Procurement PlanI. General
1. Project InformationCountry : IndiaBorrower : Government of IndiaProject Name : National Hydrology Project Loan Credit No. :
2. Bank’s Approval Date of the Procurement Plan :
3. Date of General Procurement Notice :
4. Period Covered by this procurement plan : 18 months
II. Goods, Works, and Non-Consulting Services
Thresholds for Method of Procurement for procurement of goods, works and non-consulting services
Procurement of Goods, Information technology and non consultancy services:Method of Procurement Thresholds for Methods International Competitive Bidding (ICB) > US Dollars 3 million
Limited Competitive Bidding (LIB) Must meet the requirements as per Para 3.2 of the Procurement Guidelines, and with prior agreement in PP with the Bank
National Competitive Bidding (NCB) > USD 100,000 and up to USD 3 million
Shopping Up to USD 100,000 (INR 6.5 m)Direct Must meet the requirements as per Para 3.7 of the
Procurement Guidelines, and with prior agreement in PP with the Bank
Framework Agreement Must meet the requirements as per Para 3.6 of the Procurement Guidelines, and with prior agreement in PP with the Bank
Procurement of Works:Method of Procurement Thresholds for Methods International Competitive Bidding (ICB) > US Dollars 40 million
National Competitive Bidding (NCB) > USD 100,000 and up to USD 40 million
Comparison of three quotations / Shopping Up to USD 100,000 (INR 6.5 m)Force Account Must meet the requirements as per Para 3.9 of the
Procurement Guidelines, and with prior agreement in PP with the Bank
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Prior Review Thresholds: The following would be subject to Prior review of the Bank regardless of the Method of selection:
(a) Works: First procurement under the project irrespective of value and all procurements estimated to cost more than USD 10 million
(b) Goods: First procurement under the project irrespective of value and all procurements estimated to cost more than USD 2 million; and
The Prior Review Thresholds will be reviewed and updated during the implementation of the project, and modified based on the risk assessment.
1. In the case of contracts subject to prior review, Project Implementing Entity shall seek the Bank’s no objection before granting/agreeing to (a) an extension of the stipulated time for performance of a contract that either increases the contract price or has an impact on the planned completion of the project; (b) any substantial modification of the scope of works, goods, non-consulting services or consulting services, other significant changes to the terms and conditions of such that the contract,; (c) any variation order or amendment (except in cases of extreme urgency) which singly or combined with all variation orders or amendments previously issued, increase the original contract amount by more than 15 percent; or (d) the proposed termination of the contract..
A copy of all amendments to the contract shall be furnished to the Bank for its record.
2. Prequalification
Not Applicable
Domestic Preference: The provision of domestic preference is applicable in the evaluation of Goods only.
3. Reference to Procurement Manual
The procurement manual for the project is presently under preparation. SBDs agreed between the Project and Bank will be used for all works, goods, and non consultancy procurements.
4. Any Other Special Procurement Arrangements
The National bidding method for procurement and goods and works according to the above value thresholds will be conducted in accordance with paragraphs 3.3 and 3.4 of the Bank’s Procurement Guidelines and the following provisions:
(a) Only the model bidding documents for NCB agreed with the GOI task force (and as amended for time to time) shall be used for bidding.
(b) Invitations to bid shall be advertised in at least one widely circulated national daily newspaper (or on a widely used website or electronic portal with free national and international access along with an abridged version of the said advertisement published in a widely circulated
national daily, among others, giving the website/electronic portal details from which the details of the invitation to bid can be downloaded) at least 30 days before the deadline for the submission of bids.
(c) No special preferences will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidders, state-owned enterprises, small-scale enterprises, or enterprises from any given state.
(d) Extension of bid validity shall not be allowed with reference to contracts subject to Bank prior review without the prior concurrence of the Bank (i) for the first request for extension if it is longer than four weeks and (ii) for all subsequent requests for extension irrespective of the period (such concurrence will be considered by the Bank only in cases of force majeure and circumstances beyond the control of the purchaser/employer).
(e) Rebidding shall not be carried out with reference to contracts subject to Bank prior review without the prior concurrence of the Bank. The system of rejecting bids outside a predetermined margin or ‘bracket’ of prices shall not be used in the project.
(f) Rate contracts entered into by the DGS&D will not be acceptable as a substitute for NCB procedures unless incorporation of right to audit and fraud corruption clauses. DGS&D contracts will be acceptable, however, for any procurement under the shopping procedures.
(g) Two or three envelope system will not be used (except when using the e-procurement system assessed and agreed by the Bank).
(h) No negotiations are conducted even with the lowest evaluated responsive bidders.
5. The bid evaluation will be carried out according to the agreed timeline in the Procurement Activity Schedule.
III. Selection of Consultants
1. Methods and Prior Review Threshold
Procurement methods of procurement of Consultants' Services (Firms)
Method of Procurement Thresholds for Methods Quality and Cost Based Selection (QCBS)Quality Based Selection (QBS) Must meet the requirements as per Para 3..2
to 3.4 of the Consultant GuidelinesSelection based on a Fixed Budget (FBS) Must meet the requirements as per Para 3.5 of
the Consultant Guidelines,
Selection Based on Least Cost Basis (LCS) Must meet the requirements as per Para 3.6 of the Consultant Guidelines,
Selection based on Consultant’s Qualification (CQ)
Estimated not to exceed USD 300,000, and must meet the requirements as per Para 3.7 of the Consultant Guidelines.
Single Source Selection (SSS) Must meet the requirements as per Para 3.8 to 3.11 of the Consultant Guidelines, and with prior agreement in PP with the Bank.
Procurement methods for Selection of Individual Consultants (IC)
Method of Procurement Thresholds for Methods Competitive Selection Must meet the requirements of Section V,
Para 5.1 to 5.5 of the Consultant Guidelines. Single Source Selection (SSS) Must meet the requirements of Section V,
Para 5.6 of the Consultant Guidelines and with prior agreement in PP with the Bank
*Shall meet the requirements as stated in Consultant Guidelines
Prior Review Thresholds:
(a). Consulting Firm: First procurement under the project irrespective of value and all procurements estimated to cost more than USD 1 million.(b). Individual Consultant: all procurements estimated to cost more than USD 0.3 million
Terms of Reference (ToR) for all consultant contracts shall be furnished to the Bank for its prior review and No Objection.
Note: The Prior Review Thresholds will be reviewed during the implementation of the project and modified.
1. In the case of contracts subject to prior review, before agreeing to: (a) an extension of the stipulated time for performance of a contract; (b) any substantial modification of the scope of services, substitutions of key experts, or other significant changes to the terms and conditions of the contract; or (c) the proposed termination of the contract, the Borrower shall seek the Bank’s no objection. A copy of all amendments to the contract shall be furnished to the Bank for its record.
2. Short List comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than USD 800,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines.
3. The Request for Expression of Interest for consultancy services estimated to cost above USD 300,000 equivalent per contract for firms shall be advertised in UNDB online and World Bank external Website and in accordance with other provisions of Para 2.5 of the Consultant Guidelines
4. Any other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable]
I. Implementing Agency Capacity Building Activities with Time Schedule
No Expected Outcome/Activity Description Estimated Duration
Date
1.ASCI training on Procurement Procedures arranged for Executive, Assistant Engineers who are responsible for Procurement – multiple trainings
2 weeks Continuous
2. Contract management training – multiple trainings 2 weeks Continuous
3. Customized training on Procurement Procedures arranged for Executive, Assistant Engineers who are responsible for Procurement – multiple trainings
1 week Continuous
Page 1
PROCUREMENT
PLANIndia : National Hydrology Project
General Information
Country: India Bank’s Approval Date of the Original Procurement Plan: 2017-11-03
Revised Plan Date(s): (comma delineated, leave blank if none)2018-09-28
Project ID: P152698 GPN Date:
Project Name: National Hydrology Project
Loan / Credit No: IBRD / 87250
Executing Agency(ies):Ministry of Water Resources RD-GR, National Institute of Hydrology, Roorkee, Sikkim - NHP, West Bengal Ground Water, Andhra Pradesh Ground Water, Bhakra Beas Management Board, Himachal Pradesh - NHP, Damodar Valley Corporation, Kerala Surface Water, Kerala Ground Water, Telengana Surface Water, Odisha Ground Water, Meghalaya - NHP, Rajasthan - NHP, Jharkhand - NHP, Survey of India, Andhra Pradesh Surface Water, Gujarat Surface Water, Telengana Ground Water, Assam-NHP, Gujarat Ground Water, Nagaland - NHP, Karnataka Surface Water, Chhattisgarh Ground Water, Chhattisgarh Surface Water, Tamil Nadu - NHP, Bihar Surface Water, Central Water and Power Research Station, Maharashtra Surface Water, West Bengal Surface Water, Punjab - NHP, Uttar Pradesh Ground Water, Central Water Commission - NHP, Goa - NHP, Madhya Pradesh - NHP, Bihar Ground Water, Uttar Pradesh Surface Water, Uttarakhand - NHP, Mizoram - NHP, Central Ground Water Board, Haryana - NHP, Manipur - NHP, Tripura - NHP, Maharashtra Ground Water, Central Pollution Control Board, National Remote Sensing Centre, Puducherry - NHP
WORKS
Activity Reference
No. / DescriptionLoan /
Credit No.Component Review Type Method
Market
Approach
Procurement
Process
Prequalificati
on (Y/N)
Actual
Amount
(US$)
Process
Status
Draft Pre-
qualification
Documents
Prequalification
Evaluation Report
Draft Bidding
Document /
Justification
Specific
Procurement Notice
/ Invitation
Bidding Documents
as Issued
Proposal
Submission /
Opening / Minutes
Bid Evaluation
Report and
Recommendation
for Award
Signed ContractContract
Completion
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual
IN-DVC-20023-CW-RFB /
Construction of water
Quality Lab
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00 Canceled
2017-11-
30
2017-12-
05
2018-01-
16
2018-03-
31
2018-05-
05
2019-11-
01
IN-HIMACHAL PRADESH-
20159-CW-RFQ /
Renovation and allied
works for SDC Mandi
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Under
Implement
ation
2017-08-
10
2017-11-
28
2018-05-
27
IN-HIMACHAL PRADESH-
20392-CW-RFQ / Site Store
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-10-
12
2018-01-
17
2018-07-
16
IN-ANDHRA PRADESH
SW-22044-CW-RFB /
Rennovation and repairs of
Data Centers
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-10-
31
2017-11-
05
2017-12-
17
2018-01-
16
2018-02-
20
2018-08-
19
IN-TELENGANA GW-
23242-CW-RFB /
(i)Protection works (126)
for piezometers drilled
under HP-II in Southern
Telangana Region and
(ii)Rejuvenation of existing
piezometers (86) for
effective water level
measurements in
piezometers constructed
during HP I & II.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Under
Implement
ation
2017-10-
02
2017-11-
26
2018-02-
24
IN-TELENGANA GW-
23262-CW-RFQ / Civil
Works for Purpose Driven
Studies
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-02-
05
2018-03-
19
2018-05-
18
IN-GUJARAT SW-23692-
CW-RFB / Civil Work for
Sub divisio / Section
Offices.
IBRD / 87250 PostRequest for
BidsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-10-
01
2017-10-
15
2017-10-
30
2017-11-
15
2017-12-
30
2018-06-
30
IN-ODISHA (GW)-23843-
CW-RFQ /
Renovation/Repair of
existing divisional data
centre
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-10-
05
2017-11-
30
2018-03-
31
IN-TELENGANA GW-
24093-CW-RFQ / (i)
Protection works (98) for
Peizometers drilled under
HP-II covering Cluster of
Eastern Telangana and
(ii) Rejuvenation of
existing piezometers (205)
for effective water level
measurements in
piezometers constructed
during HP I & II.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Under
Implement
ation
2017-09-
30
2017-11-
25
2018-02-
23
IN-TELENGANA GW-
24096-CW-RFQ / (i)
Protection works (76) for
Peizometers drilled under
HP-II covering Cluster of
Northern Telangana and
(ii) Rejuvenation of
existing piezometers (135)
for effective water level
measurements in
piezometers constructed
during HP I & II.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Under
Implement
ation
2017-09-
30
2017-11-
25
2018-02-
23
IN-MOWR RD-GR-28188-
CW-RFQ / Refurbishing
NPMU Office, Wood Work
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-09-
20
2017-11-
01
2018-02-
09
IN-CHHATTISGARH SW-
29222-CW-RFQ /
Renovation of Sub
divisional Data Center &
office building 2 nos.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
11
2018-01-
06
2018-07-
05
IN-KERALA SW-29241-
CW-RFQ / NHP- Discharge
Measurement Equipment -
installation of Cableways
in 7 river gauge locations
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
25
2018-01-
13
2018-03-
14
IN-GUJARAT GW-25106-
CW-RFB / Improvement of
Existing Piezometers- 526
Nos
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-10-
01
2017-10-
06
2017-11-
10
2017-11-
27
2018-01-
01
2018-06-
30
IN-MAHARASHTRA SW-
33224-CW-RFQ /
Renovation & furnishing of
existing Water Quality
Labs at Nashik &
Aurangabad in Godavari
basin of Marathwada
region.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
05
2018-03-
02
2018-08-
29
IN-MAHARASHTRA SW-
33225-CW-RFQ /
Renovation and furnishing
of existing Water Quality
Labs at Pune and
Kolhapur in Krishna basin.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
05
2018-03-
02
2018-08-
29
IN-MAHARASHTRA SW-
33226-CW-RFQ /
Renovation and furnishing
of existing Water Quality
Lab at Thane in West
flowing rivers in Konkan
basin.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
05
2018-03-
02
2018-08-
29
IN-MAHARASHTRA SW-
33227-CW-RFQ /
Renovation & furnishing of
existing Water Quality
Labs at Nagpur in
Godavari basin of
Vidharbha region.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
05
2018-03-
02
2018-08-
29
IN-MAHARASHTRA SW-
33234-CW-RFQ /
Establishment and
Furnishing of New Water
Quality Level II Lab For
Tapi Basin at Jalgaon.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
20
2018-03-
17
2018-09-
13
IN-MAHARASHTRA SW-
33257-CW-RFQ / River
Cross Section Survey for
rivers on South of
Panchganga river of
Krishna Basin.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-03-
31
2018-05-
26
2018-11-
22
IN-MAHARASHTRA SW-
33259-CW-RFQ /
Renovation & furnishing of
Divisional Data Center of
Amravati Division.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
20
2018-03-
17
2018-09-
13
IN-MAHARASHTRA SW-
33262-CW-RFQ /
Renovation of Sub
Divisional Data Center of
Akola Sub Division under
H P Division, Amaravati.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
20
2018-03-
17
2018-09-
13
IN-MAHARASHTRA SW-
33264-CW-RFQ /
Renovation of Sub
Divisional Data Center of
Jalgaon Sub Division
under H P Division,
Amaravati.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
20
2018-03-
17
2018-09-
13
IN-MAHARASHTRA SW-
33265-CW-RFQ /
Renovation of Sub
Divisional Data Center of
Dhule Sub Division under
H P Division, Amaravati.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
20
2018-03-
17
2018-09-
13
IN-MAHARASHTRA SW-
33267-CW-RFQ /
Renovation & furnishing of
Divisional & Sub-Divisional
Data Centers of
Aurangabad Division.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
20
2018-03-
17
2018-09-
13
IN-MAHARASHTRA SW-
33268-CW-RFQ /
Renovation and furnishing
of divisional and sub-
divisional data centres
under Nagpur Division
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
20
2018-03-
17
2018-09-
13
IN-MAHARASHTRA SW-
33270-CW-RFQ /
Renovation and furnishing
of divisional data centre of
Pune Division.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
20
2018-03-
17
2018-09-
13
IN-MAHARASHTRA SW-
33273-CW-RFQ /
Renovation and furnishing
of sub-divisional data
centres under Pune
Division.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
20
2018-03-
17
2018-09-
13
IN-MAHARASHTRA SW-
33277-CW-RFQ /
Renovation and furnishing
of Divisional and Sub-
divisional Data centre of
Thane Division.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
20
2018-03-
17
2018-09-
13
IN-MAHARASHTRA SW-
33365-CW-RFB /
Renovation of Jalvidnyan
Bhavan, Nashik for State
Water Data Center &
Training Center.
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
26
2017-12-
31
2018-02-
11
2018-03-
13
2018-04-
17
2018-10-
14
Page 2
IN-WEST BENGAL GW-
37311-CW-RFQ /
DRILLING AND
INSTALLATION OF 18
NEW NESTED (3 WELLS
PER NEST) GW
MONITORING WELLS IN
THREE MULTI-LAYERED
AQUIFERS AND
CONSTRUCTION OF 18
PROTECTION WORKS
FOR DWLR IN NINE
COASTAL BLOCKS OF
PURBA MEDINIPUR
DISTRICT, WEST
BENGAL
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
27
2017-12-
25
2018-01-
09
IN-WEST BENGAL GW-
37349-CW-RFQ / Protection
Works for 5 Automatic
Raingauge Station (ARS)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
28
2017-12-
26
2018-01-
10
IN-WEST BENGAL GW-
37354-CW-RFB / Protection
Works for 5 Automatic
Water Level recorder
(AWLR) & Velocity Sensor
(VS)
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2017-11-
24
2017-11-
29
2017-12-
06
2017-12-
27
2018-01-
10
2018-01-
25
IN-KERALA SW-29250-
CW-RFQ / NHP -
Rennovation of Knowledge
Centres- Upgradation of
Training Centre, Thrissur
2017-18
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
05
2018-02-
20
2018-05-
21
IN-WEST BENGAL SW-
38559-CW-RFB /
Construction of State
Data Center at Kolkata
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Under
Implement
ation
2017-12-
18
2017-12-
20
2018-01-
22
2018-02-
08
2018-03-
04
2019-03-
04
IN-KERALA SW-39093-
CW-RFQ / NHP-Shifting of
River gauge station at
Cheruthuruthy to
Vazhalikkavu Check dam
under Hydrology Section,
Wadakkanchery
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
20
2018-02-
14
2018-03-
31
IN-KERALA SW-39107-
CW-RFQ / NHP-
Construction of steps for
river gauge station at
Vettilappara -
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
22
2018-02-
16
2018-03-
18
IN-KERALA SW-39108-
CW-RFQ / NHP- Protection
of Kurumali River Gauge
station
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
18
2018-02-
12
2018-03-
29
IN-KERALA SW-39111-
CW-RFQ / NHP- Protection
of Aloor River Gauge
station
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
20
2018-02-
14
2018-03-
16
IN-KERALA SW-39132-
CW-RFQ / NHP- Protection
work for installation of
Bank Operated Cable Way
at Karikkadavu river
gauge station
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
29
2018-02-
09
2018-03-
26
IN-WEST BENGAL GW-
37305-CW-RFQ /
CONSTRUCTION OF 25
NOS PROTECTION
WORKS FOR DWLR AT
25 NOS EXISTING
GROUNDWATER
MONITORING WELLS IN
WEST BENGAL
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
17
2018-01-
14
2018-02-
28
IN-WEST BENGAL GW-
37300-CW-RFQ /
DRILLING AND
INSTALLATION OF 20
NOS GROUNDWATER
MONITORING WELLS
AND CONSTRUCTION OF
20 NOS. PROTECTION
WORKS FOR DWLR
TELEMETRY SYSTEM IN
WEATHERED ZONE OF
HARD ROCK AREAS OF
PURULIA DISTRICT,
WEST BENGAL
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
17
2018-01-
10
2018-02-
24
IN-WEST BENGAL SW-
38561-CW-RFB /
Construction of Control
Room for SCADA of
Tilpara Barrage
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Under
Implement
ation
2018-01-
31
2018-03-
21
2018-09-
17
IN-WEST BENGAL SW-
38558-CW-RFB /
Construction of Control
Room for SCADA of
Durgapur Barrage
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Under
Implement
ation
2018-01-
17
2018-03-
09
2018-09-
05
IN-SOI-44988-CW-DIR /
Establishment of
production facility for
1:25k geodatabase
processing. Work involves
civil and electrical
renovation in existing
building. Work being
executed through CPWD
as per WB guidelines at
NGDC/ DMC, Dehradun.
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-02-
09
2018-02-
14
2018-03-
07
2018-03-
12
2018-03-
20
2018-03-
31
IN-SOI-44996-CW-DIR /
Establishment of
production facility for
1:25k geodatabase
processing. Work involves
civil and electrical
renovation in existing
building. Work being
executed through CPWD
as per WB guideline at
GISTC/ UK&WUP GDC,
Dehradun.
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-02-
09
2018-02-
14
2018-03-
07
2018-03-
12
2018-03-
20
2018-03-
31
IN-SOI-45002-CW-DIR /
Establishment of
production facility for 0.5m
DEM data processing.
Work involves civil and
electrical renovation in
existing building. Work
being executed through
CPWD as per WB
guidelines at G&RB office
of Survey of India in
Dehradun.
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-02-
09
2018-02-
14
2018-03-
07
2018-03-
12
2018-03-
20
2018-03-
31
IN-TAMIL NADU -46686-
CW-RFQ / Improvements
to Data Centre in Ground
Water Division and Sub-
Divisional Data Centre at
Salem Ground Water sub
division, Ground water
circle office & Division
campus at Thanjavur
District.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-02-
12
2018-04-
02
2018-05-
31
IN-TAMIL NADU -46681-
CW-RFQ / Repairs and
Renovation works to
Regional and Division Data
Processing Centres at
Thallakulam in Madurai
District & Data Processing
Centres at Paramakudi
Ground Water Subdivision
office in Ramanathapuram
District. .
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-02-
01
2018-03-
15
2018-05-
14
IN-TAMIL NADU -46688-
CW-RFQ / Improvements
to Data Processing Centre
at Ground Water Divisions
at Tharamani, Cuddalore
and Vellore.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
31
2018-03-
15
2018-06-
18
IN-KERALA SW-39133-
CW-RFQ / NHP- Fencing
of Kunnamangalam rain
gauge station
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
29
2018-03-
01
2018-03-
22
IN-KERALA SW-39109-
CW-RFQ / NHP-
Renovation of Vanimel
River Gauge station
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
29
2018-03-
01
2018-03-
22
IN-KERALA SW-39110-
CW-RFQ / NHP: Civil
works at Kaithapram River
gauge station for
upgrading to RTDAS
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
29
2018-03-
01
2018-03-
22
IN-KERALA SW-39112-
CW-RFQ / Fencing work of
Chooral rain Gauge station
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-02-
05
2018-03-
08
2018-03-
23
IN-KERALA SW-39113-
CW-RFQ / NHP - Fencing
of Thillenkeri rain gauge
station
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-02-
05
2018-03-
08
2018-03-
23
IN-KERALA SW-39114-
CW-RFQ / NHP - Fencing
work of Payyavoor rain
gauge station
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-02-
07
2018-03-
10
2018-03-
25
IN-TAMIL NADU -46834-
CW-RFQ / Improvements
to TAWS station at Upper
Anicut in Trichy, Ooty and
Valparai in Coimbatore
District.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-02-
12
2018-04-
02
2018-05-
31
IN-JHARKHAND -47260-
CW-RFB / construction of
piezometers in different
districts of jharkhand
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-03-
14
2018-03-
16
2018-04-
13
2018-05-
11
2018-05-
23
2018-11-
19
IN-TAMIL NADU -46732-
CW-RFQ / Improvements
to the Standard
Rainguage Stations at
Sivagangai taluk Office in
Sivagangai and at
Karaikudi taluk Office in
Sivagangai District.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
31
2018-03-
15
2018-05-
14
Page 3
IN-TAMIL NADU -46744-
CW-RFQ / Improvements
to the Standard
Rainguage Stations at
Poonimangadu and
Dharanivaraghapuram in
Thiruvallur, Palur and
Thirukoilur in Cuddalore
and Villupuram
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
30
2018-03-
13
2018-05-
14
IN-BIHAR GW-50060-CW-
RFB / renovation of office
for NHP-III at chief
engineer office, patna
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-03-
22
2018-06-
29
2018-08-
28
IN-WEST BENGAL GW-
37344-CW-RFQ / Protection
Works for 5 Automatic
Weather Station (AWS)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
29
2017-12-
27
2018-01-
11
IN-SOI-23030-CW-RFB /
Lidar Survey- Acquisition
and processing including
setting up of geospatial
data production centre
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00 Canceled
2017-11-
01
2017-11-
06
2017-12-
18
2018-01-
17
2018-02-
21
2018-08-
20
IN-UTTAR PRADESH SW-
50743-CW-RFB / Supply,
Installation, Testing,
Commissioning, Training,
Dissemination, Operation
and maintenance of
SCADA System at Okhla
Barrage and Head
Regulator of Agra Canal,
New Delhi
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00 Canceled
2018-02-
23
2018-02-
23
2018-03-
17
2018-04-
30
2018-05-
25
2026-02-
24
IN-MAHARASHTRA SW-
33475-CW-RFB /
Establishment of SPMU
with furnishing of Building
& Equipments at
Jalvidnyan Bhavan,
Nashik.
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
01
2018-08-
06
2018-09-
17
2018-10-
17
2018-11-
21
2019-05-
20
IN-UTTARAKHAND-53107-
CW-RFB / Renovation
Work of Water Quality
Lab. at IRI Roorkee under
national Hydrology Project
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-06-
18
2018-06-
19
2018-06-
20
2018-06-
23
2018-06-
25
2018-06-
26
IN-UTTARAKHAND-53112-
CW-RFB / Renovation
Work of Water Quality
Lab. at Irrigation Office,
Haldwani under National
Hydrology Project
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-06-
14
2018-06-
15
2018-06-
16
2018-06-
19
2018-06-
21
2018-06-
22
IN-UTTARAKHAND-53151-
CW-RFB / Construction of
State Water Informatics
Centre building at Roorkee
under NHP
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-06-
12
2018-06-
13
2018-06-
14
2018-06-
17
2018-06-
19
2019-04-
20
IN-HIMACHAL PRADESH-
54274-CW-RFB / Deep
piezometers (civil work)
with DWLR with ODEX
Method (44 nos.)
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Under
Implement
ation
2018-03-
19
2018-03-
19
2018-04-
20
2018-07-
20
2018-08-
18
2019-08-
18
IN-HIMACHAL PRADESH-
54493-CW-RFB / Supply of
G&D Bank Operated Cable-
way (BOC)
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Under
Implement
ation
2018-03-
22
2018-03-
27
2018-05-
08
2018-08-
07
2018-09-
11
2019-09-
11
IN-HIMACHAL PRADESH-
54498-CW-RFB /
Construction of 12 nos. of
deep/shallow wells
(Observation Wells ) by
Rotary Drilling Method.
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Under
Implement
ation
2018-03-
29
2018-04-
03
2018-05-
15
2018-08-
14
2018-09-
18
2019-03-
17
IN-HIMACHAL PRADESH-
20162-CW-RFQ / Providing
and Fixing of Staff Gauge
, Gauge Plate in various
G&D Sites in
HP.(Activities of similar
nature have been clubbed)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-04-
12
2018-07-
31
2019-01-
27
IN-ASSAM -28007-CW-
RFQ / Renovation and
construction of Divisional
Data Centre
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00 Canceled
2017-10-
14
2017-12-
09
2018-06-
07
IN-CWPRS-61019-CW-RFB
/ Construction of
observatory room for
Automatic Weather Station
(AWS) under NHP in
CWPRS, Kdk, Pune-24
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-05-
26
2018-07-
21
2019-01-
17
IN-ASSAM -44713-CW-
RFB / Construction of
State Data Centre
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00 Canceled
2018-01-
19
2018-01-
24
2018-03-
07
2018-05-
20
2018-06-
24
2018-12-
21
IN-MADHYA PRADESH-
18230-CW-RFQ /
Benchmark and RL
surveys
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-06-
05
2018-07-
31
2019-01-
27
IN-MADHYA PRADESH-
18234-CW-RFQ / River
Cross section of River
monitoring sites
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-06-
05
2018-07-
31
2019-01-
27
IN-MADHYA PRADESH-
61561-CW-RFQ /
Rennovation works - State
Data Centre
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
05
2018-08-
30
2019-02-
26
IN-MADHYA PRADESH-
61564-CW-RFQ /
Rennovation works -
Bhopal Circle Data Centre
of Groundwater
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
05
2018-08-
30
2019-02-
26
IN-
BIHAR/WRD/FMISC/NHP-
SW/W-NCB-01 /
Construction of Water
Knowledge Center, Bihar
at Patna as Hydrology
Project Center all
complete.
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-12-
31
2019-01-
05
2019-02-
16
2019-05-
01
2019-06-
05
2021-06-
04
IN-SOI-61871-CW-RFQ /
Establishment of
production facility for 3-5m
DEM
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
21
2018-09-
15
2019-03-
14
IN-SOI-62132-CW-RFB /
Setting up Production
Centre for PDO
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-07-
16
2018-07-
21
2018-09-
01
2018-11-
14
2018-12-
19
2019-06-
17
IN-CGWB-32465-CW-RFB
/ Construction of 60 nos
Piezometers- Tamilnadu
and Puducherry.
