PROJECT MANAGEMENT
CONSTRUCTION PROGRESS MEETING
Project: ARRSD: New Athol Elementary School Project No.: 12063
Prepared by: Tony Dias Meeting Date: 3/4/2015 8:00 AM
Re: Construction Progress Meeting Meeting No: 6
Teacher’s Dining Room
Distribution: Attendees, School Building Committee (MF)
Present Name Association
� Mary Jane Handy Athol-Royalston Regional School District ARRSD
� Bob Rouleau Athol-Royalston Regional School District ARRSD
� Karen McNiff Athol-Royalston Regional School District ARRSD
Ken Vaidulas School Building Committee SBC
� Bob Muzzy School Building Committee SBC
� David Owen Mount Vernon Group MVG
� Chris LeBlanc Mount Vernon Group MVG
� Rafal Toczko Mount Vernon Group MVG
� Jim Mauer Fontaine Bros. FBI
� Tony Kozlik Fontaine Bros. FBI
Rich Eardensohn A.J. Virgilio AJV
Darrin Upham A.J. Virgilio AJV
� Tony Dias Symmes Maini & McKee Associates, Inc. SMMA
� Joel Seeley Symmes Maini & McKee Associates, Inc. SMMA
Doug Walsh Town of Athol Department of Public Works DPW
Andy Tessier Town of Athol Department of Public Works DPW
OLD BUSINESS
Item # Discussion BIC Status
0.1 Owner Topics ARRSD/FBI Open
01/21/15 Next school year calendar will be available within the next couple
of months.
02/04/15 to 2/25/15, see previous minutes.
03/04/15 W-9 form was received. FBI to coordinate Blasting during MCAS.
Mary Jane submitted testing schedule for Pleasant Street Elementary
School and Athol Regional Middle School. Approx. dates are first 2-weeks
in April & middle 2-weeks in May.
0.2 Schedule Update FBI Open
01/21/15 to 02/25/15, see previous minutes.
03/04/15 FBI provided 2 Week look ahead. Finish Stumping, cleanup
![Page 2: ARRSD: New Athol Elementary School · Sewer/Water Utilities; pending weather: Strip in prep for blasting and temp fencing. Concrete to start April 1 st. Need to investigate landing](https://reader033.vdocuments.us/reader033/viewer/2022050400/5f7e153f234fe3679a74f25b/html5/thumbnails/2.jpg)
Project: ARRSD: New Athol Elementary School
Meeting Date: 03/4/2015
Meeting No.: 5
Sewer/Water Utilities; pending weather: Strip in prep for blasting and temp
fencing. Concrete to start April 1st. Need to investigate landing pad,
provide plan for next week.
0.3 RFIs MVG Open
01/21/15 to 02/25/15, see previous minutes.
03/04/15 FBI provided updated RFI Log: RFI’s #42, 58A, 64, 68, 74, 77 and
82 are HOT. RFI #36 has been open for 26 days without a response. RFI
#60 requires a sketch/CAD File.
0.4 Submittals MVG Open
01/21/15 to 02/25/15, see previous minutes.
03/04/15 FBI provided updated Submittal Log: Mtl. Framing, Food Service
Roughing and Elevator submittals to be expedited. HVAC submittals for
Pumps, Fire Dampers, Sound Attenuators and Fan Coil Units are HOT.
MVG to expedite re-submittals of Concrete Rebar and Retaining Wall.
0.5 MA-CHPS Status MVG Open
01/21/15 to 02/25/15, see previous minutes
03/04/15 MVG to issue minutes from MACHPS Workshop II meeting held
on 2/4/15.
0.6 CORI Status FBI/District Open
01/21/15 to 02/25/15, see previous minutes.
03/04/15 No issues.
0.7 Changes / PCO Log FBI/MVG Open
01/21/15 to 02/25/15, see previous minutes.
03/04/15 MVG to provide Proposal Request for PCO #4.
0.10 Trailer Installation FBI Open
01/21/15 to 02/25/15, see previous minutes.
