  • 7/26/2019 Armado GEN00060-03

    1/288

    HYDRAULIC

    EXCAVATOR

    Field ssembly Instruction

    GEN00060-03

    PC2000 -8

    SERIAL NUMBERS PC2000-8-20001 and up

  • 7/26/2019 Armado GEN00060-03

    2/288

    FOREWARD

    Before starting the engine and assembling the work equipment, you must inspect and service the machine thoroughly. Since

    you are frequently obliged to work alone or with other workers in dangerous places or postures, hold a safety meeting in ad-

    vance and appoint a crane sign maker and a working leader so that all the workers can work safely.

    Particularly when working in a foreign country, there are many unsafe factors because of differences in language, customs,

    etc. Accordingly, the liaison person and work director in the field must examine the above items fully to secure the safely.

    We hope that all the workers will cooperate to assemble this machine quickly while observing the safety, quality and delivery time.

    (Instruction system diagram)

    Work leader

    Work director Crane sign maker Regular/Assistant

    Liaison personOperator for assembly

    (Interpreter)

    Mechanics Share of work

  • 7/26/2019 Armado GEN00060-03

    3/288

    CONTENTS

    SPECIFICATIONS............................................................................................................. 1POINTS REGARDING LOCAL ASSEMBLY ..................................................................... 2ASSEMBLY PROCEDURE, ASSEMBLY EQUIPMENT AND SCHEDULE ...................... 3

    FLOWCHART OF MAIN ASSEMBLY PROCEDURE........................................................ 4KIT LAYOUT DIAGRAM.................................................................................................... 5TRANSPORTATION POSTURES..................................................................................... 6LIST OF PARTS SENT INDIVIDUALLY ............................................................................ 15TOOLS AND EQUIPMENT TO BE USED FOR LOCAL ASSEMBLY............................... 27TIGHTENING TORQUE .................................................................................................... 29COATING MATERIALS LIST ............................................................................................ 33

    A. ASSEMBLY OF CHASSIS ............................................................................................ 35A- 1. Assembly of track frame assembly and center frame assembly........................... 36A- 2. Idler cushion cylinder piping ................................................................................. 39A- 3. Travel motor piping ............................................................................................... 40A- 4. Installation of travel motor cover........................................................................... 41A- 5. Filling swing circle with grease ............................................................................. 43A- 6. Assembly of revolving frame assembly and undercarriage .................................. 44A- 7. Installation of swing machinery (front) assembly (27t)

    Installation of swing motor (front) assembly (32t) ................................................. 46A- 8. Connection of swivel joint piping........................................................................... 47A- 9. Connection of swing circle grease piping ............................................................. 49

    A-10. Installation of hydraulic tank assembly ................................................................. 50A-11. Installation of fuel tank assembly.......................................................................... 55A-12. Connection of fuel tank assembly piping and wiring............................................. 56A-13. Installation of cab base assembly......................................................................... 58A-14. Installation of left floor assembly .......................................................................... 60A-15. Connection of cab base assembly piping............................................................. 64A-16. Connection of cab base assembly wiring ............................................................. 66A-17. Connection of left floor assembly heater piping.................................................... 71A-18. Connection of left floor assembly wiring............................................................... 72

    A-19. Installation of tail pipe ........................................................................................... 73A-20. Installation of power container assembly.............................................................. 74A-21. Connection of suction piping ................................................................................ 76A-22. Connection of oil cooler piping and pump drain piping......................................... 78A-23. Connection of fan motor drain piping.................................................................... 79A-24. Installation of suction unit undercover .................................................................. 80A-25. Connection of delivery piping ............................................................................... 81A-26. Connection of pilot piping and fan motor piping ................................................... 83A-27. Connection of power container assembly fuel piping ........................................... 84A-28. Connection of power container assembly air conditioner piping .......................... 86A-29. Connection of power container assembly heater piping....................................... 87A-30. Connection of power container assembly wiring .................................................. 88

  • 7/26/2019 Armado GEN00060-03

    4/288

  • 7/26/2019 Armado GEN00060-03

    5/288

    LS. ASSEMBLY OF LOADING SHOVEL WORK EQUIPMENT........................................ 179LS- 1. Installation of arm cylinder bottom parts............................................................. 180LS- 2. Installation of boom cylinder to machine body.................................................... 181LS- 3. Installation of boom cylinder hoses..................................................................... 183LS- 4. Installation of boom cylinder piping..................................................................... 184LS- 5. Installation of boom assembly ............................................................................ 185LS- 6. Installation of boom cylinder head pins............................................................... 186LS- 7. Installation of hose between machine body and boom....................................... 187

    LS- 8. Installation of bucket cylinder assembly ............................................................. 189LS- 9. Installation of arm assembly ............................................................................... 190LS-10. Installation of arm cylinder assembly.................................................................. 191LS-11. Installation of hoses between boom and arm..................................................... 192LS-12. Installation of bucket cylinder hoses................................................................... 193LS-13. Installation of grease feed hose of bucket cylinder............................................. 194LS-14. Installation of bucket assembly........................................................................... 196LS-15. Installation of bottom dump hose and grease feed hose

    between arm and bucket .................................................................................... 197

    M. INSPECTION AND SERVICING PROCEDURES AFTER ASSEMBLY....................... 199

    M- 1. Inspection of oil levels and coolant levels and using standardof fuel and lubricant.............................................................................................. 200

    M- 2. Flushing of hydraulic circuit.................................................................................. 203M- 3. Releasing residual pressure from hydraulic circuit............................................... 206M- 4. Releasing residual pressure from HIC circuit and check

    of gas pressure in HIC accumulator..................................................................... 207M- 5. Charging air conditioner with refrigerant .............................................................. 208M- 6. Installed angles of mirrors.................................................................................... 209M- 7. Installed angles of lights....................................................................................... 211

    VHMS CONTOROLLER INITIAL SETTING PROCEDURE .............................................. 215

    FIELD ASSEMBLY INSPECTION REPORT (BACKHOE)

    FIELD ASSEMBLY INSPECTION REPORT (LOADING SHOVEL)

  • 7/26/2019 Armado GEN00060-03

    6/288

    1

    SPECIFICATIONS

    PC2000-8 Backhoe

    PC2000-8 Loading shovel

    Item Unit PC2000-8

    Operating weight (including 1 operator) kg 200,000

    Bucket capacityBackhoe

    m312.0

    Loading shovel 11.0

    Name of engine Komatsu SAA12V140E-3 diesel engine

    Engine horsepower kW{HP}/rpm 728{976}/1,800

    Min. ground distance 2,095

    Travel speed (Low/High) km/h 2.7

    Swing speed rpm 4.8

  • 7/26/2019 Armado GEN00060-03

    7/288

    2

    POINTS REGARDING LOCAL ASSEMBLY

    1. Selection of work place1) The work place should be suitable for the machine. The following points should be considered.

    Area

    Hardness of ground surface

    Levelness

    Entry/Exit road, turning space

    2) Assembly work on the hydraulic circuit must not be carried out in any place where dust or rain can get into the circuit

    during the operation.

    3) If the work is carried out outside, avoid place where there is rain or strong wind.

    2. Preparation and check of lifting tools and jigs1) Check each lifting tool and jig thoroughly.

    In particular, check stands and blocks made of wood to check that the inside is not rotted or cracked.

    3. k Check during actual operation1) Apply the parking brake of the trailer and crane securely, then put chocks under the wheels.

    2) Lower the pressure and temperature of the engine, hydraulic oil, and coolant before starting work.

    3) When starting the engine, always give an agreed signal, such as blowing the horn, to warn the people around the ma-

    chine. Check also that the work equipment levers and travel levers are in neutral, and that the fuel control dial (or fuel

    control lever) is at the low idle position.

    4) Be careful to maintain the balance of parts being lifted by the crane.5) Do not allow unauthorized persons into the working area.

    4 Before starting the operation, read all the instructions, and, in particular, be sure that you understand

    the caution items.The circled numbers in the illustrations are indicated as the numbers in ( ). (Example: q(1))

    5. The leader should write out the caution items for each work process, and should explain them to en-

    sure that the workers understand them.

    6. Hold a meeting every morning before starting work to confirm the operating plan and operating safety.

  • 7/26/2019 Armado GEN00060-03

    8/288

    3

    ASSEMBLY PROCEDURE,

    ASSEMBLY EQUIPMENT AND SCHEDULE

    Day

    (Ha

    lfday

    )

    Un

    its

    tobe

    assem

    bled

    Crane

    Mo

    bilee

    leva

    ting

    workp

    latform

    Aircompressor

    Min

    .15m

    3/min

    Workers

    Foreman

    +6mec

    han

    ics

    Foreman

    +6mec

    han

    ics

    Foreman

    +6mec

    han

    ics

    Foreman

    +2mec

    han

    ics

    Starto

    fassem

    bly

    Meetin

    go

    fa

    llworkers

    Comp

    letion

    ofassem

    bly

    o

    fc

    hassis

    Starto

    feng

    ine

    Comp

    letion

    oftotalassem

    bly

  • 7/26/2019 Armado GEN00060-03

    9/288

    4

    FLOWCHART OF MAIN ASSEMBLY PROCEDURE

    To A

    A

    Necessary assembly procedure when disassembling to 27t.

    Assembly ofundercarriage

    (Crawler, centerframe)

    Installation ofhydraulic tank

    Coupling of

    revolving frame

    Installation offront machinery

    Installation ofgrease cover andladder

    Installation ofcab base

    Installation of

    counterweight

    Installation ofboom cylinder

    Installation ofboom

    Installation ofarm

    Installation ofbucket

    Motoring

    Boom sub(arm cylinder, tube)

    Installation ofpower container

    assembly

    Installation ofexterior parts,handrail and mirror

    Installation ofcab assembly

    Connection of

    swivel piping

    Installation offuel tank

    Installation ofleft floor

    Installation ofladder to cab base

  • 7/26/2019 Armado GEN00060-03

    10/288

    5

    KIT LAYOUT DIAGRAM The dimensions given below are the minimum dimensions needed.

    When selecting a work place, see "Points regarding local assembly".

    When installing the revolving frame, place wooden blocks 700 mm high under it.

    Covers

    Bucket

    Arm

    link

    Boom

    Craw

    ler

    frame

    Craw

    ler

    frame

    G reel

    Rear floor

    Front CW

    Left deck

    Left floor

    Covers

    PA ladder

    Right CW

    Right deck

    Right floor

    Cab

    Power container

    Cabbase

    Tubes

    Hoses

    Tools and equipment

    Boom cylinder

    Crane, 50 ton

    Center frame

    C weight

    F tank

    Front

    Revolvingframe

    Crane, 50 ton

  • 7/26/2019 Armado GEN00060-03

    11/288

    6

    TRANSPORTATION POSTURESFor transporting of the machine, ask your Komatsu distributor.

    Each dimension in the following figures is rounded up to the next 5 mm and each weight is rounded up to the next 100 kg.

    The arrows indicate the hanging points of each assembly.

    t Transportation posture of each kit

    (1) Center frame assembly

    (2) Crawler frame assembly

    (3) Revolving frame assembly

    Center of gravity

    Top view

    X Overall length (mm) 3,815

    Y Overall width (mm) 3,190

    Z Overall height (mm) 2,210

    W Weight (kg) 18,000

    With swivel and fixing bar

    With swing circle and grease

    piping

    With grease bath (Grease is

    packed separately)

    With travel piping tubes

    With HIC piping (Accumulator

    has been pressurized)

    [Remarks]

    Undercover is optional.

