argument for acceleration of the global overview for the sp1n development effort (by approximately...

61
Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Upload: aubrey-randall

Post on 11-Jan-2016

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Argument for Acceleration

Of the Global Overview for the SP1N Development Effort

(by approximately 6-8 weeks)

Page 2: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Key Assumptions

• Both Fiori and Spinoza are dedicated to the fruitful development of the SP1N system

• Both companies wish to reduce risk as far as is practical in this effort

• The two main (and opposing) risks to this effort are:

1. Developing a system that does not meet the user’s needs;

2. Developing a system too late to meet a market window.

Page 3: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Addressing Risk 1

Spinoza recognizes that Fiori’s phased approach to the SP1N system’s development

and the time intervals specified for the completion of each phase will adequately

mitigate the risk of developing a poor system.

Therefore, Spinoza accepts both these phases and time intervals.

Page 4: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Addressing Risk 2

Spinoza recognizes that the convergence technology space is rapidly being filled, and

that reducing time to market is therefore critical to the success of the SP1N system.

Spinoza further recognizes that eliminating or abbreviating either the phases or time

intervals specified by Fiori is unacceptable.

Page 5: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Addressing Risk 2, Cont.

Spinoza believes that it has largely generated the deliverables specified by Fiori as those

which are produced during Phase 0 and Phase 1 activities. Therefore, since the time

intervals for these phases total approximately 6-8 weeks, Spinoza believes

that our joint timeline can be reduced by this amount.

Page 6: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

To prove its case, Spinoza must:

• Come to agreement with Fiori about which deliverables are generated by Phases 0 & 1;

• Understand the particular information Fiori expects each deliverable to contain;

• Furnish that information to Fiori;

• Where necessary, document how this information was generated.

Page 7: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Timeline and Deliverables

Page 8: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Project Definition and Research

Prior research, Vision, Technical BackgroundIdentify Key Gaps, Assumptions, and potential trouble areasUnderstand current value proposition

Page 9: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Continued Detail Research

Usage Models, applications, environments, user needs and benefitsDefine User Segments vs Demographic ProfilesCompetitors, Secondary User Competition (Portable Media Devices)Develop Product Line Strategies and FoundationsTechnology Trends, Product Culture, OEM Strategies

Page 10: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Conceptualization

Form Factor ExplorationErgonomicsUser Interface Conceptualization

Page 11: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Prior Research

• The commissioning of two white papers which dealt with wireless transmission of HTML and multimedia information.

• a brainstorming session with a class of MBA students to create and market a SP1N-like device.

• a cooperative program with several Seattle University students to explore the wireless capability of portable devices.

• The development of (provisionally patented) IP which increases wireless RF bandwidth.

Page 12: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

VisionSpinoza Technology envisions a world of instant, intuitive, universal access to the information you need or want. Our mission is to design and develop “private labeled” convergence technologies for individual and enterprise applications, distributed through multiple channels including OEMs, service organizations and direct retailers.  Spinoza defines convergence as the bringing together of technologies that have traditionally been considered discrete, by incorporating them into one system.

Page 13: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Technical Background

The vision for Spinoza was fostered by:

• the emergence of portable computing devices such as the Cassiopeia, Jornada, Ipaq, and Palm VII;

• the continued development of IP-based telephony solutions;

• the proliferation of portable devices used for communication and entertainment purposes;

• the dearth of all-in-one solutions, due to form factor and revenue stream constraints by existing OEM’s.

Page 14: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Key Gaps

• Technical Expertise: in convergence space, we’ll stand up to anyone out there

• Hardware/Software: aside from a few short delays, we have gained access to the latest

• Market Research: an informed omission (Research Express for selected work)

• Large Scale Project Management; Design and Integration; Manufacturing; Content Provision: TBD, soon.

Page 15: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Assumptions

• Working prototype window: 1st quarter 2001

• Must hit stores Christmas 2001—should be able to make Fall 2001

• We represent the market• Stable IP telephony will be available for

wireline (B3) access within six months, wireless within 1 ½ years.

