BEMISA GROUP
• Bemisa Group was created in 2007 and holds a diversified portfolio composed of 14 projects spread out in 7 Brazilian states.
SINCE 2007
MISSIONExplore, develop and operate
opportunities in the mineral sector.
VISIONTo be a competitive company in the mineral sector, adding value to our
shareholders and developing projects in a sustainable way.
Engineering
Exploration
Operating
R&D
TEAMThe Bemisa Group includes
multidisciplinary team with ample experience and proven success in
the exploration, development, and operation of mineral assets.
ÁGUA AZULGold
PLANALTO PIAUÍ
SANTA MARIA DA VITÓRIA
BARATINHA
SERRA AZULBAMBUÍ
JAURU
CANABRAVA
Iron Ore
Iron Ore
Iron Ore
Limestone
REEs
Nickel
PI
Phosphate
MG
PA
BAMT
GO
RJ
COMPLEXO DOCE VALE
Mineral Water
PEDRA BRANCA
Iron Ore
BEMISA GROUP
Gold
INAJÁ
NOVO MUNDO
Gold
Iron Ore
EXTRAMIL
BOCAINA
Iron Ore
OPPORTUNITY
• Shareholder:
• Opportunity is one of the largest independent asset managers in Brazil, with over US$ 8 billion under management;
• Opportunity was founded in 1994 as an independent asset manager.
• Main Investments (Private Equity):
BEMISA Group (Mining);
Santos Brasil (Logistics);
Agro Santa Bárbara (Agribusiness);
PetroRecôncavo (Oil & Gas).
OPPORTUNITY PRIVATE EQUITY
Exploration, production, transportation, processing and trading of oil and natural gas on-shore.
o The largest independent oil producer in
onshore fields in Brazil.
o Petrorecôncavo operates 17 fields,
with 365 active oil wells, in the
Recôncavo Basin, where can be found
the majors Brazilian reserves of oil
onshore.
o Has an average production of near
4,630 barrels of oil and 340 barrels of
gas per day.
o In 2021 expects to reach an average
daily production of 8,717 barrels of oil.
PETRORECÔNCAVO SANTOS BRASIL AGRO SANTA BÁRBARAManagement of port facilities, with integrated logistics
solutions, container handling and related activities.Crop-livestock integration. Cattle raising, expertise in
insemination technology and grain farming .
o Owns one of the largest cattle
herds in Brazil, with 210,000
animals in an area of 515,000
hectares.
o In 2011 started to develop soybeans
and corn crops, promoting an
integration of crop and livestock in
its assets, what resulted in great
productivity gains.
o Currently, produces soybean in an
area of 13,800 hectares and corn in
an area of 6,300 hectares.
o Santos Brasil is Brazil’s largest container
operator with terminals in three ports:
Santos, Imbituba and Bacarena.
o The terminal in Santos Port is the
largest and busiest in South America.
o In 2016, the company handled
1,016,394 containers, which
represented a participation of 15.6% in
Brazil’s total operation.
o Also has one Vehicle Terminal, located
in Santos Port, with capacity to operate
300,000 vehicles per year.
BEMISA GROUP INVESTMENTS
59 92
121 146
190
256
330
445
551 584
0
100
200
300
400
500
600
700
2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
R$
Mill
ion
s
Accumulated Investments
Planalto Piauí Project
PLANALTO PIAUÍ PROJECT
• Ore:
Iron Ore
• Location:
Piauí State
• World class mining project;
• Resources certified by SRK Consulting;
Resources of over 1 billion tons (@27% Fe) of iron ore:
o Over 62,000 meters of drilling campaign.
• Final product with premium quality:
High iron ore content (@70% Fe) and contaminant levels below market’s standards;
• Annual production of 15 Mtpy of premium Pellet Feed Fine;
• Basic Engineering have been concluded by SNC Lavalin;
• Transnordestina railway will pass within 6 km of Planalto Piauí Project;
• Installation License (LI) for mine, beneficiation plant and infrastructure implementation;
• Mining concession issued by the Brazilian Mining and Energy Ministry.
Planalto Piauí Project
Paulistana
Tenements located within the districts of Paulistana, Curral Novo do Piauí, and Simões.
BRASIL
PROJECT LOCATION AND IRON ORE FORMATION
“Measured, Indicated and Inferred iron ore resources of about 1,003 Mt at 27.05% Fe.”
Source: SRK Consulting, 2013
Classification Tonnage (Mt) Fe (%) FeO (%)
Measured 253 27.70 11.39
Indicated 575 26.76 11.08
Inferred 175 27.07 10.44
Total 1,003 27.05 11.04
CERTIFIED RESOURCES
26.9%44.8%
Iron Ore
Pellet Feed Premium
5.4%
o Mass Yield: 31.3 %;
o Metallurgic Recovery: 81.7 %;
o 1 cobber stage followed by 4 low intensity magnetic separation stages will be enough toproduce a premium PFF;
o Flotation processes are not necessary to obtain this final commercial product;
o Final Product with Excellent Quality: high grade of iron and low levels of contaminants.
Iro
n O
re
Ben
efi
ciat
ion
SiO2Fe Al2O3
Fe70.4%
SiO2
2.2%
Al2O3
0.2%
PRODUCT QUALITY
REGULATORY & ENVIRONMENTAL LICENSING
• The Environmental Impact Study and Report (EIA RIMA) was submitted for a public hearing and approved;
• Preliminary License (LP) was obtained for mining operation, process plant and infrastructure implementation;
• The Installation License (LI) was issued, allowing the start of implementation work on Planalto PiauíProject;
• Mining concession issued by the Ministry of Mines andEnergy (MME).
Water Supply
Poço de Marruá Dam is located at approximately 60 km from the Project and
has a capacity of 300 million cubic meters of water.
The BEMISA Group has a definitive grant issued by SEMAR for pumping of 15 million cubic meters of water annually, enough to
satisfy future demand.
Power Supply
Planalto Piauí Project is located about 10 km away from a transmission line of 500kV, which connects the cities of São João do
Piauí (PI) and Milagres (CE).
Brazilian Mining and Energy Ministry has already issued to Planalto Piauí Project the
right to be connected and to use this electric power system.
EXCELLENT INFRASTRUCTURE
INTEGRATED PROJECT – MINE AND LOGISTIC
Source: Transnordestina information (dez/2016).
Exchange rate: R$ 3.30/US$.
HIGHLIGHTS
High quality iron ore Project;
World class railway;
BEMISA Group has a MOU withTransnordestina for transportationoperation;
The company is registered as user-dependent of railway service by NationalAgency for Land Transportation.
Transnordestina Railway is locatedwithin 6 km from Project’s main target;
Private port;
Deep port connection.
SUAPE
GOVERNMENTAL SUPPORT
• Planalto Piauí Project has strong political support from Brazilian governmental authorities;
• Piauí State has one of the lowest GDPs of the country.
Planalto Piauí Project
Advanced Exploration with Positive Results
Final Product with High Grades of Iron Content and Low Levels of Contaminants
Governmental Support
Basic Engineering Concluded
Excellent Logistics and Infrastructure
Installation License & Mining Concession
FINAL REMARKS