![Page 1: April 9, 2015 - NCDOT · April 9, 2015 April 2011. 5/5/2017 2 November 2011 AOI November 2013 AOI. 5/5/2017 3 November 2015 AOI Site Visit. 5/5/2017 4 Site Visit Construction Drawings](https://reader035.vdocuments.us/reader035/viewer/2022070807/5f0609fc7e708231d415fcaf/html5/thumbnails/1.jpg)
5/5/2017
1
GPR Study of Voids behind a Highway Bridge Retaining Wall
Ned Billington, PG
ESP AssociatesApril 9, 2015
April 2011
![Page 2: April 9, 2015 - NCDOT · April 9, 2015 April 2011. 5/5/2017 2 November 2011 AOI November 2013 AOI. 5/5/2017 3 November 2015 AOI Site Visit. 5/5/2017 4 Site Visit Construction Drawings](https://reader035.vdocuments.us/reader035/viewer/2022070807/5f0609fc7e708231d415fcaf/html5/thumbnails/2.jpg)
5/5/2017
2
November 2011
AOI
November 2013
AOI
![Page 3: April 9, 2015 - NCDOT · April 9, 2015 April 2011. 5/5/2017 2 November 2011 AOI November 2013 AOI. 5/5/2017 3 November 2015 AOI Site Visit. 5/5/2017 4 Site Visit Construction Drawings](https://reader035.vdocuments.us/reader035/viewer/2022070807/5f0609fc7e708231d415fcaf/html5/thumbnails/3.jpg)
5/5/2017
3
November 2015
AOI
Site Visit
![Page 4: April 9, 2015 - NCDOT · April 9, 2015 April 2011. 5/5/2017 2 November 2011 AOI November 2013 AOI. 5/5/2017 3 November 2015 AOI Site Visit. 5/5/2017 4 Site Visit Construction Drawings](https://reader035.vdocuments.us/reader035/viewer/2022070807/5f0609fc7e708231d415fcaf/html5/thumbnails/4.jpg)
5/5/2017
4
Site Visit
Construction Drawings
![Page 5: April 9, 2015 - NCDOT · April 9, 2015 April 2011. 5/5/2017 2 November 2011 AOI November 2013 AOI. 5/5/2017 3 November 2015 AOI Site Visit. 5/5/2017 4 Site Visit Construction Drawings](https://reader035.vdocuments.us/reader035/viewer/2022070807/5f0609fc7e708231d415fcaf/html5/thumbnails/5.jpg)
5/5/2017
5
Construction Drawings
Construction Photos
![Page 6: April 9, 2015 - NCDOT · April 9, 2015 April 2011. 5/5/2017 2 November 2011 AOI November 2013 AOI. 5/5/2017 3 November 2015 AOI Site Visit. 5/5/2017 4 Site Visit Construction Drawings](https://reader035.vdocuments.us/reader035/viewer/2022070807/5f0609fc7e708231d415fcaf/html5/thumbnails/6.jpg)
5/5/2017
6
Construction Photos
Construction Photos
![Page 7: April 9, 2015 - NCDOT · April 9, 2015 April 2011. 5/5/2017 2 November 2011 AOI November 2013 AOI. 5/5/2017 3 November 2015 AOI Site Visit. 5/5/2017 4 Site Visit Construction Drawings](https://reader035.vdocuments.us/reader035/viewer/2022070807/5f0609fc7e708231d415fcaf/html5/thumbnails/7.jpg)
5/5/2017
7
Locations of Slumping
GPR Data Collection on Wall
![Page 8: April 9, 2015 - NCDOT · April 9, 2015 April 2011. 5/5/2017 2 November 2011 AOI November 2013 AOI. 5/5/2017 3 November 2015 AOI Site Visit. 5/5/2017 4 Site Visit Construction Drawings](https://reader035.vdocuments.us/reader035/viewer/2022070807/5f0609fc7e708231d415fcaf/html5/thumbnails/8.jpg)
5/5/2017
8
GPR Depth Slices, 0.1’ Depth
GPR Depth Slice, 1.0’ Depth
![Page 9: April 9, 2015 - NCDOT · April 9, 2015 April 2011. 5/5/2017 2 November 2011 AOI November 2013 AOI. 5/5/2017 3 November 2015 AOI Site Visit. 5/5/2017 4 Site Visit Construction Drawings](https://reader035.vdocuments.us/reader035/viewer/2022070807/5f0609fc7e708231d415fcaf/html5/thumbnails/9.jpg)
5/5/2017
9
GPR Polarity Changes
GPR Depth Slices, 1.5’ and 4.2’ Depth
![Page 10: April 9, 2015 - NCDOT · April 9, 2015 April 2011. 5/5/2017 2 November 2011 AOI November 2013 AOI. 5/5/2017 3 November 2015 AOI Site Visit. 5/5/2017 4 Site Visit Construction Drawings](https://reader035.vdocuments.us/reader035/viewer/2022070807/5f0609fc7e708231d415fcaf/html5/thumbnails/10.jpg)
5/5/2017
10
GPR Data, EB Inside Shoulder
Conclusions
• Voids behind retaining wall formed by water flow into and around areas of slumping/flowable fill during construction before closure pour made.
