ARC Resources Investor Presentation November, 2012

Page 2: ARC Resources - November 2012 Investor Presentation

This presentation contains forward-looking information as to ARC’s internal projections, expectations or beliefs relating to

future events or future performance and includes information as to our future well inventory in our core areas, our exploration

and development drilling and other exploitation plans for 2012 and beyond, and related production expectations, the volume of

ARC's oil and gas reserves and the volume of ARC's gas resources in the NE BC Montney (as defined herein), the recognition

of additional reserves and the capital required to do so, the life of ARC's reserves, the volume and product mix of ARC's oil

and gas production, future results from operations and operating metrics. These statements represent management’s

expectations or beliefs concerning, among other things, future operating results and various components thereof or the

economic performance of ARC Resources. The projections, estimates and beliefs contained in such forward-looking

statements are based on management's assumptions relating to the production performance of ARC’s oil and gas assets, the

cost and competition for services, the continuation of ARC’s historical experience with expenses and production, changes in

the capital expenditure budgets, future commodity prices, continuing access to capital and the continuation of the current

regulatory and tax regime in Canada and necessarily involve known and unknown risks and uncertainties, such as changes in

oil and gas prices, infrastructure constraints in relation to the development of the Montney in British Columbia, risks associated

with the degree of certainty in resource assessments and including the business risks discussed in the annual MD&A and

related to management’s assumptions, which may cause actual performance and financial results in future periods to differ

materially from any projections of future performance or results expressed or implied by such forward-looking statements.

Accordingly, readers are cautioned that events or circumstances could cause actual results to differ materially from those

predicted. Other than the 2012 Guidance which is updated and discussed quarterly, ARC does not undertake to update any

forward looking information in this document whether as to new information, future events or otherwise except as required by

securities laws and regulations.

We have adopted the standard of 6 mcf:1 bbl when converting natural gas to barrels of oil equivalent ("boes"). Boes may be

misleading, particularly if used in isolation. A boe conversion ratio of 6 mcf per barrel is based on an energy equivalency

conversion method primarily applicable at the burner tip and does not represent a value equivalency at the wellhead. Given

that the value ratio based on the current price of crude oil as compared to natural gas is significantly different than the energy

equivalency of the 6:1 conversion ratio, utilizing the 6:1 conversion ratio may be misleading as an indication of value.

FORWARD LOOKING STATEMENTS

Page 3: ARC Resources - November 2012 Investor Presentation

Production (2012 YTD) 92,800 boed

Liquids 36,000 boed

Natural gas 341 mmcfd

Reserves (2P Gross) 572 mmboe

17 year RLI (1)

Current monthly dividend $0.10

Annualized total return 18% (2)

10% (3)

Enterprise value ~$8 billion (4)

Shares outstanding ~308 MM (5)

Daily average trading volume 1.4 million shares

Net debt (millions) $691 (1.0 X cash flow)(5)

Member of S&P TSX 60 Index

(1) Based on 2012 production guidance of 91,000-94,000 boe/d.

(2) Annualized total return since inception to October 31, 2012, including October 2012 dividend, and assuming DRIP participation.

(3) Annualized total return since October 31, 2007 (last 5 years).

(4) Market Capitalization as at October 31, 2012 and net debt as at September 30, 2012.

(5) As at September 30, 2012.

CORPORATE OVERVIEW

NE BC/ NW AB

NORTH AB

REDWATER

PEMBINA

S AB/

SW SASK

SE SASK/

MANITOBA

Crude Oil

Liquids-rich Gas

Dry Gas

Page 4: ARC Resources - November 2012 Investor Presentation

2012 FINANCIAL AND

OPERATIONAL PERFORMANCE

Q3 2012 YTD 2012

(CDN$ millions, except per share and per boe amounts) 2012 2011 2012 2011

Production (boe/d)

Gas

Liquids

89,511

60%

40%

85,178

64%

36%

92,814

61%

39%

80,517

61%

39%

Revenue

Gas

Liquids

329.4

72.9

256.5

351.3

116.9

234.4

1,012.6

223.0

789.6

1,049.7

321.8

727.9

Funds from operations

Per share

164.9

0.55

213.5

0.74

511.4

1.74

617.6

2.15

Operating Income

Per share

26.6

0.09

68.0

0.24

104.1

0.35

217.4

0.76

Dividends

Per share

90.6

0.30

86.2

0.30

264.9

0.90

257.5

0.90

Capital expenditures 133.1 229.3 417.8 531.0

Net debt outstanding 691.0 870.1 691.0 870.1

Weighted average number of shares outstanding

(millions) 299.7 287.1 293.4 286.0

Netback (pre-hedging) 23.04 26.62 23.25 29.77

Page 5: ARC Resources - November 2012 Investor Presentation

• Oil and liquids comprised 40% of third quarter 2012 production while contributing 78% of

third quarter revenue

• Drilled 106 gross operated wells year-to-date (99% oil and liquids-rich)

• Grew crude oil and liquids production 16% to >35,600 boe/d in Q3 2012 (relative to Q3

2011) with significant growth at Ante Creek, Pembina and Goodlands

Q4 Production

Q4 Revenue

34%

3%

60%

3%

70%

6%

22%

2%

Q3 Production Q3 Revenue

Crude Oil

Condensate

NGL’s

Natural Gas

2012 FOCUS ON OIL AND LIQUIDS

Page 6: ARC Resources - November 2012 Investor Presentation

• We believe that top performing companies all have the following attributes:

– Great assets

– Operational excellence

– Capital discipline

– Management that delivers results

• At ARC our focus since inception has been on

“Risk Managed Value Creation”

• It is not a question of growth or income but of how best to create value for our owners

• Current dividend of $0.10 per month

VALUE PROPOSITION

Page 7: ARC Resources - November 2012 Investor Presentation

Forecast Forecast -

20,000

40,000

60,000

80,000

100,000

Pro

du

ctio

n (

Bo

e/d

)

Production Growth - Montney and Non-Montney

Montney Gas (boe/d)

Montney Oil/Liquids (bbls/d)

Non-Montney Gas (boe/d)

Non-Montney Liquids (boe/d)

