approach design section - maine.gov · see mainedot detail 610(03) where shown on plans geotextile...
TRANSCRIPT
![Page 1: APPROACH DESIGN SECTION - Maine.gov · See MaineDOT Detail 610(03) Where Shown on Plans Geotextile Erosion Control 3. 0 0 ' Riprap Plain 1. 7 5: 1 (M a x) Course Gravel 18" Aggregate](https://reader035.vdocuments.us/reader035/viewer/2022062602/5f01cf697e708231d40125c5/html5/thumbnails/1.jpg)
![Page 2: APPROACH DESIGN SECTION - Maine.gov · See MaineDOT Detail 610(03) Where Shown on Plans Geotextile Erosion Control 3. 0 0 ' Riprap Plain 1. 7 5: 1 (M a x) Course Gravel 18" Aggregate](https://reader035.vdocuments.us/reader035/viewer/2022062602/5f01cf697e708231d40125c5/html5/thumbnails/2.jpg)
13'-0"13'-0"
1'-8"14'-4"14'-4"1'-8"
-2% -2%
NEXT F Beams
-2%-2%
APPROACH DESIGN SECTION
Berm
2'-0"
Shldr.
3'-0"
11'-0" Travel Lane11'-0" Travel LaneShldr.
3'-0"
Berm
2'-0"
É Construction
É Construction
É Construction
8'-0" (TYP)
(TYP)
5'-0"
Asphalt
4" Hot Mix
Guardrail Type 3c*
Guardrail Type 3c*
Existing Ground
Existing Ground
& Mulch
2" Loam, Seed
3:1
EXISTING BRIDGE TYPICAL SECTION
PROPOSED BRIDGE TYPICAL SECTION
APPROACH DESIGN SECTION
Berm
2'-0"
Shldr.
3'-0"
11'-0" Travel Lane11'-0" Travel LaneShldr.
3'-0"
Berm
2'-0"
É Construction
Guardrail Type 3c*
Guardrail Type 3c*
Existing Ground
Existing Ground
& Mulch
2" Loam, Seed
& Mulch
2" Loam, Seed
3:1
3:1
Asphalt
1 •" Hot Mix
AND HABITAT CONNECTIVITY DESIGN
RIPRAP DETAIL AT ABUTMENT
Slope Varies Slope Varies
Match Existing Match Existing
for additional details
See MaineDOT Detail 610(03)
Where Shown on Plans
Geotextile
Erosion Control
3.0
0'
Riprap
Plain
1.75:1 (Max)
Course Gravel
18" Aggregate Subbase
Guardrail Installation
Shoulder Widening and
4" Hot Mix Asphalt for
Guardrail Installation
Shoulder Widening and
4" Hot Mix Asphalt for
Face of Abutment
4" Crushed Stone
Gravel Borrow
32'-0"
Wearing Surface
with 1" Integral
10…" at abutments)
Concrete Slab (9" Midspan,
Variable Depth Structural
* See General Plan for limits of guardrail
Station 13+15.00 to 14+27.00
Station 10+92.00 to 11+47.00
MILL & OVERLAY
DE
SIG
N-
DE
TAIL
ED
BY
DA
TE
PR
OJ.
MA
NA
GE
R
SHEET NUMBER
FIE
LD
CH
AN
GE
S
RE
VISIO
NS
1
RE
VISIO
NS
2
RE
VISIO
NS
3
RE
VISIO
NS
4
CH
EC
KE
D-
RE
VIE
WE
DE.
LO
WE
LL
T.
SA
ND
EL
L10\
2018
Brid
ge
Divisio
n:
Filena
me:...\
002
_T
ypic
al Sectio
nUserna
me:
Date:1
0/10/2
018
tksandell
BO
G
ST
RE
AM
BRID
GE
NO
RT
HFIE
LD
WA
SHIN
GT
ON
CO
UN
TY
BO
G
ST
RE
AM
2OF 34
BRID
GE N
O. 3719
TY
PIC
AL
SE
CTIO
NS
M.
PA
RLIN
DE
SIG
N2-
DE
TAIL
ED
2
DE
SIG
N3-
DE
TAIL
ED
3
J.
SO
CH
AN
EK
PA
UL
YU
021699.0
0
WIN
WIN
021699.0
0B
RID
GE P
LA
NS
10\
2018
ST
AT
E O
F M
AIN
E
DE
PA
RT
ME
NT O
F T
RA
NSP
OR
TA
TIO
N
DA
TE
SIG
NA
TU
RE
P.E.
NU
MB
ER
Elevation is approx. 1' above Q1.1 (EL. 148)
Width Varies (3' to 8.5')
Shelf for Habitat Connectivity
12" Protective Aggregate Cushion
Special Fill Mixed in Per SP 203.
* See General Plan for limits of guardrail
Back of Abutment 2 to Station 13+15.00
Station 11+47.00 to Back of Abutment 1
FULL DEPTH PAVEMENT
Course Gravel
18" Aggregate Subbase Course Gravel
18" Aggregate Subbase
2:1 m
ax.
2' wide Erosion Control Blanket
Plain Riprap
3'-0
"
1'-0
"
![Page 3: APPROACH DESIGN SECTION - Maine.gov · See MaineDOT Detail 610(03) Where Shown on Plans Geotextile Erosion Control 3. 0 0 ' Riprap Plain 1. 7 5: 1 (M a x) Course Gravel 18" Aggregate](https://reader035.vdocuments.us/reader035/viewer/2022062602/5f01cf697e708231d40125c5/html5/thumbnails/3.jpg)
Brid
ge
Divisio
n:
Filena
me:...\
003
_Estim
ate and
ES
WUserna
me:
Date:1
0/10/2
018
tksandell
ESTIMATED QUANTITIES
ITEM NO. QUANTITYDESCRIPTION UNIT
DE
SIG
N-
DE
TAIL
ED
BY
DA
TE
PR
OJ.
MA
NA
GE
R
SHEET NUMBER
FIE
LD
CH
AN
GE
S
RE
VISIO
NS
1
RE
VISIO
NS
2
RE
VISIO
NS
3
RE
VISIO
NS
4
CH
EC
KE
D-
RE
VIE
WE
DE.
LO
WE
LL
T.
SA
ND
EL
L10\
2018
3OF 34
NO
RT
HFIE
LD
ST
AT
E
RO
UT
E
19
2
M.
PA
RLIN
DE
SIG
N2-
DE
TAIL
ED
2
DE
SIG
N3-
DE
TAIL
ED
3
J.
SO
CH
AN
EK
PA
UL
YU
021699.0
0
WIN
WIN 0
21699.0
0HIG
HW
AY P
LA
NS
10\
2018
DE
PA
RT
ME
NT O
F T
RA
NSP
OR
TA
TIO
N
ST
AT
E O
F M
AIN
E
DA
TE
SIG
NA
TU
RE
P.E.
NU
MB
ER
ES
TI
MA
TE
D
QU
AN
TITIE
S
(70 CY)
(480 LF)
(320 SY)
(200 LF)
(9 CY)
(23 CY)
(2080 SF)
(90 CY)
(120 CY)
(140 CY)
659.10
656.75
652.41
652.38
652.361
652.35
652.34
652.33
652.30
652.312
643.72
639.19
631.172
631.15
631.14
631.132
631.12
629.05
627.78
627.77
627.733
620.661
620.58
619.14
619.12
618.14
615.07
613.319
610.18
610.08
606.78
606.52
606.353
606.265
606.231
606.23
606.1721
603.17
535.622
530.31
530.30
527.34
526.34
526.301
523.5403
523.52
515.21
514.06
511.07
511.07
510.10
507.0821
503.27
503.26
503.13
503.12
502.49
502.31
502.291
502.261
502.219
501.92
501.91
501.903
501.90
501.541
501.54
501.231
411.09
409.15
403.213
403.208
304.10
206.082
203.25
203.24
203.20
202.202
202.19
MOBILIZATION
TEMP SOIL EROSION & WATER POLLUTION CTRL
PORTABLE CHANGEABLE MESSAGE SIGN
FLAGGER
MAINTENANCE OF TRAFFIC CONTROL DEVICES
CONSTRUCTION SIGNS
CONE
DRUM
FLASHING ARROW BOARD
TYPE III BARRICADE
TEMPORARY TRAFFIC SIGNAL
FIELD OFFICE TYPE B
TRUCK - LARGE (INCLUDING OPERATOR)
ROLLER EARTH BASE CRS (INC OP)
GRADER (INCLUDING OPERATOR)
SMALL BULLDOZER (INC OPERATOR)
ALL PURPOSE EXCAVATOR (INC OPERATOR)
HAND LABOR, STRAIGHT TIME
TEMP 4" PAINT PVMT MARK LINE W OR Y
REMOVING PAVEMENT MARKINGS
4" WHITE OR YELLOW PAINTED PAVE MRK LINE
DRAINAGE GEOCOMPOSITE INSTALLATION
EROSION CONTROL GEOTEXTILE
EROSION CONTROL MIX
MULCH
SEEDING METHOD NUMBER 2
LOAM
EROSION CONTROL BLANKET
STONE DITCH PROTECTION
PLAIN RIPRAP
LOW VOLUME GUARDRAIL END - TYPE 3
MAILBOX REMOVE & RESET
REFLECTORIZED FLEXIBLE GUARDRAIL MARKER
TERM END- SGL RAIL- GALV STEEL
GUARDRAIL TYPE 3C - 15' RADIUS AND LESS
GR TY 3C - SINGLE RAIL
BRIDGE TRANSITION - TYPE 1
18" CULV PIPE OPTION I
PRESTR STR CONC NEXT BEAM
GLASS FIBER REINF POLY PLACING
GLASS FIBER REINF POLY FAB & DEL
WORK ZONE CRASH CUSHIONS
PERMANENT CONC TRANSITION BARRIER
TEMPORARY CONC BARRIER TYPE I
PLAIN ELASTOMERIC BEARINGS
BEARING INSTALLATION
PROTECTIVE COATING FOR CONCRETE SURFACES
CURING BOX FOR CONC CYL
COFFERDAM: ABUT. 2
COFFERDAM: ABUT. 1
SPECIAL DETOUR 12 FOOT RDWY WIDTH TR NOT SEP
STEEL BRIDGE RAILING, 3 BAR
STAINLESS STEEL REINF - PLACING
STAINLESS STEEL REINF - FAB & DEL
REINFORCING STEEL, PLACING
REINFORCING STEEL, FABRICATED/DELIVERED
STRUCTURAL CONCRETE CURBS AND SIDEWALKS
STRUCTURAL CONCRETE APPROACH SLABS
SAW CUT GROOVING
STR CONC RD & SW SLAB ON CONC BR
STRUCTURAL CONCRETE, ABUT & RET WALLS
PILE DRIVING EQUIPMENT MOBILIZATION
PILE SPLICES
PILE TIPS - ROCK INJECTOR POINT
PILE TIPS
STEEL H-BEAM PILES 117 LBS/FT, IN PLACE
STEEL H-BEAM PILES 117 LBS/FT, DELIVERED
DYNAMIC LOADING TEST
UNTREAT AGGR SURF CRS
BITUMINOUS TACK COAT - APPLIED
HOT MIX ASPHALT 12.5 MM BASE
HOT MIX ASPHALT 12.5 MM HMA SURFACE
AGGR SUBB COURSE - GRAVEL
STR EA EXC-MAJOR STRUCTURES
GRANULAR BORROW
COMMON BORROW
COMMON EXCAVATION
REMOVING PAVEMENT SURFACE
REMOVING EXISTING BRIDGE
LS
LS
EA
HR
L S
SF
EA
EA
EA
EA
LS
EA
HR
HR
HR
HR
HR
HR
LF
SF
LF
SY
SY
CY
UN
UN
CY
SY
CY
CY
EA
EA
EA
EA
LF
LF
EA
LF
LS/CY
LF
LF
UN
EA
LS/LF
EA
EA
LS/SY
EA
LS
LS
LS
LS/LF
LB
LB
LB
LB
LS/CY
LS/CY
LS/SF
LS/CY
LS/CY
LS
EA
EA
EA
LF
LF
EA
CY
G
T
T
CY
CY
CY
CY
CY
SY
LS/CY
1
1
2
500
1
150
100
100
2
2
1
1
20
20
25
25
25
100
900
400
1830
110
580
180
14
15
90
150
50
500
3
1
8
1
20
70
4
10
1
15500
15500
4
4
1
16
16
1
1
1
1
1
1
3400
3400
30900
30900
1
1
1
1
1
1
8
4
4
380
380
2
5
80
50
110
325
720
250
400
900
390
1
![Page 4: APPROACH DESIGN SECTION - Maine.gov · See MaineDOT Detail 610(03) Where Shown on Plans Geotextile Erosion Control 3. 0 0 ' Riprap Plain 1. 7 5: 1 (M a x) Course Gravel 18" Aggregate](https://reader035.vdocuments.us/reader035/viewer/2022062602/5f01cf697e708231d40125c5/html5/thumbnails/4.jpg)
Brid
ge
Divisio
n:
Filena
me:...\
304.0
2 -
DG
N\
004
_N
otes
Userna
me:
Date:1
0/2
3/2
018
tksandell
DE
SIG
N-
DE
TAIL
ED
BY
DA
TE
PR
OJ.
MA
NA
GE
R
SHEET NUMBER
FIE
LD
CH
AN
GE
S
RE
VISIO
NS
1
RE
VISIO
NS
2
RE
VISIO
NS
3
RE
VISIO
NS
4
CH
EC
KE
D-
RE
VIE
WE
DE.
LO
WE
LL
T.
SA
ND
EL
L10\
2018
4OF 34
NO
RT
HFIE
LD
ST
AT
E
RO
UT
E
19
2
M.
PA
RLIN
DE
SIG
N2-
DE
TAIL
ED
2
DE
SIG
N3-
DE
TAIL
ED
3
J.
SO
CH
AN
EK
PA
UL
YU
021699.0
0
WIN
WIN 0
21699.0
0HIG
HW
AY P
LA
NS
10\
2018
DE
PA
RT
ME
NT O
F T
RA
NSP
OR
TA
TIO
N
ST
AT
E O
F M
AIN
E
DA
TE
SIG
NA
TU
RE
P.E.
NU
MB
ER
General Construction Notes
GE
NE
RA
L
NO
TE
S
MaineDOT web address: http://www.maine.gov/mdot/contractors/
17. Project information referred to below may be accessed at the following
To one foot below the ground on vertical walls against earth.
Top of abutment backwalls and wingwalls, and
Concrete barrier railing,
Concrete wearing surfaces,
All exposed surfaces of Concrete Transition Barriers,
Fascias down to the drip notch,
All exposed surfaces of concrete curbs and sidewalks,
areas:
16. Protective Coating for Concrete Surfaces shall be applied to the following
work is completed. Payment will be made under the appropriate Contract items.
lined with Stone Ditch Protection shall be constructed after paving and shoulder
Erosion Control Blanket, seeded gutters, riprap downspouts, and other gutters
15. Where it is apparent that runoff will cause continual erosion, extended-use
placement of each section of beam guardrail.
14. A Low Volume Guardrail End shall be installed concurrently with the
considered part of Item 627.78.
markings of paint, both yellow centerline and white edge lines and will be
13. Any base pavement not surfaced before winter will require temporary pavement
Resident.
aggregate surface course unless otherwise noted in the Plans or directed by the
- gravel or 11 inches aggregate subbase course - gravel and 3 inches untreated
12. Gravel entrances shall be constructed with 14 inches aggregate subbase course
shown.
sideslopes along the top of the riprap and behind the wingwalls unless otherwise
11. Place a 24 inch wide strip of Temporary Erosion Control Blanket on the
made under Pay Item 619.14, Erosion Control Mix.
accordance with Standard Specifications Section 619, Mulch. Payment will be
receiving loam and seed as directed by the Resident. Placement shall be in
10. Erosion Control Mix may be substituted in those areas normally
directed by the Resident.
9. Place loam 2 inches deep on all new or reconstructed sideslopes or as
8. Construct the riprap shelf at each abutment at EL. 148.
Control Blanket as noted below.
roadway shoulder to accommodate a 24 inch wide strip of Temporary Erosion
7. Place riprap on sideslopes as shown on the Plans up to 2 feet from the
Subsection 703.19, Material for Underwater Backfill.
shall be Granular Borrow meeting the requirements of Standard Specifications
6. All embankment material, except as otherwise shown, placed below EL. 149
equipment rental items.
of new subbase 6 inches or less thick will be made under appropriate
grubbing, shaping, ditching, and compacting the existing subbase and layers
subgrade line shown on the plans, payment for removing existing pavement,
5. In areas where the Resident directs the Contractor not to excavate to the
suitable as determined by the Resident.
4. Do not excavate for Aggregate Subbase Course where existing material is
otherwise noted.
3. All utility facilities shall be adjusted by the respective utilities unless
will be considered incidental to Contract items.
limits will be established in the field by the Resident. Payment for clearing
2. The clearing limits as shown on the plans are approximate. The exact
Right of Way Map.
1. For easements, construction limits, and right of way lines, refer to the
paid for separately, but considered incidental to related items.
25. The crushed stone surface layer of the Habitat Connectivity shelf will not be
24. Bridge removal limits shall be below proposed rip rap.
Approach Slab.
Payment will be considered incidental to Pay Item 502.31, Structural Concrete
23. Install two layers of 6 mil polyethylene sheeting under approach slabs.
Compensation and Time.
with Standard Specifications Section 109.7, Equitable Adjustments to
Lump Sum pay items, price adjustments will be made in accordance
c. If a design change results in changes to estimated quantities for
for a Lump Sum pay item, those requirements will be followed.
b. If other Contract Documents specifically allow a change in payment
Specifications Section 109.2, Elimination of Items, will take precedence.
a. If a Lump Sum pay item is eliminated, the requirements of Standard
quantities, except as follows:
actual final quantities are different from the MaineDOT provided estimated
amount, with no addition or reduction in payment to the Contractor if the
purposes only. Lump Sum pay items will be paid for at the Contract Bid
are estimated quantities and are provided by MaineDOT for informational
22. Quantities included for pay items measured and paid for by Lump Sum
the boring locations.
Data provided may not be representative of the subsurface conditions between
factual and interpretive subsurface information collected at discrete locations.
geotechnical information. The boring logs contained in the plan set present
Bidders' or Contractor's interpretations of, or conclusions drawn from, the
conditions at the construction site. MaineDOT will not be responsible for the
information or interpretations will be representative of actual subsurface
the use of the Bidders and the Contractor. No assurance is given that the
21. Geotechnical information furnished or referred to in this plan set is for
address.
Soils Report 2018-33, September 20, 2018 may be accessed at the MaineDOT web
Replacement of Bog Stream Bridge, State Route 192 over Bog Stream, Northfield,
20. The project geotechnical report titled: Geotechnical Design Report for the
conditions at the time of construction.
information or the conclusions of the report will be representative of actual
information obtained for the subject site. No assurance is given that the
web address. The hydrologic report is based on MaineDOT's interpretation of the
19. The hydrologic report of the bridge site may be accessed at the MaineDOT
bridge during its life span.
construction field changes or any alterations which may have been made to the
construction of the bridge. It is very unlikely that the plans will show any
plans are reproductions of the original drawings as prepared for the
18. The existing bridge plans may be accessed at the MaineDOT web address. The
![Page 5: APPROACH DESIGN SECTION - Maine.gov · See MaineDOT Detail 610(03) Where Shown on Plans Geotextile Erosion Control 3. 0 0 ' Riprap Plain 1. 7 5: 1 (M a x) Course Gravel 18" Aggregate](https://reader035.vdocuments.us/reader035/viewer/2022062602/5f01cf697e708231d40125c5/html5/thumbnails/5.jpg)
145
145
145
150
150
150
150
150
150
155
IPF
IPF
IPF
Begin Transition
End Project
Sta. 13+15.00
Begin Project
End Transition
Sta. 11+47.00Limit of Work
Match Existing
Begin Transition
Sta. 10+92.00
Work
Limit of Roadway
Match Existing
End Transition
Sta. 14+27.00
4" White Edge Line
Treatment (Flared)
Low Volume End
É Brg., Abut. No. 1 É Brg., Abut. No. 2
62'-0" Span
9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00
9+
58.6
9
PT
15+
33.6
8
PC
To Machias
Flow
Sta. 12+84.20Sta. 12+22.20
20° Skew
DE
SIG
N-
DE
TAIL
ED
BY
DA
TE
PR
OJ.
MA
NA
GE
R
SHEET NUMBER
FIE
LD
CH
AN
GE
S
RE
VISIO
NS
1
RE
VISIO
NS
2
RE
VISIO
NS
3
RE
VISIO
NS
4
CH
EC
KE
D-
RE
VIE
WE
DE.
LO
WE
LL
T.
SA
ND
EL
L10\
2018
Brid
ge
Divisio
n:
Filena
me:...\
304.0
2 -
DG
N\
005
_General Pla
nUserna
me:
Date:1
0/10/2
018
tksandell
BO
G
ST
RE
AM
BRID
GE
NO
RT
HFIE
LD
WA
SHIN
GT
ON
CO
UN
TY
BO
G
ST
RE
AM
5OF 34
BRID
GE N
O. 3719
GE
NE
RA
L
PL
AN
M.
PA
RLIN
DE
SIG
N2-
DE
TAIL
ED
2
DE
SIG
N3-
DE
TAIL
ED
3
J.
SO
CH
AN
EK
PA
UL
YU
021699.0
0
WIN
WIN 0
21699.0
0B
RID
GE P
LA
NS
10\
2018
ST
AT
E O
F M
AIN
E
DE
PA
RT
ME
NT O
F T
RA
NSP
OR
TA
TIO
N
DA
TE
SIG
NA
TU
RE
P.E.
