aquator manual training

13
 Page 1 of 13 Infravera Sdn. Bhd.(920487-X) No 6-3, JalanPuteri 2/4, Bandar PuteriPuchong, 47100 Puchong, Selangor. Website : www.infravera.co m Tel: 03-8063 5733 Fax: 03-8051 4637 Email: [email protected] m (Sales) support@infra vera.com (Tech. Support)  AQUATOR VERSION 2 MODELING AT CAD ITEM STEP 1. Clean The Drawing a. Faster analysis in the software b. Prevent bad/error entities c. More accurate result d. Smoother modeling experience i. Ensure the drawing does not contain 3D element /entities. ii. To ensure higher quality of clean drawing, copy ne cessary layers and paste to a new drawing. 2. Scale a. To prevent error or entities i. The best scale to import to the Aquator is 1:1. 3.  Add New Layers a. CSSS-USERWATER i. Select LAYERS icon ii. Select NEW icon to add new layers. iii.  Type for new layer (make sure in capital letter and spell with right ) and change any colour user want; a. CSSS-USERWATER Select NEW layer icon Insert both layer names

Upload: amirul-akmal

Post on 13-Apr-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

7/27/2019 Aquator Manual Training

http://slidepdf.com/reader/full/aquator-manual-training 1/13

 

Page 1 of 13 

Infravera Sdn. Bhd.(920487-X) No 6-3, JalanPuteri 2/4, Bandar PuteriPuchong, 47100 Puchong, Selangor.Website : www.infravera.com 

Tel: 03-8063 5733 Fax: 03-8051 4637 Email: [email protected] (Sales) [email protected] (Tech. Support)

 AQUATOR VERSION 2

MODELING AT CAD

ITEM STEP

1.  Clean The Drawing

a. 

Faster analysis in the

software

b. 

Prevent bad/error

entities

c. 

More accurate result

d. 

Smoother modeling

experience

i. 

Ensure the drawing does not contain 3D element /entities.

ii. 

To ensure higher quality of clean drawing, copy necessary layers and

paste to a new drawing.

2.  Scale

a. 

To prevent error or

entities

i. 

The best scale to import to the Aquator is 1:1.

3.   Add New Layers

a. 

CSSS-USERWATER

i. 

Select LAYERS icon

ii. 

Select NEW icon to add new layers.

iii. 

Type for new layer (make sure in capital letter and spell with right )

and change any colour user want;

a. 

CSSS-USERWATER

Select NEW layer icon

Insert both layer names

7/27/2019 Aquator Manual Training

http://slidepdf.com/reader/full/aquator-manual-training 2/13

 

Page 2 of 13 

Infravera Sdn. Bhd.(920487-X) No 6-3, JalanPuteri 2/4, Bandar PuteriPuchong, 47100 Puchong, Selangor.Website : www.infravera.com 

Tel: 03-8063 5733 Fax: 03-8051 4637 Email: [email protected] (Sales) [email protected] (Tech. Support)

ITEM STEP

4.  Draw water

reticulation lines.

a. 

Need to use single line

to draw.

b. 

Make sure stop at

intersection.

a)  CSSS-USERWATER

i. 

Make sure change the current layer to CSSS-USERWATER 

ii. 

Select single line and start to draw the water reticulation line.

iii. 

Make sure draw the single line and stop at every intersection.

iv. 

Node will be created based the mouse click.

5.  Save project

a. 

Project need to be

close before import the

drawing into the

INFRAVERA software

i. 

Select FILE. 

ii. 

Select SAVE AS to save the project.

iii. 

Save the project

iv. 

Close/Exit the project before import into the software

SELECT FILE

SELECT SAVE AS

WATEREC LINE

7/27/2019 Aquator Manual Training

http://slidepdf.com/reader/full/aquator-manual-training 3/13

 

Page 3 of 13 

Infravera Sdn. Bhd.(920487-X) No 6-3, JalanPuteri 2/4, Bandar PuteriPuchong, 47100 Puchong, Selangor.Website : www.infravera.com 

Tel: 03-8063 5733 Fax: 03-8051 4637 Email: [email protected] (Sales) [email protected] (Tech. Support)

 SOFTWARE

1.  IMPORT DRAWING  

STEP

1. 

Select the CAD IMPORT button.

2. 

Located the CAD drawing.

3. 

Drawing Scale will pop up after select the CAD drawing.4.

 

Select ACCEPT for drawing scale.

5. 

Water Supply Guideline will pop up, select the design guide based the project.

6. 

For example, select SYABAS. 

7. 