03/04/15 Estimated trailer installation scheduled for mid-April.
0.14 Pre-Blast Survey – Phase I “The Knob” FBI CLOSED
01/21/15 to 02/25/15, see previous minutes.
03/04/15 FBI indicated that due to exploration and findings at the “knob”,
propose to proceed with removal of the overburden to such a point as the
rock is not removable at which point cross sections will be taken to
determine Top of Rock to quantify for Unit Pricing.
1.5 Submittal Schedule MVG CLOSED
01/21/15 to 02/25/15, see previous minutes.
03/04/15 FBI submitted
![Page 3: ARRSD: New Athol Elementary School · Sewer/Water Utilities; pending weather: Strip in prep for blasting and temp fencing. Concrete to start April 1 st. Need to investigate landing](https://reader033.vdocuments.us/reader033/viewer/2022050400/5f7e153f234fe3679a74f25b/html5/thumbnails/3.jpg)
Project: ARRSD: New Athol Elementary School
Meeting Date: 03/4/2015
Meeting No.: 5
2.1 Project Sign MVG CLOSED
02/04/15 to 2/25/15, see previous minutes.
03/04/15 School Building Committee approved sign with edits. MVG
presented updated sign. Committee Members present approved, MVG to
send JPEG to FBI.
2.2 Sewer Video MVG/DPW Open
02/04/15 to 2/25/15, see previous minutes.
03/04/15 Mary Jane recommended that SMMA request that Building
Committee approved expenditure up to $20,000 for existing sewer repairs.
MVG to issue CCD. MVG indicated that a total of 217’linear feet of existing
sanitary sewer line at (3) locations between SMH 7 thru SMH 10 needs to
be replaced. DPW agreed to perform repairs of 175’ linear feet between
SMH 12 and SMH 13 outside of project cost.
3.4 N-Grid Service Order and Engineering FBI Open
02/11/15 to 02/25/15, see previous minutes.
03/04/15 Engineering of duct bank underway, FBI to confirm timing.
3.5 Verizon Service Order, Engineering & Easement ARRSD Open
02/11/15 to 02/25/15, see previous minutes.
03/04/15 Mary Jane has heard back from Verizon. Service order should be
received shortly.
3.6 N-Grid Easement ARRSD Open
02/11/15 to 02/25/15, see previous minutes.
03/04/15 Bob Rouleau to pick-up signed agreement from Athol Board of
Selectmen after this meeting.
3.7 Pre-Blast Survey – Phase II – Main Area
02/11/15 to 02/25/15, see previous minutes.
03/04/15 FBI to submit a schedule for the pre-Blast Survey.
FBI Open
4.1 Forest Mat Removal Measurement and Payment MVG Open
02/18/15 to 02/25/15, see previous minutes.
03/04/15 MVG provided letter from Marshall/Gary agreeing that 50,000 CY
is fair. Virgilio is offering to keep the 50,000 CY if no additional surveys are
required. This will result in a wash. ARRSD agree to move forward. MVG
to confirm that this is inclusive of Roadway Change.
4.2 Ledge Removal Measurement and Payment FBI Open
02/11/15 to 02/25/15, see previous minutes.
03/04/15 FBI to submit in writing that Virgilio has no issues with Scope of
Work presented to be done on Unit Price Basis. Virgilio believes that
![Page 4: ARRSD: New Athol Elementary School · Sewer/Water Utilities; pending weather: Strip in prep for blasting and temp fencing. Concrete to start April 1 st. Need to investigate landing](https://reader033.vdocuments.us/reader033/viewer/2022050400/5f7e153f234fe3679a74f25b/html5/thumbnails/4.jpg)
Project: ARRSD: New Athol Elementary School
Meeting Date: 03/4/2015
Meeting No.: 5
stripping is the way to go. Drilling will show rock location again. Need to
open up then survey.
4.3 CPM Construction Schedule
02/11/15 to 02/25/15, see previous minutes.
03/04/15 FBI has received final comments. Will have schedule for next
week.