    Top view

    Center of gravity

    For each crawler

    X Overall length (mm) 7,435

    Y Overall width (mm) 1,720

    Z Overall height (mm) 1,920

    W Weight (kg) 26,000

    With motor and motor guard

    [Remarks]

    Full roller guard is optional.

    Center of gravity

    Top view

    When

    disassembledto 32 ton

    When

    disassembledto 27 ton

    X Overall length (mm) 7,575

    Y Overall width (mm) 3,180

    Z Overall height (mm) 2,920 2,640

    W Weight (kg) 31,500 26,500

    With 6 hoses to boom

    With 4 oil cooler hoses

    With grease tank

    When disassembled to 27 ton, hydraulic tankassembly and machine (front) assembly are

    packed separately.

    (Special sling)

  • 7/26/2019 Armado GEN00060-03

    12/288

    7

    (4) Fuel tank assembly

    (5) Cab base assembly

    (6) Left floor assembly

    Top view

    Center of gravity

    X Overall length (mm) 3,100

    Y Overall width (mm) ,875

    Z Overall height (mm) 2,070

    W Weight (kg) 2,400

    With working lamp

    With fuel level sensor

    Center of gravity

    Top view

    X Overall length (mm) 3,660

    Y Overall width (mm) 2,505

    Z Overall height (mm) 2,700

    W Weight (kg) 2,500

    With front and left catwalk

    With head lamp and working lamp

    Center of gravity

    Top view

    X Overall length (mm) 2,500

    Y Overall width (mm) 2,100

    Z Overall height (mm) 3,085

    W Weight (kg) 1,500

    With battery

  • 7/26/2019 Armado GEN00060-03

    13/288

    8

    (7) Power container assembly

    (8) Operator's cab assembly

    (9) Counterweight assembly

    Center of gravity

    Top view

    X Overall length (mm) 5,215

    Y Overall width (mm) 2,455

    Z Overall height (mm) 3,195

    W Weight (kg) 16,100

    With super hood

    With handrail on radiator side

    Center of gravity

    Top view

    X Overall length (mm) 2,855

    Y Overall width (mm) 1,880

    Z Overall height (mm) 2,520

    W Weight (kg) 1,800

    With antenna retracted

    With mirrors folded

    [Remarks]

    Front guard is optional.

    Center of gravity

    Top view

    X Overall length (mm) 6,240

    Y Overall width (mm) 1,115

    Z Overall height (mm) 1,505

    W Weight (kg) 24,500

    [Parts packed separately]

    Handrail, bolts

  • 7/26/2019 Armado GEN00060-03

    14/288

    9

    (10) Slide ladder assembly

    (11) Catwalk assembly on power container side

    (12) Grease can cover assembly

    Center of gravity

    View Z

    X Overall length (mm) 3,380

    Y Overall width (mm) ,875

    Z Overall height (mm) 1,255

    W Weight (kg) ,550

    Center of gravity

    Top view

    For each catwalk

    X Overall length (mm) 2,310Y Overall width (mm) ,545

    Z Overall height (mm) 2,085

    W Weight (kg) ,260

    Center of gravity

    Top view

    X Overall length (mm) 1,030

    Y Overall width (mm) 1,025

    Z Overall height (mm) ,995

    W Weight (kg) ,260

  • 7/26/2019 Armado GEN00060-03

    15/288

    10

    (13) Right floor assembly

    (14) Right catwalk assembly

    (15) Front catwalk assembly

    Center of gravity

    Top view

    X Overall length (mm) 1,390

    Y Overall width (mm) 1,350

    Z Overall height (mm) 2,085

    W Weight (kg) ,240

    Top view

    Center of gravity

    X Overall length (mm) 3,560

    Y Overall width (mm) 1,300

    Z Overall height (mm) 1,865

    W Weight (kg) ,390

    With grease reel

    Center of gravity

    Top view

    X Overall length (mm) ,715

    Y Overall width (mm) ,810

    Z Overall height (mm) 1,540

    W Weight (kg) , 90

  • 7/26/2019 Armado GEN00060-03

    16/288

    11

    (16) Cab rear floor assembly

    (17) Boom assembly

    (18) Arm assembly

    Center of gravity

    Top view

    X Overall length (mm) 1,470

    Y Overall width (mm) 1,320

    Z Overall height (mm) ,345

    W Weight (kg) , 70

    Center of gravity

    Left side view

    X Overall length (mm) 9,170

    Y Overall width (mm) 2,065

    Z Overall height (mm) 3,195

    W Weight (kg) 18,430

    Left side view

    Center of gravity

    X Overall length (mm) 5,495

    Y Overall width (mm) 1,605

    Z Overall height (mm) 2,055

    W Weight (kg) 12,900

    With bucket cylinder

  • 7/26/2019 Armado GEN00060-03

    17/288

    12

    (19) Bucket assembly

    (20) Arm cylinder tube assembly

    (21) Hydraulic tank assembly

    Left side view

    Center of gravity

    X Overall length (mm) 5,495

    Y Overall width (mm) 1,605

    Z Overall height (mm) 2,055

    W Weight (kg) 12,900

    Specifications of standard bucket

    for crushed stones

    Left side view

    Center of gravity

    X Overall length (mm) 1,240

    Y Overall width (mm) ,320

    Z Overall height (mm) ,365

    W Weight (kg) , 60

    Top view

    Center of gravity

    X Overall length (mm) 1,860

    Y Overall width (mm) 1,115

    Z Overall height (mm) 2,085

    W Weight (kg) 1,750

  • 7/26/2019 Armado GEN00060-03

    18/288

    13

    (22) Swing machinery (front) assembly

    (23) Cab L.H. catwalk

    (24) Cab front catwalk

    Top view

    Center of gravity

    X Overall length (mm) ,775

    Y Overall width (mm) ,675

    Z Overall height (mm) 1,335

    W Weight (kg) 1,050

    Top view

    Center of gravity

    X Overall length (mm) 3,660

    Y Overall width (mm) ,615

    Z Overall height (mm) 1,355

    W Weight (kg) ,220

    Top view

    Center of gravity

    X Overall length (mm) 1,840

    Y Overall width (mm) ,560

    Z Overall height (mm) 11,325

    W Weight (kg) ,100

  • 7/26/2019 Armado GEN00060-03

    19/288

    14

    Method of installing chassis hanging jig

  • 7/26/2019 Armado GEN00060-03

    20/288

    15

    LIST OF PARTS SENT INDIVIDUALLY (Assembly of undercarriage)

    A

    No. Part No. Part name Q'tyAssembly

    procedure No. Remarks

    A-1 21T-30-71160 BOLT 76 A-1

    A-2 21T-30-71170 WASHER 76 A-1

    A-3 208-30-11850 COVER 1 A-1

    A-4 208-30-11861 GASKET 1 A-1

    A-5 01024-81225 BOLT 3 A-1

    A-6 07000-B3025 O-RING 2 A-2

    A-7 07000-B3048 O-RING 4 A-3

    A-8 02896-61018 O-RING 2 A-3

    A-9 01024-81235 BOLT 4 A-4A-10 424-54-14230 COLLAR 4 A-4

    A-11 01024-81230 BOLT 12 A-4

    A-12 21N-30-11340 COLLAR 16 A-4

    A-13 01641-21223 WASHER 12 A-4

    A-14 21T-30-32172 COVER 1 A-4

    A-15 21T-30-32182 COVER 1 A-4

    A-16 01010-82460 BOLT 10 A-4

    A-17 17A-54-44130 WASHER 10 A-4

  • 7/26/2019 Armado GEN00060-03

    21/288

    16

    LIST OF PARTS SENT INDIVIDUALLY (Coupling of revolving frame)

    B

    No. Part No. Part name Q'tyAssembly

    procedure No. Remarks

    B-1 21T-25-67150 BOLT 60 A-6

    B-2 01643-33690 WASHER 60 A-6

    B-3 01010-83090 BOLT 14 A-7

    B-4 01643-33080 WASHER 14 A-7

    B-5 07000-B3032 O-RING 1 A-7

    B-6 07000-B3032 O-RING 2 A-7

    B-7 02896-61015 O-RING 1 A-7

    B-8 02896-61008 O-RING 1 A-7

    B-9 01024-81225 BOLT 1 A-7

    B-10 11Y-62-11980 O-RING 1 A-8B-11 02896-61009 O-RING 4 A-8

    B-12 07000-B3048 O-RING 4 A-8

    B-13 07000-B5230 O-RING 2 A-10

    B-14 01011-83010 BOLT 12 A-10

    B-15 21T-26-11460 WASHER 12 A-10

    B-16 07000-B2060 O-RING 8 A-10

    B-17 11Y-62-11980 O-RING 3 A-10

    B-18 07000-B3032 O-RING 1 A-10

  • 7/26/2019 Armado GEN00060-03

    22/288

    17

    LIST OF PARTS SENT INDIVIDUALLY (Assembly of upper structure)

    C

    No. Part No. Part name Q'tyAssembly

    procedure No. Remarks

    C-1 01011-83010 BOLT 20 A-11

    C-2 21T-26-11460 WASHER 20 A-11

    C-3 04435-52212 CLIP 1 A-12

    C-4 02896-61012 O-RING 1 A-12

    C-5 02896-61015 O-RING 2 A-12

    C-6 02896-61018 O-RING 2 A-12

    C-7 01024-81220 BOLT 1 A-12

    C-8 04434-52312 CLIP 1 A-12

    C-9 04434-51912 CLIP 3 A-12

    C-10 01024-81220 BOLT 4 A-12

    C-11 01034-81245 BOLT 10 A-13

    C-12 01034-81265 BOLT 10 A-13

    C-13 21T-54-31140 CLAMP 1 A-13

    C-14 21T-54-31150 CLAMP 1 A-13

    C-15 01034-81245 BOLT 2 A-13

    C-16 01011-82035 BOLT 20 A-13

    C-17 01011-82045 BOLT 7 A-13

    C-18 567-40-41380 WASHER 27 A-13

    C-19 01010-82065 BOLT 24 A-14

    C-20 01643-32060 WASHER 24 A-14

    C-21 21T-53-31530 SHIM 3 A-14

    C-22 21T-53-31540 SHIM 3 A-14

    C-23 21T-54-33471 COVER 1 A-14

    C-24 01034-81230 BOLT 3 A-14

    C-25 02896-61012 O-RING 6 A-15

    C-26 02896-61018 O-RING 2 A-15

    C-27 21T-979-3320 JOINT 2 A-17

  • 7/26/2019 Armado GEN00060-03

    23/288

    18

    LIST OF PARTS SENT INDIVIDUALLY (Coupling of power container)

    D

    No. Part No. Part name Q'tyAssembly

    procedure No. Remarks

    D-1 21M-01-18130 TAIL PIPE 2 A-19

    D-2 01024-81230 BOLT 12 A-19

    D-3 6162-14-5640 RAIN CAP 2 A-19

    D-4 21T-54-31121 PLATE 4 A-20

    D-5 21T-54-31130 BOLT 20 A-20

    D-6 01643-34212 WASHER 20 A-20

    D-7 07000-B2140 O-RING 2 A-21

    D-8 07000-B2100 O-RING 1 A-21

    D-9 209-62-41341 CLAMP 4 A-21

    D-10 20Y-62-51671 CLAMP 2 A-21

    D-11 07000-B2060 O-RING 7 A-22

    D-12 07298-02011 HOSE 1 A-22

    D-13 07000-B3032 O-RING 1 A-23

    D-14 07000-B3048 O-RING 4 A-25

    D-15 07000-B3025 O-RING 2 A-26

    D-16 07000-B3032 O-RING 1 A-26

    D-17 02896-61018 O-RING 2 A-27

    D-18 02896-61015 O-RING 1 A-27

    D-19 02896-61015 O-RING 1 A-27

    D-20 08028-55065 CABLE 2 A-30

    D-21 01024-81020 BOLT 2 A-30

  • 7/26/2019 Armado GEN00060-03

    24/288

    19

    LIST OF PARTS SENT INDIVIDUALLY (Coupling of operator's cab)

