aquired structure prep

19
STRUCTURE FIRE CONTROL INSTRUCTOR 1 ACQUIRED ACQUIRED STRUCTURE STRUCTURE PREPARATION PREPARATION

Upload: dean-king

Post on 23-Dec-2014

193 views

Category:

Economy & Finance


0 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRUCTOR 11

ACQUIRED ACQUIRED STRUCTURE STRUCTURE PREPARATIOPREPARATIO

NN

Page 2: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRSTRUCTURE FIRE CONTROL INSTRUCTORUCTOR

22

TERMINAL PERFORMANCE TERMINAL PERFORMANCE OBJECTIVEOBJECTIVE

The student, working as a The student, working as a member of a team, shall member of a team, shall

conduct a pre-fire survey of a conduct a pre-fire survey of a structure and prepare it for use structure and prepare it for use in live fire training evolutions, in live fire training evolutions,

so that the structure is so that the structure is rendered safe for use.rendered safe for use.

Page 3: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRUCTOR 33

ENABLING OBJECTIVESENABLING OBJECTIVES

Identify and describe all permits Identify and describe all permits required for use in training in an required for use in training in an acquired structure.acquired structure.

Describe and demonstrate pre-burn Describe and demonstrate pre-burn planning procedures for an acquired planning procedures for an acquired structure.structure.

Describe and demonstrate proper Describe and demonstrate proper procedures for making an acquired procedures for making an acquired structure and the surrounding area structure and the surrounding area safe for training.safe for training.

Page 4: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRUCTOR 44

PERMITS & NOTIFICATIONSPERMITS & NOTIFICATIONS

Written documentation from Written documentation from owner:owner:Permission to burn structurePermission to burn structureClear titleClear titleCertificate of insurance cancellationCertificate of insurance cancellationAcknowledgement of post-burn Acknowledgement of post-burn

property conditionproperty condition Local burn permitLocal burn permit Permission to use fire hydrantsPermission to use fire hydrants

Page 5: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRUCTOR 55

PERMITS & NOTIFICATIONSPERMITS & NOTIFICATIONS

DispatchersDispatchers Law Enforcement Law Enforcement

AgenciesAgencies NeighborsNeighbors EPDEPD

Page 6: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRSTRUCTURE FIRE CONTROL INSTRUCTORUCTOR

66

LIABILITY INSURANCELIABILITY INSURANCE

Your department may Your department may want to obtain liability want to obtain liability

insurance to cover insurance to cover damage to other damage to other

property. property.

Page 7: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRUCTOR 77

PRE-BURN PRE-BURN PLANNINGPLANNING

Page 8: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRUCTOR 88

PRE-BURN PLANPRE-BURN PLANSite plan drawingSite plan drawing

Building planBuilding plan

Floor planFloor plan

CP locationCP location

Apparatus positionsApparatus positions

Hose line positionsHose line positions

Emergency escape routesEmergency escape routes

Emergency evacuation assembly areaEmergency evacuation assembly area

Ingress/egress routes for emergency Ingress/egress routes for emergency vehiclesvehicles

Page 9: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRUCTOR 99

PRE-BURN PLANNINGPRE-BURN PLANNING

Determine water Determine water supply requirementssupply requirementsObtain apparatusObtain apparatusEstablish separate Establish separate water sourceswater sourcesObtain weather Obtain weather reportsreportsDesignate & mark Designate & mark parking areasparking areasEstablish operations Establish operations area & mark area & mark perimeterperimeterEstablish Establish communicationscommunications

Page 10: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRUCTOR 1010

RENDERING SITE SAFERENDERING SITE SAFE

Inspect building for Inspect building for structural integritystructural integrityEnsure utilities Ensure utilities disconnecteddisconnectedRemove wall, Remove wall, ceiling & floor ceiling & floor coveringscoveringsPatch holes in Patch holes in walls & ceilingswalls & ceilingsRemove Remove exceptional weight exceptional weight from abovefrom above

Page 11: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRUCTOR 1111

RENDERING SITE SAFERENDERING SITE SAFE

Pre-cut ventilation Pre-cut ventilation openingsopenings

Remove windows Remove windows & cover openings& cover openings

Ensure doors Ensure doors function or removefunction or remove

Check/operate Check/operate building building componentscomponents

Make stairways Make stairways safesafe

Page 12: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRUCTOR 1212

RENDERING SITE SAFERENDERING SITE SAFE

Check chimney Check chimney stabilitystability

Remove fuel tanksRemove fuel tanks

Remove Remove unnecessary debrisunnecessary debris

Make Make porches/steps safeporches/steps safe

Fence off ground Fence off ground openingsopenings

Page 13: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRUCTOR 1313

RENDERING SITE SAFERENDERING SITE SAFE

Cover holes in walls/ceilings Cover holes in walls/ceilings

Check Cabinets for unsafe Check Cabinets for unsafe contentscontents

Page 14: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRUCTOR 1414

RENDERING SITE SAFERENDERING SITE SAFE

Clearly mark all burn roomsClearly mark all burn rooms

Clearly mark all sides of buildingClearly mark all sides of building

Page 15: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRUCTOR 1515

RENDERING SITE SAFERENDERING SITE SAFE

Clearly mark all exitsClearly mark all exits

Page 16: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRUCTOR 1616

RENDERING SITE SAFERENDERING SITE SAFE

Cover windows and doors so that Cover windows and doors so that rapid egress can still be rapid egress can still be achievedachieved

Page 17: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRUCTOR 1717

RENDERING SITE SAFERENDERING SITE SAFE

Eliminate toxic Eliminate toxic weed, hives & weed, hives & verminvermin

Remove hazardous Remove hazardous vegetationvegetation

Protect exposuresProtect exposures

Prepare fire setsPrepare fire sets

Page 18: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRUCTOR 1818

ENABLING OBJECTIVE ENABLING OBJECTIVE REVIEWREVIEW

We have identified and describes all We have identified and describes all permits required for use in training in an permits required for use in training in an acquired structure.acquired structure.

We have described and demonstrated We have described and demonstrated pre-burn planning procedures for an pre-burn planning procedures for an acquired structure.acquired structure.

We have described and demonstrated We have described and demonstrated proper procedures for making an proper procedures for making an acquired structure and the surrounding acquired structure and the surrounding area safe for training.area safe for training.

Page 19: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRUCTOR 1919

END OF SECTION END OF SECTION

ON ON ACQUIRED ACQUIRED

STRUCTURE STRUCTURE PREPARATIONPREPARATION