Appendix RProject Management Plan
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Page 1 of 19
Q201 16042014
MANAGEMENT PLAN
(Incorporating the Construction Phase Health & Safety Plan as required by the CDM Regulations, the Fire Safety Plan, the Site Waste
Management Plan as required by the Site Waste Management Plans Regulations 2008 and the Project Business Continuity Plan)
FOR
Customer : Education Funding Agency
Contract Name : Gnosall St Lawrence Primary School
Contract No : WM53---
Customer Project No : TBC End User Project No : TBC
Contract Address : Gnosall St Lawrence Primary School,
Lowfield Ln,
Gnosall,
Staffordshire
ST20 0ET
Issue Status/No Prepared By Signed Approved By Signed Date
Preliminary P.Lockhart
Record Of Issue
Issued To Company
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Page 2 of 19
Q201 16042014
Introduction This Plan is owned by the Project Manager and sets down the manner and means whereby Interserve Construction will achieve the customer's critical success factors for time, cost and quality. Eliminating, for all parties, as far as reasonably practicable, the risk of injury, ill health and environmental damage in a non confrontational manner. The Plan also sets out the measures to ensure continuity of service following an emergency or disaster situation, and as such is complementary to the Business Continuity Plan prepared in the Business Unit office. Interserve Construction operates a business management system that embraces health and safety, quality, environmental and employee development in an integrated manner complying with current Health, Safety and Environmental Legislation as a minimum. This is achieved through the use of standard processes and their related forms, meeting agenda, control records and operational guidance. The corporate aims of Interserve Construction, with respect to sustainability/corporate responsibility, health and safety, quality, environment and employee development are embodied in our policy statements, which are displayed on the site notice boards. This plan details project specific information to expand and explain, where appropriate, the companies standard policies and processes relating to the specific aspects of this project. The Project Manager will discuss and agree with the Project Team Representatives the means by which information will be transmitted and recorded where appropriate. All verbal discussions relevant to the project will be recorded in writing and transmitted to the appropriate Project Team Member. This Plan is a living document and will be updated as the project progresses.
Our supply chain members (designers, sub-contractors, suppliers etc) are expected, as an integral part of the management of the project, to assist and support the company in the operation and continuous improvement of our processes. The contents of this plan will be made available to all personnel engaged in the construction of the works and all subcontractors. For further details of how our Business Management System complies with international standards such as ISO 9001:2008, ISO 14001:2004 and BS OHSAS 18001:2007, please refer to our System Description Document O51.
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Page 3 of 19
Q201 16042014
Contents Page No Description
Intr
oducti
on a
nd P
roje
ct
Wid
e
Ele
ments
Description of Project
Critical Success Factors for the Project
Project Team
Programme / Duration
Methodology Overview
Measurement and KPI's
Contr
act
and
oth
er
Docum
enta
tion
Contractual Documentation
Existing Health & Safety File(s) and other Information Relevant to the Conditions or Hazards Present in Existing Structures
Health & Safety File Arrangements
Com
pete
nce
Organisations – Selection and Assessment of Contractors and Suppliers
Individuals – Competence Standards
Pla
nnin
g t
he W
ork
s Project Assurance Planning Overview
Planning the Works and Identification of Necessary Controls
Public Liaison
Waste Management Planning
Undert
akin
g t
he
Work
s
Co-ordination Arrangements and Exchange of Information
Information and Training for People on Site
Monitoring the Works
Unpla
nned
Events
Unplanned Events Reporting & Investigation
Project Emergency Arrangements
Business Continuity Plan
List of Appendices
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Page 4 of 19
Q201 16042014
Description of Project
Order Value: £approx 3.25M
The project is the design & construction of a 1.5 FE primary school following partial demolition of the existing school. The two storey timber sips panel construction will be clad externally with a combination of brick and render. Punched out windows will be upvc and ppc aluminium doors. Internally works comprise plasterboard, skim, decorations, joinery, M&E, ceiling and floor finishes. Externally new hard and soft play grounds will be formed along with paths. A second phase of works will be the demolition of the existing school building.
Critical Success Factors for the Project
The upfront demolition and the construction of the new building will be undertaken with the minimum disruption to the ongoing teaching in the existing building. Similarly the later demolition of the old school building will be carried out likewise. The development shall be carried out using good quality materials and in accordance with the drawings, specifications and design brief; all appropriate British Standards and codes of practice; all relevant Acts of Parliament or regulations made there under; all regulations and codes of practice of any local or statutory authority. The Contractor shall ensure that vehicular and pedestrian access is maintained at all times to properties in the roads adjoining the sites and shall carry out the works in such a manner as to cause the minimum of inconvenience and disruption to the occupiers and users thereof. We will work in the sprit of BREEAM and will take all necessary steps to ensure that the development would achieve a minimum score of ‘Very Good’. Soft Landings are a key component of the successful handover of the project
Project Team
Client : Education Funding Agency
Principal Contractor (CDM Regulations)
: Interserve Construction Ltd, West Midlands Building Division
CDM Coordinator : Mott MacDonald
Lead consultant & Architect: Maber Structural & Civil Engineer: ARUP M&E Design Engineers: Subcontractor Design – RPS Structural Frame: Innovare Acoustic Consultant: RPS Cost Consultants: RLF BREEAM Advisors: RPS M&E Installers: TBA. Programme / Duration
Planned Commencement Date:February 2015 Planned Completion Date:May 2016
Programme reference WM3419 G01. The partial demolition and new build period is 48 weeks in duration with a 4 week mobilisation period prior. There is a 2 week decant period followed by a
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Page 5 of 19
Q201 16042014
further 14 weeks of demolition and external works.
Methodology Overview
The main construction works for Gnosall St Lawrence Primary School will commence February 2015. Mobilisation & Site Set-up We will mobilise to site and establish site boundary with timber hoarding and heras fencing. Partial Demolition In order to progress the asbestos removal and demolition works on Possession of Site we have programmed the Refurbishment & Demolition Survey to be undertaken during the October Half Term 2014. Once the demolition is complete we’ll move from using a single mobile welfare unit to create an established, fully equipped site compound area. Substructure Works The top soil strip will be stock piled for reuse in Phase two. An existing storm drain will be diverted prior to the reduce level dig. With the footprint of the new build over sailing an existing embankment, a section of cut and fill will be undertaken. Due to the nature of the ground conditions, piling will also be carried, with works to form the foundations and ground floor slab to follow. Typical site traffic will include excavation machines, dumpers, vibrating rollers, tipper Lorries for delivery of stone and removal of spoil from site; skip wagons, concrete wagons and concrete pumps, steel, drainage & pre cast concrete delivery wagons Superstructure works The superstructure will be constructed using a small crane and fork lift. The structure is a SIP’s (Structural Insulated Panel) solution utilising a timber frame. Construction of the SIP’s frame will take approximately 9 weeks and following this the external envelope will commence. The SIP’s frame will be erected by use of a crane. The external envelope comprises of facing brick work, render and upvc windows & aluminium curtain walling. The roof is a standing seam, with an area of flat single ply over the hall and kitchen / plant room. Typical site traffic will include skip wagons, delivery vehicles for SIP’s, Bricks, roofing and scaffold and windows and doors. There will also be MEWP’s around site for access as well as the use of the forklift. We will also use the forklift to distribute materials to site from the storage area. External Works New tarmac hard play and footpaths will be formed. Any works outside of the site boundary, normally to existing services, will be protected using
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Page 6 of 19
Q201 16042014
appropriate barriers, signage and traffic management as required to segregate the works from school users. Fit out and commissioning works These will be all the works necessary inside the shell to complete the school and provide a fully functional building. Including decorations, ceiling finishes, floor finish and mechanical, electrical & plumbing installations. Typical site traffic will include fit out and service delivery wagons, forklifts, MEWP’s. Demolition Following completion of the new building and subsequent decant by the school the existing building will be demolished and new soft landscaping works completed. Typical site traffic will include excavation machines, dumpers, vibrating rollers, tipper lorries for removal of stone and delivery of topsoil from site; skip wagons.
Measurement and KPI's
Contribute to Business Unit Targets contained within the Annual Business Unit Business Plan (X60) and report on them via the X62 KPI data collection process.
Our Key Clients and the Annual Business Unit Business Plan (X60), require us to provide evidence that demonstrates Continual Improvement of our Performance, project by project and year on year.
The Project Management Team Must:
Provide the data required supporting the targets detailed within Company and Business Unit Business Plans.
Define project specific objectives and targets (including measurement rules). Any additional
Review all these measurements and assessments to ensure Continual Improvement is driven for performance improvement of projects.
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Page 7 of 19
Q201 16042014
Contractual Documentation
The Building Contract will be the EFA standard form D&B lump sum contract, with EFA terms.
Existing Health & Safety File(s) and other Information Relevant to the Conditions or Hazards Present in Existing Structures
Existing Health and Safety files are available for the following structures in relation to the project:
Structure Document Reference
Asbestos Management Survey CO 4527-05 dt 17/9/13
Additionally the following surveys/registers are available:
Survey/Register Document Reference
Acoustic survey Rev A dt Aug 13
Arboricultural survey Rev A dt Oct 13
Ecological survey Rev A dt Aug 13
Flood drainage assessment Rev A dt Aug 13
GI Desktop Survey Rev A dt June 13
GI Intrusive survey D3110-13 dt Nov 13
Topographical survey Greenhatch drwg 18780_OGL Rev 1
Underground utility survey Drwg 18780 Rev1 (6 drawings)
All the above surveys can be found at H:\Estimating Common\01 DESIGN & BUILD\Wdbxxxxx PSBP Future Schools\Wdb3419 Gnosall St Lawrence\A-contract, legal & insurance\ITT Client Documents\Volume 4 Survey Information
Note: It is an Interserve Construction requirement that a Refurbishment and Demolition Survey is always completed prior to refurbishment or demolition of structures/buildings that
could contain asbestos Supply chain members are to consider all relevant information detailed in the above when planning and undertaking their works (e.g. presence of deleterious materials inc. asbestos,
services, max floor loadings, demolition sequences etc.).
