PROJECT MANAGEMENT CONSTRUCTION PROGRESS MEETING Project: ARRSD: New Athol Elementary School Project No.: 12063 Prepared by: Tony Dias Meeting Date: 3/4/2015 8:00 AM Re: Construction Progress Meeting Meeting No: 6 Teacher’s Dining Room Distribution: Attendees, School Building Committee (MF) Present Name Association Mary Jane Handy Athol-Royalston Regional School District ARRSD Bob Rouleau Athol-Royalston Regional School District ARRSD Karen McNiff Athol-Royalston Regional School District ARRSD Ken Vaidulas School Building Committee SBC Bob Muzzy School Building Committee SBC David Owen Mount Vernon Group MVG Chris LeBlanc Mount Vernon Group MVG Rafal Toczko Mount Vernon Group MVG Jim Mauer Fontaine Bros. FBI Tony Kozlik Fontaine Bros. FBI Rich Eardensohn A.J. Virgilio AJV Darrin Upham A.J. Virgilio AJV Tony Dias Symmes Maini & McKee Associates, Inc. SMMA Joel Seeley Symmes Maini & McKee Associates, Inc. SMMA Doug Walsh Town of Athol Department of Public Works DPW Andy Tessier Town of Athol Department of Public Works DPW OLD BUSINESS Item # Discussion BIC Status 0.1 Owner Topics ARRSD/FBI Open 01/21/15 Next school year calendar will be available within the next couple of months. 02/04/15 to 2/25/15, see previous minutes. 03/04/15 W-9 form was received. FBI to coordinate Blasting during MCAS. Mary Jane submitted testing schedule for Pleasant Street Elementary School and Athol Regional Middle School. Approx. dates are first 2-weeks in April & middle 2-weeks in May. 0.2 Schedule Update FBI Open 01/21/15 to 02/25/15, see previous minutes. 03/04/15 FBI provided 2 Week look ahead. Finish Stumping, cleanup

Upload: others

Post on 29-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ARRSD: New Athol Elementary School · Sewer/Water Utilities; pending weather: Strip in prep for blasting and temp fencing. Concrete to start April 1 st. Need to investigate landing

PROJECT MANAGEMENT

CONSTRUCTION PROGRESS MEETING

Project: ARRSD: New Athol Elementary School Project No.: 12063

Prepared by: Tony Dias Meeting Date: 3/4/2015 8:00 AM

Re: Construction Progress Meeting Meeting No: 6

Teacher’s Dining Room

Distribution: Attendees, School Building Committee (MF)

Present Name Association

� Mary Jane Handy Athol-Royalston Regional School District ARRSD

� Bob Rouleau Athol-Royalston Regional School District ARRSD

� Karen McNiff Athol-Royalston Regional School District ARRSD

Ken Vaidulas School Building Committee SBC

� Bob Muzzy School Building Committee SBC

� David Owen Mount Vernon Group MVG

� Chris LeBlanc Mount Vernon Group MVG

� Rafal Toczko Mount Vernon Group MVG

� Jim Mauer Fontaine Bros. FBI

� Tony Kozlik Fontaine Bros. FBI

Rich Eardensohn A.J. Virgilio AJV

Darrin Upham A.J. Virgilio AJV

� Tony Dias Symmes Maini & McKee Associates, Inc. SMMA

� Joel Seeley Symmes Maini & McKee Associates, Inc. SMMA

Doug Walsh Town of Athol Department of Public Works DPW

Andy Tessier Town of Athol Department of Public Works DPW

OLD BUSINESS

Item # Discussion BIC Status

0.1 Owner Topics ARRSD/FBI Open

01/21/15 Next school year calendar will be available within the next couple

of months.

02/04/15 to 2/25/15, see previous minutes.

03/04/15 W-9 form was received. FBI to coordinate Blasting during MCAS.

Mary Jane submitted testing schedule for Pleasant Street Elementary

School and Athol Regional Middle School. Approx. dates are first 2-weeks

in April & middle 2-weeks in May.

0.2 Schedule Update FBI Open

01/21/15 to 02/25/15, see previous minutes.

