Page 1: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

1

ARTIFICIAL TURF FIELDSARTIFICIAL ARTIFICIAL TURF FIELDSTURF FIELDSBASE CONSTRUCTIONBASE CONSTRUCTION

FOR FOR TURF FIELDSTURF FIELDS

Presented by: Tom DeRosaPresented by: Tom DeRosa

Page 2: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

2

INITIAL CONSIDERATIONS FORDECIDING ON A TURF FIELD

BENEFITUSAGECOSTSAFETYMAINTENANCE

Page 3: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

33

TYPICAL FIELDTYPICAL FIELD

•• DEPRESSIONSDEPRESSIONS•• BALD SPOTSBALD SPOTS•• POOR DRAINAGEPOOR DRAINAGE•• EXPOSED ROCK / STONESEXPOSED ROCK / STONES•• IMPROPER PITCHIMPROPER PITCH

Page 4: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

44

SELECTING A SITESELECTING A SITE

•• ISSUESISSUES•• SOIL CONDITIONSSOIL CONDITIONS•• WATER CONDITIONSWATER CONDITIONS•• DRAIN OUTLETSDRAIN OUTLETS•• ROCKROCK•• WETLAND REQUIREMENTSWETLAND REQUIREMENTS

Page 5: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

55

REPLACING FIELD INSIDE TRACKREPLACING FIELD INSIDE TRACK

•• ACCESS TO SITEACCESS TO SITE•• PROTECTION TO TRACK SURFACEPROTECTION TO TRACK SURFACE•• PLASTICPLASTIC•• PLYWOODPLYWOOD•• STEEL PLATESSTEEL PLATES•• BRIDGEBRIDGE

Page 6: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

6

DESIGN CONSIDERATIONS

• BUDGET• ARCHITECT• IN HOUSE DESIGN• DESIGN BUILD• BID PROCESS• “QUALIFIED” LOW BIDDER

Page 7: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

77

SITE AMENITIESSITE AMENITIES•• TURFTURF•• LIGHTINGLIGHTING•• PARKINGPARKING•• BLEACHERSBLEACHERS•• FENCING / SECURITYFENCING / SECURITY•• SCOREBOARDSSCOREBOARDS•• RESTROOMSRESTROOMS•• CONCESSIONSCONCESSIONS

Page 8: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

88

SELECTING A CONTRACTORSELECTING A CONTRACTOR•• FIELD EXPERIENCEFIELD EXPERIENCE•• SYNTHETIC FIELD EXPERIENCESYNTHETIC FIELD EXPERIENCE•• LASER GRADING TECHNOLOGYLASER GRADING TECHNOLOGY

Page 9: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

99

CONSTRUCTION PROCESSCONSTRUCTION PROCESS•• MOBILIZATIONMOBILIZATION•• SITE LAYOUTSITE LAYOUT•• EXCAVATIONEXCAVATION

Page 10: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

1010

TOPSOIL REMOVALTOPSOIL REMOVAL

•• AVERAGE 3” TO 6” OF TOPSOILAVERAGE 3” TO 6” OF TOPSOIL•• AVERAGE SIZE FIELD 70,000 TO 80,000sfAVERAGE SIZE FIELD 70,000 TO 80,000sf•• CALCULATES TO 1000 TO 1500 YARDS CALCULATES TO 1000 TO 1500 YARDS

PLUS AIRATION FACTORPLUS AIRATION FACTOR

Page 11: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

1111

TYPICAL SLOPE FOR TYPICAL SLOPE FOR SUBSUB--BASE & SURFACEBASE & SURFACE

Page 12: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

1212

SURFACE & SUBSURFACE & SUB--BASE SLOPESBASE SLOPES

Page 13: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

1313

GRADING & COMPACTIONGRADING & COMPACTION•• FINE GRADE SUBFINE GRADE SUB--BASE TO PLUS OR MINUS 1”BASE TO PLUS OR MINUS 1”•• SLOPE GRADES TO DIRECT WATER TO DRAINAGESLOPE GRADES TO DIRECT WATER TO DRAINAGE•• ROLL & COMPACT SUBROLL & COMPACT SUB--BASE AT OPTIMUM BASE AT OPTIMUM