The information can be obtained/viewed at site, by contacting ------------------.
Health & Safety File Arrangements
Interserve Construction will collect and collate information on aspects of the design, the materials and the construction processes that will assist the owner and / or occupier.
Our supply chain members are obliged to provide all such information in a timely manner.
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Page 8 of 19
Q201 16042014
Details of project specific information required, number of copies and format required will be detailed on O & M Manual Requirements (Q265). Information will be passed to the CDM Co-ordinator for review prior to inclusion in the Health & Safety File for forwarding to the Client.
Further details of co-ordination arrangements may be developed commensurate with the complexity of the project and degree of information and detail required.
Organisations - Selection and Assessment of Contractors and Suppliers.
In order to adequately control Health & Safety and Environmental risks, we require all supply chain members to be competent and have adequate resources to undertake the project works.
As part of the selection process we utilise mandatory questionnaires (K29 & L23) which, when completed by potential supply chain members, are assessed against established criteria to establish the standard of arrangements. This data is then used in assessing competence to undertake the works.
Where supply chain members wish to further sub-let the project works they shall seek the approval of Interserve Construction prior to doing so, in accordance with their subcontract conditions and have comparable systems that ensure the competence of those appointed / contracted.
To ensure consistent standards with regards to the management of the works, including control of health and safety hazards and environmental impacts, supply chain members are contracted to the standards defined within the Interserve Construction “Health, Safety and Sustainability Codes for Subcontractors”, reference L8.
All supply chain members shall, following completion of their works, undergo a Performance Assessment (K9b, K9d or P9b). They then have the opportunity to assess (K9c, K9e or P9c) the company’s project performance relevant to their scope of works.
The purpose of these assessments is to support continuous improvement of our supply chain management.
Individuals – Competence Standards
All Persons
All persons on the project are to be competent and experienced for the duties they are required to undertake.
For site based personnel this includes the individual holding a current and relevant Construction Skills Certification Scheme (CSCS) card.
Note:
CSCS cards include, where appropriate, other schemes affiliated to CSCS such as CPCS for plant operations and CISRS for scaffolding.
We recognise that there may be occasions where individuals do not hold relevant cards.
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Page 9 of 19
Q201 16042014
Such individuals may be permitted access to site only with prior agreement of the Interserve Construction site management, and only where their employer has demonstrated the individual’s competence via an acceptable Employer’s Declaration (O57b).
Specific Training Requirements for Operatives In addition to the general competence requirements detailed above, Interserve Construction introduced specific minimum training requirements for operatives on all subcontracts placed from 1st October 2012. The minimum standard is the Construction Skills 1 day Health and Safety Awareness Course. Specific Training Requirements for Supervisors
In addition to the general competence requirements detailed above Interserve Construction has a specific minimum training requirement for supervisors. The minimum standard is the Construction Skills 2-day Site Supervisors Safety Training Scheme course within the last 5 years. Specific Training Requirements for Managers In addition to the general competence specified in the Health, Safety and Sustainability Codes for Subcontractors, Interserve Construction is introducing minimum training requirements for Managers. The expectation is that by July 2014 Managers will have achieved the ConstructionSkills 5-day Site Managers Safety Training Scheme.
Interserve Construction reserves the right to refuse entry should the individual’s competence not be considered sufficient.
Interserve Construction requires supply chain members to demonstrate these competence levels by the production of the appropriate operative record scheme skills card or training certificate prior to, and during, the contract works. Details of competence are to be recorded.
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Page 10 of 19
Q201 16042014
PR
OJEC
T A
SSU
RA
NC
E O
VER
VIE
W
New Contract Pre-
Commencement
Meeting
PDC 1.0
Environmental
Impact Assessment
and Emergency
Response
EIW 5.0
Quality Assurance
Quality Control
Process Surveying
Project
Management Plan
PDC 2.0
Stakeholder
Communication and
Liaison
PM 5.0
Risk Assessment
LP 220
Environmental Site
Controls
EIW 6.0
Safe Systems of
Work
LP 250
Permits to Work
LP 260
Operational Control
Subcontractors
LP 340
Work Equipment
and Statutory
Inspections
LP 350
Work Place
Inspections
LP 410
Subcontr
acto
r and D
esi
gners
Subcontractor
Procurement
PR 6.0
Change to the
Contract
Requirements
CM 8.0
Subcontractor
Payments
CM 15.0
Project Assurance
Plan
QA 1.0
CI & TP
Preconstruction
Submittals
QA 2.0
Manage Technical
Submittals
QA 3.0
Prepare Project
Handover
Requirements
QA 6.0
Inspection and Test
Records
QA 4.0
Final Inspection and
Snagging
QA 5.0
Visiting Manager’s
Review
PM 2.0
Process
Improvement
Surveying and
Reporting
QA 7.0
System Non
Conformance
Reporting
SB 3.0
Prepare Project
Handover
Requirements
QA 6.0
Document
Management
Setting up the DSM
ISDM 5.0
Document
Management During
the Project’s Life
ISDM 6.0
Assessment of
Subcontractor /
Designer
PR 7.0
Customer Project
Review
PC 1.0
Post Project Review
PC 2.0
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Page 11 of 19
Q201 16042014
Planning the Works and Identification of Necessary Controls
Interserve Construction requires the following to be prepared and monitored throughout the project period.
Project and activity specific Impact and Risk Assessments/Method Statements that detail the requirements for Safe Systems of Work and measures to minimise impact upon the environment.
Project Specific Assurance Plan (Q205) to plan completion of all aspects of the works scope.
Pre-construction Submittals (Q208) and Inspection and Test Plans (Q204) to ensure compliance with specified requirements and controls for all aspects of the work scope.
Appendix 12 of this plan details the Activities/Packages involved in this project, anticipated hazards and impacts for each activity/package and whether risk assessments and method statements and temporary works checks are required. Note: these are an overview and may not be exhaustive .
As specified within the sub-contract documentation supply chain members will need to submit the above for review by Interserve Construction. Activities may not commence until Interserve Construction confirms the submitted documentation is acceptable (L9a).
Public Liaison
The project will be registered with the Considerate Constructors Scheme. An introductory letter will be posted to all local residents bordering the site advising of the works and contact numbers for key Interserve staff. In addition the site will produce a monthly newsletter to update local residents on site progress. This will be posted, added to site notice boards and added to school web site (with schools permission. At the start of the project and other appropriate times through the duration we will hold an open evening. We also propose being present at any school parents evening to be available to answer any questions. Procedure 3/DW/C/D/b1 – Customer/Public liaison and Communication Operational guidance O711/A3400 Project Stakeholder/Public Liaison and Communication.
Waste Management Planning
Interserve is committed to reducing waste associated with design and construction activities through:
designing out waste principles
efficient materials procurement & management
efficient construction techniques
implementation of the waste hierarchy throughout the project life-span
Interserve develops, prepares and implements Site Waste Management Plans (SWMPs) for all construction projects. Through our membership of UKCG we have committed to using SWMPs on our projects as industry best practice (even where not a legal requirement). We expect our supply chain to support us in the implementation of the project SWMP to achieve our objectives and targets in relation to waste reduction, reuse and recycling.
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Page 12 of 19
Q201 16042014
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Page 13 of 19
Q201 16042014
Responsibilities and approach
The project’s Waste Manager (see Appendix 2: Responsibilities) is responsible for preparing and maintaining the project SWMP, as well as ensuring compliance with duty of care responsibilities and monthly reporting of waste data.
The SWMP template to be used on this project will be the Interserve SWMP template (R210)
The SWMP forms part of the live project documentation and is updated as necessary throughout the project lifespan. Updating of the SWMP includes recording and tracking of waste reused or removed from site, implementation of identified opportunities to reuse or recycle, as well as any changes (e.g. differences in quantities, changes as a result of altered design or scope).
SWMP review
The SWMP is reviewed throughout the construction phase, and on project completion, to assess the impacts of any changes on predicted waste quantities and costs, and to review implementation of identified opportunities.
Co-ordination Arrangements and Exchange of Information
To facilitate the effective and efficient transfer of information all communication relating to the project shall flow through Interserve Construction. All verbal discussions relevant to the project will be recorded in writing and transmitted to the appropriate Project Team Member.
This being in order to avoid misunderstanding within the application of the terms of the contract or subcontract agreements.
Co-ordination arrangements will vary greatly, dependent on both the size and nature of the work being undertaken.
The following arrangements will be implemented:-
All contractors’/subcontractors’ risk assessments and method statements will be vetted prior to work commencing.
Where contractors/subcontractors are exposed to common/shared risk factors, Interserve Construction will co-ordinate control measures common to all contractors concerned.
Each contractor’s/subcontractor’s work package will be programmed and co-ordinated to eliminate safety risks arising to other parties where possible.
Where an interaction issue exists, Interserve Construction will take a positive role in ensuring all general principles of control that were agreed are effectively put into place including the exchange of health and safety information between contractors
Regular site co-ordination meetings will be held with clients, CDM Co-ordinators, contractors and sub-contractors during which health and safety issues and any other concerns will be discussed for appropriate address.
How design changes are handled and how information is exchanged between the client, designers, CDM Co-ordinator and contractors on site.
Information and Training for People on Site
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Page 14 of 19
Q201 16042014
Induction
An Induction will be provided to all people before beginning work on site for the first time.
The induction will be provided directly by Interserve Construction or by arrangement with the individual's employers.
A signature record will be required and kept for all induction attendees.
Information will be provided on:-
Outline of the Project
Site Organisation and Key Personnel
Client requirements and constraints.
Any other constraints inc. permit regime
Site Security
Traffic routes, parking etc
Site Rules.