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Under
Implement
ation
2018-06-
01
2018-06-
06
2018-07-
18
2018-09-
30
2018-11-
04
2019-05-
03
IN-CGWB-39815-CW-RFB
/ Procurement of DWLR
with Water quality probes
and with Telemetry
(Supply, installation, real-
time data acquisition &
maintenance)
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Under
Implement
ation
2018-10-
15
2018-10-
20
2018-12-
01
2019-02-
13
2019-03-
20
2019-09-
16
IN-CWPRS-62533-CW-RFB
/ Preparation of site for
setting up of Automatic
Weather System under
NHP at CWPRS,Pune-24
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-05-
26
2018-07-
21
2019-01-
17
IN-DVC-19989-CW-RFB /
Construction of hydrological
data center of DVC
IBRD / 87250 PriorRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00 Canceled
2017-07-
10
2017-07-
15
2017-08-
26
2017-11-
08
2017-12-
13
2019-06-
11
IN-KARNATAKA SW-
26473-CW-RFQ / Up
gradation of State Data
Center:- Repair &
Renovation of office and
other allied works
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope64,512.19 Signed
2017-08-
29
2017-09-
15
2017-11-
14
IN-CWPRS-63501-CW-RFB
/ Construction of 2D
flumes under NHP at
CWPRS Kdk Pune 24
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-05-
26
2018-07-
21
2019-01-
17
IN-CWPRS-63509-CW-RFB
/ Chain link fencing for
bore well near canal
automation division under
NHP at CWPRS Pune
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-05-
26
2018-07-
21
2019-01-
17
IN-CWPRS-63854-CW-RFQ
/ Infrastructure facility for
NHP Lab at CWPRS
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-05-
29
2018-07-
24
2019-01-
20
IN-CWPRS-63966-CW-RFQ
/ Internal and external
painting including some
civil works in HMC
Division
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-05-
29
2018-07-
24
2019-01-
20
IN-CWPRS-63967-CW-RFQ
/ Internal and external
painting with some
horticulture development
for CMRT Division
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-05-
29
2018-07-
24
2019-01-
20
IN-CWPRS-63968-CW-RFQ
/ Painting of canal
automation office and
laboratory under NHP at
CWPRS
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-05-
29
2018-07-
24
2019-01-
20
IN-CWPRS-63969-CW-RFQ
/ Providing & fixing
informatory name boar
along road side at CWPRS
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-05-
29
2018-07-
24
2019-01-
20
IN-MANIPUR -41468-CW-
RFB / Construction of
state hydrological data
centre at water resources
department campus,
lamphel, Manipur
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Under
Implement
ation
2018-08-
25
2018-08-
30
2018-10-
01
2018-10-
09
2018-10-
15
2020-04-
15
NHP-2018-2019-TR-388850-
CW-NCB-DE / Construction
of Water Data Center
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-10-
31
2018-11-
05
2018-12-
17
2019-03-
01
2019-04-
05
2019-10-
02
Page 4
NHP-2018-2019-TR-776064-
CW-SH-QU / Drilling of
Piezometer
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-11-
04
2018-12-
30
2019-06-
28
NHP-2018-2019-APGW-
212910 / Protection works
for Piezometers
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-09-
17
2018-09-
22
2018-11-
03
2019-01-
16
2019-02-
20
2019-08-
19
NHP-2018-2019-APGW-
423400 / Drilling of
Piezometers
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-09-
24
2018-09-
29
2018-11-
10
2019-01-
23
2019-02-
27
2019-08-
26
NHP-2018-2019-APGW-
235012 / Construction of
State Data Center for SW
and GW
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-09-
24
2018-09-
29
2018-11-
10
2019-01-
23
2019-02-
27
2019-08-
26
NHP-2018-2019-ML-426354-
CW-NCB-SE / Construction
of Data Centre
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-08-
06
2018-08-
11
2018-09-
22
2018-12-
05
2019-01-
09
2019-07-
08
NHP-2018-2019-TSGW-
339383 / Protection works
to Piezometers of less than
50 m drilled under HP-II
in Southern Region
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
15
2018-11-
10
2019-01-
09
NHP-2018-2019-TSGW-
946553 / Protection works
to Piezometers of less than
50 m drilled under HP-II
in Northern Region
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
16
2018-11-
11
2019-01-
10
NHP-2018-2019-TSGW-
834014 / Protection works
to Piezometers less than
50m drilled under HP-II
in Eastern Telangana
Region
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
17
2018-11-
12
2019-01-
11
NHP-2018-2019-TSGW-
564746 / Rejuvenation of
Existing PZ for effective
water level monitoring
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
29
2018-11-
24
2019-01-
23
NHP-2018-2019-TSGW-
903276 / Upgradation of
State Data , Training cum
Information Centre
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-10-
08
2018-10-
13
2018-11-
24
2019-02-
06
2019-03-
13
2019-09-
09
NHP-2018-2019-TSGW-
721719 / Civil works for
Purpose Driven Studies
(Yr1)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
15
2018-12-
10
2019-06-
08
NHP-2018-2019-KASW-
842629-CW-SH-QU /
Rejuvenation of existing
peizometers-Package 1
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
07
2018-09-
01
2019-02-
28
NHP-2018-2019-KASW-
470717-CW-SH-QU /
Rejuvenation of existing
peizometers-Package 2
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
12
2018-09-
06
2019-03-
05
NHP-2018-2019-KASW-
955198-CW-SH-QU /
Rejuvenation of existing
peizometers-Package 3
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
17
2018-09-
11
2019-03-
10
NHP-2018-2019-KASW-
724042-CW-SH-QU /
Rejuvenation of existing
peizometers-Package 4
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
22
2018-09-
16
2019-03-
15
NHP-2018-2019-KASW-
316354-CW-SH-QU /
Rejuvenation of existing
peizometers-Package 5
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
28
2018-09-
22
2019-03-
21
NHP-2018-2019-KASW-
809404-CW-SH-QU /
Acoustics
works,improvements
works,civil & electrification
etc.,, to class rooms at
ESTC,KERS& other works
at WQ labs
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
01
2018-09-
26
2019-03-
25
NHP-2018-2019-KASW-
774493-CW-SH-QU /
Improvements to Main
building , KERS
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
25
2018-10-
20
2019-04-
18
NHP-2018-2019-KASW-
624324-CW-SH-QU /
Improvements to Hostel
building (Block-I) of KERS
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
15
2018-11-
10
2019-05-
09
NHP-2018-2019-KASW-
899118-CW-SH-QU / GD
housing(reconstruction)
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
25
2018-10-
20
2019-04-
18
NHP-2018-2019-KASW-
688310-CW-SH-QU /
Upgrading
Divisional/Subdivisional
data processing centers-
package1
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
20
2018-11-
15
2019-05-
14
NHP-2018-2019-KASW-
352806-CW-SH-QU /
Upgrading
Divisional/Subdivisional
data processing centers-
package 2
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
20
2018-12-
15
2019-06-
13
NHP-2018-2019-KASW-
639841-CW-SH-QU /
Upgrading
Divisional/Subdivisional
data processing centers-
package 3
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-11-
04
2018-12-
30
2019-06-
28
NHP-2018-2019-KASW-
462160-CW-SH-QU / Rain
gauge housing -
reconstruction-package 4
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
05
2018-11-
30
2019-05-
29
NHP-2018-2019-KASW-
831126-CW-SH-QU / Rain
gauge housing -
reconstruction-package 6
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
20
2018-12-
15
2019-06-
13
NHP-2018-2019-CWPRS-
599274-CW-NCB-DE /
Upgradation of Current
meter rating facility
(CMRT
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-11-
30
2018-12-
05
2019-01-
16
2019-03-
31
2019-05-
05
2019-11-
01
NHP-2018-2019-CGWB-
450136 / construction of
piezometers in costal area
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-06-
25
2018-06-
30
2018-08-
11
2018-10-
24
2018-11-
28
2019-05-
27
NHP-2018-2019-DVC-
210903-CW-NCB-DE /
Construction of Water
Quality Lab and its
Furnishing.
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-08-
10
2018-08-
15
2018-09-
26
2018-12-
09
2019-01-
13
2020-07-
11
NHP-2018-2019-SK-979458-
CW-NCB-DE / Construction
of State Data center
building
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-07-
18
2018-07-
24
2018-08-
24
2018-09-
04
2018-10-
23
2021-10-
02
NHP-2018-2019-RJ-106903-
CW-NCB-DE / State data
center
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-08-
16
2018-08-
21
2018-10-
02
2018-12-
15
2019-01-
19
2019-07-
18
NHP-2018-2019-RJ-354417-
CW-SH-QU / Regional data
center
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
20
2018-09-
14
2019-03-
13
NHP-2018-2019-RJ-214021-
CW-SH-QU / District data
center
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
20
2018-09-
14
2019-03-
13
NHP-2018-2019-RJ-968644
/ Construction , Renovation
& modernisation of
knowledge center
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-07-
09
2018-07-
14
2018-08-
25
2018-11-
07
2018-12-
12
2019-06-
10
NHP-2018-2019-CPCB-
469831 / Renovation of
Data Centre at CPCB,
Delhi
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-09-
30
2018-10-
05
2018-11-
16
2019-01-
29
2019-03-
05
2019-09-
01
IN-DVC-19989-CW-RFB-2
/ Construction of Hydrology
Control Room at DVC
Maithon under NHP.
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-07-
25
2018-07-
30
2018-09-
10
2018-11-
23
2018-12-
28
2020-06-
25
NHP-2018-2019-ML-967673-
CW-SH-SCB / Construction
of piezometers
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
08
2018-11-
03
2019-05-
02
NHP-2018-2019-UPGW-
177029-CW-NCB-SE /
INSTALLATION OF
BLOCKWISE KEY
PIEZOMETERS
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Under
Implement
ation
2018-06-
24
2018-06-
29
2018-08-
16
2018-10-
29
2018-12-
03
2019-12-
03
NHP-2018-2019-JH-372935-
CW-NCB-DE / Civil Works
for Construction of state
data and training
centre,WQ LAB,HIS
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-12-
27
2019-01-
02
2019-01-
30
2019-02-
12
2019-02-
27
2019-03-
29
NHP-2018-2019-JH-395497-
CW-NCB-DE / Construction
of piezometers
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-09-
14
2018-09-
19
2018-10-
15
2018-10-
29
2018-11-
19
2019-03-
19
NHP-2018-2019-RJ-483550
/ Establishment of SPMU (
Renovation/ civil work)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Under
Implement
ation
2018-08-
06
2018-10-
01
2019-03-
30
NHP-2018-2019-KLGW-
429114 / Platform
construction and protective
cover
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
06
2018-10-
01
2019-03-
30
NHP-2018-2019-KLGW-
170872 / Fencing for
piezometers
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
06
2018-11-
01
2019-04-
30
Page 5
NHP-2018-2019-KASW-
926942-CW-SH-QU / Rain
gauge housing -
reconstruction-package 8
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
30
2018-12-
25
2019-06-
23
NHP-2018-2019-KASW-
944031-CW-SH-QU /
Upgrading state data
centre : package 1
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
30
2018-09-
24
2019-03-
23
NHP-2018-2019-KASW-
336011-CW-SH-QU /
Upgradation of state data
centre: Package 2
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
06
2018-11-
01
2019-04-
30
NHP-2018-2019-KASW-
571476-CW-SH-QU / Rain
gauge housing-
reconstruction : Package 1
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
20
2018-10-
15
2019-04-
13
NHP-2018-2019-KASW-
226919-CW-SH-QU / Rain
gauge housing -
reconstruction-package 2
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
04
2018-10-
30
2019-04-
28
NHP-2018-2019-KASW-
890233-CW-SH-QU / Rain
gauge housing -
reconstruction-package 3
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
20
2018-11-
15
2019-05-
14
NHP-2018-2019-KASW-
664517-CW-SH-QU / Rain
gauge housing -
reconstruction-package 5
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
15
2018-12-
10
2019-06-
08
NHP-2018-2019-KASW-
254133-CW-SH-QU / Rain
gauge housing -
reconstruction-package 7
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
25
2018-12-
20
2019-06-
18
NHP-2018-2019-NIH-
193022-CW-NCB-SE /
Construction of Regional
Centre
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
15
2018-11-
10
2019-05-
09
NHP-2018-2019-AS-219985
/ CONSTRUCTION OF
BUILDING FOR NEW GD
AND GDS SITES
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-11-
15
2018-11-
20
2019-01-
01
2019-01-
31
2019-03-
07
2019-09-
03
NHP-2018-2019-AS-735672
/ RENOVATION &
CONSTRUCTION OF
DIVISIONAL DATA
CENTER(LAID,BARPETA)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-03-
10
2018-05-
05
2018-11-
01
NHP-2018-2019-AS-545673
/ RENOVATION &
CONSTRUCTION OF
DIVISIONAL DATA
CENTER(UAID,JORHAT)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-03-
11
2018-05-
06
2018-11-
02
NHP-2018-2019-AS-802077
/ RENOVATION &
CONSTRUCTION OF
DIVISIONAL DATA
CENTER(CID,BADARPUR)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
03
2018-11-
28
2019-05-
27
NHP-2018-2019-AS-819736
/ CONSTRUCTION OF
STATE DATA CENTRE
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-07-
20
2018-10-
21
2018-10-
21
2018-08-
10
2018-12-
30
2019-03-
14
2019-04-
18
2020-10-
09
NHP-2018-2019-KLSW-
513398 / Construction and
repair of cable ways
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
06
2018-10-
01
2018-10-
31
NHP-2018-2019-NL-768029
/ Construction of State
data Centre(SDC) at
Kohima
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-07-
31
2018-08-
05
2018-09-
06
2018-11-
10
2018-12-
15
2019-12-
10
NHP-2018-2019-NL-278303
/ Construction of Hydrology
Project Convention
Centre(HPCC) at Dimapur
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-07-
31
2018-08-
14
2018-09-
15
2018-11-
19
2018-12-
24
2020-06-
16
NHP-2018-2019-GJSW-
143223 / Civil and
Furnishing work for
Establishment of Flood
Management Cell.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
10
2018-11-
09
2019-03-
09
IN-TELENGANA SW-
39866-CW-RFB /
Infrastructure _Works -
Interior Works for State &
Regional Data Centers
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00 Canceled
2017-12-
20
2017-12-
25
2018-02-
05
2018-03-
07
2018-04-
11
2018-10-
08
IN-TELENGANA SW-
38228-CW-RFB / Civil
Works for Construction of
Regional Data Center
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00 Canceled
2017-12-
20
2017-12-
25
2018-02-
05
2018-03-
07
2018-04-
11
2018-10-
08
NHP-2018-2019-MZ-306433-
CW-NCB-DE / Vertical
extension of C.E Building
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
29
2018-09-
03
2018-10-
15
2018-11-
14
2018-12-
19
2019-06-
17
NHP-2018-2019-MZ-553109-
CW-NCB-DE / Construction
of Data Centre for
Southern division
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-11-
28
2018-12-
03
2019-01-
14
2019-03-
29
2019-05-
03
2019-10-
30
NHP-2018-2019-KLGW-
746971 / Piezometer-
shallow
IBRD / 87250 Post Force Account Direct
0.00
Pending
Implement
ation
2018-09-
25
2018-10-
05
2018-11-
04
2018-11-
14
NHP-2018-2019-WBGW-
404833 / Construction of
Nested (3 nos.) GW
Monitoring wells including
Protection works in 3-tier
multi-aquifer system of
coastal area
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-09-
02
2018-09-
07
2018-10-
19
2019-01-
01
2019-02-
05
2019-08-
04
NHP-2018-2019-WBGW-
229468 / Construction of
GW Monitoring Wells
including Protection works
in weathered zone of hard
rock area
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-09-
02
2018-09-
07
2018-10-
19
2019-01-
01
2019-02-
05
2019-08-
04
NHP-2018-2019-WBGW-
447564 / Interior Works in
GW Hydrology Training
Centre (GWHTC)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
06
2018-11-
01
2019-04-
30
NHP-2018-2019-WBGW-
457978 / Interior Works
for State GW Informatics
Centre (SGWIC)
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
06
2018-11-
01
2019-04-
30
NHP-2018-2019-PY-609320
/ Construction / Renovation
of Testing Lab
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
22
2018-11-
17
2019-03-
31
NHP-2018-2019-PY-794290
/ Civil Works for
Renovation of GW&SWDC
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
22
2018-11-
17
2019-03-
31
NHP-2018-2019-MN-
507826 / Furnishing of
water quality lab
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
02
2018-10-
28
2019-04-
26
IN-PUNJAB -75610-CW-
RFQ / Restoration of 700
no. ground water
observation wells already
installed in various
districts of Punjab State
under World bank Aided
Hydrology Project Phase -
II (3 Pkgs)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
28
2018-10-
22
2019-04-
20
IN-PUNJAB -54238-CW-
RFQ / RESTORATION OF
700 No. GROUND WATER
OBSERVATION WELLS
ALREADY INSTALLED IN
PUNJAB STATE UNDER
WORLD BANK AIDED
HYDROLOGY PROJECT
PHASE - II.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00 Canceled
2018-03-
25
2018-05-
20
2018-11-
16
IN-CWPRS-69317-CW-RFB
/ : Internal and External
Painting work along with
some horticulture
development for CMRT
division at CWpRS
Khadakwasla, pune_24
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
01
2018-11-
26
2019-05-
25
IN-CWPRS-69318-CW-RFB
/ Renovation and
upgradation of family
suites and hostels at
CWPRS Guest House
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
30
2018-11-
25
2019-05-
24
NHP-2018-2019-CWPRS-
205497-CW-NCB-SE /
Infrastructure facilities for
NHP Laboratory at
CWPRS
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
01
2018-11-
26
2019-05-
25
NHP-2018-2019-CWPRS-
807626-CW-NCB-SE /
Renovation of family suites
at CWPRS Guest House
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
01
2018-11-
26
2019-05-
25
NHP-2018-2019-CWPRS-
450346-CW-NCB-SE /
Renovation of Hostel
Building CWPRS Guest
House
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
30
2018-11-
25
2019-05-
24
NHP-2018-2019-CWPRS-
717414-CW-DC-DC / Civil
Works for Telemetry
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
01
2018-11-
26
2019-05-
25
NHP-2018-2019-CWPRS-
155250-CW-NCB-SE /
Construction of Bore well
& fencing- GW
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
30
2018-11-
25
2019-05-
24
NHP-2018-2019-CWPRS-
511223-CW-NCB-SE /
Construction of AWS site
and switch room
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-12-
05
2019-01-
30
2019-07-
29
Page 6
NHP-2018-2019-CWPRS-
646589-CW-NCB-SE /
Desilting and minor
repairs of Water
recirculation systems
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
20
2018-12-
15
2019-06-
13
NHP-2018-2019-CWPRS-
873052-CW-NCB-SE /
Renovation of water
control gates including civil
structures in Water
recirculation system
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
20
2018-12-
15
2019-06-
13
NHP-2018-2019-CWPRS-
455337-CW-NCB-SE /
Supply, installation,
Testing and commissioning
of Booster pump set in
the existing MS pipe line
including civil works
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-12-
05
2019-01-
30
2019-07-
29
NHP-2018-2019-CWPRS-
204908-CW-NCB-SE /
Renovation of 100 cusecs
return channel at Ch.0.0
m near Kirkatwadi nala
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
02
2018-11-
27
2019-05-
26
NHP-2018-2019-CWPRS-
802145-CW-NCB-SE /
Renovation of CMC
division building
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
20
2018-12-
15
2019-06-
13
NHP-2018-2019-CWPRS-
827974-CW-NCB-SE /
Construction: Isolation &
acoustical treatment,
lighting arrangement.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-11-
20
2019-01-
15
2019-07-
14
NHP-2018-2019-CWPRS-
285970-CW-NCB-SE /
Upgradation of various
Electrical Installations at
CWPRS
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
01
2018-11-
26
2019-05-
25
NHP-2018-2019-CWPRS-
376515-CW-NCB-SE /
Internal and external
painting including some
civil works in HMC Div.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
01
2018-11-
26
2019-05-
25
NHP-2018-2019-CWPRS-
844940-CW-NCB-SE /
Construction of
Experimental Flume
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
01
2018-11-
26
2019-05-
25
NHP-2018-2019-CWPRS-
364043-CW-NCB-SE /
Renovation of PMU Office
(civil and electrical work)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
30
2018-11-
25
2019-05-
24
NHP-2018-2019-CWPRS-
861195-CW-NCB-DE /
Construction of Test Tank
Facility- SW
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-12-
15
2019-02-
09
2019-08-
08
NHP-2018-2019-CWPRS-
503695-CW-NCB-SE / Lab
Interior-Civil works- AWS
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-11-
24
2019-01-
19
2019-07-
18
IN-CWPRS-79567-CW-RFQ
/ Lab Interior-Electrical
fittings - AWS
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
20
2018-12-
15
2019-06-
13
NHP-2018-2019-CWPRS-
446382-CW-NCB-SE /
Construction of Test Tank-
GW
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
17
2018-12-
12
2019-06-
10
NHP-2018-2019-MZ-807289
/ Vertical Extension of
C.E. Building
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
28
2018-10-
03
2018-11-
14
2018-12-
14
2019-01-
18
2019-07-
17
GOODS
Activity Reference
No. / DescriptionLoan /
Credit No.Component Review Type Method
Market
Approach
Procurement
Process
Prequalificati
on (Y/N)
Actual
Amount
(US$)
Process
Status
Draft Pre-
qualification
Documents
Prequalification
Evaluation Report
Draft Bidding
Document /
Justification
Specific
Procurement Notice
/ Invitation
Bidding Documents
as Issued
Proposal
Submission /
Opening / Minutes
Bid Evaluation
Report and
Recommendation
for Award
Signed ContractContract
Completion
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual
IN-NIH ROORKEE-16148-
GO-RFB / Desktop
Computers (20),
Workstation (1), Digital
Photocopier (1), Blade
Server (2), Projector (1)
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Under
Implement
ation
2017-10-
03
2017-11-
28
2018-03-
15
IN-SIKKIM -16384-GO-
RFQ / Procurement of 4
Computers, Printers and 2
Laptops (IT Equipment)
to set up SPMU Office as
approved in the AWP 2016-
2017 and 2017-18. The
WID are 728, 729, 2734,
2735 and 2736.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope7,248.69 Completed
2017-06-
10
2017-06-
23
2017-06-
28
17335-GO-RFB /
PROCUREMENT OF
MANUAL OBSERVATION
INSTRUMENTS (Portable
Current Meter & Eco
Sounder & GPS)
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-09-
13
2017-10-
16
2017-10-
26
IN-WEST BENGAL-GW-
17345-GO-RFB /
PROCUREMENT OF
WATER QUALITY
TESTING INSTRUMENTS
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-09-
13
2017-10-
16
2017-10-
26
IN-WEST BENGAL GW-
17346-GO-RFB /
PROCUREMENT OF IT
EQUIPMENTS (Computers
& Laptop with Software &
Peripherals) FOR HYDRO
INFORMATICS CENTRE
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-09-
13
2017-10-
16
2017-10-
26
IN-WEST BENGAL GW-
17349-GO-RFB /
PROCUREMENT OF IT
EQUIPMENTS LCD
(Projector and Screen/LED
TV & Photocopier) FOR
HYDRO INFORMATICS
CENTRE
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-09-
13
2017-10-
16
2017-10-
26
IN-SIKKIM -17740-GO-
RFQ / Procurement of
Office Furniture /
Furnishing as per AWP
2016-17 vide UID No 131.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope2,350.56 Completed
2017-06-
12
2017-06-
24
2017-06-
29
IN-ANDHRA PRADESH
GW-18140-GO-RFQ /
Procurement of Air
Conditioners for State and
District Data Centers
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-06-
15
2017-06-
15
2017-06-
15
IN-ANDHRA PRADESH
GW-18141-GO-RFQ /
Procurement of Ground
Water Monitoring
Equipment
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-06-
15
2017-06-
15
2017-06-
15
IN-ANDHRA PRADESH
GW-18149-GO-RFQ /
Procurement of DGPS
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-06-
15
2017-06-
28
2017-07-
27
IN-BBMB-18706-GO-RFQ /
Procurement of Articulating
Pickup vehicle (Multi
utility)
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-08-
11
2017-10-
29
2018-01-
27
IN-MOWR RD-GR-19666-
GO-RFQ / IT Equipment
for National Project
Management Unit
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-07-
09
2017-08-
16
2017-11-
04
IN-HIMACHAL PRADESH-
19979-GO-RFQ / supply of
ground water sampling
pump
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-08-
15
2017-12-
18
2018-06-
16
IN-DVC-19985-GO-RFQ /
Procurement of IT
hardware & software
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope6,072.37
Under
Implement
ation
2017-07-
15
2017-09-
09
2018-03-
08
IN-HIMACHAL PRADESH-
20070-GO-RFQ / supply of
bore hole camera
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-08-
15
2017-12-
18
2018-06-
16
IN-HIMACHAL PRADESH-
20073-GO-RFQ / supply of
total station
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-09-
16
2017-12-
20
2018-06-
18
IN-KERALA SW-20846-
GO-RFQ / Procurement of
bridge outfit - 10 Nos
(2016-17 and 2017-18)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
17
2018-01-
05
2018-02-
04
IN-KERALA GW-20103-
GO-RFQ / Computer
Purchase
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-07-
30
2017-09-
24
2018-03-
23
IN-HIMACHAL PRADESH-
20120-GO-RFQ / Supply of
Auto level
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-09-
16
2017-12-
20
2018-06-
18
IN-TELENGANA SW-
20126-GO-RFQ /
Procurement of Survey
Instruments like Total
Station, Auto Levels and
GPS Hand sets
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Under
Implement
ation
2017-09-
06
2017-11-
01
2018-04-
30
IN-TELENGANA SW-
20131-GO-RFQ /
Procurement of office
furniture for Central Data
center and Regional Data
Center
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Under
Implement
ation
2017-10-
08
2017-12-
03
2018-06-
01
Page 7
IN-HIMACHAL PRADESH-
20136-GO-RFQ / Supply of
Computers along with
software and accessories
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Under
Implement
ation
2017-07-
19
2017-09-
13
2018-03-
12
IN-KERALA SW-20141-
GO-RFQ / Current Meter
with accessories-Digital
type - 9 Nos
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
02
2018-01-
11
2018-02-
10
IN-KERALA SW-20143-
GO-RFQ / NHP-
Procurement of Staff
Gauge and Auto graphic
Water Level recorder. Staff
Gauge in 44 River Gauge
Stations. Each station
require Staff Gauge of
different length of 1m,
1.5m and 2 m. AWLR - 1
No
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Under
Implement
ation
2017-11-
02
2017-12-
28
2018-01-
27
IN-HIMACHAL PRADESH-
20157-GO-RFQ /
Procurement of Water
Quality Equipment &
accessories for existing lab
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Under
Implement
ation
2017-08-
08
2017-11-
27
2018-05-
26
IN-ODISHA (GW)-21788-
GO-RFQ / Procurement of
Desktop Computer with
OS
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-09-
28
2017-11-
23
2018-03-
31
IN-TELENGANA SW-
20163-GO-RFQ / Purchase
of Computers with
software
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope14,495.27 Signed
2017-09-
20
2017-11-
15
2018-05-
14
IN-HIMACHAL PRADESH-
20296-GO-RFQ /
computer/laptop/printers
etc. for state (FY:2017-18)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
16
2018-03-
06
2018-09-
02
IN-HIMACHAL PRADESH-
20297-GO-RFQ / Non ITC
Equipments ( UPS 5Kw 1
no. & 1Kw 10 nos. ,
colored photocopier 2nos.
scanner 6 nos. etc.)
FY:2017-18
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-09-
16
2017-12-
20
2018-06-
18
IN-HIMACHAL PRADESH-
20377-GO-RFQ /
Information Brochure
(FY:2017-18)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-03-
20
2018-05-
15
2018-11-
11
IN-HIMACHAL PRADESH-
20381-GO-RFQ / ADCP
above 25 meter
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
15
2017-11-
20
2018-01-
01
2018-01-
31
2018-03-
07
2018-09-
03
IN-HIMACHAL PRADESH-
20382-GO-RFQ / ADCP
Crane mounted vehicle
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
20
2018-02-
23
2018-08-
22
IN-HIMACHAL PRADESH-
20384-GO-RFQ /
Procurement of Water
Quality Equipment /
Accessories (FY:2017-18)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
20
2018-04-
18
2018-10-
15
IN-HIMACHAL PRADESH-
20389-GO-RFQ / Supply of
Discharge measurement
equipment & accessories
(FY:2107-18)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-09-
25
2018-01-
12
2018-07-
11
IN-KERALA SW-20508-
GO-RFQ / Procurement of
Computers, printers and
UPS (2016-17) and 2017-18
Computers - 31 Nos Work
station -2 nos A4 printers-
25 nos and UPS
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Under
Implement
ation
2017-11-
13
2018-01-
22
2018-03-
08
IN-RAJASTHAN -21107-
GO-RFQ / Manual Rain
Gauge equipment with
measuring glass. 45 Nos
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope67.11 Completed
2017-07-
20
2017-08-
10
2017-09-
09
IN-JHARKHAND -21432-
GO-RFQ / Purchase of
computers,
printer,scanner,laptop with
AMC.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-09-
20
2017-11-
08
2017-12-
23
IN-JHARKHAND -21445-
GO-RFQ / Resistivitymeter
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-09-
26
2017-11-
14
2017-12-
29
IN-SOI-21678-GO-RFQ /
Furniture for PDO
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-09-
05
2017-10-
31
2018-04-
29
IN-ANDHRA PRADESH
SW-21930-GO-RFQ /
Purchase of Non ICT
equipment for WQ labs &
Data Centers
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
20
2018-01-
15
2018-07-
14
IN-ANDHRA PRADESH
GW-18144-GO-RFQ /
Procurement of Geo-
Physical survey equipment
for field surveys
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-09-
25
2017-11-
18
2017-12-
19
IN-ODISHA (GW)-21932-
GO-RFQ / laptop with OS
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-09-
02
2017-10-
28
2018-03-
31
IN-ODISHA (GW)-21937-
GO-RFQ / printer
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-09-
02
2017-10-
28
2018-03-
31
IN-ANDHRA PRADESH
SW-21938-GO-RFQ /
Current Meter with
accessories
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
16
2018-02-
10
2018-08-
09
IN-ANDHRA PRADESH
SW-21946-GO-RFQ /
Procurement of Softwares
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
05
2017-12-
31
2018-06-
29
IN-ODISHA (GW)-21941-
GO-RFQ / power supply &
on-line UPS for data
centre
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-09-
02
2017-10-
28
2018-03-
31
IN-ODISHA (GW)-21962-
GO-RFQ / training
equipment/LCD projector &
screen
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-09-
04
2017-10-
30
2018-03-
31
IN-ODISHA (GW)-21973-
GO-RFQ / microsoft
office(multi user lic.)
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-09-
05
2017-10-
31
2018-03-
31
IN-ODISHA (GW)-21977-
GO-RFQ / antivirus
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-09-
05
2017-10-
31
2018-03-
31
IN-GUJARAT SW-22075-
GO-RFQ / Air conditioner-2
Nos. for GERI
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-09-
06
2017-11-
13
2018-01-
11
IN-JHARKHAND -22182-
GO-RFQ / Establishment
of SPMU IT infrastructure,
furniture etc
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-09-
05
2017-10-
17
2017-12-
01
IN-ODISHA (GW)-22530-
GO-RFQ / Handheld GPS
units
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-08-
25
2017-10-
20
2018-03-
31
IN-ODISHA (GW)-22548-
GO-RFQ / GW Monitoring
Equipment Kit ( WL
indicator, measuring tape,
Stop watch)
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-08-
25
2017-10-
20
2018-03-
31
IN-GUJARAT SW-22865-
GO-RFQ / PH Analyzer
Micro Processor based -3
nos. for GERI
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-09-
11
2017-11-
17
2018-01-
15
IN-GUJARAT SW-22875-
GO-RFQ / EC-TDS
Analyzer Micro Processor
based - 3 nos for GERI.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-09-
11
2017-11-
17
2018-01-
15
IN-GUJARAT SW-22877-
GO-RFQ / Turbidimeter -3
nos for GERI
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-09-
11
2017-11-
17
2018-01-
15
IN-GUJARAT SW-22878-
GO-RFQ / U V Spectro
Photometer-1 no for GERI
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-09-
11
2017-11-
17
2018-01-
15
IN-SOI-23021-GO-RFB /
Additional Hardware and
Software for updation
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Under
Implement
ation
2017-11-
01
2017-11-
06
2017-12-
18
2018-01-
17
2018-02-
21
2018-08-
20
IN-TELENGANA GW-
23217-GO-RFQ /
Procurement of Borehole
Logging Equipment with
AMC Support
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Under
Implement
ation
2017-09-
11
2017-11-
10
2018-01-
09
IN-GUJARAT SW-23216-
GO-RFQ / Flame
Photometer -1 no. for W.Q.
lab GERI.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
05
2018-02-
07
2018-03-
05
IN-GUJARAT SW-23218-
GO-RFQ / Ion meter -1
no. for W. Q. lab GERI
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
05
2018-02-
07
2018-03-
05
IN-GUJARAT SW-23219-
GO-RFB / Procurement of
office furniture for Water
Quality lab GERI
IBRD / 87250 PostRequest for
BidsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-08-
16
2017-09-
01
2017-09-
22
2017-10-
07
2017-11-
07
2018-03-
15
Page 8
IN-TELENGANA GW-
23260-GO-RFQ / To create
resource material (Annual
Reports, pamphlets,
Brochure, posters, audio
visuals, documentaries
etc.,)on water conservation
& management awareness
creation to water users
(IEC) & Resource material
for PDS & DSS
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-02-
03
2018-03-
18
2018-04-
17
IN-TELENGANA GW-
23278-GO-RFQ /
Procurement and
Installation of ACs (10) for
SDC and Conference Hall
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
05
2018-01-
10
2018-02-
09
IN-SIKKIM -18127-GO-
DIR / Procurement of 2
vehicles vide PID 82 of
Procurement Plan 2017-18.
by direct contracting of
Mahindra Bolero, a time
tested and suitable for
Hilly terrain condition of
Sikkim.
IBRD / 87250 Post Direct Selection Direct
24,176.32 Completed2017-08-
03
2017-08-
04
2017-08-
19
2017-10-
03
IN-GUJARAT SW-23676-
GO-RFQ / GPS Hand held
Type2 - 2 nos.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00 Canceled
2017-10-
15
2017-12-
10
2018-01-
31
IN-ODISHA (GW)-23848-
GO-RFQ / cost of
infrastructure and
furnishing of spmu
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-10-
08
2017-12-
03
2018-03-
31
IN-TELENGANA GW-
24074-GO-RFQ / Basic
Field equipment for field
officers for Strengthening
Manual Observations -
32units (Each unit
Consists of WL Indicators
-2, Geological Survey Kits-
2, Infiltrometre-1, 100m
Mesuring Tapes-5, 50m
Measuring Tapes-5, Dumpy
Level -1)
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Under
Implement
ation
2017-09-
21
2017-11-
16
2017-12-
16
IN-GUJARAT GW-24238-
GO-RFQ / Analytical
Digital Balance-3 nos for
WQ lab.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-08-
29
2017-10-
25
2017-11-
17
IN-GUJARAT GW-24242-
GO-RFQ / Manual Ground
Water Level Indicator - 10
nos
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-08-
28
2017-10-
06
2017-11-
02
IN-GUJARAT GW-24245-
GO-RFQ / Resistivity
Meter (Terameter Multi
Electrode) - 1 No.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
03
2017-12-
28
2018-01-
28
IN-GUJARAT GW-24253-
GO-RFQ / Deep Resistivity
Meter - 1 no.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-09-
08
2017-10-
26
2017-11-
09
IN-GUJARAT GW-24255-
GO-RFQ / Borehole
Camera - 1 no
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-09-
22
2017-11-
27
2017-12-
27
IN-GUJARAT GW-24268-
GO-RFQ / Laptop - 3
nos.(Through GEM)
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-09-
18
2017-10-
27
2017-11-
27
IN-GUJARAT SW-24269-
GO-RFB / Procurement of
ADCP - 3 nos
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2017-09-
01
2017-09-
06
2017-10-
18
2017-12-
31
2018-02-
04
2018-08-
03
IN-GUJARAT GW-24273-
GO-RFQ / Desktop
Computers - 10 nos.