• Vertical settlement of approach slab caused by loose material left in place during construction.
![Page 11: April 9, 2015 - NCDOT · April 9, 2015 April 2011. 5/5/2017 2 November 2011 AOI November 2013 AOI. 5/5/2017 3 November 2015 AOI Site Visit. 5/5/2017 4 Site Visit Construction Drawings](https://reader035.vdocuments.us/reader035/viewer/2022070807/5f0609fc7e708231d415fcaf/html5/thumbnails/11.jpg)
5/5/2017
11
ESP Mobile Mapper Data
• Two 3D lasers
• 4 to 6 cameras
• A military grade IMU
• Two GPS receivers
• Collect continuous point data clouds at highway speeds
Example Mobile LiDAR StudyI‐85, Salisbury
![Page 12: April 9, 2015 - NCDOT · April 9, 2015 April 2011. 5/5/2017 2 November 2011 AOI November 2013 AOI. 5/5/2017 3 November 2015 AOI Site Visit. 5/5/2017 4 Site Visit Construction Drawings](https://reader035.vdocuments.us/reader035/viewer/2022070807/5f0609fc7e708231d415fcaf/html5/thumbnails/12.jpg)
5/5/2017
12
Mobile LiDAR Data
TOPO SLOPE
Older LanesNewer Lanes
![Page 13: April 9, 2015 - NCDOT · April 9, 2015 April 2011. 5/5/2017 2 November 2011 AOI November 2013 AOI. 5/5/2017 3 November 2015 AOI Site Visit. 5/5/2017 4 Site Visit Construction Drawings](https://reader035.vdocuments.us/reader035/viewer/2022070807/5f0609fc7e708231d415fcaf/html5/thumbnails/13.jpg)
5/5/2017
13
![Page 14: April 9, 2015 - NCDOT · April 9, 2015 April 2011. 5/5/2017 2 November 2011 AOI November 2013 AOI. 5/5/2017 3 November 2015 AOI Site Visit. 5/5/2017 4 Site Visit Construction Drawings](https://reader035.vdocuments.us/reader035/viewer/2022070807/5f0609fc7e708231d415fcaf/html5/thumbnails/14.jpg)
5/5/2017
14
Repairs ‐ 2016
• Filled voids with 20 CY of foamed concrete
• Milled down roadway to remove bumps and added asphalt overlay
• Monitoring indicates no additional movement
![Page 15: April 9, 2015 - NCDOT · April 9, 2015 April 2011. 5/5/2017 2 November 2011 AOI November 2013 AOI. 5/5/2017 3 November 2015 AOI Site Visit. 5/5/2017 4 Site Visit Construction Drawings](https://reader035.vdocuments.us/reader035/viewer/2022070807/5f0609fc7e708231d415fcaf/html5/thumbnails/15.jpg)
5/5/2017
15
Thank you