architecture portfolio braden pedersen

20
BRADEN PEDERSEN Architecture Portfolio University of Sydney Master of Architecture Student Selected Works

Upload: braden-pedersen

Post on 06-Mar-2016

226 views

Category:

Documents


10 download

DESCRIPTION

University of Sydney Master of Architecture Student Selected Works

TRANSCRIPT

Page 1: Architecture Portfolio Braden Pedersen

BRADEN PEDERSENArchitecture Portfolio

University of SydneyMaster of Architecture Student

Selected Works

Page 2: Architecture Portfolio Braden Pedersen

BRADEN PEDERSEN1118/2 Chippendale WayChippendale, NSW 2008

E | [email protected] W | bradenpedersen.com

M | 0411554020

| 2 |

Page 3: Architecture Portfolio Braden Pedersen

Contents01 Digital Masters Research Studio | Terra-form Eyre

02 Sustainable Masters Research Studio | Student Housing03 Flinders St Station Design Compertition | Melbourne Opera House

04 Masters Contract Documentation | Maitland Art Gallery

Page 4: Architecture Portfolio Braden Pedersen

Masters Digital Reserch StudioTerra-form Eyre

Semester 2, 2013Tutor: Alex Jung

In partnership with:Emma Mackellar

| 4 |

Page 5: Architecture Portfolio Braden Pedersen
Page 6: Architecture Portfolio Braden Pedersen

| 6 |

Reversing the force of desertification is the primary objective of this proposal. Through this simple act, issues of overpopulation, food production and climate change are drastically reduced globally. Australia is a land of vast plains of desert. Much of this region is lower than sea level- Lake Eyre is at the heart of this basin. Its catchment area is 1,200,000 m2. Lake Eyre flooded in 2010 and lowered the mean global sea level by 10mm because it took over 6 months for water to evaporate and slowly be returned out to sea. Through its capacity to seed clouds the vast structure enables the water within lake eyre to be retained permanently and increased. In doing so it alters the regional climate, terraforming the desert into fertile land.

Page 7: Architecture Portfolio Braden Pedersen

Structure:The city is conceived as a singular structure- a physical manifestation of the conceptual ideal of a city that is ‘self supporting.’

The cloud seeding tower must be 600 metres tall in order for the air collumn to affect the troposphere . This height is enabled by percieving the structure like a suspension bridge. enabled by percieving the structure like a suspension bridge. The large central pylon is in compresion while cables allow the bridge to be suspended. The entire city acts in tension- its form generated by efficient membrane structures exempliied in Frei- Otto’s Olympic stadium in Munich.

Vertical City:Existing modes of urban densiication cause desertiication. Natural vegetation prevents the nutrient rich bio-diverse top-soil from eroding. As demand on agricultural regions in-creases, this vegetatiation is removed.

By concieving the city as vertical rather than horizontal it is By concieving the city as vertical rather than horizontal it is possible to mitigate desertiication. Greater efficiency in transort and land usage also result.

When urban and agricultural land is integrated, the city unit can become independant of external supply. It can expand limitlessly without affecting its efficiency. =

Page 8: Architecture Portfolio Braden Pedersen

Masters Sustainable Reserch StudioStudent Housing

Semester 1, 2013Tutor: Paul Berkemeier

In partnership with:Mark Szekely

| 8 |

Page 9: Architecture Portfolio Braden Pedersen
Page 10: Architecture Portfolio Braden Pedersen

There is a desperate need for additional student housing at the University of Sydney. Current housing options are limited and insufficient to match student demand. This project is aimed at maximising the number of students housed whilst minimising the cost of housing to the students. The project is built on a small left over site on campus, the roof of the electrical engineering building, to reduce costs and re-adapt an existing building. The building creates a rich and sustainable living environment for students through passive design principals such as solar access, ventilation, thermal mass, water harvesting and power generation.

| 10 |

Page 11: Architecture Portfolio Braden Pedersen
Page 12: Architecture Portfolio Braden Pedersen