(Through GEM)
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-09-
19
2017-11-
07
2017-11-
27
IN-GUJARAT GW-24276-
GO-RFQ / Workstations -
2 nos (Through GEM)
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-09-
28
2017-11-
23
2017-12-
23
IN-GUJARAT GW-24281-
GO-RFQ / Tablet - 14
nos.,Through Government
E Market(GEM)
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-10-
03
2017-11-
13
2017-11-
28
IN-GUJARAT GW-24283-
GO-RFQ / Portable
External Hard Disk - 6
nos. (Through GEM)
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-09-
18
2017-10-
31
2017-11-
27
IN-GUJARAT GW-24517-
GO-RFQ / Procurement of
B/W Printers - 10 nos.
And Colour Printer A3
Size - 1 no. (Through
GEM)
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-09-
19
2017-11-
07
2017-11-
27
IN-GUJARAT GW-24520-
GO-RFQ / Multi function
of Colour Printer cum
Scanner cum Copier of A3
Size - 1 no. And Copier
Machine - 1 no.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-10-
03
2017-11-
21
2017-12-
12
IN-NAGALAND -26244-
GO-RFQ / IT Equipment
and Accesories
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope5,667.11 Signed
2017-08-
26
2017-08-
30
2017-09-
04
IN-KARNATAKA SW-
26380-GO-RFQ /
Procurement of
Computers(18 nos) through
GEM Portal
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope22,115.75 Completed
2017-08-
29
2017-08-
29
2017-08-
29
IN-KARNATAKA SW-
26472-GO-RFQ /
Procurement of Laptops
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope8,846.30 Completed
2017-08-
29
2017-08-
29
2017-08-
29
IN-NAGALAND -26982-
GO-RFQ / Purchase of
Vehicle
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope23,424.44 Signed
2017-09-
05
2017-09-
09
2017-09-
14
IN-MEGHALAYA -27690-
GO-RFQ / Procurement of
2 laptops
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope1,164.61 Completed
2017-09-
16
2017-11-
11
2018-05-
10
IN-CHHATTISGARH GW-
28951-GO-DIR /
Procurement of colour
printer.
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2017-09-
18
2017-09-
23
2017-10-
28
2018-04-
26
IN-CHHATTISGARH GW-
28952-GO-DIR /
Procurement of A4 printer.
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2017-09-
18
2017-09-
23
2017-10-
28
2018-04-
26
IN-CHHATTISGARH GW-
28954-GO-DIR /
Procurement of Digital
Copier Multifunctional.
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2017-09-
18
2017-09-
23
2017-10-
28
2018-04-
26
IN-CHHATTISGARH GW-
28960-GO-DIR /
Procurement of Tablet
computer.
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2017-09-
18
2017-09-
23
2017-10-
28
2018-04-
26
IN-KERALA SW-29067-
GO-RFQ / Procurement of
Echo sounder - 1 No
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
03
2017-12-
29
2018-01-
28
IN-KERALA SW-29071-
GO-RFQ / NHP-
Procurement of Water
Quality Lab Equipment for
Level II Lab 2017-18.
Procurement of p H
Analyser-1No, EC-TDS
Analyser- 1No and Ion
Analyser-1 No for Level II
Lab.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Under
Implement
ation
2017-11-
20
2018-01-
15
2018-02-
14
IN-KERALA SW-29073-
GO-RFQ / NHP-
Procurement of Total
Station - 2 nos
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-10-
30
2018-01-
10
2018-02-
09
IN-KERALA SW-29081-
GO-RFQ / NHP-
Procurement of Automatic
Level - 3 Nos (2016-17
and 2017-18)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
10
2017-12-
29
2018-01-
28
IN-CHHATTISGARH SW-
29146-GO-RFQ /
Procurement of Standard
Raingauge.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
04
2017-12-
30
2018-06-
28
IN-CHHATTISGARH SW-
29149-GO-DIR /
Procurement of
Airconditioners.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
04
2017-12-
30
2018-06-
28
IN-CHHATTISGARH SW-
29152-GO-DIR /
Procurement of Online
UPS 15 KVA.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
04
2017-12-
30
2018-06-
28
IN-CHHATTISGARH SW-
29206-GO-RFQ /
Procurement 0f floor
scrubber machine.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
04
2017-12-
30
2018-06-
28
IN-KERALA SW-29209-
GO-RFQ / NHP-
Procurement of Differential
GPS - 2 Nos
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-10-
30
2018-01-
10
2018-02-
09
IN-KERALA SW-29211-
GO-RFQ / NHP -
Procurement of Data base
server and accessories for
WRIS and RTDAS and
other IT equipment 2017-
18
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
20
2018-01-
22
2018-02-
21
IN-KERALA SW-29213-
GO-RFQ / NHP -
Procurement of data from
various offices for the
development of WRIS.
2017-18
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
05
2018-01-
30
2018-07-
29
IN-CHHATTISGARH SW-
29216-GO-DIR /
Procurement of LCD
Projetor.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
04
2017-12-
30
2018-06-
28
IN-CHHATTISGARH SW-
29219-GO-DIR /
Procurement of 1 no
Vehicle.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-10-
11
2017-12-
06
2018-06-
04
Page 9
IN-KERALA SW-29223-
GO-RFQ / NHP -
Procurement of furniture
for Training centre 2017-
18. This work will be
started after completing 80
percentage of renovation
work
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-03-
19
2018-05-
14
2018-06-
13
IN-KERALA SW-29228-
GO-RFQ / NHP - Purchase
of vehicle for SPMU - 1
No
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
16
2018-01-
11
2018-02-
10
IN-KERALA SW-29244-
GO-RFQ / NHP-
Procurement of Water
Quality Lab Equipment for
level I Labs 2016-17 and
2017-18. Procurement of
Analytical Balance-5 Nos,
WQ Analyser-5Nos, p H
Analyser-1 No, EC-TDS
Analyser-1 No, Distillation
Apparatus- 1No, DO
measuring equipment- 1No
for Level
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Under
Implement
ation
2017-11-
05
2018-01-
14
2018-02-
13
IN-KERALA SW-29249-
GO-RFQ / NHP -
Procurement of furniture
for regional data centre,
divisional data centre, sub
divisional data centres and
field offices
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
27
2018-02-
05
2018-03-
07
IN-TAMIL NADU -29283-
GO-RFQ / Package I
Water Quality Equipment
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-10-
03
2017-11-
28
2017-12-
27
IN-JHARKHAND -21804-
GO-RFQ / Purchase of
DGPS (1 numbers).
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-10-
11
2017-11-
30
2018-01-
14
IN-TAMIL NADU -29575-
GO-RFQ / Pacakge IV
DWLR Telemetry, DWLR
Telemetry with water
quality prob
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-10-
03
2017-11-
28
2017-12-
27
IN-NIH ROORKEE-30957-
GO-RFB / Gas
Chromatograph Mass
Spectrometer 01, Dedicated
Auto Titrator 01, TOC
Analyser 01
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Under
Implement
ation
2017-10-
27
2017-11-
01
2017-12-
13
2018-02-
25
2018-04-
01
2018-09-
28
IN-NIH ROORKEE-30965-
GO-RFB / Element
Analyser (Dual Carbon C
13 Isotope analyser) 01,
Tritium Enrichment unit
01, Normal Scintillation
Counter 01, Liquid
Nitrogen Plant 01.
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Under
Implement
ation
2017-10-
27
2017-11-
01
2017-12-
13
2018-02-
25
2018-04-
01
2018-09-
28
IN-CWPRS-31044-GO-RFQ
/ Procurement of 16 nos.
of LaserJet Multi-function
Printers through
Government e Market
(GeM)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope6,539.18 Completed
2017-11-
04
2017-12-
30
2018-06-
28
IN-CWPRS-31046-GO-RFQ
/ Procurement of 26 nos.
of Personal Computers (i-7
& i-5) through Government
e Market (GeM)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
11
2018-01-
06
2018-07-
05
IN-CWPRS-31047-GO-RFQ
/ Procurement of Multi
Media LED Projector- 1
No. through Government e
Market(GeM)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope841.27 Completed
2017-11-
15
2018-01-
10
2018-07-
09
IN-CWPRS-31049-GO-RFQ
/ Procurement of 14 nos.
of Inverter Split Air
Conditioners (2T & 1.5T)
through Government e
Market(GeM)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
11
2018-01-
06
2018-07-
05
IN-CWPRS-31050-GO-RFQ
/ Procurement of
Refrigerator ( 2 Door/300
Liters) -1 through
Government e
Market(GeM)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
11
2018-01-
06
2018-07-
05
IN-CHHATTISGARH GW-
31279-GO-RFQ /
procurement of NON IT
Equipment ( Airconditoner
& Refrigerator ) for
Divisional data center
under PP 2017-18
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
20
2018-01-
15
2018-07-
14
IN-CHHATTISGARH GW-
31280-GO-RFQ /
Procurement of online UPS
15 KVA UNDER PP 2017-
18
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
20
2018-01-
15
2018-07-
14
IN-CHHATTISGARH GW-
31282-GO-RFQ /
Procurement of Vehicle
under PP 2017-18
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
20
2018-01-
15
2018-07-
14
IN-CWPRS-31378-GO-RFQ
/ Procurement of Office
Furniture( 10 various
types of Items) through
Government e Market
(GeM)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
11
2018-01-
06
2018-07-
05
IN-GUJARAT GW-25110-
GO-RFB / Procurement of
Telemetry Digital Water
Level Recorder - 526 Nos .
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-10-
01
2017-10-
06
2017-11-
10
2017-11-
27
2018-01-
01
2018-06-
30
IN-KERALA SW-31525-
GO-RFQ / Procurement of
Journals
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2017-10-
25
2017-10-
30
2017-12-
04
2018-01-
03
IN-WEST BENGAL GW-
31748-GO-RFQ /
PROCUREMENT OF
REAL-TIME HYDRO-
METEOROLOGICAL AND
HYDROLOGICAL
INSTRUMENTS (Current
Meter, Eco-Sounder and
Resistivity Meter)
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-10-
18
2017-11-
07
2017-12-
07
IN-WEST BENGAL GW-
31752-GO-RFQ /
PROCUREMENT OF
WATER QUALITY
TESTING INSTRUMENTS
(UV Spectrophotometer)
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-10-
18
2017-11-
10
2017-12-
10
IN-MAHARASHTRA SW-
33198-GO-RFQ / Up
gradation & Renovation of
Existing Real Time Data
Acquisition System
(RTDAS) for Tapi Basin.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
05
2018-01-
30
2018-07-
29
IN-MAHARASHTRA SW-
33201-GO-RFB /
Upgradation & Renovation
of Existing Real Time
Data Acquisition System
(RTDAS) for Godavari
Basin in Marathwada
Region.
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
25
2017-12-
30
2018-02-
10
2018-03-
12
2018-04-
16
2018-10-
13
IN-MAHARASHTRA SW-
33206-GO-RFQ /
Upgradation & Renovation
of Existing Real Time
Data Acquisition System
(RTDAS) system for
Godavari River Basin In
Vidharbha Region.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-02-
27
2018-04-
24
2018-10-
21
IN-MAHARASHTRA SW-
33205-GO-RFB / Expansion
of existing Real Time Data
Acquisition System
(RTDAS) established in HP
II for remaining area of
South of Panchganga in
Krishna basin.
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-02-
22
2018-02-
27
2018-04-
10
2018-05-
10
2018-06-
14
2018-12-
11
IN-MAHARASHTRA SW-
33209-GO-RFB / SCADA
system for reservoir
operation of Waghur
Barrage in Tapi basin.
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-03-
19
2018-03-
24
2018-05-
05
2018-06-
04
2018-07-
09
2019-01-
05
IN-MAHARASHTRA SW-
33212-GO-RFB /
Procurement of 4 no. of
River Surveyor Instrument
(Acoustic Doppler Current
Profiler) for 4 basins.
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
30
2017-12-
05
2018-01-
16
2018-02-
15
2018-03-
22
2018-09-
18
IN-MAHARASHTRA SW-
33220-GO-RFQ / Special 5
Vans to all Basins for
lowering ADCP For
Discharge Measurements
over the Bridge.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
05
2018-03-
02
2018-08-
29
IN-MAHARASHTRA SW-
33221-GO-RFQ /
Procurement of Portable
Water Quality Sondes for
Water Quality Labs in the
State.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-03-
05
2018-04-
30
2018-10-
27
IN-MAHARASHTRA SW-
33229-GO-RFQ / Providing
& supplying consumables
(Chemicals & Glasswares)
for Water Quality Lab at
Jalgaon in Tapi basin.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-03-
20
2018-05-
15
2018-11-
11
IN-MAHARASHTRA SW-
33230-GO-RFQ / Providing
& supplying consumables
(Chemicals & Glasswares)
for Water Quality Labs at
Nashik and Aurangabad in
Godavari basin of
Marathwada region.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
05
2018-03-
02
2018-08-
29
Page 10
IN-MAHARASHTRA SW-
33231-GO-RFQ / Providing
and supplying consumables
(Chemicals & Glasswares)
for Water Quality Lab at
Nagpur in Godawari basin
of Vidharbh region.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
05
2018-03-
02
2018-08-
29
IN-MAHARASHTRA SW-
33232-GO-RFQ / Providing
and supplying consumables
(Chemicals & Glasswares)
for Water Quality Labs at
Pune and Kolhapur in
Krishna basin.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
05
2018-03-
02
2018-08-
29
IN-MAHARASHTRA SW-
33233-GO-RFQ / Providing
and supplying consumables
(Chemicals and
Glasswares) for Water
Quality Lab at Thane in
West flowing rivers of
Konkan basin.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
05
2018-03-
02
2018-08-
29
IN-MAHARASHTRA SW-
33240-GO-RFQ /
Procurement of equipment
for existing Water Quality
Labs at Nashik and
Aurangabad in Godavari
basin of Marathwada
region.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
20
2018-02-
14
2018-08-
13
IN-MAHARASHTRA SW-
33241-GO-RFQ /
Procurement of equipment
for existing Water Quality
Lab at Nagpur in
Godawari basin Vidharbh
region.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
20
2018-02-
14
2018-08-
13
IN-MAHARASHTRA SW-
33242-GO-RFQ /
Procurement of equipment
for existing Water Quality
Lab at Pune and Kolhapur
in Krishna basin.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
20
2018-02-
14
2018-08-
13
IN-MAHARASHTRA SW-
33243-GO-RFQ /
Procurement of equipment
for existing Water Quality
Lab at Thane in West
flowing rivers of Konkan
basin.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
20
2018-02-
14
2018-08-
13
IN-MAHARASHTRA SW-
33248-GO-RFQ /
Procurement and fixing of
existing manual hydromet
observation network
equipment in Tapi basin.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
25
2018-01-
20
2018-07-
19
IN-MAHARASHTRA SW-
33250-GO-RFQ /
Procurement & fixing of
existing manual hydromet
observation network
equipment in Godavari
Basin of Marathwada
Region.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
25
2018-01-
20
2018-07-
19
IN-MAHARASHTRA SW-
33251-GO-RFQ /
Procurement and fixing of
existing manual hydro met
observation network
equipment in Godavari
basin of Vidharbha Region.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
25
2018-01-
20
2018-07-
19
IN-MAHARASHTRA SW-
33252-GO-RFQ /
Procurement and fixing of
existing manual hydromet
observation network
equipment in Krishna
basin.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
25
2018-01-
20
2018-07-
19
IN-MAHARASHTRA SW-
33253-GO-RFQ /
Procurement and fixing of
existing manual hydromet
observation network
equipment for west flowing
rivers in Kokan basin.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
25
2018-01-
20
2018-07-
19
IN-MAHARASHTRA SW-
33280-GO-RFQ /
Integration of Existing
RTDAS system for Tapi
basin in regional & State
data centres including
Divisional & Sub
Divisional Data Center.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-03-
24
2018-05-
19
2018-11-
15
IN-MAHARASHTRA SW-
33284-GO-RFQ /
Integration of Existing
RTDAS system for
Godavari basin in
Marathwada region in
regional & state data
centres.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-03-
24
2018-05-
19
2018-11-
15
IN-MAHARASHTRA SW-
33287-GO-RFQ /
Integration of Existing
RTDAS system for
Godavari basin in
Vidharbha region in
regional & state data
centres.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-03-
24
2018-05-
19
2018-11-
15
IN-MAHARASHTRA SW-
33341-GO-RFB /
Upgradation of existing
hydrology project web site
with State level portal for
RTDAS and development
of state chapter of India-
WRIS.
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-02-
12
2018-02-
17
2018-03-
31
2018-04-
30
2018-06-
04
2018-12-
01
IN-MAHARASHTRA SW-
33345-GO-RFQ / Providing
Video Conferencing facility
at Jalvidnyan Bhavan,
Nashik, and field offices
under Hydrology Project.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
23
2018-02-
17
2018-08-
16
IN-MAHARASHTRA SW-
33362-GO-RFB /
Development of
Modern/Smart irrigation
System of reservoir &
canal operation based on
real time information for
Tillari project.
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-03-
19
2018-03-
24
2018-05-
05
2018-06-
04
2018-07-
09
2019-01-
05
IN-MAHARASHTRA SW-
33458-GO-RFQ /
Establishment of E class
room with furnishing at
Jalvidnyan Bhavan,
Nashik.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-05-
24
2018-07-
19
2019-01-
15
IN-MAHARASHTRA SW-
33463-GO-RFQ /
Institutional Modernization
Support, including IT
systems & software.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
07
2018-03-
04
2018-08-
31
IN-MAHARASHTRA SW-
23034-GO-DIR / Purchase
of 2 vehicles in final
phase through EGems out
of 6 as approval of 2
accorded by the
Maharashtra state. 4
vehicles will be purchased
through EGems after
approval from Maharashtra
state.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-10-
26
2017-10-
26
2018-03-
31
IN-SIKKIM -35707-GO-
RFQ / RFQ for one Total
Station(UID 108)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope13,229.69 Completed
2017-12-
15
2018-02-
07
2018-08-
06
IN-SIKKIM -35726-GO-
DIR / Request for
quotations for 4 numbers
of acoustic Doppler velocity
meter ( Hand Held
Current Meter) against
UID 111
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope14,316.34 Completed
2017-12-
10
2018-03-
07
2018-09-
03
IN-TELENGANA GW-
24071-GO-RFQ / Basic
Field equipment for field
officers for Strengthening
Manual Observations (98
GPS - 3 Units for Each
District Offices(31Districts)
and 5 units for Head
Office)
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
08
2018-01-
20
2018-02-
20
IN-TELENGANA GW-
24088-GO-DIR /
Procurement of IT
Equipment for Data
Centres (Desktops,
Printers, Laptops, HDDs,
A0 Plotter etc) through
GEM
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Under
Implement
ation
2017-12-
09
2018-01-
27
2018-02-
26
IN-SIKKIM -36085-GO-
DIR / Procurement of One
vehicle vide UID 88 of
Procurement Plan 2016-17.
by direct contracting of
Mahindra Bolero, a time
tested and suitable for
Hilly terrain condition of
Sikkim
IBRD / 87250 Post Direct Selection Direct
11,574.59 Completed2017-11-
09
2017-11-
14
2017-12-
19
2018-06-
17
IN-JHARKHAND -36309-
GO-RFQ / Purchase of
computers,Laptop,Printer,An
tivirus
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
14
2018-03-
11
2018-04-
08
IN-WEST BENGAL SW-
36326-GO-RFQ /
Procurement and
installation of Photocopier
and Printers for the
State Project Management
Unit of National Hydrology
Project
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope25,355.32 Signed
2017-11-
14
2017-12-
08
2018-01-
07
IN-WEST BENGAL SW-
36330-GO-RFQ /
Procurement and
Installation of Desktop PC
with peripherals for the
State Project Management
Unit of National Hydrology
Project
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope19,082.30 Signed
2017-11-
14
2017-12-
09
2018-01-
08
Page 11
IN-PUNJAB -33503-GO-
RFQ / Purchase of Renault
Duster RXL MT 106Ps
Petrol BS4 5 Seater for
water resourcews bhawan
mohali
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
19
2017-11-
21
2018-01-
10
IN-PUNJAB -32261-GO-
RFB / Supply, Installation,
Testing Commissioning and
Maintenance of RTDAS for
selected Rivers, Head
Works and Dams for
Surface Water sector in
Punjab and Supply,
Installation, Testing
Commissioning and
Maintenance of AWS
under e-Procurement
system.
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
14
2017-12-
21
2018-01-
25
2018-02-
23
2018-03-
30
2018-09-
26
IN-UTTAR PRADESH
GW-36938-GO-RFQ / Water
Level Sounder, Hand held
GPS, or alike devices
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
04
2018-01-
11
2018-01-
31
IN-UTTAR PRADESH
GW-36953-GO-RFQ /
Development/strengthening
of IT infrastructure at
field division level
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
06
2018-01-
20
2018-02-
19
IN-CWPRS-31045-GO-RFQ
/ Procurement of 22 nos.
of 1 KVA/400VAH Line
Interactive Uninterruptible
Power Supply through
Government e
Market(GeM)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope3,379.42 Completed
2017-11-
21
2018-01-
16
2018-07-
15
IN-TELENGANA GW-
37063-GO-RFB / WQ Lab
Equpiment Up gradation
at Hyderabad and
Karimnagar
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
27
2017-12-
02
2017-12-
23
2018-01-
09
2018-02-
02
2018-04-
04
IN-UTTAR PRADESH
GW-37066-GO-DIR /
Procurement of 4 no basic
ArcGIS software
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
11
2018-02-
01
2018-03-
02
IN-UTTAR PRADESH
GW-37068-GO-RFQ /
Development of Ground
Water Atlas of Uttar
Pradesh ( Urban and
Rural )
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
03
2018-02-
24
2018-03-
26
IN-UTTAR PRADESH
GW-37074-GO-RFQ /
Development of mobile app
for field/ Community based
monitoring and
dissemination
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Under
Implement
ation
2017-11-
29
2018-01-
24
2018-05-
24
IN-UTTAR PRADESH
GW-37081-GO-RFQ /
Development of library and
E-library
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
20
2018-02-
08
2018-03-
10
IN-UTTAR PRADESH
GW-37154-GO-RFQ / "To
prepare resource material (
Annual
Reports,pamphlets,Brochure,
posters, audio
visuals,documentaries etc.,)
on water conservation &
management awareness
creation to water users
(information education &
communication )"
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
29
2018-02-
19
2018-03-
06
IN-WEST BENGAL GW-
37289-GO-RFQ /
PROCUREMENT OF 20
DWLR /ABSOLUTE
PRESSURE TYPE WITH
TELEMETRY FOR NEW
GROUNDWATER
MONITORING WELLS IN
WEATHERED ZONE OF
HARD ROCK AREA,
PURULIA DIST, WEST
BENGAL
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Under
Implement
ation
2017-11-
27
2017-12-
25
2018-01-
09
IN-WEST BENGAL GW-
37292-GO-RFQ /
PROCUREMENT OF 25
NOS DWLR /ABSOLUTE
PRESSURE TYPE WITH
TELEMETRY FOR 25
NOS EXISTING
GROUNDWATER
MONITORING WELLS IN
WEST BENGAL
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
27
2017-12-
25
2018-01-
09
IN-WEST BENGAL GW-
37369-GO-RFQ / Purchase
of IT Equipment
(Computers, workstations
& Laptop with Software &
Printer, Plotter &
Photocopier)
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
27
2017-12-
19
2017-12-
26
IN-WEST BENGAL GW-
37373-GO-RFQ /
Procurement of two nos.
Hand-held GPS
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
26
2017-12-
22
2017-12-
29
IN-SIKKIM -37684-GO-
RFQ / Procurement of 5
nos. of Rain Gauge
manual as per UID 107
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope745.27 Completed
2017-12-
10
2018-02-
15
2018-08-
14
IN-DVC-38048-GO-RFQ /
Procurement of 01 (one)
no. Server for WaterWare
Software under National
Hydrology Project (NHP).
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope12,005.28
Under
Implement
ation
2017-11-
28
2018-01-
23
2018-07-
22
IN-KERALA SW-20115-
GO-RFQ / Current Meter
with accessories- Cup Type-
46 Nos
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Under
Implement
ation
2017-10-
30
2018-01-
10
2018-02-
09
IN-KERALA SW-28944-
GO-RFB / The Supply,
Installation, Testing,
Training, Commissioning,
Operation and Maintenance
of Hydrological Information
System for Kerala State
2017-18.(
Telecommunication system
changed to INSAT as per
the direction of NPMU)
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-10-
28
2017-11-
18
2017-12-
16
2018-01-
13
2018-02-
17
2019-02-
17
IN-WEST BENGAL SW-
38546-GO-RFB /
Procurement of Discharge
measuring Equipment
(ADCP)
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope69,656.41 Signed
2017-12-
06
2017-12-
06
2017-12-
27
2018-01-
07
2018-01-
30
2018-05-
30
IN-HIMACHAL PRADESH-
20302-GO-RFQ /
Procurement of GIS .
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2018-05-
24
2018-05-
29
2018-07-
19
2018-10-
11
IN-WEST BENGAL SW-
39196-GO-RFQ /
Procurement of ITC
equipment
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope6,494.50 Signed
2017-12-
11
2018-01-
26
2018-03-
12
IN-WEST BENGAL GW-
37356-GO-RFQ /
Procurement of one ADCP
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Under
Implement
ation
2018-02-
05
2018-03-
05
2018-03-
20
IN-CHHATTISGARH SW-
28469-GO-DIR /
Procurement of 8 nos
Desktop computer.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
25
2018-02-
19
2018-08-
18
IN-CHHATTISGARH SW-
28850-GO-DIR /
Procurement of 3 nos
Laptop.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
26
2018-02-
20
2018-08-
19
IN-CHHATTISGARH SW-
28851-GO-DIR /
Procurement of 10 nos A4
printer.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
26
2018-02-
20
2018-08-
19
IN-CHHATTISGARH SW-
28853-GO-DIR /
procurement of Digital
copier multifunctional 1
no.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
26
2018-02-
20
2018-08-
19
IN-CHHATTISGARH SW-
28855-GO-DIR /
Procurement of scanner.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
26
2018-02-
20
2018-08-
19
IN-CHHATTISGARH SW-
29221-GO-DIR /
Procurement of ArC GIS
software 1no.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-02-
03
2018-03-
31
2018-09-
27
IN-CWC-NHP-10546-GO-
DIR / Extension/Up-
gradation of eSWIS
IBRD / 87250 Prior Direct Selection Direct
0.00 Canceled2017-12-
21
2017-12-
21
2018-01-
25
2018-07-
24
IN-DVC-38058-GO-RFB /
Procurement of Automated
Pipe Flow measurement
sensors for drinking/
industrial water supply for
40 nos. of consumers with
GSM telemetry.
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-02-
01
2018-02-
06
2018-03-
20
2018-04-
19
2018-05-
24
2026-05-
22
IN-DVC-38032-GO-RFB /
Supply, installation,
testing, commissioning and
maintenance of Real Time
Data Acquisition System
(RTDAS) of DVC under
National Hydrology Project
(NHP).
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Under
Implement
ation
2018-01-
10
2018-01-
15
2018-02-
26
2018-03-
28
2018-05-
02
2026-04-
30
IN-KARNATAKA SW-
26476-GO-RFQ /
Procurement of Bridge
outfits-06 numbers for
carrying out the current
meter gauging .
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope4,521.99 Completed
2017-08-
29
2017-10-
25
2018-01-
07
IN-KARNATAKA SW-
26478-GO-RFQ /
Procurement of Current
Meter Gauging equipment
with accessories.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope12,245.55 Completed
2017-08-
29
2017-10-
18
2017-12-
18
Page 12
IN-KARNATAKA SW-
41966-GO-RFQ /
Procurement of
photocopiers for divisional
and subdivisional data
centes(A3.3.03.01)
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope12,622.34 Completed
2018-01-
02
2018-01-
02
2018-01-
02
IN-KARNATAKA SW
1970-GO-RFQ /
Procurement of IT
equipments(computers-
13,laptop-03&printers-04)
for KERS training center.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope14,633.13 Completed
2018-01-
02
2018-01-
02
2018-01-
02
IN-KARNATAKA SW
1978-GO-RFQ /
Procurement of vehicles for
circle officers-2 nos
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope16,604.46 Completed
2018-01-
02
2018-01-
02
2018-01-
02
IN-SIKKIM -42253-GO-
RFQ / Procurement of 4
numbers of Hand held
GPS UID 120 by RFQ
since registration under
eGeM is not possible due
to Aadhar issues
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope1,792.18 Completed
2018-01-
08
2018-03-
05
2018-09-
01
IN-NAGALAND -42428-
GO-RFQ / purchase of
two(2) nos of handheld
GPS
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope1,494.91 Signed
2018-01-
04
2018-01-
24
2018-01-
31
IN-KARNATAKA SW-
42645-GO-RFQ /
Procurement of Bolero
Camper PS4WD (utility
vehicle) for the vehicle
mounted crane.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope17,647.23 Completed
2018-01-
06
2018-01-
27
2018-07-
26
IN-KARNATAKA SW-
42648-GO-RFQ /
Procurement of UPS for
divisional and subdivisional
offices.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope15,481.02 Completed
2018-01-
06
2018-01-
27
2018-07-
26
IN-CWPRS-43247-GO-RFQ
/ Steel tape (100 m)for
water level measuring in
borehole-1 No.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
20
2018-03-
17
2018-09-
13
IN-CWPRS-44373-GO-RFQ
/ Glassware and Chemicals
for Water Quality Lab
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-04-
02
2018-05-
28
2018-11-
24
IN-ASSAM -27692-GO-
RFQ / Total Station
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Under
Implement
ation
2017-10-
08
2017-12-
03
2018-06-
01
IN-ASSAM -26120-GO-
RFB / Silt Laboratory
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-10-
09
2017-12-
04
2018-06-
02
IN-ASSAM -27985-GO-
RFQ / Procurement of
GPS -Hand Held and
Differential GPS
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Under
Implement
ation
2017-10-
09
2017-12-
04
2018-06-
02
IN-ASSAM -27990-GO-
RFQ / Procurement of
Flow Tracker
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
24
2018-03-
21
2018-09-
17
IN-MADHYA PRADESH-
44740-GO-RFB / RTDAS
for Madhya Pradesh-Ganga
Basin(Chambal,Sindh
Betwa,Son,Tons,Dhasan
and ken sub-basins)
IBRD / 87250 PriorRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-05-
31
2018-08-
16
2018-08-
16
2018-06-
05
2018-10-
25
2019-01-
07
2019-02-
11
2020-08-
04
IN-MADHYA PRADESH-
44742-GO-RFB / DWLR
Telemetry in Piezometers
in Madhya Pradseh
IBRD / 87250 PriorRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-05-
14
2018-07-
30
2018-07-
30
2018-05-
19
2018-10-
08
2018-12-
21
2019-01-
25
2020-07-
18
IN-KARNATAKA SW-
26480-GO-RFQ /
Procurement of hydro-
meteorological instruments
for FCS stations-manual
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-08-
29
2017-11-
09
2018-01-
15
IN-KARNATAKA SW-
26479-GO-RFQ /
Procurement of Standard
Rain Gauges -manual
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-08-
29
2017-11-
07
2018-01-
15
IN-KARNATAKA SW-
45012-GO-RFQ / Providing
and supplying additional
Hard Disks, RAM, Modems
with the necessary server
interface to the existing
server and up gradation of
Rainfall receiving
applications.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
22
2018-02-
12
2018-03-
21
IN-KERALA SW-20580-
GO-RFQ / Procurement of
Water Quality Sondes for
PDS - 4 Nos
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
29
2018-03-
26
2018-04-
25
IN-KERALA SW-31524-
GO-RFQ / Procurement of
Meteorological Equipment -
SRG-28 Nos , FRP bottle-
30 Nos, Measuring Jar -
44 Nos, Plastic Container-
30 Nos, Overflow Jar- 14
Nos, Pan Evaporimeter-1
No,Pan Evaporimeter
measuring Jar-5 Nos,
Stevenson Screen -Large-4
Nos& Small- 5 N
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
20
2018-01-
29
2018-02-
28
IN-TAMIL NADU -46723-
GO-RFQ / Providing
furniture to Data
processing centres in
Ground Water Division
office, Madurai ,
Tirunelveli and Ground
Water Circle office,
Madurai.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-02-
01
2018-03-
13
2018-05-
12
IN-TAMIL NADU -46726-
GO-RFQ / Providing
Furnitures to Data
Processing Centres in
Ground Water Division
office at Thanjavur, Salem
and Ground Water Circle
office,Thanjavur.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-02-
12
2018-04-
02
2018-05-
31
IN-WEST BENGAL SW-
38548-GO-RFB /
Procurement of Survey
Instruments (1 no. RTK-
DGPS and 4 nos. GPS-
Hand held)
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope51,901.20 Signed
2018-02-
12
2018-03-
15
2018-05-
14
IN-NAGALAND -26984-
GO-DIR / purchase of GIS
software
IBRD / 87250 Post Direct Selection Direct
37,530.50 Signed2017-09-
04
2017-09-
05
2017-09-
08
2017-09-
13
IN-WEST BENGAL SW-
48181-GO-RFQ /
Procurement of Survey
Instruments (2 nos. Total
Station and 4 nos. Digital
Level)
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Under
Implement
ation
2018-02-
12
2018-03-
15
2018-05-
14
IN-ASSAM -26226-GO-
RFQ / Procurement of
Laptops with software and
Printer
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Under
Implement
ation
2017-09-
21
2017-11-
03
2018-05-
02
IN-CWPRS-49185-GO-RFQ
/ Procurement of 3 Nos. of
A3 size Monochrome
LaserJet Multi-Function
Printers through
Government-E- Market
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope1,982.93 Signed
2018-03-
03
2018-04-
28
2018-10-
25
IN-TAMIL NADU -49552-
GO-RFQ / Providing
Furnitures to Data
Processing Centres in
Ground Water Division
office,Cuddalore,
Vellore,Chennai and
Gauging Division office,
Chennai.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-03-
05
2018-04-
30
2018-10-
29
IN-TAMIL NADU -42599-
GO-DIR / Procurement of
field vehicles for data
collection
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
16
2018-03-
13
2018-05-
14
IN-WEST BENGAL GW-
37327-GO-RFQ /
Procurement and
Installation of 5 Automatic
Weather Stations (AWS)
and 5 Automatic rain
gauge Station( ARS)
including 2 years warranty
& 5 years AMC including
insurance
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
17
2018-01-
14
2018-01-
29
IN-KARNATAKA SW-
51640-GO-RFQ /
Procurement of All in one
Printers for Divisional and
Subdivisional offices.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope2,919.28 Completed
2018-02-
28
2018-02-
28
2018-04-
09
IN-CWPRS-51670-GO-RFQ
/ Electronic Water Level
Sounder-1 No.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-03-
20
2018-05-
15
2018-11-
11
IN-CWPRS-51704-GO-RFQ
/ Pen Type Coliform (Total
and Fecal) Detection Unit
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2019-01-
02
2019-02-
27
2019-08-
26
IN-CWPRS-51699-GO-RFQ
/ Fuming Chamber
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-04-
04
2018-05-
30
2018-11-
26
IN-CWPRS-51689-GO-RFQ
/ Fabrication of
Environmental Chamber
with automation and
generator set.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-04-
04
2018-05-
30
2018-11-
26
IN-CWPRS-51692-GO-RFQ
/ Water Quality Sensors
with data logger
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-04-
04
2018-05-
30
2018-11-
26
Page 13
IN-CWPRS-51695-GO-RFQ
/ Standard Solutions for
Water Quality Lab
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-12-
19
2019-02-
13
2019-08-
12
IN-CWPRS-51697-GO-RFQ
/ Laboratory Equipments (
Hot Plate,Muffle Furnance,
Water Bath (20Litres),High
Precession Balance, Water
Demeneralizer/Distilled
Water Production Systems
)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-04-
04
2018-05-
30
2018-11-
26
IN-CWPRS-51705-GO-RFQ
/ Equipments for Audio
Video studio(HD Camera
with accessories-1
No.,Tripod -2 Nos., 50"
LED TV with Speaker
with Stand- 1No. , Head
Phone- 4 Nos., Mic
Lavalier wireless 2
Nos.,Lights for field 3
Nos., Set of cables
Audio/Video)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-04-
04
2018-05-
30
2018-11-
26
IN-CWPRS-51683-GO-RFQ
/ Ground water Level
Sensor without Vent and
With Vent tube
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-04-
04
2018-05-
30
2018-11-
26
IN-CWPRS-51707-GO-RFQ
/ S/I/T/C of
Electromagnetic flow
meters(4 Nos. of various
sizes
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-05-
05
2018-06-
30
2018-12-
27
IN-CWPRS-51720-GO-RFQ
/ Procurement of Battery
Operated Fork Lift
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
04
2018-08-
29
2019-02-
25
IN-CWPRS-51848-GO-RFQ
/ Procurement of Personal
Computers (i-5 ) - 12 Nos.
through Government E
Market
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-03-
17
2018-05-
12
2018-11-
08
IN-MAHARASHTRA SW-
33199-GO-RFB / Real Time
Data Acquisition System
(RTDAS) with Civil Work
for Godavari Basin in
Marathwada Region.
