arch 1290 architectural cadd arch 1200 architectural drawing ii
DESCRIPTION
ARCH 1290 ARCHITECTURAL CADD ARCH 1200 ARCHITECTURAL DRAWING II. PROFESSOR PAUL KING It ’ s time for Research!. SLIDE 2 – TEAM 5 Profile. What attracts you to the study of Architecture? - PowerPoint PPT PresentationTRANSCRIPT
ARCH 1290 A
RCHITEC
TURAL
CADD
ARCH 1200 A
RCHITEC
TURAL
DRAWIN
G II
PROFESS
OR PAUL
KING
It’s
time
for R
esea
rch!
SLIDE 2 – TEAM 5 Profile
What attracts you to the study of Architecture?
“I view architecture as a work of art with space of opportunity. It’s a field where I can make someone happy by my thoughts to reality .” Syndi Wilkinson
“I enjoy using photography to capture the different elements of architecture.” Nita Velasquez
“Architecture is a passion where I seek beauty, space and functionality. I enjoy brainstorming my ideas using photography, design, painting and build.” Debora Tannenbaum
“Architecture is a field where I can express my creativity with rules but no guidelines.” Jeffrey Rodriguez
syndi W
ilkin
son
Information
New Castle Fieldhouse
•The New Castle Fieldhouse is a 9,325-seat multi-purpose arena in New Castle, Indiana, USA. It is home to the New Castle Chrysler High School Trojans basketball team. Built in 1959, it is the largest high school basketball gym in the world.
•The New Castle Fieldhouse was built by the Ralph Hunnicutt & Sons Construction Company. The main basketball is a "sunken" floor, meaning that one enters the building at the top of the bleachers and the playing floor is below. The distance from the level where one enters to the peak of the roof is the same as the distance from where one enters to the playing floor.
• The New Castle Fieldhouse gym is the largest high school basketball gym in the world IT hosts high school volleyball games, wrestling meets, gymnastics competitions, and gym classes during the school day. The top of the Fieldhouse is bordered by a 1/7 of a mile rubber track. The track is used for gym classes as well as being open to the public in the mornings, evenings and during lunch period.
program
Lighting
Lighting: •With few exceptions, metal halide high bay and low bay lights are the best luminaires to use for gymnasium lighting. They are common in school gyms, clubs, and recreational basketball courts and provide a robust source of white light with a high CRI
long span steel trusses for roof
framing members
Long-span & structures
http://www.rlldesign.com/gymnasium-lighting-a-214.html
http://www.enotes.com/topic/New_Castle_Fieldhouse
http://www.usatoday.com/sports/preps/basketball/2004-02-25-ten-great-hoops-newcastle_x.htm
Credits
Sites
Nita V
elas
quez
Information
Grace Church School Gymnasium
•Location: 86 4th Ave New York, NY 10003•School: Grades K-8 and 9•Gym Location: Underground, adjacent to James Renwick’s landmark gothic revival church•Architect: Alspector Architecture LLC
Gym Accommodates;
•Basketball
•Volleyball
•Soccer
•Rock climbing
•School events/parties
•It also hosts events from other schools and colleges
program
Aesthetics & Function
• The Gym has both interior and exterior windows and a stair way to the ground level
Lighting & Ventilation
Lighting: This Gym uses; •ceiling lights •natural light - via a series of large exterior and interior windows
Ventilation: There are large circular vents and smaller air units located on the south wall
Long-span & structure
Required underpinning of the adjoining church and loft building
Has an Intensive green roof
Construction assembly
Roof: Intensive green roof •Street trees •Garden•Playground
Construction: •Required underpinning of the adjoining church and loft building•Extension under the public sidewalk •Within 20 feet of the Broadway subway tunnel•site-specific vibration monitoring program was prepared due to the site’s close proximity to the City’s subway line
Extra: Underpinning
Underpinning: The process of strengthening the foundation of an existing building or structure.