03/04/15 FBI provided 2 Week look ahead. Finish Stumping, cleanup

Page 2: ARRSD: New Athol Elementary School · Sewer/Water Utilities; pending weather: Strip in prep for blasting and temp fencing. Concrete to start April 1 st. Need to investigate landing

Project: ARRSD: New Athol Elementary School

Meeting Date: 03/4/2015

Meeting No.: 5

Sewer/Water Utilities; pending weather: Strip in prep for blasting and temp

fencing. Concrete to start April 1st. Need to investigate landing pad,

provide plan for next week.

0.3 RFIs MVG Open

01/21/15 to 02/25/15, see previous minutes.

03/04/15 FBI provided updated RFI Log: RFI’s #42, 58A, 64, 68, 74, 77 and

82 are HOT. RFI #36 has been open for 26 days without a response. RFI

#60 requires a sketch/CAD File.

0.4 Submittals MVG Open

01/21/15 to 02/25/15, see previous minutes.

03/04/15 FBI provided updated Submittal Log: Mtl. Framing, Food Service

Roughing and Elevator submittals to be expedited. HVAC submittals for

Pumps, Fire Dampers, Sound Attenuators and Fan Coil Units are HOT.

MVG to expedite re-submittals of Concrete Rebar and Retaining Wall.

0.5 MA-CHPS Status MVG Open

01/21/15 to 02/25/15, see previous minutes

03/04/15 MVG to issue minutes from MACHPS Workshop II meeting held

on 2/4/15.

0.6 CORI Status FBI/District Open

01/21/15 to 02/25/15, see previous minutes.

03/04/15 No issues.

0.7 Changes / PCO Log FBI/MVG Open

01/21/15 to 02/25/15, see previous minutes.

03/04/15 MVG to provide Proposal Request for PCO #4.

0.10 Trailer Installation FBI Open

01/21/15 to 02/25/15, see previous minutes.

03/04/15 Estimated trailer installation scheduled for mid-April.

0.14 Pre-Blast Survey – Phase I “The Knob” FBI CLOSED

01/21/15 to 02/25/15, see previous minutes.

03/04/15 FBI indicated that due to exploration and findings at the “knob”,

propose to proceed with removal of the overburden to such a point as the

rock is not removable at which point cross sections will be taken to

determine Top of Rock to quantify for Unit Pricing.

1.5 Submittal Schedule MVG CLOSED

01/21/15 to 02/25/15, see previous minutes.

03/04/15 FBI submitted

Page 3: ARRSD: New Athol Elementary School · Sewer/Water Utilities; pending weather: Strip in prep for blasting and temp fencing. Concrete to start April 1 st. Need to investigate landing

Project: ARRSD: New Athol Elementary School

Meeting Date: 03/4/2015

Meeting No.: 5

2.1 Project Sign MVG CLOSED

02/04/15 to 2/25/15, see previous minutes.

03/04/15 School Building Committee approved sign with edits. MVG

presented updated sign. Committee Members present approved, MVG to

send JPEG to FBI.

2.2 Sewer Video MVG/DPW Open

02/04/15 to 2/25/15, see previous minutes.

03/04/15 Mary Jane recommended that SMMA request that Building

Committee approved expenditure up to $20,000 for existing sewer repairs.

MVG to issue CCD. MVG indicated that a total of 217’linear feet of existing

sanitary sewer line at (3) locations between SMH 7 thru SMH 10 needs to

be replaced. DPW agreed to perform repairs of 175’ linear feet between

SMH 12 and SMH 13 outside of project cost.

3.4 N-Grid Service Order and Engineering FBI Open

02/11/15 to 02/25/15, see previous minutes.

03/04/15 Engineering of duct bank underway, FBI to confirm timing.

3.5 Verizon Service Order, Engineering & Easement ARRSD Open

02/11/15 to 02/25/15, see previous minutes.

03/04/15 Mary Jane has heard back from Verizon. Service order should be

received shortly.

3.6 N-Grid Easement ARRSD Open

02/11/15 to 02/25/15, see previous minutes.