IBRD / 87250 PriorRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Under
Review
2018-05-
08
2018-05-
13
2018-06-
24
2018-09-
06
2018-10-
11
2019-04-
09
IN-MAHARASHTRA SW-
33592-GO-RFB / Operation
and Maintenance of Real
Time Data Acquisition
System for Krishna and
Bhima River Basins in
Maharashtra.
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Under
Implement
ation
2018-05-
08
2018-05-
13
2018-06-
24
2018-09-
06
2018-10-
11
2019-04-
09
IN-MAHARASHTRA SW-
33197-GO-RFB / Real Time
Data Acquisition System
(RTDAS) with Civil Work
for Tapi Basin.
IBRD / 87250 PriorRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00 Canceled
2018-05-
08
2018-05-
13
2018-06-
24
2018-09-
06
2018-10-
11
2019-04-
09
IN-UTTARAKHAND-53341-
GO-RFB / Supply of water
Quality testing equipment
for water quality lab at
Roorkee & Haldwani.
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-06-
14
2018-06-
15
2018-06-
16
2018-06-
19
2018-06-
21
2018-06-
22
IN-ANDHRA PRADESH
GW-53564-GO-RFQ /
Procurement of Air
Conditioners for District
Data Centers
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-04-
04
2018-05-
30
2018-11-
26
IN-KERALA SW-53800-
GO-RFQ / Equipments for
PDS study (Image
Processing Study) CCD
Camera - 1 No, RLS with
integrated RLS data logger-
1 No, Procurement of laser
distance measuring
equipment,Echosounder - 1
No
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Under
Implement
ation
2018-03-
18
2018-05-
02
2018-06-
01
IN-KERALA SW-53802-
GO-RFQ / Water Quality
Lab Equipment -
Assessment of Water
Quality status of Thrissur
Corporation (PDS)- Pre
programmed
Spectrophometer- 1No,
Dissolved oxygen meter -
1No
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-03-
19
2018-05-
03
2018-06-
02
IN-HIMACHAL PRADESH-
20223-GO-RFQ / GPS
Handheld (GPS of both
the FY:2016-17 & FY 2017-
18 have been clubbed)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-04-
02
2018-06-
21
2018-07-
30
IN-HIMACHAL PRADESH-
30202-GO-RFB / Supply,
Installation, Testing,
Commissioning and
Maintenance of RTDAS
for selected Automatic
Weather Stations
Automatic Rain Gauges,
AWLR (Radar type above
30m) sites in HP and
integrate with Data
Center (VSAT) located at
Mandi, in Himachal
Pradesh
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Under
Implement
ation
2018-03-
28
2018-03-
28
2018-05-
19
2018-08-
17
2018-09-
24
2019-09-
24
IN-NAGALAND -54278-
GO-RFQ / Purchase of
Computer software and
accessories
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope1,125.92 Signed
2018-03-
15
2018-03-
23
2018-03-
28
IN-PUNJAB -30139-GO-
RFQ / Supply and
Installation of Audio-Video
Instrument at Ground
Floor Conference Hall and
Video Conferencing
Instrument at First Floor
Committee Room.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00 Canceled
2017-12-
05
2018-01-
23
2018-03-
09
IN-HIMACHAL PRADESH-
20391-GO-RFQ / G&D
BOC
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00 Canceled
2017-09-
25
2018-01-
15
2018-07-
14
IN-PUNJAB -33512-GO-
RFQ / procurement of 15
no. of laptops for water
resources bhawan mohali.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
30
2017-12-
23
2018-03-
23
IN-PUNJAB -37524-GO-
RFQ / procurement of A0
scanner for water
resources bhawan mohali
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
26
2017-12-
16
2018-01-
30
IN-HIMACHAL PRADESH-
20217-GO-RFQ / Supply of
AWLR Radar Type above
30 meters (FY:2017-18)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00 Canceled
2017-08-
15
2017-11-
20
2018-05-
19
IN-HIMACHAL PRADESH-
20155-GO-RFQ / Supply of
Auto Current Meters
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-08-
27
2017-12-
30
2018-06-
28
IN-ANDHRA PRADESH
GW-18146-GO-RFQ /
Procurement of Handheld
GPS
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-06-
15
2017-06-
26
2017-07-
24
IN-MEGHALAYA -20421-
GO-DIR / Procurement of
vehicles for SPMU
IBRD / 87250 Post Direct Selection Direct
22,929.35 Completed2018-05-
01
2018-05-
06
2018-06-
10
2018-12-
07
IN-SOI-60735-GO-RFB /
Procurement of 02 nos.
Relative gravimeters for
geoid modeling.
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Under
Implement
ation
2018-04-
25
2018-04-
25
2018-05-
28
2018-06-
27
2018-07-
28
2018-09-
26
IN-SOI-60751-GO-RFB /
Procurement of Absolute
gravimeter (01 no.) for
geoid modeling
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Under
Implement
ation
2018-04-
25
2018-04-
25
2018-05-
28
2018-06-
27
2018-07-
28
2018-09-
26
IN-SOI-21533-GO-RFB /
Gravimeters for Survey of
India
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00 Canceled
2018-01-
12
2018-01-
17
2018-02-
28
2018-03-
30
2018-05-
04
2018-10-
31
IN-MIZORAM -61332-GO-
RFQ / Purchased of 16
No. mini UPS
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-05-
01
2018-05-
01
2018-05-
01
IN-MIZORAM -61352-GO-
RFQ / Purchase of
inspection vehicle- 3 Nos
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-05-
01
2018-05-
01
2018-05-
01
IN-MIZORAM -61338-GO-
RFQ / Supply and
Installation of High Speed
internet facility
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-05-
01
2018-05-
01
2018-05-
01
IN-MIZORAM -61341-GO-
RFQ / Purchase of 7 Nos
Printer by shopping
method
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-05-
01
2018-05-
01
2018-05-
01
IN-MIZORAM -61340-GO-
RFQ / Purchase of 5
Desktop Computers by
Shopping Method using E5
document
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-05-
01
2018-05-
01
2018-05-
01
IN-MIZORAM -61333-GO-
RFQ / Purchase of 1
Copier + Printer +
Scanner
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-05-
01
2018-05-
01
2018-05-
01
IN-MIZORAM -61336-GO-
RFQ / Purchase of 3
laptops by shopping
method using E5 document
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-05-
01
2018-05-
01
2018-05-
01
IN-MIZORAM -61350-GO-
RFQ / Purchase of 3nos
Projector & 2nos Screen
by Shopping Method using
E5 document
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-05-
01
2018-05-
01
2018-05-
01
Page 14
IN-MIZORAM -61349-GO-
RFQ / Purchase of 1no
Still Camera, Lens &
Flash by Shopping Method
using E5 document
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-05-
01
2018-05-
01
2018-05-
01
IN-MIZORAM -61345-GO-
RFQ / Purchase of
Television by Shopping
Method using E5 document
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-05-
01
2018-05-
01
2018-05-
01
IN-MIZORAM -61343-GO-
RFQ / Purchase of Sound
System by Shopping
Method using E5 document
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-05-
01
2018-05-
01
2018-05-
01
IN-MIZORAM -61339-GO-
RFQ / Purchase of I.T
Equipment like 4 Desktop
Computers, 3 nos Laptops,
15 nos Antivirus, 3 nos
Laser printers and 1 no
Printer + Scanner by
Shopping method using E5
document
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-05-
01
2018-05-
01
2018-05-
01
IN-MIZORAM -61351-GO-
RFQ / Purchase of
Intercom by shopping
method using E5 document
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-05-
01
2018-05-
01
2018-05-
01
IN-MIZORAM -61334-GO-
RFQ / Purchase of Office
Furniture by Shopping
Method using E5 document
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-05-
01
2018-05-
01
2018-05-
01
IN-MADHYA PRADESH-
18280-GO-RFQ /
Procurement of IT
equipments work
stations(06),Desktop
computer(14),Printers(14),U
PS(14),Scanners(05)Laptop(0
5),External Hard Disks(03)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
05
2018-10-
31
2019-04-
29
IN-MADHYA PRADESH-
18597-GO-RFQ /
Procurement of Water
Quality Lab Equipment-
Flame Photometer(1No.),UV
Spectrophotmeter(2No.),CO
D Digester(1No.),Hot Air
Oven(1No.) &
Deionizer(3No.)
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-05-
26
2018-07-
21
2019-01-
17
IN-MADHYA PRADESH-
19071-GO-RFQ /
Furnishing Divisional /
Sub Divisional with Non
ITC equipment-SW
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
05
2018-10-
31
2019-04-
29
IN-MADHYA PRADESH-
18239-GO-RFQ /
Procurement of Total
Station(01 No.),Auto
Levels(03 no.)
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-05-
21
2018-07-
16
2019-01-
12
IN-MADHYA PRADESH-
18428-GO-RFQ /
Procurement of Bridge
outfits for flow
measurement
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-06-
20
2018-08-
15
2019-02-
11
IN-MADHYA PRADESH-
18427-GO-RFQ /
Procurement of Digital
Current Meters(30Nos.)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-06-
20
2018-08-
15
2019-02-
11
IN-MADHYA PRADESH-
61566-GO-RFQ / Purchase
of 1 Vehicle for State level
SPMU
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-12-
05
2019-01-
30
2019-07-
29
IN-MADHYA PRADESH-
61567-GO-RFQ /
Digitisation of
Reports/Documents-GW
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-06-
04
2018-07-
30
2019-01-
26
IN-MADHYA PRADESH-
61661-GO-RFQ /
Furnishing State Data
Centre with Non ITC
equipment & procurement
of ACs(4No.)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
05
2018-10-
31
2019-04-
29
IN-MADHYA PRADESH-
61670-GO-RFQ / Softwares
for Data Centre- Antivirus
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
05
2018-09-
30
2019-03-
29
IN-MADHYA PRADESH-
61671-GO-RFB / Canal
SCADA for Major
Reservoir-Samrat Ashok
Sagar
IBRD / 87250 PriorRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-12-
31
2019-01-
05
2019-02-
16
2019-05-
01
2019-06-
05
2019-12-
02
IN-MADHYA PRADESH-
18610-GO-RFQ /
Procurement of Field
Survey Equipments
Theodolite (3No.) and
Diffrential GPS(1 No.)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00 Canceled
2017-08-
04
2017-09-
29
2018-03-
28
IN-NIH ROORKEE-61685-
GO-RFB / TRIPLE
QUADRUPOLE GC-MS
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-05-
31
2018-05-
31
2018-07-
12
2018-09-
24
2018-10-
29
2019-03-
22
IN-MAHARASHTRA SW-
33514-GO-RFB / Real Time
Data Acquisition System
(RTDAS) with Civil Work
for Godavari Basin in
Vidarbha Region.
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00 Canceled
2018-05-
08
2018-05-
13
2018-06-
24
2018-07-
24
2018-08-
28
2019-02-
24
IN-SOI-29487-GO-RFQ /
Procurement of mid level
workstations for PDO
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-10-
11
2017-12-
07
2018-06-
05
IN-SOI-21535-GO-RFB /
Procurement of Survey
Instruments for Geoid
modelling
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Under
Implement
ation
2017-09-
01
2017-09-
06
2017-10-
18
2017-11-
17
2017-12-
22
2018-06-
20
IN-SOI-21608-GO-RFB /
Procurement of Laptops for
PDO
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-09-
05
2017-10-
31
2018-04-
29
IN-SOI-21601-GO-RFB /
Purchase of vehicles for
PDO
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-09-
05
2017-10-
31
2018-04-
29
IN-SOI-22187-GO-RFQ /
Procurement of 01 flat bed
scanner
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-09-
05
2017-10-
31
2018-04-
29
IN-SOI-61763-GO-RFQ /
Procurement of 10 plotters
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-06-
09
2018-08-
04
2019-01-
31
IN-SOI-61764-GO-RFQ /
Procurement of 05 drum
scanners
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-06-
09
2018-08-
04
2019-01-
31
IN-SOI-22160-GO-RFQ /
Printing Consumables
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00 Canceled
2017-09-
06
2017-11-
01
2018-04-
30
IN-SOI-23020-GO-DIR /
Cost of Satellite imagery
for updation of
geodatabase
IBRD / 87250 Post Direct Selection Direct
0.00 Canceled2018-01-
01
2018-01-
11
2018-02-
15
2018-08-
14
IN-SOI-22995-GO-RFQ /
Setting up of Production
facility-Conference room,
electrification, partitioning,
computer table, chairs etc
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00 Canceled
2017-09-
06
2017-11-
01
2018-04-
30
IN-SOI-23002-GO-RFB /
Setting up of Production
facility at multiple
locations- Conference room,
office furniture and other
petty items etc
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00 Canceled
2017-11-
01
2017-11-
06
2017-12-
18
2018-01-
17
2018-02-
21
2018-08-
20
IN-SOI-22165-GO-RFB /
Setting up of Geospatial
Data Production Centres-
all hardwares including
servers, storage,
workstations, firewall, ext
HDD, related s/w, and
Non-IT infrastructures
including electrification,
networking, partioning,DG
sets, UPS etc at multiple
locations
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00 Canceled
2017-11-
01
2017-11-
06
2017-12-
18
2018-01-
17
2018-02-
21
2018-08-
20
IN-SOI-23693-GO-RFQ /
Procurement of scanners,
printers and plotters for
PDO
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-06-
16
2018-08-
11
2019-02-
07
IN-SOI-23006-GO-RFB /
Scanners and Plotters -
three for multiple locations
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00 Canceled
2017-11-
01
2017-11-
06
2017-12-
18
2018-01-
17
2018-02-
21
2018-08-
20
IN-SOI-61868-GO-RFB /
Setting up of Continuously
Operating Reference
System (CORS)
IBRD / 87250 PriorRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Under
Implement
ation
2018-07-
10
2018-07-
15
2018-08-
26
2018-11-
08
2018-12-
13
2019-06-
11
IN-SOI-61869-GO-RFB /
Procurement of PCs,
workstations, laptops and
office software for 1:25k
gdb
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-06-
25
2018-06-
30
2018-08-
11
2018-10-
24
2018-11-
28
2019-05-
27
IN-SOI-61870-GO-RFB /
Establishment of H/W
infrastructure for
Geospatial Data Centre for
1:25k geodatabase
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-07-
02
2018-07-
07
2018-08-
18
2018-10-
31
2018-12-
05
2019-06-
03
IN-SOI-61872-GO-RFB /
Procurement of PCs,
workstations,laptops,
scanners, plotters, firewall,
servers, storage devices
with related software for 3-
5m DEM
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Under
Implement
ation
2018-06-
25
2018-06-
30
2018-08-
11
2018-10-
24
2018-11-
28
2019-05-
27
Page 15
IN-KARNATAKA SW-
57627-GO-RFQ /
Procurement of 32
numbers of Autographic
Rainguages (with charts).
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-04-
09
2018-04-
09
2018-05-
31
IN-KARNATAKA SW-
57628-GO-RFQ /
Procurement of Current
meters.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope12,385.60 Completed
2018-04-
09
2018-04-
09
2018-05-
15
IN-KARNATAKA SW-
57620-GO-RFQ /
Reconstruction of
Rainguage Stations (Civil
Works)
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-04-
09
2018-04-
09
2018-04-
30
IN-CGWB-41317-GO-RFB /
Procurement of Laptop-5
Nos
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope2,956.97 Completed
2018-05-
11
2018-05-
14
2018-05-
14
IN-CGWB-62234-GO-RFQ
/ Procurement of 1 color
photocopier
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-06-
20
2018-08-
15
2018-09-
30
IN-CGWB-39830-GO-RFQ
/ Procurement of IT
equipment-02 printer
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope558.52 Completed
2018-05-
15
2018-05-
19
2018-05-
20
IN-
BIHAR/WRD/FMISC/NHP-
SW/G-NCB-01 / RTDAS for
River Basins and
Dams/Reservoirs including
Civil Work.
(River Basins: Mahananda,
Gandak, Sone, Punpun and
Kiul-Harohar and Eighteen
Dam/Reservoir)
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-07-
31
2018-08-
10
2018-09-
21
2018-12-
04
2019-01-
08
2025-01-
08
IN-
BIHAR/WRD/FMISC/NHP-
SW/G-S-01 / Establishment
Cost and Furnishing of
SPMU
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope4,278.06 Signed
2018-05-
11
2018-08-
08
2018-09-
22
IN-RAJASTHAN -40425-
GO-RFB / RTDAS for
State of Rajasthan
IBRD / 87250 PriorRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Under
Implement
ation
2018-05-
16
2018-05-
21
2018-07-
12
2018-09-
09
2018-10-
14
2019-07-
11
IN-CWPRS-63141-GO-RFQ
/ Procurement of testing
equipment for Water
Level Sensors -3 Nos &
data logger
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
03
2018-08-
28
2019-02-
24
IN-CWPRS-63269-GO-RFQ
/ Procurement of Surfer
Software
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-06-
05
2018-07-
31
2019-01-
27
IN-CWPRS-63278-GO-RFQ
/ Procurement of TerrSet
Software
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-06-
05
2018-07-
31
2019-01-
27
IN-CWPRS-63292-GO-RFQ
/ Procurement of
STATISTICA Software
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-06-
05
2018-07-
31
2019-01-
27
IN-CGWB-62237-GO-RFQ
/ Procurement of 5 laptop
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
11
2018-10-
27
2018-11-
16
IN-CWPRS-63499-GO-RFQ
/ Procurement of OTT C-2-
small current meters with
digital counter and all
necessary accessories
including propeller No.4
etc. complete - 3 Nos.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
05
2018-09-
30
2019-03-
29
IN-CWPRS-63500-GO-RFQ
/ Procurement of L-type
Pitot Tubes with digital
read out for Water-2 Nos.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
05
2018-09-
30
2019-03-
29
IN-DVC-63505-GO-DIR /
Procurement of Cartosat
2.5m steroids pair
GIS/Satellite Imageries
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2018-09-
17
2018-09-
22
2018-10-
27
2019-04-
25
IN-CWPRS-63504-GO-RFQ
/ Procurement of L-type
Pitot Tubes with digital
read out for Air-2 Nos.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
05
2018-09-
30
2019-03-
29
IN-CWPRS-63972-GO-RFQ
/ Procurement of Digital
Multi-meters with Trend
Capture -2 Nos. from
Local Market
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-05-
29
2018-07-
24
2019-01-
20
IN-CWPRS-63973-GO-RFQ
/ Procurement of Colour
Laserjet Multi-function
Printer - 1 No. by calling
limited quotations from
Local Market
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-05-
29
2018-07-
24
2019-01-
20
IN-CWPRS-63974-GO-RFQ
/ Procurement of Peristaltic
Pump - 1 No. by calling
Limited Quotations from
Local Market
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-05-
29
2018-07-
24
2019-01-
20
IN-MAHARASHTRA SW-
64924-GO-RFB / Real Time
Data Acquisition System
(RTDAS) with Civil Work
for Godavari Basin in
Vidarbha Region.
IBRD / 87250 PriorRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Under
Implement
ation
2018-06-
25
2018-06-
30
2018-08-
11
2018-10-
24
2018-11-
28
2019-05-
27
IN-NIH ROORKEE-65126-
GO-RFQ / Laptop (6 nos.)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-06-
16
2018-08-
11
2019-02-
07
IN-MAHARASHTRA SW-
33208-GO-RFB / Real Time
Data Acquisition System
(RTDAS) with Civil Work
for West flowing rivers in
Kokan Basin.
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Under
Implement
ation
2018-09-
01
2018-09-
06
2018-10-
18
2018-12-
31
2019-02-
04
2019-08-
03
IN-HARYANA -33286-GO-
RFB / Purchase of
Laptops, Computers with
Software, Printer with
Scanner and external hard
disk 2 TB
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
17
2018-02-
11
2018-08-
10
NHP-2018-2019-MOWR-
213650-GO-DC-DC /
Procurement of Image
Processing software
(ERDAS) for India WRIS
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2018-06-
05
2018-06-
10
2018-07-
15
2019-01-
11
NHP-2018-2019-MOWR-
568010-GO-DC-DC /
Procurement of GIS
software (Arc Server 1 &
Desktop 2)
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2018-06-
27
2018-07-
02
2018-08-
06
2019-02-
02
NHP-2018-2019-MOWR-
984029-GO-SH-QU /
Procurement of LED light
for NPMU Office
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-06-
11
2018-08-
06
2019-02-
02
NHP-2018-2019-MOWR-
671657-GO-SH-QU /
Procurement of Server for
the development of e-
SWIS/IndiaWRIS/MIS
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-04-
20
2018-06-
15
2018-12-
12
NHP-2018-2019-MOWR-
109303-GO-SH-QU /
Purchase of software for
daily office running like
Antivirus, Office, Windows
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-06-
11
2018-08-
06
2019-02-
02
NHP-2018-2019-MOWR-
268940-GO-SH-QU /
Procurement of AC for the
NPMU Office
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-05-
20
2018-07-
15
2019-01-
11
IN-SOI-61767-GO-DIR /
Procurement of stereo
satellite imagery for
creation of 3-5m DEM of
gap areas.
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2018-05-
21
2018-05-
26
2018-06-
30
2018-12-
27
IN-SOI-61766-GO-DIR /
Procurement of satellite
imagery for updation of
1:25k geodatabase.