FBI Open
4.4 Interior Material Colors
02/11/15 to 02/25/15, see previous minutes.
03/04/15 ARRSD requested that standard colors be used.
FBI CLOSED
5.1 April School Vacation
02/25/15, see previous minutes
03/04/15 School Committee to provide alternate dates.
ARRSD Open
5.2 Street Address
02/25/15 The District will follow up with the Town on assigning a street
address for the new school.
03/04/15 Bob Rouleau to meet with Town Clerk today.
ARRSD Open
NEW BUSINESS
Item # DISCUSSION BIC STATUS
N/A
Next Meeting
The next meeting will be on March 11, 2015 in the Teacher Dining Room. Record
The information herein reflects the understanding reached. Please contact the author if you have any questions or are not in agreement with these
Project Minutes.
Enclosures: Sign-In sheet, FBI Weekly Report, RFIs Log, Submittals Log, PCO Log.
//P:\2012\12063\11_18-CA\14-Correspondence\14.4 Construction Meeting Minutes\6_March 4, 2015 - Meeting 6\Constructionprogressmeeting_No.6_04March2015.Doc
![Page 5: ARRSD: New Athol Elementary School · Sewer/Water Utilities; pending weather: Strip in prep for blasting and temp fencing. Concrete to start April 1 st. Need to investigate landing](https://reader033.vdocuments.us/reader033/viewer/2022050400/5f7e153f234fe3679a74f25b/html5/thumbnails/5.jpg)
![Page 6: ARRSD: New Athol Elementary School · Sewer/Water Utilities; pending weather: Strip in prep for blasting and temp fencing. Concrete to start April 1 st. Need to investigate landing](https://reader033.vdocuments.us/reader033/viewer/2022050400/5f7e153f234fe3679a74f25b/html5/thumbnails/6.jpg)
WEEKLY / MONTHLY
PROGRESS REPORT Project: Athol Elementary School Owner: Athol - Royalston Regional School District Contractor: Fontaine Bros., Inc.
1 Report Date: March 4, 2015 A/E Project Number: 02012.11
Contract Completion Date/Time: June 14, 2016 Date Construction Started: December 15, 2014 ( Contract Signed) Revised Completion Date: Percent of Time Used: 14 % Is Project on Schedule: Yes
Approved Time Extensions (Days): 0 Contract Completion Date/Days: June 14, 2016 / 547 Percent of Project Completion: Days Elapsed: 79 If not, why?
Summary of Construction Activities Since Last Report: Stumping in progress Next 2 Weeks Finish Stumping / Cleanup Sewer / Water Utilities Pending WEATHER : Strip in prep for blasting Temp Fencing – weather permitting Drill Rock Probes / Test Pits??
Attachments Signed by: James Mauer Date: March 4, 2015 Copies: Owner A/E Contractor Consultants
© Copyright 2010, Construction Specifications Institute, 110 South Union St., Suite 100 Alexandria, VA 22314
Page __1_ of _1__ Form Version: November 2010
This is not an official CSI Construction Contract Administration (CCA) Form. Please use CSI's official CCA Forms if required by your project needs.
![Page 7: ARRSD: New Athol Elementary School · Sewer/Water Utilities; pending weather: Strip in prep for blasting and temp fencing. Concrete to start April 1 st. Need to investigate landing](https://reader033.vdocuments.us/reader033/viewer/2022050400/5f7e153f234fe3679a74f25b/html5/thumbnails/7.jpg)
Fontaine Bros. Inc..