    E

    No. Part No. Part name Q'tyAssembly

    procedure No. Remarks

    E-1 21T-54-36661 SHIM 16 A-31

    E-2 21T-54-36671 SHIM 8 A-31

    E-3 21T-54-35321 CUSHION 8 A-31

    E-4 8295-06-1480 LAMP BEACOM 1 A-32

    E-5 21T-06-17430 BRACKET 1 A-32

    E-6 01024-81225 BOLT 2 A-32

    E-7 8295-06-1480 LAMP BEACOM 1 A-32

    E-8 21T-06-33610 PLATE 1 A-32

    E-9 21T-06-17430 BRACKET 1 A-32

    E-11 01024-81225 BOLT 2 A-32

    E-11 04434-51012 CLIP 1 A-32E-12 01024-81220 BOLT 1 A-32

    E-13 8A13-10-2100 ANTENNA 1 A-33

    E-14 21T-06-64491 BRACKET 1 A-33

    E-15 01024-81225 BOLT 1 A-33

    E-16 02896-61012 O-RING 10 A-35

    E-17 02896-61009 O-RING 2 A-35

    E-18 21T-979-4421 SEAL 8 A-37

    E-19 08034-20830 BAND 2 A-37

    E-20 08034-20830 BAND 3 A-38

    E-21 01024-81225 BOLT 14 A-39

    E-22 21T-54-33931 HANDRAIL 1 A-40

    E-23 01034-81245 BOLT 10 A-40

  • 7/26/2019 Armado GEN00060-03

    25/288

    20

    LIST OF PARTS SENT INDIVIDUALLY (Coupling of counterweight etc)

    F

    No. Part No. Part name Q'tyAssembly

    procedure No. Remarks

    F-1 21T-30-32231 BRACKET 2 A-41

    F-2 21T-30-32241 LADDER 2 A-41

    F-3 01010-82460 BOLT 8 A-41

    F-4 01010-82450 BOLT 8 A-41

    F-5 01643-32460 WASHER 16 A-41

    F-6 01010-82050 BOLT 16 A-42

    F-7 01010-82080 BOLT 12 A-43

    F-8 01010-82060 BOLT 8 A-43

    F-9 01643-32060 WASHER 20 A-43

    F-10 21T-53-31550 PLATE 1 A-43F-11 21T-54-31560 PLATE 1 A-43

    F-12 21T-54-33331 STEP 1 A-43

    F-13 01034-81250 BOLT 4 A-43

    F-14 01034-81235 BOLT 16 A-44

    F-15 01034-81250 BOLT 6 A-45

    F-16 01010-82050 BOLT 6 A-48

    F-17 567-40-41380 WASHER 6 A-48

    F-18 21T-46-34120 BOLT 12 A-49

    F-19 209-46-11210 SPACER 12 A-49

    F-20 21T-46-34141 PLATE 2 A-49

    F-21 21T-46-34131 PLATE 2 A-49

    F-22 01024-81225 BOLT 12 A-49

    F-23 21T-54-34411 HANDRAIL 1 A-50

    F-24 21T-54-34421 HANDRAIL 1 A-50

    F-25 01034-81250 BOLT 16 A-50

  • 7/26/2019 Armado GEN00060-03

    26/288

    21

    No. Part No. Part name Q'tyAssembly

    procedure No. Remarks

    F-26 21T-54-32911 CLAMP 7 A-51

    F-27 21T-54-32921 CLAMP 7 A-51

    F-28 01034-81245 BOLT 14 A-51

    F-29 21T-54-65810 CHAIN 1 A-51

    F-30 21T-54-31140 CLAMP 1 A-51

    F-31 21T-54-31150 CLAMP 1 A-51

    F-32 01034-81245 BOLT 2 A-51

    F-33 21T-01-31471 NIPPLE 1 A-53

    F-34 07005-02416 O-RING 1 A-53

  • 7/26/2019 Armado GEN00060-03

    27/288

    22

    LIST OF PARTS SENT INDIVIDUALLY (Coupling of boom)

    H

    No. Part No. Part name Q'tyAssembly

    procedure No. Remarks

    H-1 707-01-XK750 BOOM CYLINDER(L.H.) 1 C-1

    H-2 707-01-XK760 BOOM CYLINDER(R.H.) 1 C-1

    H-3 21T-70-31421 SHIM 2 C-1

    H-4 21T-70-31470 SHIM 8 C-1

    H-5 21T-70-31690 SHIM 8 C-1

    H-6 07000-15180 O-RING 4 C-1

    H-7 07000-B2060 O-RING 4 C-2

    H-8 07000-B3048 O-RING 4 C-2

    H-9 21T-64-39410 HOSE 2 C-2

    H-10 07083-01417 HOSE 2 C-2

    H-11 21T-64-39140 TUBE 1 C-3

    H-12 21T-64-39150 TUBE 1 C-3

    H-13 21T-64-39160 TUBE 1 C-3

    H-14 07000-B3048 O-RING 2 C-3

    H-15 07000-B2060 O-RING 7 C-3

    H-16 01643-31845 WASHER 32 C-3

    H-17 01010-81840 BOLT 4 C-3

    H-18 01010-81865 BOLT 28 C-3

    H-19 707-01-XK770 ARM CYLINDER(L.H.) 1 C-3

    H-20 707-01-XK780 ARM CYLINDER(R.H.) 1 C-3

    H-21 07000-12140 O-RING 4 C-3

    H-22 21T-70-31441 SHIM 4 C-3

    H-23 07084-02022 HOSE 2 C-3

    H-24 07085-01418 HOSE 1 C-3

    H-25 07085-01420 HOSE 1 C-3

    H-26 07000-B2060 O-RING 4 C-3

    H-27 07000-B3048 O-RING 4 C-3

    H-28 07371-51470 FLANGE 4 C-3

    H-29 07371-52080 FLANGE 4 C-3

    H-30 01643-31445 WASHER 8 C-3

  • 7/26/2019 Armado GEN00060-03

    28/288

    23

    No. Part No. Part name Q'tyAssembly

    procedure No. Remarks

    H-31 01643-31845 WASHER 8 C-3

    H-32 01010-81455 BOLT 8 C-3

    H-33 01010-81865 BOLT 8 C-3

    H-34 21T-06-32810 WORK LAMP A. 4 C-3

    H-35 20Y-06-21551 BRACKET 4 C-3

    H-36 01643-31445 WASHER 4 C-3

    H-37 01010-81430 BOLT 4 C-3

    H-38 01024-81225 BOLT 4 C-3

    H-39 209-72-11311 SEAL 4 C-3

    H-40 21T-70-31480 SHIM 8 C-4

    H-41 21T-70-31490 SHIM 16 C-4

    H-42 07000-15180 O-RING 4 C-5

  • 7/26/2019 Armado GEN00060-03

    29/288

    24

    LIST OF PARTS SENT INDIVIDUALLY (Coupling of arm)

    I

    No. Part No. Part name Q'tyAssembly

    procedure No. Remarks

    I-1 07000-B2060 O-RING 6 C-6

    I-2 21T-70-31290 SEAL 4 C-7

    I-3 21N-70-12160 SEAL 4 C-7

    I-4 209-72-11261 SEAL 4 C-7

    I-5 21T-70-31391 SHIM 2 C-7

    I-6 21T-70-31780 SHIM 1 C-7

    I-7 21T-70-31810 SHIM 1 C-7

    I-8 21T-70-31820 SHIM 1 C-7

    I-9 07000-B5260 O-RING 2 C-7

    I-10 21T-70-32181 SHIM 4 C-8I-11 07000-12140 O-RING 4 C-8

    I-12 07371-51470 FLANGE 4 C-9

    I-13 07371-52080 FLANGE 4 C-9

    I-14 07084-41427 HOSE 2 C-9

    I-15 07084-42026 HOSE 2 C-9

    I-16 07000-B3048 O-RING 4 C-9

    I-17 07000-B2060 O-RING 4 C-9

    I-18 01643-31445 WASHER 8 C-9

    I-19 01643-31845 WASHER 8 C-9

    I-20 01010-81455 BOLT 8 C-9

    I-21 01010-81865 BOLT 8 C-9

    I-22 21T-68-31830 TUBE 1 C-10

    I-23 203-973-5660 CLAMP 3 C-10

    I-24 203-973-5720 SEAT 3 C-10

    I-25 01024-81055 BOLT 6 C-10

    I-26 21T-70-75290 BACKET 1 C-10

    I-27 01024-81225 BOLT 2 C-10

    I-28 07631-20409 HOSE 1 C-10

  • 7/26/2019 Armado GEN00060-03

    30/288

    25

    LIST OF PARTS SENT INDIVIDUALLY (Coupling of bucket)

    J

    No. Part No. Part name Q'tyAssembly

    procedure No. Remarks

    J-1 209-72-11261 SEAL 4 C-12

    J-2 209-70-71370 O-RING 4 C-12

    J-3 205-09-61240 BOLT 4 C-12

    J-4 01640-20610 WASHER 8 C-12

    J-5 01596-00606 NUT 4 C-12

    J-6 21N-72-11230 SHIM 2 C-13

  • 7/26/2019 Armado GEN00060-03

    31/288

    26

    LIST OF PARTS SENT INDIVIDUALLY (Bleeding air from cylinders and hydraulic circuit)

    K

    No. Part No. Part name Q'tyAssembly

    procedure No. Remarks

    K-1 209-60-77551 ELEMENT 3 M-2

    K-2 21T-60-13730 PLATE 3 M-2

    K-3 23S-54-36270 MIRROR 2 M-6

    K-4 21T-54-34690 SUPPORT 1 M-6

    K-5 21T-54-79620 CLAMP 2 M-6

    K-6 01252-71025 BOLT 4 M-6

    K-7 21T-54-34850 PLATE 1 M-6

    K-8 21T-54-34680 PLATE 1 M-6

    K-9 07283-32236 CLIP 4 M-6

    K-10 01643-31032 WASHER 8 M-6

    K-11 01597-01009 NUT 8 M-6K-12 421-54-25610 MIRROR 1 M-6

    K-13 04025-00632 SPRING PIN 1 M-6

    K-14 01252-70545 BOLT 4 M-6

    K-15 21T-54-36480 SUPPORT 1 M-6

    K-16 20Y-54-61630 CLAMP 1 M-6

    K-17 01252-71030 BOLT 2 M-6

  • 7/26/2019 Armado GEN00060-03

    32/288

    27

    TOOLS AND EQUIPMENT TO BE USED FOR LOCAL ASSEMBLY

    No. Part name Specification Q'ty Remarks

    Equipment

    1 Engine air compressor 7.0 kg/cm3 1 With 200 V, 100 V generator

    2 Crane truck 50 ton 2

    3 Grease pump Pneumatic 1 For greasing work equipment

    4 Mobile elevating work platform 10 m 1 2 workers

    5 Lift work stand 10 step, 3,000 mm 1Substituted by mobileelevating work platform

    6Stepladder

    5 step, 1,500 mm 2

    7 3 step, 900 mm 2

    8 Hydraulic wrench 750 kgm 1 Track frame, power container

    9 Hydraulic pump For hydraulic wrench, 200 V 1 Track frame, power container

    Tool

    10

    Impact wrench

    For M10 mm bolt 1 (Torque capacity: 10 70 Nm)