Site specific hazards.
Environmental Issues.
General welfare facilities, including first aid.
Emergency Procedures.
Personal Protective Equipment (PPE) standards
It should be noted that the above information covers general site wide arrangements and does not replace requirements for construction skills or activity training.
All people will be encouraged, at their induction, to bring to the attention of Interserve Construction, or their own management, any health and safety matters that give rise for concern during their employment on this project.
Supervisors Induction
In addition to the induction detailed above all supervisors will be provided with a Supervisors Induction.
The Supervisor Induction will be provided directly by Interserve Construction.
The Supervisors Induction reinforces the key duties and responsibilities of supervisors on the project.
Other Training and Information
Interserve Construction require Toolbox Talk training to be given and recorded for groups or individuals as required.
Interserve Construction will require supply chain members to undertake and record activity briefings for their employees, and others who may be affected, on the accepted Risk Assessments / Method Statements for activities prior to their commencement.
Safety training sessions on specific activities will be arranged for groups or individuals as the need arises and may be provided on site or by external arrangement.
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Page 15 of 19
Q201 16042014
Monitoring the Works
Don’t Walk By
Interserve Construction operate a “Don’t Walk By” regime and requires all Supply Chain members to promote and participate in its implementation to support us in improving “behavioural safety”.
Formal Inspections
It is essential for the successful completion of the project that all works are carried out as planned.
We have an established inspection regime that includes Health, Safety and Environmental inspections.
These inspections will include the works of supply chain members who are to co-operate fully, and address any issues identified with their works.
Details of these arrangements are included in Appendix 11 of this plan
The Interserve Construction regime described above does not negate the need for supply chain members to monitor their own works and who are expected to have comparable regimes in place.
Unplanned Events Reporting and Investigation
Interserve Construction will:-
Make available and maintain an Environmental and Health & Safety near miss log.
Make available and maintain an accident record book.
Periodically inspect all supply chain members' accident books to ensure correct accident reporting procedures are followed.
Monitor supply chain members' RIDDOR reporting.
Report to the HSE all RIDDOR accidents and diseases relating to its employees or the general public and all RIDDOR reportable dangerous occurrences.
Record any Health & Safety, Environmental and Quality operational non compliances on Q718 notices and issue to the appropriate supply chain member.
Maintain records of environmental incidents.
Report to the Environment Agency all environmental incidents resulting in pollution.
Investigate all RIDDOR reportable events and pollution or other environmental incidents to determine root cause and appropriate action to prevent recurrence.
Interserve Construction Supply Chain Members will:-
Encourage their employees in the logging of Environmental and Health & Safety near misses.
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Page 16 of 19
Q201 16042014
Make available and maintain their own accident record book.
Notify Interserve Construction of all RIDDOR reportable events or other environmental / pollution incidents.
Report RIDDOR reportable accidents or diseases relating to their own employees to the HSE.
Copy all HSE RIDDOR report confirmations to Interserve Construction immediately upon receipt.
Provide a timely response to any Q718 notices issued to them by any Interserve Construction employee.
Co-operate fully and assist Interserve Construction during their investigation of any accident or incident including provision of information and documentation as necessary to allow a thorough and timely investigation.
Project Emergency Arrangements
All people involved in the project are required to familiarise themselves with project specific emergency procedures detailed in appendix A6 of this plan and the information provided on the following notices located as detailed in appendix A10 of this plan.
L100 Emergency Procedures (inc Disaster Recovery)
L108 First Aider Notice
L72a Fire Action Notice
Emergency Exit routes
Site Facilities Drawings
Route to Hospital (where applicable)
RVP Access Points (where applicable)
For project specific fire safety arrangements refer to appendix A5 of this plan.
Additional emergency arrangements necessary, including details of any tests and inspections required, are included in appendix (A6).
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Page 17 of 19
Q201 16042014
Business Continuity Plan
The aim of this plan is to manage and minimise the business effect, to both the customer and Interserve Construction, of a partial or total disaster / major incident scenario at the site of the project works. Such a scenario could develop from one of a number of circumstances e.g. a major fire, flood, power failure or an act of civil disturbance or terrorism.
The following process shall be followed
Responses to such an incident are detailed within Appendices 3, 3A, 5 and 6 of this plan together with Emergency Procedures L100
Senior members of the project team shall retain a copy of the current edition of L100, Q201 App 3 and 3A, and the Major Incident Response Checklist, F101 in a location remote from the site offices
In the event of an incident the senior manager available shall initiate a response using the F101 checklist
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Page 18 of 19
Q201 16042014
Contract : Gnosall St Lawrence Primary School Contract No : WM53---
Appendices Rev. A B C D E
A1 Management Organisation
This details the management structure and reporting lines for the project. All parties to the project will be requested to issue a similar statement for their organisation with sufficient details and contacts to cover emergencies.
A2 Responsibilities
The Manager of the Project will appoint project staff to the specific roles listed in this appendix.
A3 Project Directory
The project directory contains names and contact details for all key project personnel including appropriate sub-contractors in order to facilitate communication.
A3A Business Continuity Plan
The Business Continuity Plan and key project personnel in order to ensure business continuity.
A4 Site Facilities
This details the site accommodation, access and parking arrangements for the project. If appropriate reference may be made to a facilities layout drawing.
A5 Project Fire Safety Arrangements
Provides project specific details of fire prevention, detection, test, inspection and fighting equipment arrangements.
A6 Project Specific and Emergency Procedures, Permits and Constraints
This details project specific requirements and constraints imposed by the customer and / or Interserve Construction
A7 Site Rules
Contains specific rules applicable to all personnel employed by the customer and all supply chain partners.
A8 Consultation with Workforce
This details the communication methods of consultation at various levels in the project organisation.
A9 Schedule of Management Meetings
Provides details and frequency of all project meetings.
A10 Schedule of Documented Information to be Displayed
Provides specific locations where document information is displayed.
A11 Monitoring Arrangements / Audit Schedule.
Provides details of periodic inspections and audit arrangements.
A12 Hazard Identification for Activities that Contain Risk
Provides details of the significant hazards, which should be considered by all parties when committing to undertaking the works.
A13 to A18 inclusive - Not used
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Page 19 of 19
Q201 16042014
A19 Stakeholder Communication Strategy Matrix
Detail the measures to be undertaken to ensure effective communication with interested stakeholders.
A20 Construction (Design & Management) Regulation 2007 Matrix
Details the relationship between the relevant ACOP and the PMP.
All appendices are first issued as Rev 0. Subsequent revisions will increase alphabetically commencing at A. The date of receipt and revision status of revised appendices is to be updated electronically DD/MM/YY or by hand on this page.
INTERSERVE PROJECT SERVICES LIMITED Q201
PROJECT MANAGEMENT PLAN Appendix 1
IPSL Q201 04-07
Contract : Gnosall St Lawrence Primary School Contract No : WM53---
Management Organisation Sheet 1 of 1 Rev 0
Interserve
Construction
Project Manager
TBA
Employers Agent
Mott MacDonald
Paul Webb
John Strike Commercial
Manager
CDM C0-ordinator Mott MacDonald
Jacqueline
Mitchell Design Team Maber, ARUP, RPS Innovare
Interserve Supply Chain
EFA
Tim Westwood
General Foreman
TBA
Interserve Building
Simon Butler
Contracts Manager
TBA
Surveyor
TBA
Mechanical
TBA
Mechanical Foreman
TBA
Design Manager
Mike Taylor
Electrical Foreman
TBA
Safety Advisor
George Lamplough
BREEAM Advisor
RPS
Engineer
TBA
Senior Surveyor
TBA
Bid Manager Matt Talbot
Electrical
TBA
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Appendix 2
Q201 16042014
Contract : Gnosall St Lawrence Primary School Contract No : WM53--- Responsibilities Sheet 1 of 1 Rev 0
Role
Co-ordinators Permits Inspections Others
Tem
pora
ry W
ork
s
Pu
blic
Lia
iso
n
En
viro
nm
enta
l
CO
SH
H
Fire
Sa
fety
Wa
ste
Ma
na
ge
r
Liftin
g O
pe
ratio
ns –
A
pp
oin
ted P
ers
on
Cra
ne
Coo
rdin
ato
r
L7
4 G
en
era
l
L7
4a H
ot W
ork
L7
4b G
rou
nd D
istu
rba
nce
L7
4c E
lectric
al W
ork
L7
4d C
onfin
ed S
pace
L7
4e H
ea
lthca
re In
fectio
n
L7
4f L
ad
de
r Pe
rmit
L91
a W
ork
ing P
latfo
rms
L9
1b E
xca
va
tions
L9
1c L
ifting E
qu
ipm
ent
L9
1g W
ork
Eq
uip
me
nt
Ind
uctio
n / B
riefin
g
Reco
rds
IT
Mate
rial
Esta
blis
hm
en
t
Stre
et a
nd
Roa
dw
ork
s
Firs
t Aid
er
Fire
Ma
rsha
ll
TW
Insta
llatio
n C
he
ckin
g
En
gin
ee
r
Tim
ber M
an
ag
er
Bio
div
ers
ity C
ham
pio
n
DS
E A
ssesso
r
Nominated Person *
Site Manager M D S M D S D D S M S D S M M M D D D D D D D S S
QS S S S D
Engineer/Foreman D D D M M S S D D S D M S S S M D S D D D
Not applicable N
M&E Subcontractor D D D
Subcontractor D D D D D D D D D
Key: D Designated M Manage (Responsible for managing others) Applicable to Inspections only
N Not Applicable. S Substitute (in the event that the designated person is unavailable)
* Where responsibility has been given to a third party (e.g. Electrical Permits to a competent electrical contractor) then detail the organisation.