Total Non-Montney production

Fo

recast

PRODUCTION GROWTH

Page 8: ARC Resources - November 2012 Investor Presentation

Proved

Undeveloped

20%

• ARC has a 16 year history of risk managed value creation

- Provided a 18% annual total return since inception

- Paid out $4.5 billion in total dividends - $28.38/share

- Grown absolute production from 9,500 boe/d to ~93,000 boe/d, – the Montney provides

the opportunity for substantial future growth

- Grown debt and dividend adjusted reserves & production by ~ 10% annually

0

25,000

50,000

75,000

100,000

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

Q3

Bo

e/d

Production History

Gas Liquids

15% CAGR*

* Compound annual growth rate

INCOME AND GROWTH ARC HAS DELIVERED BOTH

Page 9: ARC Resources - November 2012 Investor Presentation

Corporate Strategy Contained in the “Strategy” section is forward-looking information. The reader is cautioned that assumptions used in the

preparations of such information, particularly those pertaining to dividends, production levels, operating costs and drilling

results, although considered reasonable by the Company at the time of preparation, may prove to be incorrect. A number of

factors, including, but not limited to: commodity prices, reservoir performance, weather, drilling performance and industry

conditions, may cause the actual results achieved to vary from projections, anticipated results or other information provided

herein and the variations may be material. Consequently, there is no representation by the Company that actual results

achieved will be the same in whole or in part as those presented herein.

Page 10: ARC Resources - November 2012 Investor Presentation

Understand our Advantaged Position

Ma

ke

tim

e t

o T

hin

k S

tra

teg

ica

lly

Le

ve

ra

ge

ou

r A

dv

an

tag

ed

Po

sitio

n

Be Dynamic and Flexible to Changing Conditions

RISK

MANAGED

VALUE

CREATION

Operational

Excellence

Financial Flexibility

Top Talent and Strong Leadership

Culture

High Quality, Long Life

Assets

RISK MANAGED VALUE CREATION

Page 11: ARC Resources - November 2012 Investor Presentation

• ARC’s strategy has delivered exceptional results to date

– We will continue to provide income and profitable growth to our investors

• Where do we go from here?

– Continued focus on meaningful oil and gas accumulations

– Our strategic initiatives will focus on:

• Operational excellence

• Developing the Montney – near term growth is forecast as an outcome

of the quality of our opportunities

• Realization of the value embedded in our assets through the

development of our large potential resources through advanced recovery

methods or application of new technologies

• Opportunistic acquisitions to add to our meaningful resource

play presence

• Maintaining balance sheet strength and financial flexibility

STRATEGIC OVERVIEW SUMMARY

Page 12: ARC Resources - November 2012 Investor Presentation

2013 Budget

and Guidance

Page 13: ARC Resources - November 2012 Investor Presentation

2013 BUDGET

The 2013 Budget will:

• Focus on oil and liquids opportunities

• Invest in high rate of return natural gas opportunities to sustain

current production

• Leverage dominant presence and technical expertise in resource

plays

• Invest in infrastructure to set stage for growth in 2014

• Optimize capital efficiencies through active cost management and

enhanced commercialization of development

• Manage production decline rates by pacing growth

• Preserve ARC’s strong financial position and balance sheet

strength

Page 14: ARC Resources - November 2012 Investor Presentation

NE BC - $324MM* ~36 gross operated wells

42,099 boe/d

~$100MM directed towards

facilities at Parkland/Tower

Parkland/Tower, Dawson

NORTHERN AB - $211MM* ~37 gross operated wells

14,163 boe/d

2013 CAPITAL PROGRAM SETTING THE STAGE FOR 2014 PRODUCTION GROWTH

PEMBINA - $131MM* ~54 gross operated wells

9,220 boe/d

• $830 million capital program (~178 gross operated wells) with majority of spending

in oil and liquids-rich gas plays and infrastructure.

REDWATER - $10MM*

0 wells

3,539 boe/d

SE AB/SW SASK - $6MM*

0 wells

6,214 boe/d

NE BC - $324MM(1)

~36 gross operated wells

~44,500 boe/d(2)

~$100MM directed towards

facilities at Parkland/Tower

NORTHERN AB - $211MM(1)

~37 gross operated wells

~15,000 boe/d(2)

PEMBINA - $131MM(1)

~54 gross operated

wells

~11,000 boe/d(2)

REDWATER - $10MM(1)

0 wells

~3,600 boe/d(2)

S. AB/SW SASK - $6MM(1)

0 wells

~7,900 boe/d(2)

SE SASK/MANITOBA - $126MM(1)

~51 gross operated wells

~12,600 boe/d(2)

2013 Capital Budget

Capital

$MM

Volumes

Year

Average

(boe/d)

Gros

s

Wells

Net

Wells

Operated* 774 84,500 178 160

Non-Operated 56 10,600 103 10

Total 830 95,000 281 170

*Corporate $22 MM

(1) Includes Operated and Non-operated.

(2) 2013 annual average production.

Page 15: ARC Resources - November 2012 Investor Presentation

2013 BUDGET 2013/2014 Production Growth

Base Decline ~22%

Base Decline ~22%

0

20,000

40,000

60,000

80,000

100,000

120,000

140,000

2013 Budget - Volumes (BOED) All Properties

PO DEV OPT EXPLORE 2014 base production, does

not show 2014 CAPEX

program

• Overall Corporate base decline of ~ 22%.

• Oil and Liquids production increases ~ 5%.

• Gas production grows by ~2%.

• Risks to the plan: commodity prices, timing issues and cost pressures related to service sector demand

for equipment and personnel, regulatory approvals and liquids sales pipeline capacities.

Base Decline ~22%

Page 16: ARC Resources - November 2012 Investor Presentation

2013 BUDGET FOCUS ON OIL AND LIQUIDS

~75% spending on oil and

liquids-rich gas

Focus: Parkland/Tower,

Dawson

NE BC/NW AB

SE SASK/ MB

PEMBINA

NORTHERN AB

~100% spending on oil

Focus: Goodlands

~100% spending on oil and

liquids-rich gas

Focus: Ante Creek

~100% spending on oil and

liquids-rich gas

Focus: Cardium

2013 Capital by

Commodity ($ millions)

2013 Drills by

Commodity

(# of Gross Operated Wells)

• 91% of budget focused on oil/liquids drilling and infrastructure

$581

$171

$56 $22

153

16 9

Oil

Liquids-rich

Gas

Other

Page 17: ARC Resources - November 2012 Investor Presentation

2013 CAPITAL BUDGET

($ millions) 2011 (Actual) 2012 (Estimate) 2013 (Budget)

Development

Development – Facilities

396

92

400

70

563

162

Maintenance 21 27 35

Optimization 14 9 13

Exploration & Seismic 94 52 11

Enhanced Oil Recovery 20 21 27

Land 75 4 -

Other 14 17 19

Total Capital $726 $600 $830

(1) Other capital of $19 million comprises capitalized General and Administrative Expenses (“G&A”) including a portion of Long-Term Incentive Plan

(“LTIP” or the “Whole Unit Plan”) expense, information technology and corporate office capital.

