  • T.F. Green Airport Improvement Program Environmental Impact Statement and Final Section 4(f) Evaluation

    Appendix K

    Water Quality

    T.F. Green Airport Warwick, Rhode Island

    Prepared for Federal Aviation Administration

    Prepared by

    July 2011

  • T.F. Green Airport Improvement Program Environmental Impact Statement and Final Section 4(f) Evaluation

    This Page Intentionally Left Blank

  • T.F. Green Airport Improvement Program Environmental Impact Statement and Final Section 4(f) Evaluation

    T.F. Green Airport Improvement Program FEIS Appendix

    Appendix K, Water Quality, of this Final Environmental Impact Statement (FEIS) provides updated and new technical information since the publication of the Draft Environmental Impact Statement (DEIS) in July 2010. The DEIS, provided on the enclosed DVD, contained a corresponding technical report, Water Quality Technical Report, describing significant technical information pertaining to the water quality analysis. It is intended that this FEIS appendix provide an update to the DEIS technical report. Reviewers should consult both the DEIS and FEIS for full documentation.

    Table of Contents

    K.1 HydroCAD Calculations ......................................................................... K-1

    K.2 Pond Sizing Analysis .......................................................................... K-15

    K.3 Water Quality Monitoring Data ............................................................. K-21

    Appendix K – Water Quality K-i July 2011 \\Mawatr\ev\09228.00\reports\FEIS_Final_July_2011\PVD_App_K_WQ\PVD_Appendix_K_WQ_JUL_2011.doc

    eheacockSticky NoteMarked set by eheacock

  • T.F. Green Airport Improvement Program Environmental Impact Statement and Final Section 4(f) Evaluation

    This Page Intentionally Left Blank

    Appendix K – Water Quality K-ii July 2011 \\Mawatr\ev\09228.00\reports\FEIS_Final_July_2011\PVD_App_K_WQ\PVD_Appendix_K_WQ_JUL_2011.doc

  • T.F. Green Airport Improvement Program Environmental Impact Statement and Final Section 4(f) Evaluation

    K.1 HydroCAD Calculations

    The following sections provide the results of the HydroCAD Calculations for the 2004 Baseline Condition and the proposed T.F. Green Airport Improvement Program Preferred Alternative (Alternative B4).

    Appendix K – Water Quality K-1 July 2011 \\Mawatr\ev\09228.00\reports\FEIS_Final_July_2011\PVD_App_K_WQ\PVD_Appendix_K_WQ_JUL_2011.doc

  • T.F. Green Airport Improvement Program Environmental Impact Statement and Final Section 4(f) Evaluation

    This Page Intentionally Left Blank

    Appendix K – Water Quality K-2 July 2011 \\Mawatr\ev\09228.00\reports\FEIS_Final_July_2011\PVD_App_K_WQ\PVD_Appendix_K_WQ_JUL_2011.doc

  • EX1BBN DP1

    Buckeye Brook North To Buckeye Brook North

    EX2WP DP2

    Warwick Pond To Warwick Pond

    EX3BBS DP3

    Buckeye Brook South To Buckeye Brook South

    EX4TB DP4

    Tuscatucket Brook To Tuscatucket Brook

    EX5CB DP5

    Callahan Brook To Callahan Brook

    Drainage Diagram for 0922806 Existing ConditionsSubcat Reach Pond Link Prepared by Vanasse Hangen Brustlin, Inc.,  Printed 2/2/2011

    HydroCAD® 9.00  s/n 01237  © 2009 HydroCAD Software Solutions LLC

    K-3

  •    

         

       

         

       

         

       

         

       

         

          

    0922806 Existing Conditions Type III 24hr 100 Year  Rainfall=8.70" Prepared by Vanasse Hangen Brustlin, Inc. Printed  2/2/2011 HydroCAD® 9.00  s/n 01237  © 2009 HydroCAD Software Solutions LLC Page 2

    Time span=5.0020.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR20 method, UH=SCS

    Reach routing by StorInd+Trans method  Pond routing by StorInd method

    Subcatchment EX1BBN: Buckeye Brook Runoff Area=598.000 ac  39.98% Impervious  Runoff Depth>4.21" Flow Length=8,175'  Tc=47.8 min  CN=66  Runoff=1,436.88 cfs  209.596 af

    Subcatchment EX2WP: Warwick Pond Runoff Area=23.900 ac  48.95% Impervious  Runoff Depth>4.48" Flow Length=1,213'  Tc=23.8 min  CN=68  Runoff=84.51 cfs  8.916 af