    11 For M12 mm bolt 2 (Torque capacity: 30 170 Nm)

    12 For M16 mm bolt 1 (Torque capacity: 150 650 Nm)

    13 For M36 mm bolt 1 (Torque capacity: 780 2,900 Nm)

    14 For M42 mm bolt 1 (Torque capacity: 1,500 6,300 Nm)

    15

    Impact wrench socket

    Width across flats: 70 mm 1 Track frame

    16 Width across flats: 65 mm 1 Counterweight17 Width across flats: 55 mm 1

    18 Width across flats: 46 mm 1 Fuel tank

    19

    420 kgm

    torque wrench socket

    T38.1 Width across flats: 70 mm 1 Track frame

    20 T38.1 Width across flats: 65 mm 1 Counterweight

    21 T38.1 Width across flats: 55mm 1

    22 T38.1 Width across flats: 50 mm 1

    23 Socket T19 Width across flats 30 mm 1

    24Extension

    For impact wrench, 300 mm long 2

    25 For impact wrench, 200 mm long 1

    26 Impact wrench air hose Inside 12, Inside 19 50 m each

    27 Air coupler For hoses of size 4, 6 2 sets

    28 16 time wrench 450 kgm 1Unnecessary, if hydraulicwrench is available

    29

    Torque wrench

    12 kgm T19 1

    30 42 kgm T25.4 1 For 16 time wrench

    31 85 kgm T25.4 1 For 4 time wrench

    32 420 kgm T38 1

    33

    Spanner

    Width across flats: 30 mm 2

    34 Width across flats: 32 mm 2

    35 Width across flats: 36 mm 2

    36 Width across flats: 41 mm 2

    37 Standard tool set Sockets, spanners, ring wrenches 2 sets each

    38 Large hammer (Plastic) 10 P 1

    39 Bar 1 m 2

    40Hydraulic jack

    50 ton 2For receiving center frame toinstall track frame

    41 20 ton 1For tightening track frameclamping bolt

    42 Oil receiving pan Large and small 2 eachFor connecting travel pipingand work equipment piping

    43 Drum can oil filler 1

    44 Wooden block 300 400 8For supporting revolving frameand center frame

  • 7/26/2019 Armado GEN00060-03

    33/288

    28

    No. Part name Specification Q'ty Remarks

    Tool

    45

    Tap

    M10 P1.5 1

    46 M12 P1.75 1

    47 M14 P2 1

    48 M16 P2 1

    49 M20 P2.5 1

    50 M24 P3 1

    51 M27 P3 1

    52 M30 P3 153 M33 P3 1

    54 M36 P3 1

    55 M39 P3 1

    56 M42 P3 1

    Sling

    57

    Wire

    10 3,000 mm 4 Catwalk

    58 20 5,000 mm 4 Boom, arm and bucket

    59 30 6,000 mm 4Center frame and powercontainer

    60 40 5,000 mm 4Counterweight, revolvingframe and track frame

    61 Chain For 15 ton 2 Track frame

    62

    Shackle

    5.4 ton 4Center frame, boom, arm andpower container

    63 10 ton 4 Track frame and revolving frame

    64 20 ton 2 Counterweight

    65 2 ton 4 Fuel tank

    66 0.9 ton 4 Cabin

    67 SB10 2 Travel piping cover

    68Nylon sling

    50 mm wide 3,000 mm 2 Boom cylinder

    69 25 mm wide 3,000 mm 2 Handrail

    70

    Lever block

    1.5 ton 3 Left floor assembly

    71 3.0 ton 2

    72 6 ton 2

    73

    Eyebolt

    M20 2

    74 M16 4

    75 M12 4

    76 Pin Pin, 50 40 mm 2 Track frame

    Fuel,oil,grease

    ands

    ub-materials

    77 Cleaning liquid Brake cleaner spray can 10

    78 Hydraulic oil EO10 2000 L

    79 Diesel fuel 2000 L

    80 Grease G2-LI (20 L can) 5 In grease bath

    81Repair paint

    Natural yellow spray can 10

    82 Black gray spray can 10

    83 LG-6 TB1215 1Connecting faces of revolvingframe and swing circle

    84 Air conditioner refrigerant R134a 2000 g

    85 Cloth 1 bundle 20 kg For cleaning

  • 7/26/2019 Armado GEN00060-03

    34/288

    29

    TIGHTENING TORQUE

    Remove the various blind plugs and jigs used during transportation. Remove the blind jigs (flange, head, cap, O-ring) used for

    the work equipment piping and undercarriage piping, the blind plugs used for the lubrication piping, the jigs used to hold the

    cylinders, and the blind plugs used in the tap holes where parts have been removed for transportation. Be careful not to dam-

    age these parts, and keep them in a safe place so that they can be used for future transportation. For bolts where the tightening

    torque is not separately specified in the maintenance standards, use the tightening torque given in the table below.

    1. Tightening torque for bolts

    Tighten bolts according to Table 1 when using an impact wrench or spanner.

    Apply Table 1 to bolts as a rule. No torque is indicated on drawings as long as Table 1 is applicable.

    Table 1Unit: Nm {kgm}

    Thread diameter Pitch

    a (mm)

    Width across flats

    b (mm)

    Tightening torque

    Target Range

    6 1 1012

    {1.2}

    8.8 - 14.7

    {0.9 - 1.5}

    8 1.25 13 25{2.5}

    14.7 - 34{1.5 - 3.5}

    10 1.5 1754

    {5.5}

    34 - 74

    {3.5 - 7.5}

    12 1.75 1989

    {9}

    54 - 123

    {5.5 - 12.5}

    14 2 22137

    {14}

    84 - 196

    {8.5 - 20}

    16 2 24230

    {23.5}

    147 - 309

    {15 - 31.5}

    18 2.5 27

    315

    {32}

    201 - 427

    {20.5 - 43.5}

    20 2.5 30460

    {47}

    319 - 608

    {32.5 - 62}

    22 2.5 32650

    {66.5}

    471 - 829

    {48 - 84.5}

    24 3 36810

    {82.5}

    588 - 1030

    {60 - 105}

    27 3 411180

    {120}

    883 - 1470

    {90 - 150}

    30 3 461520

    {155}

    1130 - 1910

    {115- 195}

    33 3 501960

    {200}

    1470 - 2450

    {150 - 250}

    36 3 552450

    {250}

    1860 - 3040

    {190 - 310}

    39 3 602940

    {300}

    2260 - 3630

    {230 - 370}

  • 7/26/2019 Armado GEN00060-03

    35/288

    30

    When using a torque wrench, apply Table 2.

    Apply Table 2 when tightening torque must be controlled very strictly.

    Table 2Unit: Nm {kgm}

    Thread diameter Pitch

    a (mm)

    Width across flats

    b (mm)

    Tightening torque

    Target Range

    6 1 1013.2

    {1.35}

    11.8 - 14.7

    {1.2 - 1.5}

    8 1.25 1331

    {3.2}

    27 - 34

    {2.8 - 3.5}

    10 1.5 1766

    {6.7}

    59 - 74

    {6.0 - 7.5}

    12 1.75 19113

    {11.5}

    98 - 123

    {10.0 - 12.5}

    14 2 22 172{17.5}

    153 - 190{15.5 - 19.5}

    16 2 24260

    {26.5}

    235 - 285

    {23.5 - 29.5}

    18 2.5 27360

    {37.0}

    320 - 400

    {33.0 - 41.0}

    20 2.5 30510

    {52.3}

    455 - 565

    {46.5 - 58.0}

    22 2.5 32688

    {70.3}

    610 - 765

    {62.5 - 78.0}

    24 3 36

    883

    {90.0}

    785 - 980

    {80.0 - 100.0}

    27 3 411295

    {132.5}

    1150 - 1440

    {118.0 - 147.0}

    30 3 461720

    {175.0}

    1520 - 1910

    {155.0- 195.0}

    33 3 502210

    {225.0}

    1960 - 2450

    {200.0 - 250.0}

    36 3 552750

    {280.0}

    2450 - 3040

    {250.0 - 310.0}

    39 3 603280

    {335.0}

    2890 - 3630

    {295.0 - 370.0}

  • 7/26/2019 Armado GEN00060-03

    36/288

    31

    2. Tightening torque for pipe threads

    Apply the following standards to the taper male pipe threads of size R1/8 - R1, taper female pipe threads of size Rc1/8 -

    Rc1 and parallel female threads of size Rp1/8 - Rp1 (coated with adhesive). Do not apply them, however, if a tightening

    torque is otherwise specified.

    2-1. Apply Table 1 to male screws made of SS400, FC or SGP.

    Table 1Unit: Nm {kgm}

    2-2. Apply Table 2 to male screws made of S43C.

    Table 2

    Unit: Nm {kgm}

    Material of female screwSteel Cast iron Light alloy

    Nominal size

    1 / 83.9 - 6.9

    {0.4 - 0.7}

    2.9 - 5.9

    {0.3 - 0.6}

    2.0 - 3.9

    {0.2 - 0.4}

    1 / 45.9 - 11.8

    {0.6 - 1.2}

    4.9 - 9.8

    {0.5 - 1.0}

    3.9 - 7.8

    {0.4 - 0.8}

    3 / 816.7 - 26.5

    {1.7 - 2.7}

    13.7 - 21.6

    {1.4 - 2.2}

    9.8 - 16.7

    {1.0 - 1.7}

    1 / 2 32.3 - 52.9{3.3 - 5.4}

    26.5 - 43.1{2.7 - 4.4}

    19.6 - 32.3{2.0 - 3.3}

    3 / 451.0 - 85.3

    {5.2 - 8.7}

    42.1 - 70.6

    {4.3 - 7.2}

    31.4 - 52.9

    {3.2 - 5.4}

    186.2 - 173.5

    {8.8 - 17.7}

    72.5 - 146.0

    {7.4 - 14.9}

    54.9 - 111.7

    {5.6 - 11.4}

    Material of female screwSteel Cast iron Light alloy

    Nominal size

    1 / 816.7 - 29.4

    {1.7 - 3.0}

    9.8 - 19.6

    {1.0 - 2.0}

    6.9 - 14.7

    {0.7 - 1.5}

    1 / 419.6 - 44.1

    {2.0 - 4.5}

    16.7 - 37.2

    {1.7 - 3.8}

    12.7 - 28.4

    {1.3 - 2.9}

    3 / 844.1 - 93.1

    {4.5 - 9.5}

    37.2 - 77.4

    {3.8 - 7.9}

    27.4 - 58.8

    {2.8 - 6.0}

    1 / 298.0 - 188.2

    {10.0 - 19.2}

    83.3 - 157.8

    {8.5 - 16.1}

    60.8 - 115.6

    {6.2 - 11.8}

    3 / 4170.5 - 316.5

    {17.4 - 32.3}

    141.1 - 247.0

    {14.4 - 25.2}

    105.8 - 186.2

    {10.8 - 19.0}

    1367.5 - 612.5

    {37.5 - 62.5}

    309.7 - 514.5

    {31.6 - 52.5}

    235.2 - 392.0

    {24.0 - 40.0}

  • 7/26/2019 Armado GEN00060-03

    37/288

    32

    3. Tightening torque for hoses (with taper seals or face seals)

    Unit: Nm {kgm}

    When installing rubber hoses, extremely take care not to twist them.

