approved byorange county board 2 2 thisdocument … · page0250, page 0166, 0130,page 0325,and page...
TRANSCRIPT
APPROVEDBY ORANGE COUNTY BOARDConnectorRoadSecondSupplementalAgreement OE COUNTY COMMISSIONERSWh ing inWentonStreet
2 2
This document prepared by and returnedto:
Miranda F. Fitzgerald,Esq.
Lowndes, Drosdick,Doster,Kantor & Reed, P.A.
215 North Eola Drive
Orlando, FL 32801
Tax ParcelIdentificationNumbers: 19232 p: 3595
10-24-28-0000-00-053 :1 pa Page 1 of 14
14-24-28-1242-60-000sedF *1 R
sede14-24-28-1242-66-000 DOR Admin Fee $
14-24-28-1242-66-001 as ama co pret ter
15-24-28-0000-00-016 orane* countv6n as couNTY onourn MAN
15-24-28-5844-00-050to -
15-24-28-5844-00-071
PALM PARKWAY TO APOPKA-VINELAND CONNECTOR ROAD
SECOND SUPPLEMENTAL AGREEMENT
This PALM PARKWAY TO APOPKA-VINELAND CONNECTOR ROADSECOND SUPPLEMENTAL AGREEMENT (this "Second SupplementalAgreement"), effectiveas of the latestdate of execution (the"EffectiveDate"),ismadeand entered intoby and among DARYL M. CARTER, not individuallybut as Trusteeunder a Florida land trustknown and designated as "CARTER-ORANGE 105 SANDLAKE LAND TRUST" (the "Trust"),created pursuant to Section 689.071, Florida
Statutes,and existingunder and by virtue of an unrecorded trustagreement datedeffectiveas of April 10, 2008, as the same may have been, and may hereafterbe,amended from time to time, whose address is 3333 South Orange Avenue, Suite 200,Orlando, Florida 32806, Attention Daryl M. Carter,Trustee, KERINA VILLAGE,LLC, successor by conversion to Kerina Village, Inc., a Florida limited liabilitycompany, whose address is c/o Kathy Keller,5401 South Kirkman Road, Suite 650,Orlando, Florida 32819 ("Kerina"),and ORANGE COUNTY, FLORIDA, a charter
county and politicalsubdivision of the State of Florida,whose address is c/o CountyAdministrator,P.O. Box 1393, Orlando, Florida32802-1393 (the"County").
RECITALS
WHEREAS, BVC PartnersI,LLC, a Florida limitedliabilitycompany, Kerina,Inc.,a Delaware corporation,Sand Lake Investments,Ltd.,a Floridalimitedpartnership("SLI"),and the County are partiesto that certainPalm Parkway to Apopka-VinelandConnector Road Agreement, a copy of which isrecorded atOfficialRecords Book 8387,Page 3416 of the Public Records of Orange County, Florida (the "Connector Road
Agreement"), wherein the partiesset forth the terms and conditions of providing the
County right-of-way and the planning and constructionof a connector road that willconnect Palm Parkway to Apopka-Vineland Road; and
ConnectorRoadSecondSupplementalAgreementMissingLink/FentonStreet
Page2of14
WHEREAS, Kerina, Inc.,SLI, and the County are partiesto that certainPalm
Parkway to Apopka-Vineland Connector Road Supplemental Agreement, a copy ofwhich isrecorded at OfficialRecords Book 8387, Page 3525, of the Public Records of
Orange County, Florida;and
WHEREAS, on April 10, 2008, SLI conveyed itsright,title,and interestin theSLI Property to Carter,pursuant to thatcertainGeneral Warranty Deed, a copy of whichisrecorded at OfficialRecords Book 9657, Page 2821, in the Public Records of OrangeCounty, Florida,
WHEREAS, on March 12,2009, Kerina,Inc.conveyed a portionof itsright,title,and interestin the Kerina Property to Kerina Wildwood, Inc.,a Florida corporation;Kerina Village,Inc.,a Florida corporation;Kerina Loop, Inc.,a Florida corporation;Kerina Palms, Inc.,a Florida corporation;Kerina Parkside,Inc.,a Florida corporation;Kerina Schoolside,Inc,a Floridacorporation;Kerina Woods, Inc.,a Floridacorporation;Kerina Parkside Master, Inc.,a Floridacorporation;and Kerina Fish Lake, Inc.,a Florida
corporation,pursuant to those certainSpecial Warranty Deeds, copies of which arerecorded at OfficialRecords Book 9846, Page 0315, Page 0270, Page 0204, Page 0234,Page 0250, Page 0166, Page 0130, Page 0325, and Page 0321 in the Public Records of
