apresentação do powerpoint - fidic 2014... · fpso p-67 project of fpso replicants rio grande...
TRANSCRIPT
André Cordeiro
Petrobras/ Cenpes
2
The implementation of
Technological Strategy
__
3
The Technological challenge
__
Maintain the technological system
recognized for offering technologies
that contribute to the sustainable
growth of the Company
People
Technological Strategy
__
4
Processes
Investments InfrastructureTechnology and Innovation
Petrobras workforce
__More than
86,000employees
People
Petrobras Research Center (August 2014)
__
Cenpes
workforce
30661136
outsorced
1930employees
Employees: 1930
1432R&D
319Engineering
179Support
People
Petrobras Research Center (August 2014)
__
People
Petrobras Research Center (August 2014)
__
Technician
college
587
1343
Degree
professional
Masters (456)
Graduates(646)
PhD (241)
143Consultants
117Consultants
seniores
15Consultants
masters
1973
2010
9
Infrastructure
Petrobras Research Center
__
Total area - 308 thousands m2
227 laboratories
More than 8 thousand equipments
5 semi-industrial experimental plants
throughout Brazil
Infrastructure
Our R&D facilities
__
Six – Refining
Technological Center
(São Mateus do Sul)
Fortaleza Experimental
nucleus (CE)
Aracaju Experimental
nucleus (Aracaju – SE)
Taquipe Experimental
nucleus (BA)
Cenpes
(Rio de Janeiro – RJ)
Miranga Experimental
nucleus (BA)
11
Investment
Resources for technological development
—2011-13
Average:
US$ 1,243
million
US$
million
2001-03
Average:
US$ 160
million
8X
US$ 6.5 billion
12
Investment
Resources for technological development 2014 - 2018
—
60%
22% 2%
3%
12%
1%
E&P
Downstream
Gas and Energy
Biofuels
Engineering, Technology and Materials
Other areas*
UFSC
UEM
UFPA
UFRN
UFS
Processes
Thematic Networks Relationship with R&D Institutions
__
More than 100 universities and research
institutions
49 Thematic Networks
More than 200 laboratories built since 2009
More than 8000 researchers involved in
projects of Petrobras
13
Technological Focus Organized by business segment
__
New frontiers
Potential reserves of natural
gas
Well construction optimization
Pre-salt production
Offshore logistics
Production optimization of
mature fields
Subsea systems
Maximization of middle
distillates
Pre-salt oil refining
Optimization and integration
of logistics operations
Innovative productsBioproducts
Geological processes simulation
Maritime production systems
Mobility
Nanotechnology
New materials
Gas hydrates
Flow enhancement for
petrochemical
Construction and assembly
Productive processes optimization
Integrity, safety and reliability
CO2 and other emissions
Water
Impacted areas
Monetization of new potential of
natural gas
Energy supply and demand
integration and flexibility
Natural gas logistics
Cost reduction
Adding value to gas
Gas processing
14
15
Our Investments
__
Our Investments
__
Downstream
18%
Others
12%
E&P
70%
US$220.6 billion
between 2014 and 2018
Petrobras New Units
—
2014
Refap – Portfolio Diesel2 diesel hydrotreating units and 1 hydrogen generation unit
(Canoas)
Rio Grande do Sul
—
Rio Grande do Sul
—
2014
Thermoelectric Plant Sepé TiarajuIncreased nominal capacity of 161 MW to 248 MW(Canoas)
2016
FPSO P-67Project of FPSO Replicants
Rio Grande Shipyard (Rio Grande)(Lula Norte Field – Santos Basin)
2016
FPSO P-74EBR Shipyard (São José do Norte)(Franco 1 Field – Santos Basin)
2016
FPSO P-75Honório Bicalho Shipyard (Rio Grande)(Franco SW Field – Santos Basin)
2017
FPSO P-77Honório Bicalho Shipyard (Rio Grande)(Franco NW Field – Santos Basin)
Santa Catarina
—
8 modules of Fuel Gas and Gas Dehydration and
16 modules of Generation Project of FPSO Replicants
DM TKK Construction (Itajaí)
Paraná
—
Construction of ModulesOffshore Unit TECHINT (Pontal do Sul)
2017
FPSO P-76Offshore Unit TECHINT (Pontal do Sul)(Buzios III Field – Santos Basin)