    Nominal size

    of hoseWidth across flats

    Tightening torque

    Range Target

    02 19 35 - 63 {3.5 - 6.5} 44 {4.5}

    03

    22 54 - 93 {5.5 - 9.5} 74 {7.5}

    24 59 - 98 {6.0 - 10.0} 78 {8.0}

    04 27 84 - 132 {8.5 - 13.5} 103 {10.5}

    05 32 128 - 186 {13.0 - 19.0} 157 {16.0}

    06 36 177 - 245 {18.0 - 25.0} 216 {22.0}

    (10) 41 177 - 245 {18.0 - 25.0} 216 {22.0}

    (12) 46 197 - 294 {20.0 - 30.0} 245 {25.0}

    (14) 55 246 - 343 {25.0 - 35.0} 294 {30.0}

  • 7/26/2019 Armado GEN00060-03

    38/288

    33

    COATING MATERIALS LIST

    a The coating materials such as adhesives, gasket sealants, and greases used for disassembly and assembly

    are listed below.

    a For coating materials not listed below, use the equivalent of products shown in this list.

    Category Komatsu code Part No. Q'ty Container Main features and applications

    Adhesive

    LT-1A 790-129-9030 150 g Tube Used to prevent rubber gaskets, rub-

    ber cushions, and cock plugs fromcoming out.

    LT-1B 790-129-905020 g

    (2 pcs.)Polyethylene

    container

    Used for plastic (except polyethyl-ene, polypropylene, tetrafluoroethyl-ene and vinyl chloride), rubber,metal, and non-metal parts which re-quire immediate and strong adhe-sion.

    LT-2 09940-00030 50 gPolyethylene

    container

    Features: Resistance to heat andchemicals

    Used to fix and seal bolts and plugs.

    LT-3790-129-9060

    (Set of adhesiveand hardener)

    Adhesive:1 kg

    Hardener:500 g

    Can

    Used to stick metal, glass, and plas-tics.

    LT-4 790-129-9040 250 g Polyethylenecontainer

    Used to seal plugs.

    HoltzMH 705

    790-126-9120 75 g Tube Heat-resistant seal used to repair en-

    gines

    Threebond1735

    790-129-9140 50 gPolyethylene

    container

    Quick-setting adhesive Setting time: Within 5 sec. to 3 min. Used mainly to stick metals, rubbers,

    plastics, and woods.

    Aron-alpha201

    790-129-9130 2 gPolyethylene

    container

    Quick-setting adhesive Quick-setting type (max. strength is

    obtained after 30 minutes) Used mainly to stick rubbers, plas-

    tics, and metals.

    Loctite648-50

    79A-129-9110 50 cc Polyethylenecontainer

    Features: Resistance to heat and

    chemicals Used for fitted portions used at high

    temperatures.

    Gasket

    sealant

    LG-1 790-129-9010 200 g Tube Used to stick or seal gaskets and

    packings of power train case, etc.

    LG-5 790-129-9080 1 kgPolyethylene

    container

    Used to seal various threaded por-tions, pipe joints, and f langes.

    Used to seal tapered plugs, elbows,and nipples of hydraulic piping.

    LG-6 790-129-9020 200 g Tube

    Features: Silicon-based heat andcold-resistant sealant

    Used to sea flange surfaces andthreaded portions.

    Used to seal oil pan, final drive case,etc.

    LG-7 790-129-9070 1 kg Tube

    Features: Silicon-based quick-set-ting sealant

    Used to seal flywheel housing, intakemanifold, oil pan, thermostat hous-ing, etc.

    Three bond1211

    790-129-9090 100 g Tube Gasket sealant used to repair engine

    Three bond1207B

    419-15-18131 100 g Tube

    Features: Silicon-based, heat andcold-resistant, vibration-resistant,impact-resistant sealant

    Used to seal transfer case, etc.

    Molybdenum disulfidelubricant

    LM-G 09940-00051 60 g Can Used to lubricate sliding portions (to

    prevent squeaking).

    LM-P 09940-00040 200 g Tube

    Used to prevent scuffing and seizureof press-fitted portions, shrink-fittedportions, and threaded portions.

    Used to lubricate linkages, bearings,etc.

  • 7/26/2019 Armado GEN00060-03

    39/288

    34

    Category Komatsu code Part No. Q'ty Container Main applications, features

    Grease

    G2-LI

    SYG2-400LISYG2-350LISYG2-400LI-ASYG2-160LISYGA-160CNLI

    Various Various

    General purpose type

    G2-CA

    SYG2-400CASYG2-350CA

    SYG2-400CA-ASYG2-160CASYGA-160CNCA

    Various Various

    Used for bearings used at normaltemperature under light load in

    contact with water or steam.

    MolybdenumdisulfidelubricantLM-G (G2-M)

    SYG2-400MSYG2-400M-ASYGA-16CNM

    400 g 10400 g 20

    16 kg

    Bellows-typecontainer

    Can

    Used for parts under heavy load.

    Hyper WhiteGrease G2-TG0-T (*)*: For cold

    district

    SYG2-400T-ASYG2-16CNTSYG0-400T-A (*)SYG0-16CNT (*)

    Bellows-typecontainer

    Can

    Seizure resistance and heat resist-ance higher than molybdenum di-sulfide

    Not conspicuous on machine sincecolor is white.

    Biogrease G2-B,G2-BT (*)

    *: For use at hightemperatureand under highload

    SYG2-400B

    SYGA-16CNBSYG0-400BT (*)SYGA-16CNBT (*)

    Bellows-typecontainerCan

    Since this grease is decomposedby natural bacteria in short period,

    it has less effects on microorgan-isms, animals, and plants.

    Primer

    SUNSTARPAINT PRIMER580 SUPER

    417-926-3910

    20 mlGlass

    container

    Adhesiveforcabglass

    Used as primer for cab side(Using limit: 4 months afterdate of manufacture)

    SUNSTARGLASS PRIMER580 SUPER

    20 mlGlass

    container

    Used as primer for glass side(Using limit: 4 months afterdate of manufacture)

    SUNSTARPAINT PRIMER435-95

    22M-54-27230 20 mlGlass

    container

    Used as primer for paintedsurface on cab side(Using limit: 4 months afterdate of manufacture)

    SUNSTARGLASS PRIMER435-41

    22M-54-27240 150 ml Can

    Used as primer for black ce-ramic-coated surface onglass side and for hard poly-carbonate-coated surface(Using limit: 4 months afterdate of manufacture)

    SUNSTARSASH PRIMERGP-402

    22M-54-27250 20 mlGlass

    container

    Used as primer for sash(Almite)(Using limit: 4 months afterdate of manufacture)

    Adhesive

    SUNSTARPENGUINESEAL 580SUPER "S" or

    "W"

    417-926-3910 320 mlPolyethylene

    container

    "S" is used for high-tempera-ture season (April - October)and "W" for low-temperatureseason (November - April) asadhesive for glass.

    (Using limit: 4 months afterdate of manufacture)

    Sika Japan,Sikaflex 256HV

    20Y-54-39850 310 mlPolyethylene

    container

    Used as adhesive for glass.(Using limit: 6 months afterdate of manufacture)

    SUNSTARPENGUINESUPER 560

    22M-54-27210 320 mlEcocart(Special

    container)

    Used as adhesive for glass.(Using limit: 6 months afterdate of manufacture)

    Caulking

    material

    SUNSTARPENGUINESEAL No. 2505

    417-926-3920 320 mlPolyethylene

    container

    Used to seal joints of glassparts.(Using limit: 4 months afterdate of manufacture)

    SEKISUISILICONESEALANT

    20Y-54-55130 333 mlPolyethylene

    container

    Used to seal front window.(Using limit: 6 months after

    date of manufacture)

    GE TOSHIBASILICONESTOSSEAL 381

    22M-54-27220 333 ml Cartridge

    Used to seal joint of glasses.Translucent white seal. (Us-ing limit: 12 months after dateof manufacture)

    400 g

    16 kg

    400 g16 kg

  • 7/26/2019 Armado GEN00060-03

    40/288

    35

    A. ASSEMBLY OF CHASSIS

  • 7/26/2019 Armado GEN00060-03

    41/288

    36

    Assembly procedure Assembly of track frame assemblyand center frame assembly (1/3)A-1

    Precautions Tools required Equipment required

    a When slinging the center frame, take carenot to crush the grease piping of thecircuit with wires.

    Name Qty Name Qty

    Power wrench (16)(21t-98-11120)

    1 Hydraulic jack 50t 2

    Socket 38 70 mm(21T-98-11120)

    1 Truck crane 45 t 2

    Handle(21T-98-11130)

    1 Center frame stand 2

    KW45F Impact wrench 1

    Spline socket H70 1

    Tap (M45 3) 1

    Others

    Track frame assembly (right)

    Width across flats

    4413 4903 Nm

    (450 500 kgm)

    Tightening torque

    Center frame assembly

    Track frame assembly (left)

    Apply wooden blocks etc.

    to parts which wire ropes

    will touch.

    No. Part No. Q'ty

    A-1 21T-30-71160 76

    A-2 21T-30-71170 76A-3 208-30-11850 1

    A-4 208-30-11861 1

    A-5 01024-81225 3

  • 7/26/2019 Armado GEN00060-03

    42/288

    37

    1) Place the left track frame assembly as shown in the figure

    at right.

    2) Sling the center frame assembly with a 45-ton crane and

    couple it with the track frames.

    3) Remove the plugs from the coupling surface and clean

    the coupling surface in advance.

    4) Insert all the bolts, tighten them temporarily, and support

    only the right side of the center frame on a jack.

    5) Sling the right track frame assembly with the 45-ton crane

    and couple it with the center frame. At this time, the jack

    under the center frame should be heightened a little for

    the ease of coupling.

    a If you pull in the right track toward the center frame

    with a chain block, you can work easily.

    6) Insert all the bolts, tighten them temporarily, and lower

    the crane.

    7) Remove the jack.

    Assembly procedure Assembly of track frame assemblyand center frame assembly (2/3)A-1

    Tools required Equipment required

    Name Qt Name Qt

    Pin 50 40 mm(Hard steel)

    2 Crane 45t 2

    Wire 40 5 m(General purpose)

    2

    Others

    Yoke Cushioncylinder

    Blind plug

    HosePlunger on grease side

    Plunger on hydraulic cushion side

    Precautions

    [Before slinging with crane]

    Check that projection (A) of the hydraulic cushion cylinder

    plunger is approx. 10 mm.

    If the projection is not approx. 10 mm, remove the blind plug from

    the hose to drain the oil in the cylinder and then install the blind

    plug again. Check that projection (B) of the plunger on the grease side is

    approx. 35 mm (that grease has been supplied). If the projection

    is not approx. 35 mm, adjust it by supplying grease through the

    grease fitting. (See A-56.).

    Left RightCenter frame assembly

    Rear view

    Use only stands before coupling.

    After coupling with left track frame,

    left stand is not necessary any more.

    20 Pipe

    Grip

    45 t45 t

    Pin (See above figure)

    Method of slinging track frame

    If 2 cranes are used, holes can be aligned easily.

  • 7/26/2019 Armado GEN00060-03

    43/288

    38

    1) Eliminate the clearance between the mating faces of the track frame and center frame (at the top, bottom, right and left).

    Jack up the track frame, if necessary.

    2) Coupling bolt

    Power wrench (16) + 36 kgm torque wrenchMounting bolt size: M45 P3

    Tightening torque: 450 500 kgm

    Assembly procedure Assembly of track frame assemblyand center frame assembly (3/3)A-1

    Precautions Tools required Equipment required

    When installing the clamping bolts, remove thepiping at the rear of the center frame(so that you can use an impact wrench easily).(See Assembly procedure A-3.)

    Name Qty Name Qty

    20t Jack 2

    Others

    Input: 35 kgm

    If input exceeds 35 kgm, power wrench may be broken.