MOISTURE CONTENT NOT LESS THAN 95% MOISTURE CONTENT NOT LESS THAN 95% DENSITYDENSITY

•• WHEN THICKNESS OF COMPACTED SUBWHEN THICKNESS OF COMPACTED SUB--BASE BASE EXCEEDS 6”, PLACE MATERIALS IN EQUAL LAYERS, EXCEEDS 6”, PLACE MATERIALS IN EQUAL LAYERS, WITH NO LAYER MORE THAN 6” TO 12” THICKWITH NO LAYER MORE THAN 6” TO 12” THICK

Page 14: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

1414

COLLECTOR COLLECTOR DRAINAGE PIPEDRAINAGE PIPE

Page 15: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

1515

PERFORATED PIPEPERFORATED PIPE

Page 16: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

1616

LAYING & SETTING PIPE LAYING & SETTING PIPE WITH A LASER WITH A LASER

Page 17: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

1717

OPEN GRAVEL DRAINAGEOPEN GRAVEL DRAINAGE

Page 18: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

1818

DRAINAGE STRUCTURESDRAINAGE STRUCTURES•• PERIODIC CLEANING IN SUMPSPERIODIC CLEANING IN SUMPS•• CHECK SYSTEM CHECK SYSTEM •• CLEANOUTS ARE OPTIONAL IN FIELDCLEANOUTS ARE OPTIONAL IN FIELD

Page 19: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

1919

6” CONCRETE CURB6” CONCRETE CURB

•• FORMED WITH 2” x 12” WOOD FORMSFORMED WITH 2” x 12” WOOD FORMS•• SET TO GRADE WITH LASER & STRINGSET TO GRADE WITH LASER & STRING•• TYPICAL #4 REBAR PLACED INSIDETYPICAL #4 REBAR PLACED INSIDE•• EXPANSION JOINTS EVERY 20 FEETEXPANSION JOINTS EVERY 20 FEET

Page 20: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

2020

12” CONCRETE CURB WITH 12” CONCRETE CURB WITH FENCE POSTSFENCE POSTS

•• 4” PVC PIPE 4” PVC PIPE •• FOOTINGS SET MINIMUM 3’ DEEPFOOTINGS SET MINIMUM 3’ DEEP•• TYPICAL #4 REBARTYPICAL #4 REBAR•• EXPANSION JOINTS EVERY 20 FEETEXPANSION JOINTS EVERY 20 FEET

Page 21: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

2121

TRENCH DRAIN @ TRACK TRENCH DRAIN @ TRACK & BORDER EDGE @ “D” ZONE& BORDER EDGE @ “D” ZONE

Page 22: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

2222

WOOD NAILERWOOD NAILER

•• A PRESSURE TREATED 2” x 4” IS A PRESSURE TREATED 2” x 4” IS INSTALLED ONTO CURB 1 ½” INSTALLED ONTO CURB 1 ½” BELOW FINISHED GRADEBELOW FINISHED GRADE

Page 23: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

2323

PLASTIC WOOD NAILERPLASTIC WOOD NAILER•• A PLASTIC WOOD NAILER IS INSTALLED A PLASTIC WOOD NAILER IS INSTALLED

ON THE OUTSIDE, LEVEL WITH THE ON THE OUTSIDE, LEVEL WITH THE CONCRETE CURB.CONCRETE CURB.

•• A 1 FOOT WIDE STRIP OF BROWN A 1 FOOT WIDE STRIP OF BROWN COLORED TURF IS DESIGNED TO COVER COLORED TURF IS DESIGNED TO COVER THE CURB ALONG THE GRASS FOR THE CURB ALONG THE GRASS FOR MOWING PURPOSES TO SEPARATE MOWING PURPOSES TO SEPARATE BASEBALL FIELD FROM SOCCER FIELDBASEBALL FIELD FROM SOCCER FIELD

Page 24: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

2424

EDGE DETAIL @ TRENCH EDGE DETAIL @ TRENCH DRAINDRAIN

•• TURF CAN BE GLUED DIRECTLY ONTO TURF CAN BE GLUED DIRECTLY ONTO CONCRETE OR A WOOD NAILER CAN BE CONCRETE OR A WOOD NAILER CAN BE FASTEN ON TOP OF CONCRETEFASTEN ON TOP OF CONCRETE