    Subcatchment EX3BBS: Buckeye Brook Runoff Area=458.500 ac  33.13% Impervious  Runoff Depth>3.75" Flow Length=4,962'  Tc=44.1 min  CN=62  Runoff=1,025.46 cfs  143.269 af

    Subcatchment EX4TB: Tuscatucket  Runoff Area=145.600 ac  24.04% Impervious  Runoff Depth>2.73" Flow Length=2,031'  Tc=44.7 min  CN=53  Runoff=230.28 cfs  33.143 af

    Subcatchment EX5CB: Callahan Brook Runoff Area=132.900 ac  19.49% Impervious  Runoff Depth>2.87" Flow Length=1,566'  Tc=26.6 min  CN=54  Runoff=281.90 cfs  31.738 af

    Link DP1: To Buckeye Brook North  Inflow=1,436.88 cfs  209.596 af Primary=1,436.88 cfs  209.596 af

    Link DP2: To Warwick Pond  Inflow=84.51 cfs  8.916 af Primary=84.51 cfs  8.916 af

    Link DP3: To Buckeye Brook South  Inflow=1,025.46 cfs  143.269 af Primary=1,025.46 cfs  143.269 af

    Link DP4: To Tuscatucket Brook  Inflow=230.28 cfs  33.143 af Primary=230.28 cfs  33.143 af

    Link DP5: To Callahan Brook  Inflow=281.90 cfs  31.738 af Primary=281.90 cfs  31.738 af

    Total Runoff Area = 1,358.900 ac  Runoff Volume = 426.662 af  Average Runoff Depth = 3.77" 65.88% Pervious = 895.300 ac  34.12% Impervious = 463.600 ac

    K-4

    http:Primary=281.90http:Inflow=281.90http:Primary=230.28http:Inflow=230.28http:Primary=1,025.46http:Inflow=1,025.46http:Primary=84.51http:Inflow=84.51http:Primary=1,436.88http:Inflow=1,436.88http:Runoff=281.90http:Depth>2.87http:Runoff=230.28http:Depth>2.73http:Runoff=1,025.46http:Depth>3.75http:Runoff=84.51http:Depth>4.48http:Runoff=1,436.88http:Depth>4.21http:span=5.00�20.00http:Rainfall=8.70

  •    

     

    0922806 Existing Conditions Type III 24hr 100 Year  Rainfall=8.70" Prepared by Vanasse Hangen Brustlin, Inc. Printed  2/2/2011 HydroCAD® 9.00  s/n 01237  © 2009 HydroCAD Software Solutions LLC Page 3

    Summary for Subcatchment EX1BBN: Buckeye Brook North

    Runoff = 1,436.88 cfs @  12.67 hrs,  Volume= 209.596 af,  Depth> 4.21"

    Runoff by SCS TR20 method, UH=SCS, Time Span= 5.0020.00 hrs, dt= 0.05 hrs Type III 24hr 100 Year  Rainfall=8.70"

    Area (ac) CN Description 239.100 98 Paved parking, HSG A 180.600 43 Woods/grass comb., Fair, HSG A

    8.500 76 Woods/grass comb., Fair, HSG C 11.500 82 Woods/grass comb., Fair, HSG D

    158.300 43 Woods/grass comb., Fair, HSG A 598.000 66 Weighted Average 358.900 60.02% Pervious Area 239.100 39.98% Impervious Area

    Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs)

    9.6 50 0.0050 0.09 Sheet Flow, 

    Grass: Short  n= 0.150  P2= 3.30"

    1.5 194 0.0110 2.13 Shallow Concentrated Flow, 

    Paved  Kv= 20.3 fps

    36.7 7,931 0.0025 3.60 11.31 Pipe Channel, 

    24.0"  Round  Area= 3.1 sf  Perim= 6.3'  r= 0.50' n= 0.013  Concrete pipe, bends & connections

    47.8 8,175 Total

    Summary for Subcatchment EX2WP: Warwick Pond

    Runoff = 84.51 cfs @  12.33 hrs,  Volume= 8.916 af,  Depth> 4.48"

    Runoff by SCS TR20 method, UH=SCS, Time Span= 5.0020.00 hrs, dt= 0.05 hrs Type III 24hr 100 Year  Rainfall=8.70"

    Area (ac) CN Description 11.700 98 Paved parking, HSG A

    0.400 39 >75% Grass cover, Good, HSG A * 11.800 39 >75% Grass cover, Good, HSG A (assumed)