03/04/15 Bob Rouleau to pick-up signed agreement from Athol Board of

Selectmen after this meeting.

3.7 Pre-Blast Survey – Phase II – Main Area

02/11/15 to 02/25/15, see previous minutes.

03/04/15 FBI to submit a schedule for the pre-Blast Survey.

FBI Open

4.1 Forest Mat Removal Measurement and Payment MVG Open

02/18/15 to 02/25/15, see previous minutes.

03/04/15 MVG provided letter from Marshall/Gary agreeing that 50,000 CY

is fair. Virgilio is offering to keep the 50,000 CY if no additional surveys are

required. This will result in a wash. ARRSD agree to move forward. MVG

to confirm that this is inclusive of Roadway Change.

4.2 Ledge Removal Measurement and Payment FBI Open

02/11/15 to 02/25/15, see previous minutes.

03/04/15 FBI to submit in writing that Virgilio has no issues with Scope of

Work presented to be done on Unit Price Basis. Virgilio believes that

Page 4: ARRSD: New Athol Elementary School · Sewer/Water Utilities; pending weather: Strip in prep for blasting and temp fencing. Concrete to start April 1 st. Need to investigate landing

Project: ARRSD: New Athol Elementary School

Meeting Date: 03/4/2015

Meeting No.: 5

stripping is the way to go. Drilling will show rock location again. Need to

open up then survey.

4.3 CPM Construction Schedule

02/11/15 to 02/25/15, see previous minutes.

03/04/15 FBI has received final comments. Will have schedule for next

week.

FBI Open

4.4 Interior Material Colors

02/11/15 to 02/25/15, see previous minutes.

03/04/15 ARRSD requested that standard colors be used.

FBI CLOSED

5.1 April School Vacation

02/25/15, see previous minutes

03/04/15 School Committee to provide alternate dates.

ARRSD Open

5.2 Street Address

02/25/15 The District will follow up with the Town on assigning a street

address for the new school.

03/04/15 Bob Rouleau to meet with Town Clerk today.

ARRSD Open

NEW BUSINESS

Item # DISCUSSION BIC STATUS

N/A

Next Meeting

The next meeting will be on March 11, 2015 in the Teacher Dining Room. Record

The information herein reflects the understanding reached. Please contact the author if you have any questions or are not in agreement with these

Project Minutes.

Enclosures: Sign-In sheet, FBI Weekly Report, RFIs Log, Submittals Log, PCO Log.

//P:\2012\12063\11_18-CA\14-Correspondence\14.4 Construction Meeting Minutes\6_March 4, 2015 - Meeting 6\Constructionprogressmeeting_No.6_04March2015.Doc

Page 5: ARRSD: New Athol Elementary School · Sewer/Water Utilities; pending weather: Strip in prep for blasting and temp fencing. Concrete to start April 1 st. Need to investigate landing
Page 6: ARRSD: New Athol Elementary School · Sewer/Water Utilities; pending weather: Strip in prep for blasting and temp fencing. Concrete to start April 1 st. Need to investigate landing

WEEKLY / MONTHLY

PROGRESS REPORT Project: Athol Elementary School Owner: Athol - Royalston Regional School District Contractor: Fontaine Bros., Inc.

1 Report Date: March 4, 2015 A/E Project Number: 02012.11

Contract Completion Date/Time: June 14, 2016 Date Construction Started: December 15, 2014 ( Contract Signed) Revised Completion Date: Percent of Time Used: 14 % Is Project on Schedule: Yes

Approved Time Extensions (Days): 0 Contract Completion Date/Days: June 14, 2016 / 547 Percent of Project Completion: Days Elapsed: 79 If not, why?

Summary of Construction Activities Since Last Report: Stumping in progress Next 2 Weeks Finish Stumping / Cleanup Sewer / Water Utilities Pending WEATHER : Strip in prep for blasting Temp Fencing – weather permitting Drill Rock Probes / Test Pits??