NU
MB
ER
Driv
e
Gravel
Northfield Rd (Route 192)
Northfield Rd (Route 192)
Bog Stream
(Gravel)
Tobey Isla
nd
Rd
Border Rotation -29°27'33.37
Clearing Limit
E = 18.33'
T = 250.71'
L = 497.85'
R = 1704.91'
PI = 7+11.55
CURVE DATA #1
(Flared)
Treatment
Low Volume End
Treatment (Flared)
Low Volume End
Extend Culvert
Re-align Ditch
Notes:
Clearing Limit
Clearing Limit
Overlay
Mill and
Remove Existing Utility Pole
CLEARING
FROM TO
13+17 RT
12+19 LT
11+26 RT
9+93 LT
14+56 RT
13+90 LT
12+67 RT
11+41 LT
Mill and Overlay
Remove & Reset Mailbox
C ConstructionL
Scale of Feet
PLAN
25 0 25 50
4" White Edge Line
4" Double Yellow Centerline
the temporary alignment and temporary roadway cross section.
by the grading for the temporary roadway. Refer to the Detour Plan for
1. The Clearing Limit Line along the northern side of Route 192 is dictated
E = 2.76'
T = 141.88'
L = 283.63'
R = 3640.48'
PI = 16+75.57
CURVE DATA #2
Clearing Limit
Habitat Connection Shelf
Shelf
Connection
Habitat
Radius End (R=15ft)
(Typ.)
MaineDOT Standard Details
Toe into Existing Ground per
Plain Riprap,
No. 3719
Bridge
Proposed
Sawcut
SawcutSawcut
Sawcut
Construction
Full Depth
R = 15'
Sta. 14+15, 21' Rt.
Proposed Pole
Limit of Grading
Limit of Grading
Limit of Grading
Rail (typ.)
Transition
Bridge
Type 3c
Guardrail
Type 3c
Guardrail
Limit of Grading
21' Rt.
Sta. 11+75
Pole
Proposed
![Page 6: APPROACH DESIGN SECTION - Maine.gov · See MaineDOT Detail 610(03) Where Shown on Plans Geotextile Erosion Control 3. 0 0 ' Riprap Plain 1. 7 5: 1 (M a x) Course Gravel 18" Aggregate](https://reader035.vdocuments.us/reader035/viewer/2022062602/5f01cf697e708231d40125c5/html5/thumbnails/6.jpg)
125
130
135
140
145
150
155
160
165
170
175
180
185
190
195195
125
130
135
140
145
150
155
160
165
170
175
180
185
190
195195
9+00 10+00 11+00 12+00 13+00 14+00 15+00 15+50
9+00 10+00 11+00 12+00 13+00 14+00 15+00 15+50
LOW POINT = STA. 13+19.26
ELEV. = 154.85
PVI =
ST
A. 10
+92.0
1
ELE
V. =
156.6
2
PVI =
ST
A. 11+0
5.15
ELE
V. =
156.2
3
PV
C =
ST
A. 11+12.9
6
ELE
V. =
156.0
6
PVI =
ST
A. 11+6
2.9
6
ELE
V. =
155.0
2
PVT =
ST
A. 12
+12.9
6
ELE
V. =
154.9
7
PVI =
ST
A. 13
+19.2
6
ELE
V. =
154.8
5
PVI =
ST
A. 13
+65.7
0
ELE
V. =
154.8
7
PVI =
ST
A. 14
+27.0
0
ELE
V. =
154.7
3
G = -2.96%
G = -2.09%
G = -0.11% G = 0.04% G = -0.21%
V.C.L. = 100'
E = 0.247'
SD = 1317'
EL. 15
6.3
8
EL. 15
5.8
3
EL. 15
5.4
3
EL. 15
5.15
EL. 15
5.0
0
EL. 15
4.9
5
EL. 15
4.9
3
EL. 15
4.9
0
EL. 15
4.8
7
EL. 15
4.8
5
EL. 15
4.8
6
EL. 15
4.8
5
EL. 15
4.7
9
EL. 15
4.7
4
62'-0" Span
0
SCALE
5025
PROFILE
HORIZ 25
1050VERT 5
Proposed Subgrade
Superstructure
Proposed
and Granular Borrow
Limits of Structural Excavation
Proposed H-Pile (Typ.)
(Typ.)
Plain Riprap
(Typ.)
Abutment
Proposed
Grade
Existing
Grade
Finished
Proposed
Sta. 11+4
7.0
0
Sta. 13
+15.0
0
Sta. 12+22.20
Abut. No. 1
É Brg.
DE
SIG
N-
DE
TAIL
ED
BY
DA
TE
PR
OJ.
MA
NA
GE
R
SHEET NUMBER
FIE
LD
CH
AN
GE
S
RE
VISIO
NS
1
RE
VISIO
NS
2
RE
VISIO
NS
3
RE
VISIO
NS
4
CH
EC
KE
D-
RE
VIE
WE
DE.
LO
WE
LL
T.
SA
ND
EL
L10\
2018
Brid
ge
Divisio
n:
Filena
me:...\
006_
Proposed
Brid
ge Profile
Userna
me:
Date:1
0/10/2
018
tksandell
BO
G
ST
RE
AM
BRID
GE
NO
RT
HFIE
LD
WA
SHIN
GT
ON
CO
UN
TY
BO
G
ST
RE
AM
6OF 34
BRID
GE N
O. 3719
PR
OFIL
E
M.
PA
RLIN
DE
SIG
N2-
DE
TAIL
ED
2
DE
SIG
N3-
DE
TAIL
ED
3
J.
SO
CH
AN
EK
PA
UL
YU
021699.0
0
WIN
WIN 0
21699.0
0B
RID
GE P
LA
NS
10\
2018
ST
AT
E O
F M
AIN
E
DE
PA
RT
ME
NT O
F T
RA
NSP
OR
TA
TIO
N
DA
TE
SIG
NA
TU
RE
P.E.
NU
MB
ER
Q1.1 EL. 147.2
Q100 EL. 149.2
Q50 EL. 148.9
Sta. 12+84.20
Abut. No. 2
É Brg.
55' 1.5" Mill & Overlay 112' 1.5" Mill & Overlay168' Project
1.5
1.0
7.50' 1.0'
1.5' (Typ.)
![Page 7: APPROACH DESIGN SECTION - Maine.gov · See MaineDOT Detail 610(03) Where Shown on Plans Geotextile Erosion Control 3. 0 0 ' Riprap Plain 1. 7 5: 1 (M a x) Course Gravel 18" Aggregate](https://reader035.vdocuments.us/reader035/viewer/2022062602/5f01cf697e708231d40125c5/html5/thumbnails/7.jpg)
IPF
IPF
IPF
145
145
145
150
150 150
150
150
150
155
3/8" DIA REBAR PLS #360
JOINT 247
1/4" DIA REBAR
POSSIBLE DRIVEWAY MARKER
59
DELINEATOR 3719 1/4" DIA REBAR1 FT HIGH LEANING
POSSIBLE DRIVEWAY MARKER
18" CMP FAIR
JOINT 7/245
MIXED GROWTH
TOBEY ISLAND
1 FOOT WIDE
15" CMP
1’
WID
E
JOINT 246
15 IN CONC
8" DIA DOWNSPOUTS
8" DIA DOWNSPOUTS
BB-NBS-102
CASED WASH BORING
LEGENDFlow
Route 192
B O G S T R E A M
BB-NBS-101
BB-NBS-103
Scale in Feet
PLAN
25 0 25 50
É Brg., Abut. No. 1 É Brg., Abut. No. 2
62’-0" Span
10+00 11+00 12+00 13+00 14+00 15+00 16+00
15+
33.6
8
PC
To Machias
Sta. 12+84.20Sta. 12+22.20
20° Skew
R
NR
0
SCALE
5025
PROFILE
HORIZ 25
20100VERT 10
Vertical Scale has been reduced by �its original.
Boring No.
RQD=
Offset, if sh
own
BOE= Bottom of Exploration
LEGEND
No Refusal
Refusal
if applicable
Weathered Bedrock,
Pavement Thickness, if applicable
of Bedrock Core Sample
Rock Quality Designationof Bedrock
Approximate Top
BOE
BB-NBS-
101
BOE
BB-NBS-
102
BOE
RQD=55%
RQD=63%
RQD=80%
RQD=65%
BB-NBS-
103
120
115
110
105
100
95
90
85
80
75
70
65
60
120
115
110
105
100
95
90
85
80
75
70
65
60
165
125
130
135
140
145
150
155
160
165
125
130
135
140
145
150
155
160
10+00 11+00 12+00
13+00
14+00 15+00
10+00 11+00 12+00 13+00 14+00 15+00
RQD=0%
?
?
?
?
occasional cobbles, (Fill).
Gravelly SAND to SAND, some
Brown, damp, loose to dense,
??
(Glacial Till).
some to trace gravel,
Grey, wet, hard, Sandy SILT,
EL 112.2
Cobble.
Cobble.
Cobble.
Cobble.
EL 107.7
EL 75.6
Rock Mass Quality = Fair.
[Bog Lake Granite]
very close to moderately close, tight.
joints are dipping horizontal to low angle,
Amphibole GRANITE, hard, slightly weathered,
R1: Bedrock: White to grey, medium-grained,
BB-NBS-103:
Rock Mass Quality = Poor
[Bog Lake Granite]
joints are low to steep, close, tight.
Amphibole GRANITE, hard, slightly weathered,
R1: Bedrock: White to grey, medium-grained,
BB-NBS-101:
Rock Mass Quality = Fair.
R2: Bedrock: similar to above.
43%
RQD=
7.9’ Lt.
7.4’ Rt.
6.2’ Rt.
Rock Mass Quality = Good.
close to moderately close, tight.
are dipping horizontal to low angle, very
R6:Bedrock: Similar to above except, joints
Rock Mass Quality = Fair.
are dipping low angle to steep.
R7:Bedrock: Similar to above, except joints
gravel, trace silt, (Fill).
dense, SAND, some to little
Brown, damp to wet, loose to
Cobbles.
Cobble.
Cobble.
gravel, some to trace silt, (Glacial Till).
Gravelly SAND to SAND, some
Grey, wet, dense to very dense,
silt, little clay, little gravel, (Glacial Till).
Grey, wet, very dense, SAND, some
Cobble.
R1: – 14" Boulder.
little gravel, (Glacial Till).
Grey, wet, very dense, Silty SAND,
R2: – 18" Boulder.
– 6.3’ Boulder.
Spun Casing through
R3: Cobbles.
R4: Cobbles.
Rock Mass Quality = Very Poor.
[Bog Lake Granite]
and tight.
joints are low to steep, close, cross-cutting
Amphibole GRANITE, hard, slightly weathered,
R5:Bedrock: White to grey, medium-grained,
Similar to above, (Glacial Till).
little silt, (Glacial Till).
dense, SAND, some gravel,
Grey, wet, medium to very
gravel, (Glacial Till).
dense, Silty SAND, little
Grey, wet, dense to very
(Glacial Till).
some to trace gravel, cobbles,
Grey, wet, very dense, Silty SAND,
62’-0" Span
Sta. 11+4
7.0
0
Sta. 13
+15.0
0
55’ 1.5" Mill & Overlay 112’ 1.5" Mill & Overlay168’ Project
3.75’
G = -0.21%
Proposed Subgrade
Superstructure
Proposed
(Typ.)
Plain Riprap
Grade
Existing
Grade
Finished
Proposed
Q50 EL. 148.9
Sta. 12+22.20
Abut. No. 1
É Brg.
Q1.1 EL. 147.2
Q100 EL. 149.2
Sta. 12+84.20
Abut. No. 2
É Brg.
LOW POINT = STA. 13+19.26
ELEV. = 154.85
PVI =
ST
A. 10
+92.0
1
ELE
V. =
156.6
2
PVI =
ST
A. 11+0
5.15
ELE
V. =
156.2
3
PV
C =
ST
A. 11+12.9
6
ELE
V. =
156.0
6
PVI =
ST
A. 11+6
2.9
6
ELE
V. =
155.0
2
PV
T =
ST
A. 12
+12.9
6
ELE
V. =
154.9
7
PVI =
ST
A. 13
+19.2
6
ELE
V. =
154.8
5
PVI =
ST
A. 13
+65.7
0
ELE
V. =
154.8
7
PVI =
ST
A. 14
+27.0
0
ELE
V. =
154.7
3
G = -2.96%
G = -2.09%
G = -0.11% G = 0.04%
V.C.L. = 100’
E = 0.247’
SD = 1317’
This generalized interpretive soil profile is intended to convey
trends in subsurface conditions. The boundaries between strata
are approximate and idealized, and have been developed by
interpretations of widely spaced explorations and samples.
Actual soil and bedrock transitions may vary and are probably
logs.
more erratic. For more specific information refer to the exploration
Note:
SHEET NUMBER
OF
IN
TE
RP
RE
TIV
E
SU
BS
UR
FA
CE
PR
OFIL
E
BO
RIN
G
LO
CA
TIO
N
PL
AN
&
DE
SIG
N-
DE
TAIL
ED
BY
DA
TE
PR
OJ.
MA
NA
GE
R
FIE
LD
CH
AN
GE
S
RE
VISIO
NS
1
RE
VISIO
NS
2
RE
VISIO
NS
3
RE
VISIO
NS
4
CH
EC
KE
D-
RE
VIE
WE
D
GE
OT
EC
HDivisio
n:
Filena
me:...\
GE
OT
EC
H\
MS
TA\
007
_B
LP
&IS
P1.d
gn
Userna
me:
Date:1
0/10/2
018
Brandon.Sla
ven
DE
SIG
N2-
DE
TAIL
ED
2
DE
SIG
N3-
DE
TAIL
ED
3
WIN
BRID
GE P
LA
NS
ST
AT
E O
F M
AIN
E
DE
PA
RT
ME
NT O
F T
RA
NSP
OR
TA
TIO
N
DA
TE
SIG
NA
TU
RE
P.E.
NU
MB
ER
__
__
_
7
STP-2
169(9
00)
34
21699.0
0
BO
G
ST
RE
AM
BRID
GE
BO
G
ST
RE
AM
NO
RT
HFIE
LD
BRID
GE N
O. 3719
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
B.S
LA
VE
NT.W
HIT
E
__
__
__
__
__
__
__
__
__
__
__
__
JU
N
2018
__
__
__
__
__
__
__
__
__
WA
SHIN
GT
ON
CO
UN
TY
![Page 8: APPROACH DESIGN SECTION - Maine.gov · See MaineDOT Detail 610(03) Where Shown on Plans Geotextile Erosion Control 3. 0 0 ' Riprap Plain 1. 7 5: 1 (M a x) Course Gravel 18" Aggregate](https://reader035.vdocuments.us/reader035/viewer/2022062602/5f01cf697e708231d40125c5/html5/thumbnails/8.jpg)
SHEET NUMBER
OF
DE
SIG
N-
DE
TAIL
ED
BY
DA
TE
PR
OJ.
MA
NA
GE
R
FIE
LD
CH
AN
GE
S
RE
VISIO
NS
1
RE
VISIO
NS
2
RE
VISIO
NS
3
RE
VISIO
NS
4
CH
EC
KE
D-
RE
VIE
WE
D
GE
OT
EC
HDivisio
n:
Filena
me:...\
MS
TA\
008
_B
ORIN
G
LO
GS
1.d
gn
Userna
me:
Date:1
0/10/2
018
Brandon.Sla
ven
DE
SIG
N2-
DE
TAIL
ED
2
DE
SIG
N3-
DE
TAIL
ED
3
WIN
BRID
GE P
LA
NS
ST
AT
E O
F M
AIN
E
DE
PA
RT
ME
NT O
F T
RA
NSP
OR
TA
TIO
N
DA
TE
SIG
NA
TU
RE
P.E.
NU
MB
ER
__
__
_
8
STP-2
169(9
00)
34
21699.0
0
BO
G
ST
RE
AM
BRID
GE
BO
G
ST
RE
AM
NO
RT
HFIE
LD
BRID
GE N
O. 3719
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
B.S
LA
VE
NT.W
HIT
E
__
__
__
__
__
__
__
__
__
__
__
__
AU
G
2018
__
__
__
__
__
__
__
__
__
BO
RIN
G
LO
GS
WA
SHIN
GT
ON
CO
UN
TY
0
5
10
15
20
25
1D
2D
3D
4D
12/10
24/10
24/14
24/17
5.00 -
6.00
10.00 -
12.00
15.00 -
17.00
20.00 -
22.00
8/50
48/21/15/11
5/9/11/17
13/18/13/15
---
36
20
31
56
31
48
SSA
34
99
80
74
65
67
144
292
118
102
62
57
78
87
94
154.1
146.6
141.1
130.6
5.5" HMA.
0.5
Brown, damp, Gravelly SAND, trace silt, occasional
cobbles, (Fill).
8.0
Grey, wet, very dense, SAND, some gravel, little silt,
(Glacial Till).
13.5
Grey, wet, dense, Silty SAND, little gravel, (Glacial
Till).
Grey, wet, hard, Sandy SILT, trace gravel, (Glacial
Till).
Roller Coned ahead to 25.0 ft bgs.
24.0
G#296516
A-1-b, SM
G#296517
A-4, SM
Maine Department of Transportation Project: Bog Stream Bridge #3719 carries
Route 192 over Bog Stream
Boring No.: BB-NBS-101
Soil/Rock Exploration LogLocation: Northfield, Maine
US CUSTOMARY UNITS WIN: 21699.00
Driller: MaineDOT Elevation (ft.) 154.6 Auger ID/OD: 5" Solid Stem
Operator: Daggett/Niles Datum: NAVD88 Sampler: Standard Split Spoon
Logged By: B. Wilder Rig Type: CME 45C Hammer Wt./Fall: 140#/30"
Date Start/Finish: 6/13/2018; 07:00-16:30 Drilling Method: Cased Wash Boring Core Barrel: NQ-2"
Boring Location: 12+17.4, 7.9 ft Lt. Casing ID/OD: HW-4" Water Level*: 4.0 ft bgs.
Hammer Efficiency Factor: 0.928 Hammer Type: Automatic Hydraulic Rope & Cathead
Definitions: R = Rock Core Sample Su = Peak/Remolded Field Vane Undrained Shear Strength (psf) Tv = Pocket Torvane Shear Strength (psf)
D = Split Spoon Sample SSA = Solid Stem Auger Su(lab) = Lab Vane Undrained Shear Strength (psf) WC = Water Content, percent
MD = Unsuccessful Split Spoon Sample Attempt HSA = Hollow Stem Auger qp = Unconfined Compressive Strength (ksf) LL = Liquid Limit
U = Thin Wall Tube Sample RC = Roller Cone N-uncorrected = Raw Field SPT N-value PL = Plastic Limit
MU = Unsuccessful Thin Wall Tube Sample Attempt WOH = Weight of 140lb. Hammer Hammer Efficiency Factor = Rig Specific Annual Calibration ValuePI = Plasticity Index
V = Field Vane Shear Test, PP = Pocket PenetrometerWOR/C = Weight of Rods or Casing N60 = SPT N-uncorrected Corrected for Hammer Efficiency G = Grain Size Analysis
MV = Unsuccessful Field Vane Shear Test Attempt WO1P = Weight of One Person N60 C = Consolidation Test
De
pt
h (ft.)
Sa
mple
No.
Sample Information
Pe
n./
Rec. (i
n.)
Sa
mple
De
pt
h
(ft.)
Bl
ows (/
6 i
n.)
Shear
Stre
ngt
h
(psf)
N-
unc
orrecte
d
N6
0
Casi
ng
Bl
ows
Ele
vatio
n
(ft.)
Gra
phic
Lo
g
Visual Description and Remarks
Laboratory
Testing
Results/
AASHTO
and
Unified Class.
30
35
40
45
50
5D
6D
7D
8D
24/20
24/19
24/14
24/15
25.00 -
27.00
30.00 -
32.00
35.00 -
37.00
40.00 -
42.00
14/19/29/36
9/18/20/23
11/22/24/28
16/46/46/50
48
38
46
92
74
59
71
142
66
70
71
73
66
67
83
86
97
96
96
87
146
184
RC
115.6
112.2
Grey, wet, very dense, Silty SAND, little gravel,
(Glacial Till).
Roller Coned ahead to 30.0 ft bgs.
Similar to above.
Roller Coned ahead to 35.0 ft bgs.
Similar to above, except trace gravel.
Roller Coned ahead to 40.0 ft bgs.
Cobble from 37.5-37.9 ft bgs.
39.0
Roller Coned ahead to 52.4 ft bgs.
Grey, wet, very dense, Silty SAND, some gravel,
(Glacial Till).
42.4
G#296518
A-4, SM
55
60
65
70
75
R1 60/6052.40 -
57.40NQ-2 102.2
97.2
52.4
R1: Bedrock: White to grey, medium-grained, Amphibole
GRANITE, hard, slightly weathered, joints are low to
steep, close, tight.
[Bog Lake Granite]
Rock Mass Quality = Poor.
R1: Core Times (min:sec)
52.4-53.4 ft (5:02)
53.4-54.4 ft (4:52)
54.4-55.4 ft (5:03)
55.4-56.4 ft (5:20)
56.4-57.4 ft (5:10)
57.4
Bottom of Exploration at 57.4 feet below ground surface.
Remarks:
Stratification lines represent approximate boundaries between soil types; transitions may be gradual. Page 1 of 1
* Water level readings have been made at times and under conditions stated. Groundwater fluctuations may occur due to conditions other
than those present at the time measurements were made. Boring No.: BB-NBS-101
Probable Bedrock at 42.4 ft bgs.
0
5
10
15
20
25
1D
2D
3D
4D
5D
6D
7D
8D
R1
24/8
24/10
24/14
24/16
24/9
24/13
24/12
24/22
60/14
1.00 -
3.00
3.00 -
5.00
5.00 -
7.00
7.00 -
9.00
10.00 -
12.00
15.00 -
17.00
17.00 -
19.00
20.00 -
22.00
24.50 -
29.50
11/13/9/7
7/6/6/10
6/4/2/2
2/2/2/2
15/11/16/16
9/17/20/26
33/30/27/29
20/47/45/49
22
12
6
4
27
37
57
92
32
17
9
6
39
54
83
134
SSA
8
15
15
21
18
31
68
54
53
46
24
70
100
157
211
111
158
257
368
241
NQ2
154.1
144.6
137.6
130.1
6" of Pavement
0.5
Brown, damp, dense, SAND, some gravel, trace silt,
(Fill).
