Arklow Wastewater Treatment Plant Update Newsletter Public Consultation Phase 2 May 2015 IW/CP/ATP/B/0515

Upload: others

Post on 24-Dec-2019

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Arklow Wastewater Treatment Plant...A report “Irish Water & Wicklow County Council Arklow Wastewater Treatment Plant, Site Assessment Report, Phase 2”, describing the second phase

Arklow Wastewater Treatment Plant Update Newsletter Public Consultation Phase 2May 2015

IW/C

P/AT

P/B/

0515

Page 2: Arklow Wastewater Treatment Plant...A report “Irish Water & Wicklow County Council Arklow Wastewater Treatment Plant, Site Assessment Report, Phase 2”, describing the second phase

Irish Water | Arklow WwTP | ii

The purpose of this brochure is to:

• Provide updated information on the Arklow Wastewater Treatment Plant Project

• Invite you to participate in this second round of public consultation

• Provideasummaryofthefirstpublicconsultationprocessanditsfindings,whatishappeningnow,andthe next steps

Have your say

Forfurtherinformation,pleasevisitourwebsite or contact the project team:

Web: www.water.ie/arklowtp

Email: [email protected]

Telephone: 089 228 5902 9am-5pm,Monday-Friday

MásmianleatcóipdenleabhránseoafháilasGaeilge,déanteagmháilleisanlinnaranuimihirthuasluaite.

Safeguarding your water for your future

Page 3: Arklow Wastewater Treatment Plant...A report “Irish Water & Wicklow County Council Arklow Wastewater Treatment Plant, Site Assessment Report, Phase 2”, describing the second phase

Irish Water | Arklow WwTP | 1

Why do we need the Arklow Wastewater Treatment Plant?

Atpresent,untreatedwastewaterfromhomesandbusinessesinArklowisdischargedintotheAvocaRiverthatrunsdirectlythroughArklowTown,Co.Wicklow.Thispracticeofdischarginguntreatedwastewater to the river is not acceptable and Irish Water intends to fixthisprobleminpartnershipwithWicklowCountyCouncil.

TheArklowWastewaterTreatmentPlantwillbringbenefitstothepeopleofArklowintermsofhealth,integrityoftheenvironmentandimprovedwaterqualityforall.AnewWastewaterTreatmentPlant will facilitate economic and social development for the town andsurroundsofArklow.

What does the project involve?

Irish Water intends to develop the Arklow Wastewater Treatment Plant Project which includes:

• AnewWastewaterTreatmentPlant(WwTP)of36,000populationequivalentwhichwillrequireapproximately2hectaresofland,thatwillbestmeetthecurrentneedsofArklow,andallowforfuture expansion of the town

• Associatedinfrastructuresuchaspumpingstation(s)

• ApipelinetobringtheuntreatedwastewatertotheWwTPandtobringcleantreatedwastewaterfromtheplanttotheoutfall

• AnoutfallpipetosafelydischargethetreatedwastewatertotheseaortotheAvocaRiver

Page 4: Arklow Wastewater Treatment Plant...A report “Irish Water & Wicklow County Council Arklow Wastewater Treatment Plant, Site Assessment Report, Phase 2”, describing the second phase

Irish Water | Arklow WwTP | 2

What has happened to date?

Step 1:

Thefirststepoftheprocesswastoidentifyareasoflandthatpotentiallycouldbeasuitablelocationfortheplant.Partofthiswastoidentify‘constraints’.AconstraintisalimitingfactoronsiteselectionforlocatingtheWwTP.Typicalconstraintswouldincludehumansettlements,culturalheritage,environmental(Special Areas of Conservation) or technical / physical factors (mountains/rivers/lakes/geologyetc.).

Step 2:

Mappingtheseconstraints,IrishWateridentifiedtenparcelsofland that could potentially accommodate the Arklow WwTP (see maponpage5):1.Ballymoney;2.Killiniskyduff;3.Seabank;4.Killbride;5.Lamberton&BallyraineUpper,6.Ferrybank(includingtheoldWallboardsite);7.TinahaskUpper;8.MoneyBig;9.BoglandandKish;10.SheltonAbbey(includingtheoldIFIsite).

Step 3:

IrishWaterthensetaboutlookingateachoftheselandparcelsin further detail in relation to:

• Potential environmental impacts associated with these site locations

•Engineeringandconstructionconstraintsandconsiderations

• Potential outfall locations

Page 5: Arklow Wastewater Treatment Plant...A report “Irish Water & Wicklow County Council Arklow Wastewater Treatment Plant, Site Assessment Report, Phase 2”, describing the second phase

Irish Water | Arklow WwTP | 3

Basedonthisanalysis,threepotentiallandparcels(listedbelow) wereidentified:

No.3Seabank

No.6Ferrybank(OldWallboardsite)

No.7TinahaskUpper.

