Noise and Vibration The Yorkshire and Humber (CCS Cross Country Pipeline) Development Consent Order Under Regulation 5(2)(a) of the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 Document 6.13.1 BS 5228 Calculations Document 6.13.2 EHO Meeting Minutes Document 6.13.3 Noise Survey and Results
6.13.1-6.13.3 D
OC
UM
EN
T
The Yorkshire and Humber CCS Cross Country Pipeline
Application Reference: EN070001 June 2014
BS 5228 Calculations The Yorkshire and Humber (CCS Cross Country Pipeline) Development Consent Order Under Regulation 5(2)(a) of the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009
6.13.1D
OC
UM
EN
T
Environmental Statement Volume 6: Environmental Statement Document 6.13.1
Ch. 13 Noise and Vibration 1
The Yorkshire and Humber CCS Cross Country Pipeline
Appendix 6.13.1: Noise and Vibration The following tables show the construction plant, noise levels (Taken from BS 5228, where necessary), the number of plant and the assumed operating hours over a 12 hour day. Pipeline Envelope and Flexible Drainage Areas.
Typical Construction Noise Predictions – Distance 10m (16m for drainage)- Calculations to BS 5228
Data Source Plant Type
BS 5228 SPL dB
(A) Number in Operation Total SWL dB(A) Dist.
(m) Operating
Hours Noise Level dB (A)
Operation: Preparing access to and from right of way inc. Hedge removal BS 5228 Table c4.75 Tractor & Trailer 79 2 110 10.0 11 69.4 BS 5228 Table c2.21 20T Backhoe 71 2 102 10.0 11 61.4 BS 5228 Table c4.66 JCB (3CX) 69 2 100 10.0 11 59.4
70.4 Operation: Right Of Way fencing
BS 5228 Table c2.21 20T Backhoe 71 2 102 10.0 11 61.4 BS 5228 Table c4.66 JCB (3CX) 69 2 100 10.0 11 59.4 google search quad bike 54 2 85 10.0 11 44.4 BS 5228 Table c4.75 Tractor & Trailer 79 2 110 10.0 11 69.4
70.4 Operation: Pre and Post Construction Land Drainage
BS 5228 Table c2.21 20T Backhoe 71 1 99 10.0 11 58.4 BS 5228 Table c4.66 JCB (3CX) 69 2 100 10.0 11 59.4 BS 5228 Table c2.30 Stone Wagons 79 8 116 10.0 11 75.4 National Grid Mastenbroek Trencher 70 2 101 10.0 11 60.4 BS 5228 Table c2.30 Stone Carts 79 6 114.8 10.0 11 74.2
78.0 Operation: Top Soil Strip
BS 5228 Table c5.18 30T Backhoe 80 3 112.8 10.0 11 72.2 BS 5228 Table c2.13 CAT D5 78 1 106 10.0 11 65.4 BS 5228 Table c2.12 CAT D6 81 1 109 10.0 11 68.4 BS 5228 Table c5.14 CAT D8 86 4 120 10.0 11 79.4
80.6 Operation: Preparing Right of Way
BS 5228 Table c2.19 25T Backhoe 77 2 108 10.0 11 67.4 BS 5228 Table c4.66 JCB (3CX) 69 1 97 10.0 11 56.4 BS 5228 Table c2.42 stone Compactor (Teran) 78 1 106 10.0 11 65.4 BS 5228 Table c2.30 Stone Wagons 79 8 116 10.0 11 75.4 BS 5228 Table c4.75 Tractor & Trailer 79 2 110 10.0 11 69.4
77.2 Operation: Pipe Stringing, pipe bending, pipeline welding
BS 5228 Table c4.43 Crane 40T 70 1 98 10.0 4 53.0 BS 5228 Table c4.74 Pipe Carrier D8 Cradle 80 8 117 10.0 4 72.0 BS 5228 Table c2.35 Tele - Handler 71 1 99 10.0 4 54.0 BS 5228 Table c4.74 Sideboom 80 10 118 10.0 4 73.0 BS 5228 Table c2.21 20T Backhoe 71 1 99 10.0 4 54.0 BS 5228 Table c3.31 Weldsets (3 Bedford) 73 6 108.8 10.0 8 79.0
Environmental Statement Volume 6: Environmental Statement Document 6.13.1
Ch. 13 Noise and Vibration 2
The Yorkshire and Humber CCS Cross Country Pipeline
Typical Construction Noise Predictions – Distance 10m (16m for drainage)- Calculations to BS 5228
Data Source Plant Type
BS 5228 SPL dB
(A) Number in Operation Total SWL dB(A) Dist.
(m) Operating
Hours Noise Level dB (A)
BS 5228 Table c4.93 Dumpers 77 4 111 10.0 4 66.0 BS 5228 Table c2.19 25T Backhoe 77 2 108 10.0 4 63.0 BS 5228 Table c3.35 Cutting Equipment (Bedford) 65 1 93 10.0 8 63.2 BS 5228 Table c4.74 Welding Rigs 80 2 111 10.0 8 69.0 BS 5228 Table c4.74 Welding Rigs 80 4 114 10.0 8 72.0 BS 5228 Table c4.74 Welding Rigs (backend) 80 8 117 10.0 8 75.0 BS 5228 Table c3.33 generator for welding 57 1 85 10.0 8 55.2 BS 5228 Table c4.93 angle grinder 80 1 108 10.0 8 78.2
83.9 Operation: Excavation & Lay
BS 5228 Table c2.21 20T Backhoe 71 6 106.8 10.0 11 66.2 BS 5228 Table c2.16 30T Backhoe 75 5 110 10.0 11 69.4 BS 5228 Table c2.34 Flatbed (Waggon) 80 1 108 10.0 11 67.4 BS 5228 Table c4.74 Sideboom 80 8 117 10.0 11 76.4 BS 5228 Table c2.35 Tele - Handler 71 1 99 10.0 11 58.4 BS 5228 Table c4.74 Welding Rigs 80 2 111 10.0 11 70.4 78.7
Operation: Re-Instatment- regrading and subsoil BS 5228 Table c2.19 25T Backhoe 77 1 105 10.0 11 64.4 BS 5228 Table c2.12 CAT D6 81 1 109 10.0 11 68.4 69.9
Operation: Re-Instatement-Topsoil Replacement BS 5228 Table c2.16 30T Backhoe 75 3 107.8 10.0 11 67.2 BS 5228 Table c2.13 CAT D5 78 1 106 10.0 11 65.4 BS 5228 Table c2.12 CAT D6 81 1 109 10.0 11 68.4 BS 5228 Table c5.14 CAT D8 86 4 120 10.0 11 79.4 BS 5228 Table c4.75 Tractor & Trailer 79 2 110 10.0 11 69.4 80.5
Operation: Re-instatement- Pipe line markers BS 5228 Table c5.14 CAT D8 86 2 117 10.0 11 76.4 BS 5228 Table c4.74 Harrow / Seeder 79 1 107 10.0 11 66.4 BS 5228 Table c4.74 Power Harrow 79 1 107 10.0 11 66.4 BS 5228 Table c4.74 Subsoilers 79 2 110 10.0 11 69.4 BS 5228 Table c4.75 Tractor & Trailer 79 2 110 10.0 11 69.4 BS 5228 Table c2.21 20T Backhoe 71 1 99 10.0 11 58.4 BS 5228 Table c2.12 CAT D6 81 1 109 10.0 11 68.4 78.9 Re-Instatement- Mainline Backfill/ Pipe bed and surround BS 5228 Table c2.19 25T Backhoe (Long Reach) 77 5 112 10.0 11 71.4 BS 5228 Table c2.21 20T Backhoe 71 7 107.5 10.0 11 66.9 BS 5228 Table c2.12 CAT D6 81 2 112 10.0 11 71.4 BS 5228 Table c5.20 Vibrating Roller (Ramax) 75 5 110 10.0 11 69.4
76.2
Environmental Statement Volume 6: Environmental Statement Document 6.13.1
Ch. 13 Noise and Vibration 3
The Yorkshire and Humber CCS Cross Country Pipeline
Typical Construction Noise Predictions – Distance 10m (16m for drainage)- Calculations to BS 5228
Data Source Plant Type
BS 5228 SPL dB
(A) Number in Operation Total SWL dB(A) Dist.
(m) Operating
Hours Noise Level dB (A)
Operation: Auger Crossings BS 5228 Table c3.24 Auger inc screws and rails 74 1 102 10.0 4 69.2 BS 5228 Table c3.22 side boom. 80 1 108 10.0 8 78.2 BS 5228 Table c4.74 stone Compactor (Teran) 80 1 108 10.0 11 79.6
82.2 Operation: Piling Crossing
BS 5228 Table c3.29/30 crawler crane 70 1 98 10.0 11 69.6
Movax vibrohammer / Movax or the piling rig 1 105 10.0 11 76.6 BS 5228 Table c4.53 Piling rig 90 1 118 10.0 11 89.6
89.9 Operation: Mirco tunnelling Crossing
BS 5228 Table c3.29/30 crawler crane 70 1 98 10.0 11 69.6
BS 5228 Table c5.18 30T Backhoe 80 1 108 10.0 11 75.6 BS 5228 Table d7.49 generator 76 1 104 10.0 11 75.6 National Grid microtunell plant 50 1 78 10.0 11 49.6
79.1 Operation: HDD Crossing
BS 5228 Table c4.28 concrete pour 75 1 103 10.0 11 74.6 BS 5228 Table c4.28 mixing tank - 76 1 104 10.0 11 75.6 BS 5228 Table c4.96 directional drill 77 1 105 10.0 11 76.6 BS 5228 Table c4.92 mounting supports for mounting drill 87 1 115 10.0 11 86.6 BS 5228 Table c4.43 Crane 40T 70 1 98 10.0 4 53.0 BS 5228 Table d7.49 diesel generator 76 1 104 10.0 11 75.6
87.8 Operation: Testing
BS 5228 Table c4.74 Sideboom 80 1 108 10.0 2 60.0 BS 5228 Table c4.74 Welding Rigs 80 1 108 10.0 3 61.8 BS 5228 Table c2.34 Flatbed (Waggon) 80 1 108 10.0 2 60.0 National Grid Fill pumps 75 2 106 10.0 11 77.6 BS 5228 Table c2.19 25T Backhoe 77 1 105 10.0 2 57.0 77.9
Operation: Pre and Post Construction Land Drainage BS 5228 Table c2.21 20T Backhoe 71 1 99 16.0 11 54.3 BS 5228 Table c4.66 JCB (3CX) 69 2 100 16.0 11 55.3 BS 5228 Table c2.30 Stone Wagons 79 8 116 16.0 11 71.3 National Grid Mastenbroek Trencher 70 2 101 16.0 11 56.3 BS 5228 Table c2.30 Stone Carts 79 6 114.8 16.0 11 70.1
74.0
Environmental Statement Volume 6: Environmental Statement Document 6.13.1
Ch. 13 Noise and Vibration 4
The Yorkshire and Humber CCS Cross Country Pipeline
Typical Construction Noise Predictions – Distance 50m - Calculations to BS 5228
Data Source Plant Type
BS 5228 SPL
dB(A) Number in Operation Total SWL dB(A) Dist.
(m) Operating duration
Noise Level
Operation: Preparing access to and from right of way inc. Hedge removal BS 5228 Table c4.75 Tractor & Trailer 79 2 110 50.0 11 55.4 BS 5228 Table c2.21 20T Backhoe 71 2 102 50.0 11 47.4 BS 5228 Table c4.66 JCB (3CX) 69 2 100 50.0 11 45.4
Total 56.4 Operation: Right Of Way fencing
BS 5228 Table c2.21 20T Backhoe 71 2 102 50.0 11 47.4 BS 5228 Table c4.66 JCB (3CX) 69 2 100 50.0 11 45.4 Google search quad bike 54 2 85 50.0 11 30.4 BS 5228 Table c4.75 Tractor & Trailer 79 2 110 50.0 11 55.4
Total 56.4 Operation: Pre and Post Construction Land Drainage
BS 5228 Table c2.21 20T Backhoe 71 1 99 50.0 11 44.4 BS 5228 Table c4.66 JCB (3CX) 69 2 100 50.0 11 45.4 BS 5228 Table c2.30 Stone Wagons 79 8 116 50.0 11 61.4 National Grid Mastenbroek Trencher 70 2 101 50.0 11 46.4 BS 5228 Table c2.30 Stone Carts 79 6 114.8 50.0 11 60.2
Total 64.1 Operation: Top Soil Strip
BS 5228 Table c5.18 30T Backhoe 80 3 112.8 50.0 11 58.2 BS 5228 Table c2.13 CAT D5 78 1 106 50.0 11 51.4 BS 5228 Table c2.12 CAT D6 81 1 109 50.0 11 54.4 BS 5228 Table c5.14 CAT D8 86 4 120 50.0 11 65.4
Total 66.6 Operation: Preparing Right of Way
BS 5228 Table c2.19 25T Backhoe 77 2 108 50.0 11 53.4 BS 5228 Table c4.66 JCB (3CX) 69 1 97 50.0 11 42.4 BS 5228 Table c2.42 stone Compactor (Teran) 78 1 106 50.0 11 51.4 BS 5228 Table c2.30 Stone Wagons 79 8 116 50.0 11 61.4 BS 5228 Table c4.75 Tractor & Trailer 79 2 110 50.0 11 55.4
Total 63.2 Operation: Pipe Stringing, pipe bending, pipeline welding
BS 5228 Table c4.43 Crane 40T 70 1 98 50.0 4 39.0 BS 5228 Table c4.74 Pipe Carrier D8 Cradle 80 8 117 50.0 4 58.0 BS 5228 Table c2.35 Tele - Handler 71 1 99 50.0 4 40.0 BS 5228 Table c4.74 Sideboom 80 10 118 50.0 4 59.0 BS 5228 Table c2.21 20T Backhoe 71 1 99 50.0 4 40.0 BS 5228 Table c3.31 Weldsets (3 Bedford) 73 6 108.8 50.0 8 65.0 BS 5228 Table c4.9 Dumpers 77 4 111 50.0 4 52.0 BS 5228 Table c2.19 25T Backhoe 77 2 108 50.0 4 49.0 BS 5228 Table c3.35 Cutting Equipment (Bedford) 65 1 93 50.0 8 49.2 BS 5228 Table c4.74 Welding Rigs 80 2 111 50.0 8 55.0 BS 5228 Table c4.74 Welding Rigs 80 4 114 50.0 8 58.0 BS 5228 Table c4.74 Welding Rigs (backend) 80 8 117 50.0 8 61.0
Environmental Statement Volume 6: Environmental Statement Document 6.13.1
Ch. 13 Noise and Vibration 5
The Yorkshire and Humber CCS Cross Country Pipeline
Typical Construction Noise Predictions – Distance 50m - Calculations to BS 5228
Data Source Plant Type
BS 5228 SPL
dB(A) Number in Operation Total SWL dB(A) Dist.
(m) Operating duration
Noise Level
BS 5228 Table c3.33 generator for welding 57 1 85 50.0 8 41.2 BS 5228 Table c4.93 angle grinder 80 1 108 50.0 8 64.2
Total 69.9 Operation: Excavation & Lay
BS 5228 Table c2.21 20T Backhoe 71 6 106.8 50.0 11 52.2 BS 5228 Table c2.16 30T Backhoe 75 5 110 50.0 11 55.4 BS 5228 Table c2.34 Flatbed (Wagon) 80 1 108 50.0 11 53.4 BS 5228 Table c4.74 Sideboom 80 8 117 50.0 11 62.4 BS 5228 Table c2.35 Tele - Handler 71 1 99 50.0 11 44.4 BS 5228 Table c4.74 Welding Rigs 80 2 111 50.0 11 56.4 64.7
Operation: Re-Instatement- regrading and subsoil BS 5228 Table c2.19 25T Backhoe 77 1 105 50.0 11 50.4 BS 5228 Table c2.12 CAT D6 81 1 109 50.0 11 54.4 55.9 Re-Instatement-Topsoil Replacement BS 5228 Table c2.16 30T Backhoe 75 3 107.8 50.0 11 53.2 BS 5228 Table c2.13 CAT D5 78 1 106 50.0 11 51.4 BS 5228 Table c2.12 CAT D6 81 1 109 50.0 11 54.4 BS 5228 Table c5.14 CAT D8 86 4 120 50.0 11 65.4 BS 5228 Table c4.75 Tractor & Trailer 79 2 110 50.0 11 55.4
Total 66.5
Re-instatement- Pipe line markers BS 5228 Table c5.14 CAT D8 86 2 117 50.0 11 62.4 BS 5228 Table c4.74 Harrow / Seeder 79 1 107 50.0 11 52.4 BS 5228 Table c4.74 Power Harrow 79 1 107 50.0 11 52.4 BS 5228 Table c4.74 Subsoilers 79 2 110 50.0 11 55.4 BS 5228 Table c4.75 Tractor & Trailer 79 2 110 50.0 11 55.4 BS 5228 Table c2.21 20T Backhoe 71 1 99 50.0 11 44.4 BS 5228 Table c2.12 CAT D6 81 1 109 50.0 11 54.4 Total 64.9
Re-Instatement- Mainline Backfill/ Pipe bed and surround
BS 5228 Table c2.19 25T Backhoe (Long Reach) 77 5 112 50.0 11 57.4 BS 5228 Table c2.21 20T Backhoe 71 7 107.5 50.0 11 52.9 BS 5228 Table c2.12 CAT D6 81 2 112 50.0 11 57.4 BS 5228 Table c5.20 Vibrating Roller (Ramax) 75 5 110 50.0 11 55.4
Total 62.2 Operation: Auger Crossings
BS 5228 Table c3.24 Auger inc screws and rails 74 1 102 50.0 4 55.2 BS 5228 Table c3.22 Side boom. 80 1 108 50.0 8 64.2 BS 5228 Table c4.74 stone Compactor (Teran) 80 1 108 50.0 11 65.6
Environmental Statement Volume 6: Environmental Statement Document 6.13.1
Ch. 13 Noise and Vibration 6
The Yorkshire and Humber CCS Cross Country Pipeline
Typical Construction Noise Predictions – Distance 50m - Calculations to BS 5228
Data Source Plant Type
BS 5228 SPL
dB(A) Number in Operation Total SWL dB(A) Dist.