Page 16: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Potential Trouble Spots• Potential partners wanting to revisit earlier

decisions

• Tasks not worked in parallel

• Partners adopting either/or rather than both/and attitude

• Inability for project to establish SP1N-centered paradigm within convergence space.

Page 17: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Current Value Propositions

Spinoza Technology has identified three revenue models to actively cultivate:

•Subscribers

•OEM’s

•Private Labelers

Page 18: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

SubscribersCharacterized by:

•Ubiquity•Large geographic/demographic area•Can reach every part of market

•Monthly billing cycle in place•Back-office procedures already set up•User acceptance of billing model

Examples: utilities, financial services, ISPs, ASPs

Page 19: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

SubscribersAdvantages of Partnering

For Subscriber:•Enables co-branding

•Faster time to market

•Turn-key solution

For Spinoza:•Large customer base

•Recurring revenue streams

•Offsets development costs while accelerating market penetration

Page 20: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

OEM’s

Characterized by:

•Existing device or PC manufacturers•New market entrants•Established form factor/price point constraints•Established manufacturing/distribution supply chain

Examples: JVC, Dell, Gateway

Page 21: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

OEM’sAdvantages of Partnering

For Them:•Quicker time to market

•Customizable and flexible

•Can retain control over form factor

For Spinoza:•Excellent market research already in place

•Established sales and support infrastructure

Page 22: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Private Labelers

Characterized by:

•Devoted customer base•Strong brand identity•Mass distribution

Examples: Sharper Image, Brookstone

Page 23: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Private LabelersAdvantages of Partnering

For Private Labeler:•Brand enhancement opportunity

•Turn-key solution

•Private labeled point of purchase interface

For Spinoza:•Access to sophisticated distribution channels

•Relationship with expert marketers

•Revenue stream from customization (NRE) (Eddie Bauer version or REI version)

Page 24: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Usage Models

Using the SP1N System: a day in the life of an end user…

Page 25: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Applications• Media: video and sound player, sound recorder• Telephony: phone, voice mail, rolodex• Web: full browser, Java console/games, email and

messaging• PDA functions: notepad, draw, calculator,

calendar, to-do list• Desktop apps: Web-based apps, pocket version for

offline work, full version for online work with B3 and SP1Npherals.

Page 26: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Environments

• Office and Home—SP1N device plus B3 and wireline/wireless peripherals

• Remote (on the road)—SP1N device plus accessories and SP1Npherals (Bluetooth-enabled peripherals)

Page 27: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

User Needs/Benefits

Two end users are identified:

Early Adopters

Pragmatists

Page 28: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Message to Early Adopter End Users:

•For mobile communicators and information consumers who are dissatisfied with carrying multiple devices,

•The SP1N is a broadband Internet “Swiss Army Knife” that offers wireless Internet access, multimedia capabilities, communications, and applications.

•Unlike the many separate devices that provide parts of this offering,

•The SP1N is a Personal Area Network/Wide Area Network-enabled single solution convergence technology that will give easier control, replacing many electronic devices and giving easier mobility inside and outside of the home and office.

Page 29: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Message to Pragmatist End Users:• If you own a cell phone, pager, PDA, notebook, day

planner, or remote control, • and desire a simpler life with fewer devices while not

giving up any capabilities,• the SP1N is a broadband “Swiss Army Knife” that

allows you to control wireless Internet access, multimedia capabilities, communications, and applications.

• Unlike the many separate devices that currently weigh down and clutter, the SP1N is a single device that will give you easier mobility for your work and lifestyle.

Page 30: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

User Segments vs Demographic Profiles

• ?