IBRD / 87250 Post Direct Selection Direct - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
10
2018-07-
10
2018-07-
20
2018-07-
25
IN-WEST BENGAL SW-
38540-GO-RFB / Supply
Installation Testing
Commissioning and
Maintenance of Real Time
Data
Acquisition System
(RTDAS) with telemetry of
Irrigation and Waterways
Department West Bengal
Under National Hydrology
Project And Integrate with
Data Center located at
Kolkata
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Under
Implement
ation
2018-07-
25
2018-07-
25
2018-08-
27
2018-09-
17
2018-10-
08
2019-10-
08
IN-WEST BENGAL SW-
38555-GO-RFB / Supply,
installation, testing,
commissioning, training
and maintenance of
Automatic Operation of
Durgapur Barrage along
with collection, storage and
dissemination of data
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-09-
04
2018-09-
09
2018-10-
12
2018-10-
30
2018-11-
27
2019-11-
27
IN-PUNJAB -68853-GO-
RFQ / Procurement of 2
no. Vento (Volkswagen)
(TLP metallic) for Water
Resources Organisation ,
Punjab, SAS Nagar
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
15
2018-07-
17
2018-09-
05
IN-ANDHRA PRADESH
SW-21943-GO-RFQ /
Procurement of Total
Stations
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
15
2018-09-
09
2019-03-
08
Page 16
NHP-2018-2019-APSW-
785008 / Water Quality
Lab Equipment
Procurement
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Under
Implement
ation
2018-07-
16
2018-07-
21
2018-09-
01
2018-10-
01
2018-11-
05
2019-05-
04
NHP-2018-2019-APSW-
558278 / Procurement of
ADCP Equipment
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
28
2018-09-
02
2018-10-
14
2018-11-
13
2018-12-
18
2019-06-
16
NHP-2018-2019-APSW-
986420 / Procurement of
Auto CAD
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
08
2018-11-
03
2019-05-
02
NHP-2018-2019-TR-115304-
GO-SH-DE / Procurement
of Total station and
handheld GPS
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
05
2018-09-
30
2019-03-
29
NHP-2018-2019-TR-184071-
GO-SH-QU / Procurement
of office Furnitures and
equipments
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
25
2018-09-
19
2019-03-
18
NHP-2018-2019-TR-537492-
GO-SH-QU / procurement
of AC & Fans
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
25
2018-09-
19
2019-03-
18
NHP-2018-2019-TR-588114-
GO-SH-QU / Procurement
of Diesel Generator
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
25
2018-09-
19
2019-03-
18
NHP-2018-2019-TR-284354-
GO-SH-QU / Procurement
of IT equipments
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
25
2018-09-
19
2019-03-
18
NHP-2018-2019-WBSW-
351943-GO-SH-QU /
Procurement of Laptops
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Under
Implement
ation
2018-07-
20
2018-08-
24
2018-09-
24
NHP-2018-2019-WBSW-
998845-GO-DC-DC /
Procurement of PLAXIS-3D
Software
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2018-07-
25
2018-07-
25
2018-08-
13
2018-09-
12
NHP-2018-2019-WBSW-
354063-GO-DC-DC /
Procurement of HYPACK
Software
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2018-07-
25
2018-07-
25
2018-08-
13
2018-09-
12
NHP-2018-2019-WBSW-
317529-GO-DC-DC /
Procurement of Geo-Slope
and Geo-Studio software
IBRD / 87250 Post Direct Selection Direct
0.00
Under
Implement
ation
2018-07-
25
2018-07-
25
2018-08-
13
2018-09-
12
NHP-2018-2019-WBSW-
816546-GO-SH-QU /
Procurement of Hardware
for State-WRIS
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-12-
05
2019-01-
12
2019-03-
13
NHP-2018-2019-WBSW-
714477-GO-SH-QU /
Procurement of Non ITC
equipment for Data Center
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-12-
06
2019-01-
14
2019-02-
13
NHP-2018-2019-APGW-
371695 / Procurement of
Air Conditioners and
Furniture for 17 data
centers
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
14
2018-09-
08
2019-03-
07
NHP-2018-2019-APGW-
195430 / Procurement of
IT Hardware
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-07-
23
2018-07-
28
2018-09-
08
2018-11-
21
2018-12-
26
2019-06-
24
NHP-2018-2019-APGW-
547481 / Procurement of
Water Quality Equipment
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
11
2018-10-
06
2019-04-
04
NHP-2018-2019-GA-216692-
GO-NCB-DE / RT-DAS
Goa
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-09-
07
2018-09-
12
2018-10-
24
2019-01-
06
2019-02-
10
2019-08-
09
NHP-2018-2019-GA-131350-
GO-SH-SCB /
Computers,Printers with
Scanner, Network-Attached-
Storage
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
27
2018-10-
22
2019-04-
20
NHP-2018-2019-GA-716919-
GO-NCB-SE /
Computers,Laptop,Printers
with Scanner
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2019-02-
16
2019-04-
13
2019-10-
10
NHP-2018-2019-GA-698560-
GO-SH-QU / Water
Quality Equipment for
Labs
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2019-02-
23
2019-04-
20
2019-10-
17
NHP-2018-2019-GA-223965-
GO-SH-QU / Furnishing
Divisional / sub-divisional
Centre & SPMU
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2019-02-
24
2019-04-
21
2019-10-
18
IN-GOA -39865-GO-RFB /
Supply, Installation, testing
and commissioning of Real
Time Data Acquisition
System for Tillari
Irrigation Canal System
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00 Canceled
2018-01-
19
2018-01-
24
2018-03-
07
2018-06-
19
2018-07-
24
2019-03-
21
NHP-2018-2019-ML-265245-
GO-SH-QU / ArcGIS
IBRD / 87250 Post Direct Selection Direct
0.00
Under
Implement
ation
2018-07-
02
2018-07-
07
2018-08-
11
2019-02-
07
NHP-2018-2019-ML-127591-
GO-SH-LM / Procurement
of PCs and printers for
Data Centre
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Under
Implement
ation
2018-08-
11
2018-10-
06
2019-04-
04
NHP-2018-2019-ML-560924-
GO-SH-QU / Procurement
of ground water monitoring
equipments
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
10
2018-12-
05
2019-06-
03
NHP-2018-2019-ML-524253-
GO-SH-LM / Bridge outfit
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-12-
08
2019-02-
02
2019-08-
01
NHP-2018-2019-TSGW-
261629-GO-SH-QU / Basic
field equipment for field
officers
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
28
2018-09-
22
2018-11-
21
NHP-2018-2019-TSGW-
127898 / IT Equipment for
Data Centres -
Communication equipment
(Tabs)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
16
2018-09-
10
2018-11-
09
NHP-2018-2019-TSGW-
619408 / IT Equipment for
Data Centres - computers
& laptops
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
16
2018-09-
10
2018-11-
09
NHP-2018-2019-TSGW-
551441 / IT Equipment for
Data Centres - Printer
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
16
2018-09-
10
2018-11-
09
NHP-2018-2019-TSGW-
983848 / IT Equipment for
Data Centres - UPS
System
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
16
2018-09-
10
2018-11-
09
NHP-2018-2019-TSGW-
664034 / A/Cs 2T for Data
Centres and Water Quality
Labs
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
09
2018-11-
04
2019-01-
03
NHP-2018-2019-TSGW-
965817 / Updation of
existing Water Quality
Labs at Hyderabad &
Karimnagar
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
28
2018-10-
23
2018-12-
22
NHP-2018-2019-TSGW-
167277 / Procurement of
SOI Toposheets
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2018-07-
20
2018-07-
25
2018-08-
29
2019-02-
25
NHP-2018-2019-TSGW-
953596 / To create
resource material (Annual
Reports,pamplets,Brochure,p
osters,audiovisuals,documen
taries etc) on water
conservation &
management awareness
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
27
2018-12-
22
2019-02-
20
NHP-2018-2019-TSGW-
218424 / Procurement of
equipment for Tanks as
Source for regional
Groundwater Recharge
using Managed Aquifer
Storage & Recovery (ASR)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
20
2018-10-
15
2018-12-
14
NHP-2018-2019-TSGW-
553646 / Software for Data
Center - GIS software
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2018-07-
25
2018-07-
30
2018-09-
03
2019-03-
02
NHP-2018-2019-TSGW-
319070 / Software for Data
Center - Other software
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
13
2018-10-
08
2018-12-
07
NHP-2018-2019-JH-923973-
GO-SH-QU / Softwares for
data centre
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2019-01-
08
2019-02-
19
2019-03-
19
NHP-2018-2019-JH-846701-
GO-SH-QU / Printers with
scanners
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-05-
22
2018-07-
10
2018-08-
24
NHP-2018-2019-JH-919411-
GO-SH-QU / Purchase of
Computers,
Laptops,External Hard disk
etc.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
16
2018-10-
03
2018-11-
26
IN-MIZORAM -61335-GO-
DIR / Procurement of Mini
Bus
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2018-07-
13
2018-07-
13
2018-07-
13
2018-07-
13
Page 17
NHP-2018-2019-KASW-
403993-GO-NCB-DE /
RTDAS: Procurement of
TRG & AWS through
eportal
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-08-
06
2018-08-
11
2018-09-
22
2018-12-
05
2019-01-
09
2019-07-
08
NHP-2018-2019-KASW-
963084-GO-NCB-DE /
DWLR for Ground Water
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-07-
23
2018-07-
28
2018-09-
08
2018-11-
21
2018-12-
26
2019-06-
24
NHP-2018-2019-KASW-
154455-GO-SH-QU / IT
equipment for data centre-
Computers: through GEM
portal
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
02
2018-09-
27
2019-03-
26
NHP-2018-2019-KASW-
130432-GO-SH-QU / IT
equipment for data centre-
Copier / photocopier:
through GEM portal
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
03
2018-09-
28
2019-03-
27
NHP-2018-2019-KASW-
535118-GO-SH-QU / IT
equipment for data centre-
Networking / Internet
facilities
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
20
2018-11-
15
2019-05-
14
NHP-2018-2019-KASW-
695345-GO-SH-QU / IT
equipment for data centre-
Plotter: through GEM
portal
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
28
2018-09-
22
2019-03-
21
NHP-2018-2019-KASW-
460794-GO-SH-QU / IT
equipment for data centre-
Scanners: through GEM
portal
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
28
2018-09-
22
2019-03-
21
NHP-2018-2019-KASW-
929749-GO-SH-QU / IT
equipment for data centre-
Server: through GEM
portal
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
28
2018-09-
22
2019-03-
21
NHP-2018-2019-KASW-
355280-GO-SH-QU / IT
equipment for data centre-
Storage and backup
devices: through GEM
portal
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
08
2018-11-
03
2019-05-
02
NHP-2018-2019-KASW-
475013-GO-SH-QU / IT
equipment for data centre-
UPS system: through GEM
portal
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
25
2018-10-
20
2019-04-
18
NHP-2018-2019-KASW-
811349-GO-SH-QU / IT
equipment for data centre-
Video wall/LED display:
through GEM portal
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
15
2018-12-
10
2019-06-
08
NHP-2018-2019-KASW-
509421-GO-SH-QU / IT
equipment for data centre-
WorkStations: through
GEM portal
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
28
2018-09-
22
2019-03-
21
NHP-2018-2019-KASW-
704320-GO-SH-QU / IT
equipment for data centre-
Laptops: through GEM
portal
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
30
2018-09-
24
2019-03-
23
NHP-2018-2019-KASW-
735425-GO-SH-QU / IT
equipment for data centre-
Printer: through GEM
portal
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
14
2018-11-
09
2019-05-
08
NHP-2018-2019-KASW-
599620-GO-SH-QU /
SCADA for barrages &
reserviors:package1
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
25
2018-10-
20
2019-04-
18
NHP-2018-2019-KASW-
365600-GO-NCB-DE /
SCADA for barrages &
reserviors: Package 2:
Malaprabha & Bhadra
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-09-
04
2018-09-
09
2018-10-
21
2019-01-
03
2019-02-
07
2019-08-
06
NHP-2018-2019-KASW-
258058-GO-SH-QU / Bridge
Outfits
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
25
2018-10-
20
2019-04-
18
NHP-2018-2019-KASW-
151156-GO-SH-QU / Lab
equipments for KERS WQ
,divisional WQ labs
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
30
2018-11-
25
2019-05-
24
NHP-2018-2019-KASW-
134605-GO-SH-QU / Lab
equipments for munirabad
WQ, subdisional WQ labs
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
15
2018-12-
10
2019-06-
08
NHP-2018-2019-KASW-
929140-GO-SH-QU /
Furnishing State/basin
informatic centre :Pakage I
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
11
2018-12-
06
2019-06-
04
NHP-2018-2019-KASW-
643814-GO-SH-QU /
Furnishing of data centre
KERS:package 1
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
20
2018-11-
15
2019-05-
14
NHP-2018-2019-KASW-
345314-GO-SH-QU /
Procurement of Current
meters
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Under
Implement
ation
2018-08-
15
2018-10-
10
2019-04-
08
NHP-2018-2019-KASW-
873395-GO-SH-QU /
Procurement of Standard
Rain Gauges
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Under
Implement
ation
2018-08-
25
2018-10-
20
2019-04-
18
NHP-2018-2019-KASW-
106288-GO-SH-QU /
Furnishing
divisional/subdivisional data
centre package1
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
12
2018-11-
07
2019-05-
06
NHP-2018-2019-KASW-
290284-GO-SH-QU /
Furnishing
divisional/subdivisional data
centre package:2
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
03
2018-10-
29
2019-04-
27
NHP-2018-2019-KASW-
648504-GO-SH-QU /
Procurement of Remote
sensing data
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-11-
14
2019-01-
09
2019-07-
08
NHP-2018-2019-CWPRS-
993138-GO-NCB-DE /
Procurement of Underwater
Electrical Resistivity
Imaging System and GPS
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-06-
20
2018-07-
20
2018-08-
31
2018-11-
13
2018-12-
18
2019-02-
16
NHP-2018-2019-CWPRS-
517454-GO-NCB-DE /
Enhancement of Costal
Field Data Collection
Capabilities for sustainable
development of coastal
hydrology-Procuring
Waverider Buoys with
accessories
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-07-
18
2018-08-
18
2018-09-
29
2018-12-
12
2019-01-
16
2019-07-
15
NHP-2018-2019-CWPRS-
989419-GO-SH-QU / Digital
Event Counter
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
27
2018-12-
22
2019-06-
20
NHP-2018-2019-CWPRS-
224212-GO-SH-QU / Small
current meters
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
16
2018-10-
11
2018-12-
10
NHP-2018-2019-CWPRS-
514362-GO-SH-QU / 0.2
HP/ 0.25 HP Pumps
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
07
2018-09-
01
2019-02-
28
NHP-2018-2019-CWPRS-
919911-GO-SH-QU /
Weighing Balance
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
15
2018-11-
10
2019-05-
09
NHP-2018-2019-CWPRS-
533745-GO-SH-QU /
Glasswares
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
01
2018-11-
26
2019-05-
25
NHP-2018-2019-CWPRS-
132720-GO-SH-QU /
STATISTICA Software
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
20
2018-12-
15
2019-06-
13
NHP-2018-2019-CWPRS-
536851-GO-SH-QU /
SURFERv14 Software
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-06-
23
2018-09-
06
2018-11-
05
NHP-2018-2019-CWPRS-
400680-GO-SH-QU /
Terrset (Idrisi)-Image
Processing Software
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
18
2018-09-
06
2018-11-
05
NHP-2018-2019-CWPRS-
654895-GO-SH-QU / Lab
equipments (Ion Selective
Electrodes)- PDS (WQ)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
25
2018-11-
20
2019-05-
19
NHP-2018-2019-CWPRS-
460974-GO-SH-QU / Steel
tape for water level
measuring in the bore hole-
TCCF (GW)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
21
2018-10-
16
2019-04-
14
NHP-2018-2019-CWPRS-
654967-GO-SH-QU / Water
Level Monitoring System-
TCCF (GW)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-11-
24
2019-01-
19
2019-07-
18
NHP-2018-2019-TSGW-
448681 / Resource material
for PDS & DSS
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-11-
17
2019-01-
12
2019-03-
28
Page 18
NHP-2018-2019-CGWB-
931501-GO-NCB-DE /
DWLR Procurement
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-10-
30
2018-11-
04
2018-12-
16
2019-02-
28
2019-04-
04
2019-10-
01
NHP-2018-2019-CGWB-
420194-GO-SH-QU / Centre
of excellence for GW
modelling
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2019-03-
20
2019-05-
15
2019-11-
11
NHP-2018-2019-CGWB-
951078-GO-SH-QU /
Procurement of Laptops
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
21
2018-11-
16
2019-05-
15
NHP-2018-2019-CGWB-
470405-GO-SH-QU /
Procurement of Color
Photocopier
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
05
2018-11-
30
2019-05-
29
NHP-2018-2019-DVC-
247675-GO-SH-QU /
Procurement of 01 no.
Xerox machine
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
20
2018-11-
15
2018-12-
15
NHP-2018-2019-DVC-
218077-GO-NCB-DE /
Procurement of Automated
Pipe Flow Measurement
sensors for drinking /
industrial water supply for
40 nos of consumers with
GSM telemetry
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-07-
15
2018-07-
20
2018-08-
31
2018-11-
13
2018-12-
18
2019-12-
18
NHP-2018-2019-DVC-
370770 / Procurement of
Printer for the data
centre.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
30
2018-10-
25
2018-11-
24
NHP-2018-2019-SK-583221-
GO-SH-QU / Manual
Standard Rain Gauge
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
16
2018-09-
15
2018-12-
14
NHP-2018-2019-SK-883565-
GO-SH-QU / GD
stations(CM AND
ACCESSORIES)
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
16
2018-09-
15
2018-12-
14
NHP-2018-2019-SK-333559-
GO-SH-QU / Furnishing of
divisional and sub
divisional offices
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
16
2018-09-
15
2019-03-
31
NHP-2018-2019-SK-579431-
GO-SH-QU / WQ Field Kit
1
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
16
2018-09-
15
2018-12-
14
NHP-2018-2019-UK-533091
/ Procurement of Handheld
GPS
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-05-
28
2018-07-
23
2019-01-
19
NHP-2018-2019-NIH-
107727-GO-SH-QU / Copier
/ photocopier
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
06
2018-12-
01
2019-05-
30
NHP-2018-2019-NIH-
888075-GO-SH-QU /
Plotter/Printer
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
06
2018-12-
01
2019-05-
30
NHP-2018-2019-NIH-
989202-GO-SH-QU / Server
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
06
2018-12-
01
2019-05-
30
NHP-2018-2019-NIH-
204542-GO-SH-QU /
WorkStations
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
06
2018-12-
01
2019-05-
30
NHP-2018-2019-NIH-
108835-GO-SH-QU / Travel
Stationery and Computer
Consumables , Misc
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
06
2018-08-
31
2019-02-
27
NHP-2018-2019-NIH-
880926-GO-SH-QU /
Radiocarbon Dating Line
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
20
2018-10-
15
2019-04-
13
NHP-2018-2019-NIH-
934679-GO-SH-QU /
Syringe Pump
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
04
2018-10-
30
2019-04-
28
NHP-2018-2019-NIH-
241231-GO-SH-QU / Laptop
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-04-
10
2018-06-
05
2018-12-
02
NHP-2018-2019-NIH-
190238-GO-DC-DC /
GeoChemist Work Bench
Software
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
04
2018-10-
30
2019-04-
28
NHP-2018-2019-NIH-
724684-GO-DC-DC / VMOD
FLEX Software
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2019-01-
04
2019-03-
01
2019-08-
28
NHP-2018-2019-NIH-
731166-GO-SH-QU / Laptop
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
20
2018-09-
14
2019-03-
13
NHP-2018-2019-NIH-
538584-GO-SH-QU /
Camera
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
04
2018-09-
29
2019-03-
28
NHP-2018-2019-NIH-
825174-GO-SH-QU /
Handheld GPS
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
04
2018-09-
29
2019-03-
28
NHP-2018-2019-NIH-
637041-GO-DC-DC / WQ
Software
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2018-08-
30
2018-09-
04
2018-10-
09
2019-04-
07
NHP-2018-2019-NIH-
335053-GO-SH-QU /
Portable pH & EC Meter
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
20
2018-10-
15
2019-04-
13
NHP-2018-2019-NIH-
452255-GO-SH-QU / Laptop
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
20
2018-09-
14
2019-03-
13
NHP-2018-2019-NIH-
197101-GO-SH-QU /
Desktop
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
20
2018-09-
14
2019-03-
13
NHP-2018-2019-NIH-
853608-GO-SH-QU /
Printers
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
20
2018-10-
15
2019-04-
13
NHP-2018-2019-NIH-
371795-GO-SH-QU / Water
Level Meter
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
04
2018-09-
29
2019-03-
28
NHP-2018-2019-NIH-
538573-GO-SH-QU /
Camera
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
20
2018-10-
15
2019-04-
13
NHP-2018-2019-NIH-
803917-GO-DC-DC /
Softwares
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
20
2018-10-
15
2019-04-
13
NHP-2018-2019-NIH-
934561-GO-SH-QU /
Portable pH & EC Meter
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
04
2018-09-
29
2019-03-
28
NHP-2018-2019-NIH-
172815-GO-SH-QU / Digital
Burette
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
04
2018-09-
29
2019-03-
28
NHP-2018-2019-NIH-
518596-GO-SH-QU / Flame
Photometer
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
04
2018-10-
30
2019-04-
28
NHP-2018-2019-NIH-
225835-GO-SH-QU / Cut
Throat Flume / V-Notch
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
20
2018-11-
15
2019-05-
14
NHP-2018-2019-NIH-
335077-GO-SH-QU /
Desktop Workstation,
Laptop Workstation,
Desktop-5nos.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
04
2018-09-
29
2019-03-
28
NHP-2018-2019-NIH-
477025-GO-SH-QU /
Handheld GPS
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
04
2018-09-
29
2019-03-
28
NHP-2018-2019-NIH-
685156-GO-SH-QU /
Camera
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
04
2018-09-
29
2019-03-
28
NHP-2018-2019-NIH-
469053-GO-SH-QU / Mini
Disk Infiltrometer
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
04
2018-09-
29
2019-03-
28
NHP-2018-2019-NIH-
108582-GO-SH-QU /
Portable Soil & Water
Testing Kit
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
20
2018-10-
15
2019-04-
13
NHP-2018-2019-NIH-
716566-GO-ICB-DE / Triple
Quadrupole GC-MS
IBRD / 87250 PostRequest for
Bids
Open -
International
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-07-
30
2018-08-
04
2018-09-
15
2018-11-
28
2019-01-
02
2019-07-
01
NHP-2018-2019-NIH-
170551-CS-SSS-SSS /
Development of Advanced
Courses
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
04
2018-09-
29
2019-03-
28
NHP-2018-2019-WBSW-
877397-GO-DC-DC /
Procurement of ARC-GIS
Software
IBRD / 87250 Post Direct Selection Direct
0.00
Under
Implement
ation
2018-07-
19
2018-07-
25
2018-08-
16
2018-09-
15
NHP-2018-2019-RJ-398027-
GO-NCB-DE / Discharge
measurement equipment
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Under
Implement
ation
2018-07-
01
2018-07-
06
2018-08-
17
2018-10-
30
2018-12-
04
2019-06-
02
NHP-2018-2019-RJ-302457-
GO-SH-QU / Manual SRG
(2018-19)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
15
2018-09-
09
2019-03-
08
NHP-2018-2019-RJ-573302-
GO-NCB-DE / SCADA and
gate sensors for other
dams
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Under
Implement
ation
2018-07-
01
2018-07-
06
2018-08-
17
2018-10-
30
2018-12-
04
2019-06-
02
Page 19
NHP-2018-2019-RJ-270099-
GO-SH-QU / LCD screen
for conference /meetin
room and procurement of
video conference
facility(2018-19)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
06
2018-10-
01
2019-03-
30
NHP-2018-2019-RJ-436351-
GO-SH-QU / Software for
data center(2018-19)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
06
2018-10-
01
2019-03-
30
NHP-2018-2019-RJ-759763-
GO-SH-QU /
Software/models
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
15
2018-09-
09
2019-03-
08
NHP-2018-2019-RJ-596058
/ Communication
equipment for data
center(2018-19)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
06
2018-10-
01
2019-03-
30
NHP-2018-2019-RJ-551788
/ Plotter/ printers for data
center (2018-19)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
06
2018-10-
01
2019-03-
30
NHP-2018-2019-RJ-416392
/ Scanner for data center
(2018-19)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
06
2018-10-
01
2019-03-
30
NHP-2018-2019-RJ-293051
/ Servers for data center
(2018-19)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-12-
06
2019-01-
31
2019-07-
30
NHP-2018-2019-RJ-235140
/ Storage and back up
devices for data center
(2018-19)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
06
2018-10-
01
2019-03-
30
NHP-2018-2019-RJ-651934
/ Handheld GPS ( 2018-19)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
06
2018-10-
01
2019-03-
30
NHP-2018-2019-RJ-632856
/ DWLR with telemetry
GSM
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-09-
15
2018-09-
20
2018-11-
01
2019-01-
14
2019-02-
18
2019-08-
17
NHP-2018-2019-RJ-581558
/ Software for data
center(2018-19)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
06
2018-10-
01
2019-03-
30
NHP-2018-2019-RJ-801730
/ Development of
Information brochures(2018-
19)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
21
2018-10-
16
2019-04-
14
NHP-2018-2019-RJ-330361
/ Servers for hosting
website and data
services(2018-19)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
06
2018-11-
01
2019-04-
30
NHP-2018-2019-RJ-294757
/ Internet charges for
hosting(2018-19)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
06
2018-11-
01
2019-04-
30
NHP-2018-2019-RJ-334890
/ Communication system
for data exchange among
agencies
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
06
2018-11-
01
2019-04-
30
NHP-2018-2019-RJ-909517
/ Establishment cost of
SPMU ( Furnishing/
Furniture)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
04
2018-09-
29
2019-03-
28
NHP-2018-2019-RJ-997858
/ Furnishing of center
IMTI kota
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-07-
09
2018-07-
14
2018-08-
25
2018-11-
07
2018-12-
12
2019-06-
10
NHP-2018-2019-RJ-537251
/ Installation of network,
cabling etc & Training
equipment/ LCD projector
and screen
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
06
2018-10-
01
2019-03-
30
NHP-2018-2019-MHGW-
434875-GO-SH-QU / IT
Equipement for data centre
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
06
2018-10-
01
2019-03-
30
NHP-2018-2019-CPCB-
828332 / Water Quality
Kit
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
04
2018-09-
29
2019-03-
28
NHP-2018-2019-CPCB-
530430 / Procurement of
Computers and Laptops
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
20
2018-12-
15
2019-06-
13
NHP-2018-2019-CPCB-
130439 / Procurement of
Photocopier
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
20
2018-12-
15
2019-06-
13
NHP-2018-2019-CPCB-
254999 / Procurement of
Fax Machine
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
20
2018-12-
15
2019-06-
13
NHP-2018-2019-CPCB-
785943 / Procurement of
Scanner
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
20
2018-12-
15
2019-06-
13
NHP-2018-2019-CPCB-
147435 / Procurement of
Printer
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
20
2018-12-
15
2019-06-
13
NHP-2018-2019-CPCB-
587141 / Procurement of
Network/Internet Facility
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
20
2018-12-
15
2019-06-
13
NHP-2018-2019-CPCB-
900370 / Procrement of
Storage and Backup
Devices
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
20
2018-12-
15
2019-06-
13
NHP-2018-2019-ML-390072-
GO-SH-SCB / DGPS and
Handheld GPS
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
11
2018-10-
06
2019-04-
04
NHP-2018-2019-ML-879264-
GO-SH-SCB / Current
meters with accessories
and ORGs
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
11
2018-10-
06
2019-04-
04
NHP-2018-2019-ML-577403-
GO-SH-SCB / Water
Quality Sondes
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
11
2018-10-
06
2019-04-
04
NHP-2018-2019-ML-589832-
GO-NCB-SE / Supply &
Installation of DWLR with
telemetry
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
06
2018-12-
01
2019-05-
30
NHP-2018-2019-DVC-
851940-GO-SH-DE /
Procurement of Survey
instruments.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
03
2018-11-
28
2018-12-
28
NHP-2018-2019-DVC-
668297-GO-SH-DE /
Procurement of Hand Held
current meter.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
11
2018-10-
06
2018-11-
05
NHP-2018-2019-DVC-
381001-GO-DC-DC /
Procurement of GIS
software under NHP
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2018-06-
18
2018-06-
23
2018-07-
28
2018-08-
12
NHP-2018-2019-DVC-
991380-GO-NCB-DE /
Procurement of Discharge
Management Equipment
(ADCP).
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-11-
25
2019-01-
20
2019-07-
19
NHP-2018-2019-DVC-
975293-GO-SH-DE /
Furnishing of Data Centre
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2019-02-
17
2019-04-
14
2020-04-
13
NHP-2018-2019-DVC-
756876 / Procurement of
Laptops and Desktops for
Data Centre at Maithon
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
05
2018-09-
30
2018-10-
30
NHP-2018-2019-APSW-
661926-GO-NCB-SE /
RTDAS Procurement
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Under
Implement
ation
2018-07-
17
2018-07-
20
2018-08-
24
2018-09-
23
2018-10-
28
2019-07-
25
NHP-2018-2019-APSW-
114780 / Purchase of ICT
Equipment
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
05
2018-11-
30
2019-05-
29
NHP-2018-2019-APSW-
551308 / Furnishing
Divisional / Sub Divisional/
Lab offices With Non-ICT
Equipment
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
06
2018-12-
01
2019-05-
30
NHP-2018-2019-APSW-
670483 / Printing
Brouchers
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
06
2018-11-
01
2019-04-
30
NHP-2018-2019-APSW-
970837 / Procurement of
Software
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
08
2018-11-
03
2019-05-
02
NHP-2018-2019-APSW-
514172 / Purchase of ICT
Equipment
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
05
2018-11-
30
2019-05-
29
NHP-2018-2019-APSW-
394165 / Purchase of ICT
Equipment
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
05
2018-11-
30
2019-05-
29
NHP-2018-2019-APSW-
879202 / Purchase of ICT
Equipment
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
05
2018-11-
30
2019-05-
29
NHP-2018-2019-APSW-
584105 / Purchase of ICT
Equipment
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
05
2018-11-
30
2019-05-
29
NHP-2018-2019-APSW-
109151 / Purchase of ICT
Equipment
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
05
2018-11-
30
2019-05-
29
NHP-2018-2019-TSSW-
983793 / Bridge outfits
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
01
2018-11-
26
2019-05-
25
Page 20
NHP-2018-2019-TSSW-
711857 / WQ Field Kit 1
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
23
2018-11-
18
2019-05-
17
NHP-2018-2019-TSSW-
952433 / Current Meter
with accessories
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
29
2018-10-
24
2019-04-
22
NHP-2018-2019-TSSW-
997812 / Furnishing Sub
Divisional Data centres
with Non ITC equipment
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2019-01-
27
2019-03-
24
2019-09-
20
NHP-2018-2019-TSSW-
176935 / Furnishing
Divisional Data centres
with Non ITC equipment
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2019-01-
27
2019-03-
24
2019-09-
20
NHP-2018-2019-TSSW-
922045 / Procurement of
office furniture for Central
Data Center & Regional
Data Center
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-12-
02
2019-01-
27
2019-07-
26
NHP-2018-2019-TSSW-
453471 / Furnishing of
Data center and Region
data center
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-12-
16
2019-02-
10
2019-08-
09
NHP-2018-2019-TSSW-
481604 / DAS for Godavari
and Krishna in TS(only
Sensors and Telemetry
Systems inclusive of
respective civil
construction) including
Data Center requirements
IBRD / 87250 PriorRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-07-
31
2018-08-
05
2018-09-
16
2018-11-
29
2019-01-
03
2019-07-
02
NHP-2018-2019-TSSW-
832499 / Purchase of
Software-Antivirus
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
10
2018-11-
05
2019-05-
04
NHP-2018-2019-TSSW-
431169 / Servers for
Hosting Website and Data
Services
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2019-01-
27
2019-03-
24
2019-09-
20
NHP-2018-2019-UPGW-
185362-GO-SH-QU /
Procurement of Digital
Data Logger mounted on
vehicle (Geophysical
Equipment)
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
16
2018-08-
21
2018-09-
20
2018-10-
10
2018-11-
14
2018-12-
14
NHP-2018-2019-UPGW-
875446-CW-SH-QU /
Development of mobile app
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-06-
20
2018-09-
10
2019-01-
08
NHP-2018-2019-UPGW-
342327-GO-DC-DC /
Software for Data Center
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2018-08-
14
2018-08-
14
2018-10-
13
2018-11-
12
NHP-2018-2019-UPGW-
414496-GO-DC-DC /
Upgradation of existing
Remote Sensing Lab
alongwith procurement of
SOI Toposheets (Hard copy
& digital data) and
sattellite data, Geological
Maps
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2018-07-
25
2018-07-
25
2018-10-
23
2018-12-
22
NHP-2018-2019-JH-861607-
GO-SH-DE / Procurement
of Office Furniture
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
27
2018-10-
15
2018-11-
16
NHP-2018-2019-JH-919830-
GO-NCB-DE / ADCP and
other accessories
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-09-
11
2018-09-
18
2018-10-
23
2018-11-
08
2018-11-
30
2019-01-
15
NHP-2018-2019-JH-684716-
GO-SH-DE / Handheld
current meters with
accessories
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
15
2018-12-
17
2019-01-
31
NHP-2018-2019-JH-928273-
GO-SH-SCB / Purchase of
DGPS and GPS Handheld
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
16
2018-09-
14
2018-10-
15
NHP-2018-2019-JH-595199-
GO-SH-SCB /
Resistivitymeter
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
16
2018-10-
22
2018-12-
06
NHP-2018-2019-HRSW-
989048-GO-NCB-DE /
Procurement of ADCP for
canals
IBRD / 87250 PostRequest for
BidsLimited
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-08-
13
2018-08-
27
2018-09-
12
2018-09-
21
2018-09-
28
2024-09-
24
NHP-2018-2019-HRSW-
446162-GO-NCB-DE /
Installation of RTDAS in
Haryana
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-10-
03
2018-10-
08
2018-11-
19
2019-02-
01
2019-03-
08
2019-09-
04
NHP-2018-2019-HRSW-
604635-GO-SH-QU /
Procurement of AC
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-06-
08
2018-07-
18
2018-08-
01
NHP-2018-2019-HRSW-
345588-GO-NCB-DE /
SCADA for HKB Barrage
including O&M
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-07-
30
2018-08-
27
2018-09-
20
2018-10-
02
2018-10-
08
2024-10-
02
NHP-2018-2019-HRSW-
413810-GO-SH-QU /
Procurement of Work
stations
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
15
2018-11-
10
2019-05-
09
NHP-2018-2019-HRSW-
636444-GO-SH-QU /
Procurement of laptops
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
19
2018-10-
14
2019-04-
12
NHP-2018-2019-HRSW-
977832-GO-SH-QU /
Procurement of computers
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
25
2018-10-
20
2019-04-
18
NHP-2018-2019-HRSW-
859568-GO-SH-QU /
Procurement of printer
with scanner
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
25
2018-10-
20
2019-04-
18
NHP-2018-2019-HRSW-
466265-GO-SH-QU /
Procurement of printer
with scanner
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-05-
09
2018-05-
16
2018-05-
18
NHP-2018-2019-HRSW-
241802-GO-SH-QU /
Procurement of
communication
services(broadband,leaseline,
MPLS,etc)
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
13
2018-12-
08
2019-06-
06
NHP-2018-2019-HRSW-
872563-GO-SH-QU /
Procurement of external
hard disks 2TB
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
25
2018-10-
20
2019-04-
18
NHP-2018-2019-HRSW-
238689-GO-SH-QU /
Procurement of office
furniture
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
25
2018-10-
20
2019-04-
18
NHP-2018-2019-HRSW-
607826-GO-SH-QU /
Training equipment/LCD
projector and screen
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
06
2018-10-
01
2019-03-
30
NHP-2018-2019-HRSW-
424444 / Vehicle mounted
crane for ADCP
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-11-
11
2019-01-
06
2019-07-
05
NHP-2018-2019-GJSW-
308586 / Procurement of
ADCP-3 nos and
Bathymetric Survey of
Ukai Reservoir.