(m) Operating duration
Noise Level
Total 68.2 Operation: Piling Crossing
BS 5228 Table c3.29/30 crawler crane 70 1 98 50.0 11 55.6
Movax vibrohammer / Movax or the piling rig 77 1 105 50.0 11 62.6
BS 5228 Table c4.53 Piling rig 90 1 118 50.0 11 75.6 75.9 Operation: Mirco tunneling Crossing
BS 5228 Table c3.29/30 crawler crane 70 1 98 50.0 11 55.6
BS 5228 Table c5.18 30T Backhoe 80 1 108 50.0 11 65.6 BS 5228 Table d7.49 generator 76 1 104 50.0 11 61.6 National Grid microtunel plant 50 1 78 50.0 11 35.6
Total 67.4 Operation: HDD Crossing
BS 5228 Table c4.28 concrete pour 75 1 103 50.0 11 60.6 BS 5228 Table c4.28 mixing tank - 76 1 104 50.0 11 61.6 BS 5228 Table c4.96 directional drill 77 1 105 50.0 11 62.6 BS 5228 Table c4.92 mounting supports for mounting drill 87 1 115 50.0 11 72.6 BS 5228 Table c4.43 Crane 40T 70 1 98 50.0 4 39.0 BS 5228 Table d7.49 diesel generator 76 1 104 50.0 11 61.6
Total 73.8 Operation: Testing
BS 5228 Table c4.74 Sideboom 80 1 108 50.0 2 46.0 BS 5228 Table c4.74 Welding Rigs 80 1 108 50.0 3 47.8 BS 5228 Table c2.34 Flatbed (Wagon) 80 1 108 50.0 2 46.0 National Grid Fill pumps 75 2 106 50.0 11 63.6 BS 5228 Table c2.19 25T Backhoe 77 1 105 50.0 2 43.0 Total 63.9
Environmental Statement Volume 6: Environmental Statement Document 6.13.1
Ch. 13 Noise and Vibration 7
The Yorkshire and Humber CCS Cross Country Pipeline
Typical Construction Noise Predictions – Distance 100m - Calculations to BS 5228
Data source Plant Type
BS 5228 SPL
Number in Operation Total SWL dB(A) Dist. (m)
Operating Hours
Noise Level
Operation: Preparing access to and from right of way inc. Hedge removal BS 5228 Table c4.75 Tractor & Trailer 79 2 110 100.0 11 50.7 BS 5228 Table c2.21 20T Backhoe 71 2 102 100.0 11 42.7 BS 5228 Table c4.66 JCB (3CX) 69 2 100 100.0 11 40.7
Total 51.7 Operation: Right Of Way fencing
BS 5228 Table c2.21 20T Backhoe 71 2 102 100.0 11 42.7 BS 5228 Table c4.66 JCB (3CX) 69 2 100 100.0 11 40.7 google search quad bike 54 2 85 100.0 11 25.7 BS 5228 Table c4.75 Tractor & Trailer 79 2 110 100.0 11 50.7
Total 51.7 Operation: Pre and Post Construction Land Drainage
BS 5228 Table c2.21 20T Backhoe 71 1 99 100.0 11 39.7 BS 5228 Table c4.66 JCB (3CX) 69 2 100 100.0 11 40.7 BS 5228 Table c2.30 Stone Wagons 79 8 116 100.0 11 56.7 National Grid Mastenbroek Trencher 70 2 101 100.0 11 41.7 BS 5228 Table c2.30 Stone Carts 79 6 114.8 100.0 11 55.5
Total 59.3 Operation: Top Soil Strip
BS 5228 Table c5.18 30T Backhoe 80 3 112.8 100.0 11 53.5 BS 5228 Table c2.13 CAT D5 78 1 106 100.0 11 46.7 BS 5228 Table c2.12 CAT D6 81 1 109 100.0 11 49.7 BS 5228 Table c5.14 CAT D8 86 4 120 100.0 11 60.7
Total 61.9 Operation: Preparing Right of Way
BS 5228 Table c2.19 25T Backhoe 77 2 108 100.0 11 48.7 BS 5228 Table c4.66 JCB (3CX) 69 1 97 100.0 11 37.7 BS 5228 Table c2.42 stone Compactor (Teran) 78 1 106 100.0 11 46.7 BS 5228 Table c2.30 Stone Wagons 79 8 116 100.0 11 56.7 BS 5228 Table c4.75 Tractor & Trailer 79 2 110 100.0 11 50.7
Total 58.5 Operation: Pipe Stringing, pipe bending, pipeline welding
BS 5228 Table c4.43 Crane 40T 70 1 98 100.0 4 34.3 BS 5228 Table c4.74 Pipe Carrier D8 Cradle 80 8 117 100.0 4 53.3 BS 5228 Table c2.35 Tele - Handler 71 1 99 100.0 4 35.3 BS 5228 Table c4.74 Sideboom 80 10 118 100.0 4 54.3 BS 5228 Table c2.21 20T Backhoe 71 1 99 100.0 4 35.3 BS 5228 Table c3.31 Weldsets (3 Bedford) 73 6 108.8 100.0 8 59.0 BS 5228 Table c4.9 Dumpers 77 4 111 100.0 4 47.3 BS 5228 Table c2.19 25T Backhoe 77 2 108 100.0 4 44.3 BS 5228 Table c3.35 Cutting Equipment (Bedford) 65 1 93 100.0 8 43.2 BS 5228 Table c4.74 Welding Rigs 80 2 111 100.0 8 50.3 BS 5228 Table c4.74 Welding Rigs 80 4 114 100.0 8 53.3 BS 5228 Table c4.74 Welding Rigs (backend) 80 8 117 100.0 8 56.3
Environmental Statement Volume 6: Environmental Statement Document 6.13.1
Ch. 13 Noise and Vibration 8
The Yorkshire and Humber CCS Cross Country Pipeline
Typical Construction Noise Predictions – Distance 100m - Calculations to BS 5228
Data source Plant Type
BS 5228 SPL
Number in Operation Total SWL dB(A) Dist. (m)
Operating Hours
Noise Level
BS 5228 Table c3.33 generator for welding 57 1 85 100.0 8 35.2 BS 5228 Table c4.93 angle grinder 80 1 108 100.0 8 58.2
Total 64.5 Operation: Excavation & Lay
BS 5228 Table c2.21 20T Backhoe 71 6 106.8 100.0 11 47.5 BS 5228 Table c2.16 30T Backhoe 75 5 110 100.0 11 50.7 BS 5228 Table c2.34 Flatbed (Waggon) 80 1 108 100.0 11 48.7 BS 5228 Table c4.74 Sideboom 80 8 117 100.0 11 57.7 BS 5228 Table c2.35 Tele - Handler 71 1 99 100.0 11 39.7 BS 5228 Table c4.74 Welding Rigs 80 2 111 100.0 11 51.7 Total 60.0
Operation: Re-Instatment- regrading and subsoil BS 5228 Table c2.19 25T Backhoe 77 1 105 100.0 11 45.7 BS 5228 Table c2.12 CAT D6 81 1 109 100.0 11 49.7 Total 51.2 Re-Instatment-Topsoil Replacement BS 5228 Table c2.16 30T Backhoe 75 3 107.8 100.0 11 48.5 BS 5228 Table c2.13 CAT D5 78 1 106 100.0 11 46.7 BS 5228 Table c2.12 CAT D6 81 1 109 100.0 11 49.7 BS 5228 Table c5.14 CAT D8 86 4 120 100.0 11 59.4 BS 5228 Table c4.75 Tractor & Trailer 79 2 110 100.0 11 50.7 Total 60.8 Re-instatment- Pipe line markers BS 5228 Table c5.14 CAT D8 86 2 117 100.0 11 57.7 BS 5228 Table c4.74 Harrow / Seeder 79 1 107 100.0 11 47.7 BS 5228 Table c4.74 Power Harrow 79 1 107 100.0 11 47.7 BS 5228 Table c4.74 Subsoilers 79 2 110 100.0 11 50.7 BS 5228 Table c4.75 Tractor & Trailer 79 2 110 100.0 11 50.7 BS 5228 Table c2.21 20T Backhoe 71 1 99 100.0 11 39.7 BS 5228 Table c2.12 CAT D6 81 1 109 100.0 11 49.7 Total 60.2
Re-Instatement- Mainline Backfill/ Pipe bed and surround
BS 5228 Table c2.19 25T Backhoe (Long Reach) 77 5 112 100.0 11 52.7 BS 5228 Table c2.21 20T Backhoe 71 7 107.5 100.0 11 48.2 BS 5228 Table c2.12 CAT D6 81 2 112 100.0 11 52.7 BS 5228 Table c5.20 Vibrating Roller (Ramax) 75 5 110 100.0 11 50.7
Total 57.5 Operation: Auger Crossings
BS 5228 Table c3.24 Auger inc screws and rails 74 1 102 100.0 4 49.2 BS 5228 Table c3.22 side boom. 80 1 108 100.0 8 58.2 BS 5228 Table c4.74 stone Compactor (Teran) 80 1 108 100.0 11 59.6
Total 62.2
Environmental Statement Volume 6: Environmental Statement Document 6.13.1
Ch. 13 Noise and Vibration 9
The Yorkshire and Humber CCS Cross Country Pipeline
Typical Construction Noise Predictions – Distance 100m - Calculations to BS 5228
Data source Plant Type
BS 5228 SPL
Number in Operation Total SWL dB(A) Dist. (m)
Operating Hours
Noise Level
Operation: Piling Crossing BS 5228 Table c3.29/30 crawler crane 70 1 98 100.0 11 49.6
Movax vibrohammer / Movax or the piling rig 1 105 100.0 11 56.6
BS 5228 Table c4.53 Piling rig 90 1 118 100.0 11 69.6 Total 69.9 Operation: Mirco tunnelling Crossing
BS 5228 Table c3.29/30 crawler crane 70 1 98 100.0 11 49.6
BS 5228 Table c5.18 30T Backhoe 80 1 108 100.0 11 59.6 BS 5228 Table d7.49 generator 76 1 104 100.0 11 55.6 National Grid microtunell plant 50 1 78 100.0 11 29.6
Total 61.4 Operation: HDD Crossing
BS 5228 Table c4.28 concrete pour 75 1 103 100.0 11 54.6 BS 5228 Table c4.28 mixing tank - 76 1 104 100.0 11 55.6 BS 5228 Table c4.96 directional drill 77 1 105 100.0 11 56.6
BS 5228 Table c4.92 mounting supports for mounting drill 87 1 115 100.0 11 66.6
BS 5228 Table c4.43 Crane 40T 70 1 98 100.0 4 34.3 BS 5228 Table d7.49 diesel generator 76 1 104 100.0 11 55.6
Total 67.8 Operation: Testing
BS 5228 Table c4.74 Sideboom 80 1 108 100.0 2 41.2 BS 5228 Table c4.74 Welding Rigs 80 1 108 100.0 3 43.0 BS 5228 Table c2.34 Flatbed (Waggon) 80 1 108 100.0 2 41.2 National Grid Fill pumps 75 2 106 100.0 11 57.6 BS 5228 Table c2.19 25T Backhoe 77 1 105 100.0 2 38.2 Total 58.0
Environmental Statement Volume 6: Environmental Statement Document 6.13.1
Ch. 13 Noise and Vibration 10
The Yorkshire and Humber CCS Cross Country Pipeline
Typical Construction Noise Predictions – Distance 150m - Calculations to BS 5228
Data Source Plant Type
BS 5228 SPL dB(A) Number in Operation Total SWL dB(A) Dist.
(m) Operating
Hours Noise Level
Operation: Preparing access to and from right of way inc. Hedge removal BS 5228 Table c4.75 Tractor & Trailer 79 2 110 150.0 11 48.1 BS 5228 Table c2.21 20T Backhoe 71 2 102 150.0 11 40.1 BS 5228 Table c4.66 JCB (3CX) 69 2 100 150.0 11 38.1
Total 49.1 Operation: Right Of Way fencing
BS 5228 Table c2.21 20T Backhoe 71 2 102 150.0 11 40.1 BS 5228 Table c4.66 JCB (3CX) 69 2 100 150.0 11 38.1 google search quad bike 54 2 85 150.0 11 23.1 BS 5228 Table c4.75 Tractor & Trailer 79 2 110 150.0 11 48.1
Total 49.1 Operation: Pre and Post Construction Land Drainage
BS 5228 Table c2.21 20T Backhoe 71 1 99 150.0 11 37.1 BS 5228 Table c4.66 JCB (3CX) 69 2 100 150.0 11 38.1 BS 5228 Table c2.30 Stone Wagons 79 8 116 150.0 11 54.1 National Grid Mastenbroek Trencher 70 2 101 150.0 11 39.1 BS 5228 Table c2.30 Stone Carts 79 6 114.8 150.0 11 52.9
Total 56.7 Operation: Top Soil Strip
BS 5228 Table c5.18 30T Backhoe 80 3 112.8 150.0 11 50.9 BS 5228 Table c2.13 CAT D5 78 1 106 150.0 11 44.1 BS 5228 Table c2.12 CAT D6 81 1 109 150.0 11 47.1 BS 5228 Table c5.14 CAT D8 86 4 120 150.0 11 58.1
Total 59.3 Operation: Preparing Right of Way
BS 5228 Table c2.19 25T Backhoe 77 2 108 150.0 11 46.1 BS 5228 Table c4.66 JCB (3CX) 69 1 97 150.0 11 35.1 BS 5228 Table c2.42 stone Compactor (Teran) 78 1 106 150.0 11 44.1 BS 5228 Table c2.30 Stone Wagons 79 8 116 150.0 11 54.1 BS 5228 Table c4.75 Tractor & Trailer 79 2 110 150.0 11 48.1
Total 55.9 Operation: Pipe Stringing, pipe bending, pipeline welding
BS 5228 Table c4.43 Crane 40T 70 1 98 150.0 4 31.7 BS 5228 Table c4.74 Pipe Carrier D8 Cradle 80 8 117 150.0 4 50.7 BS 5228 Table c2.35 Tele - Handler 71 1 99 150.0 4 32.7 BS 5228 Table c4.74 Sideboom 80 10 118 150.0 4 51.7 BS 5228 Table c2.21 20T Backhoe 71 1 99 150.0 4 32.7 BS 5228 Table c3.31 Weldsets (3 Bedford) 73 6 108.8 150.0 8 55.5 BS 5228 Table c4.9 Dumpers 77 4 111 150.0 4 44.7 BS 5228 Table c2.19 25T Backhoe 77 2 108 150.0 4 41.7 BS 5228 Table c3.35 Cutting Equipment (Bedford) 65 1 93 150.0 8 39.7 BS 5228 Table c4.74 Welding Rigs 80 2 111 150.0 8 47.7 BS 5228 Table c4.74 Welding Rigs 80 4 114 150.0 8 50.7 BS 5228 Table c4.74 Welding Rigs (backend) 80 8 117 150.0 8 53.7
Environmental Statement Volume 6: Environmental Statement Document 6.13.1
Ch. 13 Noise and Vibration 11
The Yorkshire and Humber CCS Cross Country Pipeline
Typical Construction Noise Predictions – Distance 150m - Calculations to BS 5228
Data Source Plant Type
BS 5228 SPL dB(A) Number in Operation Total SWL dB(A) Dist.
(m) Operating
Hours Noise Level
BS 5228 Table c3.33 generator for welding 57 1 85 150.0 8 31.7 BS 5228 Table c4.93 angle grinder 80 1 108 150.0 8 54.7
Total 61.4 Operation: Excavation & Lay
BS 5228 Table c2.21 20T Backhoe 71 6 106.8 150.0 11 44.9 BS 5228 Table c2.16 30T Backhoe 75 5 110 150.0 11 48.1 BS 5228 Table c2.34 Flatbed (Waggon) 80 1 108 150.0 11 46.1 BS 5228 Table c4.74 Sideboom 80 8 117 150.0 11 55.1 BS 5228 Table c2.35 Tele - Handler 71 1 99 150.0 11 37.1 BS 5228 Table c4.74 Welding Rigs 80 2 111 150.0 11 49.1 Total 57.4
Operation: Re-Instatment- regrading and subsoil BS 5228 Table c2.19 25T Backhoe 77 1 105 150.0 11 43.1 BS 5228 Table c2.12 CAT D6 81 1 109 150.0 11 47.1 Total 48.5 Re-Instatment-Topsoil Replacement BS 5228 Table c2.16 30T Backhoe 75 3 107.8 150.0 11 45.9 BS 5228 Table c2.13 CAT D5 78 1 106 150.0 11 44.1 BS 5228 Table c2.12 CAT D6 81 1 109 150.0 11 47.1 BS 5228 Table c5.14 CAT D8 86 4 120 150.0 11 55.9 BS 5228 Table c4.75 Tractor & Trailer 79 2 110 150.0 11 48.1 Total 57.5
Re-instatment- Pipe line markers BS 5228 Table c5.14 CAT D8 86 2 117 150.0 11 55.1 BS 5228 Table c4.74 Harrow / Seeder 79 1 107 150.0 11 45.1 BS 5228 Table c4.74 Power Harrow 79 1 107 150.0 11 45.1 BS 5228 Table c4.74 Subsoilers 79 2 110 150.0 11 48.1 BS 5228 Table c4.75 Tractor & Trailer 79 2 110 150.0 11 48.1 BS 5228 Table c2.21 20T Backhoe 71 1 99 150.0 11 37.1 BS 5228 Table c2.12 CAT D6 81 1 109 150.0 11 47.1 Total 57.6
Re-Instatement- Mainline Backfill/ Pipe bed and surround
BS 5228 Table c2.19 25T Backhoe (Long Reach) 77 5 112 150.0 11 50.1 BS 5228 Table c2.21 20T Backhoe 71 7 107.5 150.0 11 45.6 BS 5228 Table c2.12 CAT D6 81 2 112 150.0 11 50.1 BS 5228 Table c5.20 Vibrating Roller (Ramax) 75 5 110 150.0 11 48.1
Total 54.8 Operation: Auger Crossings
BS 5228 Table c3.24 Auger inc screws and rails 74 1 102 150.0 4 45.7 BS 5228 Table c3.22 side boom. 80 1 108 150.0 8 54.7 BS 5228 Table c4.74 stone Compactor (Teran) 80 1 108 150.0 11 56.1
Total 58.7
Environmental Statement Volume 6: Environmental Statement Document 6.13.1
Ch. 13 Noise and Vibration 12
The Yorkshire and Humber CCS Cross Country Pipeline
Typical Construction Noise Predictions – Distance 150m - Calculations to BS 5228
Data Source Plant Type
BS 5228 SPL dB(A) Number in Operation Total SWL dB(A) Dist.