Page 18: ARC Resources - November 2012 Investor Presentation

2012 Guidance

2012 YTD

Actual 2013 Guidance

Oil (bbls/d) 30,000 – 31,000 30,955 32,000 – 34,000

Condensate (bbls/d) 2,100 – 2,500 2,368 1,800 – 2,000

Gas (mmcf/d) 340 – 350 341 340 – 350

NGL’s (bbls/d) 2,100 – 2,600 2,644 2,400 – 2,800

Total (boe/d) 91,000 – 94,000 92,814 93,000 – 97,000

Operating costs 9.50 – 9.70 9.61 9.50 – 9.70

Transportation costs 1.30 – 1.40 1.30 1.40 – 1.50

G&A expenses (1) 2.45 – 2.60 2.78 2.50 – 2.70

Interest 1.20 – 1.30 1.33 1.20 – 1.30

Income Taxes (2) 0.90 – 1.05 1.03 1.05 – 1.15

Capital expenditures (millions) (3) 600 418 830

Land expenditures and minor net property

acquisitions ($ millions) (4) 25 - 50 31 -

Weighted average shares outstanding (millions) (5) 297 293 311

2013 GUIDANCE

(1) The 2013 G&A expense before Long-Term Incentive Plan approximates $90 million ($1.75 - $1.90 per boe).

(2) 2013 Corporate tax estimate will vary depending on level of commodity prices.

(3) The $830 million 2013 capital budget does not include land and net property acquisitions as this amount is unbudgeted.

(4) Based on weighted average shares plus the dilutive impact of share options outstanding during the period.

Page 19: ARC Resources - November 2012 Investor Presentation

Asset Overview

Page 20: ARC Resources - November 2012 Investor Presentation

• ARC’s key assets with the greatest value creation opportunities and

highest future reserves contributions are:

• Ante Creek – oil resource play

• Parkland/Tower/Attachie/Septimus – liquids-rich gas resource play

• Pembina Cardium – oil resource play

• Goodlands and SE Saskatchewan – oil resource play

• Dawson – natural gas resource play

• Sunrise/Sunset – natural gas resource play

• ARC plans to develop these opportunities, subject to a supportive

commodity price environment, over the next five years

• Highlights from a few of these key areas will be covered in this

presentation

ASSET OVERVIEW

Page 21: ARC Resources - November 2012 Investor Presentation

Revitalizing a

Mature Oil Field Pembina

Page 22: ARC Resources - November 2012 Investor Presentation

PEMBINA ASSET DETAILS

Net production (boe/d) – Q3 2012 11,300

Cardium production ~80%

Production split % (liquids/gas) ~75%/25%

Land (Cardium net sections) 132

Working Interest ~78%

Reserves (2P mmboe) Cardium 41.6

Reserve Life Index 14.2

2012 Plans/Accomplishments

• ARC is the second largest operator in the

Pembina area

• 29 Hz Cardium wells drilled year-to-date 2012

• Encouraging results on recent Buck Creek

horizontals

Page 23: ARC Resources - November 2012 Investor Presentation

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

Q1

20

06

Q2

20

06

Q3

20

06

Q4

20

06

Q1

20

07

Q2

20

07

Q3

20

07

Q4

20

07

Q1

20

08

Q2

20

08

Q3

20

08

Q4

20

08

Q1

20

09

Q2

20

09

Q3

20

09

Q4

20

09

Q1

20

10

Q2

20

10

Q3

20

10

Q4

20

10

Q1

20

11

Q2

20

11

Q3

20

11

Q4

20

11

Q1

20

12

Q2

20

12

Q3

20

12

Q4

20

12

Bo

e/d

Pembina ~19% Increase in Oil & Liquids Production since 2006

gas

oil & liquids

Q1 2006 - 6,900 boe/doil and liquids

Q3 2012 - 8,200 boe/doil and liquids

PEMBINA OIL AND LIQUIDS GROWTH

ARC HAS GROWN LIQUIDS PRODUCTION IN THIS MATURE FIELD

Fo

rec

as

t

Page 24: ARC Resources - November 2012 Investor Presentation

• All economics run at FLAT price forecasts.

• Condensate 4 bbls/MMcf, Propane 20 bbls/MMcf, Butane 15 bbls/MMcf, GOR 1400 scf/bbl.

• Assumes two month lag from capital spent to production date, and on-lease tie-in well.

Type Curve

IP (1mo) boe/d 237

IP (12mo) boe/d 94

EUR mboe 167

Capital Costs ($k)

Drilling & Completion 2,000

Equip & Tie-In 300

Total 2,300

Type Curve

F&D ($/boe) 13.77 Economics - Type Curve at C$85/bbl

$4/GJ $3/GJ $2/GJ

IRR (% AT) 55% 53% 50%

Recycle Ratio 3.61 3.54 3.47

PEMBINA – HORIZONTAL WELLS DEVELOPMENT ECONOMICS

Page 25: ARC Resources - November 2012 Investor Presentation

PEMBINA 2013 BUDGET – $131MM

Base Decline ~23% Base Decline ~23%

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

2013 Budget - Volumes (BOED) Operated and Non-Operated

PO DEV OPT

• Drill 54 gross operated wells throughout the Pembina area.

• Grow operated production to >10,000 boed and total production to over ~12,000 boed.

• Continue to optimize waterfloods throughout the area by spending $10 MM on drilling water

injection wells, converting wells producers to injectors and injection stimulations.

• Test slick water completion technology to limit frac growth.