The layout CAD will appear.

SELECT CAD IMPORT

SELECT ACCEPT

i.  SELECT SYABAS

ii. SELECT OK

7/27/2019 Aquator Manual Training

http://slidepdf.com/reader/full/aquator-manual-training 4/13

 

Page 4 of 13 

Infravera Sdn. Bhd.(920487-X) No 6-3, JalanPuteri 2/4, Bandar PuteriPuchong, 47100 Puchong, Selangor.Website : www.infravera.com 

Tel: 03-8063 5733 Fax: 03-8051 4637 Email: [email protected] (Sales) [email protected] (Tech. Support)

2.  WATER TAB

STEP 

1.  Select WATER tab to start design water reticulation

2.  To show the water reticulation line only, press space bar at keyboard

SELECT WATER TAB

7/27/2019 Aquator Manual Training

http://slidepdf.com/reader/full/aquator-manual-training 5/13

 

Page 5 of 13 

Infravera Sdn. Bhd.(920487-X) No 6-3, JalanPuteri 2/4, Bandar PuteriPuchong, 47100 Puchong, Selangor.Website : www.infravera.com 

Tel: 03-8063 5733 Fax: 03-8051 4637 Email: [email protected] (Sales) [email protected] (Tech. Support)

3.  ADD TAPPING POINT & PRESSURE HEAD

STEP

1.  Select first node as tapping point. In yellow colour, the node is selected.

2.  Go to properties tab , at left hand side software.

3.  At properties tab, Input term, change tapping point to TRUE. 

4.  Indicate the value for tapping pressure head by insert the number.

4.  WATER DEMAND (Q) 

i) 

Have two method’s to key in; 

a. 

By Table

b. 

By Properties

STEP 

a. 

By table

1. 

Select last nodes, for example, node number 5.

2. 

By right click mouse at nodes, the mouse properties will pop up.

3. 

Select for table.

CHANGE TO TRUE

KEY IN THE PRESSURE

HEAD VALUE

7/27/2019 Aquator Manual Training

http://slidepdf.com/reader/full/aquator-manual-training 6/13

 

Page 6 of 13 

Infravera Sdn. Bhd.(920487-X) No 6-3, JalanPuteri 2/4, Bandar PuteriPuchong, 47100 Puchong, Selangor.Website : www.infravera.com 

Tel: 03-8063 5733 Fax: 03-8051 4637 Email: [email protected] (Sales) [email protected] (Tech. Support)

4. 

Table for water demand will pop up.

5. 

Select ADD button to add the table.

6. 

Select CALC  button to calculate the sub total Q.7.

 

Item for type of house, unit of house and water demand unit can be choosing based user.

8. 

Select OK if satisfied with the data.

9. 

Done water demand for that node.

b. 

By Properties1.

 

Select the nodes, and go to properties.

2. 

Indicate the level for that water demand manually.

3. 

For example, 0.52.

i.  SELECT THE NODES

ii. SELECT TABLE

ii. 

SELECT CALC

BUTTON

iii.  SELECT OK BUTTON

i.  SELECT ADD

BUTTON

7/27/2019 Aquator Manual Training

http://slidepdf.com/reader/full/aquator-manual-training 7/13

 

Page 7 of 13 

Infravera Sdn. Bhd.(920487-X) No 6-3, JalanPuteri 2/4, Bandar PuteriPuchong, 47100 Puchong, Selangor.Website : www.infravera.com 

Tel: 03-8063 5733 Fax: 03-8051 4637 Email: [email protected] (Sales) [email protected] (Tech. Support)

4. 

Press ENTER button at keyboard.

5.  HYDRANT

STEP

1. 

Select the nodes.

2. 

Go to properties, select for Hydrant.

3. 

Change the hydrant to TRUE.

4. 

Hydrant will pop up at layout. 

SELECT THE NODES

KEY IN THE WATER

DEMAND

SELECT THE NODES

CHANGE HYDRANT

TO TRUE

7/27/2019 Aquator Manual Training

http://slidepdf.com/reader/full/aquator-manual-training 8/13

 

Page 8 of 13 

Infravera Sdn. Bhd.(920487-X) No 6-3, JalanPuteri 2/4, Bandar PuteriPuchong, 47100 Puchong, Selangor.Website : www.infravera.com 

Tel: 03-8063 5733 Fax: 03-8051 4637 Email: [email protected] (Sales) [email protected] (Tech. Support)

6. FITTING/PUMP

STEP

1. 

By select the pipe, right click mouse at that pipe.

2. 