(m) Operating
Hours Noise Level
Operation: Piling Crossing BS 5228 Table c3.29/30 crawler crane 70 1 98 150.0 11 46.1
Movax vibrohammer / Movax or the piling rig 1 105 150.0 11 53.1
BS 5228 Table c4.53 Piling rig 90 1 118 150.0 11 66.1 Total 66.3 Operation: Mirco tunnelling Crossing
BS 5228 Table c3.29/30 crawler crane 70 1 98 150.0 11 46.1
BS 5228 Table c5.18 30T Backhoe 80 1 108 150.0 11 56.1 BS 5228 Table D7.49 generator 76 1 104 150.0 11 52.1 National Grid microtunell plant 50 1 78 150.0 11 26.1
Total 57.8 Operation: HDD Crossing
BS 5228 Table c4.28 concrete pour 75 1 103 150.0 11 51.1 BS 5228 Table c4.28 mixing tank - 76 1 104 150.0 11 52.1 BS 5228 Table c4.96 directional drill 77 1 105 150.0 11 53.1
BS 5228 Table c4.92 mounting supports for mounting drill 87 1 115 150.0 11 63.1
BS 5228 Table c4.43 Crane 40T 70 1 98 150.0 4 31.7 BS 5228 Table D7.49 diesel generator 76 1 104 150.0 11 52.1
Total 64.3 Operation: Testing
BS 5228 Table c4.74 Sideboom 80 1 108 150.0 2 38.7 BS 5228 Table c4.74 Welding Rigs 80 1 108 150.0 3 40.5 BS 5228 Table c2.34 Flatbed (Waggon) 80 1 108 150.0 2 38.7 National Grid Fill pumps 75 2 106 150.0 11 54.1 BS 5228 Table c2.19 25T Backhoe 77 1 105 150.0 2 35.7 Total 54.6
Environmental Statement Volume 6: Environmental Statement Document 6.13.1
Ch. 13 Noise and Vibration 13
The Yorkshire and Humber CCS Cross Country Pipeline
Typical Construction Noise Predictions – Distance 200m - Calculations to BS 5228
Data source Plant Type
BS 5228 SPL
Number in Operation Total SWL dB(A) Dist. (m)
Operating Hours
Noise Level
Operation: Preparing access to and from right of way inc. Hedge removal BS 5228 Table c4.75 Tractor & Trailer 79 2 110 200.0 11 47.7 BS 5228 Table c2.21 20T Backhoe 71 2 102 200.0 11 39.7 BS 5228 Table c4.66 JCB (3CX) 69 2 100 200.0 11 37.7
Total 48.7 Operation: Right Of Way fencing
BS 5228 Table c2.21 20T Backhoe 71 2 102 200.0 11 39.7 BS 5228 Table c4.66 JCB (3CX) 69 2 100 200.0 11 37.7 google search quad bike 54 2 85 200.0 11 22.7 BS 5228 Table c4.75 Tractor & Trailer 79 2 110 200.0 11 47.7
Total 48.7 Operation: Pre and Post Construction Land Drainage
BS 5228 Table c2.21 20T Backhoe 71 1 99 200.0 11 36.7 BS 5228 Table c4.66 JCB (3CX) 69 2 100 200.0 11 37.7 BS 5228 Table c2.30 Stone Wagons 79 8 116 200.0 11 53.7 National Grid Mastenbroek Trencher 70 2 101 200.0 11 38.7 BS 5228 Table c2.30 Stone Carts 79 6 114.8 200.0 11 52.5
Total 56.3 Operation: Top Soil Strip
BS 5228 Table c5.18 30T Backhoe 80 3 112.8 200.0 11 50.5 BS 5228 Table c2.13 CAT D5 78 1 106 200.0 11 43.7 BS 5228 Table c2.12 CAT D6 81 1 109 200.0 11 46.7 BS 5228 Table c5.14 CAT D8 86 4 120 200.0 11 57.7
58.9 Operation: Preparing Right of Way
BS 5228 Table c2.19 25T Backhoe 77 2 108 200.0 11 45.7 BS 5228 Table c4.66 JCB (3CX) 69 1 97 200.0 11 34.7 BS 5228 Table c2.42 stone Compactor (Teran) 78 1 106 200.0 11 43.7 BS 5228 Table c2.30 Stone Wagons 79 8 116 200.0 11 53.7 BS 5228 Table c4.75 Tractor & Trailer 79 2 110 200.0 11 47.7
Total 55.5 Operation: Pipe Stringing, pipe bending, pipeline welding
BS 5228 Table c4.43 Crane 40T 70 1 98 200.0 4 31.3 BS 5228 Table c4.74 Pipe Carrier D8 Cradle 80 8 117 200.0 4 50.3 BS 5228 Table c2.35 Tele - Handler 71 1 99 200.0 4 32.3 BS 5228 Table c4.74 Sideboom 80 10 118 200.0 4 51.3 BS 5228 Table c2.21 20T Backhoe 71 1 99 200.0 4 32.3 BS 5228 Table c3.31 Weldsets (3 Bedford) 73 6 108.8 200.0 8 53.0 BS 5228 Table c4.9 Dumpers 77 4 111 200.0 4 44.3 BS 5228 Table c2.19 25T Backhoe 77 2 108 200.0 4 41.3
BS 5228 Table c3.35 Cutting Equipment (Bedford) 65 1 93 200.0 8 37.2
BS 5228 Table c4.74 Welding Rigs 80 2 111 200.0 8 47.3 BS 5228 Table c4.74 Welding Rigs 80 4 114 200.0 8 50.3
Environmental Statement Volume 6: Environmental Statement Document 6.13.1
Ch. 13 Noise and Vibration 14
The Yorkshire and Humber CCS Cross Country Pipeline
Typical Construction Noise Predictions – Distance 200m - Calculations to BS 5228
Data source Plant Type
BS 5228 SPL
Number in Operation Total SWL dB(A) Dist. (m)
Operating Hours
Noise Level
BS 5228 Table c4.74 Welding Rigs (backend) 80 8 117 200.0 8 53.3 BS 5228 Table c3.33 generator for welding 57 1 85 200.0 8 29.2 BS 5228 Table c4.93 angle grinder 80 1 108 200.0 8 52.2
Total 60.1 Operation: Excavation & Lay
BS 5228 Table c2.21 20T Backhoe 71 6 106.8 200.0 11 44.5 BS 5228 Table c2.16 30T Backhoe 75 5 110 200.0 11 47.7 BS 5228 Table c2.34 Flatbed (Waggon) 80 1 108 200.0 11 45.7 BS 5228 Table c4.74 Sideboom 80 8 117 200.0 11 54.7 BS 5228 Table c2.35 Tele - Handler 71 1 99 200.0 11 36.7 BS 5228 Table c4.74 Welding Rigs 80 2 111 200.0 11 48.7 Total 57.0
Operation: Re-Instatment- regrading and subsoil BS 5228 Table c2.19 25T Backhoe 77 1 105 200.0 11 42.7 BS 5228 Table c2.12 CAT D6 81 1 109 200.0 11 46.7 Total 48.1 Re-Instatment-Topsoil Replacement BS 5228 Table c2.16 30T Backhoe 75 3 107.8 200.0 11 45.5 BS 5228 Table c2.13 CAT D5 78 1 106 200.0 11 43.7 BS 5228 Table c2.12 CAT D6 81 1 109 200.0 11 46.7 BS 5228 Table c5.14 CAT D8 86 4 120 200.0 11 53.4 BS 5228 Table c4.75 Tractor & Trailer 79 2 110 200.0 11 47.7 Total 55.8 Re-instatment- Pipe line markers BS 5228 Table c5.14 CAT D8 86 2 117 200.0 11 54.7 BS 5228 Table c4.74 Harrow / Seeder 79 1 107 200.0 11 44.7 BS 5228 Table c4.74 Power Harrow 79 1 107 200.0 11 44.7 BS 5228 Table c4.74 Subsoilers 79 2 110 200.0 11 47.7 BS 5228 Table c4.75 Tractor & Trailer 79 2 110 200.0 11 47.7 BS 5228 Table c2.21 20T Backhoe 71 1 99 200.0 11 36.7 BS 5228 Table c2.12 CAT D6 81 1 109 200.0 11 46.7 Total 57.2
Re-Instatement- Mainline Backfill/ Pipe bed and surround
BS 5228 Table c2.19 25T Backhoe (Long Reach) 77 5 112 200.0 11 49.7
BS 5228 Table c2.21 20T Backhoe 71 7 107.5 200.0 11 45.2 BS 5228 Table c2.12 CAT D6 81 2 112 200.0 11 49.7 BS 5228 Table c5.20 Vibrating Roller (Ramax) 75 5 110 200.0 11 47.7
Total 54.4 Operation: Auger Crossings
BS 5228 Table c3.24 Auger inc screws and rails 74 1 102 200.0 4 43.2 BS 5228 Table c3.22 side boom. 80 1 108 200.0 8 52.2
Environmental Statement Volume 6: Environmental Statement Document 6.13.1
Ch. 13 Noise and Vibration 15
The Yorkshire and Humber CCS Cross Country Pipeline
Typical Construction Noise Predictions – Distance 200m - Calculations to BS 5228
Data source Plant Type
BS 5228 SPL
Number in Operation Total SWL dB(A) Dist. (m)
Operating Hours
Noise Level
BS 5228 Table c4.74 stone Compactor (Teran) 80 1 108 200.0 11 53.6 Total 56.2 Operation: Piling Crossing
BS 5228 Table c3.29/30 crawler crane 70 1 98 200.0 11 43.6
Movax vibrohammer / Movax or the piling rig 1 105 200.0 11 50.6
BS 5228 Table c4.53 Piling rig 90 1 118 200.0 11 63.6 Total 63.8 Operation: Mirco tunnelling Crossing
BS 5228 Table c3.29/30 crawler crane 70 1 98 200.0 11 43.6
BS 5228 Table c5.18 30T Backhoe 80 1 108 200.0 11 53.6 BS 5228 Table D7.49 generator 76 1 104 200.0 11 49.6 National Grid microtunell plant 50 1 78 200.0 11 23.6
Total 55.3 Operation: HDD Crossing
BS 5228 Table c4.28 concrete pour 75 1 103 200.0 11 48.6 BS 5228 Table c4.28 mixing tank - 76 1 104 200.0 11 49.6 BS 5228 Table c4.96 directional drill 77 1 105 200.0 11 50.6
BS 5228 Table c4.92 mounting supports for mounting drill 87 1 115 200.0 11 60.6
BS 5228 Table c4.43 Crane 40T 70 1 98 200.0 4 31.3 BS 5228 Table D7.49 diesel generator 76 1 104 200.0 11 49.6
Total 61.8 Operation: Testing
BS 5228 Table c4.74 Sideboom 80 1 108 200.0 2 38.3 BS 5228 Table c4.74 Welding Rigs 80 1 108 200.0 3 40.0 BS 5228 Table c2.34 Flatbed (Waggon) 80 1 108 200.0 2 38.3 National Grid Fill pumps 75 2 106 200.0 11 51.6 BS 5228 Table c2.19 25T Backhoe 77 1 105 200.0 2 35.3 Total 52.3
Environmental Statement Volume 6: Environmental Statement Document 6.13.1
Ch. 13 Noise and Vibration 16
The Yorkshire and Humber CCS Cross Country Pipeline
Typical Construction Noise Predictions – Distance 250m - Calculations to BS 5228
Data Source Plant Type
BS 5228 SPL
dB(A) Number in Operation Total SWL dB(A) Dist.
(m) Operating
Hours Noise Level
Operation: Preparing access to and from right of way inc. Hedge removal BS 5228 Table c4.75 Tractor & Trailer 79 2 110 250.0 11 46.6 BS 5228 Table c2.21 20T Backhoe 71 2 102 250.0 11 38.6 BS 5228 Table c4.66 JCB (3CX) 69 2 100 250.0 11 36.6
Total 47.6 Operation: Right Of Way fencing
BS 5228 Table c2.21 20T Backhoe 71 2 102 250.0 11 38.6 BS 5228 Table c4.66 JCB (3CX) 69 2 100 250.0 11 36.6 Google search quad bike 54 2 85 250.0 11 21.6 BS 5228 Table c4.75 Tractor & Trailer 79 2 110 250.0 11 46.6
Total 47.6 Operation: Pre and Post Construction Land Drainage
BS 5228 Table c2.21 20T Backhoe 71 1 99 250.0 11 35.6 BS 5228 Table c4.66 JCB (3CX) 69 2 100 250.0 11 36.6 BS 5228 Table c2.30 Stone Wagons 79 8 116 250.0 11 52.6 National Grid Mastenbroek Trencher 70 2 101 250.0 11 37.6 BS 5228 Table c2.30 Stone Carts 79 6 114.8 250.0 11 51.4
Total 55.3 Operation: Top Soil Strip
BS 5228 Table c5.18 30T Backhoe 80 3 112.8 250.0 11 49.4 BS 5228 Table c2.13 CAT D5 78 1 106 250.0 11 42.6 BS 5228 Table c2.12 CAT D6 81 1 109 250.0 11 45.6 BS 5228 Table c5.14 CAT D8 86 4 120 250.0 11 56.6
Total 57.8 Operation: Preparing Right of Way
BS 5228 Table c2.19 25T Backhoe 77 2 108 250.0 11 44.6 BS 5228 Table c4.66 JCB (3CX) 69 1 97 250.0 11 33.6
BS 5228 Table c2.42 stone Compactor (Teran) 78 1 106 250.0 11 42.6
BS 5228 Table c2.30 Stone Wagons 79 8 116 250.0 11 52.6 BS 5228 Table c4.75 Tractor & Trailer 79 2 110 250.0 11 46.6
Total 54.5 Operation: Pipe Stringing, pipe bending, pipeline welding
BS 5228 Table c4.43 Crane 40T 70 1 98 250.0 4 30.2 BS 5228 Table c4.74 Pipe Carrier D8 Cradle 80 8 117 250.0 4 49.2 BS 5228 Table c2.35 Tele - Handler 71 1 99 250.0 4 31.2 BS 5228 Table c4.74 Sideboom 80 10 118 250.0 4 50.2 BS 5228 Table c2.21 20T Backhoe 71 1 99 250.0 4 31.2 BS 5228 Table c3.31 Weldsets (3 Bedford) 73 6 108.8 250.0 8 51.0 BS 5228 Table c4.9 Dumpers 77 4 111 250.0 4 43.2 BS 5228 Table c2.19 25T Backhoe 77 2 108 250.0 4 40.2
BS 5228 Table c3.35 Cutting Equipment (Bedford) 65 1 93 250.0 8 35.2
BS 5228 Table c4.74 Welding Rigs 80 2 111 250.0 8 46.2
Environmental Statement Volume 6: Environmental Statement Document 6.13.1
Ch. 13 Noise and Vibration 17
The Yorkshire and Humber CCS Cross Country Pipeline
Typical Construction Noise Predictions – Distance 250m - Calculations to BS 5228
Data Source Plant Type
BS 5228 SPL
dB(A) Number in Operation Total SWL dB(A) Dist.
(m) Operating
Hours Noise Level
BS 5228 Table c4.74 Welding Rigs 80 4 114 250.0 8 49.2
BS 5228 Table c4.74 Welding Rigs (backend) 80 8 117 250.0 8 52.2
BS 5228 Table c3.33 generator for welding 57 1 85 250.0 8 27.2 BS 5228 Table c4.93 angle grinder 80 1 108 250.0 8 50.2
Total 58.8 Operation: Excavation & Lay
BS 5228 Table c2.21 20T Backhoe 71 6 106.8 250.0 11 43.4 BS 5228 Table c2.16 30T Backhoe 75 5 110 250.0 11 46.6 BS 5228 Table c2.34 Flatbed (Wagon) 80 1 108 250.0 11 44.6 BS 5228 Table c4.74 Sideboom 80 8 117 250.0 11 53.6 BS 5228 Table c2.35 Tele - Handler 71 1 99 250.0 11 35.6 BS 5228 Table c4.74 Welding Rigs 80 2 111 250.0 11 47.6 55.9
Operation: Re-Instatement- regrading and subsoil BS 5228 Table c2.19 25T Backhoe 77 1 105 250.0 11 41.6 BS 5228 Table c2.12 CAT D6 81 1 109 250.0 11 45.6 Total 47.1 Re-Instatement-Topsoil Replacement BS 5228 Table c2.16 30T Backhoe 75 3 107.8 250.0 11 44.4 BS 5228 Table c2.13 CAT D5 78 1 106 250.0 11 42.6 BS 5228 Table c2.12 CAT D6 81 1 109 250.0 11 45.6 BS 5228 Table c5.14 CAT D8 86 4 120 250.0 11 51.4 BS 5228 Table c4.75 Tractor & Trailer 79 2 110 250.0 11 46.6 Total 54.3 Re-instatement- Pipe line markers BS 5228 Table c5.14 CAT D8 86 2 117 250.0 11 53.6 BS 5228 Table c4.74 Harrow / Seeder 79 1 107 250.0 11 43.6 BS 5228 Table c4.74 Power Harrow 79 1 107 250.0 11 43.6 BS 5228 Table c4.74 Subsoilers 79 2 110 250.0 11 46.6 BS 5228 Table c4.75 Tractor & Trailer 79 2 110 250.0 11 46.6 BS 5228 Table c2.21 20T Backhoe 71 1 99 250.0 11 35.6 BS 5228 Table c2.12 CAT D6 81 1 109 250.0 11 45.6 Total 56.1 Re-Instatement- Mainline Backfill/ Pipe bed and surround
BS 5228 Table c2.19 25T Backhoe (Long Reach) 77 5 112 250.0 11 48.6
BS 5228 Table c2.21 20T Backhoe 71 7 107.5 250.0 11 44.1 BS 5228 Table c2.12 CAT D6 81 2 112 250.0 11 48.6
BS 5228 Table c5.20 Vibrating Roller (Ramax) 75 5 110 250.0 11 46.6
53.4 Operation: Auger Crossings
BS 5228 Table c3.24 Auger inc screws and 74 1 102 250.0 4 41.2
Environmental Statement Volume 6: Environmental Statement Document 6.13.1
Ch. 13 Noise and Vibration 18
The Yorkshire and Humber CCS Cross Country Pipeline
Typical Construction Noise Predictions – Distance 250m - Calculations to BS 5228
Data Source Plant Type
BS 5228 SPL
dB(A) Number in Operation Total SWL dB(A) Dist.