    23.900 68 Weighted Average 12.200 51.05% Pervious Area 11.700 48.95% Impervious Area

    K-5

    http:Rainfall=8.70http:5.00�20.00http:Rainfall=8.70http:5.00�20.00http:1,436.88http:Rainfall=8.70

  •    

     

       

     

    0922806 Existing Conditions Type III 24hr 100 Year  Rainfall=8.70" Prepared by Vanasse Hangen Brustlin, Inc. Printed  2/2/2011 HydroCAD® 9.00  s/n 01237  © 2009 HydroCAD Software Solutions LLC Page 4

    Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.6 100 0.0030 0.08 Sheet Flow, 

    Grass: Short  n= 0.150  P2= 3.30" 0.3 50 0.0340 2.97 Shallow Concentrated Flow, 

    Unpaved  Kv= 16.1 fps 2.9 1,063 0.0070 6.02 18.93 Pipe Channel, 

    24.0"  Round  Area= 3.1 sf  Perim= 6.3'  r= 0.50' n= 0.013  Concrete pipe, bends & connections

    23.8 1,213 Total

    Summary for Subcatchment EX3BBS: Buckeye Brook South

    Runoff = 1,025.46 cfs @  12.62 hrs,  Volume= 143.269 af,  Depth> 3.75"

    Runoff by SCS TR20 method, UH=SCS, Time Span= 5.0020.00 hrs, dt= 0.05 hrs Type III 24hr 100 Year  Rainfall=8.70"

    Area (ac) CN Description 151.900 98 Paved parking, HSG A

    47.000 39 >75% Grass cover, Good, HSG A 9.200 61 >75% Grass cover, Good, HSG B

    35.800 74 >75% Grass cover, Good, HSG C 5.400 80 >75% Grass cover, Good, HSG D

    209.200 39 >75% Grass cover, Good, HSG A 458.500 62 Weighted Average 306.600 66.87% Pervious Area 151.900 33.13% Impervious Area

    Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.1 100 0.0140 0.15 Sheet Flow, 

    Grass: Short  n= 0.150  P2= 3.30" 15.7 1,126 0.0055 1.19 Shallow Concentrated Flow, 

    Unpaved  Kv= 16.1 fps 17.3 3,736 0.0025 3.60 11.31 Pipe Channel, 

    24.0"  Round  Area= 3.1 sf  Perim= 6.3'  r= 0.50' n= 0.013  Concrete pipe, bends & connections

    44.1 4,962 Total

    Summary for Subcatchment EX4TB: Tuscatucket Brook

    Runoff = 230.28 cfs @  12.66 hrs,  Volume= 33.143 af,  Depth> 2.73"

    Runoff by SCS TR20 method, UH=SCS, Time Span= 5.0020.00 hrs, dt= 0.05 hrs Type III 24hr 100 Year  Rainfall=8.70"

    K-6

    http:Rainfall=8.70http:5.00�20.00http:Rainfall=8.70http:5.00�20.00http:1,025.46http:Rainfall=8.70

  •    

     

       

     

    0922806 Existing Conditions Type III 24hr 100 Year  Rainfall=8.70" Prepared by Vanasse Hangen Brustlin, Inc. Printed  2/2/2011 HydroCAD® 9.00  s/n 01237  © 2009 HydroCAD Software Solutions LLC Page 5

    Area (ac) CN Description 35.000 98 Paved parking, HSG A 29.300 39 >75% Grass cover, Good, HSG A 81.300 39 >75% Grass cover, Good, HSG A

    145.600 53 Weighted Average 110.600 75.96% Pervious Area

    35.000 24.04% Impervious Area

    Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.6 100 0.0030 0.08 Sheet Flow, 

    Grass: Short  n= 0.150  P2= 3.30" 22.9 1,498 0.0046 1.09 Shallow Concentrated Flow, 

    Unpaved  Kv= 16.1 fps 1.2 433 0.0067 5.89 18.52 Pipe Channel, 

    24.0"  Round  Area= 3.1 sf  Perim= 6.3'  r= 0.50' n= 0.013  Concrete pipe, bends & connections

    44.7 2,031 Total

    Summary for Subcatchment EX5CB: Callahan Brook

    Runoff = 281.90 cfs @  12.40 hrs,  Volume= 31.738 af,  Depth> 2.87"

    Runoff by SCS TR20 method, UH=SCS, Time Span= 5.0020.00 hrs, dt= 0.05 hrs Type III 24hr 100 Year  Rainfall=8.70"