Similar to above, except medium dense.
Brown, moist, loose, SAND, little gravel, trace silt,
(Fill).
Brown, wet, loose, SAND, some gravel, trace silt,
(Fill).
10.0
Grey, wet, dense, Gravelly SAND, trace silt, (Glacial
Till).
Grey, wet, very dense, SAND, some gravel, some silt.
17.0
Grey, wet, very dense, SAND, some silt, little clay,
little gravel, (Glacial Till).
6" Cobble
Similar to above.
24.5
14" Boulder
G#304379
A-1-b, SW-SM
G#304380
A-1-a, SW-SM
G#304381
A-1-b, SM
G#304382
A-4, SC-SM
Maine Department of Transportation Project: Bog Stream Bridge #3719 carries
Route 192 over Bog Stream
Boring No.: BB-NBS-102
Soil/Rock Exploration LogLocation: Northfield, Maine
US CUSTOMARY UNITS WIN: 21699.00
Driller: S. W. Cole Explorations, LLC Elevation (ft.) 154.6 Auger ID/OD: 5" Solid Stem
Operator: J. Lee Datum: NAVD88 Sampler: Standard Split-Spoon
Logged By: N. Strout Rig Type: Deidrich D50 Hammer Wt./Fall: 140#/30"
Date Start/Finish: 05/01/2017 - 05/02/2017 Drilling Method: Cased Wash Boring Core Barrel: NQ-2"
Boring Location: 12+89.3, 6.2 ft Rt. Casing ID/OD: HW 4"/4.5" NW 3"/3.5" Water Level*: 9.2’ (on 05/02/2017)
Hammer Efficiency Factor: 0.873 Hammer Type: Automatic Hydraulic Rope & Cathead
Definitions: R = Rock Core Sample Su = Peak/Remolded Field Vane Undrained Shear Strength (psf) Tv = Pocket Torvane Shear Strength (psf)
D = Split Spoon Sample SSA = Solid Stem Auger Su(lab) = Lab Vane Undrained Shear Strength (psf) WC = Water Content, percent
MD = Unsuccessful Split Spoon Sample Attempt HSA = Hollow Stem Auger qp = Unconfined Compressive Strength (ksf) LL = Liquid Limit
U = Thin Wall Tube Sample RC = Roller Cone N-uncorrected = Raw Field SPT N-value PL = Plastic Limit
MU = Unsuccessful Thin Wall Tube Sample Attempt WOH = Weight of 140lb. Hammer Hammer Efficiency Factor = Rig Specific Annual Calibration ValuePI = Plasticity Index
V = Field Vane Shear Test, PP = Pocket PenetrometerWOR/C = Weight of Rods or Casing N60 = SPT N-uncorrected Corrected for Hammer Efficiency G = Grain Size Analysis
MV = Unsuccessful Field Vane Shear Test Attempt WO1P = Weight of One Person N60 C = Consolidation Test
De
pt
h (ft.)
Sa
mple
No.
Sample Information
Pe
n./
Rec. (i
n.)
Sa
mple
De
pt
h
(ft.)
Bl
ows (/
6 i
n.)
Shear
Stre
ngt
h
(psf)
N-
unc
orrecte
d
N6
0
Casi
ng
Bl
ows
Ele
vatio
n
(ft.)
Gra
phic
Lo
g
Visual Description and Remarks
Laboratory
Testing
Results/
AASHTO
and
Unified Class.
30
35
40
45
50
9D
10D
R2
24/24
24/24
24/12
30.00 -
32.00
35.00 -
37.00
40.00 -
42.00
20/25/32/44
21/26/40/43
57
66
83
96
SPUN
NQ2
SPUN
125.1
114.6
112.6
29.5
Placed NW spin casing.
Grey, wet, very dense, Silty SAND, little gravel,
(Glacial Till).
Similar to above.
40.0
18" Boulder.
42.0
6.3’ Boulder
55
60
65
70
75
R3
R4
11D
12D
13D
60/18
60/10
17/9
16/8
8/7
50.00 -
55.00
55.00 -
60.00
60.00 -
61.42
65.00 -
66.33
70.00 -
70.67
27/47/100-5"
42/68/100-4"
25/100-3"
- -
- -
- -
NQ2
SPUN
104.6
94.6
50.0
Advanced by rock core through boulder and frequent
cobbles from 50 to 60 ft bgs.
60.0
Grey, wet, very dense, Silty SAND, little gravel,
(Glacial Till).
Frequent cobbles from 62 to 64.5 ft bgs.
Similar to above.
6" Cobble.
Similar to above.
10" Cobble.
Remarks:
Auto-hammer SN #362.
Casing driven using 140# auto-hammer with 30" drop.
Water level recorded prior to drilling on 05/02/2017 with casing to 45 ft bgs.
Stratification lines represent approximate boundaries between soil types; transitions may be gradual. Page 1 of 2
* Water level readings have been made at times and under conditions stated. Groundwater fluctuations may occur due to conditions other
than those present at the time measurements were made. Boring No.: BB-NBS-102
75
80
85
90
95
100
R5
R6
R7
48/11
60/60
60/60
80.00 -
84.00
84.00 -
89.00
89.00 -
94.00
OPEN
NQ2
75.6
70.6
60.6
79.0
Top of Bedrock at Elev 75.6 ft.
Advanced by rollercone through Bedrock from 79 to 80 ft
bgs.
R5:Bedrock: White to grey, medium-grained, Amphibole
GRANITE, hard, slightly weathered, joints are low to
steep, close, cross-cutting and tight.
[Bog Lake Granite]
Rock Mass Quality = Very Poor.
R5:Core Times (min:sec)
80.0-81.0 ft (3:16)
81.0-82.0 ft (3:54)
82.0-83.0 ft (4:43)
84.0
R6:Bedrock: Similar to above except, joints are dipping
horizontal to low angle, very close to moderately
close, tight.
Rock Mass Quality = Good.
R6:Core Times (min:sec)
84.0-85.0 ft (5:00)
85.0-86.0 ft (4:02)
86.0-87.0 ft (4:13)
87.0-88.0 ft (4:43)
R7:Bedrock: Similar to above, except joints are dipping
low angle to steep. Rock Mass Quality = Fair.
R7:Core Times (min:sec)
89.0-90.0 ft (3:41)
90.0-91.0 ft (3:35)
91.0-92.0 ft (3:10)
92.0-93.0 ft (3:15)
94.0
Bottom of Exploration at 94.0 feet below ground surface.
Maine Department of Transportation Project: Bog Stream Bridge #3719 carries
Route 192 over Bog Stream
Boring No.: BB-NBS-102
Soil/Rock Exploration LogLocation: Northfield, Maine
US CUSTOMARY UNITS WIN: 21699.00
Driller: S. W. Cole Explorations, LLC Elevation (ft.) 154.6 Auger ID/OD: 5" Solid Stem
Operator: J. Lee Datum: NAVD88 Sampler: Standard Split-Spoon
Logged By: N. Strout Rig Type: Deidrich D50 Hammer Wt./Fall: 140#/30"
Date Start/Finish: 05/01/2017 - 05/02/2017 Drilling Method: Cased Wash Boring Core Barrel: NQ-2"
Boring Location: 12+89.3, 6.2 ft Rt. Casing ID/OD: HW 4"/4.5" NW 3"/3.5" Water Level*: 9.2’ (on 05/02/2017)
Hammer Efficiency Factor: 0.873 Hammer Type: Automatic Hydraulic Rope & Cathead
Definitions: R = Rock Core Sample Su = Peak/Remolded Field Vane Undrained Shear Strength (psf) Tv = Pocket Torvane Shear Strength (psf)
D = Split Spoon Sample SSA = Solid Stem Auger Su(lab) = Lab Vane Undrained Shear Strength (psf) WC = Water Content, percent
MD = Unsuccessful Split Spoon Sample Attempt HSA = Hollow Stem Auger qp = Unconfined Compressive Strength (ksf) LL = Liquid Limit
U = Thin Wall Tube Sample RC = Roller Cone N-uncorrected = Raw Field SPT N-value PL = Plastic Limit
MU = Unsuccessful Thin Wall Tube Sample Attempt WOH = Weight of 140 lb. Hammer Hammer Efficiency Factor = Rig Specific Annual Calibration ValuePI = Plasticity Index
V = Field Vane Shear Test, PP = Pocket PenetrometerWOR/C = Weight of Rods or Casing N60 = SPT N-uncorrected Corrected for Hammer Efficiency G = Grain Size Analysis
MV = Unsuccessful Field Vane Shear Test Attempt WO1P = Weight of One Person N60 C = Consolidation Test
Remarks:
Auto-hammer SN #362.
Casing driven using 140# auto-hammer with 30" drop.
Water level recorded prior to drilling on 05/02/2017 with casing to 45 ft bgs.
Stratification lines represent approximate boundaries between soil types; transitions may be gradual. Page 2 of 2
* Water level readings have been made at times and under conditions stated. Groundwater fluctuations may occur due to conditions other
than those present at the time measurements were made. Boring No.: BB-NBS-102
De
pt
h (ft.)
Sa
mple
No.
Sample Information
Pe
n./
Rec. (i
n.)
Sa
mple
De
pt
h
(ft.)
Bl
ows (/
6 i
n.)
Shear
Stre
ngt
h
(psf)
N-
unc
orrecte
d
N6
0
Casi
ng
Bl
ows
Ele
vatio
n
(ft.)
Gra
phic
Lo
g
Visual Description and Remarks
Laboratory
Testing
Results/
AASHTO
and
Unified Class.
0
5
10
15
20
25
1D
2D
3D
4D
24/12
24/8
24/22
24/18
5.00 -
7.00
10.00 -
12.00
15.00 -
17.00
20.00 -
22.00
2/1/2/2
12/12/5/2
17/18/20/27
17/18/23/30
3
17
38
41
5
26
59
63
SSA
19
10
19
18
56
32
55
36
57
147
63
63
56
68
62
OPEN
HOLE
154.0
145.7
140.7
8" HMA.
0.7
Brown, damp, loose, SAND, some gravel, trace silt.
9.0
Grey, wet, medium dense, SAND, some gravel, little
silt.
14.0
Grey, wet, very dense, Silty SAND, little gravel,
(Glacial Till).
Similar to above.
Roller Coned ahead to 47.0 ft bgs.
G#296519
A-4, SM
Maine Department of Transportation Project: Bog Stream Bridge #3719 carries
Route 192 over Bog Stream
Boring No.: BB-NBS-103
Soil/Rock Exploration LogLocation: Northfield, Maine
US CUSTOMARY UNITS WIN: 21699.00
Driller: MaineDOT Elevation (ft.) 154.7 Auger ID/OD: 5" Solid Stem
Operator: Daggett/Niles Datum: NAVD88 Sampler: Standard Split Spoon
Logged By: B. Wilder Rig Type: CME 45C Hammer Wt./Fall: 140#/30"
Date Start/Finish: 6/14/2018; 07:00-15:00 Drilling Method: Cased Wash Boring Core Barrel: NQ-2"
Boring Location: 12+36.3, 7.4 ft Rt. Casing ID/OD: HW-4"/NW-3" Water Level*: 8.5 ft bgs.
Hammer Efficiency Factor: 0.928 Hammer Type: Automatic Hydraulic Rope & Cathead
Definitions: R = Rock Core Sample Su = Peak/Remolded Field Vane Undrained Shear Strength (psf) Tv = Pocket Torvane Shear Strength (psf)
D = Split Spoon Sample SSA = Solid Stem Auger Su(lab) = Lab Vane Undrained Shear Strength (psf) WC = Water Content, percent
MD = Unsuccessful Split Spoon Sample Attempt HSA = Hollow Stem Auger qp = Unconfined Compressive Strength (ksf) LL = Liquid Limit
U = Thin Wall Tube Sample RC = Roller Cone N-uncorrected = Raw Field SPT N-value PL = Plastic Limit
MU = Unsuccessful Thin Wall Tube Sample Attempt WOH = Weight of 140lb. Hammer Hammer Efficiency Factor = Rig Specific Annual Calibration ValuePI = Plasticity Index
V = Field Vane Shear Test, PP = Pocket PenetrometerWOR/C = Weight of Rods or Casing N60 = SPT N-uncorrected Corrected for Hammer Efficiency G = Grain Size Analysis
MV = Unsuccessful Field Vane Shear Test Attempt WO1P = Weight of One Person N60 C = Consolidation Test
De
pt
h (ft.)
Sa
mple
No.
Sample Information
Pe
n./
Rec. (i
n.)
Sa
mple
De
pt
h
(ft.)
Bl
ows (/
6 i
n.)
Shear
Stre
ngt
h
(psf)
N-
unc
orrecte
d
N6
0
Casi
ng
Bl
ows
Ele
vatio
n
(ft.)
Gra
phic
Lo
g
Visual Description and Remarks
Laboratory
Testing
Results/
AASHTO
and
Unified Class.
30
35
40
45
50
5D
6D
7D
8D
9D
R1
24/15
24/20
24/19
24/20
4.89/4.8
60/60
25.00 -
27.00
30.00 -
32.00
35.00 -
37.00
40.00 -
42.00
45.00 -
45.41
47.00 -
52.00
12/28/39/44
12/12/25/37
8/16/23/33
12/21/28/40
50(4.8")
67
37
39
49
---
104
57
60
76
50
83
NQ-2
107.7
Grey, wet, hard, fine to coarse Sandy SILT, some
gravel, trace small cobbles.
Grey, wet, very dense, Silty SAND, little gravel,
(Glacial Till).
Similar to above.
Cobble from 39.4-39.9 ft bgs.
Similar to above.
Cobble from 42.0-42.5 ft bgs.
Grey, wet, very dense, Silty SAND, some gravel,
(Glacial Till).
Set in NW Casing at 45.0 ft bgs.
Cobble from 45.4-45.8 ft bgs.
Roller Coned ahead to 47.0 ft bgs.
47.0
Top of Bedrock at Elev. 107.7 ft.
R1: Bedrock: White to grey, medium-grained, Amphibole
GRANITE, hard, slightly weathered, joints are dipping
horizontal to low angle, very close to moderately
close, tight.
[Bog Lake Granite]
Rock Mass Quality = Fair.
55
60
65
70
75
R2 60/5852.00 -
57.00
97.7
R1: Core Times (min:sec)
47.0-48.0 ft (5:50)
48.0-49.0 ft (3:12)
49.0-50.0 ft (3:16)
50.0-51.0 ft (3:40)
51.0-52.0 ft (4:02)
R2: Bedrock: similar to above.
Rock Mass Quality = Fair.
R2: Core Times (min:sec)
52.0-53.0 ft (3:05)
53.0-54.0 ft (3:25)
54.0-55.0 ft (5:00)
55.0-56.0 ft (5:00)
56.0-57.0 ft (5:45)
57.0
Bottom of Exploration at 57.0 feet below ground surface.
Remarks:
Stratification lines represent approximate boundaries between soil types; transitions may be gradual. Page 1 of 1
* Water level readings have been made at times and under conditions stated. Groundwater fluctuations may occur due to conditions other
than those present at the time measurements were made. Boring No.: BB-NBS-103
![Page 9: APPROACH DESIGN SECTION - Maine.gov · See MaineDOT Detail 610(03) Where Shown on Plans Geotextile Erosion Control 3. 0 0 ' Riprap Plain 1. 7 5: 1 (M a x) Course Gravel 18" Aggregate](https://reader035.vdocuments.us/reader035/viewer/2022062602/5f01cf697e708231d40125c5/html5/thumbnails/9.jpg)
145
145
145
150
150
150
150
150
150
155
IPF
IPF
IPF
300.00'300.00'
0+
00.0
0
PO
B
0+
06.3
3
PC
0+
89.9
6PT
1+
87.5
4
PT
2+
70.6
1
PC
3+
65.3
8PC
4+
49.4
0
PT
4+
56.6
6
PO
E
Northfield Rd (Route 192)
(Gravel)
Tobey Isla
nd
Rd
Northfield Rd (Route 192)
-2% -2%
Driv
e
Gravel
1+75.00
-2%
É Temporary Detour
É Temporary Detour
2:1 M
ax
2:1 Max
E = 4.45'
T = 42.43'
L = 83.62'
R = 200.00'
PI = 0+48.76
CURVE DATA #1
E = 4.50'
T = 42.67'
L = 84.08'
R = 200.00'
PI = 1+46.12
CURVE DATA #2
E = 4.50'
T = 42.67'
L = 84.08'
R = 200.00'
PI = 3+13.28
CURVE DATA #3
E = 4.49'
T = 42.64'
L = 84.02'
R = 200.00'
PI = 4+08.02
CURVE DATA #4
TR
TRTR
TR
300.00'
CLOSED
ROAD
CLOSED
ROAD
ITEM / PHASE
DUAL ENTRY
FLASH
PREEMPT PRIORITY
DETECTOR
RECALL
PED CLEAR
PED WALK
ALL RED
YELLOW
MAXIMUM 2
MAXMIUM 1
PASSAGE TIME
MINIMUM INITIAL
MOVEMENT
1Ì 2Ì
WB TH EB TH
QUANTITY
AND ARE FURNISHED FOR INFORMATION ONLY.
THE LISTED QUANTITIES ARE APPROXIMATE
TRAFFIC SIGNALS
FURNISH AND INSTALL TEMPORARY
TEMPORARY TRAFFIC SIGNAL CONTROLLER
COMMUNICATIONS DEVICE
SIGNAL TIMING SCHEDULE
ALL
R
Y
G
TEMPORARY INDICATIONS
36"X36"
W20-1
36"X36"
W20-4
36"X36"
W20-1
Varies (12'-0" Min.) 3'-0"
12'-0" Min.
3'-0"
NOTES:NOTE:
M P H
xx
M P H
xx
TEMPORARY DETOUR SECTION
TEMPORARY DETOUR SECTION
1
1
2
DETOUR PLAN
NORTH AND SOUTH OF BOG STREAM)
(LOCATED APPROXIMATELY 250 FEET
NTS
Bridge
NTS
Approaches
TEMPORARY TRAFFIC SIGNALS
STATE ROUTE 192
Scale of Feet
PLAN
25 0 25 50
OFF
N/A
2
-
MAX
N/A
N/A
17
4
N/A
24
17
5
OFF
N/A
1
-
MAX
N/A
N/A
17
4
N/A
24
17
5
DE
SIG
N-
DE
TAIL
ED
BY
DA
TE
PR
OJ.
MA
NA
GE
R
SHEET NUMBER
FIE
LD
CH
AN
GE
S
RE
VISIO
NS
1
RE
VISIO
NS
2
RE
VISIO
NS
3
RE
VISIO
NS
4
CH
EC
KE
D-
RE
VIE
WE
DE.
LO
WE
LL
T.
SA
ND
EL
L10\
2018
Brid
ge
Divisio
n:
Filena
me:...\
304.0
2 -
DG
N\
009_
Detour Pla
nUserna
me:
Date:1
0/2
3/2
018
tksandell
BO
G
ST
RE
AM
BRID
GE
NO
RT
HFIE
LD
WA
SHIN
GT
ON
CO
UN
TY
BO
G
ST
RE
AM
9OF 34
BRID
GE N
O. 3719
CO
NC
EP
TU
AL
DE
TO
UR
PL
AN
M.
PA
RLIN
DE
SIG
N2-
DE
TAIL
ED
2
DE
SIG
N3-
DE
TAIL
ED
3
J.
SO
CH
AN
EK
PA
UL
YU
021699.0
0
WIN
WIN 0
21699.0
0B
RID
GE P
LA
NS
10\
2018
ST
AT
E O
F M
AIN
E
DE
PA
RT
ME
NT O
F T
RA
NSP
OR
TA
TIO
N
DA
TE
SIG
NA
TU
RE
P.E.
NU
MB
ER
CONTRACTOR.
652. THE DESIGN OF THE DETOUR IS THE RESPONSIBILITY OF THE
SUBMISSION OF A TRAFFIC CONTROL PLAN IN ACCORDANCE WITH SECTION
CONTINUOUS AND EFFECTIVE TRAFFIC CONTROL AS WELL AS THE
PURPOSES ONLY. THE CONTRACTOR IS STILL RESPONSIBLE FOR
THIS DETOUR PLAN IS CONCEPTUAL AND FOR INFORMATIONAL 4)
PUBLIC.
CLEARANCE TIMES IF NECESSARY FOR THE SAFETY OF THE TRAVELING
PROJECT RESIDENT SHALL HAVE THE AUTHORITY TO INCREASE ALL RED
IF A LICENSED PROFESSIONAL ENGINEER CANNOT BE REACHED, THE 3)
NOT REQUIRE A FIELD VISIT.
THAN WHAT IS SHOWN ON THE PLANS. SUCH ADJUSTMENTS MAY OR MAY
ENGINEER IF OPERATION IN THE FIELD REQUIRES TIMING DIFFERENT
THE TIMING MAY BE CHANGED BY A LICENSED PROFESSIONAL 2)
B) 25 MPH AVERAGE SPEED
A) 500 FEET BETWEEN STOP BARS AND
CLEARANCE TIMING INCLUDE:
THE ASSUMPTIONS USED IN ESTABLISHING THE ALL RED 1)
EQUIPMENT AND WORK ITEMS 643.72
36"X18"
G20-2
36"X18"
G20-2
36"X36"
W20-4
3+
54.7
0PT
1+
03.4
5PC
36"X36"
W3-3
40.00'300.00' 50.00'
300.00' 300.00' 300.00' 300.00'
9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00
Temp. Barricade Travel Way (Typ.)
Approx. Edge of Temp.
Bridge
Temporary
One Lane
Subbase Course Gravel
12" Min. Aggregate
Barrier (Typ.)
Temporary Concrete
(Contractor Designed)
Temporary Bridge
Ordinary Borrow
Existing Ground
Abutment (Typ.)
Temporary
Temporary Detour (Typ.)
Clearing Limit for
Barrier (Typ.)
Temporary Concrete
(Typ.)
Cushions
Crash
Temp. Barricade
Temporary Detour (Typ.)