Orange County, Florida,allof which are related,eitherdirectlyor indirectly,to Kerina,Inc.;and
WHEREAS, Kerina Village, LLC is the successor by conversion to Kerina
Village,Inc.and isthe only Kerina entitythatisaffectedby thisSecond SupplementalAgreement; and
WHEREAS, ithas taken longer than originallyanticipatedforCarter and Kerinato fileand process those certainapplicationsfor vacations of rights-of-wayas more
particularlydescribedin Section 18.1 of the Connector Road Agreement, and the partiesto this Second Supplemental Agreement now mutually desire to amend the terms
regarding the timing of the vacation,as well as the terms granting certaineasements
benefitingOrange County for underground utilitieswithin the right-of-waythatwillbe
vacated;and
WHEREAS, Hannah L. Smith executed a joinder and consent to the ConnectorRoad Agreement, and has also executed a joinder and consent to this Second
Supplemental Agreement, for the sole and limited purpose of agreeing to convey toCarterallof her right,title,and interest,ifany, in and to the Fenton StreetMissing Link,which is more particularlydescribed in Subsection 18.1 of the Connector Road
Agreement.
NOW THEREFORE, in considerationof the covenants and agreements containedhereinand forothergood and valuableconsideration,thereceiptand sufficiencyof whichare hereby acknowledged, the partiesto thisSecond Supplemental Agreement agree asfollows:
ConnectorRoadSecondSupplementalAgreementMissingLink/FentonStreet
Page3of14
Section 1. Recitals. The foregoing Recitalsare true and correctandare included as partof the terms and provisionsof thisSecond Supplemental Agreement.All capitalizedterms used herein without definitionshallhave the meanings ascribedtheretointhe Connector Road Agreement.
Section2. Vacation, Release, or Exchange of Right-of-Way. The
County hereby agrees to waive the followingrequirements setforthin Section9.1 of theConnector Road Agreement:
9.1 In the event the County electsto vacate the East-West Segment of
Fenton Street,the vacation ordinance shallhave an effectivedate of June
23, 2007 and shallreserveforthe County's benefitan underground utilityeasement twenty (20) feetin width, extending eastfrom the centerlineofthe Granby Street right-of-way to connect with the reserved utilityeasement in the Fenton StreetMissing Link. In the event the Countyelectsto vacate the Fenton StreetNorth-South Segment, such vacationshalltake effectimmediately upon the County's approval of the vacationordinance. In the event the County electsto vacate Granby Street,thevacation shalltake effectimmediately upon the County's approval of thevacation ordinance, and the vacation ordinance shall reserve for the
County's benefit an underground utilityeasement twenty (20) feet inwidth and with ten (10) feetof such easement to be locatedon each sideofthe existingcenterlineof the Granby Streetright-of-way.
In exchange for waiving the above referenced requirements,the partiesto this
Supplemental Agreement hereby agree to the followingprocesses:
In the event the County electsto vacate the above referenced rights-of-way, such vacations shall be approved simultaneously. Prior to the
hearingon the vacation,Carterand Kerina shalleach delivertothe Countyexecuted documents grantinga non-exclusive utilityeasement from their
respectivepropertiesas described and depicted on Exhibit 14 attachedhereto and incorporatedherein. The aforementioned easements shallberecorded and take effectimmediately following the vacationof the rights-of-way. The locationsof the easements are depicted on Exhibit 14 andhave been approved by Carter,Kerina,and the County.