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Appendix 3
Q201 19072011
Contract : Gnosall St Lawrence Primary Schooll Contract No : WM53---
Project Directory Sheet 1 of 5 Rev 0
Organisation Role Name Tel * Mobile* E-mail*
Interserve Construction Ltd, 395 George Rd Erdington, B23 7RZ
Contracts Manager
Interserve Construction Ltd, 395 George Rd Erdington, B23 7RZ
Project Manager
Interserve Construction Ltd, 395 George Rd Erdington, B23 7RZ
Project QS
Interserve Construction Ltd, 395 George Rd Erdington, B23 7RZ
Design Manager Mike Taylor 0121 344 4888 07731 922185 [email protected]
Education Funding Agency: London Organisation type: Other 33 Greycoat Street London SW1P 2QF
EFA Project Directory Tim Westwood 0370 000 2288 07770646381 [email protected]
Education Funding Agency: London Organisation type: Other 33 Greycoat Street London SW1P 2QF
EFA Project Manager Fred Ward
0370 000 2288 07876 875721
Mott MacDonald Ltd, 35 Newhall Street Birmingham B3 3PU
Senior Engineer Edward Woodhouse 0121 234 1667 [email protected]
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Appendix 3
Q201 19072011
Mott MacDonald Ltd, 35 Newhall Street Birmingham B3 3PU
Project Manager Paul Webb 121 234 1667 [email protected]
Mott MacDonald House ,1 St Mary’s Road, Sheffield, S2 4AP
CDMC Jacqueline Mitchell +44 (0)114 228 3966
The Arup Campus Blythe Gate Blythe Valley Park Solihull West Midlands B90 8AE
Lead Structural Engineer
Philip Monypenny 0121 213 3000 07986 649 254 [email protected]
The Arup Campus Blythe Gate Blythe Valley Park Solihull West Midlands B90 8AE
Senior Structural Engineer
Andrew Godber 0121 213 3000 07825 997 105 [email protected]
Robinson Low Francis (RLF) 7th Floor 54 Hagley Road Edgbaston Birmingham West Midlands B16 8PE
Cost Advisor Paul Anderson 0121 456 1474 07785 708012 [email protected]
Robinson Low Francis (RLF) 7th Floor 54 Hagley Road Edgbaston Birmingham West Midlands B16 8PE
Cost Planner Chris Barker 0121 456 1474 07969 982 816 [email protected]
Maber Associates Ltd • 8 Riverside Court • Pride Park • Derby • DE24 8JN
Maber - Project Director
Ian Harris 01332 208 800 07929 010416 [email protected]
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Appendix 3
Q201 19072011
Maber Associates Ltd • 8 Riverside Court • Pride Park • Derby • DE24 8JN
Maber - Project Architect
Steve Basran 01332 208 800 07977 557409 [email protected]
Maber Associates Ltd • 8 Riverside Court • Pride Park • Derby • DE24 8JN
Maber - Landscape Architect
Joe Boyce 01332 208 800 [email protected]
Maber Associates Ltd • 8 Riverside Court • Pride Park • Derby • DE24 8JN
Maber - Interior Designer
Chris Radcliffe 0115 941 5555 [email protected]
RPS Planning & Development Highfield House 5 Ridgeway Quinton Business Park Birmingham B32 1AF
Acoustic Engineer RPS Ben Burgess 0121 213 5500 07919 327 616 [email protected]
RPS Planning & Development Highfield House 5 Ridgeway Quinton Business Park Birmingham B32 1AF
Senior Electrical Engineer
Ian Thomas 0121 213 5500 [email protected]
RPS Planning & Development Highfield House 5 Ridgeway Quinton Business Park Birmingham B32 1AF
Mechanical Associate Laurie Taylor 0121 213 5500 [email protected]
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Appendix 3
Q201 19072011
RPS Planning & Development Highfield House 5 Ridgeway Quinton Business Park Birmingham B32 1AF
Technical Director
Dave Callaghan M.Inst.R CIBSE
0121 213 5500 07825 603 035 [email protected]
RPS Planning & Development Highfield House 5 Ridgeway Quinton Business Park Birmingham B32 1AF
Planning Associate Joe Murphy BSc(Hons) DipTP MRTPI
0121 213 5500 07970 225 215 [email protected]
Innovare Systems Ltd Unit B, Earlplace Business Park, Coventry CV4 9XL
Managing Director Innovare
Pete Blunt 0845 6740020 07972 007938 [email protected]
Innovare Systems Ltd Unit B, Earlplace Business Park, Coventry CV4 9XL
Business Development Manager Innovare
Kerry Mihailovich 0845 6740020 07736 597155 [email protected]
Innovare Systems Ltd Unit B, Earlplace Business Park, Coventry CV4 9XL
Technical Manager Innovare
Sam Dawe 0845 6740020 07736 597345 [email protected]
Innovare Systems Ltd Unit B, Earlplace Business Park, Coventry CV4 9XL
Estimator Innovare Laura Twigg 0845 6740020 [email protected],
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Appendix 3
Q201 19072011
Approved Design Consultancy Limited 11 Morston Court, Kingswood, Lakeside, Cannock, WS11 8JB
Approved Inspector Neil Eggington 01543 509 456 07812 028375 [email protected]
Approved Design Consultancy Limited 11 Morston Court, Kingswood, Lakeside, Cannock, WS11 8JB
Approved Inspector Steve Hilditch 01543 509 456 07976 000 792 [email protected]
ESA McIntosh, Westway, Hillend Industrial Park, Dalgety Bay, Fife, KY11 9HE
FF&E Manager Gary James 01383 823 636 07773 312 242 [email protected]
* Interserve Construction Employees should ensure that Contact Details on IRIS are updated to reflect current situations.
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Appendix 3A
Q201 03112011
As this schedule may include home phone numbers if should not be included in any copy of the PMP issued to third parties or on public display.
Contract : Gnosall St Lawrence Primary School Contract No : WM53---
Business Continuity Plan – Interserve Construction Team Sheet 1 of 1 Rev 0
Role Name* Contact Tel Number Mobile E-mail
BU Director / Manager Simon Butler 0121 344 4888 TBC [email protected]
Safety & Environmental Advisor
George Lamplough 0121 344 4888 TBC [email protected]
Sustainability Advisor Jon Boyce 0121 344 4888 TBC [email protected]
Contracts Manager 0121 344 4888 TBC
Communications & IT Charlie Scott 0121 344 4888 TBC [email protected]
Accommodation Ken Kendal 01922 749 000 TBC [email protected]
Insurance Declan Timmins 0121 344 4888 TBC [email protected]
PR & Media / Business Development
Holly Chapple-Hyam (interim) 0121 344 4888 TBC [email protected]
* All members of the project team should be included on this schedule. A copy of this schedule (together with App 3, L100 and F101) should be retained by senior members of the project team at a location remote from the project offices.
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Appendix 4
Q201 16042014
Contract : Gnosall St Lawrence Primary School Contract No : WM53---
Site Facilities Sheet 1 of 1 Rev 0
Interserve Construction will not be responsible for any loss by supply chain members who must
take precautions to safeguard their plant, materials, offices, stores, compounds etc.
Supply chain members providing their own facilities are responsible for the provision of adequate maintenance and will permit Interserve Construction to inspect the facilities at all reasonable times. Layout plans are to be provided for site facilities.
The layout plans include the following:
Overall site layout (including traffic management) plan.
Fire and emergency arrangements plan.
Office accommodation (including welfare) plan.
The office accommodation (inc welfare) plan is to include offices for site staff and sufficient welfare facilities to meet the numbers on site in accordance with CDM regulations.
The arrangements to be detailed are:-
Overall Site Layout (inc Traffic Management) Plan Site fencing / hoarding and sign board locations Site entrance(s) Vehicle routes including one way systems and turning areas. Pedestrian routes (segregated) Vehicular and pedestrian barriers and signage Car parking areas Office and welfare locations Delivery points and storage areas Fire and Emergency Arrangements Plan Emergency vehicle access and assembly points Fire hydrant points Fire fighting equipment locations Fire escape and assembly points Office Accommodation (inc welfare) Plan Emergency exit routes Assembly points Emergency signage Call points Smoke / heat / flame detectors
Public footpaths / routes LPG and Fuel storage areas Waste Collection / Storage areas Crane location and operating radius exclusion zones Overhead services Wheel wash arrangements and location Items for preservation / protection Designated mobile phone areas Designated smoking areas Site security arrangements Fire detection equipment Fire alarms First Aid equipment and room locations Spill kit locations Fire alarms Fire fighting equipment Emergency lighting First aid provision
Note: For multi-storey buildings and offices plans are required for each floor.
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Appendix 5
Q201 16042014
Contract : Gnosall St Lawrence Primary School Contract No : WM53---
Project Fire Safety Arrangements Sheet 1 of 3 Rev 0
Responsible Persons
A Fire Safety Coordinator and if necessary Fire Marshall(s) have been appointed for the Project and are detailed in the "Responsibilities" section of this Project Management Plan (Appendix 2).
Reducing the Risk of a Fire Starting
For a fire to start a source of ignition, a source of fuel and oxygen are all needed. Taking measures to eliminate or reduce any of these will reduce the risk of a fire starting. A fire risk assessment has been completed for this project, and is included at the end of this Appendix 5, “Project Fire Safety Arrangements”. Supply Chain members are to comply fully with the controls identified in the fire risk assessment, incorporating these controls into their risk assessments and method statements as appropriate. The fire risk and controls necessary will change as the project progresses. Examples include:
The point at which structures become substantially enclosed.
When the fire load increases or when flammable material in the permanent works are introduced
When additional ignition sources are introduced such as energisation of the permanent works electrical supply.
Where the structure reaches the criteria for a high rise construction Supply Chain members are to comply fully with any revised controls identified in the revised fire risk assessment, reviewing and revising the risk assessments and method statements for their works as appropriate. Reducing the Risk of a Fire Starting
Hot works Permits to be issued.