Report By: Jim Mauer
Date from
Sub
Date from
GCReview by
Cons
Review by
Arch
Return to
Sub Category B-I-CDescriptionItem#
New Athol Elementary School
RFI
Report Type: Open Items
Project:
Log: Days Open Calculated by: Business Days held by current reviewer
Total Items: 12
Date: 3/3/2015
Days
Open
03/02/2015080 Exposed Column A122.1 Cons 1Architectural
01/15/2015 01/26/2015036 SIDEWALK LAYOUT Cons 26Civil
01/30/2015 02/02/2015 03/03/2015042 DRAIN AND UTIL CONFLICTS & CONSTR
CONCERNS (AJV 11)
Arch 21Civil
02/24/2015077 Added Cover at Extg Sewer Line Cons 5Civil
02/17/2015 02/17/2015064 GRADE AND DRAIN DESIGN AT 30" STORM
OUTFALL (AJV 18 )
Cons 10Civil,Landscaping
02/23/2015 02/23/2015073 AREA DRAIN AT COURTYARD (AJV 20 ) Cons 6Civil,Landscaping
02/23/2015 03/03/2015081 STREET LIGHT LAYOUT REVIEW/ISSUES (AJV
22)
Cons 0Civil,Landscaping
02/23/2015 02/23/2015074 SIDEWALK/GRADING AT STREET
INTERSECTION NORTH OF EXISTING
NORTHERLY PARKING LOT (AJV 21)
Cons 6Landscaping
02/24/2015076 Alt 2 Planting Plan Cons 5Landscaping
02/17/2015 02/17/2015 02/27/2015068 Fire Protection - Dry SW in A147 & B152 (COS
11 )
Arch 10Mechanical
03/03/2015 03/03/2015058A Hanger Sysrem (NOR #39 rev #1) Cons 0Structural
03/03/2015 03/03/2015082 Slab Support (NOR 43) Cons 0Structural
Page 1 of 1www.submittalexchange.com
![Page 8: ARRSD: New Athol Elementary School · Sewer/Water Utilities; pending weather: Strip in prep for blasting and temp fencing. Concrete to start April 1 st. Need to investigate landing](https://reader033.vdocuments.us/reader033/viewer/2022050400/5f7e153f234fe3679a74f25b/html5/thumbnails/8.jpg)
Fontaine Bros. Inc..
Report By: Jim Mauer
Date from
Sub
Date from
GC
Review by
Cons
Review by
Arch
Return to
SubSection Action B-I-CDescriptionItem#
New Athol Elementary School
Submittal
Report Type: Open Items
Project:
Log: Days Open Calculated by: Business Days since date created by GC
Total Items: 67
Date: 3/3/2015
Days
OpenSupplier or
Manufacturer
02/14/2015013300-001-
0
Submittal Schedule 02-14- Arch 12013300 Submittal
Procedures
03/03/2015033113-001-
1
Resub Conc Rebar R1 - R15 Cons 0033113 Concrete
Reinforcing
03/03/2015033113-002-
0
Conc Rebar- SOD - R-16 Cons 0033113 Concrete
Reinforcing
02/24/2015 02/26/2015042000-006-
2
2nd Sub - Cast Stone Shop ArchAAN 5042000 Unit
Masonry
02/27/2015 02/27/2015042000-009-
2
Resub of Samples - Cast S ArchAAN 2042000 Unit
Masonry
02/17/2015 02/26/2015042000-011-
1
Resub Sample - Mortar Co ArchAAN 10042000 Unit
Masonry
02/27/2015 02/27/2015042000-012-
1
ADDITIONAL Ground Face Sa ArchAAN 2042000 Unit
Masonry
02/19/2015 02/23/2015 02/26/2015055000-001-
0
Lintels ArchAAN 6055000 Metal
Fabrications
Avid Ironworks
02/19/2015 03/03/2015055000-002-
0
OH Door Jambs Cons 0055000 Metal
Fabrications
Avid Ironworks
02/19/2015 03/03/2015055100-004-
0
Roof Access Stair Cons 0055100 Metal Stairs Avid Ironworks
02/05/2015 02/23/2015 02/26/2015055213-001-
0
Roof Railings - Shop Dwgs ArchAAN 6055213 Pipe & Tube
Railings
Avid Ironworks
03/03/2015 03/03/2015072500-001-
0
Underslab and Found Wtrprfg Data w MA
CHPS
Arch 0072500 Weather
Barriers
01/16/2015 02/17/2015076200-001-