Flinders St Station Design CompertitionMelbourne Opera House

2012Tutor: Samantha Donally

| 12 |

Page 13: Architecture Portfolio Braden Pedersen
Page 14: Architecture Portfolio Braden Pedersen

| 14 |

Melbourne is known to be the cultural capital of Australia but is missing one important land- mark in the city. The central location of the Flinders Street Station site made it a desirable location for a cultural precinct which included an Opera House. The Opera House has been integrated in to the existing Banana Ally Vaults which are used for performances and events. The site has been linked to the cultural precinct on Southbank creating additional connections over the Yarra River. The landscape has been folded to create a sense of intrigue for the visitors and to form pocket spaces for the train station and performance venues. The forms add to the strong geometries already evident in Melbourne creating a noticeable icon for the city. The form came from a combination of digital and analogue processes exploring spaces with strong geometries to complement the architecture already existing in Melbourne.

Page 15: Architecture Portfolio Braden Pedersen
Page 16: Architecture Portfolio Braden Pedersen

Masters Contract DocumentationMaitland Art Gallery

2013Tutor: Peter Armstrong

In partnership with:Courtney Owen

Vi LeZoya Kuptsova

Kim Lange

| 16 |

Page 17: Architecture Portfolio Braden Pedersen

GROUND FLOOR PLANDRAWING TITLE

DATE

REVISION

SCALE

DRAWING NO.

DRAWN BY

CD-03

atelier fiveWILKINSON BUILDING148 CITY ROADDARLINGTON NSW 2320ABN: 70 509 392 275(e) [email protected](p) 02 9559 4595 (f) 02 9558 4582

ARCHITECT

PROJECT

CLIENT

EXTENSIONS TO THE MAITLANDREGIONAL ART GALLERY

MAITLAND CITY COUNCIL

MAITLAND TECHNICAL COLLEGE230 HIGH STREET MAITLAND NSW 2320

PO BOX 220MAITLAND NSW 2320

NOT FOR CONSTRUCTION

- ALL INFORMATION CONTAINED ON THIS DRAWING IS COPYRIGHT. NO PART OF THIS DRAWING MAY BE COPIED OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE AUTHOR.- DO NOT SCALE FROM THIS DRAWING- CHECK ALL DIMENSIONS ON SITE- THE AUTHOR ACCEPTS NO LIABILITY FOR ANY LOSS OR DAMAGE ARISING FROM UNAUTHORISED USE OF ANY INFORMATION ON THIS DRAWING

A1

REV NOTES DATEA ISSUE FOR TENDER 10/11/2013

N

15/11/20131:100 @ A1 VL, ZK, CO, BP

A

EXIT

ACCESS

exX

ELECTRICAL LEGEND

ADJUSTABLE DOWNLIGHT

JOINERY DOWNLIGHT

WALL LIGHT

EXIT SIGN

RECESSED MULTILIGHTS

FLUORESCENT BATTON

SWITCH

EXHAUST

IN-CEILING SPEAKERS

ACCESS HATCH

SMOKE DETECTOR

NOTES

NOTE 1: ALL CEILINGS ARE SETPLASTERBOARD UNLESS NOTEDOTHERWISE

NOTE 2: OUTDOOR LIGHTING TO BEADVISED BY LANDSCAPE CONSULTANTS

NOTE 3: JOINERY LIGHTING TO BECONFIRMED BY ELECTRICAL CONSULTANT

NOTE 4: GPO QUANTITY, LOCATION ANDTYPE TO BE CONFIRMED BY ELECTRICALCONSULTANT

NOTE 5: ALL LIGHTING SYSTEMS, EXTERNALLIGHTS, WALL LIGHTS AND MULTILIGHTSYSTEMS ARE TO HAVE REMOTE CONTROLSWITCHES LOCATING IN THE GROUNDFLOOR STOREROOM