Page 25: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

2525

EDGE DETAIL AT “D” ZONEEDGE DETAIL AT “D” ZONE

•• A CONCRETE LEDGE A CONCRETE LEDGE IS FORMED WITH IS FORMED WITH BORDER @ “D” ZONEBORDER @ “D” ZONE

Page 26: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

2626

GEOTEXTILEGEOTEXTILE&&FLAT DRAINSFLAT DRAINS

•• TYPICAL FILTER FABRIC FOR PORUS BASE TYPICAL FILTER FABRIC FOR PORUS BASE INSTALLATIONINSTALLATION

•• 12” x 1” FLAT DRAINS WRAPPED WITH FILTER 12” x 1” FLAT DRAINS WRAPPED WITH FILTER FABRICFABRIC

•• FLAT DRAINS MUST GO EITHER INTO STONE FLAT DRAINS MUST GO EITHER INTO STONE AT PERIMETER DRAIN OR TIE DIRECTLY INTO AT PERIMETER DRAIN OR TIE DIRECTLY INTO COLLECTOR PIPECOLLECTOR PIPE

Page 27: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

2727

PLASTIC LINERS PLASTIC LINERS ANDAND

FLAT DRAINSFLAT DRAINS

•• PLASTIC LINERS ARE DESIGNED FOR USE PLASTIC LINERS ARE DESIGNED FOR USE OVER FIELDS WITH CLAY TYPE SOILSOVER FIELDS WITH CLAY TYPE SOILS

•• HIGH WATER TABLE AND/OR WET AREASHIGH WATER TABLE AND/OR WET AREAS•• 12” x 1” FLAT DRAINS WRAPPED WITH 12” x 1” FLAT DRAINS WRAPPED WITH

FILTER FABRIC FILTER FABRIC

Page 28: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

2828

INSTALLATION OF INSTALLATION OF FLAT DRAINSFLAT DRAINS

•• NOTE: IN MOST CASES THE FLAT NOTE: IN MOST CASES THE FLAT DRAINS RUN AT A 45 DEGREE ANGLE DRAINS RUN AT A 45 DEGREE ANGLE AGAINST THE DIRECTION OF SLOPEAGAINST THE DIRECTION OF SLOPE

Page 29: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

2929

COUPLING OF COUPLING OF FLAT DRAINSFLAT DRAINS

•• ALL DRAINS MUST BE CONTINUOUS TO ALL DRAINS MUST BE CONTINUOUS TO ALLOW WATER TO FLOW TO COLLECTOR ALLOW WATER TO FLOW TO COLLECTOR PIPES.PIPES.

Page 30: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

3030

STABLIZING FLAT STABLIZING FLAT DRAINSDRAINS

•• NOTE: CARE SHOULD BE TAKEN TO NOTE: CARE SHOULD BE TAKEN TO MAINTAIN THE STRAIGHTNESS AND MAINTAIN THE STRAIGHTNESS AND LEVELNESS OF THE FLAT DRAINSLEVELNESS OF THE FLAT DRAINS

•• IT IS IMPORTANT TO KEEP EQUAL IT IS IMPORTANT TO KEEP EQUAL DISTANCE BETWEEN EACH DRAINDISTANCE BETWEEN EACH DRAIN

Page 31: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

3131

FIELD UNDERDRAIN SYSTEMFIELD UNDERDRAIN SYSTEM

Page 32: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

3232

INSTALLATION OF STONE BASEINSTALLATION OF STONE BASE

•• TOTAL OF 6 INCHES MINIMUM BASE TOTAL OF 6 INCHES MINIMUM BASE COMPACTED & STABLECOMPACTED & STABLE

•• ONE LIFT WITH THE PROPER STONEONE LIFT WITH THE PROPER STONE•• TWO LAYER STONE BASE SYSTEMTWO LAYER STONE BASE SYSTEM•• 11stst LAYER / 4” OF ¾” PROCESSED STONE LAYER / 4” OF ¾” PROCESSED STONE

Page 33: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

3333

FINISHING STONE BASEFINISHING STONE BASE

•• 2nd LAYER / 2” OF STONE BLEND2nd LAYER / 2” OF STONE BLEND•• BLEND CONSISTS OF: BLEND CONSISTS OF:

50% / 3/8” STONE AND 50% / 3/8” STONE AND 50% OF “SAND” STONE50% OF “SAND” STONE

Page 34: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

3434

GRADING EQUIPMENT GRADING EQUIPMENT •• LASER LASER

CONTROLLED CONTROLLED PULL BOXES CAN PULL BOXES CAN BE USED FOR BE USED FOR GRADING GRADING FINISH STONEFINISH STONE

•• AUTOMATED AUTOMATED LASER LASER CONTROLLED CONTROLLED GRADERS OR GRADERS OR DOZERS ARE DOZERS ARE ALSO USEDALSO USED

Page 35: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

3535

FINE GRADING STONE FINE GRADING STONE BASEBASE

•• NOTE: IT IS IMPORTANT NOT TO GRADE NOTE: IT IS IMPORTANT NOT TO GRADE THE STONE DRY. DUST WILL SEPARATE THE STONE DRY. DUST WILL SEPARATE FROM THE LARGER STONE AND DROP FROM THE LARGER STONE AND DROP DOWN, LEAVING LARGER STONE ON TOPDOWN, LEAVING LARGER STONE ON TOP

Page 36: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

3636

ADDITIONAL STONE BLENDADDITIONAL STONE BLEND

•• DON’T LEAVE YOURSELF SHORT, IT IS DON’T LEAVE YOURSELF SHORT, IT IS IMPORTANT TO HAVE EXTRA MATERIAL TILL IMPORTANT TO HAVE EXTRA MATERIAL TILL THE PROJECT IS COMPLETE FOR REPAIRTHE PROJECT IS COMPLETE FOR REPAIR

Page 37: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

3737

COMPACTION TESTINGCOMPACTION TESTING•• ROLL & COMPACT BASE AT OPTIMUM ROLL & COMPACT BASE AT OPTIMUM

MOISTURE CONTENT NOT LESS THAN 95% MOISTURE CONTENT NOT LESS THAN 95% DENSITYDENSITY

Page 38: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

3838

PERCULATION TESTINGPERCULATION TESTING

•• STONE BASE SHOULD ACHIEVE A STONE BASE SHOULD ACHIEVE A PERCULATION RATE AT A MINIMUM PERCULATION RATE AT A MINIMUM OF 6” TO 12” OF RAIN PER HOUROF 6” TO 12” OF RAIN PER HOUR

Page 39: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

3939

COMPLETED STONE BASECOMPLETED STONE BASE•• BEFORE THE INSTALLATION OF TURF:BEFORE THE INSTALLATION OF TURF:•• A GRID MAY BE REQUIRED TO ENSURE THAT A GRID MAY BE REQUIRED TO ENSURE THAT

THE BASE IS SMOOTH & LEVELTHE BASE IS SMOOTH & LEVEL•• A VISUAL AND STRING INSPECTION IS A VISUAL AND STRING INSPECTION IS

NECESSARY NECESSARY

Page 40: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

4040

FIELD EQUIPMENTFIELD EQUIPMENT•• SCOREBOARDSCOREBOARD•• ELECTRICAL ELECTRICAL

TRENCHINGTRENCHING•• LIGHTINGLIGHTING•• FIELD WATERINGFIELD WATERING

Page 41: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

4141

FOOTBALL & SOCCER FOOTBALL & SOCCER GOALSGOALS

Page 42: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

4242

FIELD ACCESS & COMMUNICATION FIELD ACCESS & COMMUNICATION BOXESBOXES

Page 43: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

4343

EXTERIOR SOD / SEEDEXTERIOR SOD / SEED

Page 44: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

4444

TURF INSTALLATIONTURF INSTALLATION

Page 45: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

4545

SEAMINGSEAMING•• SEAMS MAY BE GLUED OR SEWNSEAMS MAY BE GLUED OR SEWN

Page 46: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

4646

BULK BAGS OF RUBBER BULK BAGS OF RUBBER AND SAND INFILLAND SAND INFILL

Page 47: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

4747

INSTALLING INFILL INSTALLING INFILL SYSTEMSYSTEM

Page 48: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

4848

LINES & LOGO’SLINES & LOGO’S

Page 49: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

4949

FENCINGFENCING

Page 50: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

5050

GRASS FIELD BEFOREGRASS FIELD BEFORE

Page 51: ARTIFICIAL TURF FIELDS - ASBA · fine grade sub-base to plus or minus 1” • slope grades to direct water to drainage • roll & compact sub-base at optimum moisture content not

5151COMPLETED TURF FIELDCOMPLETED TURF FIELD