Approaches to operations and maintenance of AMD treatment systems. Learn how they deal with tough O&M issues.

TRANSCRIPT

Page 1: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Blackleggs CreekBig Run AMD

Treatment Complex

Indiana County, PA

Page 2: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel
Page 3: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run AMD Treatment Complex

Page 4: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #2

Page 5: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #2 Intake Valve

Page 6: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #2 Limstone Bed Piping

Page 7: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #2 Settling Wetland

Page 8: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #2 Iron Coating of Limestone

Page 9: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #2 Limestone Washing and Replacing

Page 10: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #2 OM&R

• System is too small for flow requires constant adjustment of boards in drop boxes

• Requires regular flushing• Predicted dissolution and coating of stone• Plugging of holes in pipes – now using chain-sawed

slats rather than drilled holes• Uncooperative Landowner – during high flow, 10-20%

flow goes untreated• Fear that during high flow a siphon is created• Erosion in Overflow channel

Page 11: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #7

Page 12: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #7 Mine Water Capture

Page 13: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #7 Pipe Labyrinth

Page 14: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #7 Drop Boxes

Page 15: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #7 OM&R

• Cleaning Debris around mine opening• Cleaning Stone• Flushing• Cleaning and replacing stone• Clogging pipes

Page 16: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #7A Mine Blowout

#7A #8

Page 17: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #7A Mine Blowout

Page 18: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #7A Incidental Coal Extraction

Page 19: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #7, #7A, and #8 Combined

Page 20: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Discharges of Big Run #7A and #8

#7A #8

Page 21: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #8 Construction Logistics

Page 22: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #8 Drilling to Locate Mine Portal

Page 23: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #8 Partial Construction to Protect Against Possible Mine Blowout

Page 24: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #8 Construction Challenges

Page 25: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #8 COG and Robot Exploration

Page 26: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #8 Mine Water Capture

Page 27: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #8 Mine Water Inflow Management

Page 28: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #8 Completed System

Page 29: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #7, #7A, and #8 Combined

Page 30: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #8 OM&R

• Ponds too small to treat the flow and iron levels due to space constraints. We have full iron clogging every 4 months. Now we are facing decision of Lime in silo vs. cleaning stone

• Broken valve down over the bank allowing untreated water to escape to stream.

Page 31: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #3 Silo Pad

Page 32: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #3 Lyme Dosing Silo

Page 33: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Downstream of the Big Run AMD Treatment Complex

7/28/99 4/11/00 4/21/02 8/3/03 2/18/04 1/22/05 7/9/05 1/21/06 7/22/06 1/17/07 7/21/07 2/4/08 7/27/08 5/3/09 6/26/10 4/6/11 7/18/12-50

0

50

100

150

200

250

Combined Total and Hot Acidity (mg/L)

Page 34: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #3 OM&R

• At this time, we do not know how much lime is needed/yr or how much it will cost/yr

• The more lime you use, the more sludge is generated for disposal

• No sludge pond, the designed sludge pond is only big enough for #7 but two additional discharges will be sent through silo, #7A and #8

• #3 is a combo of all discharges so it is important to control flow of all other system discharges.

Page 35: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run AMD Treatment Complex OM&R

• During normal flow, 1hr/wk• During high flow it is easy to spend >20hrs/wk• Not enough sunshine to depend on solar• The more you flush the longer the system is

efficient• Constantly monitoring pH at outflow and

mouth of Big Run

Page 36: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Blackleggs Creek Watershed Association and Cooperative Trout Nursery