    Area (ac) CN Description 25.900 98 Paved parking, HSG A 91.100 43 Woods/grass comb., Fair, HSG A

    0.800 65 Woods/grass comb., Fair, HSG B 15.100 43 Woods/grass comb., Fair, HSG A

    132.900 54 Weighted Average 107.000 80.51% Pervious Area

    25.900 19.49% Impervious Area

    Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.6 100 0.0060 0.11 Sheet Flow, 

    Grass: Short  n= 0.150  P2= 3.30" 7.8 585 0.0038 1.25 Shallow Concentrated Flow, 

    Paved  Kv= 20.3 fps 3.2 881 0.0040 4.55 14.31 Pipe Channel, 

    24.0"  Round  Area= 3.1 sf  Perim= 6.3'  r= 0.50' n= 0.013  Concrete pipe, bends & connections

    26.6 1,566 Total

    K-7

    http:Rainfall=8.70http:5.00�20.00http:Rainfall=8.70

  • 0922806 Existing Conditions Type III 24hr 100 Year  Rainfall=8.70" Prepared by Vanasse Hangen Brustlin, Inc. Printed  2/2/2011 HydroCAD® 9.00  s/n 01237  © 2009 HydroCAD Software Solutions LLC Page 6

    Summary for Link DP1: To Buckeye Brook North

    Inflow Area = 598.000 ac, 39.98% Impervious,  Inflow Depth >  4.21"  for  100 Year event Inflow = 1,436.88 cfs @  12.67 hrs,  Volume= 209.596 af Primary = 1,436.88 cfs @  12.67 hrs,  Volume= 209.596 af,  Atten= 0%,  Lag= 0.0 min

    Primary outflow = Inflow, Time Span= 5.0020.00 hrs, dt= 0.05 hrs

    Summary for Link DP2: To Warwick Pond

    Inflow Area = 23.900 ac, 48.95% Impervious,  Inflow Depth >  4.48"  for  100 Year event Inflow = 84.51 cfs @  12.33 hrs,  Volume= 8.916 af Primary = 84.51 cfs @  12.33 hrs,  Volume= 8.916 af,  Atten= 0%,  Lag= 0.0 min

    Primary outflow = Inflow, Time Span= 5.0020.00 hrs, dt= 0.05 hrs

    Summary for Link DP3: To Buckeye Brook South

    Inflow Area = 458.500 ac, 33.13% Impervious,  Inflow Depth >  3.75"  for  100 Year event Inflow = 1,025.46 cfs @  12.62 hrs,  Volume= 143.269 af Primary = 1,025.46 cfs @  12.62 hrs,  Volume= 143.269 af,  Atten= 0%,  Lag= 0.0 min

    Primary outflow = Inflow, Time Span= 5.0020.00 hrs, dt= 0.05 hrs

    Summary for Link DP4: To Tuscatucket Brook

    Inflow Area = 145.600 ac, 24.04% Impervious,  Inflow Depth >  2.73"  for  100 Year event Inflow = 230.28 cfs @  12.66 hrs,  Volume= 33.143 af Primary = 230.28 cfs @  12.66 hrs,  Volume= 33.143 af,  Atten= 0%,  Lag= 0.0 min

    Primary outflow = Inflow, Time Span= 5.0020.00 hrs, dt= 0.05 hrs

    Summary for Link DP5: To Callahan Brook

    Inflow Area = 132.900 ac, 19.49% Impervious,  Inflow Depth >  2.87"  for  100 Year event Inflow = 281.90 cfs @  12.40 hrs,  Volume= 31.738 af Primary = 281.90 cfs @  12.40 hrs,  Volume= 31.738 af,  Atten= 0%,  Lag= 0.0 min

    Primary outflow = Inflow, Time Span= 5.0020.00 hrs, dt= 0.05 hrs

    K-8

    http:5.00�20.00http:5.00�20.00http:5.00�20.00http:1,025.46http:1,025.46http:5.00�20.00http:5.00�20.00http:1,436.88http:1,436.88http:Rainfall=8.70

  • 1BBN

    Buckeye Brook North

    3BBS

    Buckeye Brook South

    4TB

    Tuscatucket Brook

    5CB

    Callahan Brook

    DP1

    To Buckeye Brook North

    2WP

    Warwick Pond

    DP2

    To Warwick Pond

    DP3

    To Buckeye Brook

     South

    DP4

    To Tuscatucket Brook

    DP5

    To Callahan Brook

    Drainage Diagram for 0922806 Proposed Conditions ALT B4Subcat Reach Pond Link Prepared by Vanasse Hangen Brustlin, Inc.,  Printed 2/2/2011 HydroCAD® 9.00  s/n 01237  © 2009 HydroCAD Software Solutions LLC