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-10-
01
2018-10-
08
2018-11-
15
2018-12-
07
2018-12-
24
2019-06-
24
NHP-2018-2019-GJSW-
282480 / Procurement of
GPS â€" Hand held Type2-
2 no
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
08
2018-11-
15
2019-01-
15
NHP-2018-2019-GJSW-
869184 / Chemicals,
Glassware and other
consumable items for GERI
lab.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
15
2018-11-
20
2019-02-
20
NHP-2018-2019-GJSW-
996497 / Procurement of
Boat with Outboard
Engine-1 no
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-09-
15
2018-09-
29
2018-10-
31
2018-11-
30
2018-12-
15
2019-06-
15
IN-RAJASTHAN -72381-
GO-RFB / Medium and
deep piezometer
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-09-
15
2018-09-
20
2018-11-
01
2019-01-
14
2019-02-
18
2019-08-
17
NHP-2018-2019-RJ-274571-
GO-NCB-DE / Canal
SCADA
IBRD / 87250 PriorRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-07-
15
2018-07-
20
2018-08-
31
2018-11-
13
2018-12-
18
2019-06-
16
NHP-2018-2019-RJ-854780-
GO-SH-QU / Computer for
data center( 2018-19)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
06
2018-10-
01
2019-03-
30
NHP-2018-2019-RJ-796471
/ Laptops for data
center(2018-19)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
06
2018-10-
01
2019-03-
30
IN-ANDHRA PRADESH
SW-21936-GO-RFQ / ADCP
Carrying Vehicles and
Other inspection Vehicles
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00 Canceled
2017-12-
26
2018-02-
20
2018-08-
19
IN-JHARKHAND -21443-
GO-RFQ / Purchase of
GPS (10 nos)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-10-
11
2017-11-
30
2018-01-
14
NHP-2018-2019-KLGW-
891280 / IT equipments-
desktop computers
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
20
2018-11-
15
2019-05-
14
NHP-2018-2019-KLGW-
341034 / Handheld GPS
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
01
2018-09-
26
2019-03-
25
Page 21
NHP-2018-2019-KLGW-
462066 / IT equipments-
Audio visual
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
04
2018-10-
30
2019-04-
28
NHP-2018-2019-KLGW-
224157 / Lab equipments
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
21
2018-10-
16
2019-04-
14
NHP-2018-2019-KLGW-
992950 / Lab equipments
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
20
2018-09-
14
2019-03-
13
NHP-2018-2019-KLGW-
562650 / Pahlmlets/GW
year books/awareness
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
03
2018-11-
28
2019-05-
27
NHP-2018-2019-KLGW-
912195 / IT equipments-
Communication equipment
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
06
2018-11-
01
2019-04-
30
NHP-2018-2019-KLGW-
679062 / IT equipments-
Photocopier
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
06
2018-11-
01
2019-04-
30
NHP-2018-2019-KLGW-
420492 / IT equipments-
printer/plotter
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
06
2018-11-
01
2019-04-
30
NHP-2018-2019-KLGW-
891308 / IT equipments-
scanner
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
06
2018-11-
01
2019-04-
30
NHP-2018-2019-KLGW-
623599 / IT equipments-
storage and backup device
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
06
2018-11-
01
2019-04-
30
NHP-2018-2019-KLGW-
810820 / IT equipments-
Laptop computers
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
20
2018-11-
15
2019-05-
14
NHP-2018-2019-KLGW-
365669 / IT equipments-
server
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
15
2018-11-
10
2019-05-
09
NHP-2018-2019-KLGW-
339117 / IT equipments-
Workstation computers
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
20
2018-12-
15
2019-06-
13
NHP-2018-2019-KLGW-
805987 / IT equipments-
UPS
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
20
2018-12-
15
2019-06-
13
NHP-2018-2019-KLGW-
485006 / IT equipments-
videoconferencing unit
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
06
2018-11-
01
2019-04-
30
NHP-2018-2019-KLGW-
992750 / Supply and
installation of
DWLR(telemetry) and
Supply and installation of
DWLR(telemetry)with EC
probe
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-10-
01
2018-10-
06
2018-11-
17
2019-01-
30
2019-03-
06
2024-09-
05
NHP-2018-2019-KASW-
678575-GO-DC-DC /
Software Upgradation: ARC-
GIS
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2018-07-
25
2018-07-
30
2018-09-
03
2019-03-
02
NHP-2018-2019-KASW-
768303-GO-SH-QU /
Furnishing State/basin
informatic centre :Package
II
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-11-
10
2019-01-
05
2019-07-
04
NHP-2018-2019-KASW-
538330-GO-SH-QU /
Furnishing of data centre
KERS:package 2
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
20
2018-12-
15
2019-06-
13
NHP-2018-2019-UPGW-
850626-GO-SH-QU /
Procurement of storage
and backup devices
through GeM
(Development/
strensthening of IT
infrastructure at field
division level and at SDC,
RDC @ SDC)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
04
2018-08-
06
2018-09-
05
NHP-2018-2019-UPGW-
568007-GO-SH-QU /
Procurement of Copier /
photocopier through GeM
(Development/ strenthening
of IT infrastructure at
field division level and at
SDC, RDC and SDC)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
13
2018-07-
19
2018-08-
01
NHP-2018-2019-UPGW-
800607-GO-SH-QU /
procurement of Networking
/ Internet facilities
(Development/
strensthening of IT
infrastructure at field
division level and at SDC,
RDC and SDC)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
13
2018-07-
19
2018-09-
17
NHP-2018-2019-UPGW-
140208-GO-SH-QU /
procurement of
Plotter/Printer through
GeM (Development/
strensthening of IT
infrastructure at field
division level and at SDC,
RDC and SDC)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
20
2018-07-
23
2018-09-
21
NHP-2018-2019-UPGW-
226915-GO-SH-QU /
Procurement of Scanners
through GeM
(Development/
strengthening of IT
infrastructure at field
division level and at SDC,
RDC and SDC)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
20
2018-08-
25
2018-10-
24
NHP-2018-2019-UPGW-
981379-GO-SH-QU /
Procurement of UPS
systemr through GeM
(Development/
strensthening of IT
infrastructure at field
division level and at SDC,
RDC and SDC)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
14
2018-09-
13
2018-11-
12
NHP-2018-2019-UPGW-
594966-GO-SH-QU /
Procurement of
workstations through GeM
(Development/
strensthening of IT
infrastructure at field
division level and at SDC,
RDC and SDC)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
21
2018-09-
10
2018-11-
09
NHP-2018-2019-UK-541991
/ Procurement of ADCP
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
18
2018-10-
18
2019-01-
16
NHP-2018-2019-NIH-
503451-GO-NCB-DE / EC
Probes for Salinity
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-04-
01
2018-04-
06
2018-05-
18
2018-07-
31
2018-09-
04
2019-03-
03
NHP-2018-2019-NIH-
236582-GO-NCB-DE / Auto
Titrator Potentiometeric
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-06-
20
2018-06-
25
2018-08-
06
2018-10-
19
2018-11-
23
2019-05-
22
NHP-2018-2019-NIH-
825129-GO-NCB-DE / TOC
Analyzer
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-06-
22
2018-06-
27
2018-08-
08
2018-10-
21
2018-11-
25
2019-05-
24
NHP-2018-2019-NIH-
864594-GO-NCB-DE /
Normal Scintillation
Counter
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-06-
26
2018-07-
01
2018-08-
12
2018-10-
25
2018-11-
29
2019-05-
28
NHP-2018-2019-NIH-
896867-GO-NCB-DE /
Liquid Nitrogen Plant
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-01-
23
2018-01-
28
2018-03-
11
2018-05-
24
2018-06-
28
2018-12-
25
NHP-2018-2019-NIH-
931387-GO-NCB-DE /
CHNS Analyser with
Biomass Converter
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-04-
01
2018-04-
06
2018-05-
18
2018-07-
31
2018-09-
04
2019-03-
03
NHP-2018-2019-NIH-
279015-GO-NCB-DE / Ion
Chromotographm, Water
Purification System
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-09-
01
2018-09-
06
2018-10-
18
2018-12-
31
2019-02-
04
2019-08-
03
NHP-2018-2019-NIH-
437156-GO-NCB-DE /
Microwave digester
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-04-
23
2018-04-
28
2018-06-
09
2018-08-
22
2018-09-
26
2019-03-
25
NHP-2018-2019-NIH-
541114-GO-NCB-DE /
Element Analyser
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-05-
01
2018-05-
06
2018-06-
17
2018-08-
30
2018-10-
04
2019-04-
02
NHP-2018-2019-NIH-
310418-GO-NCB-DE /
Furniture and Furnishings
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
01
2018-10-
06
2018-11-
17
2018-12-
17
2019-01-
21
2019-07-
20
NHP-2018-2019-NIH-
432805-GO-NCB-DE /
Multi-Probe Meter,
Magnetic Stirrer, Digital
Titrator, Weighing Balance,
Deep Lab Freezer
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-07-
15
2018-07-
20
2018-08-
31
2018-11-
13
2018-12-
18
2019-06-
16
NHP-2018-2019-NIH-
604606-GO-NCB-DE / Data
Logger (TLC)
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-08-
15
2018-08-
20
2018-10-
01
2018-12-
14
2019-01-
18
2019-07-
17
NHP-2018-2019-NIH-
119698-GO-NCB-DE /
Automatic WL Recorder &
Conductivity Logger
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-04-
01
2018-04-
06
2018-05-
18
2018-07-
31
2018-09-
04
2019-03-
03
NHP-2018-2019-NIH-
741431-GO-NCB-DE /
Multi-Parameter Ion
Analyser
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-04-
01
2018-04-
06
2018-05-
18
2018-07-
31
2018-09-
04
2019-03-
03
NHP-2018-2019-NIH-
384746-GO-NCB-DE / WQ
Equipments
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-07-
30
2018-08-
04
2018-09-
15
2018-11-
28
2019-01-
02
2019-07-
01
Page 22
NHP-2018-2019-NIH-
908192-GO-NCB-DE / Soil
Monitoring Probes
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-08-
15
2018-08-
20
2018-10-
01
2018-12-
14
2019-01-
18
2019-07-
17
NHP-2018-2019-NIH-
166446-GO-NCB-DE /
Aquameter
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-08-
15
2018-08-
20
2018-10-
01
2018-12-
14
2019-01-
18
2019-07-
17
NHP-2018-2019-NIH-
320919-GO-DC-DC /
Satellite, Meteorological &
Geological Data
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2018-07-
15
2018-07-
20
2018-08-
24
2019-02-
20
NHP-2018-2019-NIH-
371269-GO-NCB-DE /
Handheld GPS
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-08-
30
2018-09-
04
2018-10-
16
2018-12-
29
2019-02-
02
2019-08-
01
NHP-2018-2019-NIH-
161213-GO-DC-DC /
Satellite Data
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2018-07-
15
2018-07-
20
2018-08-
24
2019-02-
20
NHP-2018-2019-NIH-
444196-GO-NCB-DE / Rain
Gauges
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
30
2018-08-
04
2018-09-
15
2018-10-
15
2018-11-
19
2019-05-
18
NHP-2018-2019-NIH-
247027-GO-NCB-DE / UV
Spectrophotometer
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-08-
30
2018-09-
04
2018-10-
16
2018-12-
29
2019-02-
02
2019-08-
01
NHP-2018-2019-NIH-
664627-GO-NCB-DE /
Water Purification System
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-08-
30
2018-09-
04
2018-10-
16
2018-12-
29
2019-02-
02
2019-08-
01
NHP-2018-2019-NIH-
898480-GO-NCB-DE / Soil
Moisture Probe
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-09-
15
2018-09-
20
2018-11-
01
2019-01-
14
2019-02-
18
2019-08-
17
NHP-2018-2019-NIH-
610130-GO-NCB-DE / Air
Pycnometer
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-04-
01
2018-04-
06
2018-05-
18
2018-07-
31
2018-09-
04
2019-03-
03
NHP-2018-2019-NIH-
378613-GO-NCB-DE /
Tension Infiltrometer
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-07-
15
2018-07-
20
2018-08-
31
2018-11-
13
2018-12-
18
2019-06-
16
NHP-2018-2019-NIH-
428585-GO-DC-DC / Visual
MODFLOW
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
20
2018-10-
15
2019-04-
13
NHP-2018-2019-NIH-
522571-GO-DC-DC / Soil
Data
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2018-07-
30
2018-08-
04
2018-09-
08
2019-03-
07
NHP-2018-2019-WBSW-
664351-GO-SH-SCB /
Procurement of 2 nos
Velocity Radars
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
22
2018-10-
17
2019-01-
15
IN-NIH ROORKEE-72911-
GO-RFQ / ArcGIS Software
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
22
2018-11-
17
2019-05-
16
NHP-2018-2019-MHGW-
722642-GO-NCB-DE /
Procurement Of DWLR
Telemetry for existing GW
Monitoring Wells
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
22
2018-11-
17
2019-05-
16
NHP-2018-2019-MHGW-
512749-GO-NCB-DE /
Video Conferencing
Equipment
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
30
2018-10-
05
2018-11-
16
2018-12-
16
2019-01-
20
2019-07-
19
NHP-2018-2019-CWC-
271725 / Purchase of Very
High End workstation
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-02-
03
2018-03-
31
2018-09-
27
NHP-2018-2019-CWC-
899489 / Purchase of High
End Workstation
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-02-
12
2018-04-
09
2018-10-
06
NHP-2018-2019-CWC-
339996 / Purchase of Low
End Workstation
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-02-
10
2018-04-
07
2018-10-
04
NHP-2018-2019-CWC-
505631 / Purchase of Low
End Workstation
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
25
2018-09-
19
2019-03-
18
NHP-2018-2019-CWC-
311885 / Purchase of Low
End Workstation
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
29
2018-09-
23
2019-03-
22
NHP-2018-2019-CWC-
792477 / Purchase of
Audio Visual Equipments
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
05
2018-09-
30
2019-03-
29
NHP-2018-2019-CWC-
257334 / Purchase of
Computers
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-04-
02
2018-05-
28
2018-11-
24
NHP-2018-2019-CWC-
849131 / Purchase of
Laptop
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
06
2018-11-
01
2019-04-
30
NHP-2018-2019-CWC-
950004 / Purchase of
Networking/Internet
Facility
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
10
2018-11-
05
2019-05-
04
NHP-2018-2019-CWC-
758674 / Purchase of
Plotter
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-02-
14
2018-04-
11
2018-10-
08
NHP-2018-2019-CWC-
727479 / Purchase of
Printer (Color)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-04-
02
2018-05-
28
2018-11-
24
NHP-2018-2019-CWC-
284992 / Purchase of
Printer (Color)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
07
2018-10-
02
2019-03-
31
NHP-2018-2019-CWC-
677124 / Purchase of
Scanner (A4 size)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-04-
01
2018-05-
27
2018-11-
23
NHP-2018-2019-CWC-
603110 / Purchase of
Scanner (A3 size)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
10
2018-10-
05
2019-04-
03
NHP-2018-2019-CWC-
707424 / Purchase of UPS
(7.5 KV)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-04-
02
2018-05-
28
2018-11-
24
NHP-2018-2019-CWC-
411639 / Purchase of UPS
(1 KV)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
18
2018-10-
13
2019-04-
11
NHP-2018-2019-CWC-
393223 / Purchase of
Video Conferencing
equipments
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
25
2018-10-
20
2019-04-
18
NHP-2018-2019-CWC-
400691 / Purchase of
Video wall/LED Display
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-04-
02
2018-05-
28
2018-11-
24
NHP-2018-2019-CWC-
373476 / Purchase of
Video wall/LED Display
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-04-
02
2018-05-
28
2018-11-
24
NHP-2018-2019-CWC-
566260 / Purchase of
Photocopier multi-functional
Machine A3 (Color)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-04-
01
2018-05-
27
2018-11-
23
NHP-2018-2019-CWC-
755564 / Purchase of
Photocopier Digital
multifunctional Machine
office Machine (Color)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-04-
01
2018-05-
27
2018-11-
23
NHP-2018-2019-CWC-
944587 / Purchase of
Photocopier Multifunctional
(B&W)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-04-
01
2018-05-
27
2018-11-
23
NHP-2018-2019-CWC-
325815 / Purchase of
photocopier
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-12-
11
2019-02-
05
2019-08-
04
NHP-2018-2019-CWC-
921128 / Purchase of office
Furniture
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-12-
11
2019-02-
05
2019-08-
04
NHP-2018-2019-CWC-
720626 / Purchase of Arc
GIS
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2018-08-
01
2018-08-
06
2018-09-
10
2019-03-
09
NHP-2018-2019-CWC-
393150 / Purchase of
Image processing software
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
06
2018-10-
01
2019-03-
30
NHP-2018-2019-CWC-
119701 / Procurement of
WQ lab equipment and
other accessories
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-09-
10
2018-09-
15
2018-10-
27
2019-01-
09
2019-02-
13
2019-08-
12
NHP-2018-2019-CWC-
315559 / Purchase of
RTDAS ( AWLR, ARG,
AWS & V-SAT)
IBRD / 87250 PriorRequest for
Bids
Open -
International
Single Stage -
Two Envelope0.00
Under
Review
2018-10-
18
2018-10-
23
2018-12-
04
2019-02-
16
2019-03-
23
2019-09-
19
NHP-2018-2019-NRSC-
247471 / Procurement of
workstation for conducting
trainings at NRSC
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-08-
24
2018-08-
29
2018-10-
10
2018-12-
23
2019-01-
27
2019-07-
26
NHP-2018-2019-NRSC-
762502 / Procurement of
High-end Workstations for
the geo-spatial data
analysis under NRSC
studies
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-08-
24
2018-08-
29
2018-10-
10
2018-12-
23
2019-01-
27
2019-07-
26
Page 23
NHP-2018-2019-NRSC-
284215 / Procurement of
NAS Storage for archival
and post-processing geo-
spatial data generated
under NHP
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-09-
14
2018-09-
19
2018-10-
31
2019-01-
13
2019-02-
17
2019-08-
16
NHP-2018-2019-NRSC-
296999 / Desktop
Computers for NHP NRSC
Activities
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
29
2018-10-
24
2019-04-
22
NHP-2018-2019-NRSC-
191994 / Hydrological
Modelling Software
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
19
2018-11-
14
2019-05-
13
NHP-2018-2019-NRSC-
828419 / Instrumentation
for Field Experiments
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-10-
05
2018-10-
10
2018-11-
21
2019-02-
03
2019-03-
10
2019-09-
06
NHP-2018-2019-NRSC-
728302 / Laptops for NHP
NRSC activities
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
29
2018-10-
24
2019-04-
22
NHP-2018-2019-AS-233071
/ SILT SAMPLER
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
03
2018-11-
28
2019-05-
27
NHP-2018-2019-AS-641643
/ SUPPLY
INSTALLATION,
TESTINBG,COMMISSIONI
NG AND MAINTENANCE
OF REAL TIME DATA
ACQUISITION
SYSTEM(RTDAS) OF
ASSAM UNDER
NATIONAL HYDROLOGY
PROJECT(NHP)
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-07-
09
2018-10-
19
2018-10-
19
2018-08-
08
2018-12-
28
2019-03-
12
2019-04-
16
2020-10-
07
NHP-2018-2019-AS-198046
/ CURRENT METER
WITH ACCESSORIES
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
30
2018-11-
25
2019-05-
24
NHP-2018-2019-AS-334606
/ NORMAL CURRENT
METER
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
30
2018-11-
25
2019-05-
24
NHP-2018-2019-AS-217347
/ COMPUTER FOR
DIVISIONAL
DATACENTRE(FOR
UAID,DIBRUGARH;
CAID,MANGALDA;
LAID,BARPETA ROAD;
CID,BADARPUR)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
20
2018-11-
15
2019-05-
14
NHP-2018-2019-AS-120135
/ SILT LABORATORY
EQUIPMENT
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
03
2018-11-
28
2019-05-
27
NHP-2018-2019-AS-538096
/ STANDARD
RAINGAUGE (MANUAL)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-11-
20
2019-01-
15
2019-07-
14
NHP-2018-2019-AS-926083
/ COPIER CUM PRINTER
FOR DIVISIONAL
DATACENTRE(FOR
UAID,DIBRUGARH;
CAID,MANGALDA;
LAID,BARPETA ROAD;
CID,BADARPUR)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
20
2018-11-
15
2019-05-
14
NHP-2018-2019-AS-918689
/ STORAGE AND
BACKUP DEVICE FOR
DIVISIONAL DATA
CENTRE(FOR
UAID,DIBRUGARH;
CAID,MANGALDA;
LAID,BARPETA ROAD;
CID,BADARPUR)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-11-
20
2019-01-
15
2019-07-
14
NHP-2018-2019-AS-188246
/ UPS SYSTEM FOR
DIVISIONAL DATA
CENTRE(FOR
UAID,DIBRUGARH;
CAID,MANGALDA;
LAID,BARPETA ROAD;
CID,BADARPUR)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
20
2018-11-
15
2019-05-
14
NHP-2018-2019-AS-913575
/ PROCUREMENT OF
OFFICE CHAIR (FOR
UAID,DIBRUGARH;
CAID,MANGALDA;
LAID,BARPETA ROAD;
CID,BADARPUR)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
20
2018-11-
15
2019-05-
14
NHP-2018-2019-AS-457892
/ PROCUREMENT OF
OFFICE TABLE FOR
DIVISIONAL DATA
CENTRE(FOR
UAID,DIBRUGARH;
CAID,MANGALDA;
LAID,BARPETA ROAD;
CID,BADARPUR)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
20
2018-11-
15
2019-05-
14
NHP-2018-2019-AS-869160
/ PROCUREMENT OF
OFFICE ALMIRAH FOR
DIVISIONAL DATA
CENTRE(FOR
UAID,DIBRUGARH;
CAID,MANGALDA;
LAID,BARPETA ROAD;
CID,BADARPUR)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
20
2018-11-
15
2019-05-
14
NHP-2018-2019-AS-486608
/ PROCUREMENT OF
OFFICE VISITORS CHAIR
FOR DIVISIONAL DATA
CENTRE (FOR
UAID,DIBRUGARH;
CAID,MANGALDA;
LAID,BARPETA ROAD;
CID,BADARPUR)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
20
2018-11-
15
2019-05-
14
NHP-2018-2019-AS-189173
/ PROCUREMENT OF
COMPUTER FOR STATE
DATA CENTRE
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
20
2018-11-
15
2019-05-
14
NHP-2018-2019-AS-841042
/ PROCUREMENT OF
COPIER/PRINTER FOR
STATE DATA CENTRE
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
20
2018-11-
15
2019-05-
14
NHP-2018-2019-AS-594136
/ PROCUREMENT OF
STORAGE AND BACKUP
DEVICE FOR STATE
DATA CENTRE
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
20
2018-11-
15
2019-05-
14
NHP-2018-2019-KLSW-
233047 / Arc GIS
softwares & related
Extensions,
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2018-08-
23
2018-08-
28
2018-10-
02
2018-11-
01
NHP-2018-2019-KLSW-
530747 / Current Meter
with accessories- Cup Type
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
27
2018-10-
22
2018-11-
21
NHP-2018-2019-KLSW-
634146 / Procurement of
Bridge outfit
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
27
2018-10-
22
2018-11-
21
NHP-2018-2019-KLSW-
428087 / Water Quality
Lab Equipment for Level
II Lab including PDS
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
25
2018-10-
20
2018-12-
19
NHP-2018-2019-KLSW-
650136 / Analytical
Balance Digital and Water
Quality analyser for Level
I Labs.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
22
2018-10-
17
2018-11-
16
NHP-2018-2019-KLSW-
551818 / Procurement of
Automatic Level
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
25
2018-10-
20
2018-11-
19
NHP-2018-2019-KLSW-
860160 / Procurement of
Video Conference Facility
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
27
2018-10-
22
2018-12-
21
NHP-2018-2019-KLSW-
266968 / Procurement of
IT Equipment for data
centres (Lap top computers
-3 Nos and Work station-
7 Nos)
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
28
2018-10-
23
2018-11-
22
NHP-2018-2019-KLSW-
849490 / Furnishing
regional data centre
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
21
2018-10-
16
2018-11-
15
NHP-2018-2019-NL-345762-
GO-SH-QU / Purchase of
Currentmeter
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
21
2018-09-
15
2018-10-
15
NHP-2018-2019-NL-551923
/ purchase of desktop
computer
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Under
Implement
ation
2018-07-
21
2018-09-
01
2018-09-
15
NHP-2018-2019-NL-396302
/ Furnishing of SDC
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2019-01-
20
2019-03-
17
2019-04-
01
IN-HARYANA -33337-GO-
RFB / Purchase of Vehicle
Mounted Crane
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00 Canceled
2018-03-
15
2018-03-
20
2018-05-
01
2018-07-
14
2018-08-
18
2019-02-
14
IN-HARYANA -33281-GO-
RFQ / Procurement of ACs
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00 Canceled
2018-02-
20
2018-02-
25
2018-04-
08
2018-06-
21
2018-07-
26
2019-01-
22
IN-HARYANA -33357-GO-
RFQ / Training equipment
/ LCD projector and screen
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00 Canceled
2018-02-
20
2018-02-
25
2018-04-
08
2018-06-
21
2018-07-
26
2019-01-
22
IN-HARYANA -33274-GO-
RFQ / Purchase of ADCP
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00 Canceled
2017-12-
01
2017-12-
06
2018-01-
17
2018-04-
01
2018-05-
06
2018-11-
02
Page 24
IN-HARYANA -33254-GO-
RFB / Supply and
installation of AWLR and
Digital Rain Gauges(DRG)
with Telemetry including
civil works
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00 Canceled
2017-11-
21
2017-11-
26
2018-01-
07
2018-03-
23
2018-04-
27
2018-10-
24
IN-HARYANA -33355-GO-
RFQ / Work stations
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00 Canceled
2018-03-
05
2018-04-
30
2018-10-
27
IN-HARYANA -33361-GO-
RFB / Servers
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00 Canceled
2017-12-
18
2017-12-
23
2018-02-
03
2018-04-
18
2018-05-
23
2018-11-
19
NHP-2018-2019-GJSW-
640010 / RTDAS System
for AWS, AWLR etc.
IBRD / 87250 PriorRequest for
Bids
Open -
International
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-08-
21
2018-08-
28
2018-10-
15
2018-11-
26
2018-12-
20
2019-12-
20
NHP-2018-2019-GJSW-
450483 / Procurement of
Furniture for
Establishment of Flood
Management Cell
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-11-
22
2019-01-
16
2019-04-
16
NHP-2018-2019-GJSW-
563433 / WQ lab
equipments - Flame
Photometer-1,Ion meter-1,
UV Visible
Spectrophotometer-1,EC-
TDS Analyser-3,PH
Analyser-3,Turbidimeter-
3,Refriger-1,Oven-1
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
20
2018-11-
20
2019-02-
20
IN-HARYANA -33278-GO-
RFB / SCADA system for
Barrages
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00 Canceled
2017-11-
20
2017-11-
25
2018-01-
06
2018-03-
21
2018-04-
25
2018-10-
22
IN-TELENGANA SW-
44737-GO-RFB /
Procurement of ADCP
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00 Canceled
2018-03-
05
2018-03-
10
2018-04-
21
2018-05-
21
2018-06-
25
2018-12-
22
IN-TELENGANA SW-
39972-GO-RFB / Video
Conference facility
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00 Canceled
2018-02-
20
2018-02-
25
2018-04-
08
2018-05-
08
2018-06-
12
2018-12-
09
IN-TELENGANA SW-
39969-GO-RFQ /
Procurement of office
furniture for Central Data
Center & Regional Data
Center
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00 Canceled
2017-12-
23
2018-02-
17
2018-08-
16
IN-TELENGANA SW-
39974-GO-RFB /
Hydrological Instruments
(Sensors & Telemetry
Systems) including DAS
software
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00 Canceled
2017-12-
30
2018-01-
04
2018-02-
15
2018-03-
17
2018-04-
21
2018-10-
18
IN-TELENGANA SW-
39968-GO-RFQ / IT
Equipment with Software -
IT Equipment with
Software,
Computer&Laptops,
Printers, Plotters &
Scanners, Antivirus,
Servers for Hosting
Website
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00 Canceled
2018-01-
01
2018-02-
26
2018-08-
25
IN-TELENGANASW-24378-
GO-RFQ / Current Meters
with accessories
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00 Canceled
2017-10-
15
2017-12-
10
2018-06-
08
IN-TELENGANASW-24379-
GO-RFQ / Boats with
outboard engines
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00 Canceled
2017-12-
13
2018-02-
07
2018-08-
06
IN-TELENGANA SW-
24381-GO-RFQ / Bridge
outfits
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00 Canceled
2018-02-
17
2018-04-
14
2018-10-
11
IN-TELENGANA SW-
24387-GO-RFQ / Water
Quality Field Kit
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00 Canceled
2018-02-
11
2018-04-
08
2018-10-
05
IN-TELENGANA SW-
24389-GO-RFQ / Surveying
Instruments - Differential
GPS
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00 Canceled
2018-02-
21
2018-04-
18
2018-10-
15
IN-TELENGANA SW-
24397-GO-RFQ / Power
supply & Online UPS
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00 Canceled
2017-10-
28
2017-12-
23
2018-06-
21
NHP-2018-2019-TR-670877-
GO-NCB-SE / Acoustic
Dopller Current Profiler
(ADCP)
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-09-
15
2018-09-
20
2018-11-
01
2019-01-
14
2019-02-
18
2019-08-
17
NHP-2018-2019-TR-641570-
GO-DC-DC / Arc GiS
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2018-08-
15
2018-08-
20
2018-09-
24
2019-03-
23
NHP-2018-2019-MZ-884831-
GO-SH-LM / Purchase of
AC
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
24
2018-10-
19
2019-04-
17
NHP-2018-2019-MZ-312776-
GO-SH-LM / Purchase of
Water Cooler
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
24
2018-10-
19
2019-04-
17
NHP-2018-2019-MZ-819537-
GO-SH-LM / Purchase of
Computers
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
24
2018-10-
19
2019-04-
17
NHP-2018-2019-MZ-822378-
GO-SH-LM / Purchase of
Copier/photocopier
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
24
2018-10-
19
2019-04-
17
NHP-2018-2019-MZ-936163-
GO-SH-LM / Purchase of
printers
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
24
2018-10-
19
2019-04-
17
NHP-2018-2019-MZ-976354-
GO-SH-LM / Procurement
of sound system for
Committee Room
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
28
2018-03-
25
2018-09-
21
NHP-2018-2019-MZ-814911-
GO-SH-LM / Procurement
of equipment like wading
suit etc
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-11-
08
2019-01-
03
2019-07-
02
NHP-2018-2019-MZ-155566-
GO-SH-QU / Establishment
of SRG
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-11-
06
2019-01-
01
2019-06-
30
NHP-2018-2019-MZ-152509-
GO-SH-QU / Procurement
of current meters
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
03
2018-11-
27
2019-05-
26
NHP-2018-2019-MZ-387512
/ Procurement of DG set
for Data centre
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
05
2018-11-
30
2019-05-
29
IN-APSW-21435-GO-RFQ /
Purchase of ICT
Equipments, Cloud
Computing & Training
equipments etc - Lumpsum
Provision under shopping
for the FY 2017-18
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-10-
21
2017-12-
16
2018-06-
14
NHP-2018-2019-APSW-
807113 / Procurement of
ARCGIS
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2018-08-
01
2018-08-
06
2018-09-
10
2019-03-
09
NHP-2018-2019-GA-351866-
GO-SH-QU / Levels.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
27
2018-12-
22
2019-06-
20
NHP-2018-2019-GA-806791-
GO-SH-QU / Establishment
of SPMU.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2019-01-
19
2019-03-
16
2019-09-
12
NHP-2018-2019-WBGW-
808028 / RTDAS (AWS &
ARS)_WB(GW)
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-09-
10
2018-09-
15
2018-10-
27
2019-01-
09
2019-02-
13
2019-08-
12
NHP-2018-2019-WBGW-
676348 / Procurement of
Satellite Imagery
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
20
2018-11-
15
2019-05-
14
NHP-2018-2019-WBGW-
931362 / Procurement of
DGPS & Handheld GPS
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
06
2018-11-
01
2019-04-
30
NHP-2018-2019-WBGW-
158474 / Procurement of
Water Quality Equipment
for Labs
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
06
2018-11-
01
2019-04-
30
NHP-2018-2019-WBGW-
803704 / Procurement of
IT Equipment
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
06
2018-11-
01
2019-04-
30
NHP-2018-2019-WBGW-
595296 / Procurement of
Current Meter, Resistivity
Meter and Echo Sounder
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
06
2018-11-
01
2019-04-
30
NHP-2018-2019-WBGW-
638781 / Setting up of
Hydrogeological Laboratory
and Library in GW
Hydrology Training Centre
(GWHTC)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
20
2018-11-
15
2019-05-
14
NHP-2018-2019-WBGW-
892102 / Establishment of
a Physical Server including
sStorage, Racks & UPS in
State GW Informatics
Centre (SGWIC)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
06
2018-11-
01
2019-04-
30
NHP-2018-2019-WBGW-
340435 / Laptop for
PDS_Arsenic (As)
Distribution in
Groundwater & As
Contamination in Food-
Chain
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
06
2018-11-
01
2019-04-
30
Page 25
NHP-2018-2019-WBGW-
855409 / Software for
PDS_Arsenic (As)
Distribution in
Groundwater & As
Contamination in Food-
Chain
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
06
2018-11-
01
2019-04-
30
NHP-2018-2019-WBGW-
537847 / Equipments for
PDS_Arsenic (As)
Distribution in
Groundwater & As
Contamination in Food-
Chain
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
06
2018-11-
01
2019-04-
30
NHP-2018-2019-PY-575878
/ Furnishing of Testing
Lab
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2019-02-
15
2019-04-
12
2019-10-
09
NHP-2018-2019-PY-890871
/ Supply and Installation
of RTDAS
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
15
2018-10-
20
2018-12-
01
2018-12-
31
2019-02-
04
2019-08-
03
IN-KERALA SW-74735-
GO-RFB / Procurement of
ADCP
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
12
2018-09-
17
2018-10-
29
2018-11-
28
2019-01-
02
2019-07-
01
NHP-2018-2019-UPSW-
988325-GO-NCB-DE /
RTDAS for Vindhyanchal
Region for Surface Water
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-09-
27
2018-10-
02
2018-11-
13
2019-01-
26
2019-03-
02
2024-03-
01
NHP-2018-2019-UPSW-
320396-GO-NCB-DE /
RTDAS for Bundelkhand
Region for Surface Water
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-09-
27
2018-10-
02
2018-11-
13
2019-01-
26
2019-03-
02
2024-03-
01
NHP-2018-2019-UPSW-
124234-GO-SH-QU / ADCP
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-10-
20
2018-10-
25
2018-12-
06
2019-02-
18
2019-03-
25
2019-09-
21
NHP-2018-2019-UPSW-
820116-GO-NCB-DE / HIS
for Gandak Canal System
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-12-
20
2018-12-
25
2019-02-
05
2019-04-
20
2019-05-
25
2024-05-
24
NHP-2018-2019-UPSW-
583881 / SCADA Sytem
for Okhla Barrage & Its
Regulators
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Under
Implement
ation
2018-08-
29
2018-09-
03
2018-10-
15
2018-12-
28
2019-02-
01
2024-01-
31
NHP-2018-2019-UPSW-
229665 / Control Room for
Okhla Barrage
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
03
2018-10-
29
2019-04-
27
NHP-2018-2019-PB-442654-
GO-DC-DC / System
Upgrade and VC
Equipmen- 25 no Desktop
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
30
2018-09-
24
2019-03-
23
NHP-2018-2019-PB-539986-
GO-DC-DC / System
Upgrade and VC
Equipment -25 no UPS
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
30
2018-09-
24
2019-03-
23
NHP-2018-2019-PB-191178-
GO-DC-DC / System
Upgrade and VC
Equipment- 25 No Printers
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
30
2018-09-
24
2019-03-
23
NHP-2018-2019-PB-237118-
GO-DC-DC / Procurement
of Office Furniture, Fans
etc- 25 No Fans
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
30
2018-09-
24
2019-03-
23
NHP-2018-2019-PB-527765-
GO-NCB-DE / DWLR with
Telemetry without Water
Quality-505 DWLR with 2
No Server & protective
cage at each site etc
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-09-
04
2018-09-
09
2018-10-
21
2019-01-
03
2019-02-
07
2019-08-
06
NHP-2018-2019-PB-694710-
GO-SH-QU / Water
Quality Probes -
Procurement of 6 no
Probes
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
30
2018-12-
25
2019-06-
23
NHP-2018-2019-PB-924275-
GO-NCB-DE / RTDS for
Surface Water- AWS 05
No, AWLR 16 No, Server
2 No
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-10-
08
2018-10-
13
2018-11-
24
2019-02-
06
2019-03-
13
2019-09-
09
NHP-2018-2019-PB-301167-
GO-NCB-SE / Procurement
of ADCP-3 number ADCP
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2019-03-
29
2019-04-
03
2019-05-
15
2019-07-
28
2019-09-
01
2020-02-
28
NHP-2018-2019-PB-365966-
GO-NCB-DE / Laboratory
equipments for 2 Labs-
Gas Chromatograph, Ion
Chromatograph, Deioniser,
Nephlometer, COD digester
Etc
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-11-
16
2018-11-
21
2019-01-
02
2019-03-
17
2019-04-
21
2019-10-
18
NHP-2018-2019-PB-648725-
GO-NCB-DE / Real Time
Discharge Measurement of
Sirhind Canal System for
Irrigation Monitoring and
Management
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2019-01-
31
2019-02-
05
2019-03-
19
2019-06-
01
2019-07-
06
2020-01-
02
NHP-2018-2019-NRSC-
787622 / High-end
Computer Server for NRSC-
NHP data
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
10
2018-09-
15
2018-10-
27
2018-11-
26
2018-12-
31
2019-06-
29
NHP-2018-2019-UK-707948
/ RTDAS for Uttarakhand
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Under
Implement
ation
2018-08-
07
2018-08-
12
2018-08-
24
2018-10-
08
2018-10-
22
2019-04-
20
NHP-2018-2019-GJGW-
209177 / Procurement of
Resistivity Meter - 5 Nos.