PROJECT LEGENDBGCOLCONCCOSCRDPEXFBFCFFLFWGDHBHRMSNGLOFPBRLRTRWTIMURWC

BOX GUTTERCOLUMNCONCRETECHECK ON SITECEMENT RENDERDOWNPIPEEXISTINGFACE BRICKFIBRE CEMENTFINISHED FLOOR LEVELFLOOR WASHGRATED DRAINHAND BASINHAND RAILMETAL ROOF SHEETINGNATURAL GROUND LEVELOVER FLOWPLASTERBOARDREDUCED LEVELROOF TILESRETAINING WALLTIMBERURINALTOILET

W

D

FFL

PRECAST CONCRETEWALLS TO ENG. DETAIL

SELECT STYLE EXTERNALCLADDING AS SPEC.CONCRETE BLOCK WALLSWITH PAINT FINISH ASSPECIFIED

EXG BUILDING RETAINED

WALL CONSTRUCTION ASSPECIFIEDNEW WINDOWS

EXISTING DOORS

NEW DOORS

WINDOW NUMBERS

DOOR NUMBERS

FINISHED FLOOR LEVELS

D12 D11 D10

J A M E S S T R E E T

D03 D04

D05

D02

D06

D09

D17

D16 D15

W01

D01

D07

D08

D14

D18

D20

D19

2,480 5,900 4,250

4,59

05,

050

8,85

08,

850

6,10

06,

750

6,20

0

5,900

17,530 2,480 5,900 4,25013,290 14,825 7,480 8,840

380 3445 110 1,570 110 2,590 110 4,310 110 10,980 110 4,210 380 2,550 200

4,270 110 905 110 3,300 110 4,970 110 10,220 200 2,920 1,350

4,59

05,

050

8,85

08,

850

6,10

06,

750

7,97

0

2,87

55,

160

5,00

01,

390

1,34

090

3,42

03,

740

901,

795

903,

740

902,

725

1,35

02,

290

9013

4020

02,

160

200

860

9012

,440

2,290 1,200 2,080

5,690 10,940

4,50

038

0

1,12

511

03,

260

5,37

01,

200

200

2,17

520

02,

090

200

2,13

06,

570

425

1,95

020

01,

925

360

PRECAST CONCRETE WALLWITH POLISHED FINISH

PROVIDE AGG. LINE WITHGEOTECH FABRIC SLEEVEWITHIN AGGREGATE FILL ANDDRAINAGE CELL PROTECTIONTO W.P.M AS SPECIFIED

900H CEMENT RENDEREDBLOCKWORK RETAININGWALLS TO ENG. DETAIL

CONCRETE STAIRS, NATURALFINISH

GRATED DRAINS TO ENG.DETAIL

SET DOWN STRUCTURALFLOOR LEVEL TO WET AREASTO ENG. DETAIL

TILED FINISH TO BLOCKWORKWALL AS SPECIFIED

HATCH INDICATES EXTENTOF TIMBER FLOORCONSTRUCTION

CONNECT DOWNPIPES TO NEWSTORMWATER DRAINAGE SYSTEM INACCORDANCE WITH ENG. DETAIL

TILE FINISH TO EXTERNALCONCRETE BLOCK WALLS

REMOVE EX. WINDOWS TOALLOW FOR NEWALUMINIUM FRAMED BI-FOLD DOORS. MAKE GOODEX. AS REQUIRED

ALUMINIUM FRAMED WINDOWSAND DOORS

STEEL FRAMED EXTERNALSTAIRS AS SPECIFIED AND TOSUIT BCA REQUIREMENTS

TIMBER FLOORS AND DECKINGALLOW FOR INSULATIONINTERNALLY AS SPECIFIED

TIMBER FLOOR CONSTRUCTIONTO ENGINEERS DETAIL

1000H METAL HANDRAIL ANDBALUSTRADES TO SUIT BCAREQUIREMENTS

STORMWATER PIT TO ENG.DETAIL

REINFORCED CONCRETECOLUMNS TO ENG. DETAIL

INTERNAL PLASTERBOARD LININGWITH PAINT FINISH AS PERSPECIFICATION

SELECT STYLE EXTERNAL CLADDINGALLOW FOR INSULATION ANDSARKING IN ACCORDANCE WITHSPECIFICATION

PRECAST CONCRETE WALLS TO ENG.DETAIL