(m) Operating
Hours Noise Level
rails BS 5228 Table c3.22 side boom. 80 1 108 250.0 8 50.2
BS 5228 Table c4.74 stone Compactor (Teran) 80 1 108 250.0 11 51.6
Total 54.2 Operation: Piling Crossing
BS 5228 Table c3.29/30 crawler crane 70 1 98 250.0 11 41.6
Movax vibrohammer / Movax or the piling rig 1 105 250.0 11 48.6
BS 5228 Table c4.53 Piling rig 90 1 118 250.0 11 61.6 Total 61.9 Operation: Mirco tunnelling Crossing
BS 5228 Table c3.29/30 crawler crane 70 1 98 250.0 11 41.6
BS 5228 Table c5.18 30T Backhoe 80 1 108 250.0 11 51.6 BS 5228 Table d7.49 generator 76 1 104 250.0 11 47.6 National Grid microtunell plant 50 1 78 250.0 11 21.6
Total 53.4 Operation: HDD Crossing
BS 5228 Table c4.28 concrete pour 75 1 103 250.0 11 46.6 BS 5228 Table c4.28 mixing tank - 76 1 104 250.0 11 47.6 BS 5228 Table c4.96 directional drill 77 1 105 250.0 11 48.6
BS 5228 Table c4.92 mounting supports for mounting drill 87 1 115 250.0 11 58.6
BS 5228 Table c4.43 Crane 40T 70 1 98 250.0 4 30.2 BS 5228 Table d7.49 diesel generator 76 1 104 250.0 11 47.6
Total 59.9 Operation: Testing
BS 5228 Table c4.74 Sideboom 80 1 108 250.0 2 37.2 BS 5228 Table c4.74 Welding Rigs 80 1 108 250.0 3 39.0 BS 5228 Table c2.34 Flatbed (Waggon) 80 1 108 250.0 2 37.2 National Grid Fill pumps 75 2 106 250.0 11 49.6 BS 5228 Table c2.19 25T Backhoe 77 1 105 250.0 2 34.2 Total 50.5
Environmental Statement Volume 6: Environmental Statement Document 6.13.1
Ch. 13 Noise and Vibration 19
The Yorkshire and Humber CCS Cross Country Pipeline
Typical Construction Noise Predictions – Distance 300m - Calculations to BS 5228
Data Source Plant Type
BS 5228 SPL
dB(A) Number in Operation Total SWL dB(A) Dist.
(m) Operating
Hours Noise Level
Operation: Preparing access to and from right of way inc. Hedge removal BS 5228 Table c4.75 Tractor & Trailer 79 2 110 300.0 11 46.6 BS 5228 Table c2.21 20T Backhoe 71 2 102 300.0 11 38.6 BS 5228 Table c4.66 JCB (3CX) 69 2 100 300.0 11 36.6
Total 47.6 Operation: Right Of Way fencing
BS 5228 Table c2.21 20T Backhoe 71 2 102 300.0 11 38.6 BS 5228 Table c4.66 JCB (3CX) 69 2 100 300.0 11 36.6 google search quad bike 54 2 85 300.0 11 21.6 BS 5228 Table c4.75 Tractor & Trailer 79 2 110 300.0 11 46.6
Total 47.6 Operation: Pre and Post Construction Land Drainage
BS 5228 Table c2.21 20T Backhoe 71 1 99 300.0 11 35.6 BS 5228 Table c4.66 JCB (3CX) 69 2 100 300.0 11 36.6 BS 5228 Table c2.30 Stone Wagons 79 8 116 300.0 11 52.6 National Grid Mastenbroek Trencher 70 2 101 300.0 11 37.6 BS 5228 Table c2.30 Stone Carts 79 6 114.8 300.0 11 51.4
Total 55.2 Operation: Top Soil Strip
BS 5228 Table c5.18 30T Backhoe 80 3 112.8 300.0 11 49.4 BS 5228 Table c2.13 CAT D5 78 1 106 300.0 11 42.6 BS 5228 Table c2.12 CAT D6 81 1 109 300.0 11 45.6 BS 5228 Table c5.14 CAT D8 86 4 120 300.0 11 56.6
Total 57.7 Operation: Preparing Right of Way
BS 5228 Table c2.19 25T Backhoe 77 2 108 300.0 11 44.6 BS 5228 Table c4.66 JCB (3CX) 69 1 97 300.0 11 33.6
BS 5228 Table c2.42 stone Compactor (Teran) 78 1 106 300.0 11 42.6
BS 5228 Table c2.30 Stone Wagons 79 8 116 300.0 11 52.6 BS 5228 Table c4.75 Tractor & Trailer 79 2 110 300.0 11 46.6
Total 54.4 Operation: Pipe Stringing, pipe bending, pipeline welding
BS 5228 Table c4.43 Crane 40T 70 1 98 300.0 4 30.2 BS 5228 Table c4.74 Pipe Carrier D8 Cradle 80 8 117 300.0 4 49.2 BS 5228 Table c2.35 Tele - Handler 71 1 99 300.0 4 31.2 BS 5228 Table c4.74 Sideboom 80 10 118 300.0 4 50.2 BS 5228 Table c2.21 20T Backhoe 71 1 99 300.0 4 31.2 BS 5228 Table c3.31 Weldsets (3 Bedford) 73 6 108.8 300.0 8 49.5 BS 5228 Table c4.9 Dumpers 77 4 111 300.0 4 43.2 BS 5228 Table c2.19 25T Backhoe 77 2 108 300.0 4 40.2
BS 5228 Table c3.35 Cutting Equipment (Bedford) 65 1 93 300.0 8 33.7
BS 5228 Table c4.74 Welding Rigs 80 2 111 300.0 8 46.2
Environmental Statement Volume 6: Environmental Statement Document 6.13.1
Ch. 13 Noise and Vibration 20
The Yorkshire and Humber CCS Cross Country Pipeline
Typical Construction Noise Predictions – Distance 300m - Calculations to BS 5228
Data Source Plant Type
BS 5228 SPL
dB(A) Number in Operation Total SWL dB(A) Dist.
(m) Operating
Hours Noise Level
BS 5228 Table c4.74 Welding Rigs 80 4 114 300.0 8 49.2
BS 5228 Table c4.74 Welding Rigs (backend) 80 8 117 300.0 8 52.2
BS 5228 Table c3.33 generator for welding 57 1 85 300.0 8 25.7 BS 5228 Table c4.93 angle grinder 80 1 108 300.0 8 48.7
Total 58.3 Operation: Excavation & Lay
BS 5228 Table c2.21 20T Backhoe 71 6 106.8 300.0 11 43.4 BS 5228 Table c2.16 30T Backhoe 75 5 110 300.0 11 46.6 BS 5228 Table c2.34 Flatbed (Waggon) 80 1 108 300.0 11 44.6 BS 5228 Table c4.74 Sideboom 80 8 117 300.0 11 53.6 BS 5228 Table c2.35 Tele - Handler 71 1 99 300.0 11 35.6 BS 5228 Table c4.74 Welding Rigs 80 2 111 300.0 11 47.6 Total 55.8
Operation: Re-Instatment- regrading and subsoil BS 5228 Table c2.19 25T Backhoe 77 1 105 300.0 11 41.6 BS 5228 Table c2.12 CAT D6 81 1 109 300.0 11 45.6 Total 47.0 Re-Instatment-Topsoil Replacement BS 5228 Table c2.16 30T Backhoe 75 3 107.8 300.0 11 44.4 BS 5228 Table c2.13 CAT D5 78 1 106 300.0 11 42.6 BS 5228 Table c2.12 CAT D6 81 1 109 300.0 11 45.6 BS 5228 Table c5.14 CAT D8 86 4 120 300.0 11 49.9 BS 5228 Table c4.75 Tractor & Trailer 79 2 110 300.0 11 46.6 Total 53.5 Re-instatment- Pipe line markers BS 5228 Table c5.14 CAT D8 86 2 117 300.0 11 53.6 BS 5228 Table c4.74 Harrow / Seeder 79 1 107 300.0 11 43.6 BS 5228 Table c4.74 Power Harrow 79 1 107 300.0 11 43.6 BS 5228 Table c4.74 Subsoilers 79 2 110 300.0 11 46.6 BS 5228 Table c4.75 Tractor & Trailer 79 2 110 300.0 11 46.6 BS 5228 Table c2.21 20T Backhoe 71 1 99 300.0 11 35.6 BS 5228 Table c2.12 CAT D6 81 1 109 300.0 11 45.6 Total 56.0 Re-Instatement- Mainline Backfill/ Pipe bed and surround
BS 5228 Table c2.19 25T Backhoe (Long Reach) 77 5 112 300.0 11 48.6
BS 5228 Table c2.21 20T Backhoe 71 7 107.5 300.0 11 44.1 BS 5228 Table c2.12 CAT D6 81 2 112 300.0 11 48.6
BS 5228 Table c5.20 Vibrating Roller (Ramax) 75 5 110 300.0 11 46.6
Total 53.3 Operation: Auger Crossings
BS 5228 Table c3.24 Auger inc screws and 74 1 102 300.0 4 39.7
Environmental Statement Volume 6: Environmental Statement Document 6.13.1
Ch. 13 Noise and Vibration 21
The Yorkshire and Humber CCS Cross Country Pipeline
Typical Construction Noise Predictions – Distance 300m - Calculations to BS 5228
Data Source Plant Type
BS 5228 SPL
dB(A) Number in Operation Total SWL dB(A) Dist.
(m) Operating
Hours Noise Level
rails BS 5228 Table c3.22 side boom. 80 1 108 300.0 8 48.7
BS 5228 Table c4.74 stone Compactor (Teran) 80 1 108 300.0 11 50.1
Total 52.6 Operation: Piling Crossing
BS 5228 Table c3.29/30 crawler crane 70 1 98 300.0 11 40.1
Movax vibrohammer / Movax or the piling rig 1 105 300.0 11 47.1
BS 5228 Table c4.53 Piling rig 90 1 118 300.0 11 60.1 Total 60.3 Operation: Mirco tunnelling Crossing
BS 5228 Table c3.29/30 crawler crane 70 1 98 300.0 11 40.1
BS 5228 Table c5.18 30T Backhoe 80 1 108 300.0 11 50.1 BS 5228 Table d7.49 generator 76 1 104 300.0 11 46.1 National Grid microtunell plant 50 1 78 300.0 11 20.1
Total 51.8 Operation: HDD Crossing
BS 5228 Table c4.28 concrete pour 75 1 103 300.0 11 45.1 BS 5228 Table c4.28 mixing tank - 76 1 104 300.0 11 46.1 BS 5228 Table c4.96 directional drill 77 1 105 300.0 11 47.1
BS 5228 Table c4.92 mounting supports for mounting drill 87 1 115 300.0 11 57.1
BS 5228 Table c4.43 Crane 40T 70 1 98 300.0 4 30.2 BS 5228 Table d7.49 diesel generator 76 1 104 300.0 11 46.1
Total 58.3 Operation: Testing
BS 5228 Table c4.74 Sideboom 80 1 108 300.0 2 37.2 BS 5228 Table c4.74 Welding Rigs 80 1 108 300.0 3 39.0 BS 5228 Table c2.34 Flatbed (Waggon) 80 1 108 300.0 2 37.2 National Grid Fill pumps 75 2 106 300.0 11 48.1 BS 5228 Table c2.19 25T Backhoe 77 1 105 300.0 2 34.2 Total 49.3
Environmental Statement Volume 6: Environmental Statement Document 6.13.1
Ch. 13 Noise and Vibration 22
The Yorkshire and Humber CCS Cross Country Pipeline
AGIs- Block Valves
Block Valves - Typical Construction Noise Predictions – Distance 50m - Calculations to BS 5228
Data Source Plant Type BS 5228 SPL Number in
Operation Total SWL
dB(A) Dist. (m)
Operating Hours
Noise Level
Operation: Block Valve Site- Tollingham BS 5228 Table c4.74 Tractor (Cat 583 or equivalent) with Sideboom 80 1 108 547.0 11 44.8 BS 5228 Table c4.74 Purpose-made welding rig, lorry mounted 80 2 111 547.0 11 47.8 BS 5228 Table c4.74 Tractor with dozer blade 80 1 108 547.0 11 44.8 BS 5228 Table c4.43 Tracked Crane 30t 70 1 98 547.0 11 34.8 BS 5228 Table c5.14 Dozer with blade 86 1 114 547.0 11 50.8 BS 5228 Table c6.22 Low loader up to 80t 83 1 111 547.0 11 47.8 BS 5228 Table c4.85 Road sweeper / cleaner 66 1 94 547.0 11 30.8 BS 5228 Table c4.87 Generators 65 1 93 547.0 11 29.8 BS 5228 Table c4.93 Small Tools 80 1 108 547.0 11 44.8 BS 5228 Table c3.33 generator for welding 57 1 85 547.0 11 21.8 BS 5228 Table c4.93 angle grinder 80 1 108 547.0 11 44.8
Total 55.7 Operation: Block Valve Site- Dalton
BS 5228 Table c4.74 Tractor (Cat 583 or equivalent) with Sideboom 80 1 108 408.0 11 47.4 BS 5228 Table c4.74 Purpose-made welding rig, lorry mounted 80 2 111 408.0 11 50.4 BS 5228 Table c4.74 Tractor with dozer blade 80 1 108 408.0 11 47.4 BS 5228 Table c4.43 Tracked Crane 30t 70 1 98 408.0 11 37.4 BS 5228 Table c5.14 Dozer with blade 86 1 114 408.0 11 53.4 BS 5228 Table c6.22 Low loader up to 80t 83 1 111 408.0 11 50.4 BS 5228 Table c4.85 Road sweeper / cleaner 66 1 94 408.0 11 33.4 BS 5228 Table c4.87 Generators 65 1 93 408.0 11 32.4 BS 5228 Table c4.93 Small Tools 80 1 108 408.0 11 47.4 BS 5228 Table c3.33 generator for welding 57 1 85 408.0 11 24.4 BS 5228 Table c4.93 angle grinder 80 1 108 408.0 11 47.4
Total 58.2 Operation: Block Valve Site- Skerne
BS 5228 Table c4.74 Tractor (Cat 583 or equivalent) with Sideboom 80 1 108 490.0 11 45.8 BS 5228 Table c4.74 Purpose-made welding rig, lorry mounted 80 2 111 490.0 11 48.8 BS 5228 Table c4.74 Tractor with dozer blade 80 1 108 490.0 11 45.8 BS 5228 Table c4.43 Tracked Crane 30t 70 1 98 490.0 11 35.8 BS 5228 Table c5.14 Dozer with blade 86 1 114 490.0 11 51.8 BS 5228 Table c6.22 Low loader up to 80t 83 1 111 490.0 11 48.8 BS 5228 Table c4.85 Road sweeper / cleaner 66 1 94 490.0 11 31.8 BS 5228 Table c4.87 Generators 65 1 93 490.0 11 30.8 BS 5228 Table c4.93 Small Tools 80 1 108 490.0 11 45.8 BS 5228 Table c3.33 generator for welding 57 1 85 490.0 11 22.8 BS 5228 Table c4.93 angle grinder 80 1 108 490.0 11 45.8
Total 56.6
Environmental Statement Volume 6: Environmental Statement Document 6.13.1
Ch. 13 Noise and Vibration 23
The Yorkshire and Humber CCS Cross Country Pipeline
PIG Trap, Multi Junction and Pumping Station
Above Ground Installations - Typical Construction Noise Predictions – Distance 50m - Calculations to BS 5228
Data Source Plant Type
BS 5228 SPL dB(A)
Number in Operation
Total SWL dB(A)
Dist. (m) Operating Hours Noise
Level
AGI PIG Trap BS 5228 Table c4.74 Tractor (Cat 583 or equivalent) with Sideboom 80 2 111 326.0 11 52.3
BS 5228 Table c4.74 Purpose-made welding rig, lorry mounted 80 3 112.8 326.0 11 54.1 BS 5228 Table c4.52 Tracked Crane 50t 75 1 103 326.0 11 44.3
BS 5228 Table c11.20 Lorry ordinary up to 18t 83 2 114 326.0 11 55.3
BS 5228 Table c4.93 Small Tools 80 1 108 326.0 11 49.3
BS 5228 Table c2.19 25T Backhoe 77 2 108 326.0 11 49.3
BS 5228 Table c2.12 CAT D6 81 2 112 326.0 11 53.3
BS 5228 Table c4.9 Dumper 77 2 108 326.0 11 49.3
BS 5228 Table c4.66 JCB 3cx 69 2 100 326.0 11 41.3
BS 5228 Table c2.38 Stone Roller 79 2 110 326.0 11 51.3
BS 5228 Table c3.33 generator for welding 57 1 85 326.0 11 26.3
BS 5228 Table c4.93 angle grinder 80 1 108 326.0 11 49.3 Total 61.8 AGI Multi-junction
BS 5228 Table Tractor (Cat 583 or equivalent) with Sideboom 80 2 111 225.0 11 55.6
BS 5228 Table c4.74 Purpose-made welding rig, lorry mounted 80 3 112.8 225.0 11 57.4 BS 5228 Table c4.52 Tracked Crane 50t 75 1 103 225.0 11 47.6
BS 5228 Table c4.93 Small Tools 80 1 108 225.0 11 52.6
BS 5228 Table c2.19 25T Backhoe 77 2 108 225.0 11 52.6
BS 5228 Table c2.12 CAT D6 81 2 112 225.0 11 56.6
BS 5228 Table c4.9 Dumper 77 2 108 225.0 11 52.6
BS 5228 Table c4.66 JCB 3cx 69 2 100 225.0 11 44.6
BS 5228 Table c2.38 Stone Roller 79 2 110 225.0 11 54.6
BS 5228 Table c3.33 generator for welding 57 1 85 225.0 11 29.6
BS 5228 Table c4.93 angle grinder 80 1 108 225.0 11 52.6 Total 63.9 AGI Barmston Pumping Station
BS 5228 Table c4.74 Tractor (Cat 583 or equivalent) with Sideboom 80 2 111 625.0 11 46.7
BS 5228 Table c4.74 Purpose-made welding rig, lorry mounted 80 4 114 625.0 11 49.7
BS 5228 Table c4.43 Tracked Crane 40t 70 1 98 625.0 11 33.7
Environmental Statement Volume 6: Environmental Statement Document 6.13.1
Ch. 13 Noise and Vibration 24
The Yorkshire and Humber CCS Cross Country Pipeline
Above Ground Installations - Typical Construction Noise Predictions – Distance 50m - Calculations to BS 5228
Data Source Plant Type
BS 5228 SPL dB(A)
Number in Operation
Total SWL dB(A)
Dist. (m) Operating Hours Noise
Level
BS 5228 Table c4.93 Small Tools 80 1 108 625.0 11 43.7
BS 5228 Table c5.18 35T Backhoe 80 3 112.8 625.0 11 48.5
BS 5228 Table c5.18 35T Backhoe 80 1 108 625.0 11 43.7
BS 5228 Table c2.34 Flatbed (Waggon) 80 1 108 625.0 11 43.7
BS 5228 Table c4.74 Sideboom 80 8 117 625.0 11 52.7
BS 5228 Table c2.35 Tele - Handler 71 1 99 625.0 11 34.7
BS 5228 Table c4.74 Welding Rigs 80 2 111 625.0 11 46.7
BS 5228 Table c3.33 generator for welding 57 1 85 625.0 11 20.7
BS 5228 Table c4.93 angle grinder 80 1 108 625.0 11 43.7 BS 5228 Table D7.49 diesel generator 76 1 104 625.0 11 39.7
BS 5228 Table c5.18 30T Backhoe 80 3 112.8 625.0 11 48.5
BS 5228 Table c2.13 CAT D5 78 1 106 625.0 11 41.7
BS 5228 Table c2.12 CAT D6 81 1 109 625.0 11 44.7
BS 5228 Table c5.14 CAT D8 86 4 120 625.0 11 55.7 Total 60.1
Environmental Statement Volume 6: Environmental Statement Document 6.13.1
Ch. 13 Noise and Vibration 25
The Yorkshire and Humber CCS Cross Country Pipeline
Landfall. Please note the construction noise levels have been predicted over an 1 hr period due to potential night time works due to tidal constraints.