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
29
2018-11-
16
2019-01-
15
NHP-2018-2019-GJGW-
642126 / Procurement of
Water Quality Equipments
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
29
2018-10-
30
2018-12-
14
NHP-2018-2019-GJGW-
560697 / Procurement of
Workstation - 4Nos
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
19
2018-10-
06
2018-10-
27
NHP-2018-2019-GJGW-
681508 / Procurement of
Internet Dongle-5 Nos
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
24
2018-10-
22
2018-10-
29
NHP-2018-2019-GJGW-
109366 / Procurement of
Server-1 Nos
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-12-
21
2019-01-
04
2019-02-
04
NHP-2018-2019-GJGW-
728379 / Procurement of
Desktop computer (14
Nos),Laptop (4 Nos),B& W
Printers(7 Nos),Colour
Printer (1 No)
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
08
2018-10-
22
2018-11-
12
NHP-2018-2019-GJGW-
640834 / Procurement of
Multi-functional B & W
Photocopier (2 Nos), Multi-
functional Color
Photocopier (1 No)
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
20
2018-10-
04
2018-10-
16
NHP-2018-2019-GJGW-
178548 / Procurement of
DWLR with Telemetry -
526 Nos and Improvement
of Existing Piezometer
IBRD / 87250 PostRequest for
BidsLimited
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-09-
12
2018-10-
12
2018-11-
12
2018-12-
11
2019-01-
08
2020-01-
08
NHP-2018-2019-GJGW-
329482 / Upgradation of
Arc-GIS Software - 2 Nos
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2018-11-
27
2018-12-
02
2019-01-
06
2019-02-
05
NHP-2018-2019-MN-
543631 / GPS HAND
HELD
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
15
2018-10-
10
2019-04-
08
NHP-2018-2019-MN-
638974 / ADCP &
accessories
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
10
2018-09-
15
2018-10-
27
2018-11-
26
2018-12-
31
2019-06-
29
NHP-2018-2019-MN-
544531 / MANUAL
RAINGAUGE AND
CURRENT METER WITH
ACCESSORIES
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
03
2018-10-
29
2019-04-
27
NHP-2018-2019-MN-
687315 / PROCESSING
SOFTWARE-ARC GIS
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2018-09-
25
2018-09-
30
2018-11-
04
2019-05-
03
NHP-2018-2019-GJSW-
263510 / Procurement of
Multifunction machine -6
no (Printer/Scanner/Fax).
(through eGEM)
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
05
2018-09-
07
2018-09-
30
NHP-2018-2019-PB-204052-
GO-NCB-DE / System
Upgrade and VC
Equipment-Supply and
Installation of Audio-Video
Instrument & Video
Conferencing Instrument
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-09-
18
2018-09-
23
2018-11-
04
2019-01-
17
2019-02-
21
2019-08-
20
NHP-2018-2019-PB-933393-
GO-NCB-DE / Design,
Supply, Installation,
Testing And
Commissioning Including
Warranty and Maintenance
of 75 Kw Grid Tied Roof
Top Solar PV Plant At
State Data Centre, Water
Resources Bhawan, Sector
68, Mohali
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-09-
05
2018-09-
25
2018-11-
06
2019-01-
19
2019-02-
23
2019-06-
23
NHP-2018-2019-MZ-455852-
GO-SH-SCB / Procurement
of ADCP
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-11-
06
2019-01-
01
2019-06-
30
Page 26
IN-PUNJAB -32222-GO-
RFB / Supply, Fixing and
Placing of Office Furniture
at State Data Centre,
Water Resources Bhawan,
Sector 68, S.A.S. Nagar
(Mohali).
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00 Canceled
2017-10-
18
2017-10-
25
2017-11-
27
2017-12-
26
2018-01-
30
2018-07-
27
IN-PUNJAB -54284-GO-
RFB / Supply &
Installation of Audio
Video Instrument at
Ground Floor Conference
Hall and Video
Conferencing Instrument at
First Floor Committee
Room.
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00 Canceled
2018-03-
19
2018-03-
26
2018-04-
25
2018-06-
01
2018-06-
21
2018-08-
06
IN-CWPRS-76326-GO-RFQ
/ Supply installation,testing
and commissioning of 3
nos electrically operated
butterfly valves for
operation of constant head
tank (CHT)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-12-
15
2019-02-
09
2019-08-
08
IN-CWPRS-76327-GO-RFQ
/ Supply,
installation,testing and
commissioning of 2 nos of
variable frequency drivers
(starters)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-12-
25
2019-02-
19
2019-08-
18
IN-CWPRS-76328-GO-RFQ
/ Data Acquisition system
for flow monitoring and
control
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-12-
25
2019-02-
19
2019-08-
18
IN-MAHARASHTRA SW-
76368-GO-RFB / Real Time
Data Acquisition System
(RTDAS) with Civil Work
for Tapi Basin.
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Under
Implement
ation
2018-08-
31
2018-09-
05
2018-10-
17
2018-12-
30
2019-02-
03
2019-08-
02
NHP-2018-2019-TSSW-
855121 / Procurement of
ADCP
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
01
2018-11-
26
2019-05-
25
NHP-2018-2019-TSSW-
713223 / Boats with
Outboard engines
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2019-02-
19
2019-04-
16
2019-10-
13
NHP-2018-2019-TSSW-
551816 / Procurement of
High resolution Satellite
Products
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2018-09-
25
2018-09-
30
2018-11-
04
2019-05-
03
NHP-2018-2019-TSSW-
914321 / Purchase of GIS
Software
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2018-09-
05
2018-09-
10
2018-10-
15
2019-04-
13
NHP-2018-2019-GJSW-
763326 / Procurement of
RiverWare Licence - 3
Nos.
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2018-09-
07
2018-09-
18
2018-10-
12
2018-11-
11
NHP-2018-2019-MZ-703723-
GO-SH-LM / Purchase
Video Conference
Equipment
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
14
2018-11-
09
2019-05-
08
NHP-2018-2019-MZ-664502
/ Purchase of IT
equipment (scanner, UPS
system , work station and
Internet facility)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
31
2018-10-
26
2019-04-
24
NHP-2018-2019-MN-
500441 / Surveying
Equipment (Total Station)
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Under
Implement
ation
2018-08-
29
2018-10-
24
2019-04-
22
NHP-2018-2019-CWPRS-
173750-GO-SH-DE /
Radiation Sensor Testing
Set up
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2019-01-
20
2019-03-
17
2019-09-
13
NHP-2018-2019-CWPRS-
300655-GO-NCB-DE /
Goods procurement related
to Developing Audio-Video
Recording Studio
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-11-
04
2018-12-
30
2019-06-
28
NHP-2018-2019-CWPRS-
894892-GO-NCB-DE / AWS
along with Rain guage,
Data logger & Telemetry
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
29
2018-11-
24
2019-05-
23
NHP-2018-2019-CWPRS-
314683-GO-SH-SCB /
Remote Access Terminal
with spares & accessories
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
29
2018-11-
24
2019-05-
23
NHP-2018-2019-CWPRS-
189826-GO-SH-DE / L-type
pitot tube for Water and
Air
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
29
2018-11-
24
2019-05-
23
NHP-2018-2019-CWPRS-
317498-GO-SH-DE /
Acoustic Doppler
Velocimeter
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-12-
05
2019-01-
30
2019-07-
29
NHP-2018-2019-CWPRS-
328662-GO-SH-DE / Digital
Water Level Recorder
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-12-
05
2019-01-
30
2019-07-
29
NHP-2018-2019-CWPRS-
537515-GO-SH-DE /
Fuming chamber
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
29
2018-11-
24
2019-05-
23
NHP-2018-2019-CWPRS-
503991-GO-SH-DE /
Fabrication of
Environmental Chamber
with automation and
generator set
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
29
2018-11-
24
2019-05-
23
NHP-2018-2019-CWPRS-
154847-GO-SH-DE / WQ
Monitor with data logger
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
29
2018-11-
24
2019-05-
23
NHP-2018-2019-CWPRS-
270382-GO-SH-DE / Lab
Equipments-1 (WQ)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
29
2018-11-
24
2019-05-
23
NHP-2018-2019-CWPRS-
883730-GO-SH-QU /
Standard Solutions
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
29
2018-11-
24
2019-05-
23
NHP-2018-2019-CWPRS-
337925-GO-SH-DE / Lab
Equipments-2 (WQ)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
29
2018-11-
24
2019-05-
23
NHP-2018-2019-CWPRS-
666082-GO-SH-DE /
Environmental Chamber
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
02
2018-11-
27
2019-05-
26
NHP-2018-2019-CWPRS-
118695-GO-SH-DE /
Electronic Display For
AWS Data
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
29
2018-11-
24
2019-05-
23
NHP-2018-2019-CWPRS-
457360-GO-SH-DE / Wind
Tunnel Equipment
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
16
2018-12-
11
2019-06-
09
NHP-2018-2019-CWPRS-
740428-GO-SH-DE /
Temperature Sensor Test
Equipment
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-11-
14
2019-01-
09
2019-07-
08
NHP-2018-2019-CWPRS-
659610-GO-SH-DE /
Pressure Sensor Calibrator
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
20
2018-12-
15
2019-06-
13
NHP-2018-2019-CWPRS-
296829-GO-SH-DE / Rain
gauge testing set up
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
20
2018-12-
15
2019-06-
13
NHP-2018-2019-CWPRS-
306163-GO-SH-DE /
Portable Raingauge Tester
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2019-01-
20
2019-03-
17
2019-09-
13
NHP-2018-2019-CWPRS-
440389-GO-SH-DE /
Installation of magnetic
flow meter on model canal
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
01
2018-11-
26
2019-05-
25
NHP-2018-2019-CWPRS-
459736-GO-SH-DE /
Portable Two Channel
Clamp on Ultrasonic Flow
Meter
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
10
2018-12-
05
2019-06-
03
NHP-2018-2019-CWPRS-
616099-GO-SH-DE / Supply
Installation Testing and
Commissioning of Variable
speed DC Drives
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
30
2018-12-
25
2019-06-
23
NHP-2018-2019-CWPRS-
847979-GO-SH-DE / Supply
and fixing of Electro-
magnetic flow meters
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
03
2018-11-
28
2019-05-
27
NHP-2018-2019-CWPRS-
300343-GO-SH-QU /
Software for Surge
Analysis
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-11-
25
2019-01-
20
2019-07-
19
NHP-2018-2019-CWPRS-
479481-GO-SH-DE /
Procurement of Battery
Operated Forklift
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
15
2018-12-
10
2019-06-
08
NHP-2018-2019-CWPRS-
563019-GO-SH-QU /
Glasswares and Chemicals
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
03
2018-11-
28
2019-05-
27
IN-CWPRS-79714-GO-RFQ
/ Cross section data-PDS
(WQ)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-11-
24
2019-01-
19
2019-07-
18
IN-CWPRS-79712-GO-RFQ
/ Meteorological data-PDS
(WQ)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-11-
24
2019-01-
19
2019-07-
18
Page 27
IN-CWPRS-79711-GO-RFQ
/ R.S. Imageries-PDS (WQ)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-11-
24
2019-01-
19
2019-07-
18
IN-CWPRS-79709-GO-RFQ
/ Water Quality data-PDS
(WQ)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-11-
24
2019-01-
19
2019-07-
18
NHP-2018-2019-CWPRS-
480258-GO-NCB-SE /
Furniture for family suites,
hostels at CWPRS Guest
house
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
13
2018-12-
08
2019-06-
06
NHP-2018-2019-CWPRS-
524188-GO-SH-DE /
Upgradation of existing
River Surveyor Acoustic
Doppler Current Profiler
(ADCP) M-9 type
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
01
2018-11-
26
2019-05-
25
NHP-2018-2019-CWPRS-
613536-GO-SH-DE /
Procurement of River
Surveyor Acoustic Doppler
Current Profiler (ADCP)
with accessories
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
03
2018-11-
28
2019-05-
27
NHP-2018-2019-CWPRS-
530734-GO-SH-DE /
Procurement of Heavy
Duty generator Set for
Centenary complex building
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
14
2018-12-
09
2019-06-
07
NHP-2018-2019-CWPRS-
223741-GO-SH-DE /
Testing Equipment for
Water Level Sensors-TCCF
(SW)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-11-
04
2018-12-
30
2019-06-
28
NHP-2018-2019-CWPRS-
415267-GO-NCB-DE /
Furniture-Office/ Lab
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
01
2018-11-
26
2019-05-
25
NHP-2018-2019-CWPRS-
562996-GO-SH-DE / Split
Ac (2 Ton)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
01
2018-11-
26
2019-05-
25
NHP-2018-2019-CWPRS-
878193-GO-SH-DE / Split
AC(1.5 Ton)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
20
2018-12-
15
2019-06-
13
NHP-2018-2019-CWPRS-
499111-GO-SH-DE / Split
AC
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
20
2018-12-
15
2019-06-
13
NHP-2018-2019-CWPRS-
832144-GO-SH-DE /
Refrigerator
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
30
2018-11-
25
2019-05-
24
NHP-2018-2019-CWPRS-
104881-GO-SH-DE / A4
MF Printer
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-11-
24
2019-01-
19
2019-07-
18
NHP-2018-2019-CWPRS-
695620-GO-SH-DE / A3
MF Printer
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-12-
08
2019-02-
02
2019-08-
01
NHP-2018-2019-CWPRS-
657595-GO-SH-DE / A3
MF Printer
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-12-
08
2019-02-
02
2019-08-
01
NHP-2018-2019-CWPRS-
788074-GO-SH-DE /
Personal Computers (i-5)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
24
2018-12-
19
2019-06-
17
NHP-2018-2019-CWPRS-
615656-GO-SH-DE /
Personal Computers (i-7)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
27
2018-12-
22
2019-06-
20
NHP-2018-2019-CWPRS-
732748-GO-SH-DE /
Industrial PCs
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-11-
05
2018-12-
31
2019-06-
29
NHP-2018-2019-CWPRS-
647389-GO-SH-DE /
Ground water level sensor
without vent and with
vent- TCCF (GW)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
29
2018-11-
24
2019-05-
23
NHP-2018-2019-CWPRS-
733321-GO-SH-DE /
Electronic water level
Sounder-TCCF (GW)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
29
2018-11-
24
2019-05-
23
NHP-2018-2019-CWPRS-
820540-GO-SH-DE / UPS
(5 KVA)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
29
2018-11-
24
2019-05-
23
NHP-2018-2019-CWPRS-
450929-GO-SH-DE / UPS
(1 KVA)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
29
2018-11-
24
2019-05-
23
NHP-2018-2019-MZ-655826
/ Procurement of Video
Conferencing equipment
(Display Units)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
03
2018-11-
28
2019-05-
27
NHP-2018-2019-MZ-153623
/ Procurement of Video
Conferencing equipment
(chairs & tables)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
03
2018-11-
28
2019-05-
27
NHP-2018-2019-MZ-426075
/ Procurement of DG set
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-11-
05
2018-12-
31
2019-06-
29
NHP-2018-2019-MZ-618659
/ Procurement of DG Set
Housing
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
03
2018-11-
28
2019-05-
27
NON CONSULTING SERVICES
Activity Reference
No. / DescriptionLoan /
Credit No.Component Review Type Method
Market
Approach
Procurement
Process
Prequalificati
on (Y/N)
Actual
Amount
(US$)
Process
Status
Draft Pre-
qualification
Documents
Prequalification
Evaluation Report
Draft Bidding
Document /
Justification
Specific
Procurement Notice
/ Invitation
Bidding Documents
as Issued
Proposal
Submission /
Opening / Minutes
Bid Evaluation
Report and
Recommendation
for Award
Signed ContractContract
Completion
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual
IN-BBMB-18692-NC-DIR /
O&M of RTDSS Developed
under HP-II by M/DHI on
Mike Software
IBRD / 87250 Prior Direct Selection Direct
0.00
Pending
Implement
ation
2017-06-
30
2017-07-
14
2017-08-
17
2018-08-
17
IN-HIMACHAL PRADESH-
20303-NC-RFQ /
Information Product
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-03-
20
2018-05-
15
2018-11-
11
IN-ANDHRA PRADESH
SW-21951-NC-RFQ / AMC
contact for Existing Rain
Gauge Stations
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-11-
05
2017-12-
31
2018-06-
29
IN-ANDHRA PRADESH
SW-21957-NC-RFQ /
Printing & Publications
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-10-
21
2017-12-
16
2018-06-
14
IN-GUJARAT SW-24284-
NC-RFB / Bathymatric
Survey of Ukai Reservoir.
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-08-
15
2017-09-
01
2017-09-
30
2017-10-
05
2017-11-
15
2018-06-
30
IN-MAHARASHTRA SW-
32436-NC-RFQ / Digitize
paper data, documents,
design, drawing and
scanned reports for Tapi
basin.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
06
2018-03-
03
2018-08-
30
IN-MAHARASHTRA SW-
32444-NC-RFQ / Digitize
paper data, documents,
design, drawing & scanned
reports for Godawari basin
of Marathwada region.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
06
2018-03-
03
2018-08-
30
IN-MAHARASHTRA SW-
32448-NC-RFQ / Digitize
paper data, documents,
design drawings and
scanned reports for
Godawari basin of
Vidharbha region.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
06
2018-03-
03
2018-08-
30
IN-MAHARASHTRA SW-
32450-NC-RFQ / Digitize
paper data, documents,
design, drawings and
scanned reports for
Krishna basin.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
06
2018-03-
03
2018-08-
30
IN-MAHARASHTRA SW-
32453-NC-RFQ / Digitize
paper data, documents,
design, drawing and
scanned reports for West
Flowing Rivers of Konkan
region.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
06
2018-03-
03
2018-08-
30
IN-MAHARASHTRA SW-
33477-NC-RFQ / Hiring
charges for vehicles during
implementation of NHP for
Amravati Division.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
09
2018-02-
03
2018-08-
02
IN-MAHARASHTRA SW-
33479-NC-RFQ / Hiring
charges for vehicles during
Implementation of NHP for
Godavari basin of
Marathwada region.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
09
2018-02-
03
2018-08-
02
IN-MAHARASHTRA SW-
33482-NC-RFQ / Hiring
charges for vehicles during
implementation of NHP for
Krishna Basin.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
09
2018-02-
03
2018-08-
02
IN-MAHARASHTRA SW-
33483-NC-RFQ / Hiring
charges for vehicles during
Implementation of NHP for
Godavari basin for
Vidharbha region.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
09
2018-02-
03
2018-08-
02
Page 28
IN-MAHARASHTRA SW-
33485-NC-RFQ / Hiring
charges for vehicles during
Implementation of NHP for
West flowing rivers of
Kokan basin.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
09
2018-02-
03
2018-08-
02
IN-JHARKHAND -36311-
NC-RFQ / Hiring of
vehicles
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2017-12-
24
2018-02-
18
2018-03-
11
IN-DVC-38264-NC-RFQ /
Pre Monsoon Survey of
river cross-section to
prepare Area-Elevation
Chart for calculation of
river discharge and gauge
fixing on River Damodar
and Barakar under NHP.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope2,444.66
Under
Implement
ation
2017-11-
30
2018-01-
25
2018-07-
24
IN-DVC-38266-NC-RFQ /
River cross section survey
from D/S of Konar &
Tenughat Dam upto U/S of
Panchet Dam and from
D/S of Panchet Dam to
Damodar Bridge on river
Damodar.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope12,814.59
Under
Implement
ation
2017-11-
30
2018-01-
25
2018-04-
25
IN-DVC-38267-NC-RFQ /
Hiring of 3 nos Data
Entry Operators
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope10,113.64
Under
Implement
ation
2017-12-
06
2018-01-
31
2019-01-
31
IN-DVC-38272-NC-RFQ /
Operation and maintenance
of Hydrological sites of
DVC under National
Hydrology Project (NHP)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope89,395.03
Under
Implement
ation
2017-11-
30
2018-01-
25
2020-01-
25
IN-SOI-51084-NC-RFB /
Providing Services for
Generation of GIS ready
database for river
basins/deltas covering area
of approximately 803402
sq. kms.
IBRD / 87250 PriorRequest for
Bids
Open -
International
Single Stage -
Two Envelope0.00
Under
Implement
ation
2018-03-
12
2018-04-
06
2018-05-
21
2018-08-
03
2018-09-
07
2020-02-
29
IN-SOI-51103-NC-RFB /
Provision of services for
Acquisition, Processing and
Delivery of DEM and
Digital Ortho-Image
IBRD / 87250 PriorRequest for
Bids
Open -
International
Single Stage -
Two Envelope0.00
Under
Implement
ation
2018-03-
12
2018-04-
11
2018-05-
26
2018-09-
08
2018-10-
13
2019-08-
09
IN-MAHARASHTRA SW-
33464-NC-DIR /
Installation of Internet
lease line and its
recurrent charges for
Divisional data center for
Tapi basin.
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2018-07-
31
2018-08-
05
2018-09-
09
2019-03-
08
IN-MAHARASHTRA SW-
33466-NC-DIR /
Installation of Internet
lease line & its recurrent
charges of Data Center for
Godavari basin in
Marathwada region.
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2018-07-
31
2018-08-
05
2018-09-
09
2019-03-
08
IN-MAHARASHTRA SW-
33470-NC-DIR /
Installation of Internet
lease line and its
recurrent charges for
Divisional data center for
Krishna basin.
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2018-07-
31
2018-08-
05
2018-09-
09
2019-03-
08
IN-MAHARASHTRA SW-
33468-NC-DIR /
Installation of Internet
lease line and its
recurrent charges for
Divisional data center for
Godavari basin in
Vidharbha region.
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2018-07-
31
2018-08-
05
2018-09-
09
2019-03-
08
IN-MAHARASHTRA SW-
33472-NC-DIR /
Installation of Internet
lease line and its
recurrent charges for
Divisional data center for
West flowing rivers in
Kokan basin
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2018-07-
31
2018-08-
05
2018-09-
09
2019-03-
08
IN-MAHARASHTRA SW-
33474-NC-DIR /
Installation of Internet
lease line & its recurrent
charges for Basin
Simulation Division data
center.
IBRD / 87250 Post Direct Selection Direct
0.00
Pending
Implement
ation
2018-07-
31
2018-08-
05
2018-09-
09
2019-03-
08
IN-
BIHAR/WRD/FMISC/NHP-
SW/NC-RFB-01 /
Conducting River Cross-
Section Survey of Chandan
River for Chandan Dam
Break Analysis.
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-12-
31
2019-01-
05
2019-02-
16
2019-05-
01
2019-06-
05
2019-12-
02
IN-CGWB-62250-NC-RFQ
/ Hiring of 2 Nos vehicles
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00 Canceled
2018-05-
11
2018-05-
16
2018-11-
12
IN-WEST BENGAL SW-
38551-NC-RFB / Field
Surveys related with
Benchmark and RL
Surveys
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-11-
03
2018-12-
01
2018-12-
31
IN-WEST BENGAL SW-
38552-NC-RFB /
Bathymetric Survey in
Sundarban Estuaries
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
27
2018-08-
25
2018-09-
24
NHP-2018-2019-APSW-
439382 / Development of
Water Atlas
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2016-10-
06
2016-12-
01
2017-05-
30
NHP-2018-2019-WBSW-
330978-NC-SH-QU /
Geneartion of rating curve
at Jalpaiguri on river
Teesta
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
25
2018-08-
28
2018-10-
27
NHP-2018-2019-WBSW-
747669-NC-SH-QU /
Establishment of State
WRIS and integration with
National WRIS
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
31
2018-10-
15
2019-02-
12
NHP-2018-2019-WBSW-
758134-NC-SH-QU /
Bathymetric Survey in
Sundarban Estuaries
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-11-
01
2018-12-
12
2019-02-
10
NHP-2018-2019-WBSW-
968183-NC-SH-QU /
Bathymetric Survey of
medium reservoirs in
Purulia
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
01
2018-09-
17
2019-01-
15
NHP-2018-2019-APGW-
130792 / Printing of year
book
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
08
2018-11-
03
2019-05-
02
NHP-2018-2019-APGW-
691010 / Digitization of
old reports
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
08
2018-11-
03
2019-05-
02
NHP-2018-2019-GA-798437-
NC-NCB-DE / AMC for 5
yrs for instruments
installed under HP-II
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-09-
10
2018-09-
15
2018-10-
27
2019-01-
09
2019-02-
13
2019-08-
12
NHP-2018-2019-ML-281079-
NC-SH-LM / Geo-
referencing of monitoring
wells
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
10
2018-12-
05
2019-06-
03
NHP-2018-2019-JH-628571-
NC-SH-QU / Time to time
survey of river cross
sections where GDs are
established
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-11-
05
2018-12-
24
2019-02-
07
NHP-2018-2019-JH-522893-
NC-SH-QU / Hiring of
vehicles
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
24
2018-10-
15
2018-11-
16
NHP-2018-2019-JH-772380-
NC-SH-QU / Hiring of
Non-Technical Staff such
as assistants,accountant,
Data Entry Operator,
Program assistant, Multi
Tasking Staff, Field Staff
etc
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
03
2018-11-
26
2018-12-
26
NHP-2018-2019-JH-839564-
NC-SH-QU /
Digitization/Scanning of
reports, documents
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
01
2018-11-
19
2019-02-
18
NHP-2018-2019-JH-119283-
NC-SH-QU / River Cross
section Surveys
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-11-
03
2018-12-
17
2019-01-
30
NHP-2018-2019-JH-307342-
NC-SH-QU / Hiring of
Technical Expert such as
GIS, RS, IT, MIS,
Procurement, Modeller, geo-
physist, chemist, GW
modeller, Laboratory staff
etc
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-12-
23
2019-02-
18
2019-03-
20
NHP-2018-2019-KASW-
314165-CW-SH-QU /
Bathymetric survey of
reserviors
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
13
2018-11-
08
2019-05-
07
NHP-2018-2019-DVC-
578685 / Sedimentation
survey of 4 nos Reservoirs
of DVC which are
Maithon, Panchet, Tilaiya
& Konar.
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Under
Implement
ation
2018-07-
15
2018-07-
20
2018-08-
31
2018-11-
13
2018-12-
18
2019-12-
18
NHP-2018-2019-RJ-566978
/ River cross section
surveys
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-07-
30
2018-08-
04
2018-09-
15
2018-11-
28
2019-01-
02
2019-07-
01
NHP-2018-2019-RJ-474314
/ Data digitization
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-07-
30
2018-08-
04
2018-09-
15
2018-11-
28
2019-01-
02
2019-07-
01
Page 29
IN-DVC-38268-NC-RFQ /
Sedimentation Survey of 4
nos. Reservoirs of DVC
which are at Maithon,
Panchet, Tilaiya & Konar
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00 Canceled
2017-12-
20
2018-02-
14
2019-02-
14
NHP-2018-2019-DVC-
779735-NC-SH-DE / Survey
work related to
development of Inflow
Forecasting system from
D/S of Durgapur Barrage
upto outfall of Damodar
River.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
20
2018-11-
15
2019-03-
15
NHP-2018-2019-DVC-
559899-NC-SH-DE / Hiring
of 3 nos. data entry
operator under NHP
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-11-
20
2019-01-
15
2020-01-
15
NHP-2018-2019-DVC-
266749-NC-SH-DE / Pre
monsoon River cross
section survey work at
different hydrological sites
of DVC on river damodar
and barakar.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
05
2018-09-
30
2018-10-
30
NHP-2018-2019-DVC-
308378-NC-SH-DE /
Establishment of Bench
mark and Gauge staff
near the Radar sites
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
20
2018-11-
15
2019-02-
13
NHP-2018-2019-DVC-
889370-NC-SH-DE / River
cross section survey of
Lower Damodar
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
20
2018-11-
15
2019-03-
15
NHP-2018-2019-DVC-
574266-CS-QCBS-NAT /
Development of Web
application for Damodar
catchment including
reservoirs.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2019-02-
06
2019-03-
28
2019-04-
27
NHP-2018-2019-APSW-
952886 / Digitization of
Reports
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
31
2018-11-
05
2018-12-
17
2019-01-
16
2019-02-
20
2019-08-
19
NHP-2018-2019-APSW-
683760 / Updating Level
Area Capacity Tables
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
30
2018-10-
05
2018-11-
16
2018-12-
16
2019-01-
20
2019-07-
19
NHP-2018-2019-APSW-
920867 / River Cross
Section Surveys Using
ADCP equopment
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
01
2018-10-
06
2018-11-
17
2018-12-
17
2019-01-
21
2019-07-
20
NHP-2018-2019-TSSW-
174819 / Digitization of
Data / Scanning of
Reports, Documents
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-11-
18
2019-01-
13
2019-07-
12
NHP-2018-2019-TSSW-
388008 / Digitization of
Spatial Layers
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-12-
23
2019-02-
17
2019-08-
16
NHP-2018-2019-TSSW-
815693 / Digitization of
Historical data
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-12-
16
2019-02-
10
2019-08-
09
NHP-2018-2019-TSSW-
509658 / Development of
videos and other
information
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2019-02-
27
2019-04-
24
2019-10-
21
NHP-2018-2019-TSSW-
418502 / Production of info
materials and Brochures
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2019-03-
03
2019-04-
28
2019-10-
25
NHP-2018-2019-TSSW-
595505 / Upgrade existing
database to e-SWIS
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2019-02-
23
2019-04-
20
2019-10-
17
NHP-2018-2019-UPGW-
646305-NC-SH-QU /
Development / Procurement
of Spatial Databases
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
06
2018-11-
01
2019-04-
30
NHP-2018-2019-UPGW-
300500-NC-SH-QU /
UPDATION OF WEBSITE
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
06
2018-12-
01
2019-05-
30
NHP-2018-2019-JH-843692-
NC-NCB-DE / RTDAS
system
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
Two Envelope0.00
Pending
Implement
ation
2018-08-
31
2018-09-
06
2018-10-
23
2019-01-
17
2019-02-
26
2019-03-
28
IN-ANDHRA PRADESH
SW-21933-NC-RFQ /
Digitization / Scanning of
Reports, Documents
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-01-
15
2018-03-
12
2018-09-
08
NHP-2018-2019-KLGW-
180325 / Mapping of GW
quality in the industrial
belt of Ernakulam district
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
21
2018-10-
16
2019-04-
14
NHP-2018-2019-KLGW-
423895 / Digitisation of
Data /Reports/Maps etc
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
25
2018-10-
20
2019-06-
17
NHP-2018-2019-KLGW-
542034 / RL survey
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
06
2018-12-
01
2019-05-
30
IN-KARNATAKA SW-
72864-NC-RFQ /
Digitization of spatial
layers(create maps): job
work
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-11-
17
2019-01-
12
2019-07-
11
IN-KARNATAKA SW-
72862-NC-RFQ /
Digitization/scanning of
reports,documents,existing
maps: job work
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-11-
07
2019-01-
02
2019-07-
01
NHP-2018-2019-UPGW-
269603-NC-NCB-SE /
HIRING OF VEHICLES
FOR PROJECT
IBRD / 87250 PostRequest for
BidsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-07-
06
2018-08-
20
2018-09-
19
2018-10-
04
2018-11-
08
2019-11-
08
NHP-2018-2019-WBSW-
971187-NC-SH-QU /
Generation of rating curves
for river Kangsabati and
river Rupnarayan
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
08
2018-09-
07
2019-09-
07
NHP-2018-2019-WBSW-
137049-NC-SH-QU /
Digitization of historical
data, documents and
reports etc.
