Note: QC Clause 2. and 6.9 are also invoked in
conjunction with this clause.)
7/22/2019 AS9102 FAI Guidelines
http://slidepdf.com/reader/full/as9102-fai-guidelines 6/27
-6
Quality Clause 2.5.1
Clause includes Quality Clause 2 (Source Inspection)
and Quality Clause 6.9 (AS9102 Documentation).
Reference to QC 2 requires on-site inspection and acceptance
by Telephonics representative.
General requirement is for SQM personnel to conduct the
inspection.
First Article Inspection shall be identified on the Source Request.
QC 6.9 addresses documentation, requires AS9102
documentation to accompany the shipment.
7/22/2019 AS9102 FAI Guidelines
http://slidepdf.com/reader/full/as9102-fai-guidelines 7/27-7
Quality Clause 6.9
Quality Clause 6.9
6.9 SAE AS9102, First Article Inspection (FAI) data is
required on this Purchase Order. A copy of the First Article
Inspection Report, associated drawings and all specialprocess and finish certifications of all lower level detail parts
must accompany the first shipment of unit/assemblies.
Telephonics preferred method of FAI report transmittal is by
way of electronic media.
Telephonics disclaims responsibility for material deliveredprior to first article approval.
7/22/2019 AS9102 FAI Guidelines
http://slidepdf.com/reader/full/as9102-fai-guidelines 8/27-8
Quality Clause 6.9
Requires AS9102 documentation to accompany the
shipment.
Does not require on-site inspection and acceptance.
Refers to the preference for documentation to be inelectronic format but does not make this a
requirement.
Documentation to include
Drawings
Special process certifications
Finish certifications
Addresses the requirement for lower level components
7/22/2019 AS9102 FAI Guidelines
http://slidepdf.com/reader/full/as9102-fai-guidelines 9/27-9
AS9102 as a SOW Requirement
AS9102 First Article Inspection may be called out in
the applicable Statement of Work.
Normally found in the Quality Assurance paragraphs.
Hardware Quality Engineering should identify this requirementand address it through the applicable Quality Clause.
Quality Clause 8, Statement of Work, makes this a requirement
even if QC 2.5.1 or QC6.9 are not referenced on the contract.
SOW may be called out in the block text of the contract making
this a contractual requirement.The SOW will identify the requirements, whether on-site or
documentation only.
7/22/2019 AS9102 FAI Guidelines
http://slidepdf.com/reader/full/as9102-fai-guidelines 10/27-10
AS9102 Revision A
Current revision is A, rumor exists that revision B is
coming.
Applies to the first production run parts.
Contains definitions applicable to completion of theforms.
Allows the use of other forms, however
“Forms other than those contained in the Appendix may be
used, however they must contain all „Required‟ and
„Conditionally Required‟ information and have the same field
reference n umbers ”.
Contains instructions for completion of the forms.
Contains the required form in the Appendix.
7/22/2019 AS9102 FAI Guidelines
http://slidepdf.com/reader/full/as9102-fai-guidelines 11/27-11
AS9102 Definitions
The following are included in paragraph 3 of AS9102
and are referred to here to address historic supplier
questions and discrepancies.
DRAWING REQUIREMENTS: Requirements of the drawing (including
parts lists), specification or purchasing document to which the articleis to be made. These include any notes, specifications and lower
level drawings invoked.
All notes must be addressed
All dimensions must be addressed
All lower level drawings must be addressed in the same manner
FIRST PRODUCTION RUN PARTS: “Prototype parts, or parts built using
methods different from those intended for the normal production process,
shall not be considered as part of the first production run”.
7/22/2019 AS9102 FAI Guidelines
http://slidepdf.com/reader/full/as9102-fai-guidelines 12/27-12
AS9201 Definitions
STANDARD CATALOG HARDWARE: A part or material that conforms
to an established industry or national authority published
specification, having all characteristics identified by text description,
National/Military Standard Drawing, or catalog item.
Certificate of Conformance required (Form 2, Field 10).
ATTRIBUTE DATA: A result from a characteristic or property that isappraised only as to whether it does or does not conform to a given
requirement (for example, go/no go, accept/reject, pass/fail etc.).
VARIABLES DATA: Quantitative measurements taken on a
continuous scale. For example the diameter of a cylinder or the gap
between mating parts.
7/22/2019 AS9102 FAI Guidelines
http://slidepdf.com/reader/full/as9102-fai-guidelines 13/27-13
Evaluation Activities
The organization should conduct the following
activities in support of the FAI.
1. Review documentation for the manufacturing process to ensure all
operations are complete as planned.
Routing sheets, quality plans, work instructions etc.
2. Review reference exhibits supporting the FAI for compliance.
Inspection data, test data, Acceptance Test Procedures etc.
3. Review nonconformance documentation (if any) for completeness.AS9131 may be used as a guidance.
4. Review material certifications for compliance.
7/22/2019 AS9102 FAI Guidelines
http://slidepdf.com/reader/full/as9102-fai-guidelines 14/27-14
Evaluation Activities
5. Verify that approved Special Process sources are used and that the
manufacturing/routing document calls out the correct specification.
6. Verify that Key Characteristic requirements have been met.
See AS9103 for guidance.
7. Verify part specific gages and/or tooling are qualified and traceable
as applicable.
8. Verify that every design characteristic requirement is accounted for,
uniquely identified and has inspection results traceable to eachunique identifier.
7/22/2019 AS9102 FAI Guidelines
http://slidepdf.com/reader/full/as9102-fai-guidelines 15/27-15
Partial or Re-Accomplishment of FAI
The FAI requirement, once invoked, shall continue to
apply even after initial compliance. The organization
shall perform a full or partial FAI when there is-1. A change in design affecting form, fit or function.