    K-9

  •    

         

       

         

       

         

       

         

       

         

          

    0922806 Proposed Conditions ALT B4 Type III 24hr 100 Year  Rainfall=8.70" Prepared by Vanasse Hangen Brustlin, Inc. Printed  2/2/2011 HydroCAD® 9.00  s/n 01237  © 2009 HydroCAD Software Solutions LLC Page 2

    Time span=5.0020.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR20 method, UH=SCS

    Reach routing by StorInd+Trans method  Pond routing by StorInd method

    Subcatchment 1BBN: Buckeye Brook  Runoff Area=597.900 ac  43.30% Impervious  Runoff Depth>4.44" Flow Length=8,175'  Tc=47.8 min  CN=68  Runoff=1,514.28 cfs  221.151 af

    Subcatchment 2WP: Warwick Pond Runoff Area=27.200 ac  47.43% Impervious  Runoff Depth>4.36" Flow Length=1,213'  Tc=23.8 min  CN=67  Runoff=93.73 cfs  9.882 af

    Subcatchment 3BBS: Buckeye Brook  Runoff Area=458.200 ac  42.89% Impervious  Runoff Depth>4.44" Flow Length=4,962'  Tc=44.1 min  CN=68  Runoff=1,214.47 cfs  169.708 af

    Subcatchment 4TB: Tuscatucket Brook Runoff Area=160.500 ac  30.90% Impervious  Runoff Depth>3.18" Flow Length=2,031'  Tc=44.7 min  CN=57  Runoff=299.58 cfs  42.520 af

    Subcatchment 5CB: Callahan Brook Runoff Area=115.600 ac  18.94% Impervious  Runoff Depth>2.87" Flow Length=1,566'  Tc=26.6 min  CN=54  Runoff=245.21 cfs  27.607 af

    Link DP1: To Buckeye Brook North  Inflow=1,514.28 cfs  221.151 af Primary=1,514.28 cfs  221.151 af

    Link DP2: To Warwick Pond  Inflow=93.73 cfs  9.882 af Primary=93.73 cfs  9.882 af

    Link DP3: To Buckeye Brook South  Inflow=1,214.47 cfs  169.708 af Primary=1,214.47 cfs  169.708 af

    Link DP4: To Tuscatucket Brook  Inflow=299.58 cfs  42.520 af Primary=299.58 cfs  42.520 af

    Link DP5: To Callahan Brook  Inflow=245.21 cfs  27.607 af Primary=245.21 cfs  27.607 af

    Total Runoff Area = 1,359.400 ac  Runoff Volume = 470.869 af  Average Runoff Depth = 4.16" 60.29% Pervious = 819.600 ac  39.71% Impervious = 539.800 ac

    K-10

    http:Primary=245.21http:Inflow=245.21http:Primary=299.58http:Inflow=299.58http:Primary=1,214.47http:Inflow=1,214.47http:Primary=93.73http:Inflow=93.73http:Primary=1,514.28http:Inflow=1,514.28http:Runoff=245.21http:Depth>2.87http:Runoff=299.58http:Depth>3.18http:Runoff=1,214.47http:Depth>4.44http:Runoff=93.73http:Depth>4.36http:Runoff=1,514.28http:Depth>4.44http:span=5.00�20.00http:Rainfall=8.70

  •    

     

    0922806 Proposed Conditions ALT B4 Type III 24hr 100 Year  Rainfall=8.70" Prepared by Vanasse Hangen Brustlin, Inc. Printed  2/2/2011 HydroCAD® 9.00  s/n 01237  © 2009 HydroCAD Software Solutions LLC Page 3

    Summary for Subcatchment 1BBN: Buckeye Brook North

    Runoff = 1,514.28 cfs @  12.66 hrs,  Volume= 221.151 af,  Depth> 4.44"

    Runoff by SCS TR20 method, UH=SCS, Time Span= 5.0020.00 hrs, dt= 0.05 hrs Type III 24hr 100 Year  Rainfall=8.70"

