Applying Modeling and Simulation Verification, Validation and Accreditation (VV&A) Techniques to Test and Laboratory Facilities Dr. James Elele, Jeremy Smith NAWCAD BSMVV Branch [email protected] David Hall, Charles Pedriani SURVICE Engineering Company [email protected] ASME V&V Conference 3 May 2012

Upload: vanessa-annabella-sanders

Post on 27-Dec-2015

219 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Applying Modeling and Simulation Verification, Validation and Accreditation (VV&A) Techniques to Test and Laboratory Facilities Dr. James Elele, Jeremy

Applying Modeling and Simulation Verification, Validation and Accreditation

(VV&A) Techniques to Test and Laboratory Facilities

Dr. James Elele, Jeremy Smith NAWCAD BSMVV Branch

[email protected]

David Hall, Charles PedrianiSURVICE Engineering Company

[email protected]

ASME V&V Conference3 May 2012

Page 2: Applying Modeling and Simulation Verification, Validation and Accreditation (VV&A) Techniques to Test and Laboratory Facilities Dr. James Elele, Jeremy

2

Introduction

• Tasking to support accreditation of Test and Evaluation Facilities in support of IFF Program– Develop an accreditation case for T&E facilities for operational

testing

• Applied risk-based M&S VV&A approach to facilities– Approach applied successfully to M&S for over 20 years

• Test case for future T&E facility accreditation efforts– Successful application can support efforts to institutionalize

process for T&E as well as M&S

IFF = Identification Friend or FoeT&E = Test and Evaluation

M&S = Model and Simulation

Page 3: Applying Modeling and Simulation Verification, Validation and Accreditation (VV&A) Techniques to Test and Laboratory Facilities Dr. James Elele, Jeremy

3

• Verification: The process of determining that a model implementation and its associated data accurately represent the developer's conceptual description and specifications.

– Does the model do what the originator intended, and is it relatively error free?

• Validation: The process of determining the degree to which a model and its associated data are an accurate representation of the real world from the perspective of the intended uses of the model.

– How well do model results match real world data, in the context of your needs?

• Accreditation: The official certification [determination] that a model, simulation, or federation of models and simulations and its associated data are acceptable for use for a specific purpose

– Does the accreditation authority have adequate evidence to be confident that a model is fit for purpose?

M&S VV&A Definitions

Definitions from DODI 5000.61 dated 13 May 2003

Did you build the model right?

Did you build the right model?

Did your customer accept it?

Page 4: Applying Modeling and Simulation Verification, Validation and Accreditation (VV&A) Techniques to Test and Laboratory Facilities Dr. James Elele, Jeremy

4

Underlying Principles

• The ultimate goal of VV&A efforts is to form a foundation for making good decisions

• Nature and extent of information required to support accreditation decision is at the discretion of the accreditation authority and is generally based on assessment of risk

1. Role of M&S results in decision making process

2. Importance of decision that M&S is supporting

3. Severity of the consequences of making incorrect decisions because M&S were wrong

4. Probability that analysis results based upon M&S will be challenged

Bestof

ShowGood

Enough“Better is the Enemy of Good Enough!”

Page 5: Applying Modeling and Simulation Verification, Validation and Accreditation (VV&A) Techniques to Test and Laboratory Facilities Dr. James Elele, Jeremy

5

Steps to an Accreditation Decision

Make Accreditation Decision

Review Accreditation Case

Develop Accreditation Case

Develop/Execute Accreditation Plan

Develop M&S Reqts and Accreditation Info Reqts

Analyze Intended Use Intended Use

Statement

V&V

A

Accreditation Plan

Fit for Intended

Use

Page 6: Applying Modeling and Simulation Verification, Validation and Accreditation (VV&A) Techniques to Test and Laboratory Facilities Dr. James Elele, Jeremy

6

How Much Credibility Is “Enough”?

M&S UserIt Depends on Risk

BUT

A Makeshift Bridge is Good Enough If You Need To Cross a

Meandering Shallow Stream

M&S

Page 7: Applying Modeling and Simulation Verification, Validation and Accreditation (VV&A) Techniques to Test and Laboratory Facilities Dr. James Elele, Jeremy

7

Greater Risks...

PROBLEM CREDIBLESOLUTION

Indicate the Need for Evidence of Greater Credibility

M&S

Supporting Evidence

Page 8: Applying Modeling and Simulation Verification, Validation and Accreditation (VV&A) Techniques to Test and Laboratory Facilities Dr. James Elele, Jeremy

8

Output Accuracy

Simulation meets design requirements, operates as designed

and is free of errors in software

Software (S/W) Accuracy

Simulation input data, validation data and data manipulations are

appropriate and accurate

Data Accuracy

Simulation outputs match the real world “well enough” to be of use

in a particular problem

ValidationVerification

V&V: The Central Pillars of Simulation Credibility

S/W Accuracy Output AccuracyData Accuracy

But, V&V are Just the Middle of the Bridge!