Toe of Slope for
grading) (Typ.)
impacts and slope
(minimize wetland
Temporary Shielding
(Typ.)
Traffic Signals
Install Temp.
Construction Work Zone
24" White Stop Bar (Typ.)50.00'50.00'
24"X36"
R10-6
24"X36"
R10-6
36"X36"
W1-3
36"X36"
W3-3
24"X24"
W13-1P
36"X36"
W1-3
24"X24"
W13-1P
48"X30"
R11-2
48"X30"
R11-2
48"X24"
W1-6
48"X24"
W1-6
![Page 10: APPROACH DESIGN SECTION - Maine.gov · See MaineDOT Detail 610(03) Where Shown on Plans Geotextile Erosion Control 3. 0 0 ' Riprap Plain 1. 7 5: 1 (M a x) Course Gravel 18" Aggregate](https://reader035.vdocuments.us/reader035/viewer/2022062602/5f01cf697e708231d40125c5/html5/thumbnails/10.jpg)
145
145
145
150
150
150
150
150
150
155
IPF
IPF
IPF
Bog Stream
Bog Stream
140
145
150
155
160
165165
140
145
150
155
160
165165
0+00 1+00 2+00 3+00 4+00 5+00
0+00 1+00 2+00 3+00 4+00 5+00
EL. 160.0
8
EL. 159.1
3
EL. 158.0
9
EL. 156.8
0
EL. 154.6
3
EL. 150.0
6
EL. 148.9
8
EL. 148.4
5
EL. 148.3
7
EL. 145.6
8
EL. 146.6
7
EL. 146.5
6
EL. 146.6
4
EL. 146.9
8
EL. 149.5
2
EL. 154.4
8
EL. 154.7
8
EL. 154.7
6
EL. 154.7
4
EL. 16
0.0
8
EL. 15
9.16
EL. 15
8.3
4
EL. 15
7.6
5
EL. 15
7.0
8
EL. 15
6.6
4
EL. 15
6.3
3
EL. 15
6.13
EL. 15
5.9
6
EL. 15
5.7
9
EL. 15
5.6
2
EL. 15
5.4
5
EL. 15
5.2
8
EL. 15
5.12
EL. 15
4.9
9
EL. 15
4.8
9
EL. 15
4.8
2
EL. 15
4.7
7
EL. 15
4.7
4
PVI =
ST
A. 0+0
0.0
0
ELE
V. =
160.0
8
PV
C =
ST
A. 0+15.6
0
ELE
V. =
159.5
0
PVI =
ST
A. 0+9
0.6
0
ELE
V. =
156.7
1
PV
T =
ST
A. 1+65.6
0
ELE
V. =
156.2
0
PV
C =
ST
A. 2
+94.7
4
ELE
V. =
155.3
1
PVI =
ST
A. 3
+69.7
4
ELE
V. =
154.8
0
PVT =
ST
A. 4+4
4.7
4
ELE
V. =
154.7
4
PVI =
ST
A. 4+5
6.6
6
ELE
V. =
154.7
3
G = -3.72%
G = -0.69%
G = -0.07%
V.C.L. = 150'
E = 0.569'
SD = 333'
V.C.L. = 150'
E = 0.115'
SD = 960'
9+00 10+00 11+00 12+00 13+00 14+00 15+009+
58.6
9
PT
15+
33.6
8
PC
Northfield Rd (Route 192)
Northfield Rd (Route 192)
(Gravel)
Tobey Isla
nd
Rd
Driv
e
Gravel
Flow
Scale of Feet
25 0 25 50
5 0 5 10
PROFILE
Horiz.
Vert.
Scale of Feet
PLAN
25 0 25 50
Notes:
Q1.1 EL. 147.2
Q100 EL. 149.2 Q50 EL. 148.9
Temp. Abutment
Temp. Abutment
Temp. Bridge
Temporary Roadway Grade
Existing Ground
Roadway Grade
Temporary
É Temporary Roadway
Temporary Bridge
Temp. Fill
Temp. Fill
DE
SIG
N-
DE
TAIL
ED
BY
DA
TE
PR
OJ.
MA
NA
GE
R
SHEET NUMBER
FIE
LD
CH
AN
GE
S
RE
VISIO
NS
1
RE
VISIO
NS
2
RE
VISIO
NS
3
RE
VISIO
NS
4
CH
EC
KE
D-
RE
VIE
WE
DE.
LO
WE
LL
T.
SA
ND
EL
L10\
2018
Brid
ge
Divisio
n:
Filena
me:...\
010_
Detour Brid
ge Profile
&
Gradin
gUserna
me:
Date:1
0/10/2
018
tksandell
BO
G
ST
RE
AM
BRID
GE
NO
RT
HFIE
LD
WA
SHIN
GT
ON
CO
UN
TY
BO
G
ST
RE
AM
10OF 34
BRID
GE N
O. 3719
&
GR
ADIN
G
TE
MP
OR
AR
Y
PR
OFIL
E
M.
PA
RLIN
DE
SIG
N2-
DE
TAIL
ED
2
DE
SIG
N3-
DE
TAIL
ED
3
J.
SO
CH
AN
EK
PA
UL
YU
021699.0
0
WIN
WIN 0
21699.0
0B
RID
GE P
LA
NS
10\
2018
ST
AT
E O
F M
AIN
E
DE
PA
RT
ME
NT O
F T
RA
NSP
OR
TA
TIO
N
DA
TE
SIG
NA
TU
RE
P.E.
NU
MB
ER
Abut. No. 1
É Temp Brg.
Abut. No. 2
É Temp Brg.
75'-0" Approximate Span
510.
temporary bridge as specified in Section
for the design of the Special Detour and
only. The Contractor is still responsible
conceptual and for informational purposes
3. The temporary bridge shown is
structure, etc., refer to the Detour Plan.
temporary roadway alignment, width,
2. For additional details regarding
temporary bridge for traffic management.
accommodate the temporary roadway and
convey the grading necessary to
1. This plan and profile are intended to
150
150
155
155
155
155
![Page 11: APPROACH DESIGN SECTION - Maine.gov · See MaineDOT Detail 610(03) Where Shown on Plans Geotextile Erosion Control 3. 0 0 ' Riprap Plain 1. 7 5: 1 (M a x) Course Gravel 18" Aggregate](https://reader035.vdocuments.us/reader035/viewer/2022062602/5f01cf697e708231d40125c5/html5/thumbnails/11.jpg)
6'-0"
8'-7" (Left Wingwall)
7'-11ƒ" (Right Wingwall)
5'-2•" (Left Wingwall)
13'-5‚" (Right Wingwall)
4'-0†
"
7'-4†
" (L
eft
Win
gwall)
7'-4" (Rig
ht
Win
gwall)
É Brg., Abut. No. 1
1'-6
"1'-6
"
É Construction
-2%-2%
15'-9•"14'-8…"
4'-0†
"7'-4"
É Construction
(Typ.)
11‚
"
3'-0"
STA. 12+22.20
20°0'0"
34'-0ƒ"
Profile Grade El = 151.66
Level
Jacket (Typ.)
2'-0" Ì Concrete
10'-0"10'-0"10'-0"
Bearing Pad (Typ.)
1'-0" x 1'-0" Elastomeric
Typ.
2'-4"
Beam
Sla
b Shelf
6"
Approach
Typ.
1'-8" Curb
4'-0†
"7'-4"
11'-5†
"
Left
Win
gwall
13'-9†
"
5'-3‡" 3'-2‚" 5'-3‡" 3'-1„" 5'-3‡" 3'-2‚" 5'-3‡"
10'-0" 5'-0" 5'-0" 10'-0"
7'-3‡"
16'-7•
"
Left
Win
gwall
8'-10
†"
Rig
ht
Win
gwall
21'-5
"
El = 155.39
Rig
ht
Win
gwall
18'-10
"El = 150.00
El = 151.38 Lt.
El = 151.34 Rt.
Outside Face
Measured along
End Diaphragm not shown for clarity.
El = 155.42
ABUTMENT NO. 1 PLAN
ABUTMENT NO. 1 FRONT ELEVATION
Bearing Pads
Btm Of Cap
El = 144.00
Top Of Cap
El = 151.34
Top Of Pile (Typ.)
El = 146.00
HP 14x117
DE
SIG
N-
DE
TAIL
ED
BY
DA
TE
PR
OJ.
MA
NA
GE
R
SHEET NUMBER
FIE
LD
CH
AN
GE
S
RE
VISIO
NS
1
RE
VISIO
NS
2
RE
VISIO
NS
3
RE
VISIO
NS
4
CH
EC
KE
D-
RE
VIE
WE
DE.
LO
WE
LL
T.
SA
ND
EL
L10\
2018
Brid
ge
Divisio
n:
Filena
me:...\
304.0
2 -
DG
N\
011_
Abut
ment_
No.1
Userna
me:
Date:1
0/10/2
018
tksandell
BO
G
ST
RE
AM
BRID
GE
NO
RT
HFIE
LD
WA
SHIN
GT
ON
CO
UN
TY
BO
G
ST
RE
AM
11OF 34
BRID
GE N
O. 3719
M.
PA
RLIN
DE
SIG
N2-
DE
TAIL
ED
2
DE
SIG
N3-
DE
TAIL
ED
3
J.
SO
CH
AN
EK
PA
UL
YU
021699.0
0
PIN
WIN 0
21699.0
0B
RID
GE P
LA
NS
10\
2018
ST
AT
E O
F M
AIN
E
DE
PA
RT
ME
NT O
F T
RA
NSP
OR
TA
TIO
N
DA
TE
SIG
NA
TU
RE
P.E.
NU
MB
ER
AB
UT
ME
NT
NO.
1
PL
AN
&
EL
EV
ATIO
N
Top Of Cap
El = 151.33
ABUTMENT WING ELEVATION
to be placed with Curb
Portion of Concrete
Deck and End Diaphragm
to be placed with
Portion of Concrete
Abutment Beam Seat
to be placed with
Portion of Concrete
HP 14x117
Right Wing shown; Left Wing similar
Top of Wingwall
El = 154.40
Wingwall
Top of
El = 154.43
ABUTMENT NOTES
to related items. Fill concrete may be used for the concrete jackets.
of the piles will not be paid for separately, but will be considered incidental
9. Work and materials required to construct the concrete jackets near the top
portion of the Wingwalls.
8. The End Diaphragm is to be poured at the same time as the upper
for Underwater Backfill. Pay limits will be as shown in these Plans.
7. Abutments and wingwalls shall be backfilled with Granular Borrow, Material
Section 620, Drainage Geocomposite.
the approach slab seat elevation and in accordance with Special Provision
6. Install drainage geocomposite behind the abutments and wingwalls up to
Standard Details Section 502.
5. Cover joints where waterstops are not required in accordance with
concrete.
shown in Standard Details Section 526, prior to the placement of the curb
4. The Contractor shall install Transition Barrier vertical closed stirrups, as
location.
3. Provide 4 additional stirrups in the curbs at each Transition Barrier
maximum spacing. The exact location will be determined by the Resident.
2. Place 4-in. diameter drains in the breastwall and wingwalls at 10-ft
walls and 3 inches on the bottom unless otherwise noted.
1. Reinforcing steel shall have a minimum concrete cover of 2 inches in the
![Page 12: APPROACH DESIGN SECTION - Maine.gov · See MaineDOT Detail 610(03) Where Shown on Plans Geotextile Erosion Control 3. 0 0 ' Riprap Plain 1. 7 5: 1 (M a x) Course Gravel 18" Aggregate](https://reader035.vdocuments.us/reader035/viewer/2022062602/5f01cf697e708231d40125c5/html5/thumbnails/12.jpg)
On
Btm
3"
Cover
(Typ.)
(Space around Piles)
4 ~ A800
6 ~ A800 @ 12" (E.F.)
Jacket (Typ.)
2'-0" Ì Concrete
É Brg., Abut. No. 1É Brg., Abut. No. 1
4 ~ A800
(w/ Set "B")
46 ~ Set "A" @ 9"
(w/ Set "A")
46 ~ Set "B" @ 9"
38~A650 @ 9" (Typ.)
& Set "B"
3" Begin Set "A"
12 ~ A853 @ 6" E.F.
@ 6" E.F.
10 ~ A852
(Typ. @ Piles)
8~A654 N.F. @ 9"
8~A653 F.F. &
@ 6" E.F.
12 ~ A854
@ 6"
16 ~ A855
@ 6"
16 ~ A856
@ 6"
4 ~ A857 4 ~ A858 @ 6"
6 ~ A658 @ 12" Bot.
6 ~ A656 @ 12" F.F.
6 ~ A602 @ 12" N.F.
4 ~ A658 @ 12" Bot.
4 ~ A655 @ 12" F.F.
8 ~ A601 @ 12" N.F.
5 ~ A658 @ 12" Bot.
5 ~ A655 @ 12" F.F.
8 ~ A601 @ 12" N.F.
14 ~ A658 @ 12" Bot.
14 ~ A657 @ 12" F.F.
14 ~ A603 @ 12" N.F.
10 ~ A851 @ 6" E.F.
1'-8"
2'-4"
4~
A857
@ 6" Left
Win
g
4~
A858
@ 6"
Rig
ht
Win
g
1'-0
‡"
Varies
A658 @ 12"
F.F.N.F.
N.F.F.F.
LEFT WING PLAN
8'-7"5'-2•" 7'-11ƒ" 13'-5‚"
A602
A656
A601
A655 A854
A852 or
A657
A853
A851 or
A601
A655
A603
A855
A856
@
A600
2'-5"
MIN. Splice
2'-0"
N.F.F.F.
1'-6"
1'-6"1'-6"
N.F.F.F.
3'-0"
Slab Seat
6" Approach
Beam
End Diaphragm
Front face of End Diaphragm
Back face of
Jacket (Typ.)
2'-0" Ì Concrete
around Piles
4~A800 Spa.
A600 @ 9"
A651 @ 9" A652 @ 9"
A600 @ 9"
The End Diaphragm is not shown for clarity.
around Piles
4~A800 Spa.
7'-4"
Min.
7'-8"
Max.
Evenly
4 ~ A800Evenly
4 ~ A800
@ 9"
A600
9" Horizontal
12" Vertical
A450 Ties at
6 ~
A800
@ 12
" (E.F.)
6 ~
A800
@ 12
" (E.F.)
@ 9"
A600
9" Horizontal
6" Vertical
A450 Ties at
@ 9"
A650
@
A600
Typ.
2'-5"
MIN. Splice
@ 9"
A653
@ 9"
A654
ABUTMENT NO. 1 REINFORCEMENT
SECTION A-A
SECTION B-B
Spaced
("A" Sets @ Abutment)
("B" Sets @ Abutment)
A
B
B
A
É Brg., Abut. No. 1
É Brg., Abut. No. 1
DE
SIG
N-
DE
TAIL
ED
BY
DA
TE
PR
OJ.
MA
NA
GE
R
SHEET NUMBER
FIE
LD
CH
AN
GE
S
RE
VISIO
NS
1
RE
VISIO
NS
2
RE
VISIO
NS
3
RE
VISIO
NS
4
CH
EC
KE
D-
RE
VIE
WE
DE.
LO
WE
LL
T.
SA
ND
EL
L10\
2018
Brid
ge
Divisio
n:
Filena
me:...\
012
_Abut
ment_
No.1 Reinf
Userna
me:
Date:1
0/10/2
018
tksandell
BO
G
ST
RE
AM
BRID
GE
NO
RT
HFIE
LD
WA
SHIN
GT
ON
CO
UN
TY
BO
G
ST
RE
AM
12OF 34
BRID
GE N
O. 3719
REIN
FO
RC
EM
EN
T
AB
UT
ME
NT
NO.
1
M.
PA
RLIN
DE
SIG
N2-
DE
TAIL
ED
2
DE
SIG
N3-
DE
TAIL
ED
3
J.
SO
CH
AN
EK
PA
UL
YU
021699.0
0
PIN
WIN 0
21699.0
0B
RID
GE P
LA
NS
10\
2018
ST
AT
E O
F M
AIN
E
DE
PA
RT
ME
NT O
F T
RA
NSP
OR
TA
TIO
N
DA
TE
SIG
NA
TU
RE
P.E.
NU
MB
ER
RIGHT WING PLAN
C
C
LEFT WING ELEVATION RIGHT WING ELEVATION
Spaced
NOTE
E.F. denotes "Each Face" to elevation.
F.F. denotes "Far Face" to elevation.
N.F. denotes "Near Face" to elevation,
SECTION C-C
PILE NOTES
related Contract items.
obstructions, cobbles, and boulders shall be made incidental to
obstructions may be used as approved by the Resident. Removal of
by conventional excavation methods. Alternative methods to clear
they may be cleared by preaugering, predrilling, down-hole hammers, or
encountered prior to reaching the minimum required pile tip elevation,
abutment locations and impede pile driving operations. If obstructions are
8. Cobbles and boulders may be encountered at either of the proposed
with a minimum pile tip elevation of 110.0.
501. Piles at Abutment No. 2 shall be driven to the required resistance
on or within bedrock in accordance with Standard Specification Section
7. Piles at Abutment No. 1 shall be driven to the required resistance
production pile driven at each abutment.
Specifications. The dynamic tests shall be performed on the first
axial pile load divided by a resistance factor of 0.65 per LRFD
the piles. The required nominal resistance for the pile is the factored
and 24-hour (minimum) restrike tests to confirm the nominal resistance of
6. The Contractor shall perform 2 dynamic load tests with signal matching
the wave equation analyses and the proposed driving system.
shall include the proposed stopping criteria for each abutment, based on
maximum allowable driving stress is 0.90 times Fy. The submittal analysis
one for each abutment, for review and acceptance by the Resident. The
5. The Contractor shall perform and submit two wave equation analyses,
Rock Injector Pile Tip.
equipped with a pile tip in accordance with Special Provision 501,
and 711.1 H-Beam Piles, Splices, and Tips. Abutment 2 piles shall be
with Standard Specification Subsection 501.048 - Prefabricated Pile Tips
4. Abutment No. 1 piles shall be equipped with a pile tip in accordance
for each test pile to accommodate dynamic pile testing equipment.
The order lengths of the piles shall include an additional 5 feet of length
Abutment No. 2: 4 - HP 14x117 @ 56 feet
Abutment No. 1: 4 - HP 14x117 @ 36 feet
3. Estimate of piles required:
2. H-pile material shall be ASTM A 572, Grade 50.
1. The maximum factored pile load is 317 kips
2 - A600
Set A
Set B
1 - A652
1 - A651
![Page 13: APPROACH DESIGN SECTION - Maine.gov · See MaineDOT Detail 610(03) Where Shown on Plans Geotextile Erosion Control 3. 0 0 ' Riprap Plain 1. 7 5: 1 (M a x) Course Gravel 18" Aggregate](https://reader035.vdocuments.us/reader035/viewer/2022062602/5f01cf697e708231d40125c5/html5/thumbnails/13.jpg)
6'-0"
8'-7„" (Left Wingwall)
7'-11ƒ" (Right Wingwall)
11'-6•" (Left Wingwall)
13'-5‚" (Right Wingwall)
4'-0†
"
7'-3•
" (L
eft
Win
gwall)
7'-2‡
" (Rig
ht
Win
gwall)
Beam
ABUTMENT NO. 2 FRONT ELEVATION
É Brg., Abut. No. 2
1'-6
"1'-6
"
É Construction
15'-10„"14'-8•"
É Construction
4'-0†
"7'-3
…"
-2%-2%
Btm. Of Cap
El = 144.00
Top Of Cap
El = 151.28
Sta. 12+84.20
Jacket (Typ.)
2'-0" Dia. Concrete
20°0'0"
34'-0ƒ"
Top Of Cap
El = 151.26
10'-0"10'-0"10'-0"
4'-0†
"7'-3„
"3'-0" Level
Typ.
2'-4"
El = 151.59
Profile Grade
Bearing Pad (Typ.)
1'-0" x 1'-0" Elastomeric
Sla
b Shelf
6"
Approach
Typ.
1'-8" Curb
(Typ.)
11‚
"
Left
Win
gwall
20'-1†
"
Rig
ht
Win
gwall
18'-10
"
17'-5"
Left
Win
gwall
15'-2†
"
5'-3‡" 3'-2‚" 5'-3‡" 3'-1„" 5'-3‡" 3'-2‚" 5'-3‡"
10'-0" 5'-0" 5'-0" 10'-0"
7'-3‡"
20'-1•
"
Rig
ht
Win
gwall
21'-5
"
El = 155.33
El = 150.00
Outside Face
Measured along
El = 151.31 Lt.
El = 151.29 Rt.
El = 155.30
ABUTMENT NO. 2 PLAN
Bearing Pads
DE
SIG
N-
DE
TAIL
ED
BY
DA
TE
PR
OJ.
MA
NA
GE
R
SHEET NUMBER
FIE
LD
CH
AN
GE
S
RE
VISIO
NS
1
RE
VISIO
NS
2
RE
VISIO
NS
3
RE
VISIO
NS
4
CH
EC
KE
D-
RE
VIE
WE
DE.
LO
WE
LL
T.
SA
ND
EL
L10\
2018
Brid
ge
Divisio
n:
Filena
me:...\
304.0
2 -
DG
N\
013
_Abut
ment_
No.2
Userna
me:
Date:1
0/10/2
018
tksandell
BO
G
ST
RE
AM
BRID
GE
NO
RT
HFIE
LD
WA
SHIN
GT
ON
CO
UN
TY
BO
G
ST
RE
AM
13OF 34
BRID
GE N
O. 3719
M.
PA
RLIN
DE
SIG
N2-
DE
TAIL
ED
2
DE
SIG
N3-
DE
TAIL
ED
3
J.
SO
CH
AN
EK
PA
UL
YU
021699.0
0
PIN
WIN 0
21699.0
0B
RID
GE P
LA
NS
10\
2018
ST
AT
E O
F M
AIN
E
DE
PA
RT
ME
NT O
F T
RA
NSP
OR
TA
TIO
N
DA
TE
SIG
NA
TU
RE
P.E.