0
Roof Sheet Flashing & Trim Arch 10076200 Sheet Metal
Flashing & Trim
As specified
02/18/2015 02/24/2015092216-001-
0
Mtl Framing - Engineered Shops Arch 5092216
Non-Structural
Metal Framing &
Gypsum Board
Colmac
Page 1 of 5www.submittalexchange.com
![Page 9: ARRSD: New Athol Elementary School · Sewer/Water Utilities; pending weather: Strip in prep for blasting and temp fencing. Concrete to start April 1 st. Need to investigate landing](https://reader033.vdocuments.us/reader033/viewer/2022050400/5f7e153f234fe3679a74f25b/html5/thumbnails/9.jpg)
Date from
Sub
Date from
GC
Review by
Cons
Review by
Arch
Return to
SubSection Action B-I-CDescriptionItem#
New Athol Elementary School
Submittal
Report Type: Open Items
Project:
Log: Days Open Calculated by: Business Days since date created by GC
Total Items: 67
Date: 3/3/2015
Days
OpenSupplier or
Manufacturer
02/24/2015092216-002-
0
Metal Framing- Calculations Cons 5092216
Non-Structural
Metal Framing &
Gypsum Board
03/03/2015095113-001-
0
Acoustic Ceiling Data W MA CHPS Arch 0095113 Acoustical
Panel Ceilings
03/03/2015096400-001-
0
Wd Floor Product Data w MA CHPS Arch 0096400 Wood
Flooring
03/03/2015096400-002-
0
Samples- Wood Floor / Base Arch 0096400 Wood
Flooring
03/03/2015096400-003-
0
Colors- Wood Floor Lines Arch 0096400 Wood
Flooring
03/03/2015102226-001-
0
Operable Part - Shops / Data Arch 0102226 Operable
Partitions
03/03/2015102226-002-
0
Colors- Operable Partitions Arch 0102226 Operable
Partitions
02/24/2015105113-001-
0
Metal Locker Submittals - Arch 5105113 Metal
Lockers
02/24/2015105113-002-
0
Locker COLORS Arch 5105113 Metal
Lockers
02/24/2015114000-001-
0
Food Service Roughing Shops Cons 5114000 Food
Service Equipment
02/24/2015114000-002-
0
Food Service Product Data Cons 5114000 Food
Service Equipment
02/24/2015114000-003-
0
Kitchen Hood Shops Cons 5114000 Food
Service Equipment
02/24/2015114000-004-
0
Walk In Cooler / Freezer Cons 5114000 Food
Service Equipment
03/03/2015142400-001-
0
Elevator Shops Arch 0142400 Hydraulic
Elevators
03/03/2015142400-002-
0
STAMPED Elev Dwg For Permit Arch 0142400 Hydraulic
Elevators
03/03/2015142400-003-
0
Elect Confirm- Elev Arch 0142400 Hydraulic
Elevators
Page 2 of 5www.submittalexchange.com
![Page 10: ARRSD: New Athol Elementary School · Sewer/Water Utilities; pending weather: Strip in prep for blasting and temp fencing. Concrete to start April 1 st. Need to investigate landing](https://reader033.vdocuments.us/reader033/viewer/2022050400/5f7e153f234fe3679a74f25b/html5/thumbnails/10.jpg)
Date from
Sub
Date from
GC
Review by
Cons
Review by
Arch
Return to
SubSection Action B-I-CDescriptionItem#
New Athol Elementary School
Submittal
Report Type: Open Items
Project:
Log: Days Open Calculated by: Business Days since date created by GC
Total Items: 67
Date: 3/3/2015
Days
OpenSupplier or
Manufacturer
01/02/2015 01/28/2015230000-001-
0
Hot Water Specialties 2.19 Cons 24230000 Heating,
Ventilating, Air
Conditioning
01/02/2015 01/28/2015230000-002-
0
HVAC Pumps P 1 thru P 7 Cons 24230000 Heating,
Ventilating, Air
Conditioning
01/13/2015 02/13/2015230000-004-
