Page 1: Ares Development Motor - 2 Ground Test

August 31, 2010

Ares Development Motor - 2

Ground Test

A premier aerospace and defense company www.atk.com

Page 2: Ares Development Motor - 2 Ground Test

53 Design Objectives — 764 Instrumentation Channels

Approved for public release, NASA/MSFC, August 16, 2010

The five-segment Ares motor for NASA’s next-generation launch vehicle, features a design derived from the four-segment Space Shuttle reusable solid rocket motor.

Action Time (sec) 125.6

Max Chamber Pressure (psia) 937.4

Chamber Gas Temp (°F) 5,630 Maximum Thrust (vacuum) (lbf) 3,537,000

Total Impulse (vacuum) (lbf-sec) 366,750,000

Loaded Propellant Weight (lbm) 1,380,300

Development Motor - 2 (DM-2) is the second full-scale, full-duration test of an Ares five-segment reusable solid rocket motor

Cold condition motor to achieve reduced propellant mean bulk temperature (PMBT) to obtain performance data on the propellant grain design and delivered motor ballistic characteristics at lower bounds of certification limit

Obtain performance of field joints at lower bounds of temperature exposure (shrouding)

Obtain data on capability of thermal barrier system on forward field joint with intentional flow feature (demonstrate robustness of joint configuration)

Obtain performance data on the environmentally friendly insulator in the entire motor, including the aft dome

Obtain performance data on the redesigned nozzle cowl and 15-degree aft exit cone for structural and thermal requirements

Obtain vibration, acoustic and heat flux data to support definition of motor-generating external loads for the Ares Launch Vehicle

T-1 hr Commence Final Countdown T-45 min Secure Test Area and

Commence Arming Sequence T-5 min Verify Test Bay Clear

T-1 min Commit Motor T-0 Motor Ignition

T+2 min CO2 Quench

Cold Conditioning

1

2

3

4

5

6

7

2

3 4 Field Joint

PBI-NBR Insulation 5

5 Aft Dome

Nozzle

PBI-NBR Insulation

Cowl

6

Countdown