ara energy process engineering

34
ARA ENERGY PROCESS ENGINEERING Izmir yolu, Beşevler Mah. No:274 16110 Nilüfer / Bursa Web: www.araenerji.com E-mail: [email protected]

Upload: others

Post on 02-Oct-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

ARA ENERGY PROCESS ENGINEERINGIzmir yolu, Beşevler Mah. No:274 16110 Nilüfer / Bursa

Web: www.araenerji.comE-mail: [email protected]

2

ProjectManager

Archive Secretary

WorkshopEngineers

A Class JobSecurity

SpecialistQC Manager Site Manager

HSE Engineer QC EngineerTechnicalOffice Chief Erection Chief

HSE Inspectors QC Inspectors PlanningErectionEngineers

TransportationChief

DrawingTecnician

Progress ReportEngineer

AdministrationChief

MaterialRecival &

Warehouse

LocalPurchasing

Ara EnergySite Organisation

Opportunities multiply as they are seized. —Sun Tzu

4

Strategic PartnershipsPursuing partnerships for mutual development

Strategic business relationships around the world mean more opportunities for growth and diversification. We are partnering with leading companies from around the world to strengthen our downstream integration and achieve greater

sustainable competitive advantage from exploration, production and marketing.When deciding to do business and choosing business partners, we have 3 essential principles,

Reliability, business enthusiasm, and professionalism.

We believe that our partners also choose us for exactly these reasons. Our strength comes from our faith in one another.

OUR PEOPLEQualified for Perfection

REFERANCES

1 - REFINERY WORKS

For the combined cycle power plant with 890 MW

electricity generation capacity in Kırıkkale, which was

constructed by Dema Makina, a turnkey project of 5 tanks,

three of which were 2000 m3, two 450 m3 and one 110 m3,

were carried out.

Engineering and projecting

Field Installation Works

IAPP IC ANADOLU POWER PLANT STORAGE TANKSINSTALLATIONS

7

ASPHALT TRUCK LOADING STATIONS

In the first stage of the Tüpraş İzmir Aliağa Refinery, mechanical design and

field fabrication and assembly works were carried out for 5 island second

phase and 3 island land tankers for the filling plant. The employer is Ordinat. In

addition, the production of pneumatic stairways used in the plant has been

made and commissioned. Installation of the cantilever assemblies, filling arm

assemblies and other equipment are within the scope of the work.

8

D E M I N W A T E R T A N K S A N D T R A N S F E R L I N E S

9

Tüpraş undertook the engineering and project design and installation work for 2,000 m3 demineralized water tanks for İzmir / Aliağa Refinery and transmission lines (piping) and pumping stations between the plants to be installed together with these tanks.Our project, which started in July 2015, was completed successfully in November 2016.

F I R E - F I G H T I N G S Y S T E M R E N O V A T I O N W O R K S

10

For Tüpraş İzmir refinery, the fire systems in 100, 200, 7000 and 7500 units were re-designed according to the revised standards and the unit works were renewed without interruption. Within the scope of the project, remote controlled monitor towers, hydrant systems and foam extinguishing systems of the pump stations were established. Our project was completed in November 2017.

R A W W A T E R L I N E R E N O V A T I O N W O R K S

11

For the Tüpraş Kırıkkale refinery, a 1200 m long DN 800 diameter underground steel pipeline project between the Kapulukaya dam and the raw water pumping station was designed and field fabrication installations were carried out.

2 0 1 7 R E F I N E R Y G E N E R A L M I S C E L L A N E O U S P L A T F O R M S I N S T A L L A T I O N S

12

Tüpraş Kırıkkale refinery has project design and assembly works for the platforms.

R U P C R O S S B R I D G E F L O W M E T E R S P L A T F O R M

13

For Tüpraş İzmit Refinery, platform projects, manufacturing and assemblies were made on pipe rack for access to flow meters in Rup Unit.

T C D D H A L K A P I N A R S T O R A G E T A N K M A N U F A C T U R I N G

14

Elron inşaat tarafından yapımı üstlenilen TCDD ihtiyacı olan Halkapınar istasyonunda bulunan depolama tankları imalat ,montaj ve borulama işleri yapılmıştır.

7 C 1 3 W A T E R ' S P L T 2 1 C S R S Y S T E M T R A N S F E R P I P I N G W O R K

15

P L T 1 0 9 D E M I N W A T E R B Y P A S S P I P E L I N E W O R K S

For the Tüpraş İzmit refinery, the manufacturing, installation and commissioning of the pipelines required for the Plt 21 and PLt 109 units were carried out.

