application challenges of s1000dpublic.s1000d.org/documents/2015 s1000d user forum...
TRANSCRIPT
1 UNCLASSIFIED S1000D User Forum, San Diego, CA, USA
Application Challenges of S1000D to TAI’s “Unmanned Air System
(UAS)” Programs
Presenter Name: Sami Tarık VESKE
Rank or Title: Chief, Integrated Product Support (Trainer A/C & UAS Programs)
Organization: TAI - Turkish Aerospace Industries, Inc.
September 21-23, 2015
2 UNCLASSIFIED S1000D User Forum, San Diego, CA, USA
Sami Tarık VESKE
Chief, Integrated Product Support
(Trainer A/C & UAS Programs)
TAI - Turkish Aerospace Industries, Inc.
2010-Cont. Chief, ILS-Trainer Aircraft & Unmanned Air Vehicle (UAV) Systems-TAI,
2007-2010 Chief, Supportability & Maintainability-TAI,
2000-2007 Lead, Supportability-TAI,
1998-2000 Supervisor, Production AS 532 Cougar Helicopter-TAI,
1995-1998 Supervisor, Production F-16 Forward Fuselage-TAI,
1990-1995 Supervisor, Production F-16 Center Fuselage-TAI,
1989-1990 Mltry.Srv. Officer, (II. Lieutenant),Turkish Land Forces of Command/ANKARA,
1988-1989 Engineer, Production & Maintenance, Çukurova Sanayi İşletmeleri/TARSUS,
1983-1988 Middle East Technical University (METU), Mechanical Eng. Dept., ANKARA,
Speaker’s Background E
XP
ER
IEN
CE
2010-Cont. Integrated Logistics Support (ILS), “Defense Industries and Technology
Training Center” Command, ANKARA
2014-2015 Performance Based Logistics (PBL), “Defense Industries and Technology
Training Center” Command, ANKARA
TE
AC
HIN
G
2015-Cont. NATO Industrial Advisory Group (NIAG) study on SOI Maturity Assessment
through NATO SLCM Perspective (SG.204) Chairperson
2012-Cont. AIA/ASD, SX000i International Guide For The Use Of The S-Series Integrated
Logistics Support (ILS) Specifications, Working Group Member ME
MB
ER
3 UNCLASSIFIED S1000D User Forum, San Diego, CA, USA
Murat Arda ÇAKMAK
Technical Leader, Integrated Product Support
(Trainer A/C & UAS Programs)
TAI - Turkish Aerospace Industries, Inc.
2013-Cont. Technical Leader, ILS-UAV Systems & Fighter Program -TAI
2012-2013 Technical Expert, Life Cycle Costing & Estimation-TAI
2007-2012 Head of Novel Programs Unit, TUBITAK-SAGE
2005-2007 Chief Senior Researcher, Business Development Unit, TUBITAK-SAGE
2002-2005 Senior Researcher, Business Development Unit, TUBITAK-SAGE
1999-2002 Senior Researcher, External Ballistics Unit, TUBITAK-SAGE
1998-1999 Mltry.Srv. Officer, (II. Lieutenant), Logistics Services Dept. ,Turkish Air Forces,
1996-1998 OJT, Design & Process Engineer, Sikorsky Aircraft
1994-1996 Researcher, Aerodynamics Unit, TUBITAK-SAGE
Co-Writer’s Background E
XP
ER
IEN
CE
2000-Cont. R&D Management, “Defense Industries and Technology
Training Center” Command, ANKARA
2015-Cont. Performance Based Logistics (PBL), “Defense Industries and Technology
Training Center” Command, ANKARA
TE
AC
HIN
G
2015-Cont. NATO Industrial Advisory Group (NIAG) study on SOI Maturity Assessment
through NATO SLCM Perspective (SG.204), Rapporteur
2007-2011 NATO RTO SAS.069 & SAS.076 Life Cycle Costing & Estimation
Working Group Member
2005-2006 NATO Industrial Advisory Group (NIAG) study on Precision Airdrop Systems
(SG.096), National Focal Point
ME
MB
ER
4 UNCLASSIFIED S1000D User Forum, San Diego, CA, USA
Outline
TAI Brief
Unmanned Air System (UAS) Overview
Application Challenges of S1000D
Epilogue
5 UNCLASSIFIED S1000D User Forum, San Diego, CA, USA
TAI/Ankara
Location
6 UNCLASSIFIED S1000D User Forum, San Diego, CA, USA
$8 M
$913 M
Build to Design
1986 2005 2013
CO-PRODUCTION
ESTABLISMENT
MOD & SYSTEM INTEGRATION
1984/1985
1986
1990
1995
AERO
STRUCTURES
PRODUCT DESIGN
SATELLITES
2010
2005
SERIAL PRODUCTION OF INDIGENOUS PLATFORMS
2014
1 B$
2014
7 UNCLASSIFIED S1000D User Forum, San Diego, CA, USA
Outline
TAI Brief
Unmanned Air System (UAS) Overview
Application Challenges of S1000D
Epilogue
8 UNCLASSIFIED S1000D User Forum, San Diego, CA, USA
UAS Overview
GCS
ATOLS
GDT
RVT
GDT-R
SGT
A/V
SATCOM
C&C Center
Typical Medium Altitude Long Endurance (MALE) Unmanned
Aerial Vehicle System
Designed to Perform
Real Time Intelligence, Surveillance, Target Acquisition and
Reconnaissance (ISTAR) missions.