NU
MB
ER
AB
UT
ME
NT
NO.
2
Top of Pile (Typ.)
El.= 146.00
PL
AN
&
EL
EV
ATIO
N
to be placed with Curb
Portion of Concrete
Deck and End Diaphragm
to be placed with
Portion of Concrete
Abutment Beam Seat
to be placed with
Portion of Concrete
HP 14x117
HP 14x117
Right Wing shown; Left Wing similar
ABUTMENT WING ELEVATION
Top of Wingwall
El = 154.31
Wingwall
Top of
El = 154.29
![Page 14: APPROACH DESIGN SECTION - Maine.gov · See MaineDOT Detail 610(03) Where Shown on Plans Geotextile Erosion Control 3. 0 0 ' Riprap Plain 1. 7 5: 1 (M a x) Course Gravel 18" Aggregate](https://reader035.vdocuments.us/reader035/viewer/2022062602/5f01cf697e708231d40125c5/html5/thumbnails/14.jpg)
É Brg., Abut. No. 2
É Brg., Abut. No. 2
É Brg., Abut. No. 2 É Brg., Abut. No. 2
(w/ Set "B")
46 ~ Set "A" @ 9"
6 ~ B800 @ 12" (E.F.)
Jacket (Typ.)
2'-0" Ì Concrete (w/ Set "A")
46 ~ Set "B" @ 9"
38~B650 @ 9" (Typ.)
(Typ.)
On
Btm
3"
Cover
& Set "B"
3" Begin Set "A"
1'-6"
Slab Seat
6" Approach 1'-6"
End Diaphragm
Back face of
B651 @ 9" B652 @ 9"
End Diaphragm
Front face of
Beam
N.F.
Jacket (Typ.)
2'-0" Ì Concrete
around Piles
4~B800 Spa.
F.F.
B600 @ 9"
3'-0"
@ 6" E.F.
10 ~ B85210 ~ B851 @ 6" E.F.
12 ~ B853 @ 6" E.F.
7'-3„
"Min.
7'-7„
" Max.
4 ~ B800
(Typ. @ Piles)
8~B654 N.F. @ 9"
8~B653 F.F. &
(Space around Piles)
4 ~ B800
Evenly
4 ~ B800
6 ~
B800
@ 12
" (E.F.)
@ 9"
B600
@ 9"
B653
@
B600
Typ.
2'-5"
MIN. Splice
@ 9"
B654
@ 6" E.F.
12 ~ B854
@ 6"
16 ~ B855
@ 6"
16 ~ B856 @ 6"
4 ~ B858 4 ~ B857 @ 6"
12 ~ B658 @ 12" Bot.
12 ~ B656 @ 12" F.F.
12 ~ B602 @ 12" N.F.
4 ~ B658 @ 12" Bot.
4 ~ B655 @ 12" F.F.
8 ~ B601 @ 12" N.F.
14 ~ B658 @ 12" Bot.
14 ~ B657 @ 12" F.F.
14 ~ B603 @ 12" N.F.
5 ~ B658 @ 12" Bot.
5 ~ B655 @ 12" F.F.
8 ~ B601 @ 12" N.F.
1'-6"2'-0"
N.F.
around Piles
4~B800 Spa.
@
B600
2'-5"
MIN. Splice
F.F.
B600 @ 9"
Evenly
4 ~ B800
9" Horizontal
12" Vertical
B450 Ties at
6 ~
B800
@ 12
" (E.F.)
@ 9"
B600
9" Horizontal
6" Vertical
B450 Ties at
@ 9"
B650
SpacedSpaced
2'-4"
1'-8"
Varies
1'-0
‡"
4~
B858
@ 6" Left
Win
g
4~
B857
@ 6"
Rig
ht
Win
g
A658 @ 12"
LEFT WING PLAN
8'-7"11'-6•" 7'-11ƒ" 13'-5‚"
N.F.F.F. F.F.N.F.
B602
B656
B601
B655
B855B856
B854
B852 or
B853
B851 or
B655
B601
B657
B603
The End Diaphragm is not shown for clarity.
ABUTMENT NO. 2 REINFORCEMENT
SECTION A-A
SECTION B-B
NOTES:
("A" Sets @ Abutment)
("B" Sets @ Abutment)
A
A
DE
SIG
N-
DE
TAIL
ED
BY
DA
TE
PR
OJ.
MA
NA
GE
R
SHEET NUMBER
FIE
LD
CH
AN
GE
S
RE
VISIO
NS
1
RE
VISIO
NS
2
RE
VISIO
NS
3
RE
VISIO
NS
4
CH
EC
KE
D-
RE
VIE
WE
DE.
LO
WE
LL
T.
SA
ND
EL
L10\
2018
Brid
ge
Divisio
n:
Filena
me:...\
014
_Abut
ment_
No.2
Reinf
Userna
me:
Date:1
0/10/2
018
tksandell
BO
G
ST
RE
AM
BRID
GE
NO
RT
HFIE
LD
WA
SHIN
GT
ON
CO
UN
TY
BO
G
ST
RE
AM
14OF 34
BRID
GE N
O. 3719
M.
PA
RLIN
DE
SIG
N2-
DE
TAIL
ED
2
DE
SIG
N3-
DE
TAIL
ED
3
J.
SO
CH
AN
EK
PA
UL
YU
021699.0
0
PIN
WIN 0
21699.0
0B
RID
GE P
LA
NS
10\
2018
ST
AT
E O
F M
AIN
E
DE
PA
RT
ME
NT O
F T
RA
NSP
OR
TA
TIO
N
DA
TE
SIG
NA
TU
RE
P.E.
NU
MB
ER
REIN
FO
RC
EM
EN
T
AB
UT
ME
NT
NO.
2
B
B
LEFT WING ELEVATION RIGHT WING ELEVATION
RIGHT WING PLAN
E.F. denotes "Each Face" to elevation.
F.F. denotes "Far Face" to elevation.
N.F. denotes "Near Face" to elevation,
1. See Drawing 10 for Pile Notes.
C
C
C
C
SECTION C-C
2 - B600
Set A
Set B
1 - B652
1 - B651
![Page 15: APPROACH DESIGN SECTION - Maine.gov · See MaineDOT Detail 610(03) Where Shown on Plans Geotextile Erosion Control 3. 0 0 ' Riprap Plain 1. 7 5: 1 (M a x) Course Gravel 18" Aggregate](https://reader035.vdocuments.us/reader035/viewer/2022062602/5f01cf697e708231d40125c5/html5/thumbnails/15.jpg)
8" Sla
b
AS601
1" Cl.
AS502
AS651 @ 12"
26'-4"
1" Ì Plastic Tube Drains @ 5'-0"
3" Min. 30 ~ AS651 @ 12" 3" Min
3" Min. 3" Min30 ~ AS601 @ 6"
Abutment Backwall
1'-9"
15'-6
"
(Typ.)
2" Cl.
3"
3"
15OF 34
É Drain
Brid
ge
Divisio
n:
Filena
me:...\
015
_Approach Sla
b
Details
Userna
me:
Date:1
0/10/2
018
tksandell
AP
PR
OA
CH
SL
AB
DE
TAIL
S
APPROACH SLAB REINFORCEMENT - PLAN
APPROACH SLAB REINFORCEMENT - SECTION SHEET NUMBER
BO
G
ST
RE
AM
BRID
GE
NO
RT
HFIE
LD
BO
G
ST
RE
AM
WA
SHIN
GT
ON
CO
UN
TY
DE
SIG
N-
DE
TAIL
ED
PR
OJ.
MA
NA
GE
R
FIE
LD
CH
AN
GE
S
RE
VISIO
NS
1
RE
VISIO
NS
2
RE
VISIO
NS
3
RE
VISIO
NS
4
CH
EC
KE
D-
RE
VIE
WE
D
M.
PA
RLIN
DE
SIG
N2-
DE
TAIL
ED
2
DE
SIG
N3-
DE
TAIL
ED
3
E.
LO
WE
LL
J.
SO
CH
AN
EK
T.
SA
ND
EL
L
PA
UL
YU
BY
DA
TE
10\
2018
10\
2018
DA
TE
SIG
NA
TU
RE
P.E.
NU
MB
ER
BRID
GE N
O. 3719
021699.0
0
PIN
WIN 0
21699.0
0B
RID
GE P
LA
NS
ST
AT
E O
F M
AIN
E
DE
PA
RT
ME
NT O
F T
RA
NSP
OR
TA
TIO
N
16 ~
AS502
@ 12
"
![Page 16: APPROACH DESIGN SECTION - Maine.gov · See MaineDOT Detail 610(03) Where Shown on Plans Geotextile Erosion Control 3. 0 0 ' Riprap Plain 1. 7 5: 1 (M a x) Course Gravel 18" Aggregate](https://reader035.vdocuments.us/reader035/viewer/2022062602/5f01cf697e708231d40125c5/html5/thumbnails/16.jpg)
DE
SIG
N-
DE
TAIL
ED
BY
DA
TE
PR
OJ.
MA
NA
GE
R
SHEET NUMBER
FIE
LD
CH
AN
GE
S
RE
VISIO
NS
1
RE
VISIO
NS
2
RE
VISIO
NS
3
RE
VISIO
NS
4
CH
EC
KE
D-
RE
VIE
WE
DE.
LO
WE
LL
T.
SA
ND
EL
L10\
2018
Brid
ge
Divisio
n:
Filena
me:...\
016_
Prestressed_
NE
XT
_Bea
ms
Userna
me:
Date:1
0/10/2
018
tksandell
BO
G
ST
RE
AM
BRID
GE
NO
RT
HFIE
LD
WA
SHIN
GT
ON
CO
UN
TY
BO
G
ST
RE
AM
16OF 34
BRID
GE N
O. 3719
PR
EC
AS
T
NE
XT
BE
AM
S
M.
PA
RLIN
DE
SIG
N2-
DE
TAIL
ED
2
DE
SIG
N3-
DE
TAIL
ED
3
J.
SO
CH
AN
EK
PA
UL
YU
021699.0
0
PIN
WIN 0
21699.0
0B
RID
GE P
LA
NS
10\
2018
ST
AT
E O
F M
AIN
E
DE
PA
RT
ME
NT O
F T
RA
NSP
OR
TA
TIO
N
DA
TE
SIG
NA
TU
RE
P.E.
NU
MB
ER
10‚" 10‚"
1'-1•" 3'-10•" 1'-1•"
2'-0"
4"
FASCIA OVERHANG DETAIL
4" (T
yp.)
R
NEXT 28 F BEAM SECTION
•" Drip Notch 3"
62'-0" horizontal span length
63'-0ƒ" girder length measured along Profile Grade
6" 6"
É Brg., Abut. No. 1
1'-6"
1'-6
"2'-0"
É Brg., Abut. No. 2
Vent ducts (Typ. both ends ~ Adjust to clear reinforcing)É 4 ~ 4"o
20° Skew
É
NE
XT
Bea
m
•" Chamfer
1'-3" 3'-9" 1'-3"
(See Note No. 6)
Roughen surface
‚" Draft
Typ.
11" 11"
ELASTOMERIC BEARING PAD NOTES
edition of the AASHTO LRFD Bridge Construction Specifications, Section 18.2.
3. Elastomeric Bearing Pads shall conform to the requirements of the latest
A Durometer hardness of 70.
2. The Elastomer shall have a shear modulus of 260 psi +/- 15% and a Shore
inches tall.
1. Elastomeric Bearing Pads shall be 12 inches by 12 inches in plan and 1‚
7" Chamfer, Typ.
PRECAST CONCRETE SUPERSTRUCTURE NOTES
ASTM A 615, Grade 60.
may be substituted for the welded wire fabric. Reinforcing steel shal1 be
8. A mat of mild reinforcing steel #4 bars @ 12 inches in both directions,
debonded 6 inches from the end of the beam.
7. A maximum of 50 percent of the strands in the bottom 5 rows may be
elevations.
size shall be left to facilitate taking elevations for setting bottom of slab
the centerline of each beam. At these locations, a flattened area of sufficient
raked to a surface roughness of ± ‚ inch, except at 10 ft. increments along
6. The top surface of the upper flange of the prestressed beams shall be
actuated tools on the beams will not be permitted.
5. The drilling of holes in the prestressed beams and the use of powder
otherwise noted.
4. Reinforcing steel shall have a minimum concrete cover of 2 inches unless
44 kips per prestressing strand.
3. Prestressing strands shall be 0.6-in. diameter. The tensioning force is
Prestressed Concrete Superstructure - Camber.
at erection is 2‡ inches. Refer to Special Provision Section 535, Precast,
2. The estimated camber at release is 2.0 inches and the estimated camber
be found at http:/www.pcine.org.
NORTHEAST (PCINE). Standardized section properties and details may
1. NEXT F Beams are a non - proprietary shape developed by PCI
![Page 17: APPROACH DESIGN SECTION - Maine.gov · See MaineDOT Detail 610(03) Where Shown on Plans Geotextile Erosion Control 3. 0 0 ' Riprap Plain 1. 7 5: 1 (M a x) Course Gravel 18" Aggregate](https://reader035.vdocuments.us/reader035/viewer/2022062602/5f01cf697e708231d40125c5/html5/thumbnails/17.jpg)
DE
SIG
N-
DE
TAIL
ED
BY
DA
TE
PR
OJ.
MA
NA
GE
R
SHEET NUMBER
FIE
LD
CH
AN
GE
S
RE
VISIO
NS
1
RE
VISIO
NS
2
RE
VISIO
NS
3
RE
VISIO
NS
4
CH
EC
KE
D-
RE
VIE
WE
DE.
LO
WE
LL
T.
SA
ND
EL
L10\
2018
Brid
ge
Divisio
n:
Filena
me:...\
017
_Prestressed_
NE
XT
_Bea
ms
Userna
me:
Date:1
0/10/2
018
tksandell
BO
G
ST
RE
AM
BRID
GE
NO
RT
HFIE
LD
WA
SHIN
GT
ON
CO
UN
TY
BO
G
ST
RE
AM
17OF 34
BRID
GE N
O. 3719
PR
EC
AS
T
NE
XT
BE
AM
S
M.
PA
RLIN
DE
SIG
N2-
DE
TAIL
ED
2
DE
SIG
N3-
DE
TAIL
ED
3
J.
SO
CH
AN
EK
PA
UL
YU
021699.0
0
PIN
WIN 0
21699.0
0B
RID
GE P
LA
NS
10\
2018
ST
AT
E O
F M
AIN
E
DE
PA
RT
ME
NT O
F T
RA
NSP
OR
TA
TIO
N
DA
TE
SIG
NA
TU
RE
P.E.
NU
MB
ER
62'-0" horizontal span length
63'-0ƒ" girder length measured along Profile Grade
6"
É Brg., Abut. No. 1
1'-6"
1'-6
"2'-0"
NEXT 28 F BEAM PART REINFORCING ELEVATION
NEXT 28 F BEAM TYPICAL REINFORCING SECTION
NEXT 28 F BEAM END REINFORCING SECTION
4" Typ.
2.5
"
2" (Typ.)
2" (T
yp.)
8~#4 Bars equally spaced~8'-0" long
End Zone Reinforcing
Debonded Strand Length:
Prestress Strand:
40 Prestress Strands Total
Bar Reinforcement:
4'-0"
8'-0"
12'-0"
of fla
nge
2"
Mid-h
eig
ht
(Typ.
@
Both Ste
ms)
2" cover
(Typ. @ both stems)
10'-0" of beam
(20"x10") for first
#5 L bars @ 6"
(WWF) @ mid-depth of flange
4x4 W4xW4 Welded Wire Fabric
(Typ. @ both stems)
#4 Shear stirrups
NEXT 28 F BEAM PART REINFORCING PLAN
spaced @ 3" = 1'-9"
Bundled #4 stirrups
#4 Stirrups spaced @ 9"= 1'-3"
spaced @ 3"
#4 stirrups
4" (Max.) #4 Bars spaced @ 6" = 3'-6"
in each stem
2~#4 Bars
2~#4 Bars
Horizontal legs extend 3'-4"
end zone verticals
Additional #4 -shaped
(Typ. @ both stems)
10'-0" of beam
(10"x10") for first
#5 J bars @ 6"
É 4 ~ 4" Ì Vent ducts (Typ. both ends ~ Adjust to clear reinforcing)
2~#4
Bars
12"
Clear Cover
1" Min.
L Bar
Stirrup &
0" between
Horizontal legs extend 3'-4"
(Typ. @ both stems)
end zone verticals
Additional #4 -shaped
(Typ.)
10"
Length of Beam
#4 Bars Full
strands at each stem
Extend all bonded P/S
(Max.)
4"
= 3'-6"
#4 Bars @ 6"
10'-0"
![Page 18: APPROACH DESIGN SECTION - Maine.gov · See MaineDOT Detail 610(03) Where Shown on Plans Geotextile Erosion Control 3. 0 0 ' Riprap Plain 1. 7 5: 1 (M a x) Course Gravel 18" Aggregate](https://reader035.vdocuments.us/reader035/viewer/2022062602/5f01cf697e708231d40125c5/html5/thumbnails/18.jpg)
Bridge Rail Post (Typ.)
B1
B2
B3
B4
Barrier (Typ.)
Concrete Transition
19'-8•"62'-0"12'-3‡"
18'-7‡"62'-0"19'-8•"
28 F Beam (Typ.)
Precast NEXT
Precast NEXT Beam
Seal Material as Required
Traffic / Bicycle (Typ.)
Steel Bridge Railing, 3-Bar
6'-4"1'-6"6'-4„"10 Spaces @ 8'-0" = 72'-0"6'-4„"1'-6"6'-4"
6'-4"1'-6"3'-2„"10 Spaces @ 8'-0" = 72'-0"3'-2„"7'-10"
SUPERSTRUCTURE PLAN
TRANSVERSE SECTION NEXT BEAM GAP FORM DETAIL
É Brg., Abut. No. 1 É Brg., Abut. No. 2
Dimensions are horizontal
É Constr
uction
16'-0"16'-0"
1'-8"14'-4"14'-4"1'-8"
B1B2 B3
B4
-2%
(Typ.)
9"
Reveal
•"± •" Tolerance
CIP Slab
Ca
mber
Differential
-2%
DE
SIG
N-
DE
TAIL
ED
BY
DA
TE
PR
OJ.
MA
NA
GE
R
SHEET NUMBER
FIE
LD
CH
AN
GE
S
RE
VISIO
NS
1
RE
VISIO
NS
2
RE
VISIO
NS
3
RE
VISIO
NS
4
CH
EC
KE
D-
RE
VIE
WE
DE.
LO
WE
LL
T.
SA
ND
EL
L10\
2018
Brid
ge
Divisio
n:
Filena
me:...\
018
_S
uperstructure
Userna
me:
Date:1
0/10/2
018
tksandell
BO
G
ST
RE
AM
BRID
GE
NO
RT
HFIE
LD
WA
SHIN
GT
ON
CO
UN
TY
BO
G
ST
RE
AM
18OF 34
BRID
GE N
O. 3719
M.
PA
RLIN
DE
SIG
N2-
DE
TAIL
ED
2
DE
SIG
N3-
DE
TAIL
ED
3
J.
SO
CH
AN
EK
PA
UL
YU
021699.0
0
PIN
WIN 0
21699.0
0B
RID
GE P
LA
NS
10\
2018
ST
AT
E O
F M
AIN
E
DE
PA
RT
ME
NT O
F T
RA
NSP
OR
TA
TIO
N
DA
TE
SIG
NA
TU
RE
P.E.
NU
MB
ER
with 1" Integral Wearing Surface
(9" Midspan, 10…" at abutments)
Variable Depth Structural Concrete Slab
PL
AN
&
EL
EV
ATIO
N
SU
PE
RS
TR
UC
TU
RE
SUPERSTRUCTURE NOTES
prior to the placement of curb concrete.
stirrups, as shown in these Plans and the Standard Details,
6. The Contractor shall install Transition Barrier vertical closed
Concrete Bridges.
502.261, Structural Concrete Roadway and Sidewalk Slabs on
5. End Diaphragm concrete will be paid for under Item No.
both end diaphragms, has been made.
and shall be kept plastic until the entire placement, including
4. The superstructure slab concrete shall be placed continuously
2 inches unless otherwise noted.
3. Reinforcing steel shall have a minimum concrete cover of
joint between the curb and slab.
2. Form a one inch V-groove on the fascias at the horizontal
Precast, Prestressed Concrete Superstructure - Camber.
adjusted in accordance with Special Provisions Section 535,
1. The deck thickness and curb stirrup dimensions shall be
11‡
" Abutm
ents
10•
" Mid Span
8"
11‡
" Abutm
ents
10•
" Mid Span
8"
É Construction
Deck
Level
Deck
Level
![Page 19: APPROACH DESIGN SECTION - Maine.gov · See MaineDOT Detail 610(03) Where Shown on Plans Geotextile Erosion Control 3. 0 0 ' Riprap Plain 1. 7 5: 1 (M a x) Course Gravel 18" Aggregate](https://reader035.vdocuments.us/reader035/viewer/2022062602/5f01cf697e708231d40125c5/html5/thumbnails/19.jpg)
6" 6"
(64 runs of 1 each
@ 6" ~
Botto
m)
(32 runs of 1 each
@ 12
" ~ Top)
106 ~ S601g @ 6" (Top)
2'-10"
2'-10"
@ 6" (Top & Bottom) @ 6" (Top & Bottom)
(Top, each Abutment)
106 ~ S601g @ 6" (Bottom) 20 ~ S602g - S621g
96 each ~ S622g, S623g
6 ea. ~ S501g, S502g (3 runs of 1 each in both curbs)
252 ~ S651s (126 @ 6" in both overhangs - Top)
10 ~ S624s @ 3"
20 ~ S602g - S621g
É Brg., Abut. No. 1
É Brg., Abut. No. 2
Dimensions are horizontal
É Constr
uction
DE
SIG
N-
DE
TAIL
ED
BY
DA
TE
PR
OJ.