Landfall NSR - Typical Construction Noise Predictions – Distance 1.3km - Calculations to BS 5228
Data Source Plant Type BS 5228 SPL dB(A) Number in
Operation Total SWL
dB(A) Dist. (m)
Duration as % 1 hr Tt
Noise Level
Operation: Pilling Cofferdam BS 5228 Table C3.29/30 Crawler crane 70 1 98 1300.0 100.00 27.7
MOVAX Vibrohammer / Movax or piling rig 1 105 1300.0 100.00 34.7
BS 5228 Table C4.53 Piling rig 90 1 118 1300.0 100.00 47.7 Total 48.0 Operation: Beach Excavation
BS 5228 Table c2.21 20T Backhoe 71 1 99 1300.0 100.00 28.7 BS 5228 Table C5.18 30T Backhoe 80 1 108 1300.0 100.00 37.7 BS 5228 Table C2.12 CAT D6 81 2 112 1300.0 100.00 41.7 BS 5228 Table C5.16 25T Dumper Truck 81 2 112 1300.0 100.00 41.7
Total 43.3 Operation: Pipe Laying and Tie-in
BS 5228 Table C2.35 500T Winch 71 1 99 1300.0 100.00 28.7 BS 5228 Table C3.29/30 Crawler crane 70 1 98 1300.0 100.00 27.7 BS 5228 Table C4.74 Welding Rigs 80 2 111 1300.0 100.00 40.7
Total 41.2 Operation: Re-Instatement- Mainline Backfill/ Pipe bed and surround
BS 5228 Table C2.19 25T Backhoe (Long Reach) 77 1 105 1300.0 100.00 34.7 BS 5228 Table C2.21 20T Backhoe 71 1 99 1300.0 100.00 28.7 BS 5228 Table C5.16 25T Dump Truck 81 2 112 1300.0 100.00 41.7 BS 5228 Table C2.12 CAT D6 81 2 112 1300.0 100.00 41.7 BS 5228 Table C5.20 Vibrating Roller (Ramax) 75 2 106 1300.0 100.00 35.7
Total 45.7 Operation: HDD
BS 5228 Table c4.28 concrete pour 75 1 103 1300.0 100.00 32.7 BS 5228 Table c4.28 mixing tank - 76 1 104 1300.0 100.00 33.7 BS 5228 Table c4.96 directional drill 77 1 105 1300.0 100.00 34.7 BS 5228 Table c4.92 mounting supports for mounting drill 87 1 115 1300.0 100.00 44.7 BS 5228 Table c4.43 Crane 40T 70 1 98 1300.0 100.00 27.7 BS 5228 Table D7.49 diesel generator 76 1 104 1300.0 100.00 33.7
Total 46.0
Environmental Statement Volume 6: Environmental Statement Document 6.13.1
Ch. 13 Noise and Vibration 26
The Yorkshire and Humber CCS Cross Country Pipeline
Landfall - Typical Construction Noise Predictions – Distance 100m - Calculations to BS 5228
Data Source Plant Type BS 5228 SPL dB(A) Number in
Operation Total SWL
dB(A) Dist. (m)
Duration as % 1 hr Tt
Noise Level
Operation: Pilling Cofferdam BS 5228 Table C3.29/30 Crawler crane 70 1 98 100.0 100.00 50.0
MOVAX Vibrohammer / Movax or piling rig 1 105 100.0 100.00 57.0
BS 5228 Table C4.53 Piling rig 90 1 118 100.0 100.00 70.0 Total 70.3 Operation: Beach Excavation
BS 5228 Table c2.21 20T Backhoe 71 1 99 100.0 100.00 51.0 BS 5228 Table C5.18 30T Backhoe 80 1 108 100.0 100.00 60.0 BS 5228 Table C2.12 CAT D6 81 2 112 100.0 100.00 64.0 BS 5228 Table C5.16 25T Dumper Truck 81 2 112 100.0 100.00 64.0
Total 65.6 Operation: Pipe Laying and Tie-in
BS 5228 Table C2.35 500T Winch 71 1 99 100.0 100.00 51.0 BS 5228 Table C3.29/30 Crawler crane 70 1 98 100.0 100.00 50.0 BS 5228 Table C4.74 Welding Rigs 80 2 111 100.0 100.00 63.0
Total 63.5 Operation: Re-Instatement- Mainline Backfill/ Pipe bed and surround
BS 5228 Table C2.19 25T Backhoe (Long Reach) 77 1 105 100.0 100.00 57.0 BS 5228 Table C2.21 20T Backhoe 71 1 99 100.0 100.00 51.0 BS 5228 Table C5.16 25T Dump Truck 81 2 112 100.0 100.00 64.0 BS 5228 Table C2.12 CAT D6 81 2 112 100.0 100.00 64.0 BS 5228 Table C5.20 Vibrating Roller (Ramax) 75 2 106 100.0 100.00 58.0
Total 68.0 Operation: HDD
BS 5228 Table c4.28 concrete pour 75 1 103 100.0 100.00 55.0 BS 5228 Table c4.28 mixing tank - 76 1 104 100.0 100.00 56.0 BS 5228 Table c4.96 directional drill 77 1 105 100.0 100.00 57.0 BS 5228 Table c4.92 mounting supports for mounting drill 87 1 115 100.0 100.00 67.0 BS 5228 Table c4.43 Crane 40T 70 1 98 100.0 100.00 50.0 BS 5228 Table D7.49 diesel generator 76 1 104 100.0 100.00 56.0
Total 68.3
Environmental Statement Volume 6: Environmental Statement Document 6.13.1
Ch. 13 Noise and Vibration 27
The Yorkshire and Humber CCS Cross Country Pipeline
Landfall Barmston Caravan Park - Typical Construction Noise Predictions – Distance 1.187km - Calculations to BS 5228
Data source Plant Type BS 5228 SPL dB(A) Number in
Operation Total SWL
dB(A) Dist. (m)
Duration as % 1 hr Tt
Noise Level
Operation: Pilling Cofferdam BS 5228 Table C3.29/30 Crawler crane 70 1 98 1187.0 100.00 28.5
MOVAX Vibrohammer / Movax or piling rig 1 105 1187.0 100.00 35.5
BS 5228 Table C4.53 Piling rig 90 1 118 1187.0 100.00 48.5 Total 48.8 Operation: Beach Excavation
BS 5228 Table c2.21 20T Backhoe 71 1 99 1187.0 100.00 29.5 BS 5228 Table C5.18 30T Backhoe 80 1 108 1187.0 100.00 38.5 BS 5228 Table C2.12 CAT D6 81 2 112 1187.0 100.00 42.5 BS 5228 Table C5.16 25T Dumper Truck 81 2 112 1187.0 100.00 42.5
Total 44.1 Operation: Pipe Laying and Tie-in
BS 5228 Table C2.35 500T Winch 71 1 99 1187.0 100.00 29.5 BS 5228 Table C3.29/30 Crawler crane 70 1 98 1187.0 100.00 28.5 BS 5228 Table C4.74 Welding Rigs 80 2 111 1187.0 100.00 41.5
Total 42.0 Operation: Re-Instatement- Mainline Backfill/ Pipe bed and surround
BS 5228 Table C2.19 25T Backhoe (Long Reach) 77 1 105 1187.0 100.00 35.5 BS 5228 Table C2.21 20T Backhoe 71 1 99 1187.0 100.00 29.5 BS 5228 Table C5.16 25T Dump Truck 81 2 112 1187.0 100.00 42.5 BS 5228 Table C2.12 CAT D6 81 2 112 1187.0 100.00 42.5 BS 5228 Table C5.20 Vibrating Roller (Ramax) 75 2 106 1187.0 100.00 36.5
Total 46.5 Operation: HDD
BS 5228 Table c4.28 concrete pour 75 1 103 1134.0 100.00 33.9 BS 5228 Table c4.28 mixing tank - 76 1 104 1134.0 100.00 34.9 BS 5228 Table c4.96 directional drill 77 1 105 1134.0 100.00 35.9 BS 5228 Table c4.92 mounting supports for mounting drill 87 1 115 1134.0 100.00 45.9 BS 5228 Table c4.43 Crane 40T 70 1 98 1134.0 100.00 28.9 BS 5228 Table d7.49 diesel generator 76 1 104 1134.0 100.00 34.9
Total 47.2
Application Reference: EN070001 June 2014
EHO Meeting Minutes The Yorkshire and Humber (CCS Cross Country Pipeline) Development Consent Order Under Regulation 5(2)(a) of the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009
6.13.2D
OC
UM
EN
T
Meeting Minutes
Page: 1 of 3 Doc. FA/02 Revised: June 2013
Meeting Title: Selby EHO Meeting – Noise and Vibration Assessment
Project: Yorkshire and Humber CCS Cross Country
Pipeline
Job No/Ref: 60301887
Location: Selby District Council, Civic Centre Date held: 18th
June 2013
Duration: 1.5 hours Time: 9.00 am Start
Invitees: Debbie Preston (DP) – AECOM
Charlotte Clinton (CC)-- AECOM
Diana Adamson (DA) – Selby Environmental Health
Officer
Apologies:
Richard Gwilliam (RG)- National Grid
No. Item Actions
1. Meeting Agenda
Purpose of the Meeting
i. Project Update since the Scoping Report Issue
ii. Project Programme
iii. Scoping Opinion
iv. Scope of environmental assessment
Noise Monitoring
i. Proposed noise monitoring locations – Camblesforth Multi-junction and Drax Pig
Trap
ii. Proposed monitoring durations
iii. Timing of the monitoring
Noise Policies
i. The application of BS 4142 and the WHO Guidelines
ii. Construction limits / proposed approach
Net Steps
i. Environmental Statement
ii. Statements of Common Ground
2. Purpose of the Meeting
CC gave an overview of the project explaining that project consists of a 68km cross country
pipeline from a proposed Multi-junction near Camblesforth to the Coast to the north of
Barmston and a connecting pipeline to the White Rose CCS project at Drax.
CC explained that addition to the pipeline there a four different types of installation, a PIG
(pipeline inspection gauge) Trap adjacent to the White Rose Project, a Multi-junction to the
south of Drax, three block valves at Tollingham, Dalton and Skerne and a Pumping Station
at Barmston. CC noted that both the Multi-junction and the PIG Trap fall within Selby’s
Authority Area.
CC explained the main changes to the scheme since the submission of the Scoping Report
in February 2012 as a result of DECC announcement in spring 2013:
� The scheme no longer consists of a pipeline connection with Hatfield.
� The White Rose Project includes a compressor facility as part of their proposals.
As such there is no longer a need for a compressor station as part of the pipeline
scheme. The proposed Compressor and Multi-junction site as set out within the
Scoping Report now just consists of a Multi-junction, to enable other emitters to
connect into the pipeline in the future.
Meeting Minutes
Page: 1 of 3 Doc. FA/02 Revised: June 2013
Meeting Title: East Riding EHO Meeting – Noise and Vibration Assessment
Project: Yorkshire and Humber CCS Cross Country
Pipeline
Job No/Ref: 60301887
Location: County Hall Beverley Date held: 26th
June 2013
Duration: 1.5 hours Time: 10.30 am Start
Invitees: Richard Gwilliam (RG)- National Grid
Debbie Preston (DP) – AECOM
Charlotte Clinton (CC) -- AECOM
Saboor Sheikh (SS) – East Riding Senior
Environmental Control Officer
Hilary Holloway (HH) – East Riding Senior EHO
Goole
Apologies:
Helen Shewan (HS) – East Riding
Senior EHO Bridlington
No. Item Actions
1. Meeting Agenda
Purpose of the Meeting
i. Project Update since the Scoping Report Issue
ii. Project Programme
iii. Scoping Opinion
iv. Scope of environmental assessment
Noise Monitoring
i. Proposed noise monitoring locations – Barmston Pumping Station
ii. Proposed monitoring durations
iii. Timing of the monitoring
iv. Noise monitoring proposals for Camblesforth Multi-junction (Selby)
Noise Policies
i. The application of BS 4142 and the WHO Guidelines
ii. Construction limits / proposed approach
Net Steps
i. Environmental Statement
ii. Statements of Common Ground
2. Purpose of the Meeting
RG gave an overview of the project explaining that project consists of a 68km cross country
pipeline from a proposed Multi-junction near Camblesforth to the Coast to the north of
Barmston and a connecting pipeline to the White Rose CCS project at Drax. RG explained
that the pipe would be 24 inch in diameter which will be buried with approximately 1.2m of
cover.
In addition to the pipeline there a four different types of installation, a PIG (Pipe Inspection
Gauge) Trap adjacent to the White Rose Project, a Multi-junction to the south of Drax, three
block valves at Tollingham, Dalton and Skerne and a Pumping Station at Barmston.
RG ran through the main changes to the scheme since the submission of the Scoping
Report in February 2012 as a result of DECC announcement in spring 2013:
� The scheme no longer consists of a pipeline connection with Hatfield.
� The White Rose Project includes a compressor facility as part of the proposals. As
Meeting Minutes
Page: 2 of 3 Doc. FA/02 Revised: June 2013
such there is no longer a need for a compressor station as part of the scheme.
The proposed Compressor and Multi-junction site as set out within the Scoping
Report now just consists of a Multi-junction, to enable other emitters to connect
into the pipeline in the future.
RG explained that it is the intention to submit the Development Consent Order (DCO) in
February 2014 and a draft Environmental Statement will be produced by September 2013.
HH enquired as to how the scheme works. RG explained that three technologies are
available which are:
� Post construction (retrofit)
� Pre combustion (coal heated in the absence of Oxygen)
� Oxy-fuel (coal burnt in pure Oxygen)
RG explained that the White Rose Project is based on the Oxy-fuel technology
3. Noise Monitoring
CC explained that as per the Scoping Report it is the intention to undertake noise
monitoring for the Pumping Station at Barmston, however explained that noise monitoring
is not proposed for the Block Valves as these installations would not produce a noise
source.
RG added that the maintenance of the Block Valves would be infrequent approximately
once every six months.
It was agreed by all that noise monitoring is not required at the block valve sites.
Locations
DP presented the proposed noise monitoring locations for the Pumping Station. All agreed
that locations 2 and 3 Low Stone Hills and Rose Cottage respectively were appropriate and
that location 1 would be moved to a location closer to Barmston, as Hamilton Hill Farm
does not have residential dwellings. The proposed noise monitoring locations are shown on
the attached plan.
Timings
DP proposed that night time noise surveys will be undertaken with two sets of 30 minute
surveys undertaken on a rotational basis between the three receptors between 12 midnight
and 4am on a weekday. This is representative of the quietest time of day. All agreed that
this was appropriate and that daytime and evening surveys were not required in addition.
DP enquired as to whether the state of the tide had an impact on the background noise
levels in the area. DP to speak with Helen Shewan to confirm.
Post Meeting Note: DP spoke with HS on 3/07/13. Agreed that it is normally the waves
crashing which causes the most noise. No policy on if noise surveys should be taken at
high or low tide. Agreed to undertake noise monitoring at low wind speeds where possible
(to minimise impact from waves) and make note of the tidal conditions.
DP
4. Noise Policies
Operation
DP proposed the use of principles of BS 4142 (though it is expected that the background
noise levels will be low and fall outside the scope of BS 4142). HH explained that this is
appropriate in the absence of anything else but should be used indicatively only and should
seek to achieve that the A-weighted noise emissions at the nearest receptors do not
exceed the existing background levels.
HH expressed concern with regards to Low Frequency emissions as there is no standard
for their control. HH enquired as to whether there are any proposed sources of low
frequency noise generation. CC to confirm.
HH explained that if the design included sources of Low Frequency noise emissions
ERoYC would wish to see appropriate isolation and attenuation techniques included within
the design.
Construction
DP proposed that the approach to assessing the impact of construction noise is to use
noise levels of the main items construction plant and predict the potential construction
CC
Meeting Minutes
Page: 3 of 3 Doc. FA/02 Revised: June 2013
noise using guidance in BS 5288 at set distances from the construction works instead of at
every receptor along the pipeline route. HH and SS agreed that that this was a sensible
approach.
In relation to construction compounds, the impact would be assessed by comparing the
change in traffic flow as a result of construction traffic.
HH explained that the preference would be for good construction management rather than
entering into a form of Section 61 agreement. HH explained that good construction
management should also include:
� Notifying local residents of when activities would be taking place in their area
� Notification of any 24 hour construction operations
� Keeping the Parish Councils updated throughout
HH noted that where generators would be required for a prolonged periods of time
consideration should be given to the use of silent generator.
5. Next Steps
Environmental Statement
RG explained that impact assessments would be undertaken over the summer and a draft
Environmental Statement produced for September 2013. RG explained that this would also
include a draft Environmental Management Plan (EMP). HH noted that ERoYC would be
happy to provide comment on the EMP in sub draft.
Statements of Common Ground
CC explained that it is the intention to produce statements of common ground with
stakeholders which will set out the matters agreed on such as noise monitoring locations
and methods. This will focus the efforts during the determination to those which are not
agreed on. HH and SS welcomed this approach.