Page 9: Applying Modeling and Simulation Verification, Validation and Accreditation (VV&A) Techniques to Test and Laboratory Facilities Dr. James Elele, Jeremy

9

Simulation possesses all required functionality and fidelity for the

problem being solved

Anchors the M&S to the Problem

Simulation has adequate user support to facilitate correct operation and

interpretation of its outputs

Ties the M&S to a Useful Solution

AccuracyAccuracyM&S

Requirements

CapabilityCapability

UserCapabilities

UsabilityUsability

The “Other Pillars” of Simulation Credibility

Problem CredibleSolution

Capability Usability

Can I Be Sure I’m Not Mis-

Using the M&S?

M&S

Does the M&S Do What I Need

It To Do?

Accuracy of:•Software•Data•Outputs

Page 10: Applying Modeling and Simulation Verification, Validation and Accreditation (VV&A) Techniques to Test and Laboratory Facilities Dr. James Elele, Jeremy

10

The Essence of Accreditation

TO PROVE THE M&S IS SUITABLE FOR THE NEED REQUIRES AN OBJECTIVE COMPARISON

OF M&S INFORMATION WITH M&S REQUIREMENTS WITHIN THE CONTEXT OF THE PROBLEM

M&SREQUIREMENTS

M&SINFORMATION

IDENTIFYWORK-AROUNDS,

USAGE CONSTRAINTS,REQUIRED IMPROVEMENTS

AND RISKS

IDENTIFY M&S DEFICIENCIES

ACCREDITATIONDECISION

• Capability• Accuracy• Usability

• Data Quality• M&S Documentation• Design Documentation• Configuration Mgt• V&V Results• Etc.

Defined by the User(Formally or Implied)

Provided by the Model DeveloperProvided by the Model Developer or Model Proponentor Model Proponent

PROBLEM CONTEXT

Page 11: Applying Modeling and Simulation Verification, Validation and Accreditation (VV&A) Techniques to Test and Laboratory Facilities Dr. James Elele, Jeremy

11

How Much V&V is Enough?

It Depends on Risk– Risk means something “bad”

might happen because you believed an incorrect simulation result

• Decisions based on M&S results are at risk

• VV&A reduces that risk

RISK =

PROBABILITY x IMPACT

HIGH

LOWPROBABILITY

RISK

IMPACT

MODERATE

Page 12: Applying Modeling and Simulation Verification, Validation and Accreditation (VV&A) Techniques to Test and Laboratory Facilities Dr. James Elele, Jeremy

12

Quantifying Risk Level

RISK LEVEL VALUES ARE:• Subjective• Consistent with MIL-STD-882• Tailorable to each application

RISK LEVEL VALUES ARE:• Subjective• Consistent with MIL-STD-882• Tailorable to each application

HIGHER RISK MEANS MORE CREDIBILITY EVIDENCE IS NEEDED TO ACHIEVE ACCREDITATION

Probability of Incorrect

Simulation Result

Level of Impact on the Program

Negligible Marginal Serious Critical Catastrophic

Frequent Low Moderate High High High

Probable Low Moderate Moderate High High

Occasional Low Low Moderate Moderate High

Remote Low Low Low Moderate Moderate

Impossible Low Low Low Low Moderate

Page 13: Applying Modeling and Simulation Verification, Validation and Accreditation (VV&A) Techniques to Test and Laboratory Facilities Dr. James Elele, Jeremy

13

Low Moderate High

1

2

3

4

5

1 2 3 4 5

Impact

Lik

elih

oo

d

Reduced reliance on M&S results

Imp

rove

d M

&S

Cre

dib

ility

Risk = Likelihood x Impact

Risk Reduction Strategies

Page 14: Applying Modeling and Simulation Verification, Validation and Accreditation (VV&A) Techniques to Test and Laboratory Facilities Dr. James Elele, Jeremy

14

Application to Test and Laboratory Facilities

• This was a trial application of the M&S VV&A approach to test facilities– Identification Friend-or-Foe (IFF) system testing to evaluate

new IFF system performance

• Accreditation of test facilities required by Commander, Operational Test and Evaluation Force (COMOPTEVFOR)