MA
NA
GE
R
SHEET NUMBER
FIE
LD
CH
AN
GE
S
RE
VISIO
NS
1
RE
VISIO
NS
2
RE
VISIO
NS
3
RE
VISIO
NS
4
CH
EC
KE
D-
RE
VIE
WE
DE.
LO
WE
LL
T.
SA
ND
EL
L10\
2018
Brid
ge
Divisio
n:
Filena
me:...\
019_
Superstructure
Userna
me:
Date:1
0/10/2
018
tksandell
BO
G
ST
RE
AM
BRID
GE
NO
RT
HFIE
LD
WA
SHIN
GT
ON
CO
UN
TY
BO
G
ST
RE
AM
19OF 34
BRID
GE N
O. 3719
M.
PA
RLIN
DE
SIG
N2-
DE
TAIL
ED
2
DE
SIG
N3-
DE
TAIL
ED
3
J.
SO
CH
AN
EK
PA
UL
YU
021699.0
0
PIN
WIN 0
21699.0
0B
RID
GE P
LA
NS
10\
2018
ST
AT
E O
F M
AIN
E
DE
PA
RT
ME
NT O
F T
RA
NSP
OR
TA
TIO
N
DA
TE
SIG
NA
TU
RE
P.E.
NU
MB
ER
REIN
FO
RC
EM
EN
T
SU
PE
RS
TR
UC
TU
RE
End Diaphragm)
ED751 (see
End Diaphragm)
ED751 (see
DECK REINFORCING PLAN
![Page 20: APPROACH DESIGN SECTION - Maine.gov · See MaineDOT Detail 610(03) Where Shown on Plans Geotextile Erosion Control 3. 0 0 ' Riprap Plain 1. 7 5: 1 (M a x) Course Gravel 18" Aggregate](https://reader035.vdocuments.us/reader035/viewer/2022062602/5f01cf697e708231d40125c5/html5/thumbnails/20.jpg)
DE
SIG
N-
DE
TAIL
ED
BY
DA
TE
PR
OJ.
MA
NA
GE
R
SHEET NUMBER
FIE
LD
CH
AN
GE
S
RE
VISIO
NS
1
RE
VISIO
NS
2
RE
VISIO
NS
3
RE
VISIO
NS
4
CH
EC
KE
D-
RE
VIE
WE
DE.
LO
WE
LL
T.
SA
ND
EL
L10\
2018
Brid
ge
Divisio
n:
Filena
me:...\
02
0_
Superstructure
Userna
me:
Date:1
0/10/2
018
tksandell
BO
G
ST
RE
AM
BRID
GE
NO
RT
HFIE
LD
WA
SHIN
GT
ON
CO
UN
TY
BO
G
ST
RE
AM
20OF 34
BRID
GE N
O. 3719
M.
PA
RLIN
DE
SIG
N2-
DE
TAIL
ED
2
DE
SIG
N3-
DE
TAIL
ED
3
J.
SO
CH
AN
EK
PA
UL
YU
021699.0
0
PIN
WIN 0
21699.0
0B
RID
GE P
LA
NS
10\
2018
ST
AT
E O
F M
AIN
E
DE
PA
RT
ME
NT O
F T
RA
NSP
OR
TA
TIO
N
DA
TE
SIG
NA
TU
RE
P.E.
NU
MB
ER
REIN
FO
RC
EM
EN
T
SU
PE
RS
TR
UC
TU
RE
4„" 25 Spaces @ 6"
6"
12"
@ 6"
6 Spaces
@ 12"
5 Spaces
@ 6"
4 Sp.
6"
6"
@ 12"
5 Spaces
@ 12"
5 Spaces
@ 6"
6 Spaces
@ 12"
3 Sp. 12" 12"
@ 6"
6 Spaces
@ 6"
6 Spaces
@ 12"
2 Sp. 6"
2„"
@ 6"
11 Spaces
@ 12"
5 Spaces
@ 12"
5 Spaces
@ 12"
5 Spaces
@ 6"
6 Spaces
@ 12"
3 Spaces
@ 6"
6 Spaces
@ 6"
6 Spaces
6"
12" 12"
-@ 6"
5 Spaces
6"
@ 12"
2 Sp. 6"
@ 12"
2 Sp.6"
@ 6"
6 Spaces
@ 6"
6 Spaces
@ 12"
5 Spaces
@ 6"
3 Sp.
6"
@ 12"
5 Spaces
2 Sp. @ 6"
@ 12"
2 Sp.
6"
@ 6"
23 Spaces 4‚"
6"
@ 12"
2 Sp.
6"
@ 6"
3 Sp.
@ 12"
5 Spaces
@ 6"
6 Spaces
@ 12"
2 Sp. 12"
@ 12"
2 Sp.
@ 6"
6 Spaces
@ 12"
5 Spaces
2 Sp. @ 6" 6"
25 Spaces @ 6" 2‚"
CURB STIRRUP LAYOUT PLAN - WEST HALF
CURB STIRRUP LAYOUT PLAN - EAST HALF
MA
TC
HLIN
E
MA
TC
HLIN
E
2 Sp. @ 6"
26 - S554s 17 - S553s 16 - S552s 21 - S551s
12 - S554s 15 - S553s 18 - S552s 14 - S551s
17 - S552s 16 - S553s 24 - S554s
5 - S551s 17 - S552s 16 - S553s 26 - S554s
![Page 21: APPROACH DESIGN SECTION - Maine.gov · See MaineDOT Detail 610(03) Where Shown on Plans Geotextile Erosion Control 3. 0 0 ' Riprap Plain 1. 7 5: 1 (M a x) Course Gravel 18" Aggregate](https://reader035.vdocuments.us/reader035/viewer/2022062602/5f01cf697e708231d40125c5/html5/thumbnails/21.jpg)
S601g
HALF DECK REINFORCING SECTION
Symmetrical about É Construction
S601g
S622g OR S623g
S622g OR S623g
É Construction
2•
" Cl.
1" Cl.
DE
SIG
N-
DE
TAIL
ED
BY
DA
TE
PR
OJ.
MA
NA
GE
R
SHEET NUMBER
FIE
LD
CH
AN
GE
S
RE
VISIO
NS
1
RE
VISIO
NS
2
RE
VISIO
NS
3
RE
VISIO
NS
4
CH
EC
KE
D-
RE
VIE
WE
DE.
LO
WE
LL
T.
SA
ND
EL
L10\
2018
Brid
ge
Divisio
n:
Filena
me:...\
02
1_
Superstructure
Userna
me:
Date:1
0/10/2
018
tksandell
BO
G
ST
RE
AM
BRID
GE
NO
RT
HFIE
LD
WA
SHIN
GT
ON
CO
UN
TY
BO
G
ST
RE
AM
21OF 34
BRID
GE N
O. 3719
M.
PA
RLIN
DE
SIG
N2-
DE
TAIL
ED
2
DE
SIG
N3-
DE
TAIL
ED
3
J.
SO
CH
AN
EK
PA
UL
YU
021699.0
0
PIN
WIN 0
21699.0
0B
RID
GE P
LA
NS
10\
2018
ST
AT
E O
F M
AIN
E
DE
PA
RT
ME
NT O
F T
RA
NSP
OR
TA
TIO
N
DA
TE
SIG
NA
TU
RE
P.E.
NU
MB
ER
REIN
FO
RC
EM
EN
T
SU
PE
RS
TR
UC
TU
RE
S501g or S502g
S551s - S554s
S651s
![Page 22: APPROACH DESIGN SECTION - Maine.gov · See MaineDOT Detail 610(03) Where Shown on Plans Geotextile Erosion Control 3. 0 0 ' Riprap Plain 1. 7 5: 1 (M a x) Course Gravel 18" Aggregate](https://reader035.vdocuments.us/reader035/viewer/2022062602/5f01cf697e708231d40125c5/html5/thumbnails/22.jpg)
22~ED551 spliced to abutment #5 bars
ED554
64~ED751 spliced to abutment back face bars @ 9" (Abutment No. 1 end)
64~ED751 spliced to abutment back face bars @ 9" (Abutment No. 2 end)
ED554
END DIAPHRAGM REINFORCING ELEVATION
END DIAPHRAGM REINFORCING ELEVATION
(3 @ 12" between stems)
9~ED552
Abutment No. 1 Front Face shown; Abutment No. 2 similar
(3 @ 12" outside of end stems)
6~ED555
Abutment No. 1 Back Face shown; Abutment No. 2 similar
DE
SIG
N-
DE
TAIL
ED
BY
DA
TE
PR
OJ.
MA
NA
GE
R
SHEET NUMBER
FIE
LD
CH
AN
GE
S
RE
VISIO
NS
1
RE
VISIO
NS
2
RE
VISIO
NS
3
RE
VISIO
NS
4
CH
EC
KE
D-
RE
VIE
WE
DE.
LO
WE
LL
T.
SA
ND
EL
L10\
2018
Brid
ge
Divisio
n:
Filena
me:...\
304.0
2 -
DG
N\
02
2_
End
Dia
phrag
mUserna
me:
Date:1
0/10/2
018
tksandell
BO
G
ST
RE
AM
BRID
GE
NO
RT
HFIE
LD
WA
SHIN
GT
ON
CO
UN
TY
BO
G
ST
RE
AM
22OF 34
BRID
GE N
O. 3719
REIN
FO
RC
EM
EN
T
EN
D
DIA
PH
RA
GM
M.
PA
RLIN
DE
SIG
N2-
DE
TAIL
ED
2
DE
SIG
N3-
DE
TAIL
ED
3
J.
SO
CH
AN
EK
PA
UL
YU
021699.0
0
PIN
WIN 0
21699.0
0B
RID
GE P
LA
NS
10\
2018
ST
AT
E O
F M
AIN
E
DE
PA
RT
ME
NT O
F T
RA
NSP
OR
TA
TIO
N
DA
TE
SIG
NA
TU
RE
P.E.
NU
MB
ER
(3 @ 12" between stems)
12~ED553
3~ED601 @ 12"
![Page 23: APPROACH DESIGN SECTION - Maine.gov · See MaineDOT Detail 610(03) Where Shown on Plans Geotextile Erosion Control 3. 0 0 ' Riprap Plain 1. 7 5: 1 (M a x) Course Gravel 18" Aggregate](https://reader035.vdocuments.us/reader035/viewer/2022062602/5f01cf697e708231d40125c5/html5/thumbnails/23.jpg)
Elastomeric Bearing Pad
ED551
ED601
or
ED552
ED553
Elastomeric Bearing Pad
ED551
or
ED552
ED553
ED601
End Diaphragm End Diaphragm
ED751 ED751
Sla
bN
EX
T
Bea
m
Approach Slab (Typ.)
1'-6"1'-6" 1'-6" 1'-6" 6"6"
#6 @ 6" Top & Bottom #6 @ 6" Top & Bottom
S622g or S623g
S622g or S623g S622g or S623g
S622g or S623g
LONGITUDINAL SECTION
É Brg., Abut. No. 1 É Brg., Abut. No. 2
REIN
FO
RC
EM
EN
T
LO
NGIT
UDIN
AL
SE
CTIO
N
DE
SIG
N-
DE
TAIL
ED
BY
DA
TE
PR
OJ.
MA
NA
GE
R
SHEET NUMBER
FIE
LD
CH
AN
GE
S
RE
VISIO
NS
1
RE
VISIO
NS
2
RE
VISIO
NS
3
RE
VISIO
NS
4
CH
EC
KE
D-
RE
VIE
WE
DE.
LO
WE
LL
T.
SA
ND
EL
L10\
2018
Brid
ge
Divisio
n:
Filena
me:...\
02
3_
Longitudin
al Sectio
nUserna
me:
Date:1
0/10/2
018
tksandell
23OF 34
NO
RT
HFIE
LD
ST
AT
E
RO
UT
E
19
2
M.
PA
RLIN
DE
SIG
N2-
DE
TAIL
ED
2
DE
SIG
N3-
DE
TAIL
ED
3
J.
SO
CH
AN
EK
PA
UL
YU
021699.0
0
PIN
WIN 0
21699.0
0HIG
HW
AY P
LA
NS
10\
2018
ST
AT
E O
F M
AIN
E
DE
PA
RT
ME
NT O
F T
RA
NSP
OR
TA
TIO
N
DA
TE
SIG
NA
TU
RE
P.E.
NU
MB
ER
![Page 24: APPROACH DESIGN SECTION - Maine.gov · See MaineDOT Detail 610(03) Where Shown on Plans Geotextile Erosion Control 3. 0 0 ' Riprap Plain 1. 7 5: 1 (M a x) Course Gravel 18" Aggregate](https://reader035.vdocuments.us/reader035/viewer/2022062602/5f01cf697e708231d40125c5/html5/thumbnails/24.jpg)
Brid
ge
Divisio
n:
Filena
me:...\
02
4_
Reinforcin
g Schedule
Userna
me:
Date:1
0/10/2
018
tksandell
QTY. LENGTH TYPE A B C D E F G H O R LOCATION
BENT BARS
MARKMARK QTY. LENGTH LOCATION
STRAIGHT BARS
DE
SIG
N-
DE
TAIL
ED
BY
DA
TE
PR
OJ.
MA
NA
GE
R
SHEET NUMBER
FIE
LD
CH
AN
GE
S
RE
VISIO
NS
1
RE
VISIO
NS
2
RE
VISIO
NS
3
RE
VISIO
NS
4
CH
EC
KE
D-
RE
VIE
WE
DE.
LO
WE
LL
T.
SA
ND
EL
L10\
2018
BO
G
ST
RE
AM
BRID
GE
NO
RT
HFIE
LD
WA
SHIN
GT
ON
CO
UN
TY
BO
G
ST
RE
AM
24OF 34
BRID
GE N
O. 3719
M.
PA
RLIN
DE
SIG
N2-
DE
TAIL
ED
2
DE
SIG
N3-
DE
TAIL
ED
3
J.
SO
CH
AN
EK
PA
UL
YU
021699.0
0
WIN
WIN 0
21699.0
0B
RID
GE P
LA
NS
10\
2018
DE
PA
RT
ME
NT O
F T
RA
NSP
OR
TA
TIO
N
ST
AT
E O
F M
AIN
E
DA
TE
SIG
NA
TU
RE
P.E.
NU
MB
ER
ST
EE
L
SC
HE
DU
LE
REIN
FO
RCIN
G
MARK QTY. LENGTH LOCATION
GENERAL NOTES
TYPE - BENDING DIAGRAMS
MARK QTY. LENGTH LOCATION QTY. LENGTH TYPE A B C D E F G H O R LOCATIONMARKMARK QTY. LENGTH LOCATION
B
A
L
1
1
AB
C
D
E
SJ
A
B
C
D
E
F
EP
G
D
HB
CB
E
A
D
E
B
AG
H
C
C
D
S
A
B
G C
B D
A G
SL
A
B
C
D
E
SB
A C
O
PR
B
A
B
D
E
G
O
C
CB
R
A
C
C
B
A B
C
T
E
D
A
H
1
1A
B B
C
O
PA
H
H
B E1 E2 etc.
D1 D2 D3 etc.
FC
O
B
C C C C C
C
A
H
B
J
RA
BC
E
C
R
B
G
O
W
1
1D D
R
H
BC E
D
F
1
2
H
O
M
D
E
V
H
scheduled on the plans.
either case will be based on crank bars as
the same bar size as the crank bar. Payment in
two (2) straight bars (one top and one bottom) of
2. Each crank bar, Type B, may be replaced by
Mark "S650" = bar size #6
Mark "P805" = bar size #8
Mark "A502" = bar size #5
mark indicate the size of the bar:
1. The first two digits following the letter(s) of the
C
D
A
B
G
O
SC
ABUTMENT 1
0
0
0
0
0
B
C
VA
H
A
G
6‡"
9‡"
0
GFRP: CSA S807-10, ACI 440.1R-15
Stainless Reinforcing Steel: ASTM A955, Grade 75
Reinforcing Bar: ASTM A 615/A 615M, Grade 60
of ACI Standard 315 and ACI Standard 318.
the recommendations of the current revision
Bending details and hooks shall conform to
All dimensions are out-to-out of bar.
A800
A603
A603
A603
A603
A603
A603
A603
A603
A603
A603
A603
A603
A603
A603
A602
A602
A602
A602
A602
A602
A601
A600
20
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
16
92
33'-9"
11'-0"
10'-6"
10'-3"
9'-9"
9'-3"
8'-10•"
8'-4•"
8'-0"
7'-6"
7'-0"
6'-6"
6'-3"
5'-9"
5'-3"
11'-0"
9'-10•"
8'-9"
7'-6"
6'-4•"
5'-3"
11'-0"
7'-0"
Horizontal Abutment Stem
Vertical Right Wing (Variable)
Vertical Right Wing (Variable)
Vertical Right Wing (Variable)
Vertical Right Wing (Variable)
Vertical Right Wing (Variable)
Vertical Right Wing (Variable)
Vertical Right Wing (Variable)
Vertical Right Wing (Variable)
Vertical Right Wing (Variable)
Vertical Right Wing (Variable)
Vertical Right Wing (Variable)
Vertical Right Wing (Variable)
Vertical Right Wing (Variable)
Vertical Right Wing (Variable)
Vertical Left Wing (Variable)
Vertical Left Wing (Variable)
Vertical Left Wing (Variable)
Vertical Left Wing (Variable)
Vertical Left Wing (Variable)
Vertical Left Wing (Variable)
Vertical Wingwall Stem
Vertical Abutment Stem
ABUTMENT 1
6'-0"
6'-0"
6‡"
9‡"
A858
A857
A856
A855
A854
A854
A854
A854
A854
A854
A854
A854
A854
A854
A854
A854
A853
A853
A853
A853
A853
A853
A853
A853
A853
A853
A853
A853
A852
A851
A658
A657
A657
A657
A657
A657
A657
A657
A657
A657
A657
A657
A657
A657
A657
A656
A656
A656
A656
A656
A656
A655
A654
A653
A652
A651
A650
A450
1'-0"
1'-0"
0
10'-0"
9'-6"
9'-3"
8'-9"
8'-3"
7'-10•"
7'-4•"
7'-0"
6'-6"
6'-0"
5'-6"
5'-3"
4'-9"
4'-3"
10'-0"
8'-10•"
7'-9"
6'-6"
5'-4•"
4'-3"
10'-0"
0
0
5'-4"
0
0
6"
3'-4†"
2'-6"
1'-6"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
2'-8"
2'-8"
1'-2"
6'-0"
2'-8"
3'-4"
1'-0"
1'-0"
2'-0"
7…"
1'-1ƒ"
1'-2"
3'-2"
2‚"
4
4
16
16
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
22
22
29
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
9
8
8
46
46
38
414
22'-3"
16'-1•"
5'-11•"
5'-3‡"
9'-3"
9'-6"
10'-0"
10'-4•"
10'-9"
11'-3"
11'-9"
12'-3"
12'-6"
13'-0"
13'-4•"
13'-10•"
8'-9"
9'-3"
10'-4•"
11'-6"
12'-7•"
13'-9"
15'-0"
16'-0"
17'-3"
18'-3"
19'-4•"
20'-6"
14'-6"
22'-1"
5'-0"
11'-0"
10'-6"
10'-3"
9'-9"
9'-3"
8'-10•"
8'-4•"
8'-0"
7'-6"
7'-0"
6'-6"
6'-3"
5'-9"
5'-3"
11'-0"
9'-10•"
8'-10•"
7'-6"
6'-4•"
5'-3"
11'-0"
5'-11…"
6'-5ƒ"
6'-6"
8'-1"
8'-6"
4'-6‚"
V
V
VA
VA
A
A
A
A
A
A
A
A
A
A
A
A
V
V
V
V
V
V
V
V
V
V
V
V
A
V
SL
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
SL
SL
L
S
SL
CB
7'-9"
8'-3"
8'-3"
8'-6"
9'-0"
9'-4•"
9'-9"
10'-3"
10'-9"
11'-3"
11'-6"
12'-0"
12'-4•"
12'-10•"
7'-9"
8'-3"
9'-4•"
10'-6"
11'-7•"
12'-9"
14'-0"
15'-0"
16'-3"
17'-3"
18'-4•"
19'-6"
13'-6"
21'-1"
1'-6"
2'-8"
2'-8"
11"
2'-8"
6"
14'-6"
7'-10•"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
0
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
Horizontal Stem to Wing
Horizontal Stem to Wing
Horizontal Left Wing
Horizontal Left Wing
Horizontal Left Wing
Horizontal Left Wing
Horizontal Left Wing
Horizontal Left Wing
Horizontal Left Wing
Horizontal Left Wing
Horizontal Left Wing
Horizontal Left Wing
Horizontal Left Wing
Horizontal Left Wing
Horizontal Right Wing
Horizontal Right Wing
Horizontal Right Wing
Horizontal Right Wing
Horizontal Right Wing
Horizontal Right Wing
Horizontal Right Wing
Horizontal Right Wing
Horizontal Right Wing
Horizontal Right Wing
Horizontal Right Wing
Horizontal Right Wing
Horizontal Left Wing
Horizontal Right Wing
Vertical Right Wing Varies
Vertical Right Wing Varies
Vertical Right Wing Varies
Vertical Right Wing Varies
Vertical Right Wing Varies
Vertical Right Wing Varies
Vertical Right Wing Varies
Vertical Right Wing Varies
Vertical Right Wing Varies
Vertical Right Wing Varies
Vertical Right Wing Varies
Vertical Right Wing Varies
Vertical Right Wing Varies
Vertical Right Wing Varies
Vertical Left Wing
Vertical Left Wing
Vertical Left Wing
Vertical Left Wing
Vertical Left Wing
Vertical Left Wing
Vertical Left Wing
Abutment Stem Bottom at Piles
Abutment Stem Bottom at Piles
Abutment Stem Vertical
Abutment Stem Vertical
Abutment Stem Bottom
Abutment Ties
![Page 25: APPROACH DESIGN SECTION - Maine.gov · See MaineDOT Detail 610(03) Where Shown on Plans Geotextile Erosion Control 3. 0 0 ' Riprap Plain 1. 7 5: 1 (M a x) Course Gravel 18" Aggregate](https://reader035.vdocuments.us/reader035/viewer/2022062602/5f01cf697e708231d40125c5/html5/thumbnails/25.jpg)
Brid
ge
Divisio
n:
Filena
me:...\
02
5_
Reinforcin
g Schedule
Userna
me:
Date:1
0/10/2
018
tksandell
QTY. LENGTH TYPE A B C D E F G H O R LOCATION
BENT BARS
MARKMARK QTY. LENGTH LOCATION
STRAIGHT BARS
DE
SIG
N-
DE
TAIL
ED
BY
DA
TE
PR
OJ.