No bonfires on site.
Keep skips away from site boundary to reduce risk of arson.
The requirements for permits and the details of site constraints are listed in Appendix 6, “Project Specific and Emergency Procedures, Permits and Constraints” and where appropriate Appendix 7, “Site Rules”. Reducing the Risk of Fire Spreading Compartmentation Requirements To reduce the risk of fire spreading and provide a safe means of escape, buildings and other structures are divided by fire resisting walls and floors. This compartmentation will be an integral part of the structures permanent works design, of which installation at the earliest opportunity should be considered, and may include temporary compartmentation to reduce the risk of fire spreading and providing safe escape during the construction phase.
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Appendix 5
Q201 16042014
HSE guidance HSG168 Fire Safety in Construction will be followed for maximum escape route distances and therefore inform where temporary compartmentation will be required. Emergency Arrangements
Arrangements are established to enable people to evacuate the worksite and reach a place of safety in the event of a fire or other emergency. Fire Detection and Alarm System Smoke detectors will be fitted within all site accommodation as a fire detection system. Within the new build the fire alarm system will be installed and commissioned as soon as practical within the programme. A wireless audible alarm will be used on site and in the site accommodation. Locations of fire detection and alarm equipment detailed on the plans referenced in Appendix 4 “Site Facilities”. Fire Fighting Equipment Portable fire extinguishers will be used on site and in the site accommodation. Locations detailed on the plans referenced in Appendix 4 “Site Facilities”. Emergency Action Plans On discovering a fire activate the fire alarm to advise others to evacuate. Only tackle the fire with the portable fire extinguishers available if confident and trained to do so. On hearing the alarm evacuate the building by the nearest fire escape route. Assemble at the fire assembly point located ????? On hearing the alarm the fire marshal/ fire coordinator to call 999. On hearing the alarm the project manager is to notify the school office to advise of the need for the school to evacuate. Subcontract supervisors are to carry out a head count and notify of any missing persons. Fire co-ordinator to check head count against signing in book. Fire marshal to meet attending emergency services at the site entrance and direct to the scene, briefing and informing of site risks i.e. gas / flammable stores that may be involved or in the vicinity of the fire. No one is to leave site or return to work until advised by the fire marshal it is safe to do so. The fire marshal will take direction from the attending fire officer. Communication of and Training in the Established Arrangements The locations of the arrangements that are in place to fight fires and evacuate the worksite can be found on the “Site Facilities” section of this Project Management Plan (see Appendix 4). The locations of the arrangements that are in place to fight fires and evacuate offices and welfare accommodation can also be found on the “Site Facilities” section of this Project Management Plan (see Appendix 4).
These will detail:
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Appendix 5
Q201 16042014
Fire fighting equipment locations
Fire alarm / call points
Escape routes and fire exits
Muster points (Assembly Points)
Emergency vehicle access and assembly points
Emergency contacts are indicated on the Emergency Procedures Notice (ref L100) detailed on the project notice board and the fire action notices (ref L72a) situated at the fire alarm / call points. In case of fire the alarm is Siren , vacate the affected area and move to the Assembly Points. Monitoring, Inspection, Testing and Audit
Type Frequency
Fire Arrangements Inspection Weekly (“L4” Inspection regime) Fire precautions monitoring
inspection Weekly by Fire coordinator or deputy
Alarm Test Weekly Detection Device Test Weekly Fire Drills / Evacuation Plan At least every 6 months Fire Fighting Equipment Service At least every 12 months Fuel Bund Integrity Inspection Weekly Other Fire arrangements check Done during first 2 weeks then every 2 list (L72b) months
Co-ordination of Fire Arrangements with Client or Adjacent Employers / Sites On hearing the alarm the project manager is to notify the school office to advise of the need for the school to evacuate. If the school fire alarm is activated the construction site will evacuate until it is established it is safe to return to work (false alarm or fire officer advises ok). Fire Service Liaison Upon contract award the local fire station will be contacted to advise of the construction works and also requested to visit site to establish access routes to the existing and new build. Details of the local fire station are:- Gnosall Community Fire Station Wharf Lane Gnosall Staffordshire ST20 0D
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Appendix 5
Q201 19072011
Contract : Gnosall St Lawrence Primary School Contract No : WM53---
Project Fire Safety Arrangements Sheet 1 of 1 Rev 0
Hazard / Risk
Risk Level Before Controls
Those at Risk Controls
Risk Level After Controls
L Sv R L Sv R
Hot works 3 3 9 Operatives and Members of the public
Hot Works permits to be issued for each operation. Area to be checked prior to start of work & at least 1hr after Hot works have finished, to be counter signed by issuer and permit holder. Appropriate extinguisher to be at hand.
1 3 3
Electricity 2 3 6 Operatives and Members of the public
Equipment to be tested in accordance with current regulations and recorded. Tools and equipment except safety lighting to be disconnected when not in use.
1 3 3
COSHH 2 3 6 Operatives and Members of the public
Substance to be stored in accordance with COSHH assessment sheets, in sub contractor vehicles or in lockable container. Operatives to be given tool box talks on use of substances if necessary.
1 3 3
Flammable liquids & gasses 3 3 9 Operatives and Members of the public
Empty & full containers to be stored separately. Hazard warning signs to be placed appropriately, when needed to identify risk to workforce and others. Liquids to be stored in bunded container volume to be volume plus ten percent.
1 3 3
Arson 3 3 9 Operatives and Members of the public
Site to be kept secure at all times. Materials stored in controlled environments. Rubbish removed to skips at the end of each shift. Skips to be lockable when necessary.
1 3 3
Smoking 2 3 6 Operatives and Members of the public
Designated smoking areas to be located outside of construction zone and away from material stores.
1 3 3
Environmental factors 2 3 6 Operatives and Members of the public
Flammable and explosive materials to be stored away form delight sunlight in properly ventilated areas
1 3 3
Assessment Date: Next Review Date:
Key: L = Likelihood Sv = Severity R = Risk Rated 1 to 3 - 1 low, 3 high L x Sv = R
NB. This Risk Assessment should be reviewed on a regular basis and following any change in circumstances (LP220 cl. 5.2.6 refers)
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Appendix 6
Q201 19072011
Contract : Gnosall St Lawrence Primary School Contract No : WM53--- Project Specific and Emergency Procedures, Permits and Constraints
Sheet 1 of 1 Rev 0
The following will be operated for the activities or locations listed in order to control the risks associated with those activities or locations.
Project Specific Procedures Required Activity / Location
Identification Cards Yes Any works in existing building
Considerate Constructor Scheme Yes Site, public relations
Working Hours Yes Site working as per contract documents.
Drugs and Alcohol Monitoring Yes Site as per U11
Project Emergency Procedures Required Activity / Location
Emergency contacts L100 Yes Site
Fuel/Chemical Spillage R105 Yes Site
Bomb Threat O69 Yes Site and welfare facilities.
Permit Type Required Activity / Location
L74 Permit to work - General Yes For access to restricted areas.
L74a Hot Work Permit Yes Cutting, welding, grinding, soldering etc.
L74b Ground Disturbance Permit Yes RLD, excavations, fencing, landscaping .
L74c Electrical Work Permit Yes Issued By Sub contractor ONLY
L74d Confined Spaces Permit Yes Deep drainage, small rooms.
L74e Healthcare Infection Permit N/A
G95-96-97 Permit to Load / Unload
Yes propping for floors/ walls
Q715 Permit to Close Yes Walls/ Ceilings
Other
Constraints Permitted Activity / Location
Bonfires No
Smoking No Except in designated areas
Radios No Site
Mobile Phones Yes Site / Red Hat supervisors when safe to do
The persons responsible for the issue or co-ordination of permits are detailed in Appendix A2 of this plan.
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Appendix 7
Q201 16042014
Contract : Gnosall St Lawrence Primary School Contract No : WM53--- Site Rules Sheet 1 of 3 Rev 0
General Site Rules
The wearing of Safety Footwear, High Visibility Clothing and Safety Helmet is a mandatory requirement. The only exceptions are whilst in the site offices, welfare facilities, or by written authority from the Manager of the Project. All personnel working on site and/or Visitors to Site are to sign in at reception/other location using the Site Visitors Book O28 and/or other arrangement. Parking is only permitted in the designated areas. Do not obstruct neighbours driveways. Use the designated walkways to and around the site.
No activity can start on this project unless it has been properly planned; this is normally detailed in a method statement. No person is to start any activity unless they have been briefed and you understand how to carry out the task. If in doubt stop work and ask.
A permit to work is required for any work that involves ground disturbance, entry into confined spaces and hot work.
The wearing of shorts is not permitted.
The taking of alcohol and/or non-prescribed drugs is strictly prohibited on site. Anyone found or believed to be under the influence of either or both will not be permitted to continue working, and will be instructed to leave the site.
The site is no smoking, other than in designated areas.
The use of mobile phones is not permitted, other than in designated areas.
The use of radios is not permitted.
The use of headphones and earphones to listen to music from a personal music device while carrying out vehicle and plant movements is prohibited. No food or drink consumption other than in the canteen area. No pets on site. Do not attempt to lift any load which is too heavy for you. Get help. Do not indulge in horseplay.
We are an Investors in Diversity company and therefore respectful behaviour is expected at all times on sites including dealing with sub-contractors, clients, third parties and members of the general public. This includes any acts that could be perceived as bullying and harassment, for example, violence, aggression, offensive language, intimidation, acts of discrimination e.g. sexist, racist or ageist comments or behaviours. This list is not exhaustive. Incidents of this nature will be considered as serious and appropriate action will be taken dependent on the circumstances.
Welfare and other facilities are to be used and not abused. Treat in a manner you would expect to find them. Good hygiene can prevent conditions such as Leptospirosis or dermatitis. Report missing toiletries to a member of staff.