Reasons for underpinning:•Foundation is weak or unstable•Construction that requires the excavation of the soil that supports the foundation
1. http://www.gcschool.org/about-gcs/history-and-timeline/index.aspx
2. http://www.alspectorarchitecture.com/gcs.htm
3. http://www.schooldesigner.com/Architects/Alspector-Architecture-LLC/Elements/Gym-Under-Ground.asp
4. http://www.structuretone.com/ST/index.nsf/O/GraceChurchSchool?opendocument&Sectors=Education~Education
5. http://www.foundationsystemsrepair.com/foundation-underpinning.html
6. http://www.google.com/imgres?q=underpinning&um=1&hl=en&sa=N&biw=1335&bih=784&tbm=isch&tbnid=B_uA0yluh1koHM:&imgrefurl=http://www.foundationrepair.org/underpinning&docid=0ZNsTRWeBDKtcM&w=645&h=443&ei=teiRTuu1Bufl0QGw__Ai&zoom=1
7. http://en.wikipedia.org/wiki/Main_Page
Credits
Sites
Debor
a Ta
nnenbau
m
BMCC-Borough of Manhattan Community College/CUNY
Location: 199 Chambers St. New York, NY 10007
Two Year College
Gym Location: Ground 2, adjacent to Harrison Street, Tribeca
Administration and Planning: Vice-President Scott Anderson
INFORMATION
FIT-FASHION INSTITUTE OF TECHNOLOGY/SUNY
Location: Seventh Avenue at West 27th Street New York, NY 10001
Two and Four Year College
Gym Location: Underground, B Building level SC Chelsea area
INFORMATION
BMCC/CUNY PROGRAM
RECREATION FACILITY INCLUDES:
BASKETBALL
WEIGHT ROOM
HANDBALL
BOWLING
BASEBALL
SOCCER’
VOLLEYBALL
SPORTS TEM COMPETE IN BOTH:
CUNY ATHLETIC SYSTEM, AND
LOCAL NCAA COLLEGIATE SPORTS SYSTEM
FIT/SUNY PROGRAM
RECREATION FACILITY INCLUDES:
TRACK AND FIELDDANCESOCCERTENNISVOLLEYBALL
INTERCOLLEGIATE TEAMS IN TENNIS, CROSS-COUNTRY, HALF-MARATHON, TRACK AND FIELD, DANCE, WOMEN’S VOLLEYBALL
FIT TEAMS COMPETE AGAINST OTHER SCHOOLS IN REGION XV OF THE NATIONAL JUNIOR COLLEGE ATHLETIC ASSOCIATION
PROGRAM
MULTI-USE SPACE: 103’ X 143’
PERIMETER CURTAINS HANG DIVIDING NETS ABOUT 12’
ABOVE THE FLOOR HOME AND VISITORS SEATING
AREAS WALLS WITH CUSHIONS CARDIO / WARM UP AREA AND
EQUIPMENT STANDARD GALVANIZED STEEL PIPE
POST WITH STELL CLAMP FOR HANG BASKETS AND PORTABLE HYDRAULIC GOAL
MOVABLE WALL ASSEMBLY FOR COURT CONVERSION
FLOOR EXERCISE MAT AREA FLOORING OVER WOOD
AESTHETICS & FUNCTION
VENTILATION
CEILING LIGHTS
NATURAL LIGHT – EXTERNAL WINDOWS
LONG-SPAN STRUCTURE
TYPE OF ROOF AND SUPPORT
CONSTRUCTION ASSEMBLY
FLOOR STRUCTURE ASSEMBLY: 1 OR 2 WAY CONCRETE SLAB OR FOR HEAVIER 2-WAY CONCRETE SLAB
ROOF STRUCRURE ASSEMBLY: CONCRETE FLAT SLAB STEEL TRUS 1 OR 2 WAY CONCRETE SLAB
EXTERIOR WALL ASSEMBLY: CMU AND BRICK VENEER (INSULATED) CMU INSULATED
GYMNASIUMS DISTRIBUTED LIVE LOADS: 100 PSF LONG SPAN SYSTEM STEEL TRUSS FLAT SURFACE SEISMIC – RESISTANT DESIGN MASONRY
REFERENCE
www.cuny.eduwww.bmcc.cuny.edu
www.suny.eduwww.fitnyc.edu
Allen and Iano. 2009. “Fundamentals of Building Construction- Materials and Methods". John Wiley &Sons. Hoboken, NJ
Jeffre
y Rod
riguez
Carlsbad High School Gymnasium
Location:Carlsbad, CaliforniaArchitect Team:Principal-In-Charge: Ralph Roesling
Manager: Chuck forteProject Architect: Rommel OlaesEngineer:Civil: Flores Lund ConsultantsStructural: Stedman & Dyson Structural Engineers
Mechanical: E/C EngineeringElectrical: Semenza Engineering
Site Info. & Credits
Program
Capacity: Designed to fit up to 2,ooo people
Space size: 28,300 square feet
Space: Full size basketball court Two cross courts Training room Locker rooms Offices Storage areas
Two types of CMU.
Steel beams & Columns
Windows at entrance of the building
Two stairways
Aesthetics & Function
Lighting & Ventilation
Ventilation Lighting Natural Lighting
Long-Span: Steel trussesCurved Steel beams
Long-Span & Structure
•Roof Structure:
A. Deep cellular steel deck
B. Standing seam metal (Absorbs less heat)
A.
B.
Construction Assembly
• Wall:•Load-bearing concrete masonry
Sources
http://www.rntarchitects.com/design/ProjectPdfs/k12/CarlsbadHighSchoolGymnasium.pdf