MA
NA
GE
R
SHEET NUMBER
FIE
LD
CH
AN
GE
S
RE
VISIO
NS
1
RE
VISIO
NS
2
RE
VISIO
NS
3
RE
VISIO
NS
4
CH
EC
KE
D-
RE
VIE
WE
DE.
LO
WE
LL
T.
SA
ND
EL
L10\
2018
BO
G
ST
RE
AM
BRID
GE
NO
RT
HFIE
LD
WA
SHIN
GT
ON
CO
UN
TY
BO
G
ST
RE
AM
25OF 34
BRID
GE N
O. 3719
M.
PA
RLIN
DE
SIG
N2-
DE
TAIL
ED
2
DE
SIG
N3-
DE
TAIL
ED
3
J.
SO
CH
AN
EK
PA
UL
YU
021699.0
0
WIN
WIN 0
21699.0
0B
RID
GE P
LA
NS
10\
2018
DE
PA
RT
ME
NT O
F T
RA
NSP
OR
TA
TIO
N
ST
AT
E O
F M
AIN
E
DA
TE
SIG
NA
TU
RE
P.E.
NU
MB
ER
ST
EE
L
SC
HE
DU
LE
REIN
FO
RCIN
G
MARK QTY. LENGTH LOCATION
GENERAL NOTES
TYPE - BENDING DIAGRAMS
MARK QTY. LENGTH LOCATION QTY. LENGTH TYPE A B C D E F G H O R LOCATIONMARKMARK QTY. LENGTH LOCATION
B
A
L
1
1
AB
C
D
E
SJ
A
B
C
D
E
F
EP
G
D
HB
CB
E
A
D
E
B
AG
H
C
C
D
S
A
B
G C
B D
A G
SL
A
B
C
D
E
SB
A C
O
PR
B
A
B
D
E
G
O
C
CB
R
A
C
C
B
A B
C
T
E
D
A
H
1
1A
B B
C
O
PA
H
H
B E1 E2 etc.
D1 D2 D3 etc.
FC
O
B
C C C C C
C
A
H
B
J
RA
BC
E
C
R
B
G
O
W
1
1D D
R
H
BC E
D
F
1
2
H
O
M
D
E
V
H
scheduled on the plans.
either case will be based on crank bars as
the same bar size as the crank bar. Payment in
two (2) straight bars (one top and one bottom) of
2. Each crank bar, Type B, may be replaced by
Mark "S650" = bar size #6
Mark "P805" = bar size #8
Mark "A502" = bar size #5
mark indicate the size of the bar:
1. The first two digits following the letter(s) of the
C
D
A
B
G
O
SC
ABUTMENT 2 ABUTMENT 2 ABUTMENT 2
6"
0
0
5'-4"
0
0
4'-3"
4'-9"
5'-3"
5'-9"
6'-3"
6'-9"
7'-3"
7'-9"
8'-412"
8'-1012"
9'-412"
10'-0"
4'-3"
4'-9"
5'-3"
5'-6"
6'-0"
6'-6"
7'-0"
7'-412"
7'-1012"
8'-3"
8'-9"
9'-3"
9'-6"
10'-0"
0
1'-0"
1'-0"
4'-614"
8'-1"
6'-6"
6'-534"
5'-1138"
5'-3"
5'-9"
6'-3"
6'-9"
7'-3"
7'-9"
8'-3"
8'-9"
9'-412"
9'-1012"
10'-412"
11'-0"
5'-3"
5'-9"
6'-3"
6'-6"
7'-0"
7'-6"
8'-0"
8'-412"
8'-1012"
9'-3"
9'-9"
10'-3"
10'-6"
11'-0"
5'-0"
22'-3"
21'-3"
0
0
0
0
0
6'-0"
6'-0"
B
C
VA
H
A
G
5'-3‡"
5'-11•" 6‡"
9‡"
6‡"
9‡"
8'-6"
10'-0"
0
GFRP: CSA S807-10, ACI 440.1R-15
Stainless Reinforcing Steel: ASTM A955, Grade 75
Reinforcing Bar: ASTM A 615/A 615M, Grade 60
of ACI Standard 315 and ACI Standard 318.
the recommendations of the current revision
Bending details and hooks shall conform to
All dimensions are out-to-out of bar.
B800
B603
B603
B603
B603
B603
B603
B603
B603
B603
B603
B603
B603
B603
B603
B602
B602
B602
B602
B602
B602
B602
B602
B602
B602
B602
B602
B601
B600
20
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
16
92
33'-9"
11'-0"
10'-6"
10'-3"
9'-9"
9'-3"
8'-10•"
8'-4•"
8'-0"
7'-6"
7'-0"
6'-6"
6'-3"
5'-9"
5'-3"
11'-0"
10'-4•"
9'-10•"
9'-4•"
8'-9"
8'-3"
7'-9"
7'-3"
6'-9"
6'-3"
5'-9"
5'-3"
11'-0"
7'-0"
Horizontal Abutment Stem
Vertical Right Wing (Variable)
Vertical Right Wing (Variable)
Vertical Right Wing (Variable)
Vertical Right Wing (Variable)
Vertical Right Wing (Variable)
Vertical Right Wing (Variable)
Vertical Right Wing (Variable)
Vertical Right Wing (Variable)
Vertical Right Wing (Variable)
Vertical Right Wing (Variable)
Vertical Right Wing (Variable)
Vertical Right Wing (Variable)
Vertical Right Wing (Variable)
Vertical Right Wing (Variable)
Vertical Left Wing (Variable)
Vertical Left Wing (Variable)
Vertical Left Wing (Variable)
Vertical Left Wing (Variable)
Vertical Left Wing (Variable)
Vertical Left Wing (Variable)
Vertical Left Wing (Variable)
Vertical Left Wing (Variable)
Vertical Left Wing (Variable)
Vertical Left Wing (Variable)
Vertical Left Wing (Variable)
Vertical Left Wing (Variable)
Vertical Wingwall Stem
Vertical Abutment Stem
B858
B857
B856
B855
B854
B854
B854
B854
B854
B854
B854
B854
B854
B854
B854
B854
B853
B853
B853
B853
B853
B853
B853
B853
B853
B853
B853
B853
B852
B851
B658
B657
B657
B657
B657
B657
B657
B657
B657
B657
B657
B657
B657
B657
B657
B656
B656
B656
B656
B656
B656
B656
B656
B656
B656
B656
B656
B655
B654
B653
B652
B651
B650
B450
3'-4†"
2'-6"
1'-6"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
2'-8"
2'-8"
1'-2"
6'-0"
2'-8"
3'-4"
1'-0"
1'-0"
2'-0"
7…"
1'-1ƒ"
1'-2"
3'-2"
2‚"
4
4
16
16
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
22
22
35
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
9
8
8
46
46
38
414
22'-1"
20'-9"
20'-6"
19'-4•"
18'-3"
17'-3"
16'-0"
15'-0"
13'-9"
12'-7•"
11'-6"
10'-4•"
9'-3"
8'-9"
19'-6"
18'-6"
17'-6"
16'-6"
15'-6"
14'-6"
13'-9"
12'-9"
11'-9"
10'-10•"
9'-10•"
9'-3"
V
V
VA
VA
A
A
A
A
A
A
A
A
A
A
A
A
V
V
V
V
V
V
V
V
V
V
V
V
A
V
SL
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
SL
SL
L
S
SL
CB
8'-4•"
7'-9"
8'-3"
8'-10•"
9'-10•"
10'-9"
11'-9"
12'-9"
13'-6"
14'-6"
15'-6"
16'-6"
17'-6"
18'-6"
7'-9"
8'-3"
9'-4•"
10'-6"
11'-7•"
12'-9"
14'-0"
15'-0"
16'-3"
17'-3"
18'-4•"
19'-6"
19'-9"
21'-1"
1'-6"
2'-8"
2'-8"
11"
2'-8"
6"
12'-10•"
14'-6"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
0
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11‚"
11'-0"
Horizontal Stem to Wing
Horizontal Stem to Wing
Horizontal Left Wing
Horizontal Left Wing
Horizontal Left Wing
Horizontal Left Wing
Horizontal Left Wing
Horizontal Left Wing
Horizontal Left Wing
Horizontal Left Wing
Horizontal Left Wing
Horizontal Left Wing
Horizontal Left Wing
Horizontal Left Wing
Horizontal Right Wing
Horizontal Right Wing
Horizontal Right Wing
Horizontal Right Wing
Horizontal Right Wing
Horizontal Right Wing
Horizontal Right Wing
Horizontal Right Wing
Horizontal Right Wing
Horizontal Right Wing
Horizontal Right Wing
Horizontal Right Wing
Horizontal Left Wing
Horizontal Right Wing
Vertical Right Wing Varies
Vertical Right Wing Varies
Vertical Right Wing Varies
Vertical Right Wing Varies
Vertical Right Wing Varies
Vertical Right Wing Varies
Vertical Right Wing Varies
Vertical Right Wing Varies
Vertical Right Wing Varies
Vertical Right Wing Varies
Vertical Right Wing Varies
Vertical Right Wing Varies
Vertical Right Wing Varies
Vertical Right Wing Varies
Vertical Left Wing
Vertical Left Wing
Vertical Left Wing
Vertical Left Wing
Vertical Left Wing
Vertical Left Wing
Vertical Left Wing
Vertical Left Wing
Vertical Left Wing
Vertical Left Wing
Vertical Left Wing
Vertical Left Wing
Vertical Left Wing
Abutment Stem Bottom at Piles
Abutment Stem Bottom at Piles
Abutment Stem Vertical
Abutment Stem Vertical
Abutment Stem Bottom
Abutment Ties
![Page 26: APPROACH DESIGN SECTION - Maine.gov · See MaineDOT Detail 610(03) Where Shown on Plans Geotextile Erosion Control 3. 0 0 ' Riprap Plain 1. 7 5: 1 (M a x) Course Gravel 18" Aggregate](https://reader035.vdocuments.us/reader035/viewer/2022062602/5f01cf697e708231d40125c5/html5/thumbnails/26.jpg)
Brid
ge
Divisio
n:
Filena
me:...\
02
6_
Reinforcin
g Schedule
Userna
me:
Date:1
0/10/2
018
tksandell
QTY. LENGTH TYPE A B C D E F G H O R LOCATION
BENT BARS
MARKMARK QTY. LENGTH LOCATION
STRAIGHT BARS
DE
SIG
N-
DE
TAIL
ED
BY
DA
TE
PR
OJ.
MA
NA
GE
R
SHEET NUMBER
FIE
LD
CH
AN
GE
S
RE
VISIO
NS
1
RE
VISIO
NS
2
RE
VISIO
NS
3
RE
VISIO
NS
4
CH
EC
KE
D-
RE
VIE
WE
DE.
LO
WE
LL
T.
SA
ND
EL
L10\
2018
BO
G
ST
RE
AM
BRID
GE
NO
RT
HFIE
LD
WA
SHIN
GT
ON
CO
UN
TY
BO
G
ST
RE
AM
26OF 34
BRID
GE N
O. 3719
M.
PA
RLIN
DE
SIG
N2-
DE
TAIL
ED
2
DE
SIG
N3-
DE
TAIL
ED
3
J.
SO
CH
AN
EK
PA
UL
YU
021699.0
0
WIN
WIN 0
21699.0
0B
RID
GE P
LA
NS
10\
2018
DE
PA
RT
ME
NT O
F T
RA
NSP
OR
TA
TIO
N
ST
AT
E O
F M
AIN
E
DA
TE
SIG
NA
TU
RE
P.E.
NU
MB
ER
ST
EE
L
SC
HE
DU
LE
REIN
FO
RCIN
G
MARK QTY. LENGTH LOCATION
Reinforcing Bar: ASTM A 615/A 615M, Grade 60
of ACI Standard 315 and ACI Standard 318.
the recommendations of the current revision
Bending details and hooks shall conform to
All dimensions are out-to-out of bar.
GENERAL NOTES
TYPE - BENDING DIAGRAMS
MARK QTY. LENGTH LOCATION QTY. LENGTH TYPE A B C D E F G H O R LOCATIONMARKMARK QTY. LENGTH LOCATION
B
A
L
1
1
AB
C
D
E
SJ
A
B
C
D
E
F
EP
G
D
HB
CB
E
A
D
E
B
AG
H
C
C
D
S
A
B
G C
B D
A G
SL
A
B
C
D
E
SB
A C
O
PR
B
A
B
D
E
G
O
C
CB
R
A
C
C
B
A B
C
T
E
D
A
H
1
1A
B B
C
O
PA
H
H
B E1 E2 etc.
D1 D2 D3 etc.
FC
O
B
C C C C C
C
A
H
B
J
RA
BC
E
C
R
B
G
O
W
1
1D D
R
H
BC E
D
F
1
2
H
O
M
D
E
V
H
scheduled on the plans.
either case will be based on crank bars as
the same bar size as the crank bar. Payment in
two (2) straight bars (one top and one bottom) of
2. Each crank bar, Type B, may be replaced by
Mark "S650" = bar size #6
Mark "P805" = bar size #8
Mark "A502" = bar size #5
mark indicate the size of the bar:
1. The first two digits following the letter(s) of the
C
D
A
B
G
O
SC
APPROACH SLAB
AS601
AS502
60
32
16'-2"
29'-2"
Approach Slab Longitudinal
Approach Slab Transverse
APPROACH SLAB
AS651 60 4'-6" L 3'-0" 1'-6"
END DIAPHRAGM
ED601 6 33'-8" Back Face Horiz.
END DIAPHRAGM
ED751
ED555
ED554
ED553
ED552
ED551
128
12
4
24
18
44
L
S
S
S
S
L
14'-6"
2'-2"
10'-10"
5'-2"
2'-11"
3'-4"
11'-0"
0
0
0
0
10"
3'-6"
10"
4'-2"
10"
10"
2'-6"
6"
2'-6"
3'-6"
1'-3"
10"
4'-2"
10"
10"
0
0
0
0
SUPERSTRUCTURE (GFRP REINFORCEMENT) SUPERSTRUCTURE (STAINLESS STEEL REINFORCEMENT)
20 33'-8" Top of Slab above Diaphragm
Slab Longitudinal
Slab Longitudinal
Slab Transverse Variable
Slab Transverse Variable
Slab Transverse Variable
Slab Transverse Variable
Slab Transverse Variable
Slab Transverse Variable
Slab Transverse Variable
Slab Transverse Variable
Slab Transverse Variable
Slab Transverse Variable
Slab Transverse Variable
Slab Transverse Variable
Slab Transverse Variable
Slab Transverse Variable
Slab Transverse Variable
Slab Transverse Variable
Slab Transverse Variable
Slab Transverse Variable
Slab Transverse Variable
Slab Transverse Variable
Slab Transverse
Curb Longitudinal Bar
Curb Longitudinal Bar
46'-0"
22'-0"
3'-3"
4'-8"
6'-1"
7'-7"
9'-0"
10'-5"
11'-11"
13'-4"
14'-9"
16'-2"
17'-8"
19'-1"
20'-6"
22'-0"
23'-5"
24'-10"
26'-4"
27'-9"
29'-2"
30'-8"
31'-8"
46'-0"
22'-0"
96
96
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
212
6
6
5'-8"
4'-11‚"
4'-10•"
4'-11•"
5'-0•"
C
SC
SC
SC
SC
8"
0"
6"
6"
6"
5'-0"
1'-10"
1'-2"
1'-2•"
1'-3"
1'-3"
1'-3"
1'-3"
1'-3"
1'-10‚"
1'-1•"
1'-2"
1'-2•"
0"
10"
10"
10"
1'-5…"
1'-4‚"
1'-4•"
1'-4ƒ"
252
88
64
68
40
10"
11"
3'-4"
1'-3
"
1'-6"
2'-4"
1'-1•"
1'-1•"8•"
6" 6
"
~ TB550 ~
~ TB652 ~~ TB651 ~~ TB650 ~
3 - Bar Bike
5
2
5
4
6
2
2
2
2
2
2
10
Qty.
2'-4"
2'-6"
2'-6"
STEEL SCHEDULE
REINFORCING
MODIFIED CONCRETE TRANSITION BARRIER
8'-3"
7'-5"
5'-10"
2'-7"
10'-2"
4'-8"
1'-6"
1'-8"
1'-10"
2'-0"
2'-2"
4'-6"
Length
steel.
All reinforcing will be stainless
Modified Transition Barrier.
Quantities given are for one
out of bar.
All dimensions are out - to -
bar. (TB500 = bar size #5.)
the size of the reinforcing
letters of the mark indicate
The first digit following the
Notes:
s = Stainless Steel
See Standard Detail 526(37)
Dimensions modified.
TB652s
TB651s
TB650s
TB600s
TB550s
TB506s
TB505s
TB504s
TB503s
TB502s
TB501s
TB500s
S623g
S622g
S621g
S620g
S619g
S618g
S617g
S616g
S615g
S614g
S613g
S612g
S611g
S610g
S609g
S608g
S607g
S606g
S605g
S604g
S603g
S602g
S601g
S502g
S501g
S624s
S651s
S554s
S553s
S552s
S551s
SUPERSTRUCTURE (STAINLESS STEEL)
![Page 27: APPROACH DESIGN SECTION - Maine.gov · See MaineDOT Detail 610(03) Where Shown on Plans Geotextile Erosion Control 3. 0 0 ' Riprap Plain 1. 7 5: 1 (M a x) Course Gravel 18" Aggregate](https://reader035.vdocuments.us/reader035/viewer/2022062602/5f01cf697e708231d40125c5/html5/thumbnails/27.jpg)
EL. 15
6.38
EL. 15
5.83
Brid
ge
Divisio
n:
Filena
me:...\
304.0
2 -
DG
N\
11+00 11+2
5Userna
me:
Date:1
0/10/2
018
tksandell
DE
SIG
N-
DE
TAIL
ED
BY
DA
TE
PR
OJ.
MA
NA
GE
R
SHEET NUMBER
FIE
LD
CH
AN
GE
S
RE
VISIO
NS
1
RE
VISIO
NS
2
RE
VISIO
NS
3
RE
VISIO
NS
4
CH
EC
KE
D-
RE
VIE
WE
DE.
LO
WE
LL
T.
SA
ND
EL
L10\
2018
OF 34
NO
RT
HFIE
LD
ST
AT
E
RO
UT
E
19
2
M.
PA
RLIN
DE
SIG
N2-
DE
TAIL
ED
2
DE
SIG
N3-
DE
TAIL
ED
3
J.
SO
CH
AN
EK
PA
UL
YU
021699.0
0
WIN
WIN 0
21699.0
0HIG
HW
AY P
LA
NS
10\
2018
DE
PA
RT
ME
NT O
F T
RA
NSP
OR
TA
TIO
N
ST
AT
E O
F M
AIN
E
DA
TE
SIG
NA
TU
RE
P.E.
NU
MB
ER
CR
OS
S
SE
CTIO
NS
27
NO
RT
HFIE
LD
ST
AT
E
RO
UT
E
19
2
135
140
145
150
155
160
165
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70
11+00.00
135
140
145
150
155
160
165
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70
135
140
145
150
155
160
165
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70
11+25.00
135
140
145
150
155
160
165
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70
CLMatch MatchMatch
Existin
g
R.O.W
Existin
g
R.O.W
(Follow Exist. Slope)
Prop. Extension to Sta. 11+41.68', 23.02' Rt.
To Sta. 11+36.99', 22.83' Rt., Inv. 152.58
From Sta. 10+96.79', 22.63' Rt., Inv. 154.01
Exist. 18" CMP Culvert
CLL
Match Exist Slope
Grubbing in Fill
Match Exist Slope
MatchMatchMatch
3:1
Existin
g
R.O.W
Existin
g
R.O.W
CLL
Grubbing in Fill
3:1 Max.
1.85 CYG:
0.51 CYF:
1.98 CYC:
20.30 CYG:
12.87 CYF:
15.89 CYC:
Install Terminal End
Sta. 11+30 - 30.56' RT.
Install GR Type 3c - Single Rail
Sta. 11+33 - 23.72' RT.
Sta. 11+30 - 30.56' RT. TO
Radius 15' or Less (606.231)
Install Curved GR Type 3c
Sta. 11+47 - 14.31' RT.
Sta. 11+33 - 23.72' RT. TO
![Page 28: APPROACH DESIGN SECTION - Maine.gov · See MaineDOT Detail 610(03) Where Shown on Plans Geotextile Erosion Control 3. 0 0 ' Riprap Plain 1. 7 5: 1 (M a x) Course Gravel 18" Aggregate](https://reader035.vdocuments.us/reader035/viewer/2022062602/5f01cf697e708231d40125c5/html5/thumbnails/28.jpg)
EL. 15
5.15
DE
SIG
N-
DE
TAIL
ED
BY
DA
TE
PR
OJ.
MA
NA
GE
R
SHEET NUMBER
FIE
LD
CH
AN
GE
S
RE
VISIO
NS
1
RE
VISIO
NS
2
RE
VISIO
NS
3
RE
VISIO
NS
4
CH
EC
KE
D-
RE
VIE
WE
DE.
LO
WE
LL
T.
SA
ND
EL
L10\
2018
Brid
ge
Divisio
n:
Filena
me:...\
304.0
2 -
DG
N\
11+5
0 11+7
5Userna
me:
Date:1
0/10/2
018
tksandell
BO
G
ST
RE
AM
BRID
GE
NO
RT
HFIE
LD
WA
SHIN
GT
ON
CO
UN
TY
BO
G
ST
RE
AM
28OF 34
BRID
GE N
O. 3719
M.