Base Decline ~23%

Page 26: ARC Resources - November 2012 Investor Presentation

A Montney

Oil Success Story Ante Creek

Page 27: ARC Resources - November 2012 Investor Presentation

ANTE CREEK ASSET DETAILS

Net production (boe/d) – Q3 2012 10,500

Liquids (bbls/d) 5,400

Gas (mmcf/d) 31

Production split % (liquids/gas) ~50/50

Land (Montney net sections) 263

Working Interest ~99%

Reserves (2P mmboe) 47.2

Liquids (mmbbls) 20.2

Gas (bcf) 162

Reserve Life Index 18.2

2012 Plans/Accomplishments

• 30 mmcf/d gas plant commissioned in late February,

alleviating capacity constraints

• Growth in oil and liquids production in 2012

• Production to increase through 2013 as we “drill to fill”

new gas plant

Page 28: ARC Resources - November 2012 Investor Presentation

0

2,000

4,000

6,000

8,000

10,000

12,000

Q1

20

05

Q2

20

05

Q3

20

05

Q4

20

05

Q1

20

06

Q2

20

06

Q3

20

06

Q4

20

06

Q1

20

07

Q2

20

07

Q3

20

07

Q4

20

07

Q1

20

08

Q2

20

08

Q3

20

08

Q4

20

08

Q1

20

09

Q2

20

09

Q3

20

09

Q4

20

09

Q1

20

10

Q2

20

10

Q3

20

10

Q4

20

10

Q1

20

11

Q2

20

11

Q3

20

11

Q4

20

11

Q1

20

12

Q2

20

12

Q3

20

12

Q4

20

12

Bo

e/d

Ante Creek > 45% Increase in Liquids Production during 2012

gas

oil & liquids

ANTE CREEK GROWING OIL AND LIQUIDS

>45% growth in Q4 2012 liquids

production relative to Q4 2011

Fo

rec

as

t

EXPANDED CAPACITY WILL FACILITATE GROWTH IN 2012/2013

Page 29: ARC Resources - November 2012 Investor Presentation

0

50

100

150

200

250

300

350

400

450

0 3 6 9 12 15 18 21 24 27 30 33 36

Pro

du

cti

on

Rate

(B

OE

/d)

Months

Type Curve

Capital Costs ($K)

Drilling & Completions 3,600

Equip & Tie-In 400

Total 4,000

• All economics run at FLAT price forecasts

Type Curve

IP (1mo) boe/d 385

IP (12mo) boe/d 235

EUR mboe 265

F&D ($/boe) 15 Economics - Type Curve at C$85/bbl

$4/GJ $3/GJ $2/GJ

IRR (% AT) 45% 35% 25%

Recycle Ratio 2.2 2.0 1.8

ANTE CREEK DEVELOPMENT ECONOMICS

Page 30: ARC Resources - November 2012 Investor Presentation

ANTE CREEK 2013 BUDGET – $186MM OPERATED

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

16,000

2013 Budget - Volumes (BOED) Operated

PO DEV OPT

• Drill 34 wells and grow production to 15,000 boed by the end of 2013.

• Drill 4 step-out wells to hold land (expiries) and prove up undeveloped land base.

Base Decline ~28%

Page 31: ARC Resources - November 2012 Investor Presentation

British Columbia

Montney Gas

and Liquids

Page 32: ARC Resources - November 2012 Investor Presentation

We engaged GLJ to provide a resources evaluation of our properties at Dawson, Parkland, Tower, Sunrise/Sunset, Attachie, Septimus, Sundown and

Blueberry located in northeastern British Columbia and at Pouce Coupe located in northwestern Alberta (collectively, the "Evaluated Areas" or "NE BC

Montney"). The evaluation procedures employed by GLJ are in compliance with standards contained in the Canadian Oil and Gas Evaluation Handbook

("COGE Handbook") and the evaluation is based on GLJ's January 1, 2012 pricing

The estimates of Economic Contingent Resources (or ECR), DPIIP, TPIIP, UPIIP and Prospective Resources should not be confused with reserves and

readers should review the definitions and notes set forth at the end of this presentation. Actual natural gas resources may be greater than or less than

the estimates provided herein.

There is no certainty that it will be commercially viable to produce any of the resources that are categorized as discovered resources. There is no

certainty that any portion of ARC's resources that have been categorized as undiscovered resources will be discovered. Furthermore, if discovered, there

is no certainty that it will be commercially viable to produce any portion of such undiscovered resources. Unless indicated otherwise in this presentation,

all references to ECR volumes are Best Estimate ECR volumes.

Continuous development through multi-year exploration and development programs and significant levels of future capital expenditures are required in

order for additional resources to be recovered in the future. The principal risks that would inhibit the recovery of additional reserves relate to the potential

for variations in the quality of the Montney formation where minimal well data currently exists, access to the capital which would be required to develop

the resources, low gas prices that would curtail the economics of development and the future performance of wells, regulatory approvals, access to the

required services at the appropriate cost, and the effectiveness of fraccing technology and applications. The contingencies that prevent the ECR from

being classified as reserves are due to the early evaluation stage of these potential development opportunities. Additional drilling, completion, and test

results are required before these contingent resources are converted to reserves and a larger component of DPIIP is converted to ECR.

Projects have not been defined to develop the resources in the Evaluated Areas as at the evaluation date. Such projects, in the case of the Montney

resource development, have historically been developed sequentially over a number of drilling seasons and are subject to annual budget constraints,

ARC's policy of orderly development on a staged basis, the timing of the growth of third party infrastructure, the short and long-term view of ARC on gas

prices, the results of exploration and development activities of ARC and others in the area and possible infrastructure capacity constraints.

See “Definitions of Oil and Gas Reserves and Resources” in this presentation.

NE B.C. MONTNEY VAST RESOURCE BASE

Page 33: ARC Resources - November 2012 Investor Presentation

MONTNEY LANDS WORLD CLASS RESOURCE

• NE BC Montney lands are a major

growth engine.

• Significant opportunity to grow

liquids production.

• Total BC Montney production of 240

mmcf/d with Dawson contributing

approximately 160 mmcf/d.

• New, 60 mmcf/d gas plant with 130

bbls/mmcf of liquids handling

capacity planned for Parkland/Tower

in early 2014.

• Ideally positioned with access to

west coast and other Alberta

markets.

Blueberry

Page 34: ARC Resources - November 2012 Investor Presentation

• Very early stage in reserve booking cycle:

• 2P Reserves (1.9 Tcf) plus Cum Prod only 5.3% of TPIIP at 3%

cut-off (4.2% at 0% cut-off).

• Best Estimate ECR estimated to be 4.1 Tcf resulting in total

recovery including 2P reserves and Cum Prod to date of only

15.7% of TPIIP at 3% cut-off (12.3% at 0% cut-off).

• ARC estimates the 2P Reserves plus ECR (6.0 Tcf) can support a

peak production rate of 800 mmcf/d for 10 years.

• Estimated Prospective Resources of 4.0 Tcf (“Best Estimate”) results

in a total potential recovery factor of ~20% - 25% of the TPIIP.