0
Displacement Diffusers Cons 12230000 Heating,
Ventilating, Air
Conditioning
01/13/2015 01/28/2015230000-006-
0
Fire Dampers 2.01P Cons 24230000 Heating,
Ventilating, Air
Conditioning
01/13/2015 02/13/2015230000-008-
0
Registers, Grilles and Diffusers Cons 12230000 Heating,
Ventilating, Air
Conditioning
01/13/2015 01/28/2015230000-009-
0
Duct Sound Attenuators H3.2 Cons 24230000 Heating,
Ventilating, Air
Conditioning
01/20/2015 01/28/2015230000-016-
0
Fan Coil Units H3.1 w Sub Request Cons 24230000 Heating,
Ventilating, Air
Conditioning
01/26/2015 02/13/2015230000-020-
0
Cabinet Unit Heaters Cons 12230000 Heating,
Ventilating, Air
Conditioning
01/26/2015 02/13/2015230000-021-
0
Electric Unit Heater w / Sub Req Cons 12230000 Heating,
Ventilating, Air
Conditioning
01/26/2015 02/13/2015230000-022-
0
Finned Tube Radiation A, B & C Cons 12230000 Heating,
Ventilating, Air
Conditioning
01/26/2015 02/13/2015230000-023-
0
Unit Heaters Cons 12230000 Heating,
Ventilating, Air
Conditioning
01/27/2015 03/03/2015230000-024-
0
Pipe & Fittings Cons 0230000 Heating,
Ventilating, Air
Conditioning
Page 3 of 5www.submittalexchange.com
![Page 11: ARRSD: New Athol Elementary School · Sewer/Water Utilities; pending weather: Strip in prep for blasting and temp fencing. Concrete to start April 1 st. Need to investigate landing](https://reader033.vdocuments.us/reader033/viewer/2022050400/5f7e153f234fe3679a74f25b/html5/thumbnails/11.jpg)
Date from
Sub
Date from
GC
Review by
Cons
Review by
Arch
Return to
SubSection Action B-I-CDescriptionItem#
New Athol Elementary School
Submittal
Report Type: Open Items
Project:
Log: Days Open Calculated by: Business Days since date created by GC
Total Items: 67
Date: 3/3/2015
Days
OpenSupplier or
Manufacturer
01/27/2015 03/03/2015230000-025-
0
Hangers Cons 0230000 Heating,
Ventilating, Air
Conditioning
02/10/2015 03/03/2015230000-026-
0
Valves Cons 0230000 Heating,
Ventilating, Air
Conditioning
02/10/2015 03/03/2015230000-027-
0
Thermometers Cons 0230000 Heating,
Ventilating, Air
Conditioning
02/10/2015 03/03/2015230000-028-
0
Pressure Gauges Cons 0230000 Heating,
Ventilating, Air
Conditioning
02/10/2015 03/03/2015230000-029-
0
Unions Cons 0230000 Heating,
Ventilating, Air
Conditioning
02/10/2015 03/03/2015230000-030-
0
Strainers Cons 0230000 Heating,
Ventilating, Air
Conditioning
02/10/2015 03/03/2015230000-031-
0
Make Up Water Valve Cons 0230000 Heating,
Ventilating, Air
Conditioning
02/12/2015 03/03/2015230000-032-
0
HVAC Insulation Cons 0230000 Heating,
Ventilating, Air
Conditioning
03/03/2015 03/03/2015260001-005-
1
Resub 2.08 - Wiring Devices Cons 0260001 Electrical
01/29/2015 03/03/2015260001-007-
0
Firestopping and MISC Elec Mats & MA
CHPS
Cons 0260001 Electrical
01/29/2015 03/03/2015260001-008-
0
Hangers and Supports Cons 0260001 Electrical
02/05/2015 02/26/2015260001-009-
0
Handholes Revision 1 Cons 3260001 Electrical
02/12/2015 02/13/2015260001-011-
0
2.26 - Lighting Fixtures- Except Stage Cons 12260001 Electrical
02/17/2015 02/24/2015260001-012-
0
2.24 & 2.25 - Generator and ATS Cons 5260001 Electrical
Page 4 of 5www.submittalexchange.com