2. A change in manufacturing source, process, inspection method, location of manufacture tooling or materials.
3. A change in numerical control program or translation to another media.
4. A natural or man-made event which may adversely affect the manufacturing
process.
5. A lapse in production for two years or as specified by the customer.
The FAI is not complete until the organization closes all
non-conformances affecting the part and implements the
corrective actions. The organization shall re-do the FAI for
those affected characteristics.
7/22/2019 AS9102 FAI Guidelines
http://slidepdf.com/reader/full/as9102-fai-guidelines 16/27-16
AS 9102 Forms
The Appendix of the Standard contains the forms that comply
with the documentation requirements.
Each field of the forms is designated with a unique reference
number.
Each field is also identified as:(R) Required, mandatory information
(CR) Conditionally Required, must be completed when there exists a
customer requirement.
(O) Optional, this field is provided for convenience.
Forms other than those contained in the Appendix may be used,
however they must contain all “Required” and “Conditionally Required”
information and have the same field numbers.
7/22/2019 AS9102 FAI Guidelines
http://slidepdf.com/reader/full/as9102-fai-guidelines 17/27-17
AS9102 Forms
The organization shall verify every Design Characteristic during
FAI and record the results. Every Design Characteristic shall
have its own unique identifier.
Reference characteristics may be omitted from the FAI.
Characteristics not measurable in the final product shall be
verified during the manufacturing process (as long as they are
not affected by subsequent operations) or by destructive means.
Characteristics verified at the detail level may be referenced in
the assembly level FAIR.
7/22/2019 AS9102 FAI Guidelines
http://slidepdf.com/reader/full/as9102-fai-guidelines 18/27
-18
AS9102 Form 1
7/22/2019 AS9102 FAI Guidelines
http://slidepdf.com/reader/full/as9102-fai-guidelines 19/27
-19
AS9102 Form 1
Form 1: Part Number Accountability
This form is used to identify the part that is being first-article
inspected and associated subassemblies or detail parts.
Fields 1-4 (repeated on all forms) identify the part number and name,
serial number (CR) and FAI report number (O).
Fields 5-8 (CR) identify drawings, revisions, and any changes from
the drawing (i.e. SVRs).
Field 9 (R) provides traceability to the manufacturing record (router
number, manufacturing plan number, etc.).
Fields 10-12 provide identification of the organization.
Field 13 (R) identify if a detail part or assembly FAI.
Field 14 (R) Identify either a Full or Partial FAI
Fields 15-18 apply if the part number in Field 1 is an assembly
requireing lower level parts to be installed in the assembly.
7/22/2019 AS9102 FAI Guidelines
http://slidepdf.com/reader/full/as9102-fai-guidelines 20/27
-20
AS9102 Form 2
7/22/2019 AS9102 FAI Guidelines
http://slidepdf.com/reader/full/as9102-fai-guidelines 21/27
-21
AS9102 Form2
Form 2: Product Accountability
This form is used if any material, special processes or funtional
testing are defines as a Design Requirement.
Field 5 (CR) The name of the material or the process
Field 6 (CR) Material or process specificationInclude all “Make From” materials
Include all Raw Materials incorporated
Include Standard Catalog Hardware
Fields 8-9 (CR) Apply if Special Processes are required to be
approved by the customer
Field 10 (CR) Certificate of Conformance number
Special Process completion certification
Raw Material test report
Standard Catalog hardware compliance number
Traceability number
7/22/2019 AS9102 FAI Guidelines
http://slidepdf.com/reader/full/as9102-fai-guidelines 22/27
-22
AS9102 Form 2
Form 2 Continued
Field 11 (CR) Functional Test Procedure Number
When Functional Test (ATP) is a Design Requirement
Field 12 (CR) Acceptance Report Number
Certification indicating that test requirements have been met.
ATP results
Outside testing results certifications
7/22/2019 AS9102 FAI Guidelines
http://slidepdf.com/reader/full/as9102-fai-guidelines 23/27
-23
AS9102 Form 3
7/22/2019 AS9102 FAI Guidelines
http://slidepdf.com/reader/full/as9102-fai-guidelines 24/27
-24
AS9102 Form3
Form 3: Characteristic Accountability, Verification and
Compatibility Evaluation
Field 5 (R) Unique characteristic number for each Design
Characteristic
Field 6 (CR) Reference Location i.e. drawing zone, page number andsection, specification etc.
Field 7 (CR) Characteristic Designator i.e. key, critical, flight safety,
major etc.
Field 8 (R) Requirement i.e. dimensional characteristics with
tolerances, drawing notes, specification requirements etc.
Field 9 (R) Results
Multiple Characteristics list each characteristic as an individual value
Or list once with the minimum and maximum values noted
If a characteristic is found to be non-conforming then that characteristic
must be listed separately with the measured value noted.
7/22/2019 AS9102 FAI Guidelines
http://slidepdf.com/reader/full/as9102-fai-guidelines 25/27
-25
AS9102 Form 3
Form 3 Continued
Field 9 Continued
If a Design Requirement requires verification testing actual values will be
recorded on the form.
An attached laboratory report listing specific values may be referenced in this
field.
For metallurgical characteristics with a visual verification
requirement list the photo number of the closest comparison.
A C of C is acceptable, record the reference number in this field.
For processes that require verification per Design Characteristic
include a statement of compliance.For part marking ensure marking is legible, correct and properly
located.
Attach photo if possible.
7/22/2019 AS9102 FAI Guidelines
http://slidepdf.com/reader/full/as9102-fai-guidelines 26/27
-26
AS9102 Form 3
7/22/2019 AS9102 FAI Guidelines
http://slidepdf.com/reader/full/as9102-fai-guidelines 27/27
AS9102
Questions?