Recovery factors at that level could support a peak production rate of

>1.3 Bcf/d for 10 years.

NE B.C. MONTNEY RESERVES AND RESOURCES

Page 35: ARC Resources - November 2012 Investor Presentation

ARC RESOURCES MONTNEY GAS WELLS EXCEEDING EXPECTATIONS

ARC’S MONTNEY GAS WELLS HAVE THE BEST INITIAL PRODUCTIVITY

Page 36: ARC Resources - November 2012 Investor Presentation

Liquids

Rich Gas Parkland/Tower

Page 37: ARC Resources - November 2012 Investor Presentation

PARKLAND/TOWER EVALUATING POTENTIAL AND DEVELOPING

EXISTING LANDS

2012 Plans/Accomplishments

• 11 wells drilled at Tower since late 2011

• 8 wells now tied-in at Tower, with restricted production rates as result of liquids handling facility limitations

• Application submitted to construct two 60 mmcf/d gas plants with 130 bbls/mmcf liquids handling capacity.

Pending approval, will commence construction in 2013 with commissioning of the first phase in early 2014.

Parkland Tower

Net production (boe/d) 7,200 800

Liquids (bbls/d) 930 500

Gas (mmcf/d) 39 1.7

Land (net sections) 23 56

Working Interest ~84% ~90%

Reserves (2P mmboe) 49.7 4.5

Liquids (mmbbls) 8.4 1.4

Gas (bcf) 247.0 19.2

Reserve Life Index 16 37 Parkland

Tower

Page 38: ARC Resources - November 2012 Investor Presentation

Up

per

San

ds

Lo

wer

San

ds

MA

5

8-25-79-15W6

• At Parkland, the Upper Montney is considerably thicker than at Dawson. We believe the

lower-most sands are not contributing to production – a horizontal well has been drilled into

these lower sands to test this theory.

No communication

between upper and

lower sands to date

Lower sand and

upper sand 1

month

production are

similar

PARKLAND CAN A SINGLE WELL DRAIN THE FULL

VERTICAL SECTION?

Page 39: ARC Resources - November 2012 Investor Presentation

0

1,000

2,000

3,000

4,000

5,000

6,000

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36

Gas R

ate

mcf/

d

Months

Type Curve

• All economics run at FLAT price forecasts.

• Condensate 10 bbls/MMcf, Propane 6 bbls/MMcf, Butane 7 bbls/MMcf.

• Royalties noted (24%) based on approximate subsequent year royalty rate after.

$850 M credit is drawn down.

• Assumes one month lag from initial capital spent to production date.

Type Curve

IP (1mo) MMcf/d 5.0

IP (12mo) MMcf/d 2.6

EUR Bcf 4.8

Capital Costs ($k)

Drilling & Completion 4,200

Equip & Tie-In 500

Total 4,700

F&D ($/boe) 5.5 Economics - Type Curve at C$85/bbl

$4/GJ $3/GJ $2/GJ

IRR (% AT) 65% 40% 15%

Recycle Ratio 3.6 2.8 1.8

PARKLAND DEVELOPMENT ECONOMICS

Page 40: ARC Resources - November 2012 Investor Presentation

TOWER/PARKLAND 2013 BUDGET – $249MM OPERATED

2014 base

production, does not include 2014 CAPEX program

0

5,000

10,000

15,000

20,000

25,000

2013 Budget - Volumes (BOED) Operated

PO DEV OPT

Base Decline ~21%

• Drill 24 horizontal wells.

• Construct the oil handling, gas processing and pipeline infrastructure with a planned start-up in

early 2014

• Significant capital being spent in 2013 with volumes coming on-stream in 2014.

Page 41: ARC Resources - November 2012 Investor Presentation

Dawson

Page 42: ARC Resources - November 2012 Investor Presentation

DAWSON ASSET DETAILS

Net production (boe/d) – YTD 2012 25,300

Liquids (bbls/d) 700

Gas (mmcf/d) 160

Production split % (liquids/gas) ~97% gas

Land (Montney net sections) 130

Working Interest ~96%

Reserves (2P mmboe) 174

Liquids (mmbbls) 5.0

Gas (bcf) 1,012

Reserve Life Index 16.8

2012 Plans/Accomplishments

• Inventory of completed gas wells to be tied-in

throughout remainder of 2012 and into 2013

• Maintain 2012 production flat at 165 mmcf/d

120 mmcf/d

Gas Plant

45 mmcf/d

Compressor

Station

Page 43: ARC Resources - November 2012 Investor Presentation

0

1,000

2,000

3,000

4,000

5,000

6,000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Gas R

ate

(M

cf/

d)

Months

• All economics run at FLAT price forecasts.

• Condensate 3.5 bbls/MMcf , Butane 0.6 bbls/MMcf and Propane 0.4 bbls/MMcf .

• Deep drill royalty credit ~1$MM applied to all cases.

Type Curve

IP (1mo) MMcf/d 5.0

IP (12mo) MMcf/d 4.2

EUR (Bcf) 6.2

Capital $k

Drilling & Completion 4,600

Tie-In 500

Total 5,100

Type Curve

F&D ($/boe) 5.1 Economics - Type Curve at C$85/bbl

$4/GJ $3/GJ $2/GJ

IRR (% AT) 80% 40% 5%

Recycle Ratio 3.2 2.3 1.1

DAWSON DEVELOPMENT ECONOMICS

Page 44: ARC Resources - November 2012 Investor Presentation

DAWSON 2013 BUDGET – $52MM OPERATED

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

2013 Budget - Volumes (BOED) Operated

PO DEV

• Dawson is a world-class asset that continues to exceed expectations.

• Drill 9 horizontal Montney wells, on two pads, add compression to 1-34 compressor station

and optimize gas plant.

Base Decline ~28%

Page 45: ARC Resources - November 2012 Investor Presentation

Sunrise/Sunset/Sundown

Page 46: ARC Resources - November 2012 Investor Presentation

SUNRISE/SUNSET/SUNDOWN ASSET DETAILS

Net production (boe/d) – Q3 2012 2,700

Production split % (liquids/gas) 100% gas

Land (Montney net sections) 52

Working Interest ~76%

Reserves (2P mmboe) 82.8

Liquids (mmbbls) 2.3

Gas (bcf) 483

Reserve Life Index 54.7

Attachie

Tower

Parkland

Septimus

Sunset

Sunrise

Sundown

Dawson

ARC <100%

ARC 100%

2013 Plans

• Sunrise well performance has exceeded

expectations and no additional drilling is

required to hold production flat.