ALUMINIUM FRAMED SLIDING DOORSTO GALLERY BACK ROOMS TOMANUFACTURERS INSTRUCTIONS

ROLLER DOOR TO LOADING DOCK TOMANUFACTURERS DETAIL

METAL BOLLARDS AS SPECIFIED

SELECT STYLE EXTERNAL CLADDINGAS SPECIFIED. ALLOW TO PACK OUTWALL FOR ANGULAR CONSTRUCTION

NEW STEEL GUTTERS ANDDOWNPIPES AS SPECIFIED

H I

G H

S

T R

E E

T

GARDENSOFT LANDSCAPING

FRONTENTRANCE

CONCRETE

CONCRETE PATH

RL 8.9

FFL 8.9

RL 8.1

RL 8.9

FEMALEWCTILESFFL 8.9

STORETILES

DISABLED WCTILESFFL 8.9

MALE WCTILESFFL 8.9

KITCHENSTORE

TILESFFL 8.9KITCHEN

TILESFFL 8.9

FRONTENTRANCE

CONCRETEFFL 8.9

CAFETIMBER

FFL 8.9

ENTRANCEFOYERCONCRETE

SHOPCONCRETE

FFL 8.9

STORECONCRETE

BIN STORECONCRETE

FFL 7.4

FFL 7.4

DECKTIMBER

FFL 8.9

FIREEXIT

FIREEXIT

FFL 8.9

COL COL

COL COL

COLCOL

COL COL

COLCOL

GALLERY B/1CONCRETE

FFL 8.9 CONCRETEFOOT PATH

PICTURESTORECONCRETE

FFL 8.9

LOADINGCONCRETE

FFL 8.9

STOREROOMCONCRETE

FFL 8.9

DP

DPBOLLARD

BOLLARD

DECKTIMBER

FFL 8.9

HR

HR

STORETIMBER

FFL 8.9

FIREEXIT

HRHR

GALLERY B/2TIMBER

FFL 8.9

EX

EXSE

RVI

CES

SER

VIC

ES

EX

REAR GARDENSOFT LANDSCAPINGRETAIN EXISTING GROUND

LEVELS UNCHANGED

SIDE GARDENSOFT LANDSCAPINGRETAIN EXISTING GROUND

LEVELS UNCHANGED

BOUNDARY

EX STAIRUNCHANGED

EX. ENTRY

CONCRETEFOOT PATH

CONCRETEFOOT PATHG

ATE

BOUN

DARY

BOUN

DARY

AWNING OVER

BIN STORECONCRETE

STORECONCRETE

JOINERY JOINERY

JOINERY

WINDOW OVER

BRIDGE OVER

No. 230MAITLAND

REGIONAL ARTGALLERY

EXG. BRICKBUILDING

TILED ROOF

D.P. 581007SITE AREA 5540.18 sqm

W03W02

W04

WIN

DOW

OVE

R

D13

BRIDGE OVER

BUILD

ING

OVER

W06

W05

WINDOW OVER

FEMALE STORE DISABLED MALE KITCHEN STORE BIN STORE

DECKCAFEKITCHENMALEHALL

FEMA

LEHA

LLEN

TRY

1

2

3

4 5

EXSE

RVIC

ESEX

SERV

ICES

STAI

RST

ORE

GALL

ERY

B/2

VOID

LIFT

STOR

EDE

CKST

AIR

ANGLED WALL OVERSTORE LIFTHALL

STAIR

STOREROOM LOADING FIRE EXIT

GALLERY B/1

MALE

MALE

KITC

HEN

KITC

HEN

KITC

HEN

SHOP

CAFE

KITC

HEN

KITC

HEN

STOR

E

BIN

STOR

EBI

N ST

ORE

STAI

R

STOR

E

STOR

E RO

OMS

PICT

URE

STOR

E

PICT

URE

STOR

EGA

LLER

Y B/

1

GALL

ERY

B/1

GALL

ERY

B/1

GALL

ERY

B/2

STOR

EFO

YER

FOYE

R

FOYE

R

FOYE

R

ENTR

Y

DECK DE

CK

SETOUTPOINT

RW

RW

RW

RW

RAMP GRADIENT 1:12

D23

D22 D21

D24

D25

DCBA

1

2

3

4

5

6

7

DCBA

1

2

3

4

5

6

7

6,65

05,

160

57511

090

011

02,

535

380

1,975903,0402001,40090435

200 4,260 200 4,220 200 1,350 350

8,380

27,4

60

725

3,67

552

08,

850

4,40

01,

000

8,29

020

06,

035

8,86

01,

125

110

2,66

5

5,77

320

03,

750

200

3,40

020

03,