    20 t

  • 7/26/2019 Armado GEN00060-03

    44/288

    39

    Assembly procedure

    Idler cushion cylinder pipingA-2

    Precautions Tools required Equipment required

    1) When connecting the crawler frame, removethe bolts and bracket marked with .

    2) When connecting, take care not to break thetube.

    Name Qty Name Qty

    KW10P Impact wrench 1

    KW12P Impact wrench 1

    17 mm Socket 1

    19 mm Socket 1

    Others

    Bracket and clamp are

    installed to piping when

    transported.

    3Tightening torque for U-clamp11 -- 26 Nm {1.1 -- 2.7 kgm }

    Bolts are installed to crawler

    frame when transported.

    Use following parts installed when transported.

    07371-30640(4): FLANGE

    07395-21035(8): BOLT

    No. Part No. Q'ty

    A-6 07000-B3025 2

  • 7/26/2019 Armado GEN00060-03

    45/288

    40

    Assembly procedure

    Travel motor pipingA-3

    Precautions Tools required Equipment required

    1) Take care that dirt will not enter the piping.

    2) The hoses are installed to the travel motor.

    Name Qty Name Qty

    KW10P Impact wrench 1

    KW12P Impact wrench 1

    KW14P Impact wrench 1

    17 mm Socket 1

    19 mm Socket 1

    150 mm Extension 1

    300 mm Extension 1

    24 mm Spanner 1

    32 mm Spanner 1

    Others

    Use following parts installed when transported.

    07371-51470(8): FLANGE

    01010-81455(16): BOLT

    01643-31445(16): WASHER

    Connect

    Return piping which was removed

    when track frame and center frame

    were connected.

    No. Part No. Q'ty

    A-7 07000-B3048 4

    A-8 02896-61018 2

  • 7/26/2019 Armado GEN00060-03

    46/288

    41

    Assembly procedure

    Installation of travel motor cover (1/2)A-4

    Precautions Tools required Equipment required

    Travel motor guard is installed to crawlerframe assembly when transported.Travel motor cover is installed temporarily tocrawler frame assembly when transported.

    a Before performing this item, bleed air fromthe travel motor.

    Name Qty Name Qty

    KW12P Impact wrench 1

    19 mm socket 1

    Others

    Crawler frame

    Travel motor cover

    Travel motor guard

  • 7/26/2019 Armado GEN00060-03

    47/288

    42

    Assembly procedure

    Installation of travel motor cover (2/2)A-4

    Precautions Tools required Equipment required

    . Name Qty Name Qty

    KW12P Impact wrench 1

    19 mm socket 1

    Others

    Right side

    Left side

    No. Part No. Q'ty

    A-9 01024-81235 4

    A-10 424-54-14230 4

    A-11 01024-81230 12

    A-12 21N-30-11340 16

    A-13 01641-21223 12

    A-14 21T-30-32172 1A-15 21T-30-32182 1

    A-16 01010-82460 10

    A-17 17A-54-44130 10

  • 7/26/2019 Armado GEN00060-03

    48/288

    43

    Assembly procedure

    Filling swing circle with greaseA-5

    Precautions Tools required Equipment required

    1) Supply grease (G2-LI) of 4 20 l(18 kg) pales = 80 l(72 kg).

    2) Clean the swing circle mounting face.

    3) Remove the rust preventive.(If any rust preventive is left, the bolttorque will be decreased.)

    Name Qty Name Qty

    Others

    Grease bath seal (all round)

    1) Fill the swing circle grease bath with grease (G2-LI).

    2) Apply grease to the swing circle gear contact faces. (Approx. 10 L in 80 L shown above)

    3) Fill the grease bath seal with grease.

    4) Apply gasket sealant LG-6to top of swing bearing.See Note 2.

    See Note 1.

    (Note 1) (Note 2)

    Grease bath seal

    Supply grease near

    swing circle gear.

    Apply LG-6 to swing circle gear

    side of outer race mounting bolts.

    G2-LI

    (gasket sealant)

  • 7/26/2019 Armado GEN00060-03

    49/288

    44

    1) Positioning of crane and revolving frame 2) Method of slinging front end

    Rear of boom foot pin

    3) Method of slinging rear end

    Sling front and rear ends simultaneously with 2 truck cranes.

    Assembly procedure Assembly of revolving frame assemblyand undercarriage (1/2)A-6

    Precautions Tools required Equipment required.

    aWhen slinging the revolving frame, adjust it to the horizontal in eachdirection with shackles.

    aRemove the rust preventive from the mounting faces of the revolving frameand swing circle and from the inside face of the taps and then clean thosefaces. (If any rust preventive is left, the bolt torque will be decreased.)

    Name Qt Name Qt

    See above.

    SC55 shackle = 18 t(Inside width: 83 mm)

    SC40 shackle = 10 t

    Others

    Fix the ropes to the hook securely.

    Take care of the center of

    gravity of the crane hook.

    If the hook is loaded,the boom lowers a little.

    When installing revolving frame assembly to

    undercarriage, remove transportation jigs.

  • 7/26/2019 Armado GEN00060-03

    50/288

    45

    Assembly procedure Assembly of revolving frame assemblyand undercarriage (2/2)A-6

    Precautions Tools required Equipment required

    Name Qt Name Qt

    For temporary tightening

    KW45F Impact wrench 1

    19 mm Socket 1

    For retightening 1

    KW45FG Impact wrench 1

    55 mm Spline socket 1

    Tap (M36 3) 1

    Others

    Fix the ropes to the hook securely.

    Take care of the center of

    gravity of the crane hook.If the hook is loaded,

    the boom lowers a little.

    a When disassembling to 27 t, install swing

    machinery later.

    a When disassembling to 32 t, raise the

    motor.

    See Installation of swing machinery (A-7).

    Dowel pin

    Width across flats

    3Tightening torque :250 -- 310 kgm

    Apply LT-2.

    Revolving frame assembly Apply LG-6 (TB1215) all round revolving

    frame coupling surface without leaving anybreaks. (Apply to inside of bolt holes.)

    3Tightening torque :2450 -- 3040 Nm {250 -- 300 kgm}

    Apply LT-2.

    Right

    LeftFront

    Rear

    aSling horizontally to protect the pinion.

    No. Part No. Q'ty

    B-1 21T-25-67150 60

    B-2 01643-33690 60

    1) Clean the mounting surface.

    2) Align the dowel pin with the dowel pin hole of the swing circle.

    3) Sling and couple the revolving frame.

    Take care not to hit it against the swivel joint and grease bath.

    4) Tighten all the bolts lightly.

    Retighten them after finishing assembly.

    5) Tighten the 3 bolts on each side, front 8 bolts and rear 3 bolts (17 in total) in figure

    to the specified torque.

  • 7/26/2019 Armado GEN00060-03

    51/288

    46

    Assembly procedure Installation of swing machinery (front) assembly (27t)Installation of swing motor (front) assembly (32t)A-7

    Precautions Tools required Equipment required

    a When connecting the revolving frame to theundercarriage, raise the swing motorassembly (front). (200 mm)After connecting the revolving frame to theundercarriage, reinstall the swing motorassembly. (When disassembled to 32 t)

    Name Qty Name Qty

    KW45F Impact wrench 1

    46 mm Box 1

    Joint 1

    KW10P Impact wrench 1

    14 mm Box 1

    19 mm Set wrench 1

    19 mm Spanner 132 mm Set wrench 1

    32 mm Spanner 1

    Others

    Swing machinery (front) assembly

    Swing motor (front) assembly

    155 195 kgm

    1140 kg

    Connection at5 places

    Coupling

    Use split flanges and bolts

    installed when transported.

    07371-31049(6): FLANGE

    07375-21035(12): BOLT

    No. Part No. Q'ty

    B-3 01010-83090 14

    B-4 01643-33080 14

    B-5 07000-B3032 1

    B-6 07000-B3032 2B-7 02896-61015 1

    B-8 02896-61008 1

    B-9 01024-81225 1

  • 7/26/2019 Armado GEN00060-03

    52/288

    47

    Assembly procedure

    Connection of swivel joint piping (1/2)A-8

    Precautions Tools required Equipment required

    a Connect the travel piping before installingthe swing machinery.

    Name Qty Name Qty

    KW14PI Impact wrench 1

    22 mm Socket 1

    150 mm Extension 1

    41 mm Spanner 1

    Pliers 1

    Set wrench 1

    Others

    Connection

    Connection

    Coupling

    No. Part No. Q'ty

    B-10 11Y-62-11980 1

    B-11 02896-61009 4

    To drain filter

  • 7/26/2019 Armado GEN00060-03

    53/288

    48

    Assembly procedure

    Connection of swivel joint piping (2/2)A-8

    Precautions Tools required Equipment required

    Name Qty Name Qty

    KW14PI Impact wrench 1

    22 mm Socket 1

    150 mm Extension 1

    41 mm Spanner 1

    Pliers 1

    Others

    Connection

    Use following parts installed when transported.

    07371-51470(8): FLANGE01010-81455(16): BOLT

    01643-31445(16): WASHER

    If installed angle ofpipe is not proper

    when connected,

    loosen opposite side

    and then install.

    No. Part No. Q'ty

    B-12 07000-B3048 4

  • 7/26/2019 Armado GEN00060-03

    54/288

    49

    Assembly procedure

    Connection of swing circle grease pipingA-9

    Precautions Tools required Equipment required

    Name Qty Name Qty

    17 mm Spanner 1

    19 mm Spanner 1

    Others

    Connection

  • 7/26/2019 Armado GEN00060-03

    55/288

    50

    Assembly procedure

    Installation of hydraulic tank assembly (1/5)A-10

    Precautions Tools required Equipment required

    a Before connecting the revolving frame tothe undercarriage, install the hydraulictank.

    Name Qty Name Qty

    Others

    Hydraulic tank assembly

    1670 kg

    Use bolts and washers installed when

    transported.

    01024-81235(8): BOLT

    3Tightening torque :1520 -- 1910 Nm {155 -- 195 kgm}

    Connection

    Suction tubes are installed temporarily

    to chassis when transported.

    3Tightening torque for U-clamp35.3 -- 87.2 Nm {3.6 -- 8.9 kgm}

    3Tightening torque for coupling6.4 -- 7.4 Nm {0.65 -- 0.75 kgm}

    No. Part No. Q'tyB-13 07000-B5230 2

    B-14 01011-83010 12

    B-15 21T-26-11460 12

    For disassembly to 27 t

  • 7/26/2019 Armado GEN00060-03

    56/288

    51

    Assembly procedure

    Installation of hydraulic tank assembly (2/5)A-10

    Precautions Tools required Equipment required

    Name Qty Name Qty

    Others

    For disassembly to 27 t

    Clamp air conditioner hoses

    at 4 places marked with .

    Clamp PPC hoses

    at 2 places marked with .

  • 7/26/2019 Armado GEN00060-03

    57/288

    52

    Assembly procedure

    Installation of hydraulic tank assembly (3/5)A-10

    Precautions Tools required Equipment required

    Name Qty Name Qty

    Others

    Use split flanges and bolts installed when transported.

    07371-32076(16): FLANGE

    07375-21240(32): BOLT

    Connection at5 places

    Clamp hose.

    No. Part No. Q'ty

    B-16 07000-B2060 8

    For disassembly to 27 t

  • 7/26/2019 Armado GEN00060-03

    58/288

    53

    Assembly procedure

    Installation of hydraulic tank assembly (4/5)A-10

    Precautions Tools required Equipment required

    Name Qty Name Qty

    Others

    Use split flanges and bolts installed when transported.