• We currently have regulatory approval for a

120 mmcfd gas processing facility.

Page 47: ARC Resources - November 2012 Investor Presentation

• Producing Formation:

– Montney

– Gross thickness = 325m

– Net pay = 160m

– Porosity = 6%

– Permeability = 0.01 – 0.1 mD

(Upper Montney)

(Middle Montney)

(Lower Montney)

SUNRISE RESERVOIR DESCRIPTION

Page 48: ARC Resources - November 2012 Investor Presentation

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

2 4 6 8 10 12 14 16 18 20 22 24

Ga

s R

ate

mc

f/d

Months

Type Curve

• All economics run at FLAT price forecasts.

• Assumes development is done with 8 wells per pad.

• Condensate 1 bbls/MMcf, Propane 3 bbls/MMcf, Butane 1 bbls/MMcf.

• Royalties noted (24%) based on approximate subsequent year royalty rate after $1,250k credit is drawn down.

• Assumes one month lag from capital spent to production date, and on-lease tie-in well.

Capital Costs ($k)

Drilling & Completion 5,600

Equip & Tie-In 400

Total 6,000

Type Curve

IP (1mo) MMcf/d 6.0

IP (12mo) Mcf/d 2.8

EUR Bcf 7.0

F&D ($/boe) 5.25 Economics - Type Curve at C$85/bbl

$4/GJ $3/GJ $2/GJ

IRR (% AT) 50% 30% 10%

Recycle Ratio 3.3 2.6 1.6

SUNRISE/SUNSET DEVELOPMENT ECONOMICS

Page 49: ARC Resources - November 2012 Investor Presentation

Summary

Page 50: ARC Resources - November 2012 Investor Presentation

• ARC is a top-tier oil and natural gas producer focused on “Risk Managed Value Creation”

• Extensive land position in top quality resource plays provides significant growth opportunity.

• Significant near-term oil and liquids growth opportunities

• Significant long-term natural gas growth opportunity in B.C. Montney

• Diverse inventory of high quality oil, liquids-rich gas and natural gas development

opportunities provides optionality through commodity price cycles

• History of proven performance

• Grown absolute production from 9,500 boe/d to ~93,000 boe/d to date

• Grown P+P reserves from 47 mmboe to 572 mmboe to date

• Progressive approach of applying new technologies to “unlock” value

• Proven track record of “Operational Excellence” in both cost management and safety

• Solid balance sheet with protective hedging program

• Experienced management team with track record of delivering results

WHY INVEST IN ARC RESOURCES

Page 51: ARC Resources - November 2012 Investor Presentation

Forecast Forecast -

20,000

40,000

60,000

80,000

100,000

Pro

du

ctio

n (

Bo

e/d

)

Production Growth - Montney and Non-Montney

Montney Gas (boe/d)

Montney Oil/Liquids (bbls/d)

Non-Montney Gas (boe/d)

Non-Montney Liquids (boe/d)

Total Non-Montney production

Fo

recast

PRODUCTION GROWTH

Page 52: ARC Resources - November 2012 Investor Presentation

Appendix

Page 53: ARC Resources - November 2012 Investor Presentation

Debt raised from three different sources:

1. Bank Credit Facility - $1.9 billion plus $25 million overdraft facility, 12 banks under

facility

• $nil drawn under credit facility as at September 30, 2012

• The credit facility was extended to August 3, 2016

• Pre-approval for an additional $250 million (Accordion)

2. Long-term notes

• Private Placement market

• Currently have US$631MM and CDN$63MM drawn (Q3 2012)

3. Prudential Master Shelf

• Direct long-term relationship with major insurance company

• Currently have US$106.3 MM drawn out of capacity of US$225MM (Q3 2012)

• Term extended to April 14, 2015

ACCESS TO CAPITAL DEBT

Page 54: ARC Resources - November 2012 Investor Presentation

• ARC’s long-term notes are structured so that they mature over a number of years; this

reduces refinancing risk

• ARC’s undrawn credit facility of $1.2 billion (after debt and equity proceeds) allows for

significant flexibility to repay debt

DEBT MATURITIES SPREAD OVER TIME

0

20

40

60

80

100

120

2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024

C$

Mill

ion

s

Long-term Principal Note Repayment Schedule

Page 55: ARC Resources - November 2012 Investor Presentation

Summary of Hedge Positions as at November 7, 2012 (1)

Nov – Dec 2012 2013 2014 2015 - 2017

Crude Oil – WTI (2):

(US$/bbl) US$/bbl bbl/d US$/bbl bbl/d US$/bbl bbl/d US$/bbl bbl/d

Ceiling $ 91.11 18,000 $ 104.01 14,992 - - - -

Floor $ 90.00 18,000 $ 95.01 14,992 - - - -

Sold Floor $ 63.44 16,000 $ 64.17 11,984 - - - -

Crude Oil Floors as % of 2012

Guidance (3) 55% 43% -

Natural Gas – Nymex (3): US$/mmbtu mmbtu/d US$/mmbtu mmbtu/d US$/mmbtu mmbtu/d US$/mmbtu mmbtu/d

Ceiling

$ 3.48

175,000 3.93 157,041 $ 4.83 90,000 $ 5.00 60,000

Floor

$ 3.48

175,000 3.39 157,041 $ 4.00 90,000 $ 4.00 60,000

Natural Gas Floors as % of 2012

Guidance (3) 50% 46% 26% 17%

Total Floors as % of 2012 Guidance (3) 51% 43% 16% 11%

HEDGE POSITIONS AS OF NOVEMBER 7, 2012

(1) The prices and volumes noted above represent averages for several contracts representing different periods and the average price for the portfolio of options listed above does not

have the same payoff profile as the individual option contracts. Viewing the average price of a group of options is purely for indicative purposes.

(2) For 2012 and 2013, all floor positions settle against the monthly average WTI price, providing protection against monthly volatility. Positions establishing the “Ceiling” have been sold

against either the monthly average or the annual average WTI price. In the case of settlements on annual positions, ARC will only have a negative settlement if prices average

above the strike price for an entire year, providing ARC with greater potential upside price participation for individual months.

(3) Based on 2012 guidance of 92,500 boe/d for 2012 hedge positions and based on 2013 guidance midpoint of 95,000 boe/d for 2013, 2014 and 2015-2017 hedge positions. Crude

oil floors as a % of production are based on guidance volumes for crude oil and condensate production for the respective period.

Page 56: ARC Resources - November 2012 Investor Presentation

The discussion in this presentation in respect of reserves and resources is subject to a number of cautionary statements,

assumptions and risks as set forth below and elsewhere in this presentation. See also the definitions of oil and gas reserves

and resources found at the end of this presentation.

The reserves data set forth in this presentation is based upon an evaluation by GLJ Petroleum Consultants Ltd. ("GLJ") with

an effective date of December 31, 2011 using forecast prices and costs. The reserves evaluation was prepared in

accordance with National Instrument 51-101 ("NI 51-101"). Crude oil, natural gas and natural gas liquids benchmark

reference pricing, as at December 31, 2011, inflation and exchange rates used in the evaluation are based on GLJ's

January 1, 2012 pricing. Reserves included herein are stated on a company gross basis (working interest before deduction

of royalties without including any royalty interests) unless noted otherwise.

There is no assurance that the forecast prices and costs assumptions will be attained and variances could be material. The

recovery and reserves estimates of crude oil, natural gas liquids and natural gas reserves provided herein are estimates only

and there is no guarantee that the estimated reserves will be recovered. Actual crude oil, natural gas and natural gas liquid

reserves may be greater than or less than the estimates provided herein.

See also ”NE B.C. Montney Vast Resource Base”, for further discussion regarding reserves and resources.

See “Definitions of Oil and Gas Reserves and Resources” in this presentation.

RESERVES AND RESOURCES

Page 57: ARC Resources - November 2012 Investor Presentation

0

100

200

300

400

500

600

700

mm

bo

e

Gas

Liquids

INTERNAL DEVELOPMENT

MONTNEY

19% CAGR

• Reserves as of December 31, 2011* (mmboe)

- Proved Producing 209 (98 mmboe liquids, 655 bcf gas)

- Total Proved 360 (123 mmboe liquids, 1,419 bcf gas)

- Proved Plus Probable 572 (170 mmboe liquids, 2,413 bcf gas)

Crude oil

24%

Natural

Gas70%

NGL's6%

36%

25%

37%

Probable Proved

Producing

Proved

Undeveloped

Proved

Non-Producing 2%

KEY RESERVE INFORMATION 19% COMPOUND ANNUAL GROWTH

Page 58: ARC Resources - November 2012 Investor Presentation

0%

100%

200%

300%

400%

500%

600%

700%

1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011

Acquisitions

Development

• Fourth consecutive year of greater than 200% reserve replacement through the drill bit

• Proved plus probable reserves increased 18% to 572 mmboe after divest of non-core assets with 14.6 mmboe of 2P reserves

385 PER CENT RESERVE REPLACEMENT IN 2011

Page 59: ARC Resources - November 2012 Investor Presentation

• An Independent Resources Evaluation conducted by GLJ effective December 31, 2011

estimates the TPIIP to be 39.6 Tcf using a 3% porosity cut-off and 50.4 Tcf using no cut-off

(comparable to US shale gas resource-in-place estimates).

• DPIIP estimated to be 21.2 Tcf (54% of TPIIP) using a 3% porosity cut-off and 25.5 Tcf

(51% of TPIIP) using no cut-off.

• ARC estimates $54 million of capital would be required to drill and test sufficient wells to

convert all of the TPIIP into DPIIP

• ARC’s long-term development plans are based upon the estimated TPIIP

• The amount of natural gas and NGL’s which is ultimately recovered from ARC’s NE B.C.

Montney resource will be primarily a function of the future price of both commodities

(1) The resource categories do not include free liquids or associated solution gas in the Tower field.

(2) All volumes in table are company gross and raw gas volumes.

Resource Categories (1) (2)

3% Porosity

Cut-Off (Tcf)

0% Porosity

Cut-Off (Tcf)

Total Petroleum Initially In Place (TPIIP) 39.6 50.4

Discovered Petroleum Initially In Place (DPIIP) 21.2 25.5

Undiscovered Petroleum Initially In Place (UPIIP) 18.4 24.9

NE B.C. MONTNEY RESOURCE POTENTIAL

Page 60: ARC Resources - November 2012 Investor Presentation

• GLJ’s Best Estimate of the ECR is 4.1 Tcf of gas and 101 Mmbbls

• Significant natural gas liquids (“NGL”) resource exists in the Montney in the Attachie,

Parkland, Septimus and Tower areas

• GLJ’s Best Estimate of the NGL ECR is 101 Mmbbls. In addition, GLJ’s Best Estimate of

Prospective NGL Resources is 98 Mmbbls

Reserves and Economic Contingent Resources (1)(5)(6)

Low

Estimate Best Estimate

High

Estimate

Natural Gas (Tcf)

Reserves (2) 1.0 1.9 2.4 (3)

Economic Contingent Resources 2.5 4.1 5.7

Natural Gas Liquids (mmbbls) (4)

Reserves 11.3 21.1 26.6 (3)

Economic Contingent Resources 64.2 101.0 133.9

Prospective Resources (1)(6)

Low

Estimate Best Estimate

High

Estimate

Natural gas (Tcf) 2.9 4.0 5.3

Natural gas liquids (mmbbls) (4) 69.0 98.0 131.2

(1) All DPIIP other than cumulative production, reserves, and ECR and all UPIIP other than Prospective Resources has been categorized as unrecoverable.

(2) For reserves, the volume under the heading Low Estimate are proved reserves, the volume under the heading Best Estimate are 2P reserves and the number under

the heading High Estimate are 2P plus possible reserves.

(3) This volume is an arithmetic sum of multiple estimates of reserves, which statistical principles indicate may be misleading as to volumes that may actually be

recovered. Readers should give attention to the estimates of individual classes of reserves and appreciate the differing probabilities associated with each class.

(4) The liquid yields are based on average yield over the producing life of the property.

(5) Cumulative production has been 0.2 Tcf on a raw basis.

(6) All volumes in table are company gross and sales volumes.

NE B.C. MONTNEY RESERVES AND RESOURCES

Page 61: ARC Resources - November 2012 Investor Presentation

(1) Graph represents peak calendar day IP rates for the first month of production to July 2012.

(2) Region includes all horizontal wells from NE BC and NW AB Montney.