Attachments Signed by: James Mauer Date: March 4, 2015 Copies: Owner A/E Contractor Consultants

© Copyright 2010, Construction Specifications Institute, 110 South Union St., Suite 100 Alexandria, VA 22314

Page __1_ of _1__ Form Version: November 2010

This is not an official CSI Construction Contract Administration (CCA) Form. Please use CSI's official CCA Forms if required by your project needs.

Page 7: ARRSD: New Athol Elementary School · Sewer/Water Utilities; pending weather: Strip in prep for blasting and temp fencing. Concrete to start April 1 st. Need to investigate landing

Fontaine Bros. Inc..

Report By: Jim Mauer

Date from

Sub

Date from

GCReview by

Cons

Review by

Arch

Return to

Sub Category B-I-CDescriptionItem#

New Athol Elementary School

RFI

Report Type: Open Items

Project:

Log: Days Open Calculated by: Business Days held by current reviewer

Total Items: 12

Date: 3/3/2015

Days

Open

03/02/2015080 Exposed Column A122.1 Cons 1Architectural

01/15/2015 01/26/2015036 SIDEWALK LAYOUT Cons 26Civil

01/30/2015 02/02/2015 03/03/2015042 DRAIN AND UTIL CONFLICTS & CONSTR

CONCERNS (AJV 11)

Arch 21Civil

02/24/2015077 Added Cover at Extg Sewer Line Cons 5Civil

02/17/2015 02/17/2015064 GRADE AND DRAIN DESIGN AT 30" STORM

OUTFALL (AJV 18 )

Cons 10Civil,Landscaping

02/23/2015 02/23/2015073 AREA DRAIN AT COURTYARD (AJV 20 ) Cons 6Civil,Landscaping

02/23/2015 03/03/2015081 STREET LIGHT LAYOUT REVIEW/ISSUES (AJV

22)

Cons 0Civil,Landscaping

02/23/2015 02/23/2015074 SIDEWALK/GRADING AT STREET

INTERSECTION NORTH OF EXISTING

NORTHERLY PARKING LOT (AJV 21)

Cons 6Landscaping

02/24/2015076 Alt 2 Planting Plan Cons 5Landscaping

02/17/2015 02/17/2015 02/27/2015068 Fire Protection - Dry SW in A147 & B152 (COS

11 )

Arch 10Mechanical

03/03/2015 03/03/2015058A Hanger Sysrem (NOR #39 rev #1) Cons 0Structural

03/03/2015 03/03/2015082 Slab Support (NOR 43) Cons 0Structural

Page 1 of 1www.submittalexchange.com

jim
Highlight
jim
Highlight
jim
Highlight
jim
Highlight
jim
Highlight
jim
Highlight
jim
Highlight
jim
Highlight
Page 8: ARRSD: New Athol Elementary School · Sewer/Water Utilities; pending weather: Strip in prep for blasting and temp fencing. Concrete to start April 1 st. Need to investigate landing

Fontaine Bros. Inc..

Report By: Jim Mauer

Date from

Sub

Date from

GC

Review by

Cons

Review by

Arch

Return to

SubSection Action B-I-CDescriptionItem#

New Athol Elementary School

Submittal

Report Type: Open Items

Project:

