architecture & planning solutions€¦ · architecture & planning solutions. architects landscape...

8
Architecture & Planning Solutions Architects Landscape Architects Interior Designers Urban Consultants OXFORDSHIRE ARDLEY VIRIDOR ENERGY from WASTE & IBA FACILITY Site Plan - General Arrangement plan Scale 1/800 at A1 Sept 2008 Drawing No. EfW-P0R-09 Tel. 01689 852 622 e-mail: [email protected] 0m 10m 20m Scale + 102m AOD + 102m AOD + 102m AOD + 102m AOD + 102m AOD + 102m AOD + 102m AOD + 103m AOD + 102m AOD + 100m AOD + 102m AOD + 102m AOD + 102m AOD + 102m AOD + 100m AOD + 100m AOD + 100m AOD + 102m AOD + 102m AOD + 102m AOD 115.0 115.0 115.0 115.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 105.0 105.0 105.0 105.0 105.0 105.0 105.0 105.0 105.0 105.0 105.0 105.0 105.0 105.0 100.0 100.0 100.0 120.0 120.0 120.0 125.0 125.0 125.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 For Illustrative Purposes Only 52 car parking spaces - disabled bays shown hatched Fire water pond Cycle Store Water Attenuation Lagoon Bottom Ash Facility Energy from Waste Facility Offices 100.00 AOD Weigh bridge Water Attenuation Lagoon

Upload: others

Post on 25-Apr-2020

30 views

Category:

Documents


0 download

TRANSCRIPT

  • Architecture & Planning SolutionsArchitects Landscape Architects Interior Designers Urban Consultants

    OXFORDSHIRE ARDLEY VIRIDOR ENERGY from WASTE & IBA FACILITYSite Plan - General Arrangement plan

    Scale 1/800 at A1 Sept 2008Drawing No. EfW-P0R-09

    Tel. 01689 852 622 e-mail: [email protected] 10m 20mScale

    + 102m AOD

    + 102m AOD

    + 102m AOD

    + 102m AOD

    + 102m AOD

    + 102m AOD

    + 102m AOD

    + 103m AOD

    + 102m AOD

    + 100m AOD

    + 102m AOD

    + 102m AOD

    + 102m AOD

    + 102m AOD

    + 100m AOD

    + 100m AOD

    + 100m AOD

    + 102m AOD

    + 102m AOD

    + 102m AOD

    115.0

    115.

    0

    115.

    0

    115.0

    110.0

    110.0

    110.0

    110.0

    110.

    011

    0.0

    110.0

    110.0

    105.

    0

    105.0

    105.0

    105.0

    105.0

    105.0

    105.0

    105.

    0

    105.

    0

    105.0

    105.0

    105.0

    105.0

    105.0

    100.0

    100.0

    100.

    0

    120.

    0

    120.0

    120.0

    125.

    0

    125.0

    125.

    0

    100.0

    100.0

    100.0

    100.0

    100.0

    100.

    0

    100.

    0

    100.0

    100.0

    100.

    0

    100.0

    100.

    0

    100.0

    100.0

    100.0100

    .0

    For Illustrative Purposes Only

    52 car parking spaces -disabled bays shownhatched

    Fire water pond

    Cycle Store

    Water Attenuation Lagoon

    Bottom AshFacility

    Energy from WasteFacilityOffices100.00AOD

    Weigh bridge

    Water Attenuation Lagoon

    FICHTNERRectangle

    RSText boxNote: Drainage and lagoon layouts may be altered by the EPC Contractor at during detailed deisgn.

  • Architecture & Planning SolutionsArchitects Landscape Architects Interior Designers Urban Consultants

    OXFORDSHIRE ARDLEY VIRIDOR ENERGY from WASTE & IBA FACILITYSite Plan - Roof plan

    Scale 1/800 at A1 Sept 2008Drawing No. EfW-P0R-10

    London Studio, 10 Forest Drive, Keston Park, Kent BR2 6EFTel. 01689 852 622 e-mail: [email protected]

    0m 10m 20m

    Scale

    + 102m AOD

    + 102m AOD

    + 102m AOD

    + 102m AOD

    + 102m AOD

    + 102m AOD

    + 102m AOD

    + 103m AOD

    + 102m AOD

    + 100m AOD

    + 102m AOD

    + 102m AOD

    + 102m AOD

    + 102m AOD

    + 100m AOD

    + 100m AOD

    + 100m AOD

    + 102m AOD

    + 102m AOD

    + 102m AOD

    115.0

    115.

    0

    115.

    0

    115.0

    110.0

    110.0

    110.0

    110.0

    110.

    011

    0.0

    110.0

    110.0

    105.

    0

    105.0

    105.0

    105.0

    105.0

    105.0

    105.0

    105.

    0

    105.

    0

    105.0

    105.0

    105.0

    105.0

    105.0

    100.0

    100.0

    100.

    0

    120.

    0

    120.0

    120.0

    125.

    0

    125.0

    125.

    0

    100.0

    100.0

    100.0

    100.0

    100.0

    100.

    0

    100.

    0

    100.0

    100.0

    100.

    0

    100.0

    100.

    0

    100.0

    100.0

    100.0100

    .0

    For Illustrative Purposes Only

    52 car parking spaces -disabled bays shownhatched

    Weigh bridge

    Water Attenuation Lagoon

    Water Attenuation Lagoon

    RSText boxNote: Drainage and lagoon layouts may be altered by the EPC Contractor during detailed design.