P Y M K 6 0 3 C r u d e O i l P l a n t L i n e s C o n s t r u c t i o n

16

Production, installation and commissioning works were carried out for the Tüpraş İzmir refinery in accordance with the projects that have provided the Crude Oil Revamp LP Steam Line, the LCO Vessel Sales Line, and the Asme Stamped 1509 Drum.

T ü p r a ş N e w W a t e r T r e a t m e n t P l a n t P l a n t I n s t a l l a t i o n a n d P i p i n g W o r k s

17

Tüpraş refinery in Izmir / Aquamatch manufacturing project in accordance with the equipment and pipelines that are required for New Plant Water treatement for Turkey, was made the purchase to installation and commissioning works.

T ü p r a ş P L T - 1 9 / 2 1 a n d P L T - 6 2 W a t e r T r e a t m e n t P l a n t O p t i m i z a t i o n s

18

For Tüpraş İzmit, water treatment units, chemical storage tanks, pipelines pump skids and construction infrastructure works for these works have been carried out in accordance with the projects, manufacturing, installation and commissioning works were carried out.

E r e n E n e r g y Ç a t a l a ğ z ı P o w e r P l a n t S e a W a t e r T r e a t m e n t P l a n t

19

Eren Enerji Çatalağzı Thermal Power Plant has been commissioned to manufacture water treatment units, chemical storage tanks, pipelines, pump skids, construction equipments and equipment for water treatment plants.

S O C A R P e t k i m S t e a m P r o d u c t i o n P l a n t N o . 4 S t e a m B o i l e r M o d e r n i z a t i o n

W o r k

20

Socar Petkim Petrochemical Inc. A complete change-over of the eco-pipes and walls of the boiler located in the Steam Power Plant was made.

A N A G O L D G O L D M I N E S T O R A G E T A N K S , P R O C E S S T A N K S , T H I C K E N E R

I N S T A L L A T I O N S

21

Erzincan Çöpler Sülfid Plant 2nd stage 12 process tanks,

thickener assemblies are made .

T Ü P R A Ş P L A N N E D S H U T D O W N W O R K S

U 4 0 0 0 N e w O p t i m i x C h a r g e r N o z z l e P l a n t

B U R N E R C H A N G E I N O V E N S ( 8 1 0 0 - 8 3 0 0 - 8 5 0 0 )

2 6 C - 1 0 1 C O L O N M O D E R N I Z A T I O N

R E F I N E R Y H E A T - E X C H A N G E R E X C H A N G E R R E -T U B I N G S

22

Mechanical installations, rotating equipment assemblies, piping and manufacturing works have been carried out in the planned posture of the Project / Investments Department and Maintenance Department in Tüpraş İzmir and Kırıkkale refineries.

Q U A L I T Y C E R T I F I C A T E S

H S E A U D I T

I S O 9 0 0 1

O H S A S 1 8 0 0 1

I S O 1 4 0 0 1

23

Q U A L I T Y C E R T I F I C A T E S

W E L D I N G D O C U M E N T S

24

REFERANCES

2 – ROLLING MILL

S O M E O F O U R R E F E R A N C E S

26

COMPANY NAME LOCATION

ÇER ÇELİK ENDUSTRİ A.Ş. İZMİR TURKİYE

ERHALLAR DEMİR ÇELİK A.Ş. KARABÜK TURKİYE

DEMİRSAN A.Ş. KOCAELİ TURKİYE

KROMAN A.Ş. KOCAELİ TURKİYE

KÜRÜM DEMİR ÇELİK A.Ş. KOCAELİ TURKİYE

HAS ÇELİK A.Ş. KOCAELİ TURKİYE

SIDDIK KARDEŞLER KOCAELİ TURKİYE

EREGE METAL A.Ş. İZMİR TURKİYE

PAY METAL A.Ş. HATAY TURKİYE

DÖRT YILDIZ A.Ş. TEKİRDAĞ TURKİYE

COMPANY NAME LOCATION

KUWAIT STEEL KUWAIT

MNS MAKİNA KUWAIT

COMOLON STEEL MOROCCO

MIK METAL GEORGIA

ALITETEFAG MAKKAH MILL S ARABIA

RAK STEEL S ARABIA

AL FALEH CO IRAQ

FLOD ZAFER TEBRİZ / IRAN

R O L L I N G M I L L

27

R O L L I N G M I L L

28

R O L L I N G M I L L

29

R O L L I N G M I L L

30

R O L L I N G M I L L

31

R O L L I N G M I L L

32

R O L L I N G M I L L

33

THANK YOU!

34

ARA ENERGY PROCESS ENGINEERINGIzmir yolu, Beşevler Mah. No:274 16110 Nilüfer / Bursa

Web: www.araenerji.comE-mail: [email protected]