Log: Days Open Calculated by: Business Days since date created by GC

Total Items: 67

Date: 3/3/2015

Days

OpenSupplier or

Manufacturer

02/14/2015013300-001-

0

Submittal Schedule 02-14- Arch 12013300 Submittal

Procedures

03/03/2015033113-001-

1

Resub Conc Rebar R1 - R15 Cons 0033113 Concrete

Reinforcing

03/03/2015033113-002-

0

Conc Rebar- SOD - R-16 Cons 0033113 Concrete

Reinforcing

02/24/2015 02/26/2015042000-006-

2

2nd Sub - Cast Stone Shop ArchAAN 5042000 Unit

Masonry

02/27/2015 02/27/2015042000-009-

2

Resub of Samples - Cast S ArchAAN 2042000 Unit

Masonry

02/17/2015 02/26/2015042000-011-

1

Resub Sample - Mortar Co ArchAAN 10042000 Unit

Masonry

02/27/2015 02/27/2015042000-012-

1

ADDITIONAL Ground Face Sa ArchAAN 2042000 Unit

Masonry

02/19/2015 02/23/2015 02/26/2015055000-001-

0

Lintels ArchAAN 6055000 Metal

Fabrications

Avid Ironworks

02/19/2015 03/03/2015055000-002-

0

OH Door Jambs Cons 0055000 Metal

Fabrications

Avid Ironworks

02/19/2015 03/03/2015055100-004-

0

Roof Access Stair Cons 0055100 Metal Stairs Avid Ironworks

02/05/2015 02/23/2015 02/26/2015055213-001-

0

Roof Railings - Shop Dwgs ArchAAN 6055213 Pipe & Tube

Railings

Avid Ironworks

03/03/2015 03/03/2015072500-001-

0

Underslab and Found Wtrprfg Data w MA

CHPS

Arch 0072500 Weather

Barriers

01/16/2015 02/17/2015076200-001-

0

Roof Sheet Flashing & Trim Arch 10076200 Sheet Metal

Flashing & Trim

As specified

02/18/2015 02/24/2015092216-001-

0

Mtl Framing - Engineered Shops Arch 5092216

Non-Structural

Metal Framing &

Gypsum Board

Colmac

Page 1 of 5www.submittalexchange.com

jim
Highlight
jim
Highlight
Page 9: ARRSD: New Athol Elementary School · Sewer/Water Utilities; pending weather: Strip in prep for blasting and temp fencing. Concrete to start April 1 st. Need to investigate landing

Date from

Sub

Date from

GC

Review by

Cons

Review by

Arch

Return to

SubSection Action B-I-CDescriptionItem#

New Athol Elementary School

Submittal

Report Type: Open Items

Project:

Log: Days Open Calculated by: Business Days since date created by GC

Total Items: 67

Date: 3/3/2015

Days

OpenSupplier or

Manufacturer

02/24/2015092216-002-

0

Metal Framing- Calculations Cons 5092216

Non-Structural

Metal Framing &

Gypsum Board

03/03/2015095113-001-

0

Acoustic Ceiling Data W MA CHPS Arch 0095113 Acoustical

Panel Ceilings

03/03/2015096400-001-

0

Wd Floor Product Data w MA CHPS Arch 0096400 Wood

Flooring

03/03/2015096400-002-

0

Samples- Wood Floor / Base Arch 0096400 Wood

Flooring

03/03/2015096400-003-

0

Colors- Wood Floor Lines Arch 0096400 Wood

Flooring

03/03/2015102226-001-

0

Operable Part - Shops / Data Arch 0102226 Operable

Partitions

03/03/2015102226-002-

0

Colors- Operable Partitions Arch 0102226 Operable

Partitions

02/24/2015105113-001-

0

Metal Locker Submittals - Arch 5105113 Metal

Lockers

02/24/2015105113-002-

0

Locker COLORS Arch 5105113 Metal

Lockers

02/24/2015114000-001-

0

Food Service Roughing Shops Cons 5114000 Food

Service Equipment

02/24/2015114000-002-

0

Food Service Product Data Cons 5114000 Food

Service Equipment

02/24/2015114000-003-

0

Kitchen Hood Shops Cons 5114000 Food

Service Equipment

02/24/2015114000-004-

0

Walk In Cooler / Freezer Cons 5114000 Food

Service Equipment

03/03/2015142400-001-

0

Elevator Shops Arch 0142400 Hydraulic

Elevators

03/03/2015142400-002-

0

STAMPED Elev Dwg For Permit Arch 0142400 Hydraulic

Elevators

03/03/2015142400-003-

0

Elect Confirm- Elev Arch 0142400 Hydraulic

Elevators

Page 2 of 5www.submittalexchange.com

jim
Highlight
jim
Highlight
jim
Highlight
jim
Highlight
Page 10: ARRSD: New Athol Elementary School · Sewer/Water Utilities; pending weather: Strip in prep for blasting and temp fencing. Concrete to start April 1 st. Need to investigate landing