    07371-31049(2): FLANGE

    07375-21035(4): BOLT

    Connection at4 places

    No. Part No. Q'ty

    B-17 11Y-62-11980 3

    B-18 07000-B3032 1

    For disassembly to 27 t

  • 7/26/2019 Armado GEN00060-03

    59/288

    54

    Assembly procedure

    Installation of hydraulic tank assembly (5/5)A-10

    Precautions Tools required Equipment required

    Precautions to be observed when connectingDT, DTP or DTHD connectorAfter connecting the connector, check visually

    that the connector is locked securely.If the connector is not locked securely,reconnect it.

    Name Qty Name Qty

    Others

    When locked When unlocked

    For disassembly to 27 t

    Clamp wiring harness

    (Side of vertical panel of revolving frame).

    Clamp wiring harness

    (L-bracket in cab base).

    Connect wiring harness connector

    (inside of cab base).

    Pull wiring harness into cab base

    through this grommet.

  • 7/26/2019 Armado GEN00060-03

    60/288

    55

    Assembly procedure

    Installation of fuel tank assemblyA-11

    Precautions Tools required Equipment required

    Name Qty Name Qty

    KW45F Impact wrench 1 45t Crane 1

    46 mm Socket 1

    12 5 m Wire 2

    Eyebolt M30-P3 2

    Others

    50 t Crane Fuel tank assembly2,400 kg (including 400 L of fuel)

    Bolt Collar

    No. Part No. Q'ty

    C-1 01011-83010 20

    C-2 21T-26-11460 20

  • 7/26/2019 Armado GEN00060-03

    61/288

    56

    Fuel piping1. Connection of return and spill lines

    1) Remove the blind plugs of the return and spill lines.

    2) Connect the return and spill lines marked withand fix them with the clamps.

    2. Connection of drain and supply lines

    1) Remove the transportation clamps of the drain line marked withA.Keep 1 of the 2 clamps to use in 3).

    2) Remove the blind plugs of the drain and supply lines.

    3) Connect the drain and supply lines marked withw.

    Assembly procedure Connection of fuel tank assemblypiping and wiring (1/2)A-12

    Precautions Tools required Equipment required

    Name Qty Name Qty

    27 mm Spanner 1

    32 mm Spanner 1

    36 mm Spanner 1

    19 mm Socket 1

    KW14PI Impact wrench 1

    Others

    Return line

    Band marker: Red

    Spill line

    Band marker: None

    O-ring

    BoltClamp

    O-ring

    Delivery line

    O-ring

    Drain line

    Reused clamp

    No. Part No. Q'ty

    C-3 04435-52212 1

    C-4 02896-61012 1C-5 02896-61015 2

    C-6 02896-61018 2

    C-7 01024-81220 1

  • 7/26/2019 Armado GEN00060-03

    62/288

    57

    Electric wiring

    Assembly procedure Connection of fuel tank assemblypiping and wiring (2/2)A-12

    Precautions Tools required Equipment required

    Precautions to be observed when connectingDT, DTP or DTHD connectorAfter connecting the connector, check visually

    that the connector is locked securely.If the connector is not locked securely,reconnect it.

    Name Qty Name Qty

    Others

    When locked When unlocked

    Clamp

    Clamp

    Bolt

    Bolt

    1. Clamp the wiring harness to the grease can bracket.

    4 places marked with

    2. Connect the wiring harness connector marked with .

    No. Part No. Q'tyC-8 04434-52312 1

    C-9 04434-51912 3

    C-10 01024-81220 4

  • 7/26/2019 Armado GEN00060-03

    63/288

    58

    Assembly procedure

    Installation of cab base assembly (1/2)A-13

    Precautions Tools required Equipment required

    a Install the catwalks while the cab base ison the ground.

    Name Qty Name Qty

    KW20PI Impact wrench 1 45t Crane 1

    30 mm Socket 1

    12 5 m Wire 3

    SC14 Shackle 3

    Others

    Cab base assembly

    Cab front catwark

    100 kg

    Cab left catwark

    220 kg

    2300 kgMounting bolt ofcab base assembly

    Mounting bolt ofcab base assembly

    No. Part No. Q'ty

    C-11 01034-81245 10

    C-12 01034-81265 10C-13 21T-54-31140 1

    C-14 21T-54-31150 1

    C-15 01034-81245 2

  • 7/26/2019 Armado GEN00060-03

    64/288

    59

    Assembly procedure

    Installation of cab base assembly (2/2)A-13

    Precautions Tools required Equipment required

    Name Qty Name Qty

    Others

    C-18

    C-18 C-17

    C-16 C-18 C-16

    No. Part No. Q'ty

    C-16 01011-82025 20

    C-17 01011-82045 7

    C-18 567-40-41380 27

  • 7/26/2019 Armado GEN00060-03

    65/288

    60

    Assembly procedure

    Installation of left floor assembly (1/4)A-14

    Precautions Tools required Equipment required

    After the work, return the bolts removed toinstall the eyebolts.

    Name Qty Name Qty

    Others

    Install eyebolt. Install eyebolt.

    Install eyebolt. Sling jig

  • 7/26/2019 Armado GEN00060-03

    66/288

    61

    Assembly procedure

    Installation of left floor assembly (2/4)A-14

    Precautions Tools required Equipment required

    Before tightening the mounting bolts at parts(a) and (b), check that both mating faces arefitted to each other.

    Name Qty Name Qty

    Others

    Part a

    Part b

    C-20 C-19

    C-20 C-19C-20 C-19

    No. Part No. Q'ty

    C-19 01010-82065 24

    C-20 01643-32060 24

  • 7/26/2019 Armado GEN00060-03

    67/288

    62

    Assembly procedure

    Installation of left floor assembly (3/4)A-14

    Precautions Tools required Equipment required

    Clearance a: 15 mm 10 mm(Reduce difference between widest andnarrowest clearances to 3 mm or less)

    Clearance b: 17 mm 5 mm(Reduce difference between widest andnarrowest clearances to 3 mm or less)

    Name Qty Name Qty

    Others

    C-23 C-24

    Clearance b

    Adjust clearance at this part,

    if necessary, by inserting shim

    under condenser box.Condenser box

    Clearance a

    Shim Shim

    C-21 C-22

    No. Part No. Q'ty

    t1.2 C-21 21T-53-31530 3

    t1.6 C-22 21T-53-31540 3

    C-23 21T-54-33471 1

    C-24 01034-81230 3

  • 7/26/2019 Armado GEN00060-03

    68/288

    63

    Adjust the projection of rubber stopper (a) at the door bottom and position of lock bar bracket (c) so that lock bar (b) at the door

    top will clasp while rubber stopper (a) is in contact with the side cover.

    Assembly procedure

    Installation of left floor assembly (4/4)A-14

    Lock bar bracket (c)

    Lock bar (b)

    Rubber stopper (a)

  • 7/26/2019 Armado GEN00060-03

    69/288

    64

    Assembly procedure

    Connection of cab base assembly piping (1/2)A-15

    Precautions Tools required Equipment required

    a Remove the hose cap. Name Qty Name Qty

    Others

    Connection (Face seal)

    Connection (Quick coupler)

    Green

    Brown

    White

    Black

    Yellow

    Blue

    Red

    No color mark

    Black/Black

    Blue/Black

    Red/Black

    Green/Black

    25

    No. Part No. Q'ty

    C-25 02896-61012 6

  • 7/26/2019 Armado GEN00060-03

    70/288

    65

    Assembly procedure

    Connection of cab base assembly piping (2/2)A-15

    Precautions Tools required Equipment required

    Name Qty Name Qty

    Others

    Connection

    Right wall in cab base

    No. Part No. Q'ty

    C-26 02896-61018 2

  • 7/26/2019 Armado GEN00060-03

    71/288

    66

    Assembly procedure

    Connection of cab base assembly wiring (1/5)A-16

    Precautions Tools required Equipment required

    When connecting the DRC multi-poleconnector, see "Precautions for connectingDRC multi-pole connector" on pages 3/5 5/5of this section.

    When connecting the DT, DTP or DTHDconnector, see "Precautions for connectingDT, DTP or DTHD connector" on pages 5/5of this section.

    Name Qty Name Qty

    Others

    Pass wiring harness through hole.

    Pass wiring harness

    through hole.

    Remove dust proof cap

    Connection

    Male Female

    CN-A05 21T-06-33810 21T-06-33820CN-A04 21T-06-338A0 21T-06-33830

    CN-A2221T-06-33120

    08191-00770(4)21T-06-33850

    08191-00770(4)

    Cap part No.

  • 7/26/2019 Armado GEN00060-03

    72/288

    67

    Assembly procedure

    Connection of cab base assembly wiring (2/5)A-16

    Precautions Tools required Equipment required

    When connecting the DT, DTP or DTHDconnector, see "Precautions for connectingDT, DTP or DTHD connector" on pages 5/5of this section.

    Remove the cover of part X when connectingthe wiring harness and install it again afterthe work.

    Name Qty Name Qty

    Others

    Connection

    Connection

    Connection

    Fix with clamps.

  • 7/26/2019 Armado GEN00060-03

    73/288

    68

    "Precautions for connecting DRC multi-pole connector"Precautions to be observed when connecting DRC multi-pole connector

    1. Before connecting

    2. Preparation for connection

    If the DRC multi-pole connector is at a high place, prepare a work stand so that you can stand stably and connect the con-

    nector while checking it visually.

    Assembly procedure

    Connection of cab base assembly wiring (3/5)A-16

    Precautions Tools required Equipment required

    Name Qty Name Qty

    Others

    If the seal rubber is broken or deformed,

    the connector may not be connected normally.

    In this case, replace the connector with new one.

    17A-06-41830

    17A-06-41840

    Check the edge for breakage or

    deformation. If it has any

    abnormality, replace the whole

    connector with new one.

  • 7/26/2019 Armado GEN00060-03

    74/288

    69

    3. Connecting method

    1) Check that the key ways are aligned and then set the terminals to each other while setting the seal rubber edge to the

    receptacle connector edge.

    While swinging the connectors up and down and to the right and left so that the terminals will be in position and clear-

    ance "a" and "b", and "c" and "d" between the connectors will be the same respectively, tighten the center hexagonsocket head bolt 1 turn.

    2) While swinging the connectors up and down and to the right and left again to adjust them finely so that clearance "a"

    and "b", and "c" and "d" between the connectors will be the same respectively, tighten the bolt gradually. Repeat this

    work several times.

    Assembly procedure

    Connection of cab base assembly wiring (4/5)A-16

    Precautions Tools required Equipment required

    Name Qty Name Qty

    Others

    Receptacle connector edge

    Seal rubber edge

    Terminal

    Up

    Down

    Left Right

    Hexagon socket head bolt

    Side view Bottom view

  • 7/26/2019 Armado GEN00060-03

    75/288

    70

    3) After clearances "a" and "b", and "c" and "d" between the connectors become the same and below 1 mm, tighten the

    hexagon socket head bolt to the following torque.

    4) Check after connection

    Turn the key switch ON and check that the electric parts of the chassis are operating normally. (Observe the condi-

    tion for several minutes after turning the key switch ON.)

    Start the engine, move the work equipment, and check that the electric parts (monitors and lights) do not blink

    because of vibrations.

    If any abnormality is detected by the above 2 checks, disconnect the connector and check it for a problem, and then repeat

    steps 1 - 3.

    "Precautions for connecting DT, DTP or DTHD connector"

    Precautions to be observed when connecting DT, DTP or DTHD connector

    After connecting the connector, check visually that the connector is locked securely.