Section3. Exchange of Smith-Bennett Road and Conveyance ofFenton Street Missing Link. The County hereby agrees to waive the followingrequirementssetforthin Section 18.1 of the Connector Road Agreement:
Kerina, SLI and Hannah L. Smith, who has joined in this Agreementexpresslyfor the purpose of acknowledging the conveyance commitmentset forth in this Subsection 18.1, shall convey to the County their
respectiveownership interestsinthe feetitleto a thirty(30)footwide stripof land more particularlydepicted and described on Exhibit 10 attached
ConnectorRoadSecondSupplementalAgreementMissingLink/FentonStreet
Page4of14
hereto and incorporatedherein (the"Fenton StreetMissing Link"). Thedeeds conveying the Fenton StreetMissing Link shallcontain a rightofreverterthat shalltake effecton June 23, 2007 for allof the County'sinterestin the Fenton StreetMissing Link except thatthe County shallreserve for the County's benefitan underground utilityeasement twenty(20) feetin width extending in an east-westdirectionforthe entirelengthof the Fenton Streetmissing Link at a locationacceptableto the OrangeCounty UtilitiesDepartment Director,SLI and Hannah L. Smith.
In exchange for waiving the above referenced requirements,the partiesto thisSecond Supplemental Agreement hereby agree to thefollowingprocesses:
Hannah L. Smith, who has joined in thisSecond Supplemental Agreementexpresslyforthe purpose of acknowledging her conveyance commitmentsetforthin thisSection 3, shallconvey to Carterallof her right,title,and
interest,ifany, in and to a thirty(30) footwide stripof land depicted anddescribed on the Amended Exhibit 10 attached hereto and incorporatedherein (the"Fenton StreetMissing Link") by Quit-Claim Deed within ten
(10) days of the EffectiveDate of thisSecond Supplemental Agreement,which conveyance by Hannah L. Smith shall be without covenant,warranty,representation,or recourse. Carter shallbe responsiblefor thecosts associated with recording the deed, as well as attorneys' feesassociatedwith the conveyance. In considerationof the County's vacationof Fenton StreetEast-West Segment, Granby Street,the Fenton StreetNorth-South Segment, and the Smith-Bennett Connector, Carter andKerina shalleach grantthe County a utilityeasement, as more particularlyset forth in Section 2 of this Second Supplemental Agreement, in
substantiallythe same form that is attached to the Connector Road
Agreement.
Section4. Recordation. This Second Supplemental Agreement shallbe recorded in the Public Records of Orange County, Floridawithin thirty(30) days ofthe EffectiveDate. Carterand Kerina hereby agree to each pay one-halfof the recordingcosts.
Section5. No Other Modifications. Except as expressly modified
hereby, allof the terms, covenants, provisions and conditions of the Connector Road
Agreement and the Supplemental Agreement shallremain in fullforce and effectinaccordance with their terms and are hereby ratifiedand confirmed and cannot bemodified unlesssaidmodificationsareproduced in writingand signed by alltheparties.
[SIGNATURE BLOCKS APPEAR ON FOLLOWING PAGES]
ConnectorRoadSecondSupplementalAgreementMissingLink/FentonStreet
Page5of14
IN WITNESS WHEREOF, the partieshave executed and deliveredthisSecond
Supplemental Agreement on the datesspecifiedbelow.
"COUNTY"
(OfficialSea ORANGE COUNTY, FLORIDA
By: Bo of County Commissioners
T sa Jacobs
Orange County Mayor
ATTEST: DATE: / . 2 1. I/
Martha O. Haynie
Orange County ComptrollerClerk to theBo
By:r -
eputy Clerk
Kathleen C. Johnson
PrintedName
[SIGNATURE BLOCKS CONTINUE ON FOLLOWING PAGES]
ConnectorRoadSecondSupplementalAgreementMissingLink/FentonStreet
Page6of14
Witnesses: "TRUST"
CARTER-ORANGE 105 SAND LAKE LAND
TRUST, created by that certainunrecorded trust
agreement dated effec e 008, as may be
amended from time e.
By:
e: Dary Ty but as
Trusteeof the Carter-Orange 105 Sand Lake
Land Trust
STATE OF FLORIDA
COUNTY OF ORANGE
The foregoinginstrumentwas acknowledged beforeme thi y of r 011,by Daryl M. Carter,in his capacityas Trustee,not individually,of the Carter-Orange 105 SandLake Land Trust.He ispersonallyknown tome
t ame: t ,
,o as R rm-R No Public-Stateof FloridaMYcouMissoNIDD892842 Commission No.