400

200

1,14

020

06,

035

8,86

011

03,

260

380

17,7

2020

017

,735

7,31

05,

460

378

1,72

711

01,

800

1,60

0

4,54

020

04,

830

200

9,25

08,

440

150

7,31

05,

370

3,24

011

02,

400

380

1,20

015

0

B

B

A

A

C C

D D

ALUMINIUM FRAMEDDOUBLE HEIGHT WINDOWAS SPECIFIED

HATCH INDICATES EXTENT OFTIMBER FLOORCONSTRUCTION

RETAIN AND MAKE GOOD EX.OPENINGS

PROVIDE NEW FRAMED WALLAS INDICATED TO ALLOW FORSERVICES PROVIDEPLASTERBOARD AND PAINTFINISH AS SPECIFIED

STEEL FRAMED STAIRS WITHTIMBER LINING AS SPECIFIED

LIFT INSTALLED TO MANUFACTURERSSPECIFICATION

STEEL FRAMED EXTERNAL STAIRS ASSPECIFIED AND TO SUIT BCAREQUIREMENTS

EXISTINGGALLERY

REMAIN UNCHANGED UNLESSNOTED OTHERWISE

LIFT

D26

EXISTINGGALLERY

REMAIN UNCHANGED UNLESSNOTED OTHERWISE

01 PROPOSEDGROUND FLOOR PLAN 1:100

Page 18: Architecture Portfolio Braden Pedersen

The aim of this project was to to complete all contract documentation required for tender from a sketch level design. The project was for the all ready existing extension to the Maitland Regional Art Gallery for Maitland City Council. Being the project architect I was responsible for looking after a team of 5 and scheduling the work that needed to be completed in 6 weeks. For this project we produced 24 working drawings, specifications and cost control for the building project showing an ability to communicate this documentation to clients, statutory authorities, consultants, tenderers, contractors and sub-contractors.

| 18 |

Page 19: Architecture Portfolio Braden Pedersen

DETAILS (4)DRAWING TITLE

DATE

REVISION

SCALE

DRAWING NO.

DRAWN BY

CD-20

atelier fiveWILKINSON BUILDING148 CITY ROADDARLINGTON NSW 2320ABN: 70 509 392 275(e) [email protected](p) 02 9559 4595 (f) 02 9558 4582

ARCHITECT

PROJECT

CLIENT

EXTENSIONS TO THE MAITLANDREGIONAL ART GALLERY

MAITLAND CITY COUNCIL

MAITLAND TECHNICAL COLLEGE230 HIGH STREET MAITLAND NSW 2320

PO BOX 220MAITLAND NSW 2320

NOT FOR CONSTRUCTION

- ALL INFORMATION CONTAINED ON THIS DRAWING IS COPYRIGHT. NO PART OF THIS DRAWING MAY BE COPIED OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE AUTHOR.- DO NOT SCALE FROM THIS DRAWING- CHECK ALL DIMENSIONS ON SITE- THE AUTHOR ACCEPTS NO LIABILITY FOR ANY LOSS OR DAMAGE ARISING FROM UNAUTHORISED USE OF ANY INFORMATION ON THIS DRAWING

A1

REV NOTES DATEA ISSUE FOR TENDER 10/11/2013

N

15/11/20131:5 @ A1 VL, ZK, CO, BP

A

PROJECT LEGEND

PRECAST CONCRETEWALLS TO ENG. DETAIL

SELECT STYLE EXTERNALCLADDING AS SPEC.CONCRETE BLOCK WALLSWITH PAINT FINISH ASSPECIFIEDEXG BUILDING RETAINED

INSULATION AS SPEC.

SPANDEK DECKING ASSPECIFIED

BOX GUTTER HANGINGSUPORTS AT 600mmCENTRES

ROOF SUPPORT STRUCTURE TOENGINEERS DETAILS

ROOF BEAM TO ENGINEERSDETAILS

13mm PLASTERBOARDCEILING FIXED TO TOP

HAT SECTIONS

INSULATION

FIBRE CEMENTBOARD ON TOP OF

DECKING

GALVANISED STEEL BOXGUTTER SUPPORTED BY

FIBRE CEMENT BOARD

MS GIRT SECTION

METAL DECK ROOFSHEETING AS SPECIFIEDWITH 2DEG PITCH FIXED

TO PURLINSACOUSTIC 50mm

INSULATION, SISILATIONAND SAFTEY MESH TO

RUN UNDER ROOFSHEETING

CORRUGATED METALSHEET CLADDINGFIXED TO TOP HATSECTION

TOP HAT SECTIONFIXED TO PRECASTCONCRETE

PRECAST CONCRETEPANEL TO ENGINEERSDETAIL

FLASHING OVERGUTTER EDGE FIXEDTO PRECASTCONCRETE PANEL

SPANDEK DECKING ASSPECIFIED

BOX GUTTER HANGINGSUPORTS AT 600mmCENTRES

ROOF SUPPORTSTRUCTURE TOENGINEERS DETAILS

FIBRE CEMENT BOARD ONTOP OF DECKING

GALVANISED STEELBOX GUTTERSUPPORTED BY FIBRECEMENT BOARD

Z PURLIN

STEEL STRUCTURE TOENGINEERS DETAILS

CORRUGATED METALCLADDING FIXED TO TOPHAT SECTION

FIBRE CEMENT SHEETINGFIXED TO TOP HATSECTIONS WITH INSULATION

100mm STEEL STUD FRAME

13mm PLASTERBOARDFIXED TO STEEL STUD

FRAME

SHADOW GAP ANGLE

UB TO STRUCTURALENGINEERS DETAIL

INSULATION AS SPECIFIED

13mm PLASTERBOARDCEILING

RONDO SUSPENDEDCEILING SYSTEM FROM

ROOF PURLINS

SHS TO ENGINEERSDETAIL

PACKING ASREQUIRED

METAL PARAPETOVER PRECAST

CONCRETE PANEL

METAL KLIP LOCKROOF SHEETING

FIXED TO PURLINS

STEEL PORTAL FRAMEBEYOND TO

ENGINEERS DETAILS

INSULATION,SISILATION AND

SAFTEY MESH ASSPECIFIED

PACKING AS REQUIRED

MARINE PLY

FIX STRAP

BOX GUTTER DETAIL1:5CD14

M

PRECAST PARAPET/ WALL/ ROOF DETAIL1:5CD16

L

DETAILS (3)DRAWING TITLE

DATE

REVISION

SCALE

DRAWING NO.

DRAWN BY

CD-19

atelier fiveWILKINSON BUILDING148 CITY ROADDARLINGTON NSW 2320ABN: 70 509 392 275(e) [email protected](p) 02 9559 4595 (f) 02 9558 4582

ARCHITECT

PROJECT

CLIENT

EXTENSIONS TO THE MAITLANDREGIONAL ART GALLERY

MAITLAND CITY COUNCIL

MAITLAND TECHNICAL COLLEGE230 HIGH STREET MAITLAND NSW 2320

PO BOX 220MAITLAND NSW 2320

NOT FOR CONSTRUCTION

- ALL INFORMATION CONTAINED ON THIS DRAWING IS COPYRIGHT. NO PART OF THIS DRAWING MAY BE COPIED OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE AUTHOR.- DO NOT SCALE FROM THIS DRAWING- CHECK ALL DIMENSIONS ON SITE- THE AUTHOR ACCEPTS NO LIABILITY FOR ANY LOSS OR DAMAGE ARISING FROM UNAUTHORISED USE OF ANY INFORMATION ON THIS DRAWING