Different Payloads for
Different Missions…
UAV System could be operated from;
Main Operating Base (MOB)
Deployed Operating Base (DOB)
Forward Operating Strip (FOS)
9 UNCLASSIFIED S1000D User Forum, San Diego, CA, USA
UAS Overview
Air Vehicle Mobile Ground Control Station
Fixed Ground Control Station
Ground Data Terminal Back-up Ground Data Terminal
Mobile SATCOM Ground Terminal
Fixed SATCOM Ground Terminal
ATOLS Ground Terminal
Remote Video Terminal
Ground Support Equipment
Application
challenges of
S1000D are
shown in these
sub-systems
10 UNCLASSIFIED S1000D User Forum, San Diego, CA, USA
Outline
TAI Brief
Unmanned Air System (UAS) Overview
Application Challenges of S1000D
Epilogue
11 UNCLASSIFIED S1000D User Forum, San Diego, CA, USA
MIL-STD-881C &UAS
12 UNCLASSIFIED S1000D User Forum, San Diego, CA, USA
Air Vehicle
Mobile Ground Control Station Ground Data
Terminal
MIL-STD-881C &UAS
13 UNCLASSIFIED S1000D User Forum, San Diego, CA, USA
S1000D SNS Temporary Solution
Air Vehicle
Ground Data Terminal
Mobile Ground Control Station
14 UNCLASSIFIED S1000D User Forum, San Diego, CA, USA
Air Vehicle 8.2.5-Air Vehicle, Engines & Equipment
Air Vehicle
15 UNCLASSIFIED S1000D User Forum, San Diego, CA, USA
Mobile Ground Control Station 8.2.7-General Surface Vehicles
Mobile Ground Control Station
16 UNCLASSIFIED S1000D User Forum, San Diego, CA, USA
Ground Data Terminal 8.2.4-General Communications
Ground Data Terminal
17 UNCLASSIFIED S1000D User Forum, San Diego, CA, USA
Outline
TAI Brief
Unmanned Air System (UAS) Overview
Application Challenges of S1000D
Epilogue
18 UNCLASSIFIED S1000D User Forum, San Diego, CA, USA
Change Proposal for S1000D
Chap 8.2.9 Maintained SNS – Unmanned Air System S1000D-A-08-02-0900-00A-040A-A
Is an additional
Unmanned Air
System Chapter
needed ?
19 UNCLASSIFIED S1000D User Forum, San Diego, CA, USA
Change Proposal for S1000D
TAI’s proposal, relating to add «Unmanned Air
System» Chapter to the S1000D, will be submitted
to the Steering Committee (SG) via
www.s1000d.org by Change Proposal Form (CPF).
20 UNCLASSIFIED S1000D User Forum, San Diego, CA, USA
Change Proposal for S1000D
TAI is ready to share its experience and lessons learned
in related WG or TT to update S1000D in accordance
with CPF.
TAI is eager to
participate to related
Working Group (WG)
or Task Team (TT)
when CPF state turns
to «INWORK» status.
21 UNCLASSIFIED S1000D User Forum, San Diego, CA, USA
Thank you for your attention !
"The
future is in the skies."