  • Architecture & Planning SolutionsArchitects Landscape Architects Interior Designers Urban Consultants

    OXFORDSHIRE ARDLEY VIRIDOR ENERGY from WASTE & IBA FACILITYWest Elevation

    Scale 1/400 at A1 Sept 2008Drawing No. EfW-P0R-17

    London Studio, 10 Forest Drive, Keston Park, Kent BR2 6EFTel. 01689 852 622 e-mail: [email protected]

    0m 10m 20m

    Scale

    M

    D C D

    BE

    FB KK F

    EB B

    G GG

    For Illustrative Purposes Only

    Materials Key:

    RoofKalzip standing seam or similar, stucco embossed aluminium finish withspecial custom Kalzip profile roof edge including secret gutters.Wave roof fenestration Danpalon polycarbonate in pale sea green colour16mm 1040 reverse fixed.

    Walls

    Lantern walls of Kalzip aluminium louvres for ventilation to boiler hall tomatch finish of standing seam roof.Fenestration to lantern, Danpalon polycarbonate of finely graded lightgreen to pale yellow hue.Fenestration Danpalon polycarbonate in pale sea green colour 16mm1040 reverse fixed. Double wall where necessary for sound attenuation.Corus Prisma steel sinusoidal sheeting laid vertically, colour metalic silverto match Kalzip standing seam roof.Reinforced insitu concrete wall with smooth formwork surface withexposed panel joints established with vertical climbing planting onstainless steel wire Jacob trellis.Metal louvres to match colour of vertical planting wall will be introducedwhere necessary for ventilation and the entry of combustion air within thetop level of this nominal 5m high band.Door portals of nominal 500 mm wide RS Channels painted finish forprotection of adjacent wall finishes. ACC screen cladding - perforated Kalzip stucco embossed suspendedover ACC with integral wind wall in Corus Prisma steel sinusoidalsheeting laid vertically - colour Straw by plant manufacturer Offices

    Kalzip standing seam or similar stucco embossed aluminium finish withspecial custom Kalzip profile roof edge including secret gutters.

    Office walls - Kingspan KS 1000MR micro rib colour - StrawFenestration to Northtwest,southwest in Seufert-Niklaus GMBH timber &glass facade wirh Levolux timber Brise soleil, 1.5m off facade

    Parking & Pathways

    Concrete block paving in contrasting colours and textures to grid patternshown

    Stack & AccessoriesStack and accessories, lightening conductor, navigation lights,maintenance platform ladders. in light grey RAL no. 7035

    A

    B

    C

    D

    B

    E

    F

    C

    G

    H

    J

    K

    L

    M

    Note:- Materials outlined above may be subject to substitution by other equaland approved products

    FICHTNERRectangle

    FICHTNERLine

    FICHTNERLine

  • BA DISCHARGER

    RECIRCULATION SILOBOILER

    BA DISCHARGER

    RECIRCULATION SILOBOILER

    DYR UREA DENOX

    WORKSHOPS

    BA DISCHARGER

    RECIRCULATION SILO

    +0.00

    +0.00

    BOILER

    DYR UREA DENOX

    BA DISCHARGER

    RECIRCULATION SILO

    +0.00

    +0.00

    BOILER

    Architecture & Planning SolutionsArchitects Landscape Architects Interior Designers Urban Consultants

    OXFORDSHIRE ARDLEY VIRIDOR ENERGY from WASTE & IBA FACILITYOffices & Visitor's Centre Floor Plans

    Scale 1/250 at A1 Sept 2008Drawing No. EfW-P0R-14

    London Studio, 10 Forest Drive, Keston Park, Kent BR2 6EFTel. 01689 852 622 e-mail: [email protected]

    0m 10m 20m

    Scale

    Male Lockers& Showers

    Cafe

    Foyer

    FemaleLockers &Showers

    Reception

    Ground Floor Plan First Floor Plan

    Second Floor Plan Third Floor Plan

    GOODSLIFT

    GOODSLIFT

    GOODSLIFT

    GOODSLIFT

    Office

    PlantManager

    +3.60

    General Office

    GeneralOffice

    OfficeOffice Office

    Seminarroom

    +7.20

    40p meeting room

    Exhibition Area

    View to plant

    Seminarroom

    Storage

    Atrium

    Atrium

    Mezzanine

    Technology

    +10.80Control Room

    +10.80

    Void over workshop

    Technology

    For Illustrative Purposes Only

    Cycle Store

    FICHTNERRectangle

    FICHTNERLine

    FICHTNERLine

  • Gatehouse Detail

    South Elevation East Elevation �West handed� North Elevation

    Weigh bridge

    Protective barrier in yellowpainted steel sections

    0m 5m

    Scale

    N

    For Illustrative Purposes Only

    MATERIALS:

    Aluminium curtain wall with low e sealed double glazing units andaluminium infill spandrel and end panelsAluminium solar shadesAll aluminium with anti- corrosion protection from the marine atmosphereSedum roof

    Architecture & Planning SolutionsArchitects Landscape Architects Interior Designers Urban Consultants

    OXFORDSHIRE ARDLEY VIRIDOR ENERGY from WASTE & IBA FACILITYGatehouse Detail

    Scale 1/50 at A1 Oct 2008Drawing No. EfW-P0R-21

    Tel. 01689 852 622 e-mail: [email protected]

    FICHTNERRectangle

    FICHTNERRectangle

    POR09POR10POR14POR21

    Index: