arc electrical engineering pte. ltd. 7030 ang mo kio...
TRANSCRIPT
![Page 1: ARC ELECTRICAL ENGINEERING PTE. LTD. 7030 ANG MO KIO …arceng.com.sg/wp-content/uploads/2018/10/PROFILE_ARC-ELECTRI… · - Transformer Testing, Commissioning and Maintenance. 7](https://reader031.vdocuments.us/reader031/viewer/2022040917/5e924b7d3874ad0f593ec401/html5/thumbnails/1.jpg)
ARC ELECTRICAL ENGINEERING PTE. LTD. 7030 ANG MO KIO AVE 5,
NORTH STAR BUILDING #06-27, SINGAPORE 569880
1
+65 6299 3800
+65 6299 5981
![Page 2: ARC ELECTRICAL ENGINEERING PTE. LTD. 7030 ANG MO KIO …arceng.com.sg/wp-content/uploads/2018/10/PROFILE_ARC-ELECTRI… · - Transformer Testing, Commissioning and Maintenance. 7](https://reader031.vdocuments.us/reader031/viewer/2022040917/5e924b7d3874ad0f593ec401/html5/thumbnails/2.jpg)
POWER SYSTEMS ENGINEERING
- CONTROL & RELAY PANELS (ANY CLASS)
SCADA SYSTEM
- PROTOCOL CONVERTORS
- GATEWAY/RTU PANELS
- HMI / CLIENTS
RELAY APPLICATION / TECHNICAL SUPPORT
2
![Page 3: ARC ELECTRICAL ENGINEERING PTE. LTD. 7030 ANG MO KIO …arceng.com.sg/wp-content/uploads/2018/10/PROFILE_ARC-ELECTRI… · - Transformer Testing, Commissioning and Maintenance. 7](https://reader031.vdocuments.us/reader031/viewer/2022040917/5e924b7d3874ad0f593ec401/html5/thumbnails/3.jpg)
SITE SUPPORT
- TESTING & COMMISSIONING
* PRIMARY EQUIPMENTS
* CONTROL & PROTN. PANELS
* LV / MV SWGR PANELS
* SCADA HMI & EMS
- MAINTENANCE WORKS
- RETROFIT WORKS
- ELECTRICAL BALANCE OF PLANT
3
![Page 4: ARC ELECTRICAL ENGINEERING PTE. LTD. 7030 ANG MO KIO …arceng.com.sg/wp-content/uploads/2018/10/PROFILE_ARC-ELECTRI… · - Transformer Testing, Commissioning and Maintenance. 7](https://reader031.vdocuments.us/reader031/viewer/2022040917/5e924b7d3874ad0f593ec401/html5/thumbnails/4.jpg)
END TO END SUPPORT
- FROM TENDERING TO COMMISSIONING
EQUIPMENTS WE HAVE
REFERENCES
OUR POLICY
SUMMARY & THANKS GIVING
4
![Page 5: ARC ELECTRICAL ENGINEERING PTE. LTD. 7030 ANG MO KIO …arceng.com.sg/wp-content/uploads/2018/10/PROFILE_ARC-ELECTRI… · - Transformer Testing, Commissioning and Maintenance. 7](https://reader031.vdocuments.us/reader031/viewer/2022040917/5e924b7d3874ad0f593ec401/html5/thumbnails/5.jpg)
5
- Transformer Testing, Commissioning and Maintenance
![Page 6: ARC ELECTRICAL ENGINEERING PTE. LTD. 7030 ANG MO KIO …arceng.com.sg/wp-content/uploads/2018/10/PROFILE_ARC-ELECTRI… · - Transformer Testing, Commissioning and Maintenance. 7](https://reader031.vdocuments.us/reader031/viewer/2022040917/5e924b7d3874ad0f593ec401/html5/thumbnails/6.jpg)
6
- Transformer Testing, Commissioning and Maintenance
![Page 7: ARC ELECTRICAL ENGINEERING PTE. LTD. 7030 ANG MO KIO …arceng.com.sg/wp-content/uploads/2018/10/PROFILE_ARC-ELECTRI… · - Transformer Testing, Commissioning and Maintenance. 7](https://reader031.vdocuments.us/reader031/viewer/2022040917/5e924b7d3874ad0f593ec401/html5/thumbnails/7.jpg)
7
RTCC Panel with Paralleling Scheme
BDV Test
Polarization Index
Tan Delta. Ratio Checks, Winding
Resistance
Transformer Mechanical Protection
Like PRD, Buchholz, etc – Checks
(Alarm/Trip Test)
![Page 8: ARC ELECTRICAL ENGINEERING PTE. LTD. 7030 ANG MO KIO …arceng.com.sg/wp-content/uploads/2018/10/PROFILE_ARC-ELECTRI… · - Transformer Testing, Commissioning and Maintenance. 7](https://reader031.vdocuments.us/reader031/viewer/2022040917/5e924b7d3874ad0f593ec401/html5/thumbnails/8.jpg)
8
- LV/MV Panel Maintenance
![Page 9: ARC ELECTRICAL ENGINEERING PTE. LTD. 7030 ANG MO KIO …arceng.com.sg/wp-content/uploads/2018/10/PROFILE_ARC-ELECTRI… · - Transformer Testing, Commissioning and Maintenance. 7](https://reader031.vdocuments.us/reader031/viewer/2022040917/5e924b7d3874ad0f593ec401/html5/thumbnails/9.jpg)
9
- All Relay – Configuration, Testing and Commissioning
![Page 10: ARC ELECTRICAL ENGINEERING PTE. LTD. 7030 ANG MO KIO …arceng.com.sg/wp-content/uploads/2018/10/PROFILE_ARC-ELECTRI… · - Transformer Testing, Commissioning and Maintenance. 7](https://reader031.vdocuments.us/reader031/viewer/2022040917/5e924b7d3874ad0f593ec401/html5/thumbnails/10.jpg)
10
- All Control and Power Cables – Testing and Commissioning
![Page 11: ARC ELECTRICAL ENGINEERING PTE. LTD. 7030 ANG MO KIO …arceng.com.sg/wp-content/uploads/2018/10/PROFILE_ARC-ELECTRI… · - Transformer Testing, Commissioning and Maintenance. 7](https://reader031.vdocuments.us/reader031/viewer/2022040917/5e924b7d3874ad0f593ec401/html5/thumbnails/11.jpg)
11
- All Control and Relay – Testing and Commissioning
- Thermal Scanning
![Page 12: ARC ELECTRICAL ENGINEERING PTE. LTD. 7030 ANG MO KIO …arceng.com.sg/wp-content/uploads/2018/10/PROFILE_ARC-ELECTRI… · - Transformer Testing, Commissioning and Maintenance. 7](https://reader031.vdocuments.us/reader031/viewer/2022040917/5e924b7d3874ad0f593ec401/html5/thumbnails/12.jpg)
12
![Page 13: ARC ELECTRICAL ENGINEERING PTE. LTD. 7030 ANG MO KIO …arceng.com.sg/wp-content/uploads/2018/10/PROFILE_ARC-ELECTRI… · - Transformer Testing, Commissioning and Maintenance. 7](https://reader031.vdocuments.us/reader031/viewer/2022040917/5e924b7d3874ad0f593ec401/html5/thumbnails/13.jpg)
13
Battery Racks / Battery Installation, Load Test and Commissioning
![Page 14: ARC ELECTRICAL ENGINEERING PTE. LTD. 7030 ANG MO KIO …arceng.com.sg/wp-content/uploads/2018/10/PROFILE_ARC-ELECTRI… · - Transformer Testing, Commissioning and Maintenance. 7](https://reader031.vdocuments.us/reader031/viewer/2022040917/5e924b7d3874ad0f593ec401/html5/thumbnails/14.jpg)
CONTROL & RELAY PANELS (ANY CLASS)
14
![Page 15: ARC ELECTRICAL ENGINEERING PTE. LTD. 7030 ANG MO KIO …arceng.com.sg/wp-content/uploads/2018/10/PROFILE_ARC-ELECTRI… · - Transformer Testing, Commissioning and Maintenance. 7](https://reader031.vdocuments.us/reader031/viewer/2022040917/5e924b7d3874ad0f593ec401/html5/thumbnails/15.jpg)
LV / MV SWGR PANELS
15
![Page 16: ARC ELECTRICAL ENGINEERING PTE. LTD. 7030 ANG MO KIO …arceng.com.sg/wp-content/uploads/2018/10/PROFILE_ARC-ELECTRI… · - Transformer Testing, Commissioning and Maintenance. 7](https://reader031.vdocuments.us/reader031/viewer/2022040917/5e924b7d3874ad0f593ec401/html5/thumbnails/16.jpg)
16
![Page 17: ARC ELECTRICAL ENGINEERING PTE. LTD. 7030 ANG MO KIO …arceng.com.sg/wp-content/uploads/2018/10/PROFILE_ARC-ELECTRI… · - Transformer Testing, Commissioning and Maintenance. 7](https://reader031.vdocuments.us/reader031/viewer/2022040917/5e924b7d3874ad0f593ec401/html5/thumbnails/17.jpg)
- IEC 61850 / HSR / PRP
- MODBUS / IEC 101 / IEC 104
17
![Page 18: ARC ELECTRICAL ENGINEERING PTE. LTD. 7030 ANG MO KIO …arceng.com.sg/wp-content/uploads/2018/10/PROFILE_ARC-ELECTRI… · - Transformer Testing, Commissioning and Maintenance. 7](https://reader031.vdocuments.us/reader031/viewer/2022040917/5e924b7d3874ad0f593ec401/html5/thumbnails/18.jpg)
- EMS
- PROTOCOL CONVERSION
- CLIENT / SERVER CONCEPTS
18
![Page 19: ARC ELECTRICAL ENGINEERING PTE. LTD. 7030 ANG MO KIO …arceng.com.sg/wp-content/uploads/2018/10/PROFILE_ARC-ELECTRI… · - Transformer Testing, Commissioning and Maintenance. 7](https://reader031.vdocuments.us/reader031/viewer/2022040917/5e924b7d3874ad0f593ec401/html5/thumbnails/19.jpg)
19
PRIMARY EQUIPMENTS
GIS Tests:• Breaker / Isolator / CT / VT / Contact Resistance / ES HV Test • Other Tests if specified Transformer Tests:• BDV / Polarization Index / Tan Delta / Ratio / Winding Resistance• Mech. Protections – PRD / Buchholz (Alarm/Trip Test)
![Page 20: ARC ELECTRICAL ENGINEERING PTE. LTD. 7030 ANG MO KIO …arceng.com.sg/wp-content/uploads/2018/10/PROFILE_ARC-ELECTRI… · - Transformer Testing, Commissioning and Maintenance. 7](https://reader031.vdocuments.us/reader031/viewer/2022040917/5e924b7d3874ad0f593ec401/html5/thumbnails/20.jpg)
20
CONTROL & PROTECTION PANELS
• Protection Schemes Logical Verifications
• Protection Relays Settings & Testing with Reputed Test Kits
• RTCC Panel with Paralleling Scheme
![Page 21: ARC ELECTRICAL ENGINEERING PTE. LTD. 7030 ANG MO KIO …arceng.com.sg/wp-content/uploads/2018/10/PROFILE_ARC-ELECTRI… · - Transformer Testing, Commissioning and Maintenance. 7](https://reader031.vdocuments.us/reader031/viewer/2022040917/5e924b7d3874ad0f593ec401/html5/thumbnails/21.jpg)
21
LV / MV SWITCHGEAR
• Protection Schemes Logical Verifications
• Protection Relays Settings & Testing with Reputed Test Kits
• CT / VT / CB & Instrument Testing
• AC DB / DC DB Testing
![Page 22: ARC ELECTRICAL ENGINEERING PTE. LTD. 7030 ANG MO KIO …arceng.com.sg/wp-content/uploads/2018/10/PROFILE_ARC-ELECTRI… · - Transformer Testing, Commissioning and Maintenance. 7](https://reader031.vdocuments.us/reader031/viewer/2022040917/5e924b7d3874ad0f593ec401/html5/thumbnails/22.jpg)
22
SCADA
• I / O Points Check
• Communication Checks using IED Scout / MOD Scan Tools
• E & I Systems
• IED to IED communications –GOOSE
• Network Topology Verification
![Page 23: ARC ELECTRICAL ENGINEERING PTE. LTD. 7030 ANG MO KIO …arceng.com.sg/wp-content/uploads/2018/10/PROFILE_ARC-ELECTRI… · - Transformer Testing, Commissioning and Maintenance. 7](https://reader031.vdocuments.us/reader031/viewer/2022040917/5e924b7d3874ad0f593ec401/html5/thumbnails/23.jpg)
23
• Transformer Oil BDV, OLTC/RTCC Checks
• Electric motors• Electric control equipment –
LCC/Remote Panel • Electrical protection equipment • Switchgear & Control equipment• Overall Interlocks/Control and
Protection after retrofit including method of statement procedure/RA – document preparation
• Protection Relay Replacement with SI test inclusive of it’s configuration
![Page 24: ARC ELECTRICAL ENGINEERING PTE. LTD. 7030 ANG MO KIO …arceng.com.sg/wp-content/uploads/2018/10/PROFILE_ARC-ELECTRI… · - Transformer Testing, Commissioning and Maintenance. 7](https://reader031.vdocuments.us/reader031/viewer/2022040917/5e924b7d3874ad0f593ec401/html5/thumbnails/24.jpg)
24
Cable Pulling
Cable Tray/Support
Cable Termination
IO Points Checks for total system
Cable Schedule
Cable Interface Drawings
Busduct – Installation, T & C
![Page 25: ARC ELECTRICAL ENGINEERING PTE. LTD. 7030 ANG MO KIO …arceng.com.sg/wp-content/uploads/2018/10/PROFILE_ARC-ELECTRI… · - Transformer Testing, Commissioning and Maintenance. 7](https://reader031.vdocuments.us/reader031/viewer/2022040917/5e924b7d3874ad0f593ec401/html5/thumbnails/25.jpg)
25
TM1600 – CB Timing Kit
CMC356 TRAX 280 – Transformer TestT2000 – CT and
3kV AC Dielectric
200A – CONTACT RESISTANCE METER
![Page 26: ARC ELECTRICAL ENGINEERING PTE. LTD. 7030 ANG MO KIO …arceng.com.sg/wp-content/uploads/2018/10/PROFILE_ARC-ELECTRI… · - Transformer Testing, Commissioning and Maintenance. 7](https://reader031.vdocuments.us/reader031/viewer/2022040917/5e924b7d3874ad0f593ec401/html5/thumbnails/26.jpg)
26
TAN DELTA – Transformer/Bushing/
Motor
LOAD BANK (RESISTIVE)
Schneider Electric - FFT
![Page 27: ARC ELECTRICAL ENGINEERING PTE. LTD. 7030 ANG MO KIO …arceng.com.sg/wp-content/uploads/2018/10/PROFILE_ARC-ELECTRI… · - Transformer Testing, Commissioning and Maintenance. 7](https://reader031.vdocuments.us/reader031/viewer/2022040917/5e924b7d3874ad0f593ec401/html5/thumbnails/27.jpg)
27
Transformer – Winding Resistance, TTR and SFRA Test Kit
![Page 28: ARC ELECTRICAL ENGINEERING PTE. LTD. 7030 ANG MO KIO …arceng.com.sg/wp-content/uploads/2018/10/PROFILE_ARC-ELECTRI… · - Transformer Testing, Commissioning and Maintenance. 7](https://reader031.vdocuments.us/reader031/viewer/2022040917/5e924b7d3874ad0f593ec401/html5/thumbnails/28.jpg)
284000A – PI KIT
MULTIMETERS
FLUKE 435 – PQ ANALYZER
THERMAL CAMERA
![Page 29: ARC ELECTRICAL ENGINEERING PTE. LTD. 7030 ANG MO KIO …arceng.com.sg/wp-content/uploads/2018/10/PROFILE_ARC-ELECTRI… · - Transformer Testing, Commissioning and Maintenance. 7](https://reader031.vdocuments.us/reader031/viewer/2022040917/5e924b7d3874ad0f593ec401/html5/thumbnails/29.jpg)
29
AC/DC HIPOT TEST SET 30KVA/150KV AC 210KV DC
60kV VLF Test Kit
![Page 30: ARC ELECTRICAL ENGINEERING PTE. LTD. 7030 ANG MO KIO …arceng.com.sg/wp-content/uploads/2018/10/PROFILE_ARC-ELECTRI… · - Transformer Testing, Commissioning and Maintenance. 7](https://reader031.vdocuments.us/reader031/viewer/2022040917/5e924b7d3874ad0f593ec401/html5/thumbnails/30.jpg)
30
GIS LCC, Control and Protection Panel – From Engineering to Commissioning
• BUSSBAR CORP, Philippines – 66kV/132kV AIS• 22kV GIS – Secondary Engineering for • Schneider Electric – Marina Bay Project @SPPG Project
Solar Installation : PUB,Choa Chu kang Water works through SolarGy pl, CW Group –Installation, Test and commissioning of Rooftop Solar System
Data Centre : KC2, Equinix through Wah Loon engineering pl (sub con), MICROSOFT,
GOOGLE through ABB : GLOBAL SWITCH (LV, MV PANELS, Annual Maintenance Contract)
![Page 31: ARC ELECTRICAL ENGINEERING PTE. LTD. 7030 ANG MO KIO …arceng.com.sg/wp-content/uploads/2018/10/PROFILE_ARC-ELECTRI… · - Transformer Testing, Commissioning and Maintenance. 7](https://reader031.vdocuments.us/reader031/viewer/2022040917/5e924b7d3874ad0f593ec401/html5/thumbnails/31.jpg)
31
Oil and Gas : SLNG through SC & T (2 Part – 1 through Alstom Grid and other for Euroasiatec – GT side (11/22/6.6kV)
: Keppel Shipyard – Heat Trace installation work for Saksi, Mondo vessels through Supermec
: ROCKWELL AUTOMATION – LV/MV PANELS
: Ex PROOF PANELS – NUOVA ASP
Construction : e-BoP for PUB Plant through HSL Pte Ltd
Power Plants : KMCC2/Banyan/TMUC/HYFLUX through ALSTOM
KMC 1 – Plant Maintenance (GSUT/UAT)
Hyflux – WTE Plant (66kV GIS/GSUT/UAT)
![Page 32: ARC ELECTRICAL ENGINEERING PTE. LTD. 7030 ANG MO KIO …arceng.com.sg/wp-content/uploads/2018/10/PROFILE_ARC-ELECTRI… · - Transformer Testing, Commissioning and Maintenance. 7](https://reader031.vdocuments.us/reader031/viewer/2022040917/5e924b7d3874ad0f593ec401/html5/thumbnails/32.jpg)
32
Our policy is to identify the needs of our customersand satisfy them by our quality products andservices delivered on time, in conformance withtheir requirements.
![Page 33: ARC ELECTRICAL ENGINEERING PTE. LTD. 7030 ANG MO KIO …arceng.com.sg/wp-content/uploads/2018/10/PROFILE_ARC-ELECTRI… · - Transformer Testing, Commissioning and Maintenance. 7](https://reader031.vdocuments.us/reader031/viewer/2022040917/5e924b7d3874ad0f593ec401/html5/thumbnails/33.jpg)
33
We render the following services : Overseas Capabilities▪ Pre Commissioning Tests on
➢ Power Transformers up to 500MVA➢ GIS Substations➢ Control & Protection System/Relays➢ MV/LV Switchgears
▪ Power Plant commissioning▪ OHL commissioning▪ Supervision / Coordination of substation commissioning
activities▪ Trouble shooting / Fault Analysis▪ Protocol Interface / ICD, CID file Creation and Verification
of Logic Files (FUPLA, CAP505, PCM600 and PSL) Micom Agile, Studio1 and DIGSY, etc)