PA
RLIN
DE
SIG
N2-
DE
TAIL
ED
2
DE
SIG
N3-
DE
TAIL
ED
3
J.
SO
CH
AN
EK
PA
UL
YU
021699.0
0
WIN 0
21699.0
0B
RID
GE P
LA
NS
10\
2018
ST
AT
E O
F M
AIN
E
DE
PA
RT
ME
NT O
F T
RA
NSP
OR
TA
TIO
N
DA
TE
SIG
NA
TU
RE
P.E.
NU
MB
ER
WIN
CR
OS
S
SE
CTIO
NS
135
140
145
150
155
160
165
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70
11+50.00
135
140
145
150
155
160
165
0 5 10 15 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70
135
140
145
150
155
160
165
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70
11+75.00
135
140
145
150
155
160
165
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70
CL
EL. 15
5.43
-2.0%-2.0%
3:1
Existin
g
R.O.W
Existin
g
R.O.W
Install Low Volume End Treatment
Sta. 11+79 - 15.82' LT.
Sta. 11+41 - 18.96' LT. TO
Install Bridge Transition Rail
Sta. 11+98 - 14.33' LT.
Sta. 11+79 - 15.82' LT. TO
CLL
Grubbing in Fill
Grubbing in Fill
-2.0%-2.0%
Existin
g
R.O.W
Existin
g
R.O.W
CLL
2:1
3:1 Max.
6:1
Grubbing in Fill
Grubbing in Fill
20
22.45 CYG:
31.56 CYF:
30.87 CYC:
14.73 CYG:
20.30 CYF:
45.03 CYC:
Install GR Type 3c - Single Rail
Sta. 11+97 - 14.33' RT. TO
Sta. 11+47 - 14.31' RT. TO
![Page 29: APPROACH DESIGN SECTION - Maine.gov · See MaineDOT Detail 610(03) Where Shown on Plans Geotextile Erosion Control 3. 0 0 ' Riprap Plain 1. 7 5: 1 (M a x) Course Gravel 18" Aggregate](https://reader035.vdocuments.us/reader035/viewer/2022062602/5f01cf697e708231d40125c5/html5/thumbnails/29.jpg)
EL. 15
4.95
DE
SIG
N-
DE
TAIL
ED
BY
DA
TE
PR
OJ.
MA
NA
GE
R
SHEET NUMBER
FIE
LD
CH
AN
GE
S
RE
VISIO
NS
1
RE
VISIO
NS
2
RE
VISIO
NS
3
RE
VISIO
NS
4
CH
EC
KE
D-
RE
VIE
WE
DE.
LO
WE
LL
T.
SA
ND
EL
L10\
2018
Brid
ge
Divisio
n:
Filena
me:...\
304.0
2 -
DG
N\
12
+00 12
+2
5Userna
me:
Date:1
0/10/2
018
tksandell
BO
G
ST
RE
AM
BRID
GE
NO
RT
HFIE
LD
WA
SHIN
GT
ON
CO
UN
TY
BO
G
ST
RE
AM
29OF 34
BRID
GE N
O. 3719
M.
PA
RLIN
DE
SIG
N2-
DE
TAIL
ED
2
DE
SIG
N3-
DE
TAIL
ED
3
J.
SO
CH
AN
EK
PA
UL
YU
021699.0
0
WIN 0
21699.0
0B
RID
GE P
LA
NS
10\
2018
ST
AT
E O
F M
AIN
E
DE
PA
RT
ME
NT O
F T
RA
NSP
OR
TA
TIO
N
DA
TE
SIG
NA
TU
RE
P.E.
NU
MB
ER
WIN
CR
OS
S
SE
CTIO
NS
135
140
145
150
155
160
165
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70
12+00.00
135
140
145
150
155
160
165
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70
135
140
145
150
155
160
165
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70
12+25.00
135
140
145
150
155
160
165
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70
CL
-2.0% -2.0%
EL. 15
5.00
2:1
Existin
g
R.O.W
Existin
g
R.O.W
Existin
g
R.O.W
CL
Install Bridge Transition Rail
Sta. 12+16 - 14.33' RT.
Sta. 11+97 - 14.33' RT. TO
CLL
Grubbing in Fill
Grubbing in Fill
CL
CLCL
-2.0% -2.0%
Existin
g
R.O.W
Existin
g
R.O.W
CLL
CLL
4:1
Limits of Excavation
21.48 CYG:
0.00 CYF:
45.90 CYC:
14.68 CYG:
0.00 CYF:
116.54 CYC:
![Page 30: APPROACH DESIGN SECTION - Maine.gov · See MaineDOT Detail 610(03) Where Shown on Plans Geotextile Erosion Control 3. 0 0 ' Riprap Plain 1. 7 5: 1 (M a x) Course Gravel 18" Aggregate](https://reader035.vdocuments.us/reader035/viewer/2022062602/5f01cf697e708231d40125c5/html5/thumbnails/30.jpg)
EL. 15
4.90
DE
SIG
N-
DE
TAIL
ED
BY
DA
TE
PR
OJ.
MA
NA
GE
R
SHEET NUMBER
FIE
LD
CH
AN
GE
S
RE
VISIO
NS
1
RE
VISIO
NS
2
RE
VISIO
NS
3
RE
VISIO
NS
4
CH
EC
KE
D-
RE
VIE
WE
DE.
LO
WE
LL
T.
SA
ND
EL
L10\
2018
Brid
ge
Divisio
n:
Filena
me:...\
304.0
2 -
DG
N\
12
+5
0 12
+7
5Userna
me:
Date:1
0/10/2
018
tksandell
BO
G
ST
RE
AM
BRID
GE
NO
RT
HFIE
LD
WA
SHIN
GT
ON
CO
UN
TY
BO
G
ST
RE
AM
30OF 34
BRID
GE N
O. 3719
M.
PA
RLIN
DE
SIG
N2-
DE
TAIL
ED
2
DE
SIG
N3-
DE
TAIL
ED
3
J.
SO
CH
AN
EK
PA
UL
YU
021699.0
0
WIN 0
21699.0
0B
RID
GE P
LA
NS
10\
2018
ST
AT
E O
F M
AIN
E
DE
PA
RT
ME
NT O
F T
RA
NSP
OR
TA
TIO
N
DA
TE
SIG
NA
TU
RE
P.E.
NU
MB
ER
WIN
CR
OS
S
SE
CTIO
NS
135
140
145
150
155
160
165
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70
12+50.00
135
140
145
150
155
160
165
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70
135
140
145
150
155
160
165
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70
12+75.00
135
140
145
150
155
160
165
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70
CL
CLCL
-2.0% -2.0%
EL. 15
4.93
Existin
g
R.O.W
Existin
g
R.O.W
Relocate Utility Pole
Sta. 12+36.52', 20.50' Rt
Exist. Utility Pole
Limits of Excavation
CLL
CLL
CL
CLCL
-2.0% -2.0%
CLL
Existin
g
R.O.W
Existin
g
R.O.W
Limits of Excavation
0.00 CYG:
0.00 CYF:
126.66 CYC:
0.00 CYG:
0.00 CYF:
0.00 CYC:
![Page 31: APPROACH DESIGN SECTION - Maine.gov · See MaineDOT Detail 610(03) Where Shown on Plans Geotextile Erosion Control 3. 0 0 ' Riprap Plain 1. 7 5: 1 (M a x) Course Gravel 18" Aggregate](https://reader035.vdocuments.us/reader035/viewer/2022062602/5f01cf697e708231d40125c5/html5/thumbnails/31.jpg)
EL. 15
4.85
DE
SIG
N-
DE
TAIL
ED
BY
DA
TE
PR
OJ.
MA
NA
GE
R
SHEET NUMBER
FIE
LD
CH
AN
GE
S
RE
VISIO
NS
1
RE
VISIO
NS
2
RE
VISIO
NS
3
RE
VISIO
NS
4
CH
EC
KE
D-
RE
VIE
WE
DE.
LO
WE
LL
T.
SA
ND
EL
L10\
2018
Brid
ge
Divisio
n:
Filena
me:...\
304.0
2 -
DG
N\
13
+00 13
+2
5Userna
me:
Date:1
0/10/2
018
tksandell
BO
G
ST
RE
AM
BRID
GE
NO
RT
HFIE
LD
WA
SHIN
GT
ON
CO
UN
TY
BO
G
ST
RE
AM
31OF 34
BRID
GE N
O. 3719
M.
PA
RLIN
DE
SIG
N2-
DE
TAIL
ED
2
DE
SIG
N3-
DE
TAIL
ED
3
J.
SO
CH
AN
EK
PA
UL
YU
021699.0
0
WIN 0
21699.0
0B
RID
GE P
LA
NS
10\
2018
ST
AT
E O
F M
AIN
E
DE
PA
RT
ME
NT O
F T
RA
NSP
OR
TA
TIO
N
DA
TE
SIG
NA
TU
RE
P.E.
NU
MB
ER
WIN
CR
OS
S
SE
CTIO
NS
135
140
145
150
155
160
165
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70
13+00.00
135
140
145
150
155
160
165
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70
135
140
145
150
155
160
165
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70
13+25.00
135
140
145
150
155
160
165
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70
CL
CL
CL
-2.0% -2.0%
EL. 15
4.87
2:1
Existin
g
R.O.W
Existin
g
R.O.W
Install Low Volume End Treatment
Sta. 13+53 - 18.93' LT.
Sta. 13+16 - 14.33' LT. TO
Install Bridge Transition Rail
Sta. 13+16 - 14.33' LT.
Sta. 12+97 - 14.33' LT. TO
146.68
CLL
Grubbing in Fill
Existin
g
R.O.W
Existin
g
R.O.W
CLL
2.5:1 2:1
-2.0%-2.0%
Grubbing in Fill Grubbing in Fill
8.06 CYG:
0.00 CYF:
107.68 CYC:
26.25 CYG:
10.85 CYF:
28.52 CYC:
Install GR Type 3c - Single Rail
Sta. 13+41 - 14.33' RT.
Sta. 13+09 - 14.33' RT. TO
![Page 32: APPROACH DESIGN SECTION - Maine.gov · See MaineDOT Detail 610(03) Where Shown on Plans Geotextile Erosion Control 3. 0 0 ' Riprap Plain 1. 7 5: 1 (M a x) Course Gravel 18" Aggregate](https://reader035.vdocuments.us/reader035/viewer/2022062602/5f01cf697e708231d40125c5/html5/thumbnails/32.jpg)
EL. 15
4.85
DE
SIG
N-
DE
TAIL
ED
BY
DA
TE
PR
OJ.
MA
NA
GE
R
SHEET NUMBER
FIE
LD
CH
AN
GE
S
RE
VISIO
NS
1
RE
VISIO
NS
2
RE
VISIO
NS
3
RE
VISIO
NS
4
CH
EC
KE
D-
RE
VIE
WE
DE.
LO
WE
LL
T.
SA
ND
EL
L10\
2018
Brid
ge
Divisio
n:
Filena
me:...\
304.0
2 -
DG
N\
13
+5
0 13
+7
5Userna
me:
Date:1
0/10/2
018
tksandell
BO
G
ST
RE
AM
BRID
GE
NO
RT
HFIE
LD
WA
SHIN
GT
ON
CO
UN
TY
BO
G
ST
RE
AM
32OF 34
BRID
GE N
O. 3719
M.
PA
RLIN
DE
SIG
N2-
DE
TAIL
ED
2
DE
SIG
N3-
DE
TAIL
ED
3
J.
SO
CH
AN
EK
PA
UL
YU
021699.0
0
WIN 0
21699.0
0B
RID
GE P
LA
NS
10\
2018
ST
AT
E O
F M
AIN
E
DE
PA
RT
ME
NT O
F T
RA
NSP
OR
TA
TIO
N
DA
TE
SIG
NA
TU
RE
P.E.
NU
MB
ER
WIN
CR
OS
S
SE
CTIO
NS
135
140
145
150
155
160
165
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70
13+50.00
135
140
145
150
155
160
165
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70
135
140
145
150
155
160
165
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70
13+75.00
135
140
145
150
155
160
165
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70
CL
CL
-2.0% -2.0%
EL. 15
4.85
3:1
3:1
2:1
Existin
g
R.O.W
Existin
g
R.O.W
Install Low Volume End Treatment
Sta. 13+78 - 18.93' RT.
Sta. 13+41 - 14.33' RT. TO
147.78
CLL
CLL
Grubbing in FillGrubbing in Fill
CLL
Existin
g
R.O.W
Existin
g
R.O.W
CLL
3:1
3:1
MatchMatch
Grubbing in Fill
148.00
Grubbing in Fill
4:1
3:1
42.51 CYG:
52.76 CYF:
11.45 CYC:
53.80 CYG:
97.98 CYF:
16.99 CYC:
![Page 33: APPROACH DESIGN SECTION - Maine.gov · See MaineDOT Detail 610(03) Where Shown on Plans Geotextile Erosion Control 3. 0 0 ' Riprap Plain 1. 7 5: 1 (M a x) Course Gravel 18" Aggregate](https://reader035.vdocuments.us/reader035/viewer/2022062602/5f01cf697e708231d40125c5/html5/thumbnails/33.jpg)
EL. 15
4.79
EL. 15
4.79
EL. 15
4.74
DE
SIG
N-
DE
TAIL
ED
BY
DA
TE
PR
OJ.
MA
NA
GE
R
SHEET NUMBER
FIE
LD
CH
AN
GE
S
RE
VISIO
NS
1
RE
VISIO
NS
2
RE
VISIO
NS
3
RE
VISIO
NS
4
CH
EC
KE
D-
RE
VIE
WE
DE.
LO
WE
LL
T.
SA
ND
EL
L10\
2018
Brid
ge
Divisio
n:
Filena
me:...\
304.0
2 -
DG
N\
14
+00 14
+2
5Userna
me:
Date:1
0/10/2
018
tksandell
BO
G
ST
RE
AM
BRID
GE
NO
RT
HFIE
LD
WA
SHIN
GT
ON
CO
UN
TY
BO
G
ST
RE
AM
33OF 34
BRID
GE N
O. 3719
M.
PA
RLIN
DE
SIG
N2-
DE
TAIL
ED
2
DE
SIG
N3-
DE
TAIL
ED
3
J.
SO
CH
AN
EK
PA
UL
YU
021699.0
0
WIN 0
21699.0
0B
RID
GE P
LA
NS
10\
2018
ST
AT
E O
F M
AIN
E
DE
PA
RT
ME
NT O
F T
RA
NSP
OR
TA
TIO
N
DA
TE
SIG
NA
TU
RE
P.E.
NU
MB
ER
WIN
CR
OS
S
SE
CTIO
NS
135
140
145
150
155
160
165
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70
14+00.00
135
140
145
150
155
160
165
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70
135
140
145
150
155
160
165
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70
14+25.00
135
140
145
150
155
160
165
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70
CL
CL
CL
Match Match
3:1
Existin
g
R.O.W
Existin
g
R.O.W
To Sta. 14+29.01', -28.92' Lt., Inv. 150.22
From Sta. 13+89.66', -28.79' Lt., Inv. 149.03
Exist. 15" PCP Culvert
CLL
Grubbing in Fill
Existin
g
R.O.W
Existin
g
R.O.W
CLL
3:1
Grubbing in Fill
Match Match
45.02 CYG:
83.71 CYF:
16.16 CYC:
28.26 CYG:
42.08 CYF:
8.88 CYC:
![Page 34: APPROACH DESIGN SECTION - Maine.gov · See MaineDOT Detail 610(03) Where Shown on Plans Geotextile Erosion Control 3. 0 0 ' Riprap Plain 1. 7 5: 1 (M a x) Course Gravel 18" Aggregate](https://reader035.vdocuments.us/reader035/viewer/2022062602/5f01cf697e708231d40125c5/html5/thumbnails/34.jpg)
IPF
IPF
IPF
3/8" DIA REBAR PLS #360
JOINT 247
1/4" DIA REBAR
POSSIBLE DRIVEWAY MARKER
59
DELINEATOR 3719 1/4" DIA REBAR1 FT HIGH LEANING
POSSIBLE DRIVEWAY MARKER
18" CMP FAIRJOINT 7/245
MIXED GROWTH
TOBEY ISLAND
1 FOOT WIDE
15" CMP1’
WID
E
JOINT 246
15 IN CONC
8" DIA DOWNSPOUTS
8" DIA DOWNSPOUTS
NO. GRANTOR INSTRUMENT DATE BOOK PAGE
COUNTY RECORDSHEET NUMBER
OFDATE
COMMISSIONER
CHIEF ENGINEER
REVISIONS
NO. DATE DESCRIPTION BY
RIG
HT O
F W
AY M
AP
ST
AT
E O
F M
AIN
E
DE
PA
RT
ME
NT O
F T
RA
NSP
OR
TA
TIO
N
ITE
MT
EC
HC
HE
CK
ED
OVER
RIGHT-OF-WAY MAP
WIN
SCALE 1"= 25’
PLAN FILED IN PLAN BOOK PAGE
RO
WDivisio
n:
Filena
me:...\
00\
RO
W\
MS
TA\
001_
RW
PL
AN
1.d
gn
Userna
me:
Date:1
0/16/2
018
betin
a.m
artin
STATE OF MAINE
REGISTRY OF DEEDS
COUNTY
RECEIVED
Attest:
,
REGISTER
Plan Book , Page
at h m M and recorded in
Town, County, State
Ledge
Trees
Tree Line
Conifer
Catch Basin
Manhole
Deciduous
Utlity Pole
Telephone Line
Traverse Point
IPFIRF
Electric Line
Sewer Manhole
Control Of Access
Limits of Wrought Portion L.O.W.P.
Water Line
Sanitary Sewer
Guardrail
Existing Right of Way
Water Edge
Bush Line
P.L.
Fence
Underdrain Line
PLAN LEGEND
Culvert
Gas Line
Traveled WayApprox. Property Lines
Sign
Fire Hydrant
Monument
Building
C.O.A.
Cut Line Fill Line
Clearing Limit Line Stonewall
AR
EA
S
EXIS
TIN
G
CO
NDITIO
N
PL
AN
FIN
AL
RIG
HT
OF
WA
Y
New Right of Way
New Easement
New Temporary Rights
10+00 11+00Baseline 12+00
New R/W Along Existing R/W
New R/W Within Existing R/W
Pipe Found
WellWELL
Existing Proposed
Ditch
16 S
TA
TE H
OU
SE ST
ATIO
N - A
UG
UST
A, M
E 0
4333-0
016 - 2
07-6
24-3
460
CHAIN LINK BARB WIRE STOCKADE
Replacement Pin Set
Iron Rod Found
Retaining Wall
Mailbox
Rock/Boulder Flag Pole
Existing Proposed
CurbingScale of Feet
25 0 25 50
ABUTTING PROPERTY OWNERS.
IT CANNOT BE USED TO ESTABLISH LEGAL BOUNDARIES BETWEEN
ACQUISITION OF REAL PROPERTY FOR TRANSPORTATION PURPOSES.
THIS PLAN WAS PREPARED IN CONNECTION WITH THE DEPARTMENT’S
75 100
BOG STREAM BRIDGE
BOG STREAM
BRIDGE NO. 3719
BM
D
BD
M
BD
M
021699.00
FEDERAL AID PROJECT NO. STP-2169(900)
NORTHFIELD
NO
RT
HFIE
LD
WASHINGTON COUNTY
STATE AID HIGHWAY NO. 1DAVID BERNHARDT
JOYCE NOEL TAYLOR
SHEET 1 OF 1
OCTOBER 2018
ROUTE 192 NORTHFIELD ROAD
D.O.T. FILE NO. 15-333
3434
TO
BE
Y’S IS
LA
ND
RO
AD
P.L.
+20
TEMP.
ROAD
LIMITS TEMP.
BO
OK 2525,
PA
GE 111
W.C.R.D.
RO
W
TO
OT
HE
RS
TEMP.
CONST.
LIMIT
S
ï »¿285î��
+20+25
P.L.
TO WESLEY
GRID
NO
RT
H
MAIN
E 2000
EAS
T
ZO
NE
B.L.
BEGINB.L.
END
+60+50+10
574.99’TO MACHIAS
BO
OK 4147, 2
55
W.C.R.D.
RO
W
TO
OT
HE
RS
JANICE E. HOOPERDOUGLAS L. HOOPER
N/F
SCOTT F. REYNOLDS
N/F
1941
S.H.C. FILE NO. S-15-84
R/W REFERENCE
S.A. HWY. NO. 1 ROUTE 192NORTHFIELD ROAD
S 60°32’26.5" E
+10
ROAD
LIMITSSLOPE
EASE.
LIMITS
+50 +75
0.26î�
SLOPE EASE.
LIMIT
S
TOTAL AREA = 59* AC. (PER DEED)
TEMP. CONST. RIGHTS = 285* S.F. (1)
SLOPE EASE. = 0.08* AC. (1)
ITEM NO. (2)
SCOTT F. REYNOLDS
55’
50’
55’
65’
55’
TOE OF SLOPE DITCH
STA. 13+20. TO STA. 13+81 LT.
TOTAL AREA = 276.74* AC. (PER TOWN)
TEMP. ROAD RIGHTS = 0.26* AC. (1)
SLOPE EASE. = 0.06* AC. (1)
ITEM NO. (1)
R.H. FOSTER, INC.
BOG STREAM
BOG STREAM
+30 +30
40’
40’
SLOPE EASE. LIMITS
0.08î�
SLOPEEASE. LIMITS
40’
40’
+80 +25
0.06* AC.
MAP CAB. 3, DR. 22, SHEET #89
W.C.R.D.
DATED JANUARY 19, 2015
BY ANDREW MULHOLLAND, WEST FALLS SURVEYING
FOR WENDELL WHITE
SEE RIGHT OF WAY SURVEY
9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00
9+
58.6
9
15+
33.6
8
E = 18.33’
T = 250.71’
L = 497.85’
R = 1704.91’
PI = 7+11.55
CURVE DATA #1
E = 2.76’
T = 141.88’
L = 283.63’
R = 3640.48’
PI = 16+75.57
CURVE DATA #2
PT =
PC
=
Flow