Meeting Minutes
Page: 2 of 3 Doc. FA/02 Revised: June 2013
CC explained that it is the intention to submit the Development Consent Order (DCO) in
February 2014 and a draft Environmental Statement will be produced by September 2013.
3. Noise Monitoring
CC explained that as per the Scoping Report it is the intention to undertake noise
monitoring for the Pumping Station at Barmston, however explained that noise monitoring
is not proposed for the Block Valves as these installations would not produce a noise
source.
Locations
DP presented the three proposed noise monitoring locations for the Multi-junction. DA
agreed that the locations looked sensible and three would be sufficient. DA stated at
location 3, the monitoring position should not be too close to the trees. DA enquired as to
whether DP thought a monitoring location at Camblesforth would be required. DP explained
that due to the distance and the intervening railway line and road she did not think this
would be necessary. DA agreed, but suggested that look at recent noise monitoring results
in Cambleforth from the recent Drax ES and these could be used if necessary.
DP presented the two proposed noise monitoring locations for the Drax PIG Trap. DA
explained the recent noise assessments have been undertaken for the Lytog Plant Project
and that it may be appropriate to use their data for the Foreman’s Cottage receptor.
Therefore it was agreed to monitor at Old Lodge and review the existing data available for
Foreman’s Cottage
Timings
DP proposed that night time noise surveys will be undertaken with two sets of 30 minute
surveys undertaken on a rotational basis between 12 midnight and 4am. This is
representative of the quietist time of day. All agreed that this was appropriate at that
daytime and evening surveys were not required in addition.
DA and DP discussed the requirement for background noise to be obtained at the
weekends. Due to Drax being the influencing noise source within the area and this
operates on a 24 hour seven days a week process there is unlikely to be a difference in
night time noise levels in the week and at weekends.
DA noted that it would be beneficial to obtain the shift patterns from Drax and any proposed
night time construction operations prior to undertaking the monitoring. DA noted that the
Biomass plant was currently under construction.
DP/CC
4. Noise Policies
Operation
DP proposed the use of principles of BS 4142 It is noted that the background noise levels
may be low in Carlton and fall outside the scope of BS 4142. DP and DA discussed using
WHO guidance and BS 8388 internal noise levels if background noise levels fall outside the
scope of BS 4142. DA would like to see no disturbance in gardens for daytime and
internal disturbance for night. SDC have no policy on noise limits for operational noise, but
should seek to achieve that the A-weighted noise emissions at the nearest receptors do not
exceed the existing background noise levels. .
Construction
DP proposed that the approach to assessing the impact of construction noise is to use
noise levels of the main items construction plant and predict the potential construction
noise using guidance in BS 5288 at set distances from the construction works instead of at
every receptor along the pipeline route. DA agreed that that this was a sensible approach.
In relation to construction compounds, the impact would be assessed by comparing the
change in traffic flow as a result of construction traffic.
DA explained that the preference would be for good construction management rather than
entering into a form of Section 61 agreement. Construction works should be restricted to
Monday to Friday daytime and Saturday mornings where possible. DA highlighted the
importance good communication with local residents and keeping them informed of any
construction works and durations.
CC explained that a draft Environmental Management Plan (EMP) would be included
Meeting Minutes
Page: 3 of 3 Doc. FA/02 Revised: June 2013
within the Environmental Statement.
5. Net Steps
Environmental Statement
CC explained that impact assessments would be undertaken over the summer and a draft
Environmental Statement produced for September 2013.
Statements of Common Ground
CC explained that it is the intention to produce statements of common ground with
stakeholders which will set out the matters agreed on such as noise monitoring locations
and methods. This will focus the efforts during the determination to those which are not
agreed on.
Application Reference: EN070001 June 2014
Noise Survey and Results The Yorkshire and Humber (CCS Cross Country Pipeline) Development Consent Order Under Regulation 5(2)(a) of the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009
6.13.3D
OC
UM
EN
T
Environmental Statement Volume 6: Environmental Statement Document 6.13.3
Ch. 13 Noise and Vibration 1
The Yorkshire and Humber CCS Cross Country Pipeline
Appendix 6.13.3 Noise Survey and Results.
Background noise surveys were undertaken at seven locations between midnight and 04:00. All of the locations apart from Location 2 were short term attended measurements undertaken on public accessible land. At Location 2 a noise logger was installed in the rear garden between 31st July and 2nd July 2013 as permission was only granted to access this land during daytime hours.
The noise monitoring survey was undertaken in accordance with the principles of BS 7445 ‘Description and measurement of environmental noise’ and BS 4142 ‘Method for rating industrial noise affecting mixed residential and industrial areas’.
The calibration of the equipment was checked before and after each set of measurements and no drift in calibration was noted. All members of staff undertaking noise measurements were competent, being Members of the Institute of Acoustics. The calibration certificates of the equipment used can be provided on request.
At each location the microphone was mounted on a tripod, 1.5 metres above the ground, in free-field conditions.
Location 1 Old Lodge (Drax PIG Trap)
Figure 1. – Sound Level Meter Monitoring Location Grid Reference 467517,428098 SLM – Norsonic NOR140 Serial Number – 140919 Calibrator –B&K 4231 Serial Number- 2106194 01/08/13
Environmental Statement Volume 6: Environmental Statement Document 6.13.3
Ch. 13 Noise and Vibration 2
The Yorkshire and Humber CCS Cross Country Pipeline
The Roads were wet during the measurement from rain earlier in the day; however there were no major roads in the direct vicinity, with low frequency traffic at the time of measurements. Prevailing noise source were electrical buzzing from Drax Power with deeper mechanical whirring sound. Other source of noise was wind noise in the trees. Two vehicle movements were noted during the measurement period.
• 01.47 Passing Car on lane adjacent to measurement site. • 01.52 Passing Car
All values are in dB re 20µPa, Free-field, fast time-weighting
Table 1 Noise Monitoring Results- Old Lodge
Date Start Time
Duration, T (mm:ss)
Noise Level, dB Weather Conditions
LAeq,T LA90,T LA10,T LAFmax,T
01/08/13 01:24 30:00 58.5 45.7 61.9 80.6 Wind; 7mph, Dry, 16˚C, Cloud 7/8.
01/08/13 01:54 30:00 61.7 47.7 65.6 80.7 Wind; 7-10mph, Dry,
16˚C, Cloud; 6/8
Environmental Statement Volume 6: Environmental Statement Document 6.13.3
Ch. 13 Noise and Vibration 3
The Yorkshire and Humber CCS Cross Country Pipeline
Location 2 Brock Holes (Camblesforth Multi-junction)
Figure 2. – Sound Level Meter Monitoring Location Grid Reference 467578, 425281 SLM – RION NL 32 Serial Number – 00840884 Calibrator –B&K 4231 Serial Number- 2106194 31/7/13 to 02/08/13 Sound Level Meter was positioned on the South Side of the farmhouse in a field owned by the property owner. Recording began at 14.24 on 31st July 2013 and continued to 12:49 on 2nd August 2013. The equipment was check at the data gathered was downloaded during the afternoon of 1st August 2013. Prevailing noise at the location was road noise from the A645 and the M62 to the south. During quiet periods throughout the night it might have been possible to hear Drax Power Station. When setting up the equipment on 31st July the weather conditions were: Wind; 4mph, Dry, 21˚C, Cloud; 8/8. During the afternoon on 1st August 2013 the weather conditions were: Wind; 4-8mph, Dry, 31˚C, Cloud; 2/8. Wind noise in trees around the location was louder than the previous day. The noise data collected between Midnight and 04:00 on 1st and 2nd August 2013 is shown in Table 2.
Environmental Statement Volume 6: Environmental Statement Document 6.13.3
Ch. 13 Noise and Vibration 4
The Yorkshire and Humber CCS Cross Country Pipeline
Table 2 Noise Monitoring Results at Brock Holes
Date and Start Time Duration, T
(mm:ss)
Noise Level, dB
LAeq,T LA90,T LA10,T LAFmax,T
01/08/2013 00:00 0:01:00 30.1 29.2 31.0 32.3
01/08/2013 00:01 0:01:00 34.0 30.7 36.5 40.3
01/08/2013 00:02 0:01:00 34.5 32.0 37.4 39.7
01/08/2013 00:03 0:01:00 38.3 34.0 41.5 44.0
01/08/2013 00:04 0:01:00 36.1 31.3 40.3 43.2
01/08/2013 00:05 0:01:00 38.5 33.6 41.0 46.1
01/08/2013 00:06 0:01:00 40.9 34.8 44.4 46.9
01/08/2013 00:07 0:01:00 36.6 33.6 39.4 44.8
01/08/2013 00:08 0:01:00 41.8 38.4 44.2 47.0
01/08/2013 00:09 0:01:00 38.0 31.9 42.4 47.1
01/08/2013 00:10 0:01:00 34.4 31.6 37.1 38.6
01/08/2013 00:11 0:01:00 42.5 36.4 46.2 52.5
01/08/2013 00:12 0:01:00 34.7 33.0 36.2 40.3
01/08/2013 00:13 0:01:00 39.9 34.1 43.8 49.4
01/08/2013 00:14 0:01:00 37.2 35.1 39.0 43.2
01/08/2013 00:15 0:01:00 41.5 36.9 45.4 48.8
01/08/2013 00:16 0:01:00 47.5 39.5 50.9 55.0
01/08/2013 00:17 0:01:00 45.0 35.2 47.6 64.8
01/08/2013 00:18 0:01:00 35.2 31.9 37.4 40.2
01/08/2013 00:19 0:01:00 33.3 30.2 36.4 37.7
01/08/2013 00:20 0:01:00 38.6 33.5 41.7 47.2
01/08/2013 00:21 0:01:00 31.4 30.5 32.5 34.2
01/08/2013 00:22 0:01:00 39.4 31.6 43.2 48.7
01/08/2013 00:23 0:01:00 31.2 29.8 32.9 34.7
01/08/2013 00:24 0:01:00 31.5 30.4 32.8 34.7
01/08/2013 00:25 0:01:00 31.8 30.7 32.8 35.2
01/08/2013 00:26 0:01:00 31.5 30.2 32.7 34.0
01/08/2013 00:27 0:01:00 31.4 30.4 32.5 34.3
01/08/2013 00:28 0:01:00 31.3 30.3 32.2 33.8
01/08/2013 00:29 0:01:00 32.9 31.6 33.7 38.0
01/08/2013 00:30 0:01:00 37.6 34.0 41.3 44.2
01/08/2013 00:31 0:01:00 33.9 32.7 34.8 40.2
01/08/2013 00:32 0:01:00 39.1 31.3 41.8 51.4
01/08/2013 00:33 0:01:00 38.4 30.8 43.4 47.2
Environmental Statement Volume 6: Environmental Statement Document 6.13.3
Ch. 13 Noise and Vibration 5
The Yorkshire and Humber CCS Cross Country Pipeline
01/08/2013 00:34 0:01:00 37.2 33.7 40.2 42.7
01/08/2013 00:35 0:01:00 38.6 34.2 41.5 51.1
01/08/2013 00:36 0:01:00 36.3 30.3 40.5 44.3
01/08/2013 00:37 0:01:00 41.7 31.4 46.1 50.7
01/08/2013 00:38 0:01:00 39.7 30.7 44.0 48.2
01/08/2013 00:39 0:01:00 37.3 32.5 41.0 48.9
01/08/2013 00:40 0:01:00 35.3 32.3 37.8 41.0
01/08/2013 00:41 0:01:00 31.1 30.2 31.9 33.5
01/08/2013 00:42 0:01:00 30.6 29.4 31.7 33.1
01/08/2013 00:43 0:01:00 30.1 28.9 31.4 32.1
01/08/2013 00:44 0:01:00 38.3 29.9 42.0 45.5
01/08/2013 00:45 0:01:00 37.3 32.1 40.8 46.6
01/08/2013 00:46 0:01:00 33.0 29.8 36.1 39.8
01/08/2013 00:47 0:01:00 37.5 33.7 40.2 42.6
01/08/2013 00:48 0:01:00 33.4 30.1 36.1 40.7
01/08/2013 00:49 0:01:00 30.2 29.3 30.9 32.0
01/08/2013 00:50 0:01:00 40.4 29.6 44.2 53.7
01/08/2013 00:51 0:01:00 37.2 29.3 39.6 48.3
01/08/2013 00:52 0:01:00 29.1 28.1 29.8 30.8
01/08/2013 00:53 0:01:00 28.8 28.0 29.8 31.8
01/08/2013 00:54 0:01:00 36.2 31.1 38.7 45.6
01/08/2013 00:55 0:01:00 29.4 27.8 31.5 32.8
01/08/2013 00:56 0:01:00 27.8 26.8 28.7 30.0
01/08/2013 00:57 0:01:00 28.3 26.7 29.3 30.5
01/08/2013 00:58 0:01:00 27.3 26.7 27.9 29.0
01/08/2013 00:59 0:01:00 40.3 30.6 43.6 46.2
01/08/2013 01:00 0:01:00 39.3 33.5 42.0 46.1
01/08/2013 01:01 0:01:00 37.6 27.8 42.1 48.0
01/08/2013 01:02 0:01:00 27.6 26.5 28.4 33.6
01/08/2013 01:03 0:01:00 38.7 33.5 41.7 49.4
01/08/2013 01:04 0:01:00 29.3 27.8 30.5 37.6
01/08/2013 01:05 0:01:00 37.4 28.0 41.7 45.1
01/08/2013 01:06 0:01:00 40.5 36.9 43.1 45.1
01/08/2013 01:07 0:01:00 37.9 31.1 41.5 46.9
01/08/2013 01:08 0:01:00 36.7 33.4 40.1 41.8
01/08/2013 01:09 0:01:00 39.0 35.2 41.7 47.8
01/08/2013 01:10 0:01:00 41.5 33.2 45.1 50.1
01/08/2013 01:11 0:01:00 37.6 35.0 40.3 42.9
01/08/2013 01:12 0:01:00 35.1 32.3 36.9 41.9
01/08/2013 01:13 0:01:00 40.8 33.5 44.9 48.3
Environmental Statement Volume 6: Environmental Statement Document 6.13.3
Ch. 13 Noise and Vibration 6
The Yorkshire and Humber CCS Cross Country Pipeline
01/08/2013 01:14 0:01:00 34.5 33.1 35.8 38.7
01/08/2013 01:15 0:01:00 32.9 31.7 34.1 37.0
01/08/2013 01:16 0:01:00 33.6 32.6 34.3 35.0
01/08/2013 01:17 0:01:00 38.0 33.1 41.4 44.7
01/08/2013 01:18 0:01:00 41.4 37.3 43.5 52.7
01/08/2013 01:19 0:01:00 34.6 33.4 35.6 36.8