A1

REV NOTES DATEA ISSUE FOR TENDER 10/11/2013

N

15/11/20131:5 @ A1 VL, ZK, CO, BP

A

PROJECT LEGEND

PRECAST CONCRETEWALLS TO ENG. DETAIL

SELECT STYLE EXTERNALCLADDING AS SPEC.CONCRETE BLOCK WALLSWITH PAINT FINISH ASSPECIFIEDEXG BUILDING RETAINED

INSULATION AS SPEC.

METAL DECK ROOFSHEETING AS SPECIFIED

WITH 2DEG PITCH FIXED TOPURLINS

ACOUSTIC 50mmINSULATION,

SISILATION ANDSAFTEY MESH TO RUN

UNDER ROOFSHEETING

ROOF PURLINSTO ENGINEERSDETAILS

200UB BEAM TOENGINEERS DETAILS

STEEL STUD WORKWITH ACOUSTIC

INSULATIONRONDO SUSPENDEDCEILING SYSTEMFROM ROOF PURLINS

BIFOLD DOOR HEADINSTALLED TOMANUFACTURER'SDETAIL AS SPECIFIED

FIBRE CEMENTSHEETING TO BE

FINISHEDACCORDING TOSPECIFICATION

SHADOW GAP ANGLE

13mm PLASTERBOARDFIXED TO STEEL STUDWORK

100mm STEEL STUD WALL

13MM PLASTERBOARDCELINGFIBRE CEMENT SHEETING

FIXED TO SUSPENDEDCEILING SYSTEM

30mm FURRING CHANNEL

50mm INSULATION BATSAS SPECIFIED

METAL FLASHING ASSPECIFIED

ROOF STRUCTURE TOENGINEERS DETAILS

RONDO SUSPENDEDCEILING SYSTEM

HUNG FROM ROOFPURLINS

50mm INSULATIONBATS AS SPECIFIED

13mm PLASTERBOARDCEILING PAINTED

STRUCTURAL UBBEAM TO ENGINEERSDETAILS

13mmPLASTERBOARD ONSTEEL STUDFRAMING

INSULATION ASSPECIFIED

GLAZING AS SPECIFIED

ALUMINIUM WINDOWINSTALLED TOMANUFACTURER'SDETAILS

ALPOLIC CLADDING PANNELWIITH SPECIFIED FINISH

INSTALLED TOMANUFACTURER'S DETAILS

CORRUGATED SHEETMETAL FIXED TO TOP

HAT SECTIONS

125mm TOP HAT SECTIONS

200mm PRECAST CONCRETETO ENGINEERS DETAILS

FIXING ANGLE FORPRECAST TO

CONCRETE SLAB

13mmPLASTERBOARDFIXED TO STEEL STUDFRAME

100mm STEEL STUDFRAME

INSULATION BATS

THICKENED STEEL PLATEOVER SERVICE DUCT

CONCRETEDOWNTURNED BEAM

SUPPORTING SLABAND PRECAST TO

ENGINEERS DETAILS

30mm TOP HAT SECTIONS

CONCRETE SLAB TOENGINEERS DETAILS

SUSPENSION RODSUPPORTED BYCONCRETE SLAB

RONDO SUSPENDEDCEILING

13mm PLASTERBOARD

METAL DECK ROOFSHEETING AS SPECIFIED

WITH 2DEG PITCH FIXED TOPURLINS

ACOUSTIC 50mmINSULATION, SISILATION

AND SAFTEY MESH TO RUNUNDER ROOF SHEETING

HEAD/ CEILING/ ROOF DETAIL1:5CD15

J

WALL/ WINDOW/ ROOF DETAIL1:5CD15

K

150634

477222

477220

Page 20: Architecture Portfolio Braden Pedersen

bradenpedersen.com