Select for fitting or pump. If select for fitting, choose the types of fitting to add on.

3. 

For example, select for air valve fitting.

4. 

Air valve fitting icon will appear at layout.

5. Key in the head loss for air valve, by select component at properties.

i. SELECT FITTING

ii. SELECT AIR VALVE

i. SELECT THE

COMPONENT

ii. KEY IN THE HEAD

LOSS

7/27/2019 Aquator Manual Training

http://slidepdf.com/reader/full/aquator-manual-training 9/13

 

Page 9 of 13 

Infravera Sdn. Bhd.(920487-X) No 6-3, JalanPuteri 2/4, Bandar PuteriPuchong, 47100 Puchong, Selangor.Website : www.infravera.com 

Tel: 03-8063 5733 Fax: 03-8051 4637 Email: [email protected] (Sales) [email protected] (Tech. Support)

7. RUN RESULT

STEP

1. 

Select INTEGRITY  icon before run.

2. 

INTEGRITY PASS information will pop up.3.

 

Select OK button

4. The output data can be check at information tab (below tab)

8. SECTIONS

STEP

1. 

Select SECTIONS icon.

2. 

Section Data will be appearing at left side. Tick all the section.

3. 

Select BUILD button to generate section.

SELECT OK

SELECT SECTIONS

7/27/2019 Aquator Manual Training

http://slidepdf.com/reader/full/aquator-manual-training 10/13

 

Page 10 of 13 

Infravera Sdn. Bhd.(920487-X) No 6-3, JalanPuteri 2/4, Bandar PuteriPuchong, 47100 Puchong, Selangor.Website : www.infravera.com 

Tel: 03-8063 5733 Fax: 03-8051 4637 Email: [email protected] (Sales) [email protected] (Tech. Support)

STEP

4. 

Section will appear at section layout.

5. 

To change the datum of slope, select SETUP button.

6. 

Setup for CAD section will pop up, search for DATUM, and change the value. For example 80.

7. 

Done change the datum value, select OK button.

8. 

The data need to be change by re-select BUILD button. 

9. 

The section with new datum will be pop up again at layout section too.

TICK ALL THE SECTION

SELECT BUILD

CHANGE THE

DATUM VALUE

SELECT OK

BUTTON

7/27/2019 Aquator Manual Training

http://slidepdf.com/reader/full/aquator-manual-training 11/13

 

Page 11 of 13 

Infravera Sdn. Bhd.(920487-X) No 6-3, JalanPuteri 2/4, Bandar PuteriPuchong, 47100 Puchong, Selangor.Website : www.infravera.com 

Tel: 03-8063 5733 Fax: 03-8051 4637 Email: [email protected] (Sales) [email protected] (Tech. Support)

10. 3D VIEW

i) To view data input in 3D environment.

STEP

1. 

Select 3D View  icon.

2. 

3D image will appear.

11. CALCULATION

i) Break down water reticulation calculation.

STEP 

. Select Calculation icon.

2. The data calculation table will be pop up.

3. Click Select All  button, and then Select show button.

4. The calculation will be appear.

7/27/2019 Aquator Manual Training

http://slidepdf.com/reader/full/aquator-manual-training 12/13

 

Page 12 of 13 

Infravera Sdn. Bhd.(920487-X) No 6-3, JalanPuteri 2/4, Bandar PuteriPuchong, 47100 Puchong, Selangor.Website : www.infravera.com 

Tel: 03-8063 5733 Fax: 03-8051 4637 Email: [email protected] (Sales) [email protected] (Tech. Support)

STEP 

12. SAVE PROJECT

STEP

1. 

Select file  icon.

2. 

Select save as to save the project.

3.  Make sure save the project in one’s folder. 

SELECT ALL

BUTTON

SELECT SHOW

SELECT SAVE AS

7/27/2019 Aquator Manual Training

http://slidepdf.com/reader/full/aquator-manual-training 13/13

 

Page 13 of 13 

Infravera Sdn. Bhd.(920487-X) No 6-3, JalanPuteri 2/4, Bandar PuteriPuchong, 47100 Puchong, Selangor.Website : www.infravera.com 

Tel: 03-8063 5733 Fax: 03-8051 4637 Email: [email protected] (Sales) [email protected] (Tech. Support)

13. GENERATE REPORT

STEP

1. 

Select REPORT tab.

2. Select WATER iconto generate the report.

3. The report will be pop up.

4. To change the format of report,select file and select EXPORT DOCUMENT and choose the format.

5. Or user also can select Export Document icon to change the format. 

SELECT REPORTS

TAB