![Page 12: ARRSD: New Athol Elementary School · Sewer/Water Utilities; pending weather: Strip in prep for blasting and temp fencing. Concrete to start April 1 st. Need to investigate landing](https://reader033.vdocuments.us/reader033/viewer/2022050400/5f7e153f234fe3679a74f25b/html5/thumbnails/12.jpg)
Date from
Sub
Date from
GC
Review by
Cons
Review by
Arch
Return to
SubSection Action B-I-CDescriptionItem#
New Athol Elementary School
Submittal
Report Type: Open Items
Project:
Log: Days Open Calculated by: Business Days since date created by GC
Total Items: 67
Date: 3/3/2015
Days
OpenSupplier or
Manufacturer
02/23/2015 03/03/2015260001-013-
0
2.23 - Uninterruptable Power Supplies Cons 0260001 Electrical
02/25/2015 03/03/2015260001-014-
0
2.22 - Variable Frequency Drives Cons 0260001 Electrical
02/25/2015 03/03/2015260001-015-
0
2.19 -2.20 - 2.14 Disconnect Switches and
- Cartridge Fuses Overcurrent Encl
Cons 0260001 Electrical
02/25/2015 03/03/2015260001-016-
0
2.17 - Lighting Control Panelboards Cons 0260001 Electrical
02/25/2015 03/03/2015260001-017-
0
2.21 - Motor Controls Cons 0260001 Electrical
02/25/2015 03/03/2015260001-018-
0
2.16 -2.18 Panelboards and - Molded Case
Circuit Breakers
Cons 0260001 Electrical
02/25/2015 02/26/2015260001-019-
0
2.11 - Switchboard 2.12 Surge 2.18 Mold
Case Cir Breakers
Cons 3260001 Electrical
02/25/2015 03/03/2015260001-020-
0
2.15 - Dry Type Three Phase Transformers Cons 0260001 Electrical
02/05/2015312000-001-
0
Blasters proof of Insurance Cons 18312000 Earth
Moving
02/25/2015312000-002-
0
Pre Blast Inspection Certification- Middle
School
Cons 4312000 Earth
Moving
02/25/2015321210-001-
1
Resub- Retaining Wall Cons 4321210 Site
Improvements
Page 5 of 5www.submittalexchange.com
![Page 13: ARRSD: New Athol Elementary School · Sewer/Water Utilities; pending weather: Strip in prep for blasting and temp fencing. Concrete to start April 1 st. Need to investigate landing](https://reader033.vdocuments.us/reader033/viewer/2022050400/5f7e153f234fe3679a74f25b/html5/thumbnails/13.jpg)
ATHOL ELEMENTARY SCHOOL
Prepared by Fontaine Brothers Inc. 3/4/2015 Page 1
01/17/15 1 Utility Company Backcharges P01/29/15 RFI 34A 2 RCP Revisions at B204A P Note to subs- Extras / Credits ???02/11/15 3 Existing Sewer Video Report- Repairs / Replace ?? P 2/11 - In review by Athol DPW03/03/15 RFI 41 4 Add CB and Pipe SKCE-09 & 010 P
Initiation Date Approved AmountRequest, RFI, or ASI NotesDate
SubmittedPCO # Status - Approved Rejected
CO No.DESCRIPTION Amount
![Page 14: ARRSD: New Athol Elementary School · Sewer/Water Utilities; pending weather: Strip in prep for blasting and temp fencing. Concrete to start April 1 st. Need to investigate landing](https://reader033.vdocuments.us/reader033/viewer/2022050400/5f7e153f234fe3679a74f25b/html5/thumbnails/14.jpg)
![Page 15: ARRSD: New Athol Elementary School · Sewer/Water Utilities; pending weather: Strip in prep for blasting and temp fencing. Concrete to start April 1 st. Need to investigate landing](https://reader033.vdocuments.us/reader033/viewer/2022050400/5f7e153f234fe3679a74f25b/html5/thumbnails/15.jpg)