APPGE08a1 1 Utilization Rate APP Functionality = Scheduled operations = Operation to be scheduled le A - resource 1, utilization rate: 100% or no. of resources: 1 Time e B - resource 1, utilization rate: 50% or no. of resources: 0.5 Time Adjusting norm times via work centers and/or resources Models the effects of, for example: - New or old machines - Different operator experience Resource 1 Resource 1

Upload: gabriel-clarke

Post on 08-Jan-2018

214 views

Category:

Documents


2 download

DESCRIPTION

APPGE08a1 3 Maximize and Protect Flow APP Functionality l Link order release to finite capacity l Schedule based on the bottleneck’s capacity l Use a time buffer before a bottleneck to ensure it is kept busy l Use inventory buffers only in strategic places to protect throughput, e.g., before bottleneck and assembly W/C resources 150/hr 180/hr 100/hr Bottleneck 150/hr 180/hr 90/hr 120/hr 150/hr 120/hr W/C A W/C B W/C D W/C E W/C C W/C G W/C H W/C F Produc t A W/C I Inventory buffer Purchased item Work center Planning item/order

TRANSCRIPT

Page 1: APPGE08a1 1 Utilization Rate APP Functionality = Scheduled operations = Operation to be scheduled Example A - resource 1, utilization rate: 100% or no

APPGE08a1 1

Utilization Rate APP Functionality

= Scheduled operations = Operation to be scheduled

Example A - resource 1, utilization rate: 100% or no. of resources: 1

Time

Example B - resource 1, utilization rate: 50% or no. of resources: 0.5

Time

Adjusting norm times via work centers and/or resources Models the effects of, for example:

- New or old machines- Different operator experience

Resource 1

Resource 1

Page 2: APPGE08a1 1 Utilization Rate APP Functionality = Scheduled operations = Operation to be scheduled Example A - resource 1, utilization rate: 100% or no

APPGE08a1 2

Accurate W/C Resource Data

AB Preparation timeBC Set-up timeCD Operation timeDE Post operation timeEF Transportation timeFG Average queue time (pull-up only)GH Preparation time

Plus:Utilization rateNo. of resourcesSequencing rulesOperator time factorInfinite/finite capacity

A B C D E F G HOperation 10 Operation 20

Resource 1

Resource 2

APP Functionality

Page 3: APPGE08a1 1 Utilization Rate APP Functionality = Scheduled operations = Operation to be scheduled Example A - resource 1, utilization rate: 100% or no

APPGE08a1 3

Maximize and Protect Flow APP Functionality

Link order release to finite capacity Schedule based on the bottleneck’s

capacity Use a time buffer before a

bottleneck to ensure it is kept busy Use inventory buffers only in

strategic places to protect throughput, e.g., before bottleneck and assembly W/C resources

150/hr

180/hr

100/hr

Bottleneck

150/hr

180/hr

90/hr

120/hr

150/hr

120/hr

W/C A

W/C B

W/C D

W/C E

W/C C

W/C G

W/C H

W/C F

Product A

W/C I

Inventory buffer

Purchased item

Work center

Planning item/order