    Area (ac) CN Description 258.900 98 Paved parking, HSG A 182.200 43 Woods/grass comb., Fair, HSG A 8.500 76 Woods/grass comb., Fair, HSG C 11.500 82 Woods/grass comb., Fair, HSG D 136.800 43 Woods/grass comb., Fair, HSG A 597.900 68 Weighted Average 339.000 56.70% Pervious Area 258.900 43.30% Impervious Area

    Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.6 50 0.0050 0.09 Sheet Flow, 

    Grass: Short  n= 0.150  P2= 3.30" 1.5 194 0.0110 2.13 Shallow Concentrated Flow, 

    Paved  Kv= 20.3 fps 36.7 7,931 0.0025 3.60 11.31 Pipe Channel, 

    24.0"  Round  Area= 3.1 sf  Perim= 6.3'  r= 0.50' n= 0.013  Concrete pipe, bends & connections

    47.8 8,175 Total

    Summary for Subcatchment 2WP: Warwick Pond

    Runoff = 93.73 cfs @  12.33 hrs,  Volume= 9.882 af,  Depth> 4.36"

    Runoff by SCS TR20 method, UH=SCS, Time Span= 5.0020.00 hrs, dt= 0.05 hrs Type III 24hr 100 Year  Rainfall=8.70"

    Area (ac) CN Description 12.900 98 Paved parking, HSG A 0.400 39 >75% Grass cover, Good, HSG A

    * 13.900 39 >75% Grass cover, Good, HSG A (assumed) 27.200 67 Weighted Average 14.300 52.57% Pervious Area 12.900 47.43% Impervious Area

    K-11

    http:Rainfall=8.70http:5.00�20.00http:Rainfall=8.70http:5.00�20.00http:1,514.28http:Rainfall=8.70

  •    

     

       

     

    0922806 Proposed Conditions ALT B4 Type III 24hr 100 Year  Rainfall=8.70" Prepared by Vanasse Hangen Brustlin, Inc. Printed  2/2/2011 HydroCAD® 9.00  s/n 01237  © 2009 HydroCAD Software Solutions LLC Page 4

    Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.6 100 0.0030 0.08 Sheet Flow, 

    Grass: Short  n= 0.150  P2= 3.30" 0.3 50 0.0340 2.97 Shallow Concentrated Flow, 

    Unpaved  Kv= 16.1 fps 2.9 1,063 0.0070 6.02 18.93 Pipe Channel, 

    24.0"  Round  Area= 3.1 sf  Perim= 6.3'  r= 0.50' n= 0.013  Concrete pipe, bends & connections

    23.8 1,213 Total

    Summary for Subcatchment 3BBS: Buckeye Brook South

    Runoff = 1,214.47 cfs @  12.61 hrs,  Volume= 169.708 af,  Depth> 4.44"

    Runoff by SCS TR20 method, UH=SCS, Time Span= 5.0020.00 hrs, dt= 0.05 hrs Type III 24hr 100 Year  Rainfall=8.70"

    Area (ac) CN Description 196.500 98 Paved parking, HSG A 41.900 39 >75% Grass cover, Good, HSG A 8.500 61 >75% Grass cover, Good, HSG B 33.900 74 >75% Grass cover, Good, HSG C 5.400 80 >75% Grass cover, Good, HSG D

    172.000 39 >75% Grass cover, Good, HSG A 458.200 68 Weighted Average 261.700 57.11% Pervious Area 196.500 42.89% Impervious Area

    Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.1 100 0.0140 0.15 Sheet Flow, 

    Grass: Short  n= 0.150  P2= 3.30" 15.7 1,126 0.0055 1.19 Shallow Concentrated Flow, 

    Unpaved  Kv= 16.1 fps 17.3 3,736 0.0025 3.60 11.31 Pipe Channel, 

    24.0"  Round  Area= 3.1 sf  Perim= 6.3'  r= 0.50' n= 0.013  Concrete pipe, bends & connections

    44.1 4,962 Total

    Summary for Subcatchment 4TB: Tuscatucket Brook

    Runoff = 299.58 cfs @  12.64 hrs,  Volume= 42.520 af,  Depth> 3.18"

    Runoff by SCS TR20 method, UH=SCS, Time Span= 5.0020.00 hrs, dt= 0.05 hrs Type III 24hr 100 Year  Rainfall=8.70"

    K-12

    http:Rainfall=8.70http:5.00�20.00http:Rainfall=8.70http:5.00�20.00http:1,214.47http:Rainfall=8.70

  •    

     

       

     