    If the connector is not locked securely, reconnect it.

    Assembly procedure

    Connection of cab base assembly wiring (5/5)A-16

    Precautions Tools required Equipment required

    Name Qty Name Qty

    Others

    Approx. 1 mm

    2.83 0.28 Nm {0.28 0.03 kgm}

    When locked When unlocked

  • 7/26/2019 Armado GEN00060-03

    76/288

    71

    Assembly procedure

    Connection of left floor assembly heater pipingA-17

    Precautions Tools required Equipment required

    Name Qty Name Qty

    Others

    Distinction tape color: Blue

    Connection

    Distinction tape color: Red

    27

    No. Part No. Q'ty

    C-27 21T-979-3320 2

  • 7/26/2019 Armado GEN00060-03

    77/288

    72

    Assembly procedure

    Connection of left floor assembly wiringA-18

    Precautions Tools required Equipment required

    Precautions to be observed when connectingDT, DTP or DTHD connectorAfter connecting the connector, check visually

    that the connector is locked securely.If the connector is not locked securely,reconnect it.

    Name Qty Name Qty

    Others

    When locked When unlocked

    Front of machine

    Left of machine

    ConnectionConnection

    To cab

    This cable isdescribed in A-27.To air

    conditionercondenser

    Right side of battery case

    Top of air condit ioner condenser

  • 7/26/2019 Armado GEN00060-03

    78/288

    73

    Assembly procedure

    Installation of tail pipeA-19

    Precautions Tools required Equipment required

    a Before performing this work, connect thecontainer to the revolving frame.

    Name Qty Name Qty

    Others

    Top of power container

    Front of machine Left of machine

    No. Part No. Q'ty

    D-1 21M-01-18130 2D-2 01024-81230 12

    D-3 6162-14-5640 2

  • 7/26/2019 Armado GEN00060-03

    79/288

    74

    Assembly procedure

    Installation of power container assembly (1/2)A-20

    Precautions Tools required Equipment required

    a Before connecting the container, removethe undercover installed temporarily.(See A-24.)

    Name Qty Name Qty

    Others

    Power container assembly

    Right rear stopper

    Left rear stopper

    16100 kg

    Position container so that container frame will

    touch positioning stopper of container mount

    of revolving frame.

  • 7/26/2019 Armado GEN00060-03

    80/288

    75

    Assembly procedure

    Installation of power container assembly (2/2)A-20

    Precautions Tools required Equipment required

    Retighten the bolts finally after installing thecounterweight for safety.

    Name Qty Name Qty

    Others

    M42 3, L = 350 mm, Width across flats 65 mm

    3Tightening torque :3430 -- 4212 Nm (350 -- 430 kgm)

    Apply LT-2.

    Nut is welded to

    revolving frame.

    Plate with nuts

    4

    No. Part No. Q'ty

    D-4 21T-54-31121 4

    D-5 21T-54-31130 20

    D-6 01643-34212 20

  • 7/26/2019 Armado GEN00060-03

    81/288

    76

    Assembly procedure

    Connection of suction piping (1/2)A-21

    Precautions Tools required Equipment required

    Since the suction tube is lowered whendelivered, prepare MIKALOR bands.(See tightening procedure 2/2.)

    Name Qty Name Qty

    Others

    Use following parts installed

    when transported.

    01024-81230(4): BOLT Use following parts installed when transported.

    01010-81640(8): BOLT

    01643-31645(8): WASHER

    Main pump seen from below

    Connection

    Replace band(upper).

    Replace band

    (upper).

    No. Part No. Q'ty

    D-7 07000-B2140 2D-8 07000-B2100 1

    D-9 209-62-41341 4

    D-10 20Y-62-51671 2

  • 7/26/2019 Armado GEN00060-03

    82/288

    77

    1. Once a MIKALOR clamp is removed, do not use it again but replace it with new one.

    2. Install MIKALOR clamp marked as shown below.

    (1) Adjust bridge position so that the bridge shoud go into the bottom of band of clamp as shown in the following figure.

    (2) Tighten bolt so that dimension (a) should be below figure by using impact wrenchi.

    Assembly procedure

    Connection of suction piping (2/2)A-21

    BridgeApply lubricating oil

    (PANDO 18B made by Three Bond)

    on thread of bolt

    before tightening a bolt.

    Punch hole

    The overlap of bridge and band.

    No.

    1 209-62-41341 15 0-3

    2 20Y-62-51671 20 0-3

    Clamp part No. Dimension (a)

  • 7/26/2019 Armado GEN00060-03

    83/288

    78

    Assembly procedure

    Connection of oil cooler piping and pump drain pipingA-22

    Precautions Tools required Equipment required

    Take care that the O-ring will not be caught. Name Qty Name Qty

    Others

    Use following parts installed when transported.

    07371-32076(14): FLANGE

    07375-21240(28): BOLT

    Connection

    Connection

    Connection at3 places

    Temporarily

    installed to hose

    No. Part No. Q'ty

    D-11 07000-B2060 7

    D-12 07298-02011 1

  • 7/26/2019 Armado GEN00060-03

    84/288

    79

    Assembly procedure

    Connection of fan motor drain pipingA-23

    Precautions Tools required Equipment required

    Name Qty Name Qty

    Others

    Use following parts installed when transported.

    07371-31049(2): FLANGE

    07375-21035(4): BOLT

    Connection

    D-13

    No. Part No. Q'ty

    D-13 07000-B3032 1

  • 7/26/2019 Armado GEN00060-03

    85/288

    80

    Assembly procedure

    Installation of suction unit undercoverA-24

    Precautions Tools required Equipment required

    Name Qty Name Qty

    Others

    Undercover is installed to

    container when transported.

    When connecting suction unit,

    remove undercover, if necessary.

    After connecting suction unit,

    install undercover again.

    Z

  • 7/26/2019 Armado GEN00060-03

    86/288

    81

    Remove the covers shown below.

    Assembly procedure

    Connection of delivery piping (1/2)A-25

    Precautions Tools required Equipment required

    Name Qty Name Qty

    Others

    Parts to be removed

  • 7/26/2019 Armado GEN00060-03

    87/288

    82

    Assembly procedure

    Connection of delivery piping (2/2)A-25

    Precautions Tools required Equipment required

    a Secure the scaffoldings. Name Qty Name Qty

    Others

    Left of machine

    Front of machine

    Use following parts installed when transported.

    07371-51470(8): FLANGE

    01010-81455(16): BOLT

    01643-31445(16): WASHER

    Front end of power container

    Connection

    No. Part No. Q'ty

    D-14 07000-B3048 4

  • 7/26/2019 Armado GEN00060-03

    88/288

    83

    Assembly procedure

    Connection of pilot piping and fan motor pipingA-26

    Precautions Tools required Equipment required

    Name Qty Name Qty

    Others

    Left of machine

    Front of machine

    Use following parts installed when transported.

    07371-31049(2): FLANGE

    07375-21035(4): BOLT

    Use following parts installed when transported.

    07371-30640(4): FLANGE

    07375-21035(8): BOLT

    Front end of power container

    Connection

    D-16 D-15

    No. Part No. Q'ty

    D-15 07000-B3025 2

    D-16 07000-B3032 1

  • 7/26/2019 Armado GEN00060-03

    89/288

    84

    Assembly procedure Connection of power container assemblyfuel piping (1/2)A-27

    Precautions Tools required Equipment required

    3 Tightening torque for hoseA 177 245 Nm {18 25 kgm}B 128 186 Nm {13 19 kgm}

    Name Qty Name Qty

    Others

    Connection at3 places

    No. Part No. Q'tyD-17 02896-61018 2

    D-18 02896-61015 1

  • 7/26/2019 Armado GEN00060-03

    90/288

    85

    Assembly procedure Connection of power container assemblyfuel piping (2/2)A-27

    Precautions Tools required Equipment required

    Name Qty Name Qty

    Others

    Connection

    D-19

    No. Part No. Q'ty

    D-19 02896-61015 1

  • 7/26/2019 Armado GEN00060-03

    91/288

    86

    Assembly procedure Connection of power container assemblyair conditioner pipingA-28

    Precautions Tools required Equipment required

    Name Qty Name Qty

    Others

    Parts to be removed

    M24 (Width across flats: 27)

    Container side is female.

    M24 (Width across flats: 27)

    Container side is male.

    M22 (Width across flats: 24)

    Container side is female.

    M22 (Width across flats: 24)

    Container side is male.

    Connection

    Tightening torque 29.4 34.3 Nm Tightening torque 29.4 34.3 Nm

    Tightening torque 19.6 24.5 Nm Tightening torque 19.6 24.5 Nm

    Coat air conditioner lubrication oil

    Male Female

    M22 21F-979-3250 21F-979-3220

    M24 21F-979-3260 21F-979-3230

    Remove hose dust caps and connect hoses.

  • 7/26/2019 Armado GEN00060-03

    92/288

    87

    Assembly procedure Connection of power container assemblyheater pipingA-29

    Precautions Tools required Equipment required

    a Before connecting these hoses, connectall of the other heater hoses.

    Name Qty Name Qty

    Others

    Parts to be removed

    Connection (Quick coupler)

  • 7/26/2019 Armado GEN00060-03

    93/288

    88

    Assembly procedure Connection of power container assemblywiring (1/2)A-30

    Precautions Tools required Equipment required

    Name Qty Name Qty

    Others

    Connect the battery cable after all the

    wiring harnesses are connected.

    Front of machine

    Left of machine

    To ground seat ofrevolving frame vertical plate

    Connection

    Fix 2 terminals together.

    Connection

    May be connected to either one.

    Connection

    Fix 2 terminals together.

    Connection

    Remove cover and connect terminals in it.After connecting, install cover again.

    CNT02CNT01

  • 7/26/2019 Armado GEN00060-03

    94/288

    89

    Assembly procedure Connection of power container assemblywiring (2/2)A-30

    Precautions Tools required Equipment required

    Precautions to be observed when connectingDT, DTP or DTHD connectorAfter connecting the connector, check visually

    that the connector is locked securely.If the connector is not locked securely,reconnect it.

    Name Qty Name Qty

    Others

    When locked When unlocked

    Left of machine

    Front of machine

    Pass wiring harness

    through hole.

    Pass wiring harness

    through hole.

    Connection

    No. Part No. Q'ty

    D-19 08028-55065 2

    D-20 01024-81020 2

  • 7/26/2019 Armado GEN00060-03

    95/288

    90

    Assembly procedure

    Installation of operator's cab assembly (1/3)A-31

    Precautions Tools required Equipment required

    Name Qty Name Qty

    Others

    Operator's cab assembly

    When installing cab,remove mount coverand stopper bracket(see next page).

  • 7/26/2019 Armado GEN00060-03

    96/288

    91

    Assembly procedure

    Installation of operator's cab assembly (2/3)A-31

    Precautions Tools required Equipment required

    Name Qty Name Qty

    Others

    Left of machine

    Front of machine

    Adjust so that clearance

    will be 1.5 3 mm or less

    when operator is seated.

    When installing operator's cab assembly, set

    dowel pins of viscous mount to mating holes

    so that they will not be broken.

    Right and left mounts (J) - (P)

    Stopper bracket is installed

    to cab base temporarily.

    No. Part No. Q'tyE-1 21T-54-36661 16

    E-2 21T-54-36671 8

    E-3 21T-54-35321 8

  • 7/26/2019 Armado GEN00060-03

    97/288

    92

    STANDARD QUANTITIES OF SHIM

    Assembly procedure

    Installation of operator's cab assembly (3/3)A-31

    PORTION PART NUMBERSTD

    QUANTITIE