Any problems or concerns are to be reported straight away to an immediate supervisor or any
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Appendix 7
Q201 16042014
member of the Interserve site team. Any incidents/accidents involving operatives or the public must be recorded and reported to the Site Management
Any enquiries or complaints from the public or local inhabitants must be referred to the Interserve site team. Site Health & Safety Rules
ALL operatives MUST sign in and out in case of an emergency Site hours 7.30 – 17.30 No Deliveries between 8.30 to 9.15am and 2.45 to 3.15pm Mon-Fri “All persons are to stop, not disturb, and report to their supervisor and Interserve management should they come across any material that they suspect may contain asbestos”
No person will be allowed to drive any item of plant unless a current competence card is held. A valid driving licence is also required if driving on a highway. Keep to designated vehicle/plant routes and keep within the site speed limit. Vehicles reversing on site should do so with the aid of a banksman.
All plant shall be inspected before use to ensure it is fit for purpose and well maintained. Only plant in good condition with proper exhaust arrangements will be utilised.
No young person (Under 18 years) will be allowed to work on site unless their employer has completed a risk assessment.
All work areas must be kept tidy and cables elevated wherever practical.
Work at height must be carried out from work platforms unless suitable edge protection is in place. A specific risk assessment must be in place to justify the use of ladders or stepladders. When working at height do not work above other trades.
Scaffolds must only be erected or altered or adjusted by trained persons.
Objects or materials must not be thrown down from height.
Only 110volt and battery operated tools are to be used.
Unauthorised tampering with electrical equipment, guards, barriers and covers or the abuse of any thing that is there to protect you or others is not permitted.
Site Environmental Rules Where practical all plant must be shut down when not required, including during breaks to avoid fuel wastage and unnecessary noise.
All standing plant must be provided with a suitable drip tray.
Plant must only be refuelled in designated areas.
Any spillages must be reported to site management and be cleaned up as soon as possible.
Materials are to be stored only in designated areas. A high standard of cleanliness shall be maintained and rubbish and debris collections shall be as appropriate to achieve this. All operatives are to minimise the wastage of materials. Reusable materials should be stored safely
Use double sided copying wherever possible.
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Appendix 7
Q201 16042014
Waste paper must be collected for recycling.
Switch off lights, heating and computers when not required.
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Appendix 8
Q201 16042014
Contract : Gnosall St Lawrence Primary School Contract No : WM53---
Consultation with Workforce Sheet 1 of 1 Rev 0
Interserve operates an open policy on receiving advice and views from persons at work and welcomes such information. Any member of the site management team may be approached and informed of any concerns that an individual or collective group may have. In addition the following methods of consultation are used on this project.
Project Level (Use drop down menu to change)
Method of Consultation Methods selected
1. Induction Yes
2. Site Progress Meeting (Interserve Construction Team) Yes
3. Notice Boards Yes
4. Safety forum / group Not Applicable
5. Appointed Safety Representatives Not Applicable
6. Elected Representatives Not Applicable
7. S/C Co-ordination Meeting Yes
8. L32-21 Consultation Yes
9.
Work gang Level
Method of Consultation Methods selected
1. Activity Briefings Yes
2. Toolbox Talks Yes
3.
4.
5.
Individual Level
Method of Consultation Methods selected
1. Open Door Policy Yes
2. Directly with each employee Yes
3. Feedback / Suggestion Boxes Yes
4. Confidential Reporting Procedures. Yes
5. Interserve Construction Employee Assessment Not Applicable
6.
7.
8.
All personnel will be informed of this communication process during the site induction. Posters / Notices will be placed at strategic locations to this effect. (See Appendix 10)
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Appendix 9
Q201 16042014
Contract : Gnosall St Lawrence Primary School Contract No : WM53---
Schedule of Management Meetings Sheet 1 of 1 Rev 0
Ref Name Frequency Record
F201 New Project Pre-commencement Date held: F201
F211 External Pre-commencement Once F4a+b
F701 Internal Site Progress Meeting As required F4c
Site Meeting with Client Monthly F14
F723 Subcontractor Post Tender Review Once each Sub Contractor F723Mi
F724 Subcontractor Initial Contract Part A and B as appropriate
Once each Sub Contractor F724Mi
F725 Prestart Safety & Environmental Induction
Once each Sub Contractor F725Mi
F726 Subcontractor Progress As required F726Mi
F731 Site Safety and Environmental Meeting (All S/C)
Monthly F4a+b
F751 Construction Stage Initial Design Team Meeting
Once F4a+b
F754 Design Team Meeting (D&B) As required F4a+b
F941 Project Post Completion Review Once F4c
X28 Customer Satisfaction Once at end of project X28
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Appendix 10
Q201 19072011
Contract : Gnosall St Lawrence Primary School Contract No : WM53---
Schedule of Documented Information to be Displayed Sheet 1 of 1 Rev 0
Mandatory Optional as Required
Location Q201 P
roje
ct
Mana
ge
ment P
lan
Em
plo
yers
Lia
bility
In
sura
nce
HS
E F
10
Health
& S
afe
ty
Polic
y B
ookle
t
Code fo
r S/C
’s
(L8)
Accid
en
t Book
Site
Facilitie
s
Vis
itors
Notic
e
Site
Ru
les
L100
L108
- Firs
t Aid
er
L120
- Firs
t Aid
Notic
e
L72a
Fire
Actio
n
Health
& S
afe
ty
Law
O50 P
olic
y
Sta
tem
ents
Consulta
tion w
ith
Work
forc
e L
32
-21
Em
erg
ency E
xit
Route
s
Route
to H
ospita
l
RV
P A
ccess
Poin
ts
Obje
ctiv
es
Fuel/C
he
mic
al
Spilla
ge (R
10
5)
No S
mokin
g s
igns
Every Office D N D
Common Areas N D D
All fire call points N D
Reception notice Board Upstairs
D D D D D D D D D D N D D D D D D D
Canteen D D D D D D D D D D N D D D D D D D
Toilets D D N D D
Induction Room D D D D D D D D D D D N D D D D D D D D D
Key: D Designated N Not Applicable
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Appendix 11
Q201 19072011 Key: D Designated N Not Applicable For System and Safety Audits enter a planned date or Frequency / Interval i.e. 3M = 3 monthly - for all others enter D
Contract : Gnosall St Lawrence Primary School Contract No : WM53---
Monitoring Arrangements / Audit Schedule Sheet 1 of 1 Rev 0
Person Responsible
Exte
rna
l Syste
m
Aud
it
Inte
rna
l Syste
m A
ud
it
Safe
ty A
udit
Safe
ty A
dvis
or's
Month
ly In
sp
ectio
n
Contra
ct M
an
agers
Month
ly P
roje
ct P
lan
Valid
atio
n &
Syste
ms
check
L91 In
spectio
ns
(Weekly
)
L4 &
L4
a H
&S
, Env.
Inspectio
ns (W
eekly
)
On-lin
e D
ispla
y
Scre
en A
ssessm
ent
(Once)
H1 D
aily
Dia
ries
H27 D
aily
Allo
ca
tions
Safety Advisor – George Lamplough
As d
ete
rmin
ed
by c
urre
nt B
M
Tra
da A
udit P
rogra
mm
e
As d
ete
rmin
ed
by c
urre
nt a
ud
it
pro
gra
mm
e p
rep
are
d b
y
appro
pria
te B
.I.M. –
gene
rally
to
be a
t thre
e m
onth
ly in
terv
als
As d
ete
rmin
ed
by c
urre
nt a
ud
it
pro
gra
mm
e p
rep
are
d b
y H
& S
Co
rpo
rate
Se
rvic
es
D D
Contract Manager – TBC D
Project Manager – TBC D D D D
Engineer – TBC S S
BIM- Colin Wright
B.M.Trada
Project Validation Record to be completed by Contracts Manager or other Senior Manager designated to undertake monthly validation of the plan and Visiting Managers (Monthly) Integrated Systems Check and Review (Q22F)
Print Initials
Month/Year
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Appendix 12
Note: The hazards and issues above have been identified by Interserve Construction to assist those planning the works, they may not be exhaustive and need to be supplemented where appropriate by trade specialists or where required by site conditions. Where indicated risk assessment and method statements are required, detailing controls that address the hazards and issues indicated. Works are not to commence until Interserve Construction have reviewed the submitted documentation and confirmed that it is adequate for work to commence. Minimum controls are detailed in the Interserve Construction health and safety, and environmental management systems, and duplicated in the Interserve Construction Health, Safety and Sustainability Codes for Subcontractors (L8). Use L9r to register receipt and status of the System of Work
