Page 1: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

pre-design analysis

titiwangsa : site 1+ 4

Page 2: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

character appraisal

buildings, structures and spaces

restrictions, guidelines and requirements

micro

users + activities

precedents

Page 3: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

character appraisal

Page 4: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Settlement pattern

Page 5: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

2

(HKL)Women and chilrden’s Hospital

5

National Library

9 National Heart Institute

4

National Blood Institute

6

Istana Budaya

7

National Visual Art Museum

10 Titiwangsa Stadium

3 UKM Medical

1 Pulapol KL

8 KPJ

(HKL)North, South Ward Block, Radiotheraphy

1940

1962

1975

1977

Titiwangsa Lake Park

1982

11

1999

2000

2002

2005

2009

2011 Historical development From mining to an urban park

Page 6: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

5

National Library 4

National Blood Centre

6

Istana Budaya

7

National Visual Art Museum

10 Titiwangsa Stadium

Management office

Page 7: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

t in ted g las s and c lean modern lines with traditional Malay design prominent in the form of a light blue origami-style metallic roof

sirih junjung inspired roof shape (traditional arrangement or a present made of betel leaves used during Malay weddings). Serambi, rummah ibu, rumah dapur layout

building design is based on the Malay headgear o r 'tengkolok' which is a symbol of intel lectual pride and respect in Malay culture.

Traditional malay architecture Applying the past to the present

Page 8: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

modernized

traditional

The slope Pitch roof + layering

Page 9: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

The blue roof Public buildings : healthcare + culture

Page 10: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA
Page 11: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

buildings, structures

and spaces

Page 12: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Relationship built-unbuilt Provide intimacy and sense of enclosure which defines the boundaries

Page 13: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Urban grain Contrast between fine and coarse creates focal point

Page 14: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Formal-informal Site at contiguous area, acts as the engaging point

Page 15: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

The frame Hard edges frames area of potential users. Soft edges promotes engagement in free flowing space.

Page 16: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

District Urban park as the heart of this district

residential

institutional

Page 17: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Path | major path branches out to a network that wraps around | multiple ingress points

Page 18: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Point of Interest Visual Cues: | National Landmark gives impression to site | Local Landmark creates familiarity

SK Jln Kuantan 1 Asrama 1M

Stadium Titiwangsa

D’SAJI KL Titiwangsa

Istana Budaya Office

Kelab Golf Titiwangsa PDRM

Page 19: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Foci | Sandwiched between 2 prominent nodes | physically and visually reachable from sites

school

food stall

floating restaurant

food stall

Page 20: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Site 1

Page 21: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Foci

Site 4

Page 22: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Restrictions, guidelines

+ requirements

Page 23: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

ZONE : PUBLIC OPEN SPACE Class D6 Sports and Recreation Facilities

| Courts or sports and recreational spaces | Race course | Swimming Pool | Polo Ground | Clubhouse | Paintball space | Facilities for sports and recreational

Class + Activity

Page 24: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Height control Source: DBKL

Page 25: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Height control Source: DBKL

Page 26: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

60m

40m 35m

20m

Height control

Page 27: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Site 1

Page 28: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Site 4

Page 29: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Future developments

Page 30: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

micro

Page 31: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Site condition : sun orientation

Suitable placement of program depending on

orientation | morning based programme | evening based programme

0700

Page 32: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Site condition : sun orientation

Suitable placement of program depending on

orientation | morning based programme | evening based programme

1000

Page 33: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Site condition : sun orientation

Suitable placement of program depending on

orientation | morning based programme | evening based programme

1200

Page 34: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Site condition : sun orientation

Suitable placement of program depending on

orientation | morning based programme | evening based programme

1400

Page 35: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Site condition : sun orientation

Suitable placement of program depending on

orientation | morning based programme | evening based programme

1700

Page 36: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Site condition : sun orientation

Suitable placement of program depending on

orientation | morning based programme | evening based programme

0700

Page 37: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Site condition : sun orientation

Suitable placement of program depending on

orientation | morning based programme | evening based programme

1000

Page 38: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Site condition : sun orientation

Suitable placement of program depending on

orientation | morning based programme | evening based programme

1200

Page 39: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Site condition : sun orientation

Suitable placement of program depending on

orientation | morning based programme | evening based programme

1400

Page 40: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Site condition : sun orientation

Suitable placement of program depending on

orientation | morning based programme | evening based programme

1700

Page 41: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Site condition : lake view

Possible glare to occur at certain times of the day

Page 42: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Site condition : lake view

Possible glare to occur at certain times of the day

Page 43: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Permeability + transparencies Ambiguous boundary proposing a free moving ground

Page 44: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Permeability + transparencies Defined boundary defines movement

Page 45: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Permeability + transparencies

Intersection creates pauses

Page 46: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Permeability + transparencies

Directional linear flow

Page 47: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Visual analysis Line of sight

Page 48: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Visual analysis Line of sight

Page 49: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Visual analysis Site 1

Page 50: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Visual analysis Site 4

Page 51: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

users +activities

Page 52: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Activity spine + nodes Sites intersect with spine which absorbs the vibrancy of the park

Page 53: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Temporal quality Fluctuates throughout the day

0700 1100 1500 1900 2200

Page 54: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

User Group | Close proximity to destination, directs potential users to use that path | Potential users play a role in programme

food stalls

food stalls

plaza

school

carpark

bike rental

construction

office

Page 55: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Gap + Enclosure | Active + dormant | Infill + improve street quality | Influx of human flow

Page 56: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

SWOT SITE 1

Strength : multiple ingress points

Weakness : exposed

Threat : traffic at peak hours

Opportunity : fluctuation of crowd

Page 57: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

SWOT SITE 4

Strength : Single entry point

Opportunity : Observation platform

Threat : pedestrian’s safety questioned

Weakness : absence of node

Page 58: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

precedent

Page 59: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

fala park / PL

architekci

Wolsztyn, Poland

2012

Page 60: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

location

Page 61: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Old abandoned industrial site

Wolsztyn lake

Wolsztyn park

context

Page 62: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

programme ground floor plan

children play area

squash courts climbing wall

bowling alley

cafe

Page 63: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

programme section

childrenplayarea

squashcourtsclimbingwall

cafe

promoting life at the core which punctures through levels

focal point

central dispersion + linearity in movement

Page 64: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

core

Page 65: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

programme first floor plan

gymnasium

lockers

Page 66: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

extensive character

Page 67: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

programme second floor plan

rooftop tennis courts

Page 68: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

cityscape church towers dense roofs

Page 69: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA
Page 70: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Black box gym / HAD &

Epos Architects

Chengdu, China 2015

Page 71: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

location

Page 72: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

programme ground floor plan Traffic flow and internal-external space

transformations unfold around this courtyard

Page 73: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

programme first floor plan Multiple and contrasting programmes

becomes center of vitality

Page 74: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

Steel beams + columns perforated steel plates

Page 75: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA
Page 76: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

attraction power holding power [engagement] power

Page 77: ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA

[ engagement ] noun meaningful contact and connection