so , My Commission Expires:
[SIGNATURE BLOCKS CONTINUE ON FOLLOWING PAGE]
ConnectorRoadSecondSupplementalAgreementMissingLink/FentonStreetPage7of14
"KERINA"
Witnesses: KERINA VILLAGE, LLC,a Floridalimitedliabilitycompany
Name:////;L.,t?.fff.,A(14-MM7V William A. Tallent
Managing Member
Date:
STATE OF FLORIDA
COUNTY OF ORANGE
,The foregoing instrument was acknowledged before me this & day of
,2011, by William A. Tallent,Managing Member of Kerina Village,LLC, aFlorida limited liabilitycompany. He is personally known to me or has produced
as identification.
comm# DDoseries PrintName: J.dt- //.7 J.,'a/MExpires8/10/2011 Notary Public Stateof Florida
** ...... .. . , fno Commission No.:
My Commission Expires:
[SIGNATURE BLOCKS CONTINUE ON FOLLOWING PAGE]
ConnectorRoadSecondSupplementalAgreementMissingLink/FentonStreet
Page8of14
LIMITED JOINDER OF HANNAH L. SMITH
HANNAH L. SMITH hereby joins in the execution of this Second SupplementalAgreement forthe soleand limitedpurposeof agreeingto convey to Carterallof herright,titleand interest,ifany,in and to thatportionof the Fenton StreetMissing Link as providedforinSection3 ofthisSecond SupplementalAgreement.
Witnesses:
Name. Regina G. Babla' Hannah L. Smith,i vidually
Date: Marchyg , 2011
STATE OF FLORIDA
COUNTY OF ORANGE
The foregoinginstrumentwas acknowledged beforeme this day of March ,2011, by Hannah L. Smith, individually.She is known to me or has produced
asidentification.
REGINA G.BABIAKNOTNWPUBUC-SMTEOFFLORMCOMMISSION#EE063785 Print Regina G. BahEXPIRES 3/14/2015sonomornam-seemornw1 Notary Public- StateofFlorida
Commission No. &~9'd 4 3 775
My Commission Expires:3 // V /P / 6~
0027034\095887\1184141\16
ConnectorRoadSecondSupplementalAgreementMissingLink/FentonStreet
Page9of14
Amended Exhibit 10
Legal Description and Sketch of Fenton StreetMissing Link
ConnectorRoadSecondSupplementalAgreementMissingLink/FentonStreet
Page10of14
SCHEDULE"A"
Description:
A portionofSection10,Township24South,Range28East.OrangeCounty.Florida,beingmoreparticulorlydescribedoafo?Iows:
CommenceoftheSoutheastcornerofsaidSection10;thenceN 88'55'OJ~W ofongtheSouthlineofsaidSection10a diatonceof60.01feettothePointofBeginning;thencecontinueN 88'55'03"WofongsoldSouthlinea distanceof52).30teettoa pointontheNortheasterlyright-of-waylineofFentonStreetasdescribedinOfficiolRecordsBook543J.Pages899-826,PubileRecordsofOrangeCounty,Florfdo,saidpointbeingonanon-tongentcurve,concaveSouthwesterly,havingacontrolongleof16'56'56'andaradiusof690.70feet;thenceNorthwesterlyalongtheareofsaidcurveandolongsoldNortheasterlyright-of-waylineadistanceof204.32feettoapointthatis30.00feetNorthof.measuredata rightangleto,saidSouthline(chordbearinganddistancebetweensaidpointsbeingN 80'26'35"W 203.57feet);thenceS 88'55'O3"Ealongalinethatis30.00feetNorthofandporoffelwithsaidSouthfinea distanceof721.98feettoapointontheWestlineoftheEast60.00feetoftheSoutheost1/4ofsaidSection10;thenceS00'Ti'05'EolongsaidWestlineadistanceof30.01feettothePointofBeginning.Containing97,625squarefeetmoreorless.
