arch 103 final port

32

Upload: jacky-hoang

Post on 22-Mar-2016

214 views

Category:

Documents


0 download

DESCRIPTION

ccsf architecture 103 studio

TRANSCRIPT

Page 1: ARCH 103 FINAL PORT
Page 2: ARCH 103 FINAL PORT
Page 3: ARCH 103 FINAL PORT
Page 4: ARCH 103 FINAL PORT
Page 5: ARCH 103 FINAL PORT
Page 6: ARCH 103 FINAL PORT
Page 7: ARCH 103 FINAL PORT
Page 8: ARCH 103 FINAL PORT
Page 9: ARCH 103 FINAL PORT
Page 10: ARCH 103 FINAL PORT
Page 11: ARCH 103 FINAL PORT
Page 12: ARCH 103 FINAL PORT
Page 13: ARCH 103 FINAL PORT
Page 14: ARCH 103 FINAL PORT
Page 15: ARCH 103 FINAL PORT
Page 16: ARCH 103 FINAL PORT
Page 17: ARCH 103 FINAL PORT
Page 18: ARCH 103 FINAL PORT
Page 19: ARCH 103 FINAL PORT
Page 20: ARCH 103 FINAL PORT

END OF MIDTERMS

Page 21: ARCH 103 FINAL PORT

END OF MIDTERMS

DENSITY DISTRIBUTIONEM

BARCADERO

JOHN MAHER

UNION

GREEN

1

THE FINAL JUNK HALL PAVILION WAS A RESPONSE TO TWO MAJOR IDEAS. THE FIRST WAS AN SITE SPECIFIC RESPONSE TO THE AREA AND THE SECOND WAS A RESPONSE TO THE URBAN CONDITION OF THE CITY AND ITS ARCHITECTURE.

N

2 PROGRAM INDEPENDENCY

N

Page 22: ARCH 103 FINAL PORT

DENSITY DISTRIBUTIONTHE PREVIOUS GESTURE MODELS WERE A RESPONSE TO THE EMBARCADERO’S OVERALL DENSITY OF ACTIVITIES. HERE I BEGIN TO PROPOSE AND SHIFT THE DENSITY OF EMBARCADERO TO THE DEAD AREA ALONG GREEN, JOHN MAHER AND UNION STREET.

1

EMBARCADERO

JOHN MAHER

UNION

GREEN

N

EXPLOR. ENTRANCE

Page 23: ARCH 103 FINAL PORT

2THE CONNECTION BETWEEN EMBARCADERO TO THE DEAD AREA BEGINS TO EXPAND CAUSING A WALKABLE PATH FOR PEDESTRIANS. THIS PATH WILL SERVE AS THE PUBLIC SPACE.

UNION

JOHN MAHER

GREEN

EMBARCADERO

N

Page 24: ARCH 103 FINAL PORT

UNION

JOHN MAHER

GREEN

EMBARCADERO

N

SOFT SPACE

3THE NEXT MODEL IS A MORE EXTRUDED VERSION OF THE PERVIOUS MODEL. SPACES CAN NOW BE OCCUPIED UNDER AND ON THE PUBLIC SPACE (WHICH IS NOW COVERED IN CLIPBOARD, WHILE THE MESH REPRESENTS SOFT SPACE LIKE GRASS). THE VOIDS AND ABOVE THE PUBLIC SPACE WILL HOUSE THE PAVILION.

VOID

VOID

PAVILION’S MAIN

ENTRANCEPUBLIC SPACE’S MAIN ENTRANCE

Page 25: ARCH 103 FINAL PORT

PROGRAM INDEPENDENCY

1JUNK HALL PAVILION NEEDS TO ACCOMMODATE SPACES FOR CHANGINGPROGRAMS: THE JUNK HALL DISPLAY SPACE AND THE FREE CHINA JUNK EXHIBIT SPACE. BUT ON A GRANDER SCALE, CITIES ARE RAPIDLY CHANGING AND ITS ARCHITECTURE ARE LAGGING BEHIND. SPACES FOR BUILDINGS CAN NOT ACCOMMODATE THE CHANGING CITY WITHOUT DRASTIC ACTIONS LIKE DEMOLITION AND REBUILDING. I PROPOSE THAT THE JUNK HALL PAVILION CONSISTS OF INDEPENDENT SPACES AND PROGRAMS THAT DOES NOT RELY ON OTHER SPACES TO FUNCTION.

THEATER

RESTAURANT

JUNK HALL DISPLAY

OFFICE

FREE CHINA AND GLOBAL SHIP EXHIBITS

Page 26: ARCH 103 FINAL PORT

2A CIRCULATORY SYSTEM CONNECTS ALL OF THE GIVEN PROGRAMS AND SPACES, WHICH ALLOWS PEOPLE TO ACCESS EACH PROGRAMINDEPENDENTLY. FOR EXAMPLE, IF ALL PROGRAMS EXCEPT THE THEATER WERE CLOSED, THE THEATER CAN BE ACCESSED INDEPENDENTLY. PEOPLE CAN GAIN ACCESS TO EACH PROGRAM WITHOUT HAVING TO ENTER THROUGH THE MAIN ENTRANCE.

EXH. HALLS TO THEATER OR PUBLIC

SPACE

EXH. HALLS TO PUBLIC SPACE

EXH. HALLS TO JUNK HALL DISPLACE

EXH. HALLS

THEATER

JUNK HALL

3RD FLOOR 3RD FLOOR

1ST FLOOR

1ST FLOOR

OFFICERESTAURANT

1ST FLOOR

1ST FLOOR

1 JUNK HALL 2 EXH HALL3 THEATER4 OFFICE5 RESTAURANT

1

2

2

3

4

5

Page 27: ARCH 103 FINAL PORT

END OF MIDTERMS

3 THE CLIENT HAS THE FLEXIBILITY TO CLOSE AND OPEN CERTAIN SPACES TO ACCOMMODATE WHAT THE CITY NEEDS.

Page 28: ARCH 103 FINAL PORT

END OF MIDTERMS

JUNK HALL PAVILION

Page 29: ARCH 103 FINAL PORT
Page 30: ARCH 103 FINAL PORT
Page 31: ARCH 103 FINAL PORT

DRAWINGS

F1

F2

F3

SECTION B

B

B

SECTION A

A

A

Page 32: ARCH 103 FINAL PORT

END