Step 4:

PublicconsultationtookplacefromOctobertoDecember2014onthefirstphaseofthesiteselectionprocess,includingfeedbackontheconstraintsandwhatshouldbeconsideredinchoosingtheEmergingPreferredSite,routepipelineandoutfalllocation.

IrishWaterwouldliketothankallofthosewhotookpartinthisfirstroundofpublicconsultation.Areport“Consultation Report Phase 1” summarisingtheissuesraisedisnowavailableontheIrishWaterwebsite at www.water.ie/arklowtp.Relevantfeedbackfromthepublicconsultationformedpartofthenextstageoftheprocess,wherefurtherstudieswereundertaken.

Step 5:

Followingmoredetailedinvestigationsoneachoftheidentifiedlandparcels,IrishWaterhasidentifiedtheEmergingPreferredSiteasFerrybank(OldWallboardsite),No.6onthemap,withanoutfallto theIrishSea.

TheEmergingPreferredSitewaschosenfollowinganassessmentof landparcelsandreviewofissuesraisedfromthepublicconsultation.This process involved an assessment of the pros and cons of each of thelandparcels,pipelineroutesandoutfalllocationsagainstarange ofcriteria(environment,social,economicandtechnical,setoutbelow).

Page 6: Arklow Wastewater Treatment Plant...A report “Irish Water & Wicklow County Council Arklow Wastewater Treatment Plant, Site Assessment Report, Phase 2”, describing the second phase

Irish Water | Arklow WwTP | 4

Why is Ferrybank (old Wallboard site) the Emerging Preferred Site?

Takingintoaccountthecriteriaabove,thissitehasthelowestenvironmentalimpactofalltheproposedsites.Furtherinformationon this can be found in “Irish Water & Wicklow County Council Arklow Wastewater Treatment Plant, Site Assessment Report, Phase 2” on our website at www.water.ie/arklowtp.

Alternatives

AspartoftheEnvironmentalImpactAssessmentprocess,allprojectsmust also examine alternatives in order to ensure the best project is movedthroughtheplanningprocess.

Followingthepublicconsultationprocess,twoalternativesitesforthisprojectwereidentifiedas:

•SheltonAbbey(includingtheoldIFIsite),No.10ontheMap

•Kilbride,No.4ontheMap

These sites have been assessed as part of the process and were consideredtohaveagreaterimpactontheenvironmentincomparisontotheEmergingPreferredSite,Ferrybank(OldWallboardSite).

Environmental Criteria Technical Criteria

Ecology Safety

CulturalHeritage PlanningPolicy

Landscape&Visual Engineering&Design

Hydrology&Hydrogeology LandValuation

Soils&Geology

Traffic

AirQuality&Odour

Agriculture&Agronomy

Noise&Vibration

People&Communities

Page 7: Arklow Wastewater Treatment Plant...A report “Irish Water & Wicklow County Council Arklow Wastewater Treatment Plant, Site Assessment Report, Phase 2”, describing the second phase

Irish Water | Arklow WwTP | 5

FERRYBANK(OLD WALLBOARD FACTORY)

KILBRIDE

SHELTON ABBEY(IFI SITE)

SEABANK

BALLYMONEY

KILLINSKYDUFF

LAMBERTON &BALLYRAINEUPPER

TINAHASKUPPER

MONEYBIG

BOGLAND& KISH

1

3

2

4

10

5

7

8

9

6

EMERGINGPREFERREDSITE FORWWTP

IRISH SEA

AVOCARIVER

Page 8: Arklow Wastewater Treatment Plant...A report “Irish Water & Wicklow County Council Arklow Wastewater Treatment Plant, Site Assessment Report, Phase 2”, describing the second phase

Irish Water | Arklow WwTP | 6

What is happening now?

IrishWaterisnowseekingyourviewsonFerrybank(oldWallboardSite)astheEmergingPreferredSitefortheArklowWwTPProjectaspartofaneightweeknon-statutorypublicconsultationwhichwillstartonthe13thMayandcloseon 10thJuly2015.

Irish Water would like to hear your views on the following:

• WhatareyourviewsontheEmergingPreferredSiteatFerrybank(OldWallboardSite),routepipelineandoutfalllocation?