01/08/2013 01:20 0:01:00 36.0 32.7 37.1 46.6
01/08/2013 01:21 0:01:00 40.2 34.6 43.1 48.5
01/08/2013 01:22 0:01:00 35.2 33.5 36.9 38.3
01/08/2013 01:23 0:01:00 34.7 33.3 35.9 36.9
01/08/2013 01:24 0:01:00 38.5 34.4 41.4 44.5
01/08/2013 01:25 0:01:00 35.6 33.7 37.1 42.1
01/08/2013 01:26 0:01:00 37.7 34.6 40.9 42.7
01/08/2013 01:27 0:01:00 37.7 33.4 40.2 46.2
01/08/2013 01:28 0:01:00 39.3 36.5 41.5 44.7
01/08/2013 01:29 0:01:00 37.4 33.3 41.2 44.0
01/08/2013 01:30 0:01:00 33.6 32.5 34.6 35.5
01/08/2013 01:31 0:01:00 33.5 31.8 35.1 36.4
01/08/2013 01:32 0:01:00 34.5 33.0 35.4 43.7
01/08/2013 01:33 0:01:00 34.3 33.3 35.2 37.6
01/08/2013 01:34 0:01:00 34.1 32.7 35.1 36.1
01/08/2013 01:35 0:01:00 35.5 33.7 36.8 39.8
01/08/2013 01:36 0:01:00 34.3 33.2 35.3 36.7
01/08/2013 01:37 0:01:00 35.7 34.1 36.8 38.5
01/08/2013 01:38 0:01:00 39.3 36.6 41.4 46.5
01/08/2013 01:39 0:01:00 41.1 37.5 44.3 47.2
01/08/2013 01:40 0:01:00 36.6 35.0 38.7 39.7
01/08/2013 01:41 0:01:00 35.2 34.2 36.2 37.3
01/08/2013 01:42 0:01:00 37.7 35.7 39.7 40.9
01/08/2013 01:43 0:01:00 37.4 35.7 38.9 41.6
01/08/2013 01:44 0:01:00 36.2 34.3 37.9 39.5
01/08/2013 01:45 0:01:00 35.6 33.9 37.0 38.9
01/08/2013 01:46 0:01:00 34.8 32.8 36.6 39.3
01/08/2013 01:47 0:01:00 38.6 34.9 41.3 45.8
01/08/2013 01:48 0:01:00 37.2 34.1 39.2 47.3
01/08/2013 01:49 0:01:00 35.7 33.8 38.8 41.4
01/08/2013 01:50 0:01:00 39.9 33.6 43.3 48.0
01/08/2013 01:51 0:01:00 35.6 33.5 37.3 39.8
01/08/2013 01:52 0:01:00 39.7 36.0 43.1 47.6
01/08/2013 01:53 0:01:00 36.6 35.0 37.9 39.8
Environmental Statement Volume 6: Environmental Statement Document 6.13.3
Ch. 13 Noise and Vibration 7
The Yorkshire and Humber CCS Cross Country Pipeline
01/08/2013 01:54 0:01:00 42.1 39.2 44.6 47.4
01/08/2013 01:55 0:01:00 40.7 35.1 45.0 48.7
01/08/2013 01:56 0:01:00 36.2 34.7 38.0 39.0
01/08/2013 01:57 0:01:00 35.9 34.3 37.6 39.3
01/08/2013 01:58 0:01:00 36.0 33.2 38.1 39.5
01/08/2013 01:59 0:01:00 35.7 34.9 36.7 38.1
01/08/2013 02:00 0:01:00 35.1 33.7 36.8 37.9
01/08/2013 02:01 0:01:00 36.6 35.1 38.3 41.2
01/08/2013 02:02 0:01:00 36.3 35.1 37.5 39.0
01/08/2013 02:03 0:01:00 40.1 36.2 43.4 46.3
01/08/2013 02:04 0:01:00 36.3 34.5 37.8 39.0
01/08/2013 02:05 0:01:00 37.0 35.2 38.2 39.4
01/08/2013 02:06 0:01:00 38.0 36.2 39.9 42.5
01/08/2013 02:07 0:01:00 37.1 34.6 38.9 40.1
01/08/2013 02:08 0:01:00 38.2 36.1 40.2 43.4
01/08/2013 02:09 0:01:00 39.7 36.2 43.3 45.1
01/08/2013 02:10 0:01:00 42.1 39.5 44.1 48.0
01/08/2013 02:11 0:01:00 38.5 35.8 41.1 42.3
01/08/2013 02:12 0:01:00 41.4 37.7 44.3 47.2
01/08/2013 02:13 0:01:00 37.7 36.4 39.7 40.8
01/08/2013 02:14 0:01:00 39.9 35.7 42.7 45.3
01/08/2013 02:15 0:01:00 38.4 36.9 39.9 42.2
01/08/2013 02:16 0:01:00 37.0 34.5 40.1 42.9
01/08/2013 02:17 0:01:00 33.7 32.5 35.1 37.7
01/08/2013 02:18 0:01:00 34.8 32.8 37.0 38.3
01/08/2013 02:19 0:01:00 37.9 33.9 41.3 43.2
01/08/2013 02:20 0:01:00 35.3 32.3 37.6 39.9
01/08/2013 02:21 0:01:00 33.1 31.2 34.4 37.9
01/08/2013 02:22 0:01:00 33.3 31.9 35.0 37.4
01/08/2013 02:23 0:01:00 33.3 31.9 34.5 35.7
01/08/2013 02:24 0:01:00 37.3 32.2 40.9 44.4
01/08/2013 02:25 0:01:00 38.3 32.0 40.6 45.8
01/08/2013 02:26 0:01:00 31.7 29.5 33.5 34.9
01/08/2013 02:27 0:01:00 29.7 28.5 30.7 31.4
01/08/2013 02:28 0:01:00 29.5 28.9 30.2 31.4
01/08/2013 02:29 0:01:00 31.7 28.2 33.2 45.7
01/08/2013 02:30 0:01:00 35.9 31.1 38.6 49.5
01/08/2013 02:31 0:01:00 30.7 28.7 32.1 36.7
01/08/2013 02:32 0:01:00 28.4 27.3 29.3 32.2
01/08/2013 02:33 0:01:00 28.2 27.4 29.0 30.5
Environmental Statement Volume 6: Environmental Statement Document 6.13.3
Ch. 13 Noise and Vibration 8
The Yorkshire and Humber CCS Cross Country Pipeline
01/08/2013 02:34 0:01:00 28.7 27.9 29.4 31.1
01/08/2013 02:35 0:01:00 33.4 28.5 38.7 40.9
01/08/2013 02:36 0:01:00 37.9 31.9 41.3 47.6
01/08/2013 02:37 0:01:00 29.1 28.1 30.0 31.5
01/08/2013 02:38 0:01:00 29.5 28.7 30.3 31.2
01/08/2013 02:39 0:01:00 28.7 28.0 29.4 30.7
01/08/2013 02:40 0:01:00 29.7 28.9 30.3 31.9
01/08/2013 02:41 0:01:00 29.1 28.4 29.8 31.8
01/08/2013 02:42 0:01:00 28.7 28.1 29.3 30.7
01/08/2013 02:43 0:01:00 29.0 28.3 29.6 30.6
01/08/2013 02:44 0:01:00 40.2 29.3 44.7 47.9
01/08/2013 02:45 0:01:00 41.1 29.9 44.3 53.8
01/08/2013 02:46 0:01:00 29.4 28.7 30.3 31.3
01/08/2013 02:47 0:01:00 28.7 27.7 29.6 31.4
01/08/2013 02:48 0:01:00 28.6 27.4 29.6 31.5
01/08/2013 02:49 0:01:00 35.0 27.9 39.6 42.8
01/08/2013 02:50 0:01:00 35.5 29.3 39.2 45.1
01/08/2013 02:51 0:01:00 28.7 27.3 29.8 31.6
01/08/2013 02:52 0:01:00 28.9 27.8 30.0 33.2
01/08/2013 02:53 0:01:00 28.7 27.8 29.9 31.7
01/08/2013 02:54 0:01:00 28.0 26.9 28.8 30.6
01/08/2013 02:55 0:01:00 29.2 28.3 30.1 31.3
01/08/2013 02:56 0:01:00 32.5 30.3 33.9 35.8
01/08/2013 02:57 0:01:00 30.5 29.2 31.7 33.0
01/08/2013 02:58 0:01:00 31.2 29.4 32.8 35.0
01/08/2013 02:59 0:01:00 41.6 34.5 44.5 52.5
01/08/2013 03:00 0:01:00 34.8 30.2 37.5 45.0
01/08/2013 03:01 0:01:00 30.6 29.4 31.5 33.0
01/08/2013 03:02 0:01:00 36.7 29.7 42.8 44.7
01/08/2013 03:03 0:01:00 42.0 33.1 44.4 57.5
01/08/2013 03:04 0:01:00 32.1 30.1 34.3 37.1
01/08/2013 03:05 0:01:00 38.8 35.9 40.6 44.3
01/08/2013 03:06 0:01:00 37.3 30.8 40.4 47.2
01/08/2013 03:07 0:01:00 30.6 29.4 31.8 34.7
01/08/2013 03:08 0:01:00 41.2 35.0 44.7 48.4
01/08/2013 03:09 0:01:00 37.5 29.5 41.7 49.4
01/08/2013 03:10 0:01:00 35.2 28.4 39.9 45.2
01/08/2013 03:11 0:01:00 39.9 34.5 43.4 46.1
01/08/2013 03:12 0:01:00 39.2 36.3 41.1 45.2
01/08/2013 03:13 0:01:00 34.4 31.6 37.7 40.6
Environmental Statement Volume 6: Environmental Statement Document 6.13.3
Ch. 13 Noise and Vibration 9
The Yorkshire and Humber CCS Cross Country Pipeline
01/08/2013 03:14 0:01:00 41.6 35.4 45.5 51.4
01/08/2013 03:15 0:01:00 37.0 31.3 40.5 42.9
01/08/2013 03:16 0:01:00 40.9 35.3 44.3 49.2
01/08/2013 03:17 0:01:00 39.6 33.6 42.9 50.7
01/08/2013 03:18 0:01:00 42.1 36.6 44.7 47.4
01/08/2013 03:19 0:01:00 41.8 35.9 44.3 49.5
01/08/2013 03:20 0:01:00 33.5 31.8 35.5 39.2
01/08/2013 03:21 0:01:00 40.9 31.7 44.8 51.3
01/08/2013 03:22 0:01:00 35.6 32.2 38.4 42.0
01/08/2013 03:23 0:01:00 36.1 33.5 38.3 43.9
01/08/2013 03:24 0:01:00 42.1 33.6 45.9 48.7
01/08/2013 03:25 0:01:00 50.1 44.2 52.3 56.3
01/08/2013 03:26 0:01:00 46.2 41.0 49.5 52.4
01/08/2013 03:27 0:01:00 42.2 38.1 45.6 48.6
01/08/2013 03:28 0:01:00 45.3 39.5 48.1 50.7
01/08/2013 03:29 0:01:00 41.9 31.0 45.7 53.2
01/08/2013 03:30 0:01:00 38.7 30.7 42.0 46.0
01/08/2013 03:31 0:01:00 33.5 29.5 35.1 44.3
01/08/2013 03:32 0:01:00 32.2 29.8 35.8 38.0
01/08/2013 03:33 0:01:00 40.1 36.3 43.5 46.0
01/08/2013 03:34 0:01:00 35.6 30.7 38.4 43.0
01/08/2013 03:35 0:01:00 35.8 29.7 40.6 43.3
01/08/2013 03:36 0:01:00 37.5 30.9 40.7 46.9
01/08/2013 03:37 0:01:00 29.8 28.8 30.7 33.6
01/08/2013 03:38 0:01:00 36.6 29.1 39.6 46.2
01/08/2013 03:39 0:01:00 35.5 31.2 38.8 44.2
01/08/2013 03:40 0:01:00 30.6 29.4 31.4 32.7
01/08/2013 03:41 0:01:00 30.6 29.9 31.3 33.3
01/08/2013 03:42 0:01:00 33.6 31.4 35.7 37.9
01/08/2013 03:43 0:01:00 37.1 34.3 39.7 41.7
01/08/2013 03:44 0:01:00 35.7 31.9 39.2 41.8
01/08/2013 03:45 0:01:00 37.3 34.3 39.4 43.3
01/08/2013 03:46 0:01:00 36.8 30.8 40.9 43.6
01/08/2013 03:47 0:01:00 38.6 31.9 42.7 47.5
01/08/2013 03:48 0:01:00 39.8 32.3 42.9 45.2
01/08/2013 03:49 0:01:00 40.7 35.1 43.4 48.5
01/08/2013 03:50 0:01:00 30.9 28.9 32.7 35.6
01/08/2013 03:51 0:01:00 30.8 29.3 32.5 34.0
01/08/2013 03:52 0:01:00 30.3 29.5 31.1 31.9
01/08/2013 03:53 0:01:00 37.4 29.9 42.4 44.4
Environmental Statement Volume 6: Environmental Statement Document 6.13.3
Ch. 13 Noise and Vibration 10
The Yorkshire and Humber CCS Cross Country Pipeline
01/08/2013 03:54 0:01:00 40.1 31.5 42.7 51.0
01/08/2013 03:55 0:01:00 29.8 28.2 31.2 33.9
01/08/2013 03:56 0:01:00 28.0 27.1 28.8 32.3
01/08/2013 03:57 0:01:00 32.7 27.9 36.4 39.2
01/08/2013 03:58 0:01:00 40.8 36.6 43.9 47.7
01/08/2013 03:59 0:01:00 36.4 28.7 40.1 44.5
02/08/2013 00:00 0:01:00 31.0 28.6 33.0 36.9
02/08/2013 00:01 0:01:00 32.4 28.3 34.1 40.8
02/08/2013 00:02 0:01:00 40.6 36.0 43.9 47.6
02/08/2013 00:03 0:01:00 34.6 29.1 38.7 41.9
02/08/2013 00:04 0:01:00 29.3 28.4 30.3 33.9
02/08/2013 00:05 0:01:00 37.4 28.7 41.7 45.4
02/08/2013 00:06 0:01:00 41.2 30.8 43.8 50.1
02/08/2013 00:07 0:01:00 30.0 29.0 31.0 33.2
02/08/2013 00:08 0:01:00 37.3 29.9 40.2 43.1
02/08/2013 00:09 0:01:00 38.2 29.2 42.0 45.1
02/08/2013 00:10 0:01:00 28.7 27.6 30.2 31.6
02/08/2013 00:11 0:01:00 28.6 27.6 29.5 31.0
02/08/2013 00:12 0:01:00 28.8 27.6 29.8 33.6
02/08/2013 00:13 0:01:00 29.6 27.3 31.5 39.0
02/08/2013 00:14 0:01:00 41.1 36.6 43.5 47.1
02/08/2013 00:15 0:01:00 38.1 32.6 42.2 45.7
02/08/2013 00:16 0:01:00 35.5 31.2 38.5 43.1
02/08/2013 00:17 0:01:00 37.4 31.1 40.2 42.7
02/08/2013 00:18 0:01:00 31.1 28.7 33.5 38.1
02/08/2013 00:19 0:01:00 28.0 27.3 28.8 30.0
02/08/2013 00:20 0:01:00 28.2 26.9 29.1 32.3
02/08/2013 00:21 0:01:00 38.6 34.2 41.2 45.3
02/08/2013 00:22 0:01:00 36.8 27.7 40.6 46.9
02/08/2013 00:23 0:01:00 26.9 26.0 27.9 29.5
02/08/2013 00:24 0:01:00 38.3 27.8 42.0 44.5
02/08/2013 00:25 0:01:00 35.9 28.7 39.9 45.5
02/08/2013 00:26 0:01:00 28.5 26.7 29.8 35.8
02/08/2013 00:27 0:01:00 27.4 26.4 28.3 32.4
02/08/2013 00:28 0:01:00 35.1 26.8 39.8 44.5
02/08/2013 00:29 0:01:00 42.7 34.8 45.8 53.5
02/08/2013 00:30 0:01:00 31.7 27.2 34.9 39.4
02/08/2013 00:31 0:01:00 29.6 26.9 32.5 35.6
02/08/2013 00:32 0:01:00 41.2 28.2 45.7 50.9
02/08/2013 00:33 0:01:00 39.1 28.4 43.4 51.8
Environmental Statement Volume 6: Environmental Statement Document 6.13.3
Ch. 13 Noise and Vibration 11
The Yorkshire and Humber CCS Cross Country Pipeline
02/08/2013 00:34 0:01:00 39.6 31.8 44.1 47.7
02/08/2013 00:35 0:01:00 42.6 36.4 45.7 49.6
02/08/2013 00:36 0:01:00 40.2 32.5 44.8 50.8
02/08/2013 00:37 0:01:00 36.8 29.5 40.2 45.3
02/08/2013 00:38 0:01:00 41.6 38.9 43.6 46.2
02/08/2013 00:39 0:01:00 39.3 33.5 42.7 46.3
02/08/2013 00:40 0:01:00 40.0 29.7 44.3 49.5
02/08/2013 00:41 0:01:00 37.2 30.7 40.8 43.6
02/08/2013 00:42 0:01:00 29.1 27.9 30.4 32.2
02/08/2013 00:43 0:01:00 38.5 30.0 42.8 46.4
02/08/2013 00:44 0:01:00 28.5 26.4 31.7 34.8
02/08/2013 00:45 0:01:00 37.4 26.7 41.0 45.4
02/08/2013 00:46 0:01:00 37.8 32.2 41.3 45.8
02/08/2013 00:47 0:01:00 42.0 37.4 45.3 48.1
02/08/2013 00:48 0:01:00 31.0 26.8 35.3 38.3
02/08/2013 00:49 0:01:00 25.9 25.3 26.6 28.9
02/08/2013 00:50 0:01:00 26.8 25.6 27.6 33.2
02/08/2013 00:51 0:01:00 34.8 28.5 38.9 42.4
02/08/2013 00:52 0:01:00 38.1 26.6 42.8 47.5
02/08/2013 00:53 0:01:00 26.7 25.5 27.5 36.0
02/08/2013 00:54 0:01:00 31.5 27.8 34.4 35.9
02/08/2013 00:55 0:01:00 36.5 31.5 39.6 42.0
02/08/2013 00:56 0:01:00 31.8 27.6 35.0 38.1
02/08/2013 00:57 0:01:00 36.7 32.8 39.2 40.9
02/08/2013 00:58 0:01:00 37.9 33.7 40.6 47.8
02/08/2013 00:59 0:01:00 37.0 33.2 40.5 45.4
02/08/2013 01:00 0:01:00 38.6 34.4 41.7 44.8
02/08/2013 01:01 0:01:00 39.3 35.7 42.1 46.4
02/08/2013 01:02 0:01:00 30.9 28.7 32.6 37.3
02/08/2013 01:03 0:01:00 43.1 35.1 45.9 49.4
02/08/2013 01:04 0:01:00 40.3 29.4 44.8 48.8
02/08/2013 01:05 0:01:00 27.7 27.1 28.3 29.6
02/08/2013 01:06 0:01:00 28.2 27.1 29.3 31.6
02/08/2013 01:07 0:01:00 26.8 26.1 27.4 28.7
02/08/2013 01:08 0:01:00 39.9 27.7 44.3 46.8
02/08/2013 01:09 0:01:00 37.0 27.6 41.5 45.3
02/08/2013 01:10 0:01:00 27.2 26.3 28.0 30.7
02/08/2013 01:11 0:01:00 31.7 26.9 35.3 40.3
02/08/2013 01:12 0:01:00 36.4 28.1 40.3 43.4
02/08/2013 01:13 0:01:00 43.9 30.7 47.6 51.7
Environmental Statement Volume 6: Environmental Statement Document 6.13.3
Ch. 13 Noise and Vibration 12
The Yorkshire and Humber CCS Cross Country Pipeline
02/08/2013 01:14 0:01:00 35.9 29.0 39.5 43.3
02/08/2013 01:15 0:01:00 27.4 26.2 28.7 30.3
02/08/2013 01:16 0:01:00 32.3 27.3 36.0 39.5
02/08/2013 01:17 0:01:00 37.7 33.5 40.8 42.4
02/08/2013 01:18 0:01:00 35.6 27.0 40.3 43.0
02/08/2013 01:19 0:01:00 39.2 28.8 42.8 49.4
02/08/2013 01:20 0:01:00 28.8 27.4 30.1 35.6
02/08/2013 01:21 0:01:00 27.7 27.0 28.4 29.5
02/08/2013 01:22 0:01:00 27.2 26.7 27.8 28.7
02/08/2013 01:23 0:01:00 27.9 27.2 28.8 31.5
02/08/2013 01:24 0:01:00 28.0 27.3 28.6 29.9
02/08/2013 01:25 0:01:00 29.7 28.1 31.3 32.5
02/08/2013 01:26 0:01:00 30.2 28.8 31.5 34.6
02/08/2013 01:27 0:01:00 38.5 31.6 42.4 45.8
02/08/2013 01:28 0:01:00 37.2 33.3 40.7 42.7
02/08/2013 01:29 0:01:00 37.9 32.4 40.5 44.8
02/08/2013 01:30 0:01:00 38.0 33.5 41.6 45.3
02/08/2013 01:31 0:01:00 35.1 28.0 38.4 44.6
02/08/2013 01:32 0:01:00 27.7 26.6 28.6 31.0
02/08/2013 01:33 0:01:00 27.0 26.1 27.7 31.6
02/08/2013 01:34 0:01:00 40.9 29.4 44.6 47.7
02/08/2013 01:35 0:01:00 38.8 34.5 42.1 44.1
02/08/2013 01:36 0:01:00 32.6 28.9 36.0 39.3
02/08/2013 01:37 0:01:00 40.6 36.1 43.3 45.9
02/08/2013 01:38 0:01:00 29.9 26.1 34.6 36.6
02/08/2013 01:39 0:01:00 28.2 26.3 30.7 32.6
02/08/2013 01:40 0:01:00 41.1 35.1 43.8 47.1
02/08/2013 01:41 0:01:00 38.2 31.8 42.1 46.4