Page 31: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Competitors

• PDA manufacturers

• Computer manufacturers

• Cellular manufacturers

Page 32: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

PDA manufacturers

• Palm, Casio, HP, Compaq

• Adding more functions all the time

• Constrained by existing form factors, price points, and/or revenue streams

• Realistic TTM: 1-2 years

Page 33: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Computer manufacturers

• Dell, Gateway, IBM (HP, Compaq)

• Have the resources and customer base

• Constrained by customer expectations of computing power

• Realistic TTM—2 years

Page 34: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Cellular manufacturers

• Nokia, Ericson, Motorola

• Quickly adding functions; accepted subscriber revenue model allows for faster market penetration

• Constrained by “size wars,” severely scaled-down processors, cellular rates

• Realistic TTM—2-3 years

Page 35: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Secondary Competition

• Portable multimedia player manufacturers

• Pager/instant messaging device manufacturers

• Game console manufacturers

Page 36: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Portable multimedia player manufacturers

• Rio, MP3Man, MovieMan

• Popular, impressive-looking, fun

• Constrained by processor specialization and price wars; little interest in convergence

• Realistic TTM—2-3 years if ever

Page 37: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Pager/instant messaging device manufacturers

• Blackberry, Nokia etc.

• Convenient, inexpensive

• Constrained by size and price wars; too weak to accommodate new functions

• Realistic TTM--never

Page 38: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Game console manufacturers

• Nintendo, Sega, Sony

• High buzz factor, strong processors, good graphics experience

• Constrained by specialized processors, price point

• Realistic TTM—dark horse: somewhere between tomorrow and never

Page 39: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Product Line Strategies

• Platform Roulette

• Research Philosophy

• Current Feature/Platform Progress

Page 40: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Playing “Platform Roulette”

The future of convergence technology is unknown. Today’s dominant platform

may be gone tomorrow…

Therefore, Spinoza Technology is working to identify and develop solutions for all

major platforms.

Page 41: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Features

Research

Our Research Philosophy: Simulate, Specify, Prototype

Sim

ulate

Platforms

Page 42: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Current Platform Features Platform

Feature(assuming high

BW Internet Connection )

PocketPC Palm JWorks QuartzEPOC32 BeIA

Telephony * * * • +Full Browsing • • • •

Streaming Media • • + *Web Apps * + • • •

Instant Messaging * * •

* 3rd Party+ Available within 3 months • available

Page 43: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Technology Trends

Much of Spinoza’s work has pushed the cutting edge of convergence technology.

Therefore, the SP1N system largely constitutes a trend in and of itself.

•Wireless broadband•PushHTML•Connection management

Page 44: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Product Culture

• ?

Page 45: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

OEM Strategies

See value propositions for customer strategies

Page 46: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Form Factor Exploration

• Randy has purchased the “latest and greatest” in the portable device world in order to grow in-house form factor experts

• Each member of Team Spinoza has moved into at least two PDA’s

• Gable Design retained for initial form factor work.

Page 47: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

B3

Page 48: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

SP1N

Page 49: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

SP1N w/full keyboard

Page 50: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

SP1N w/flip keypad

Page 51: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Ergonomics

Page 52: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

User Interface Conceptualization

Page 53: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Robert enjoys Full-Featured Web Browsing, Streaming & E-Commerce from his SP1N on

his way to work.

Page 54: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

He gets a head start on his day by catching up on office E-Mail &

reviewing documents for an early morning meeting.

Page 55: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Robert hears a song on the radio and uses SP1N to find and purchase it.

Page 56: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

At the office, he uses the SP1N System to access a web-based Application

Server.

Page 57: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

He notices some discrepancies in a spreadsheet and uses the SP1N System’s

Telephony to discuss the numbers.

Page 58: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Later that day, Robert uses the SP1N System’s Video Conferencing to talk

with a client.

Page 59: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

Going home, Robert uses the SP1N’s MP3 player to relax. He gets an instant

message from his wife.

Page 60: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

At home, Robert uses the SP1N System’s Web Browsing & Interactive Game Play to

keep the kids entertained.

Page 61: Argument for Acceleration Of the Global Overview for the SP1N Development Effort (by approximately 6-8 weeks)

After dinner, Robert and his wife use the SP1N System to stream a webcast of one of

their favorite bands.