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-08-
08
2018-09-
26
2019-03-
25
NHP-2018-2019-NRSC-
539558 / Procurement of
High Resolution ALTM
DEM for flood forecasting
and inundation simulations
for Tapi River Basin
IBRD / 87250 Post Force Account Direct
0.00
Pending
Implement
ation
2018-10-
01
2018-10-
01
2018-10-
01
2018-10-
01
NHP-2018-2019-NRSC-
110495 / Procurement of
archived High Resolution
ALTM DEM for flood
forecasting and inundation
simulations for Godavari
River Basin
IBRD / 87250 Post Force Account Direct
0.00
Pending
Implement
ation
2018-09-
14
2018-09-
14
2018-09-
14
2018-09-
14
NHP-2018-2019-NRSC-
599443 / Procurement of
addtional area High
Resolution ALTM DEM for
flood forecasting and
inundation simulations for
Godavari River Basin
IBRD / 87250 Post Force Account Direct
0.00
Pending
Implement
ation
2018-11-
01
2018-11-
01
2018-11-
01
2018-11-
01
IN-TELENGANA SW-
24399-NC-RFQ /
Digitisation of Data
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00 Canceled
2017-12-
17
2018-02-
11
2018-08-
10
IN-TELENGANA SW-
20164-NC-RFQ /
Digitization of Historical
Data
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00 Canceled
2017-09-
17
2017-11-
12
2018-05-
11
NHP-2018-2019-WBGW-
494325 / Web Hosting for
NHP_WB(GW)
IBRD / 87250 PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
06
2018-11-
01
2019-04-
30
IN-KERALA SW-74736-NC-
RFQ / Establishing Bench
Marks in RTDAS sites
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-09-
15
2018-10-
27
2018-11-
26
NHP-2018-2019-MN-
631907-NCS-RQ / Water
quality through outsourcing
IBRD / 87250 PostRequest for
QuotationsLimited
Single Stage -
One Envelope0.00
Pending
Implement
ation
2018-10-
20
2018-12-
15
2019-06-
13
CONSULTING FIRMSActivity Reference
No. / DescriptionLoan /
Credit No.Component Review Type Method
Market
Approach
Contract TypeActual
Amount
(US$)
Process
StatusTerms of Reference
Expression of
Interest Notice
Short List and
Draft Request for
Proposals
Request for
Proposals as
Issued
Opening of
Technical Proposals
/ Minutes
Evaluation of
Technical Proposal
Combined
Evaluation Report
and Draft
Negotiated
Contract
Signed ContractContract
Completion
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual
IN-MOWR RD-GR-9255-
CS-QCBS / Consultancy for
Technical Assistance and
Management Consultants
(TAMC).
IBRD / 87250 Prior
Quality And
Cost-Based
Selection
Open -
International
0.00Under
Implementation2017-03-08
2017-03-
08
2017-03-
08
2017-03-
08
2017-03-
08
2017-04-
12
2017-05-
17
2018-05-
17
IN-HIMACHAL PRADESH-
20293-CS-INDV / SCADA
Automation of Tube-wells
(FY:2017-18)
IBRD / 87250 Post
Consultant
Qualification
Selection
Open - National
0.00Pending
Implementation2017-12-15
2018-01-
05
2018-02-
18
2018-03-
20
2018-04-
24
2018-10-
21
IN-HIMACHAL PRADESH-
20378-CS-INDV / DSS for
Sub River Basin Giri
River, Sal (Chamba) , Gaj
and Banoor Khad
(Kangra)Seer Khad &
Dehra and Developing
Water Storage Capacity of
Seasonal Stream in
Himachal Pradesh
IBRD / 87250 Post
Quality And
Cost-Based
Selection
Open - National
0.00Pending
Implementation2017-12-11
2018-01-
01
2018-02-
14
2018-03-
14
2018-04-
13
2018-05-
18
2018-06-
22
2019-06-
22
Page 30
IN-MEGHALAYA -20423-
CS-CQS / Consultancy
services for design of State
Data Centre
IBRD / 87250 Post
Consultant
Qualification
Selection
Open - National
15,293.96 Completed 2017-07-132017-08-
03
2017-09-
16
2017-10-
16
2017-11-
20
2018-05-
19
IN-ANDHRA PRADESH
SW-22030-CS-QCBS /
Development of IWRM &
Decision support systems
IBRD / 87250 Prior
Quality And
Cost-Based
Selection
Open - National
0.00Pending
Implementation2017-11-30
2017-12-
21
2018-02-
03
2018-03-
03
2018-04-
02
2018-05-
07
2018-06-
11
2019-06-
11
IN-ANDHRA PRADESH
SW-22040-CS-CQS / River
cross section surveys
IBRD / 87250 Post
Consultant
Qualification
Selection
Open - National
0.00Pending
Implementation2017-11-30
2017-12-
21
2018-02-
03
2018-03-
05
2018-04-
09
2018-10-
06
IN-TELENGANA GW-
23248-CS-QCBS /
Consultancy Services for
Study to delineate basin
wise subsurface geometry
in 3D using existing data
and evaluation of aquifer
characteristics in
Telangana region to
develop comprehensive
ground water Atlas
IBRD / 87250 Post
Quality And
Cost-Based
Selection
Open - National
0.00Pending
Implementation2018-01-18
2018-02-
08
2018-03-
24
2018-04-
21
2018-05-
21
2018-06-
25
2018-07-
30
2021-07-
29
IN-ASSAM -24094-CS-CQS
/ Consultancy service for
State Data Centre
(3.5Lakh is approved in
annual work plan for 2016-
17)
IBRD / 87250 Post
Consultant
Qualification
Selection
Open - National
0.00Pending
Implementation2017-08-07
2017-08-
21
2017-09-
11
2017-09-
14
2017-09-
20
2019-03-
14
IN-
BIHAR/WRD/FMISC/NHP-
SW/CS-CQS-01 / Planning,
Designing and
Architectural Layout of
Water Knowledge Center,
Bihar at Patna.
IBRD / 87250 Post
Consultant
Qualification
Selection
Open - National
31,898.73 Signed 2017-11-302017-11-
30
2018-01-
14
2018-02-
13
2018-03-
20
2018-05-
19
IN-MOWR RD-GR-31816-
CS-QCBS / Consultancy
services for hiring
Technical Assistance and
management Consultancy
IBRD / 87250 Prior
Quality And
Cost-Based
Selection
Open -
International
18,521,033.83 Signed 2017-10-122017-10-
12
2017-10-
12
2017-10-
12
2017-10-
12
2017-10-
12
2017-10-
12
2018-10-
12
IN-WEST BENGAL GW-
32653-CS-QCBS / Web
Hosting for NHP_WB(GW)
IBRD / 87250 Post
Quality And
Cost-Based
Selection
Open - National
0.00Pending
Implementation2017-10-26
2017-11-
02
2017-11-
14
2017-11-
21
2017-11-
28
2017-12-
12
2017-12-
18
2018-01-
17
IN-MAHARASHTRA SW-
33228-CS-QCBS / NABL
Accreditation of Existing
Water Quality Labs in
State.
IBRD / 87250 Post
Quality And
Cost-Based
Selection
Open - National
0.00Pending
Implementation2018-01-31
2018-02-
21
2018-04-
06
2018-05-
04
2018-06-
03
2018-07-
08
2018-08-
12
2019-08-
12
IN-MAHARASHTRA SW-
33349-CS-QCBS /
Development of Mobile
Application for RTSF &
ROS of Krishna & Bhima
Basin.
IBRD / 87250 Post
Quality And
Cost-Based
Selection
Open - National
0.00Pending
Implementation2017-12-25
2018-01-
15
2018-02-
28
2018-03-
28
2018-04-
27
2018-06-
01
2018-07-
06
2019-07-
06
IN-MAHARASHTRA SW-
33356-CS-QCBS /
Comprehensive River Basin
Planning for Water
Management of Entire
Godavari Basin in
Marathwada Region with
compatibility to proposed
IWRM study up to
Jayakwadi Dam.
IBRD / 87250 Post
Quality And
Cost-Based
Selection
Open - National
0.00Pending
Implementation2018-02-26
2018-03-
19
2018-05-
02
2018-05-
30
2018-06-
29
2018-08-
03
2018-09-
07
2019-09-
07
IN-MAHARASHTRA SW-
33358-CS-QCBS / River
Basin planning for Water
management for Godavari
Basin in Vidharbha Region
IBRD / 87250 Post
Quality And
Cost-Based
Selection
Open - National
0.00Pending
Implementation2018-02-26
2018-03-
19
2018-05-
02
2018-05-
30
2018-06-
29
2018-08-
03
2018-09-
07
2019-09-
07
IN-MAHARASHTRA SW-
33360-CS-QCBS / River
Basin planning for Water
management for Krishna
Basin.
IBRD / 87250 Post
Quality And
Cost-Based
Selection
Open - National
0.00Pending
Implementation2018-03-31
2018-04-
21
2018-06-
04
2018-07-
02
2018-08-
01
2018-09-
05
2018-10-
10
2019-10-
10
IN-MAHARASHTRA SW-
33488-CS-QCBS / Up
gradation of existing Web
Portal for RTDAS & ROS.
IBRD / 87250 Post
Quality And
Cost-Based
Selection
Open - National
0.00Pending
Implementation2018-01-01
2018-01-
22
2018-03-
07
2018-04-
04
2018-05-
04
2018-06-
08
2018-07-
13
2019-07-
13
IN-SIKKIM -18688-CS-
CQS / Procurement of
Architectural Consultant
vide PID no:84 of PP 2016-
17, is proposed in CQS
method as advised by
NPMU and WB Officials
at Guwahati Workshop on
5-9th June.
IBRD / 87250 Post
Consultant
Qualification
Selection
Open - National
0.00Under
Implementation2017-08-03
2017-09-
08
2017-09-
22
2017-09-
26
2017-10-
12
2018-02-
09
IN-CWC-NHP-12586-CS-
QCBS / To equip MoWR,
RD&GR, CWC, CGWB and
states with rational water-
related assessment and
planning at basin level,
through the development
and application for 3
basins in India (Godavari
Basin, Krishna Basin and
Mahanadi Basin).
IBRD / 87250 Prior
Quality And
Cost-Based
Selection
Open -
International
0.00 Canceled 2017-12-212017-12-
21
2017-12-
21
2018-01-
18
2018-02-
17
2018-03-
24
2018-04-
28
2019-04-
28
IN-CWC-NHP-40711-CS-
QCBS / Cost Estimate of
IWRM Study of Krishna &
Godavari River Basin for
Package-I(Krishna &
Godawari Basin)
IBRD / 87250 Prior
Quality And
Cost-Based
Selection
Open -
International
0.00Under
Implementation2017-12-21
2017-12-
21
2017-12-
22
2018-01-
19
2018-02-
18
2018-03-
25
2018-04-
29
2019-04-
29
IN-CWC-NHP-40721-CS-
QCBS / Cost Estimate of
IWRM Study of Krishna &
Godavari River Basin for
Package-II(Mahanadi Basin)
IBRD / 87250 Prior
Quality And
Cost-Based
Selection
Open -
International
0.00Under
Implementation2017-12-21
2017-12-
21
2017-12-
22
2018-01-
19
2018-02-
18
2018-03-
25
2018-04-
29
2019-04-
29
IN-DVC-38274-CS-QCBS /
Inflow Forecasting system
and Stream flow
measurement for Damodar
Basin upto outfall of
Damodar River
IBRD / 87250 Post
Quality And
Cost-Based
Selection
Open - National
0.00 Canceled 2018-01-152018-02-
05
2018-03-
21
2018-04-
18
2018-05-
18
2018-06-
22
2018-07-
27
2019-07-
27
IN-UTTARAKHAND-53352-
CS-CQS / Consultancy
services for Planning,
Designing and
Architectural layout of
State Water Informatics
Center (SWIC) at Roorkee
under National Hydrology
Project.
IBRD / 87250 Post
Consultant
Qualification
Selection
Open - National
0.00Pending
Implementation2018-06-11
2018-06-
12
2018-06-
14
2018-06-
15
2018-06-
17
2019-04-
10
IN-KERALA SW-59043-CS-
CQS / Hiring of
Consultancy Services for
preparation of bankable
report for Rejuvenation of
Meenachil, Periyar,
Bharathapuzha, Kallayi &
Valapattanam Rivers and
Sasthamkotta, Ashtamudi
& Vembanad Lakes
through cleaning and
removal of wastes
IBRD / 87250 Post
Consultant
Qualification
Selection
Open -
International
0.00Pending
Implementation2018-04-13
2018-05-
04
2018-06-
17
2018-07-
17
2018-08-
21
2019-02-
17
IN-MIZORAM -59384-CS-
CQS / Selection of
Consultant for Design &
Supervision of Southern
Divisional Centre.
IBRD / 87250 Post
Consultant
Qualification
Selection
Open - National
0.00Pending
Implementation2018-04-16
2018-04-
16
2018-04-
16
2018-04-
16
2018-04-
16
2018-10-
13
IN-ANDHRA PRADESH
GW-59608-CS-CQS /
Consultancy services for
Planning, Designing and
Architectural Layout for
construction of State Data
Center for both Surface
Water & Ground Water
and Water Audit
Department under National
Hydrology Project
IBRD / 87250 Post
Consultant
Qualification
Selection
Open - National
0.00Pending
Implementation2018-04-17
2018-05-
08
2018-06-
21
2018-07-
21
2018-08-
25
2019-02-
21
IN-ANDHRA PRADESH
GW-53541-CS-QCBS /
Draft EoI for Consultancy
services for Planning,
Designing and
Architectural Layout for
construction of State Data
Centre for both Surface
Water & Ground Water
and Water Audit
Department under National
Hydrology Project
IBRD / 87250 Post
Quality And
Cost-Based
Selection
Open - National
0.00 Canceled 2018-03-262018-04-
16
2018-05-
30
2018-06-
27
2018-07-
27
2018-08-
31
2018-10-
05
2019-10-
05
IN-SOI-21568-CS-QCBS /
Procurement, Contract
Management and Project
Management Specialists
IBRD / 87250 Post
Quality And
Cost-Based
Selection
Open - National
0.00 Canceled 2017-11-012017-11-
22
2018-01-
05
2018-02-
02
2018-03-
04
2018-04-
08
2018-05-
13
2019-05-
13
IN-SOI-21539-CS-QCBS /
Consultant for setting up
of H/w infrastructure for
geospatial data production
centres
IBRD / 87250 Post
Quality And
Cost-Based
Selection
Open - National
0.00 Canceled 2017-07-242017-07-
24
2017-09-
06
2017-10-
04
2017-11-
03
2017-12-
08
2018-01-
12
2019-01-
12
IN-SOI-23705-CS-QCBS /
MIS assistant at PDO
IBRD / 87250 PostQuality And
Cost-Based
Selection
Open - National
0.00 Canceled 2017-09-012017-09-
22
2017-11-
05
2017-12-
03
2018-01-
02
2018-02-
06
2018-03-
13
2019-03-
13
IN-
BIHAR/WRD/FMISC/NHP-
SW/CS-QCBS-02 /
Development of Sone
Canal Asset Management
System for Irrigation
Management (using Online
Web based Monitoring
system and GIS
Techniques) and as a
Decision Support Tool
IBRD / 87250 Post
Quality And
Cost-Based
Selection
Open - National
0.00Pending
Implementation2018-12-31
2019-01-
21
2019-03-
06
2019-04-
03
2019-05-
03
2019-06-
07
2019-07-
12
2021-01-
12
IN-SOI-23001-CS-QCBS /
Hiring of technical
resources for spatial data
editing and processing and
QA/QC -10m DTM
IBRD / 87250 Post
Quality And
Cost-Based
Selection
Open - National
0.00 Canceled 2017-09-012017-09-
22
2017-11-
05
2017-12-
03
2018-01-
02
2018-02-
06
2018-03-
13
2019-03-
13
IN-
BIHAR/WRD/FMISC/NHP-
SW/CS-QCBS-01 /
Development of
Embankment Asset
Management System for
Gandak River basin with
structuring of a Master
module.
IBRD / 87250 Post
Quality And
Cost-Based
Selection
Open - National
0.00Under
Implementation2018-05-22
2018-06-
12
2018-07-
26
2018-08-
23
2018-09-
22
2018-10-
27
2018-12-
01
2020-03-
01
Page 31
NHP-2018-2019-MOWR-
547786-NC-NCB-DE /
Engagement of Audit firm
for Internal Audit (for 3
Years duration)
IBRD / 87250 PostLeast Cost
SelectionOpen - National
0.00Pending
Implementation2018-07-25
2018-08-
15
2018-09-
28
2018-10-
26
2018-11-
25
2018-12-
30
2019-02-
03
2019-08-
02
NHP-2018-2019-APSW-
320900 / Development of
Website and Mobile app
IBRD / 87250 Post
Consultant
Qualification
Selection
Open - National
0.00Pending
Implementation2018-10-01
2018-10-
22
2018-12-
05
2019-01-
04
2019-02-
08
2019-08-
07
NHP-2018-2019-APGW-
307654 / Design of District
Data Centers at Chittoor
and Eluru
IBRD / 87250 Post
Consultant
Qualification
Selection
Open - National
0.00Pending
Implementation2018-09-03
2018-09-
24
2018-11-
07
2018-12-
07
2019-01-
11
2019-07-
10
NHP-2018-2019-GA-682090-
CS-QCBS-NAT / Study of
river/coastal zone
interaction, erosion
problems due to changing
river flows, etc
IBRD / 87250 Prior
Quality And
Cost-Based
Selection
Open - National
0.00Pending
Implementation2018-12-07
2018-12-
28
2019-02-
10
2019-03-
10
2019-04-
09
2019-05-
14
2019-06-
18
2020-06-
17
NHP-2018-2019-TSGW-
954549 / Development of
website, Village GW
estimation software, data
entry & analysis software,
mobile app design, creation
& automation of central
DB
IBRD / 87250 Post
Quality And
Cost-Based
Selection
Open - National
0.00Pending
Implementation2018-09-10
2018-10-
01
2018-11-
14
2018-12-
12
2019-01-
11
2019-02-
15
2019-03-
22
2020-03-
21
NHP-2018-2019-TSGW-
995210 / Comprehensive
Planing for interiors and
Architecture for DDCs,
SDC and Training cum
Information Centres
IBRD / 87250 Post
Consultant
Qualification
Selection
Open - National
0.00Pending
Implementation2018-07-23
2018-08-
13
2018-09-
26
2018-10-
26
2018-11-
30
2019-01-
14
NHP-2018-2019-JH-309381
/ Consultancy Services for
Designing, Drawing and
Architectural Layout for
Construction of state data
and training center
IBRD / 87250 Post
Consultant
Qualification
Selection
Open - National
0.00Pending
Implementation2018-07-30
2018-08-
06
2018-08-
27
2018-09-
10
2018-10-
08
2018-11-
22
NHP-2018-2019-CWPRS-
555102-CS-FBS-NAT /
Consultancy Services: PDS
for SW GW interaction
IBRD / 87250 PostFixed Budget
SelectionOpen - National
0.00Pending
Implementation2018-08-20
2018-09-
10
2018-10-
24
2018-11-
21
2018-12-
21
2019-01-
25
2019-03-
01
2020-02-
29
NHP-2018-2019-CWPRS-
710523-CS-QCBS-INT /
Consultancy-Setting up
TCCF for Hydro-met-WQ
instruments
IBRD / 87250 Post
Quality And
Cost-Based
Selection
Open -
International
0.00Pending
Implementation2019-01-03
2019-01-
24
2019-03-
09
2019-04-
06
2019-05-
06
2019-06-
10
2019-07-
15
2020-07-
14
NHP-2018-2019-SK-962040-
CS-LCS-NAT / Consultancy
services for developing
Website
IBRD / 87250 PostLeast Cost
SelectionOpen - National
0.00Pending
Implementation2018-10-24
2018-10-
26
2018-11-
12
2018-11-
27
2018-11-
29
2018-12-
03
2018-12-
24
2019-03-
24
NHP-2018-2019-RJ-601794-
CS-QCBS-NAT /
Development of mobile
application
IBRD / 87250 Post
Consultant
Qualification
Selection
Open - National
0.00Pending
Implementation2018-07-30
2018-08-
20
2018-10-
03
2018-11-
02
2018-12-
07
2019-06-
05
NHP-2018-2019-RJ-796152-
CS-QCBS-NAT / Create on
line e-library
IBRD / 87250 Post
Consultant
Qualification
Selection
Open - National
0.00Pending
Implementation2018-08-01
2018-08-
22
2018-10-
05
2018-11-
04
2018-12-
09
2019-06-
07
NHP-2018-2019-RJ-444765-
CS-QCBS-NAT / River
basin management
IBRD / 87250 Prior
Quality And
Cost-Based
Selection
Open - National
0.00Pending
Implementation2018-07-30
2018-08-
20
2018-10-
03
2018-10-
31
2018-11-
30
2019-01-
04
2019-02-
08
2020-02-
08
NHP-2018-2019-RJ-316692
/ Consultancy services for
developing website
IBRD / 87250 Post
Consultant
Qualification
Selection
Open - National
0.00Pending
Implementation2018-09-01
2018-09-
22
2018-11-
05
2018-12-
05
2019-01-
09
2019-07-
08
NHP-2018-2019-RJ-289949
/ Study of water
availability, Dynamic land
use land cover pattern and
water quality for Bisalpur
project
IBRD / 87250 Post
Quality And
Cost-Based
Selection
Open - National
0.00Pending
Implementation2018-07-30
2018-08-
20
2018-10-
03
2018-10-
31
2018-11-
30
2019-01-
04
2019-02-
08
2020-02-
08
NHP-2018-2019-RJ-760744
/ Consultancy for design,
architecture etc.
IBRD / 87250 Post
Consultant
Qualification
Selection
Open - National
0.00Pending
Implementation2018-08-16
2018-09-
06
2018-10-
20
2018-11-
19
2018-12-
24
2019-06-
22
NHP-2018-2019-MHGW-
296042-CS-LCS-NAT /
Development and
maintenance of hydrology
project web site
IBRD / 87250 PostLeast Cost
SelectionOpen - National
0.00Pending
Implementation2018-12-30
2019-01-
20
2019-03-
05
2019-04-
02
2019-05-
02
2019-06-
06
2019-07-
11
2020-01-
07
NHP-2018-2019-CPCB-
397370 / Development of
Web bases system for data
entry
IBRD / 87250 Post
Quality And
Cost-Based
Selection
Open - National
0.00Pending
Implementation2018-08-16
2018-09-
06
2018-10-
20
2018-11-
17
2018-12-
17
2019-01-
21
2019-02-
25
2020-02-
25
NHP-2018-2019-CPCB-
519933 / Bench marking of
Quality Assurance in
Water Quality labs
IBRD / 87250 Post
Quality And
Cost-Based
Selection
Open - National
0.00Pending
Implementation2018-12-30
2019-01-
20
2019-03-
05
2019-04-
02
2019-05-
02
2019-06-
06
2019-07-
11
2020-07-
10
NHP-2018-2019-CPCB-
748617 / Consultancy for
survey, identification and
preparation of Nationwide
compendium based on
Basin sub basin Inventory
of water Pollution
IBRD / 87250 Prior
Quality And
Cost-Based
Selection
Open - National
0.00Pending
Implementation2018-07-25
2018-08-
15
2018-09-
28
2018-10-
26
2018-11-
25
2018-12-
30
2019-02-
03
2020-02-
03
NHP-2018-2019-TSSW-
277192 / Consultancy
services for hosting website
IBRD / 87250 Post
Consultant
Qualification
Selection
Open - National
0.00Pending
Implementation2019-01-09
2019-01-
30
2019-03-
15
2019-04-
14
2019-05-
19
2019-11-
15
NHP-2018-2019-RJ-320952-
CS-SSS-SSS /
Establishment of state
chapter WRIS including
integration with India
WRIS
IBRD / 87250 Post
Quality And
Cost-Based
Selection
Open - National
0.00Pending
Implementation2018-07-05
2018-07-
26
2018-09-
08
2018-10-
06
2018-11-
05
2018-12-
10
2019-01-
14
2020-01-
14
NHP-2018-2019-RJ-977784
/ Purpose driven study for
demand based irrigation
and command area
management using remote
sensing and other
innovative technologies
IBRD / 87250 Post
Quality And
Cost-Based
Selection
Open - National
0.00Pending
Implementation2018-07-30
2018-08-
20
2018-10-
03
2018-10-
31
2018-11-
30
2019-01-
04
2019-02-
08
2020-02-
08
IN-ANDHRA PRADESH
SW-21934-CS-LCS /
Consultancy Services for
Hosting Website &
Maintenance
IBRD / 87250 PostLeast Cost
SelectionOpen - National
0.00 Canceled 2017-11-152017-12-
06
2018-01-
19
2018-02-
16
2018-03-
18
2018-04-
22
2018-05-
27
2018-11-
23
NHP-2018-2019-KLGW-
185873-CS-SSS-SSS /
Development of mobile
APPS
IBRD / 87250 Post
Consultant
Qualification
Selection
Open - National
0.00Pending
Implementation2018-11-01
2018-11-
22
2019-01-
05
2019-02-
04
2019-03-
11
2019-09-
07
NHP-2018-2019-KLGW-
288382 / Management of
GW pumping for Irrigation
with special reference to
calcified zones in Palakkad
district
IBRD / 87250 Post
Consultant
Qualification
Selection
Open - National
0.00Pending
Implementation2018-09-24
2018-10-
15
2018-11-
28
2018-12-
28
2019-02-
01
2019-07-
31
NHP-2018-2019-CWC-
750657 / Physical Based
Mathematical modeling for
sediment rate estimation
and sediment transport in
the river basin
IBRD / 87250 PriorLeast Cost
Selection
Open -
International
0.00Pending
Implementation2018-09-28
2018-10-
19
2018-12-
02
2018-12-
30
2019-01-
29
2019-03-
05
2019-04-
09
2019-10-
06
NHP-2018-2019-CWC-
841056 / Development of
Regional models for water
availability
IBRD / 87250 PostLeast Cost
Selection
Open -
International
0.00Pending
Implementation2018-10-29
2018-11-
19
2019-01-
02
2019-01-
30
2019-03-
01
2019-04-
05
2019-05-
10
2019-11-
06
NHP-2018-2019-CWC-
218376 / Basin wise EHP
Model for medium & long
term forecasting
IBRD / 87250 PriorLeast Cost
Selection
Open -
International
0.00Pending
Implementation2018-08-31
2018-09-
21
2018-11-
04
2018-12-
02
2019-01-
01
2019-02-
05
2019-03-
12
2019-09-
08
NHP-2018-2019-CWC-
266557 / 2D Stream-flow
forecasting system
including inundation
modelling
IBRD / 87250 PriorLeast Cost
Selection
Open -
International
0.00Pending
Implementation2019-09-24
2019-10-
15
2019-11-
28
2019-12-
26
2020-01-
25
2020-02-
29
2020-04-
04
2020-10-
01
NHP-2018-2019-AS-485181
/ Planning & Designing of
State Data Centre,
CONSTRUCTION OF
STATE DATA CENTRE
IBRD / 87250 Post
Consultant
Qualification
Selection
Open - National
0.00Pending
Implementation2017-10-17
2017-11-
07
2017-12-
21
2018-01-
20
2018-02-
24
2018-08-
23
NHP-2018-2019-AS-638684
/ CREATION OF STATE
CHAPTER WRIS
INCLUDING HARDWARE
AND SOFTWARE SUCH
AS GIS AND IMAGE
PROCESSING SOFTWARE
ETC.
IBRD / 87250 Post
Quality And
Cost-Based
Selection
Open - National
0.00Pending
Implementation2018-07-30
2018-08-
20
2018-10-
03
2018-10-
31
2018-11-
30
2019-01-
04
2019-02-
08
2020-02-
08
IN-TELENGANA SW-
25088-CS-CQS /
Development of Videos
IBRD / 87250 Post
Consultant
Qualification
Selection
Open - National
0.00 Canceled 2018-01-272018-02-
17
2018-04-
02
2018-05-
02
2018-06-
06
2018-12-
03
IN-TELENGANA SW-
24402-CS-CQS / Website
Development & Hosting
IBRD / 87250 Post
Consultant
Qualification
Selection
Open - National
0.00 Canceled 2017-11-202017-12-
11
2018-01-
24
2018-02-
23
2018-03-
30
2018-09-
26
IN-TELENGANA SW-
24426-CS-QCBS / IWRM
for Godavari & Krishna
Basin by developing River
basin modeling (including
supply of Hardware and
Software), Development of
Data Ware Housing and
Data Mining of
Hydrological data and
Development
IBRD / 87250 Post
Quality And
Cost-Based
Selection
Open - National
0.00 Canceled 2018-01-102018-01-
31
2018-03-
16
2018-04-
13
2018-05-
13
2018-06-
17
2018-07-
22
2019-07-
22
IN-TELENGANA SW-
25078-CS-CQS /
Preparation of Master Plan
of river basins on GIS
Platform( including supply
of Hardware and software)
IBRD / 87250 Post
Consultant
Qualification
Selection
Open - National
0.00 Canceled 2017-11-162017-12-
07
2018-01-
20
2018-02-
19
2018-03-
26
2018-09-
22
NHP-2018-2019-WBGW-
568037 / Aquifer
Assessment & Budgeting
IBRD / 87250 Post
Consultant
Qualification
Selection
Open - National
0.00Pending
Implementation2018-09-01
2018-09-
22
2018-11-
05
2018-12-
05
2019-01-
09
2019-07-
08
NHP-2018-2019-WBGW-
833494 / Public Alert:
Block Level GW
Availability
IBRD / 87250 Post
Consultant
Qualification
Selection
Open - National
0.00Pending
Implementation2018-09-01
2018-09-
22
2018-11-
05
2018-12-
05
2019-01-
09
2019-07-
08
Page 32
NHP-2018-2019-WBGW-
752894 / DSS Development
for Integrated GW
Management in Minor
Irrigation
IBRD / 87250 Post
Consultant
Qualification
Selection
Open - National
0.00Pending
Implementation2018-09-01
2018-09-
22
2018-11-
05
2018-12-
05
2019-01-
09
2019-07-
08
NHP-2018-2019-WBGW-
250911 / Establishment of
State GW Resources
Information System i.e.
WB_GWRIS
IBRD / 87250 Post
Consultant
Qualification
Selection
Open - National
0.00Pending
Implementation2018-09-01
2018-09-
22
2018-11-
05
2018-12-
05
2019-01-
09
2019-07-
08
NHP-2018-2019-WBGW-
161732 / Regional GIS
based Spatial Information
Developement
IBRD / 87250 Post
Consultant
Qualification
Selection
Open - National
0.00Pending
Implementation2018-09-01
2018-09-
22
2018-11-
05
2018-12-
05
2019-01-
09
2019-07-
08
NHP-2018-2019-TSSW-
290829 / Development of
Mobile Applications
IBRD / 87250 Post
Consultant
Qualification
Selection
Open - National
0.00Pending
Implementation2019-01-22
2019-02-
12
2019-03-
28
2019-04-
27
2019-06-
01
2019-11-
28
INDIVIDUAL CONSULTANTS