02/08/2013 01:42 0:01:00 32.8 27.7 36.1 38.6
02/08/2013 01:43 0:01:00 31.4 27.7 34.9 40.1
02/08/2013 01:44 0:01:00 32.3 28.9 35.5 39.1
02/08/2013 01:45 0:01:00 28.7 27.9 29.5 31.1
02/08/2013 01:46 0:01:00 28.2 27.6 28.8 32.6
02/08/2013 01:47 0:01:00 28.3 27.7 28.8 30.0
02/08/2013 01:48 0:01:00 28.6 27.6 29.6 32.2
02/08/2013 01:49 0:01:00 30.7 29.4 32.0 36.7
02/08/2013 01:50 0:01:00 29.3 28.4 30.3 32.8
02/08/2013 01:51 0:01:00 36.5 30.6 40.2 43.5
02/08/2013 01:52 0:01:00 32.0 27.0 35.3 40.3
02/08/2013 01:53 0:01:00 41.5 34.5 45.8 50.4
Environmental Statement Volume 6: Environmental Statement Document 6.13.3
Ch. 13 Noise and Vibration 13
The Yorkshire and Humber CCS Cross Country Pipeline
02/08/2013 01:54 0:01:00 39.7 29.5 43.1 47.0
02/08/2013 01:55 0:01:00 27.0 25.7 28.9 31.2
02/08/2013 01:56 0:01:00 37.8 31.5 41.5 46.8
02/08/2013 01:57 0:01:00 36.2 28.7 40.3 42.7
02/08/2013 01:58 0:01:00 40.7 29.8 44.1 47.6
02/08/2013 01:59 0:01:00 27.8 26.9 28.7 30.2
02/08/2013 02:00 0:01:00 26.9 26.0 27.7 29.0
02/08/2013 02:01 0:01:00 36.9 32.1 40.0 42.1
02/08/2013 02:02 0:01:00 41.0 35.8 44.0 47.5
02/08/2013 02:03 0:01:00 33.2 26.0 34.9 45.5
02/08/2013 02:04 0:01:00 26.3 25.7 27.0 28.1
02/08/2013 02:05 0:01:00 26.2 25.2 27.0 28.4
02/08/2013 02:06 0:01:00 26.4 25.6 27.0 29.8
02/08/2013 02:07 0:01:00 26.8 25.8 27.5 31.3
02/08/2013 02:08 0:01:00 26.2 25.5 27.0 28.3
02/08/2013 02:09 0:01:00 25.5 24.9 26.0 27.5
02/08/2013 02:10 0:01:00 26.2 25.2 27.2 34.7
02/08/2013 02:11 0:01:00 30.9 25.7 34.1 42.4
02/08/2013 02:12 0:01:00 37.3 26.1 41.7 44.0
02/08/2013 02:13 0:01:00 34.3 25.2 36.4 46.7
02/08/2013 02:14 0:01:00 40.9 35.6 44.4 49.4
02/08/2013 02:15 0:01:00 41.0 35.4 44.3 47.7
02/08/2013 02:16 0:01:00 28.2 25.9 30.9 36.4
02/08/2013 02:17 0:01:00 37.1 26.4 41.6 46.2
02/08/2013 02:18 0:01:00 38.7 35.0 41.3 45.0
02/08/2013 02:19 0:01:00 28.3 26.6 30.8 33.4
02/08/2013 02:20 0:01:00 26.8 26.3 27.3 28.2
02/08/2013 02:21 0:01:00 26.9 26.1 27.6 30.3
02/08/2013 02:22 0:01:00 27.0 26.2 27.6 31.0
02/08/2013 02:23 0:01:00 27.3 26.7 27.9 29.1
02/08/2013 02:24 0:01:00 27.6 27.1 28.1 29.2
02/08/2013 02:25 0:01:00 28.0 27.5 28.5 29.6
02/08/2013 02:26 0:01:00 28.9 28.0 29.9 32.4
02/08/2013 02:27 0:01:00 28.8 28.2 29.4 31.6
02/08/2013 02:28 0:01:00 29.1 28.6 29.6 30.4
02/08/2013 02:29 0:01:00 36.9 31.5 40.4 44.4
02/08/2013 02:30 0:01:00 37.6 30.9 40.7 47.4
02/08/2013 02:31 0:01:00 37.9 31.0 41.5 46.5
02/08/2013 02:32 0:01:00 28.4 27.7 29.1 30.7
02/08/2013 02:33 0:01:00 34.3 28.3 29.6 58.9
Environmental Statement Volume 6: Environmental Statement Document 6.13.3
Ch. 13 Noise and Vibration 14
The Yorkshire and Humber CCS Cross Country Pipeline
02/08/2013 02:34 0:01:00 29.4 28.6 30.2 32.1
02/08/2013 02:35 0:01:00 37.9 31.0 41.0 45.8
02/08/2013 02:36 0:01:00 30.9 29.4 32.8 37.4
02/08/2013 02:37 0:01:00 30.3 29.6 31.0 32.2
02/08/2013 02:38 0:01:00 30.0 29.4 30.7 32.4
02/08/2013 02:39 0:01:00 30.4 29.7 31.1 32.3
02/08/2013 02:40 0:01:00 31.5 30.1 32.5 33.7
02/08/2013 02:41 0:01:00 31.8 31.0 32.7 33.9
02/08/2013 02:42 0:01:00 33.0 32.3 33.7 36.5
02/08/2013 02:43 0:01:00 35.6 33.2 37.3 39.8
02/08/2013 02:44 0:01:00 37.4 34.7 41.0 43.1
02/08/2013 02:45 0:01:00 34.4 33.3 35.5 37.6
02/08/2013 02:46 0:01:00 33.5 32.6 34.3 35.5
02/08/2013 02:47 0:01:00 34.8 33.3 36.2 39.1
02/08/2013 02:48 0:01:00 37.3 34.3 40.3 43.8
02/08/2013 02:49 0:01:00 33.5 32.9 34.2 35.4
02/08/2013 02:50 0:01:00 34.8 33.7 36.5 38.3
02/08/2013 02:51 0:01:00 36.5 34.0 39.3 42.4
02/08/2013 02:52 0:01:00 33.2 32.6 33.7 36.3
02/08/2013 02:53 0:01:00 33.2 32.4 34.0 35.1
02/08/2013 02:54 0:01:00 34.1 32.6 35.4 37.4
02/08/2013 02:55 0:01:00 40.4 36.1 43.7 45.4
02/08/2013 02:56 0:01:00 33.9 32.9 34.9 37.8
02/08/2013 02:57 0:01:00 33.3 32.5 34.0 35.5
02/08/2013 02:58 0:01:00 32.6 31.9 33.3 34.7
02/08/2013 02:59 0:01:00 32.9 31.9 33.9 36.6
02/08/2013 03:00 0:01:00 37.1 32.8 40.8 45.0
02/08/2013 03:01 0:01:00 36.3 32.7 38.9 44.4
02/08/2013 03:02 0:01:00 37.9 34.6 40.3 43.4
02/08/2013 03:03 0:01:00 33.4 32.3 34.5 36.5
02/08/2013 03:04 0:01:00 38.3 34.1 41.1 43.6
02/08/2013 03:05 0:01:00 35.9 34.6 37.4 41.7
02/08/2013 03:06 0:01:00 39.9 36.4 42.8 46.0
02/08/2013 03:07 0:01:00 39.0 34.7 41.8 47.1
02/08/2013 03:08 0:01:00 36.7 32.1 40.1 45.0
02/08/2013 03:09 0:01:00 36.9 33.2 39.9 42.8
02/08/2013 03:10 0:01:00 39.7 35.7 42.8 44.8
02/08/2013 03:11 0:01:00 33.1 32.3 33.8 34.9
02/08/2013 03:12 0:01:00 32.3 31.3 33.4 34.7
02/08/2013 03:13 0:01:00 31.7 30.8 32.4 35.5
Environmental Statement Volume 6: Environmental Statement Document 6.13.3
Ch. 13 Noise and Vibration 15
The Yorkshire and Humber CCS Cross Country Pipeline
02/08/2013 03:14 0:01:00 40.5 34.9 44.0 48.4
02/08/2013 03:15 0:01:00 33.4 31.0 36.7 39.9
02/08/2013 03:16 0:01:00 31.4 30.6 32.3 34.0
02/08/2013 03:17 0:01:00 36.1 31.1 39.4 44.0
02/08/2013 03:18 0:01:00 33.1 29.4 37.0 41.6
02/08/2013 03:19 0:01:00 38.2 29.5 42.4 46.6
02/08/2013 03:20 0:01:00 34.3 29.3 37.7 44.3
02/08/2013 03:21 0:01:00 36.3 28.6 41.8 45.8
02/08/2013 03:22 0:01:00 45.5 40.2 48.1 51.0
02/08/2013 03:23 0:01:00 34.5 28.3 38.5 44.0
02/08/2013 03:24 0:01:00 46.0 37.9 49.0 51.2
02/08/2013 03:25 0:01:00 47.6 45.0 49.4 51.8
02/08/2013 03:26 0:01:00 48.3 43.9 50.9 53.4
02/08/2013 03:27 0:01:00 41.9 33.4 45.7 50.4
02/08/2013 03:28 0:01:00 43.8 36.0 46.7 49.1
02/08/2013 03:29 0:01:00 40.4 33.4 43.1 49.9
02/08/2013 03:30 0:01:00 34.7 26.8 38.8 43.3
02/08/2013 03:31 0:01:00 35.5 26.0 38.4 47.5
02/08/2013 03:32 0:01:00 39.2 26.4 43.5 48.6
02/08/2013 03:33 0:01:00 26.9 26.0 27.9 29.6
02/08/2013 03:34 0:01:00 41.2 29.6 44.6 47.0
02/08/2013 03:35 0:01:00 36.8 27.9 40.7 44.5
02/08/2013 03:36 0:01:00 27.2 26.7 27.8 31.2
02/08/2013 03:37 0:01:00 26.6 26.0 27.2 28.3
02/08/2013 03:38 0:01:00 26.9 26.0 27.6 33.1
02/08/2013 03:39 0:01:00 28.3 25.9 29.3 38.0
02/08/2013 03:40 0:01:00 40.6 34.5 44.0 50.4
02/08/2013 03:41 0:01:00 37.0 28.8 40.8 45.3
02/08/2013 03:42 0:01:00 41.3 36.8 44.7 47.0
02/08/2013 03:43 0:01:00 37.5 30.9 41.7 46.0
02/08/2013 03:44 0:01:00 34.8 25.9 39.5 44.5
02/08/2013 03:45 0:01:00 25.3 24.5 26.0 27.6
02/08/2013 03:46 0:01:00 41.1 29.8 44.9 50.2
02/08/2013 03:47 0:01:00 32.6 25.5 37.3 42.6
02/08/2013 03:48 0:01:00 26.7 25.4 28.6 32.1
02/08/2013 03:49 0:01:00 26.3 25.2 27.5 33.6
02/08/2013 03:50 0:01:00 26.1 25.3 26.9 28.9
02/08/2013 03:51 0:01:00 27.0 25.3 28.9 32.3
02/08/2013 03:52 0:01:00 27.8 25.0 31.2 34.2
02/08/2013 03:53 0:01:00 26.9 25.5 28.4 31.0
Environmental Statement Volume 6: Environmental Statement Document 6.13.3
Ch. 13 Noise and Vibration 16
The Yorkshire and Humber CCS Cross Country Pipeline
Location 3 Wade House Lane (Camblesforth Multi-Junction Site)
Figure 3. – Sound Level Meter Monitoring Location Grid Reference 466921,425719 SLM – Norsonic NOR140 Serial Number – 140919 Calibrator –B&K 4231 Serial Number- 2106194 02/08/13
The prevailing noise source: was road traffic on A645. There was little wind noise in the trees and an audible whirring from Drax power station. The frequency of vehicles on the A645 being around 1 per 20 seconds.
02/08/2013 03:54 0:01:00 42.7 29.9 46.4 49.3
02/08/2013 03:55 0:01:00 41.1 31.5 46.4 50.4
02/08/2013 03:56 0:01:00 42.9 36.3 46.4 49.9
02/08/2013 03:57 0:01:00 34.1 26.6 38.5 44.0
02/08/2013 03:58 0:01:00 27.7 26.2 29.2 34.6
02/08/2013 03:59 0:01:00 29.2 26.7 32.8 37.2
Table 3 Noise Monitoring Results- Wade House Lane
Environmental Statement Volume 6: Environmental Statement Document 6.13.3
Ch. 13 Noise and Vibration 17
The Yorkshire and Humber CCS Cross Country Pipeline
All values are in dB re 20µPa, Free-field, fast time-weighting Location 4 Park Cottage (Camblesforth Multi-Junction Site)
Figure 4. – Sound Level Meter Monitoring Location Grid Reference 465613, 424322 SLM – Norsonic NOR140 Serial Number – 140919 Calibrator –B&K 4231 Serial Number- 2106194 02/08/13
The noise monitoring location was opposite the entrance to Park Cottage. The prevailing noise source was from an industrial unit on Mill Lane to the east of the Park Cottage. The noise appeared to be focused in the 500Hz frequency. Other noise sources included toad traffic noise on A1040 in Carlton and M62 to the south.
Other noise sources noted were:
• 00:33 Distant alarm
• 00:39 cars arriving at nearby farm yard.
Date Start Time
Duration, T (mm:ss)
Noise Level, dB Weather Conditions
LAeq,T LA90,T LA10,T LAFmax,T
02/08/13 01:10 30:00 35.9 27.1 39.6 63.1 Wind 0-2 mph. Dry,
cloud 0/8, 23˚C
02/08/13 03:04 30:00 40.3 31.5 43.8 67.0 Wind 0-2 mph. Dry,
cloud 1/8, 23˚C
Table 4 Noise Monitoring Results- Park Cottage
Environmental Statement Volume 6: Environmental Statement Document 6.13.3
Ch. 13 Noise and Vibration 18
The Yorkshire and Humber CCS Cross Country Pipeline
All values are in dB re 20µPa, Free-field, fast time-weighting Location 5 Rose Cottage (Barmston Pumping Station)
Figure 5. – Sound Level Meter Monitoring Location Grid Reference 515432, 461508 SLM – Norsonic NOR140 Serial Number – 140919 Calibrator –B&K 4231 Serial Number- 2106194 31/7/13 Distant prevailing noise source is road traffic on A165, which was very in-frequent and quiet. The site is surrounded by trees, measurement location was in a hollow however there was a little breeze at the tree tops causing a little noise.
Noise sources noted were: • 01.59 Distant Car on the A165 • 02.01 Car A165
Date Start Time
Duration, T (mm:ss)
Noise Level, dB Weather Conditions
LAeq,T LA90,T LA10,T LAFmax,T
02/08/13 00:10 30:00 40.9 38.5 40.3 70.6 Wind 0-2 mph. Dry,
cloud 0/8, 25˚C
02/08/13 02:24 30:00 40.0 38.9 40.2 61.7 Wind 0-2 mph. Dry,
cloud 1/8, 23˚C
Environmental Statement Volume 6: Environmental Statement Document 6.13.3
Ch. 13 Noise and Vibration 19
The Yorkshire and Humber CCS Cross Country Pipeline
There was a slight increase in frequency of vehicles on the A165 during the second monitoring period.
All values are in dB re 20µPa, Free-field, fast time-weighting
Location 6 Low Stone Hill (Barmston Pumping Station)
Figure 6. – Sound Level Meter Monitoring Location Grid Reference 515028, 460624 SLM – Norsonic NOR140 Serial Number – 140919 Calibrator –B&K 4231 Serial Number- 2106194 31/7/13 The monitoring location was 3m from A165. The main noise was from passing cars which are noted below. During the second monitoring period, the wind speed had increased and wind in the trees could be heard.
• 01.11 Car Pass • 01.16 Car Pass
Table 5 Noise Monitoring Results- Rose Cottage
Date Start Time
Duration, T (mm:ss)
Noise Level, dB Weather Conditions
LAeq,T LA90,T LA10,T LAFmax,T
31/07/13 01:52 30:00 37.7 26.7 38.2 61.8 Wind 0-2 mph. Dry,
cloud 2/8, 16˚C
31/07/13 03:52 30:00 37.0 27.4 40.5 60.4 Wind 0-2 mph. Dry,
cloud 5/8, 16˚C
Environmental Statement Volume 6: Environmental Statement Document 6.13.3
Ch. 13 Noise and Vibration 20
The Yorkshire and Humber CCS Cross Country Pipeline
• 01.17 Car Pass • 01.19 Car Pass-Police van arrival, engine running awhile and speech
with doors closing and opening. Meter was paused as soon as possible.
• 01.22 Reading resumed, car door closing. • 01.29 Car Passing • 01.32 4 cars passing in very close succession, sound took much
longer to dissipate. • 01.34 Location is a little exposed, wind speed increased, therefore
increasing the noise produced by tree leaves etc. • 01.37 Passing Car • 01.40 Passing Car • 03.11 Passing Car • 03.23 Passing Car • 03.27 Passing Car • 03.34 Passing Car • 03.38 Passing Lorry • 03.40 Passing Car
All values are in dB re 20µPa, Free-field, fast time-weighting
Location 7 Hamilton Hill Lane (Barmston Pumping Station)
Table 6 Noise Monitoring Results- Low Stone Hill
Date Start Time
Duration, T (mm:ss)
Noise Level, dB Weather Conditions
LAeq,T LA90,T LA10,T LAFmax,T
31/07/13 01:10 30:00 56.8 24.4 51.1 84 Wind 0-2 mph. Dry,
cloud 2/8, 17˚C
31/07/13 03:11 30:00 60.0 33.7 50.6 87.4 Wind 3-5 mph. Dry,
cloud 3/8, 16˚C
Environmental Statement Volume 6: Environmental Statement Document 6.13.3
Ch. 13 Noise and Vibration 21
The Yorkshire and Humber CCS Cross Country Pipeline
Figure 7. – Sound Level Meter Monitoring Location Grid Reference 516387, 459254 SLM – Norsonic NOR140 Serial Number – 140919 Calibrator –B&K 4231 Serial Number- 2106194 31/7/13 The prevailing noise source was road traffic noise on A165 which is 0.5 miles away. Could also hear the waves on the coast. Distant aircraft noise could be heard when the surrounding noise environment was very quiet.
All values are in dB re 20µPa, Free-field, fast time-weighting
Table 7 Noise Monitoring Results- Hamilton Hill Lane
Date Start Time
Duration, T (mm:ss)
Noise Level, dB Weather Conditions
LAeq,T LA90,T LA10,T LAFmax,T
31/07/13 01:10 30:00 38.7 25.6 39.0 62.6 Wind 0-2 mph. Dry,
cloud 1/8, 18˚C
31/07/13 03:11 30:00 43.7 29.5 45.5 68.9 Wind 3-4 mph. Dry,
cloud 2/8, 16˚C