SURVEYORSNOTES:1.GeoringsasshownhereonarebasedontheSouthlineofSection10.Township24South,Range28East,CrongeCounty,Florido,beingN 685503"W.ossumed.2.Iherebycertifythotthe"SketchofDescription"oftheabovedescribedpropertyistrueandcorrecttothebestofmyknowledgeandbeliefasrecentlydrownundermydirectionandthatitmeetstheMinimumTechnicalStandardsforLandSurveyingCH.81017-5requirements.3.NotvolidwithouttheoriginotsignatureandraisedsealofaFloridalicensedsurveyorandmapper
Date: CEFIT.NO.L92108 171010DESCRIPTION 12/10/2003toFOR JobNo.: sale:
46171 t"-200 1,ORANCECOUNTYDEPARTMENTOF cu.simy-s.noneseministmw. eCAPITALPROJECTS ca.mouse..testeuses4.seriousdrawingsearth.notationthat 1
SHEET1OF2 /SEESHEET2FORSKETCH no:ofs
ConnectorRoad SecondSupplementalAgreementMissingLink/FentonStreet
Page 11of14
SKETCH OF DESCRIPTION
UNEfABLEUNE LENCTH BEARINGLI 50.01Nga'55'03"W
CURSETABLEC(IRVELENGTHRADIUSTANGENTCHORD OfARFNG DELTA
C2 50.11'370.00'S.OS'10.7$*5OtY)5153'W j*4756"
WESTUNE00EAST60'OFTHE OSOUTHEAST1/4OFSECTION10-24-28
NoRTHEASTERLYRICHT-0F-wAYUNE
SOlr55'o3'E 721.98. I00$*EFENTONFINEET(RIGHT-OF-WAYVARIES), N81r5503"W 521.30'
SOUTHUNEOF.J LISECTION10-24-28
Polaror accINNING
o.,e, /
LTCEND:LI - UNENUMBERcy * CURVENUMBERP.C.- POINTOFCURVATURE
Revised:October12.2007KR SOtttHEASTERNSURVWING&MPPINGCORP.Revised:Mayis2007DC * * 6500411AmericanDrawingNo.4617tOn 1 =200 orisasse,recruemaio-43soJobNo.<at?' GRAPHICSCAt (407)292-8S60fea(407)292-0t45
SeeSheet1forDescription O
ConnectorRoadSecondSupplementalAgreementMissingLink/FentonStreet
Page12of14
Exhibit 14
Location of 20 Foot UtilityEasement to County
ConnectorRoadSecondSupplementalAgreementMissingLink/FentonStreet
Page13of14
SKETCH OF DESCR1PTION
DESCRIP770N:
Thatport of Sections10 ond 15,Township24 South,Range 28 East,Orange County,Florido,and the East 10.00 feet of Lots S and 28, MUNGER AND COMPANYSUBDIVISION,occordingto theplotthereof,as recordedin PlotBook E, Page 22, ofthe PublicRecordsof Orange County,Florido,describedas follows:
BEGIN of the Southeastcornerof said Section10; thence SOO'00'J8"W olong theEast lineof Northeast1/4 of saidSectionIS fora distanceof 10.00 feet;thenceN88*51'f3"Wolonga line10.00feetSouth of and porolletwiththe South lineof theSoutheast 1/4 of said Section 10 for a distanceof 1307.67 feet; thenceS0010'26"W olong a line10.00feetEast of and porollelwith the East lineof saidLots 5 and 28 and the Northerlyprolongationthereof,1324.94 feet; thenceN8976'17"W along the South lineof said Lot 28 ond the Easterlyprolongationthereof,20.00 feet;thenceN00'f0'26"Ealong a line10.00feetWest of and paralletwith the East Une of sold Lots 5 and 28 ond the Northerlyprolongationthereof,1345.08 feet;thenceSB8*51'13"Eolong a line10.00 feetNorth of and parallelwiththe South Ilneof the Southeast1/4 of said Section10 fora distanceof 1267.56feet;thence SOO71'06"E,10.00 feet to the South lineof said Southeast V4 ofSection10; thence S88'51'f3"Eolong sold South line60.02 feet to the POINT OFBEGINNING.
Containing1.204 acres more or less and being subjectto any rights-of-way,restrictionsand easements of record.
2/10/11JW R
DATE BYREVISIONS
PREPAREDFOR: KERINA, INC. -ge--------****PARKSIDEPD(FENTONANDGRANBYSTREET20FOOTEASEMENT) orde Pr a n Meppos
pursuanttoSection472027,FlorideStotutes.