• Facilities used for system assessment include:– All-up ship radar and related system representations– Simple stimulators– Engineering Test Equipment (ETE) facility specific to IFF

system testing

Page 15: Applying Modeling and Simulation Verification, Validation and Accreditation (VV&A) Techniques to Test and Laboratory Facilities Dr. James Elele, Jeremy

15

ETE Facility

• Generates waveform signals to stimulate a production IFF transponder in the laboratory

• To evaluate system requirement for resistance to signals from transmitters other than the desired transmitter– Critical technical parameter “susceptibility of the IFF

system to false interrogations”– Metric: Probability of resistance to false signals = Pr

Page 16: Applying Modeling and Simulation Verification, Validation and Accreditation (VV&A) Techniques to Test and Laboratory Facilities Dr. James Elele, Jeremy

16

Initial ETE Risk Assessment

M&S Characteristic Criterion Risk

CAPABILITY

Intended Use The specific intended use(s) of the facility, model or simulation is/are clearly stated.

LOW

Design The facility and analysis process (framework, algorithms, data sources, and assumptions) produces credible results.

MODERATE

ACCURACY

Input Data For each facility, model or simulation, input data are credible and subject to review and revision.

LOW

System Verification

The facility, model or simulation has been formally tested or reviewed and has been demonstrated to accurately represent the specific intended use(s) and requirements.

MODERATE

Results Validation The facility’s, model’s or simulation’s responses have been compared with known or expected behavior from the subject it represents and has been demonstrated to be sufficiently accurate for the specific intended use(s).

MODERATE

USABILITY

Configuration Management

For each facility, model or simulation, modeled components are supported by a sound written Configuration Management (CM) Plan.

MODERATE

User Community For each facility, model or simulation, the capability is designed and developed for the level of competency for its intended purpose. The capability is supported by documents such as user’s manual, technical manual, and/or reference guide.

MODERATE

Page 17: Applying Modeling and Simulation Verification, Validation and Accreditation (VV&A) Techniques to Test and Laboratory Facilities Dr. James Elele, Jeremy

17

Initial ETE Assessment and Recommendations*

CAPABILITY:• The intended use is clearly stated: to evaluate the probability of

responding to a false signal (Pr)• No formal design documents exist: recommend laboratory design be

adequately documented ACCURACY:

• Input data are provided by actual hardware • Recommend documenting a complete set of test cases and results and

any previous verification activities• Recommend independent subject matter expert (SME) review of

laboratory resultsUSABILITY:

• Recommend facility develop and implement an overall configuration management plan

• The test approach appears to have been successfully used over a span of many years to support a variety of identification programs for DOD and the FAA: recommend the facility provide documented results of previous uses

* Incorporated into ETE Facility Accreditation Plan

Page 18: Applying Modeling and Simulation Verification, Validation and Accreditation (VV&A) Techniques to Test and Laboratory Facilities Dr. James Elele, Jeremy

18

Observations

• Application to test facility similar to M&S– Biggest issue for both: getting good documentation– Lack of configuration management plans– Poor documentation of prior V&V results

• They did V&V, they just didn’t write it down

– Accreditation Support Package (ASP) document format works equally well for both

• Differences:– Developing intended use statement more natural for

test facilities than for M&S• Use of T&E facilities seems to have more focused objectives

initially than use of M&S

Page 19: Applying Modeling and Simulation Verification, Validation and Accreditation (VV&A) Techniques to Test and Laboratory Facilities Dr. James Elele, Jeremy

19

Accreditation Support Package

• EXECUTIVE SUMMARY

• ASP OVERVIEW

• CAPABILITY– M&S Description– Functional Capabilities– Development History– Assumptions and Limitations– Implications for M&S Use

• USABILITY– Documentation Assessment– User Support– Usage History– Implications for M&S Use

• ACCURACY– Software Accuracy

• Software Verification Results– Design Verification– Implementation Verification

• Software Development and Management Environment

– Software Development Environment

– Configuration Management

• Software Quality Assessment• Implications for M&S Use

– Data Accuracy• Input Data• Data Transformations• Implications for M&S Use

– Output Accuracy• Sensitivity Analysis• Benchmarking• Face Validation• Results Validation• Implications for M&S Use

Page 20: Applying Modeling and Simulation Verification, Validation and Accreditation (VV&A) Techniques to Test and Laboratory Facilities Dr. James Elele, Jeremy

20

Thoughts on Broader Application

• Risk-based approach seems as applicable to test facilities as to M&S

• Risk assessment can also help prioritize which facilities justify spending more VV&A resources

• Suggest standardizing and institutionalizing risk-based VV&A process for both M&S and T&E– No consistent application across DOD for either– Risk-based VV&A promotes cost-effective VV&A for

both M&S and T&E facilities