April 4, 2016 PHOTOS TAKEN WHILE AT THE SITE: 5 Project 3 area photos. Project 3 area. Ditch line repairs required. Project 3 area Sediment removed and area hudro seeded, wattle inlet protection installed.

Upload: others

Post on 17-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: April 4, 2016 PHOTOS TAKEN WHILE AT THE SITE€¦ · April 4, 2016 PHOTOS TAKEN WHILE AT THE SITE: 7 Project 2 area Restoration work performed by Dalziel Enterprises. Slope repair

April 4, 2016 PHOTOS TAKEN WHILE AT THE SITE:

5

Project 3 area photos.

Project 3 area. Ditch line repairs required.

Project 3 area Sediment removed and area hudro seeded, wattle inlet protection installed.

Page 2: April 4, 2016 PHOTOS TAKEN WHILE AT THE SITE€¦ · April 4, 2016 PHOTOS TAKEN WHILE AT THE SITE: 7 Project 2 area Restoration work performed by Dalziel Enterprises. Slope repair

April 4, 2016 PHOTOS TAKEN WHILE AT THE SITE:

Project 5 area photos.

Slope repair required. Slope too steep to establish permanent vegetative groundcover, rolled erosion control product incorrectly installed.

Eamon Drive grading and shaping on going. Slopes hydro seeded.

Page 3: April 4, 2016 PHOTOS TAKEN WHILE AT THE SITE€¦ · April 4, 2016 PHOTOS TAKEN WHILE AT THE SITE: 7 Project 2 area Restoration work performed by Dalziel Enterprises. Slope repair

April 4, 2016 PHOTOS TAKEN WHILE AT THE SITE:

7

Project 2 area Restoration work performed by Dalziel Enterprises.

Slope repair. Rolled erosion control product installed on slope, ditch line shaped and excelsior matting installed on road shoulder. Project 2 area by Dalziel Enterprises.

Drop Inlet area repair and restoration. Project 2 area by Dalziel Enterprises.