2014
Fertilizer Plant (UFN III)Capacity 761 thousand ton/year of ammonia and 1223 ton/year of urea(Três Lagoas)
Mato Grosso do Sul
—
Amazonas
—
2017
UTE-AzulãoConverts the gas into electricity energy(Azulão Field)
Maranhão
—
2018
Premium I RefineryProcess 300 thousand bpd(Bacabeira)
Rio Grande do Norte
—
2016
Gasfor IIGas pipeline Guamaré – Pecém II(Guamaré )
Pernambuco
—
2015
Abreu e Lima Refinery (RNEST)Capacity – 230 thousand bpd(Ipojuca)
Construction of drilling vesselsAtlântico Sul Shipyard (Ipojuca)
Alagoas
—
Construction of ModulesProject of FPSO Replicants
Tomé / Ferrostaal Shipyard (Maceió)
2014
Ammonium Sulfate UnitNitrogen Fertilizer Plant
Petrobras first plant of ammonium sulfate(Laranjeiras)
Sergipe
—
2017
Camaçari Industrial ComplexUTE-Muricy II and Pecem II
Installed capacity of each - 140MWh(Camaçari)
Bahia
—
Construction of drilling vesselsEnseada do Paraguaçu Shipyard (Maragogipe)
Espírito Santo
—
2017
FPSO P-68Project of FPSO Replicants
Jurong Shipyard (Aracruz)(Lula Sul Field – Santos Basin)
2016
Fertilizer Plants José AlencarProduction of 519 thousand tons/year of ammonia(Uberaba)
Minas Gerais
—
2014
RPBC – Portfolio Diesel6 units of chemical processing to produce diesel S-10(Cubatão)
São Paulo
—
2014
São Bernardo do Campo Gas pipelineSantos – São Paulo II(São Bernardo do Campo)
2014
Gas Treatment Unit – Caraguatatuba(Caraguatatuba)
Rio de Janeiro
—
2014
Ilha Comprida Terminal Storage and disposal of 4,080 tons of LPG per day(Baía de Guanabara - RJ)
2014
Baixada Fluminense Thermoelectric PlantInstalled capacity - 530MW(Seropédica)
2015
FPSO Cidade de ItaguaíBrasfels Shipyard (Angra dos Reis)
(Iracema Norte Field - Santos Basin)
2016
FPSO Cidade de SaquaremaBrasa Shipyard (Niterói)
(Lula Central Field - Santos Basin)
2016
FPSO Cidade de MaricáBrasa Shipyard (Niterói)
(Lula Alto Field - Santos Basin)
2016
Petrochemical Complex of RJ – ComperjArea of 45 km2
(Itaboraí)
2016
Processing unit of natural gas – TecabExtends the capability of processing natural gas and condensate(Macaé)
2017
Maricá-Comperj Gas Pipeline (Itaboraí)
2016 and 2017
P-67 and P-70Project of FPSO Replicants
Construction of modules and integration
Porto do Açu (São João da Barra)
Pre-salt
—
Pre-salt
—
2013
FPSO Cidade de São Paulo120 thousand bpd of oil and 5 MM m3/d of gas(Sapinhoá Field – Santos Basin)
2013
FPSO Cidade de Niterói100 thousand bpd of oil and 3,5 MM m3/d of gas(Marlim Leste Field – Campos Basin)
2013
P-55180 thousand bpd of oil and 4 MM m3/d of gas(Roncador Field – Santos Basin)
2013
FPSO P-63140 thousand bpd of oil and 1 MM m3/d of gas(Papa-Terra Field – Campos Basin)
2013
FPSO P-58180 thousand bpd of oil and 6 MM m3/d of gas(North of Parque das Baleias – Campos Field)
2013
P-61(Papa-Terra Field – Campos Basin)
2013
FPSO Cidade de Paraty120 thousand bpd of oil and 5 MM m3/d of gas(Lula Nordeste Field –Santos Basin)
2013
FPSO Cidade de Itajaí80 thousand bpd of oil and 2 MM m3/d of gas(Baúna Field – Santos Basin)
2013
P-62180 thousand bpd of oil and 6 MM m3/d of gas(Roncador Field – Campos Basin)
2014
FPSO Cidade de Mangaratiba150 thousand bpd of oil and 8 MM m3/d of gas(Iracema Sul Field – Santos Basin)
2014
FPSO Cidade de Ilhabela150 thousand bpd of oil and 6 MM m3/d of gas(Sapinhoá Norte Field – Santos Basin)
Our investments will move us beyond
Seek the monetization of natural gas reserves
Production capacity of nitrogen fertilizers
2020
169%
Natural gas consumption by distributors 33%
Capacity of thermal generation 20%
We produce gasoline, diesel and other derivatives
Average quantity processed
2014
2,1million bpd
2020
3,3million bpd
Our oil production is rising
1.93
3.2
4.2
MMbpd
MMbpd
MMbpd
Technological Park in Rio de Janeiro—
CENPES
TO BE INSTALLEDTECHNOLOGICAL CENTERS INSTALLED
THANK YOU!
André CordeiroPetrobras / Cenpes