Date from

Sub

Date from

GC

Review by

Cons

Review by

Arch

Return to

SubSection Action B-I-CDescriptionItem#

New Athol Elementary School

Submittal

Report Type: Open Items

Project:

Log: Days Open Calculated by: Business Days since date created by GC

Total Items: 67

Date: 3/3/2015

Days

OpenSupplier or

Manufacturer

01/02/2015 01/28/2015230000-001-

0

Hot Water Specialties 2.19 Cons 24230000 Heating,

Ventilating, Air

Conditioning

01/02/2015 01/28/2015230000-002-

0

HVAC Pumps P 1 thru P 7 Cons 24230000 Heating,

Ventilating, Air

Conditioning

01/13/2015 02/13/2015230000-004-

0

Displacement Diffusers Cons 12230000 Heating,

Ventilating, Air

Conditioning

01/13/2015 01/28/2015230000-006-

0

Fire Dampers 2.01P Cons 24230000 Heating,

Ventilating, Air

Conditioning

01/13/2015 02/13/2015230000-008-

0

Registers, Grilles and Diffusers Cons 12230000 Heating,

Ventilating, Air

Conditioning

01/13/2015 01/28/2015230000-009-

0

Duct Sound Attenuators H3.2 Cons 24230000 Heating,

Ventilating, Air

Conditioning

01/20/2015 01/28/2015230000-016-

0

Fan Coil Units H3.1 w Sub Request Cons 24230000 Heating,

Ventilating, Air

Conditioning

01/26/2015 02/13/2015230000-020-

0

Cabinet Unit Heaters Cons 12230000 Heating,

Ventilating, Air

Conditioning

01/26/2015 02/13/2015230000-021-

0

Electric Unit Heater w / Sub Req Cons 12230000 Heating,

Ventilating, Air

Conditioning

01/26/2015 02/13/2015230000-022-

0

Finned Tube Radiation A, B & C Cons 12230000 Heating,

Ventilating, Air

Conditioning

01/26/2015 02/13/2015230000-023-

0

Unit Heaters Cons 12230000 Heating,

Ventilating, Air

Conditioning

01/27/2015 03/03/2015230000-024-

0

Pipe & Fittings Cons 0230000 Heating,

Ventilating, Air

Conditioning

Page 3 of 5www.submittalexchange.com

jim
Highlight
jim
Highlight
jim
Highlight
jim
Highlight
jim
Highlight
jim
Highlight
jim
Highlight
Page 11: ARRSD: New Athol Elementary School · Sewer/Water Utilities; pending weather: Strip in prep for blasting and temp fencing. Concrete to start April 1 st. Need to investigate landing

Date from

Sub

Date from

GC

Review by

Cons

Review by

Arch

Return to

SubSection Action B-I-CDescriptionItem#

New Athol Elementary School

Submittal

Report Type: Open Items

Project:

Log: Days Open Calculated by: Business Days since date created by GC

Total Items: 67

Date: 3/3/2015

Days

OpenSupplier or

Manufacturer

01/27/2015 03/03/2015230000-025-

0

Hangers Cons 0230000 Heating,

Ventilating, Air

Conditioning

02/10/2015 03/03/2015230000-026-

0

Valves Cons 0230000 Heating,

Ventilating, Air

Conditioning

02/10/2015 03/03/2015230000-027-

0

Thermometers Cons 0230000 Heating,

Ventilating, Air

Conditioning

02/10/2015 03/03/2015230000-028-

0

Pressure Gauges Cons 0230000 Heating,

Ventilating, Air

Conditioning

02/10/2015 03/03/2015230000-029-

0

Unions Cons 0230000 Heating,

Ventilating, Air

Conditioning

02/10/2015 03/03/2015230000-030-

0

Strainers Cons 0230000 Heating,

Ventilating, Air

Conditioning

02/10/2015 03/03/2015230000-031-

0

Make Up Water Valve Cons 0230000 Heating,

Ventilating, Air

Conditioning

02/12/2015 03/03/2015230000-032-

0

HVAC Insulation Cons 0230000 Heating,

Ventilating, Air

Conditioning

03/03/2015 03/03/2015260001-005-

1

Resub 2.08 - Wiring Devices Cons 0260001 Electrical

01/29/2015 03/03/2015260001-007-

0

Firestopping and MISC Elec Mats & MA

CHPS

Cons 0260001 Electrical

01/29/2015 03/03/2015260001-008-

0

Hangers and Supports Cons 0260001 Electrical

02/05/2015 02/26/2015260001-009-

0

Handholes Revision 1 Cons 3260001 Electrical

02/12/2015 02/13/2015260001-011-

0

2.26 - Lighting Fixtures- Except Stage Cons 12260001 Electrical

02/17/2015 02/24/2015260001-012-

0

2.24 & 2.25 - Generator and ATS Cons 5260001 Electrical

Page 4 of 5www.submittalexchange.com

jim
Highlight
jim
Highlight
Page 12: ARRSD: New Athol Elementary School · Sewer/Water Utilities; pending weather: Strip in prep for blasting and temp fencing. Concrete to start April 1 st. Need to investigate landing

Date from

Sub

Date from

GC

Review by

Cons

Review by

Arch

Return to

SubSection Action B-I-CDescriptionItem#

New Athol Elementary School

Submittal

Report Type: Open Items

Project:

Log: Days Open Calculated by: Business Days since date created by GC

Total Items: 67

Date: 3/3/2015

Days

OpenSupplier or

Manufacturer

02/23/2015 03/03/2015260001-013-

0

2.23 - Uninterruptable Power Supplies Cons 0260001 Electrical

02/25/2015 03/03/2015260001-014-

0

2.22 - Variable Frequency Drives Cons 0260001 Electrical

02/25/2015 03/03/2015260001-015-

0

2.19 -2.20 - 2.14 Disconnect Switches and

- Cartridge Fuses Overcurrent Encl

Cons 0260001 Electrical

02/25/2015 03/03/2015260001-016-

0

2.17 - Lighting Control Panelboards Cons 0260001 Electrical

02/25/2015 03/03/2015260001-017-

0

2.21 - Motor Controls Cons 0260001 Electrical

02/25/2015 03/03/2015260001-018-

0

2.16 -2.18 Panelboards and - Molded Case

Circuit Breakers

Cons 0260001 Electrical

02/25/2015 02/26/2015260001-019-

0

2.11 - Switchboard 2.12 Surge 2.18 Mold

Case Cir Breakers

Cons 3260001 Electrical

02/25/2015 03/03/2015260001-020-

0

2.15 - Dry Type Three Phase Transformers Cons 0260001 Electrical

02/05/2015312000-001-

0

Blasters proof of Insurance Cons 18312000 Earth

Moving

02/25/2015312000-002-

0

Pre Blast Inspection Certification- Middle

School

Cons 4312000 Earth

Moving

02/25/2015321210-001-

1

Resub- Retaining Wall Cons 4321210 Site

Improvements

Page 5 of 5www.submittalexchange.com

jim
Highlight
jim
Highlight
Page 13: ARRSD: New Athol Elementary School · Sewer/Water Utilities; pending weather: Strip in prep for blasting and temp fencing. Concrete to start April 1 st. Need to investigate landing

ATHOL ELEMENTARY SCHOOL

Prepared by Fontaine Brothers Inc. 3/4/2015 Page 1

01/17/15 1 Utility Company Backcharges P01/29/15 RFI 34A 2 RCP Revisions at B204A P Note to subs- Extras / Credits ???02/11/15 3 Existing Sewer Video Report- Repairs / Replace ?? P 2/11 - In review by Athol DPW03/03/15 RFI 41 4 Add CB and Pipe SKCE-09 & 010 P

Initiation Date Approved AmountRequest, RFI, or ASI NotesDate

SubmittedPCO # Status - Approved Rejected

CO No.DESCRIPTION Amount

Page 14: ARRSD: New Athol Elementary School · Sewer/Water Utilities; pending weather: Strip in prep for blasting and temp fencing. Concrete to start April 1 st. Need to investigate landing