Q201 16042014
Contract : Gnosall St Lawrence Primary School Contract No : WM53---
Hazard Identification for Activities that Contain Risk (A copy of this Appendix must be provided to all Supply Chain Members) Sheet 1 of 2 Rev 0
Hazards / Impacts
D1
D1a
D2
D3
D4
D5
D6
D7
D8
D9
D10
D11
D12
D13
D14
D15
D16
D17
D18
D19
D20
D21
D22
D23
D23
a
D24
D25
D26
D27
D28
D29
D30
R20
2-R
1
R20
2-R
2
R20
2-R
3
R20
2-R
4
R20
2-R
5
R20
2-R
6
R20
2-R
7
R20
2-R
8
R20
2-R
9
R20
2-R
10
R20
2-R
11
R20
2-R
12
R20
2-R
13
Activities / Packages
Ve
hic
le &
Pla
nt M
ove
me
nts
Deliv
erie
s, L
oa
din
g a
nd U
nlo
ad
ing
Pu
blic
Fla
mm
ab
le S
ub
sta
nce
s
(Fire
/ Exp
losio
n)
Und
erfo
ot C
on
ditio
ns
(Slip
s, T
rips a
nd
Fa
lls)
Wo
rkin
g a
t Heig
ht - G
en
era
l
Wo
rkin
g a
t Heig
ht - S
ca
ffold
s
Wo
rkin
g a
t Heig
ht - M
EW
P's
Se
rvic
es (|B
urie
d / O
ve
rhe
ad
)
Exca
va
tion
s
Pla
nt &
Eq
uip
me
nt
Liftin
g O
pera
tion
s - C
ran
ea
ge
Liftin
g O
pera
tion
- Exca
va
tors
Ma
nu
al H
and
ling
Ele
ctric
ity
Haza
rdo
us S
ub
sta
nce
s (C
OS
HH
)
Le
ad
Asb
esto
s
Nois
e
Vib
ratio
n
Con
fine
d S
pa
ce
s
Dem
olitio
n
Roa
dw
ork
s
Mic
rob
iolo
gic
al H
aza
rds
Mic
rob
iolo
gic
al H
aza
rds H
ea
lthca
re
Wo
rkin
g O
ve
r / Nea
r Wate
r
Stru
ctu
ral In
sta
bility
Lo
ne
Work
ing
Fo
od
Pre
pa
ratio
n
(Can
tee
n F
acilitie
s)
Dis
pla
y S
cre
en
Eq
uip
men
t
Non
-ion
isin
g R
ad
iatio
n
Incle
me
nt / E
xtre
me
Wea
the
r
Non
-Haza
rdo
us W
aste
Con
tam
ina
ted
La
nd
Dem
olitio
n
Exca
va
tion
an
d F
illing
Haza
rdo
us W
aste
Sp
ecia
l Waste
Cultu
ral H
erita
ge
Em
issio
ns to
Air
Use o
f En
erg
y a
nd
Wate
r
Site
Ma
na
gem
en
t of M
ate
rials
Raw
Ma
teria
l Se
lectio
n
Eco
log
y
Nuis
an
ce
(inc T
ran
sp
ort)
Dis
ch
arg
es to
La
nd
an
d W
ate
r
Cou
rse
s
Ris
k A
sse
ssm
en
t an
d M
eth
od
Sta
tem
en
t Requ
ired
Te
mp
ora
ry W
ork
s C
he
ck R
equ
ired
Site Cabins X X X X X X X X X Y Y
Hoarding/Heras Fencing X X X X X X X X X X X X X X Y Y
Drainage X X X X X X X X X X X X X X X X X X X X X X Y Y
Groundworks X X X X X X X X X X X X X X X X X X X X X X X Y Y
Concrete X X X X Y Y
Incoming Services X X X X X X X X X X X X X X X Y Y
SIPS Frame X X X X X X X X X X X X X X X Y Y
Brickwork X X X X X X X X X X X Y Y
Render X X X X X X X X X Y Y
UPVC Windows X X X X X X X X X Y Y
Aluminium Curtain Walling X X X X X X X X X Y Y
Standing Seam Roof X X X X X X X X X X X Y Y
Single Ply Roofing X X X X X X X X X X X X X Y Y
Scaffolding X X X X X X X X X Y Y
Canopies X X X X X X X X X Y Y
Dryling/Plaster/Skim X X X X X X Y Y
Ceilings X X X X X X Y Y
Joinery X X X X X X Y Y
Decorations X X X X X X X Y Y
Mechanical X X X X X X X X X X X X X X Y Y
Electrical X X X X X X X X X X X X X X X X Y Y
Floor Finishes X X X X X X X Y Y
Tiling X X X X X Y Y
Fencing X X X X X X X X X x X X X Y Y
INTERSERVE CONSTRUCTION Q201
PROJECT MANAGEMENT PLAN Appendix 12
Note: The hazards and issues above have been identified by Interserve Construction to assist those planning the works, they may not be exhaustive and need to be supplemented where appropriate by trade specialists or where required by site conditions. Where indicated risk assessment and method statements are required, detailing controls that address the hazards and issues indicated. Works are not to commence until Interserve Construction have reviewed the submitted documentation and confirmed that it is adequate for work to commence. Minimum controls are detailed in the Interserve Construction health and safety, and environmental management systems, and duplicated in the Interserve Construction Health, Safety and Sustainability Codes for Subcontractors (L8). Use L9r to register receipt and status of the System of Work
Q201 16042014
Contract : Gnosall St Lawrence Primary School Contract No : WM53---
Hazard Identification for Activities that Contain Risk (A copy of this Appendix must be provided to all Supply Chain Members) Sheet 2 of 2 Rev 0
Hazards / Impacts
D1
D1a
D2
D3
D4
D5
D6
D7
D8
D9
D10
D11
D12
D13
D14
D15
D16
D17
D18
D19
D20
D21
D22
D23
D23
a
D24
D25
D26
D27
D28
D29
D30
R20
2-R
1
R20
2-R
2
R20
2-R
3
R20
2-R
4
R20
2-R
5
R20
2-R
6
R20
2-R
7
R20
2-R
8
R20
2-R
9
R20
2-R
10
R20
2-R
11
R20
2-R
12
R20
2-R
13
Activities / Packages
Ve
hic
le &
Pla
nt M
ove
me
nts
Deliv
erie
s, L
oa
din
g a
nd U
nlo
ad
ing
Pu
blic
Fla
mm
ab
le S
ub
sta
nce
s
(Fire
/ Exp
losio
n)
Und
erfo
ot C
on
ditio
ns
(Slip
s, T
rips a
nd
Fa
lls)
Wo
rkin
g a
t Heig
ht - G
en
era
l
Wo
rkin
g a
t Heig
ht - S
ca
ffold
s
Wo
rkin
g a
t Heig
ht - M
EW
P's
Se
rvic
es (|B
urie
d / O
ve
rhe
ad
)
Exca
va
tion
s
Pla
nt &
Eq
uip
me
nt
Liftin
g O
pera
tion
s - C
ran
ea
ge
Liftin
g O
pera
tion
- Exca
va
tors
Ma
nu
al H
and
ling
Ele
ctric
ity
Haza
rdo
us S
ub
sta
nce
s (C
OS
HH
)
Le
ad
Asb
esto
s
Nois
e
Vib
ratio
n
Con
fine
d S
pa
ce
s
Dem
olitio
n
Roa
dw
ork
s
Mic
rob
iolo
gic
al H
aza
rds
Mic
rob
iolo
gic
al H
aza
rds H
ea
lthca
re
Wo
rkin
g O
ve
r / Nea
r Wate
r
Stru
ctu
ral In
sta
bility
Lo
ne
Work
ing
Fo
od
Pre
pa
ratio
n
(Can
tee
n F
acilitie
s)
Dis
pla
y S
cre
en
Eq
uip
men
t
Non
-ion
isin
g R
ad
iatio
n
Incle
me
nt / E
xtre
me
Wea
the
r
Non
-Haza
rdo
us W
aste
Con
tam
ina
ted
La
nd
Dem
olitio
n
Exca
va
tion
an
d F
illing
Haza
rdo
us W
aste
Sp
ecia
l Waste
Cultu
ral H
erita
ge
Em
issio
ns to
Air
Use o
f En
erg
y a
nd
Wate
r
Site
Ma
na
gem
en
t of M
ate
rials
Raw
Ma
teria
l Se
lectio
n
Eco
log
y
Nuis
an
ce
(inc T
ran
sp
ort)
Dis
ch
arg
es to
La
nd
an
d W
ate
r
Cou
rse
s
Ris
k A
sse
ssm
en
t an
d M
eth
od
Sta
tem
en
t Requ
ired
Te
mp
ora
ry W
ork
s C
he
ck R
equ
ired
Kerbs, Edgings x X X X X X X X X X Y Y
Paving, slabing x X X X X X X X X Y Y
Tarmac X X X X X X X X X Y Y
Soft Landscaping X X X X X X X X X X X X X X Y Y
External furniture X X X X X X X Y Y
White Lining X X X X X Y Y
INTERSERVE CONSTRUCTION
STAKEHOLDER COMMUNICATION STRATEGY MATRIXAppendix 19
Contract No: Revision No:
Name Frequency
Project Team
Client Education Funding Agency
33Greycoat Street, London, SW1P 2QF
Tim Westwood/ Fred
Ward
Project Manager Project Manager Monthly Monthly progress
meetings
Minutes of meetings ICL/EFA NO B
Material Supplier Interserve Construction Buying Department,
Karen Perks, George Road Offices
Karen Perks As required P66 order Email saved on H
drive
NO P
Sub Contractor Various Supply Chain Various During enquiry,
as required,
during site
progress
meetings
Email and site
meetings
Email saved on H
drive, metings (F)
As required NO K/F
Statutory Bodies
District Council Weekly, monthly
meetings
Weekly, monthly client
progress meetings
Minutes of meeting,
diary input
All main parties if
required
NO B/H1
Environment Agency / SEPA National customer contact centre, PO Box
544 Rotheram, S60 1BY, 03708 506 507
Project Manager As required As required Minutes of meeting,
diary input
All main parties if
required
NO B/H1
Highway Route Manager
Statutory Undertakers
Health & Safety Executive 1 Hagley Road, Birmingham, B16 8HS Project Manager As required on site meetings, email minutes of meeting All main parties if
required
NO L
Environmental Health Environmental Health Area Office North, 581
Tyburn Road, Erdington, Birmingham B24
9RX
Project Manager As required on site meetings, email minutes of meeting All main parties if
required
NO B/R
Local Community
Emergency Services
Local Authority / Parish Council
Land Agents n/a
Land Tenant n/a
Landowners
Public
Local Residents Surrounding residents and businesses Project Manager Project Manager Monthly basis letter drop Saved on H drive to school and project
officer
B
Utilities
Severn Trent Water Authority 0800 783 4444 Project Manager As required on site meetings, email minutes of meeting All main parties if
required
NO B
Western Power Distribution 0800 328 1111 / 0121 623 9780 Project Manager As required on site meetings, email minutes of meeting All main parties if
required
NO B
British Telecom 0800 917 3993 Project Manager As required on site meetings, email minutes of meeting All main parties if
required
NO B
Gas 800 111 999 Project Manager As required on site meetings, email minutes of meeting All main parties if
required
NO B
1 = Interserve 2 = Client 3 = Designer 4 = CDM Co-ordinator
WM53--- 0Continuing/Development
Interserve Construction Record of
Communication
Circulation
Requirements File
Refe
r
ence
A21
(Yes /
No)
Means Of
Communication with
Stakeholder
Stakeholder Contact Details
(Name, Address and Telephone No.)