MONTNEY HORIZONTAL WELLS 30 DAY HZ IP RATES GLACIER - TOWN

ARC’S DAWSON/PARKLAND WELLS HAVE EXCEEDED EXPECTATIONS

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

1 101 201 301 401 501 601 701 801 901 1001

Pro

du

cti

on

Ra

te (

mc

f/d

)

ARC Others

Other Wells P50

3.3 Mmcf/d

ARC P50

5.2 Mmcf/d

Page 62: ARC Resources - November 2012 Investor Presentation

• Prospective land base of

117 sections

• ARC has drilled four Hz wells to date:

• The 4-20 well tested at 10.7 mmcfd

and 350 bbls per day of free liquids

with 1,300 psia flowing pressure

• Tied in two wells to the 4-9 battery

and brought production on-stream

late in Q2

• Interpreted a 3D seismic program

over 300 square kilometers in the first

half of 2012

ATTACHIE NEW OPPORTUNITY UNDEFINED POTENTIAL

Page 63: ARC Resources - November 2012 Investor Presentation

Forecast

Reserves are estimated remaining quantities of oil and natural gas and related substances anticipated to be recoverable from known

accumulations, as of a given date, based on the analysis of drilling, geological, geophysical and engineering data; the use of established

technology; and specified economic conditions, which are generally accepted as being reasonable. reserves are classified according to the

degree of certainty associated with the estimates as follows:

Proved Reserves are those reserves that can be estimated with a high degree of certainty to be recoverable. It is likely that the actual

remaining quantities recovered will exceed the estimated proved reserves.

Probable Reserves are those additional reserves that are less certain to be recovered than proved reserves. It is equally likely that the

actual remaining quantities recovered will be greater or less than the sum of the estimated proved plus probable reserves.

Possible Reserves are those additional reserves that are less certain to be recovered than probable reserves. It is unlikely that the

actual remaining quantities recovered will exceed the sum of the estimated proved plus probable plus possible reserves.

Resources encompasses all petroleum quantities that originally existed on or within the earth’s crust in naturally occurring accumulations,

including Discovered and Undiscovered (recoverable and unrecoverable) plus quantities already produced. “Total resources” is equivalent

to “Total Petroleum Initially-In-Place”. Resources are classified in the following categories:

Total Petroleum Initially-In-Place (“TPIIP”) is that quantity of petroleum that is estimated to exist originally in naturally occurring

accumulations. It includes that quantity of petroleum that is estimated, as of a given date, to be contained in known accumulations,

prior to production, plus those estimated quantities in accumulations yet to be discovered.

Discovered Petroleum Initially-In-Place (“DPIIP”) is that quantity of petroleum that is estimated, as of a given date, to be contained in

known accumulations prior to production. The recoverable portion of discovered petroleum initially in place includes production,

reserves, and contingent resources; the remainder is unrecoverable.

Contingent Resources are those quantities of petroleum estimated, as of a given date, to be potentially recoverable from known

accumulations using established technology or technology under development but which are not currently considered to be

commercially recoverable due to one or more contingencies.

DEFINITIONS OF OIL AND GAS

RESERVES AND RESOURCES

Page 64: ARC Resources - November 2012 Investor Presentation

Forecast

Economic Contingent Resources are those contingent resources which are currently economically recoverable.

Undiscovered Petroleum Initially-In-Place (“UPIIP”) is that quantity of petroleum that is estimated, on a given date, to be contained

in accumulations yet to be discovered. The recoverable portion of undiscovered petroleum initially in place is referred to as

“prospective resources” and the remainder as “unrecoverable.”

Prospective Resources are those quantities of petroleum estimated, as of a given date, to be potentially recoverable from

undiscovered accumulations by application of future development projects.

Unrecoverable is that portion of DPIIP and UPIIP quantities which is estimated, as of a given date, not to be recoverable by future

development projects. A portion of these quantities may become recoverable in the future as commercial circumstances change or

technological developments occur; the remaining portion may never be recovered due to the physical/chemical constraints represented

by subsurface interaction of fluids and reservoir rocks.

Uncertainty Ranges are described by the Canadian Oil and Gas Evaluation Handbook as low, best, and high estimates for reserves and

resources as follows:

Low Estimate: This is considered to be a conservative estimate of the quantity that will actually be recovered. It is likely that the actual

remaining quantities recovered will exceed the low estimate. If probabilistic methods are used, there should be at least a 90 percent

probability (P90) that the quantities actually recovered will equal or exceed the low estimate.

Best Estimate: This is considered to be the best estimate of the quantity that will actually be recovered. It is equally likely that the

actual remaining quantities recovered will be greater or less than the best estimate. If probabilistic methods are used, there should be

at least a 50 percent probability (P50) that the quantities actually recovered will equal or exceed the best

estimate.

High Estimate: This is considered to be an optimistic estimate of the quantity that will actually be recovered. It is unlikely that the

actual remaining quantities recovered will exceed the high estimate. If probabilistic methods are used, there should be at least a 10

percent probability (P10) that the quantities actually recovered will equal or exceed the high estimate.

DEFINITIONS OF OIL AND GAS

RESERVES AND RESOURCES

Page 65: ARC Resources - November 2012 Investor Presentation

This presentation contains forward-looking statements that may be identified by words like

“outlook”, “estimates” and similar expressions. These forward-looking statements are based on

certain assumptions that involve a number of risks and uncertainties and are not guarantees of

future performance. Reference is made to the November 2, 2011 news release titled “ARC

Resources Ltd. Announces A $760 Million Capital Budget For 2012, Which includes a Twelve Per

Cent Production Growth Target”, the January 26, 2012 release titled “ARC Resources Ltd.

Announces 18 per cent increase in year-end Reserves and results of updated Independent

Resources Evaluation for Northeast British Columbia Montney Assets”; and the February 8, 2012

release titled “ARC Resources Ltd. reports Fourth Quarter 2011 Results” which may be found on

SEDAR at www.sedar.com and are incorporated by reference and outline a number of risks and

uncertainties associated with forward looking statements. Actual results could differ materially

as a result of changes to ARC’s plans, the impact of changes in commodity prices, general

economic, market and business conditions as well as production development and operating

performance and other risks associated with oil and gas operations.

For further information about ARC Resources please visit our website www.arcresources.com Or contact: Investor Relations E-mail: [email protected] T 403.503.8600 F 403.509.6417 Toll Free 1.888.272.4900 ARC Resources Ltd. 1200, 308 – 4 Avenue S.W. Calgary, AB T2P 0H7

For further information about ARC’s properties please

view our virtual field tour (in our operations section) at

www.arcresources.com