    0922806 Proposed Conditions ALT B4 Type III 24hr 100 Year  Rainfall=8.70" Prepared by Vanasse Hangen Brustlin, Inc. Printed  2/2/2011 HydroCAD® 9.00  s/n 01237  © 2009 HydroCAD Software Solutions LLC Page 5

    Area (ac) CN Description 49.600 98 Paved parking, HSG A 34.600 39 >75% Grass cover, Good, HSG A 0.100 61 >75% Grass cover, Good, HSG B

    * 76.200 39 >75% Grass cover, Good, HSG A (assumed) 160.500 57 Weighted Average 110.900 69.10% Pervious Area 49.600 30.90% Impervious Area

    Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.6 100 0.0030 0.08 Sheet Flow, 

    Grass: Short  n= 0.150  P2= 3.30" 22.9 1,498 0.0046 1.09 Shallow Concentrated Flow, 

    Unpaved  Kv= 16.1 fps 1.2 433 0.0067 5.89 18.52 Pipe Channel, 

    24.0"  Round  Area= 3.1 sf  Perim= 6.3'  r= 0.50' n= 0.013  Concrete pipe, bends & connections

    44.7 2,031 Total

    Summary for Subcatchment 5CB: Callahan Brook

    Runoff = 245.21 cfs @  12.40 hrs,  Volume= 27.607 af,  Depth> 2.87"

    Runoff by SCS TR20 method, UH=SCS, Time Span= 5.0020.00 hrs, dt= 0.05 hrs Type III 24hr 100 Year  Rainfall=8.70"

    Area (ac) CN Description 21.900 98 Paved parking, HSG A 88.200 43 Woods/grass comb., Fair, HSG A 0.800 65 Woods/grass comb., Fair, HSG B 4.700 43 Woods/grass comb., Fair, HSG A

    115.600 54 Weighted Average 93.700 81.06% Pervious Area 21.900 18.94% Impervious Area

    Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.6 100 0.0060 0.11 Sheet Flow, 

    Grass: Short  n= 0.150  P2= 3.30" 7.8 585 0.0038 1.25 Shallow Concentrated Flow, 

    Paved  Kv= 20.3 fps 3.2 881 0.0040 4.55 14.31 Pipe Channel, 

    24.0"  Round  Area= 3.1 sf  Perim= 6.3'  r= 0.50' n= 0.013  Concrete pipe, bends & connections

    26.6 1,566 Total

    K-13

    http:Rainfall=8.70http:5.00�20.00http:Rainfall=8.70

  • 0922806 Proposed Conditions ALT B4 Type III 24hr 100 Year  Rainfall=8.70" Prepared by Vanasse Hangen Brustlin, Inc. Printed  2/2/2011 HydroCAD® 9.00  s/n 01237  © 2009 HydroCAD Software Solutions LLC Page 6

    Summary for Link DP1: To Buckeye Brook North

    Inflow Area = 597.900 ac, 43.30% Impervious,  Inflow Depth >  4.44"  for  100 Year event Inflow = 1,514.28 cfs @  12.66 hrs,  Volume= 221.151 af Primary = 1,514.28 cfs @  12.66 hrs,  Volume= 221.151 af,  Atten= 0%,  Lag= 0.0 min

    Primary outflow = Inflow, Time Span= 5.0020.00 hrs, dt= 0.05 hrs

    Summary for Link DP2: To Warwick Pond

    Inflow Area = 27.200 ac, 47.43% Impervious,  Inflow Depth >  4.36"  for  100 Year event Inflow = 93.73 cfs @  12.33 hrs,  Volume= 9.882 af Primary = 93.73 cfs @  12.33 hrs,  Volume= 9.882 af,  Atten= 0%,  Lag= 0.0 min

    Primary outflow = Inflow, Time Span= 5.0020.00 hrs, dt= 0.05 hrs

    Summary for Link DP3: To Buckeye Brook South

    Inflow Area = 458.200 ac, 42.89% Impervious,  Inflow Depth >  4.44"  for  100 Year event Inflow = 1,214.47 cfs @  12.61 hrs,  Volume= 169.708 af Primary = 1,214.47 cfs @  12.61 hrs,  Volume= 169.708 af,  Atten= 0%,  Lag= 0.0 min

    Primary outflow = Inflow, Time Span= 5.0020.00 hrs, dt= 0.05 hrs

    Summary for Link DP4: To Tuscatucket Brook

    Inflow Area = 160.500 ac, 30.90% Impervious,  Inflow Depth >  3.18"  for  100 Year event Inflow = 299.58 cfs @  12.64 hrs,  Volume= 42.520 af Primary = 299.58 cfs @  12.64 hrs,  Volume= 42.520 af,  Atten= 0%,  Lag= 0.0 min