Mll
DONALD W. McINTOSH ASSOCiATES, INC. ""anwmoss meENGINEERS PLANNERS SURVEYORS(2200PARKAVENUENORTH,WINTERPARK,FLORIDA32789(407)644-4068CERTIFICATEOFAUTHORIZATIONNO.LS65
DRAWNBY:SUM CHECKEDBY:AMMY JOBNO. SCALE SHEET 1 1 CU E TUAANDTHEDATE:...JEZ?#/lt...DATE:6/28/70 74770.oses t"=200' OF 2 SURVEVORANDMAPPDr.
rinted:The70-Feb-200- 04*48PM\Pro)20D4\Z4170\Sdw9\sod\FENTONANDGRANBYSTREET.dwg I0-164
ConnectorRoadSecondSupplementalAgreementMissingLink/FentonStreet
Page14of14
SKETCH OF DESCRIPTIONN UNEOFS 30.00'SE1/4 SMITH BENNETT ROAD0 SEC10-24-28
UNPLATTED EUNEOFSE1/4 60,00' 1o SEC10-24-28
NW COROFNE7/4,NE7/4- qc
- -8_ ___ _ SBB'SI?J"E1267.56'
------- ---- -J--- --- L5r -p -81 NB8'51'tJ"W7307.67'2'0.0 | FENTON STREET
I IBLOCK84111 1 1 UNPLATTED 5UNEOFSE1/4Itter, litil SECTO-24-28'500 '26"W
---EUNELOTS5 AWO28cGLLEGEPLACE POINT OF BEGINNING
SOUTHEASTCORNER10.00Illil orSrc10-24-28it ildillS)
itial ZJNE TABIESLOCK8 NUMBERSEARING DISTANCE
Lt ouITTroIIII L2 S00'DO'38"W10.00.8.L..L..L
LJ N89*f6'97"W 20.00'PARKPLACEL4 50071'O6'E 10.00'LS S88'51'TJ"E 60,02'It II CENTRALORANGEPARK
(PS0,PG563-65)rT-i-rTn-rT1-rrn
SURVEYOR'SNOTES:a BLOCK62111 I I I1 III II I II - Thisisnota survey."O I I I - BearingsbasedontheSouthlineofther illiIll II IIIIIIIII Southeast1/4ofSection10,Township24co. J.LJ.I..a..1.J.LA-LLl-LLl-LLJ South,Range28East,Orangecounty,to MONTICELLOAE Florldo,beingN88'51'7J"W.(onassurned
-pp- meridian).III IIlllIIIIIIIIIllilil 1111IllitIIIIIIIIIII 1 )IIIIIIt ) IIIIIIIIII IIIlliflittilillI'stoc
LEGENDI IIlliflIIIIIIIIIIIIIIIIIIllIIIIIIIIIIIIIIII)I
1 J..L..L..11 11.1..11 1.Lil11 .L1...1J ORB OFFICALRECORDSBOOKE 10.00'LOTS5 AND 26 R/W RICHT-OF-WAY
BRAMBLETONAVE PB PLATBOOKfl~rTD~FTD-FT1~fT1~rT1-rTi FTD-F1 PG PAGEIIIllitIIIIII)IIIIIIIIlli LT LINENUMBERJ Il l ill II III J 1 III I lil lil l SEC10-24-28SECTION70,TOWNSHIP24SOUTH,11 li li I RANGE28EAST
IIIIBLOCKSOillilllillillltilillistillitilll))IlllilliIIIIggg illill))111111111lillillllltillilli)Illf il0 .a..x2..2..11 1.LJ..-L1 11..1J.1 1 L1...LJ SEESHEETIFORLEGALDESCRIPTIONF$YE_JTE_AVE._(UNEOFNE,NE1/4Lor37 '4 SE 15-24-28
PREPAREDFOR:KERINA, INC.
PARKSIDEPO(FENTONANDGRANSYSTREET20FOOTEASEMENT)
IMI
DONALD W. McINTOSH ASSOCIATES, INC.ENGINEERS PLANNERS SURVEYORS2200PARKAVENUENORTH,WINTERPARK,FLORIDA32789(407)644-4068CERTWICATEOFAUTHORIZATIONNO.LB68
ORAWNBY:IBM/LWCHECKEDBY:.:ARY JOBNO. SCALE SHEETDATE:A DATE:n/Faho 74t70.atoS I"=200' Oi-
rioted:Thu7O-Fee--20fI- 04:48PM.\Propoo*\24770\sewp\sod\FENTOWANDGRANBYSTREET.dwy CSf 10-164