• WhatareyourviewsontheprocessforselectingtheEmergingPreferredSite,routepipelineandoutfalllocation?

• Doyouhaveanycommentsonthealternativesites,routepipeline and outfall locations?

• Is there any other information you believe is relevant to the selectionoftheEmergingPreferredSiteselection,routepipeline and outfall location?

• How would you like to be communicated with as the project progresses?

A report “Irish Water & Wicklow County Council Arklow Wastewater Treatment Plant, Site Assessment Report, Phase 2”,describingthesecondphaseoftheprojectingreaterdetailisavailableonthe Irish Water website at www.water.ie/arklowtp and can beviewedatplanningcountersinWicklowCountyCouncilandArklowMunicipalDistrictofficesandattheWicklowandArklowLibraries.

Page 9: Arklow Wastewater Treatment Plant...A report “Irish Water & Wicklow County Council Arklow Wastewater Treatment Plant, Site Assessment Report, Phase 2”, describing the second phase

Irish Water | Arklow WwTP | 7

What is happening next?

All feedback received from this second phase of non-statutory public consultation will be reviewed by the Project Team and will bereportedinaConsultationReport.RelevantfeedbackfromthisphasewillbeusedtoinformtheEnvironmentalImpactStatement.

TheConsultationReportwillaccompanytheFinalSiteSelectionReporttowardstheendof2015.Thiswillbeavailablefrom www.water.ie/arklowtp and we will update all those who have madeasubmissionduringtheproject.

FollowingthepublicationoftheFinalSiteSelectionReport,anEnvironmentalImpactAssessment(EIA)willbeundertaken,thiswillincludethedesignoftheWastewaterTreatmentPlant,associatedpumpingstations,routepipelineandoutfalllocation.TheEIAwillexaminetheFinalSite,routepipelineandoutfalllocationunderthefollowingareas(thisisnotanexhaustivelist):

•HumanBeings •Ecology(FloraandFauna)

•SoilsandGeology •Water

•Noise •AirandDust

•Traffic •LandscapeandVisual

•Odour •MaterialAssets

ThepreparationoftheEIAincludingthesupportingenvironmentalstudies will take over a year to carry out and it is hoped this will becompletedbytheendof2016.FollowingthecompletionoftheEIAanEnvironmentalImpactStatement(EIS)willbesubmittedtoAnBordPleanálaaspartof aplanningapplication.

Page 10: Arklow Wastewater Treatment Plant...A report “Irish Water & Wicklow County Council Arklow Wastewater Treatment Plant, Site Assessment Report, Phase 2”, describing the second phase

Irish Water | Arklow WwTP | 8

History of the proposed Arklow Wastewater Treatment Plant

TheprocessofprovidingaWwTPforArklowbeganwithaplanningpermissionbeinggrantedtoArklowTownCouncilin1994.Duetochangesinenvironmentalpolicyinthefollowingyears,anewEISwasrequiredaspartoftheplanningpermissionprocessandin2005planningpermissionfortheArklowWwTPwasonceagaingranted.Thispermissionwassubjecttolegalchallengewhichresultedintheplanningpermissionexpiringinearly2015.

IrishWatertookresponsibilityforprovidingandmanagingpublicwaterservicesthroughoutIrelandin2014.Providinga new Wastewater Treatment Plant for the people of Arklow is one of Irish Water’s key priorities and we are committed to ensuringthatthisisdeliveredthroughthedevelopmentofanewplanningprocess.

Asthecompetentauthorityforassessinganddeterminingplanningapplications,theBoardwillcarryoutastatutoryconsultation which will provide you with a further opportunity to haveyoursay.ArevisedapplicationforaWastewaterDischargeLicencewillbemadetotheEnvironmentalProtectionAgency(EPA)inparallelwiththeplanningapplication.

Page 11: Arklow Wastewater Treatment Plant...A report “Irish Water & Wicklow County Council Arklow Wastewater Treatment Plant, Site Assessment Report, Phase 2”, describing the second phase

Irish Water | Arklow WwTP | 9

Have your say

Ifyouwouldliketomakeasubmission,pleasesend itbyemailorpost,by10thJuly2015:

Email: [email protected]

Post: Arklow Submissions Irish Water c/oArklowMunicipalDistrictOffices Avoca River House Arklow Co. Wicklow

Page 12: Arklow Wastewater Treatment Plant...A report “Irish Water & Wicklow County Council Arklow Wastewater Treatment Plant, Site Assessment Report, Phase 2”, describing the second phase