Stakeholder Contact
(Name)
Initial Interserve
Construction Contact
Gnosall St Lawrence Primary SchoolContract:
Q201 16042014
Resp
onsib
l
Stakeholder
INTERSERVE CONSTRUCTION Q201
CONSTRUCTION (DESIGN & MANAGEMENT) REGULATIONS 2007 Appendix 20
Q201 16042014
Schedule of Construction Phase Plan Requirements (As Appendix 3 of the CDM ACoP) including Reference to the Appropriate Sections of the Interserve Construction Project Management Plan (Q201) Extract from Appendix 3 of the CDM ACoP, “When drawing up the construction phase plan, you should consider each of the following topics. Information should be included in the plan where the topic is relevant to the work proposed. The plan sets out how health and safety is to be managed during the construction phase. The level of detail should be proportionate to the risks involved in the project”. Extract from paragraph 163 of the CDM ACoP, “The topics that need to be addressed when developing the construction phase plan are shown at Appendix 3. Where other available documents address these issues appropriately, the plan may refer to them; the information does not need to be repeated”.
ACoP Description Q 201 Section
Description of Project
(a) Project description and programme details, including any key dates; “Description of Project”, “Programme Duration” and “Methodology Overview”
(b) Details of client, CDM co-ordinator, designers, principal contractor and other consultants;
“Project Team”
(c) Extent and location of existing records and plans that are relevant to health and safety on site, including information about existing structures when appropriate.
“Existing Health & Safety Files and other Information Relevant to the Conditions or Hazards Present in Existing Structures”
Management of the Work
(a) Management structure and responsibilities; Appendix A1, “Management Organisation” and Appendix A2, “Responsibilities”
(b) Health and safety goals for the project and arrangements for monitoring and review of health and safety performance;
“Introduction” and “Measurement and KPI’s”
(c) Arrangements for:-
INTERSERVE CONSTRUCTION Q201
CONSTRUCTION (DESIGN & MANAGEMENT) REGULATIONS 2007 Appendix 20
Q201 16042014
(i) regular liaison between parties on site, “Public Liason” and Co-ordination Arrangements”
(ii) consultation with the workforce, Appendix A8, “Communication with Workforce”
(iii) the exchange of design information between the client, designers, CDM co-ordinator and contractors on site,
“Co-ordination Arrangements”
(iv) handling design changes during the project, “Co-ordination Arrangements”
(v) the selection and control of contractors, “Organisations - Selection and Assessment of Contractors and Suppliers”
(vi) the exchange of health and safety information between contractors, “Co-ordination Arrangements”, “Information and Training for People on Site” and Appendix A9, Schedule of Management “Meetings”
(vii) site security, Appendix A4, Site Facilities”, Appendix A6,”Project Specific and Emergency Procedures, Permits and Constraints”, Appendix 12, “Hazard Identification for Activities that Contain Risk” (D2 Public)
(viii) site induction, “Information and Training for People on Site”
(ix) on-site training, “Information and Training for People on Site”
(x) welfare facilities and first aid, Appendix A4, “Site Facilities”, “Project Emergency Arrangements” and Appendix A6, “Project Specific and Emergency Procedures, Permits and Constraints”
(xi) the reporting and investigation of accidents and incidents including near misses,
“Unplanned Events Reporting and Investigation”
(xii) the production and approval of risk assessments and written systems of work;
“Planning the Works and Identification of Necessary Controls”, Appendix 12, “Hazard Identification for Activities that Contain
INTERSERVE CONSTRUCTION Q201
CONSTRUCTION (DESIGN & MANAGEMENT) REGULATIONS 2007 Appendix 20
Q201 16042014
Risk” and “Co-ordination Arrangements and Exchange of Information”
(d) Site rules (including drug and alcohol policy); Appendix A7 “Site Rules”
(e) Fire and emergency procedures. “Project Emergency Arrangements”, Appendix A4, Site Facilities”, Appendix A5 “Project Fire Safety Arrangements” and Appendix A6,”Project Specific and Emergency Procedures
Arrangements for Controlling Significant Site Risks
(a) Safety risks, including:- Through the risk assessment and method statement process described in “Control of the Works”, Appendix 12, “Hazard Identification for Activities that Contain Risk” and “Co-ordination Arrangements”
Minimum controls and arrangements are detailed in the Interserve Construction management systems, specifically in procedure LP 220, “Risk Assessment, Appendix LP220/D.
These minimum controls/arrangements are mirrored in the Codes for Subcontractors (L8) to ensure consistency of standards for both direct Interserve Construction and subcontract works.
(i) delivery and removal of materials (including waste) and work equipment taking account of any risks to the public, for example during access to or egress from the site,
LP 220, “Risk Assessment, Appendix LP220/D – D1a
(ii) dealing with services – water, electricity and gas, including overhead powerlines and temporary electrical installations,
LP 220, “Risk Assessment, Appendix LP220/D – D8 & D14
(iii) accommodating adjacent land use, LP 220, “Risk Assessment, Appendix LP220/D – D2
(iv) stability of structures whilst carrying out construction work, LP 220, “Risk Assessment, Appendix LP220/D – D25
INTERSERVE CONSTRUCTION Q201
CONSTRUCTION (DESIGN & MANAGEMENT) REGULATIONS 2007 Appendix 20
Q201 16042014
including temporary structures and existing unstable structures,
(v) preventing falls, LP 220, “Risk Assessment, Appendix LP220/D – D5, D6, & D7
(vi) work with or near fragile materials, LP 220, “Risk Assessment, Appendix LP220/D – D5
(vii) control of lifting operations, LP 220, “Risk Assessment, Appendix LP220/D – D11 & D12
(viii) the maintenance of plant and equipment, LP 220, “Risk Assessment, Appendix LP220/D – D10
(ix) work on excavations and work where there are poor ground conditions,
LP 220, “Risk Assessment, Appendix LP220/D – D9
(x) work on wells, underground earthworks and tunnels, LP 220, “Risk Assessment, Appendix LP220/D – D9
(xi) work on or near water where there is a risk of drowning, LP 220, “Risk Assessment, Appendix LP220/D – D24
(xii) work involving diving, Specialist works, no standard controls, specialist competent contractors would be engaged as “Organisations - Selection and Assessment of Contractors and Suppliers”, specific risk would be added in “spare” column of Appendix 12, “Hazard Identification for Activities that Contain Risk”, specialist competent contractor to develop risk assessment and method statements as described in “Control of the Works”
(xiii) work in a caisson or compressed air working, As above
(xiv) work involving explosives, As above
(xv) traffic routes and segregation of vehicles and pedestrians, LP 220, “Risk Assessment, Appendix LP220/D – D1
(xvi) storage of materials (particularly hazardous materials) and work equipment,
LP 220, “Risk Assessment, Appendix LP220/D – D15
General storage arrangements in Appendix A4, Site Facilities”,
INTERSERVE CONSTRUCTION Q201
CONSTRUCTION (DESIGN & MANAGEMENT) REGULATIONS 2007 Appendix 20
Q201 16042014
(xvii) any other significant safety risks. Specific risk would be added in “spare” column of Appendix 12, “Hazard Identification for Activities that Contain Risk”, specialist competent contractor to develop risk assessment and method statements as described in “Control of the Works”
(b) Health risks, including:- Through the risk assessment and method statement process described in “Control of the Works”, Appendix 12, “Hazard Identification for Activities that Contain Risk” and “Co-ordination Arrangements”
Minimum controls and arrangements are detailed in the Interserve Construction management systems, specifically in procedure LP 220, “Risk Assessment, Appendix LP220/D.
These minimum controls/arrangements are mirrored in the Codes for Subcontractors (L8) to ensure consistency of standards for both direct Interserve Construction and subcontract works.
(i) the removal of asbestos, LP 220, “Risk Assessment, Appendix LP220/D – D17
(ii) dealing with contaminated land, LP 220, “Risk Assessment, Appendix LP220/D – D15
(iii) manual handling, LP 220, “Risk Assessment, Appendix LP220/D – D13
(iv) use of hazardous substances, particularly where there is a need for health monitoring,
LP 220, “Risk Assessment, Appendix LP220/D – D15
(v) reducing noise and vibration, LP 220, “Risk Assessment, Appendix LP220/D – D18 & 19
(vi) work with ionising radiation, Specialist works, no standard controls, specialist competent contractors would be engaged as “Organisations - Selection and Assessment of Contractors and Suppliers”, specific risk would be added in “spare” column of Appendix 12, “Hazard Identification for Activities that Contain Risk”, specialist competent
INTERSERVE CONSTRUCTION Q201
CONSTRUCTION (DESIGN & MANAGEMENT) REGULATIONS 2007 Appendix 20
Q201 16042014
contractor to develop risk assessment and method statements as described in “Control of the Works”
(vii) exposure to UV radiation (from the sun), LP 220, “Risk Assessment, Appendix LP220/D – D29
(viii) any other significant health risks, Specific risk would be added in “spare” column of Appendix 12, “Hazard Identification for Activities that Contain Risk”, specialist competent contractor to develop risk assessment and method statements as described in “Control of the Works”
The Health and Safety File
(a) Layout and format; Health and Safety File Arrangements”
(b) Arrangements for the collection and gathering of information; Health and Safety File Arrangements”
(c) Storage of information. Health and Safety File Arrangements”