    Primary outflow = Inflow, Time Span= 5.0020.00 hrs, dt= 0.05 hrs

    Summary for Link DP5: To Callahan Brook

    Inflow Area = 115.600 ac, 18.94% Impervious,  Inflow Depth >  2.87"  for  100 Year event Inflow = 245.21 cfs @  12.40 hrs,  Volume= 27.607 af Primary = 245.21 cfs @  12.40 hrs,  Volume= 27.607 af,  Atten= 0%,  Lag= 0.0 min

    Primary outflow = Inflow, Time Span= 5.0020.00 hrs, dt= 0.05 hrs

    K-14

    http:5.00�20.00http:5.00�20.00http:5.00�20.00http:1,214.47http:1,214.47http:5.00�20.00http:5.00�20.00http:1,514.28http:1,514.28http:Rainfall=8.70

  • T.F. Green Airport Improvement Program Environmental Impact Statement and Final Section 4(f) Evaluation

    K.2 Pond Sizing Analysis

    The following graphs provide the pond sizing analysis for the Preferred Alternative (Alternative B4). Included are the Buckeye Brook North drainage area, the Buckeye Brook South drainage area, the Warwick Pond drainage area, and the Tuscatucket Brook drainage area.

    Appendix K – Water Quality K-15 July 2011 \\Mawatr\ev\09228.00\reports\FEIS_Final_July_2011\PVD_App_K_WQ\PVD_Appendix_K_WQ_JUL_2011.doc

  • T.F. Green Airport Improvement Program Environmental Impact Statement and Final Section 4(f) Evaluation

    Buckeye Brook North Drainage Area - Pond Sizing

    Source: HydroCAD TR-20 Pond Sizing Analysis

    Appendix K – Water Quality K-16 July 2011 \\Mawatr\ev\09228.00\reports\FEIS_Final_July_2011\PVD_App_K_WQ\PVD_Appendix_K_WQ_JUL_2011.doc

  • T.F. Green Airport Improvement Program Environmental Impact Statement and Final Section 4(f) Evaluation

    Buckeye Brook South Drainage Area – Pond Sizing

    Source: HydroCAD TR-20 Pond Sizing Analysis

    Appendix K – Water Quality K-17 July 2011 \\Mawatr\ev\09228.00\reports\FEIS_Final_July_2011\PVD_App_K_WQ\PVD_Appendix_K_WQ_JUL_2011.doc

  • T.F. Green Airport Improvement Program Environmental Impact Statement and Final Section 4(f) Evaluation

    Warwick Pond Drainage Area – Pond Sizing

    Source: HydroCAD TR-20 Pond Sizing Analysis

    Appendix K – Water Quality K-18 July 2011 \\Mawatr\ev\09228.00\reports\FEIS_Final_July_2011\PVD_App_K_WQ\PVD_Appendix_K_WQ_JUL_2011.doc

  • T.F. Green Airport Improvement Program Environmental Impact Statement and Final Section 4(f) Evaluation

    Tuscatucket Brook Drainage Area – Pond Sizing

    Source: HydroCAD TR-20 Pond Sizing Analysis

    Appendix K – Water Quality K-19 July 2011 \\Mawatr\ev\09228.00\reports\FEIS_Final_July_2011\PVD_App_K_WQ\PVD_Appendix_K_WQ_JUL_2011.doc

  • T.F. Green Airport Improvement Program Environmental Impact Statement and Final Section 4(f) Evaluation

    This Page Intentionally Left Blank

    Appendix K – Water Quality K-20 July 2011 \\Mawatr\ev\09228.00\reports\FEIS_Final_July_2011\PVD_App_K_WQ\PVD_Appendix_K_WQ_JUL_2011.doc

  • T.F. Green Airport Improvement Program Environmental Impact Statement and Final Section 4(f) Evaluation

    K.3 Water Quality Monitoring Data

    The following tables provide water quality monitoring data for Outfalls 10A and 11A/12A from 2006 to 2010. According to RIAC, data from 2004 and 2005 are not available for these outfalls. Dissolved oxygen (DO) is also not available during this time period.

    Appendix K – Water Quality K-21 July 2011 \\Mawatr\ev\09228.00\reports\FEIS_Final_July_2011\PVD_App_K_WQ\PVD_Appendix_K_WQ_JUL_2011.doc

  • T.F. Green Airport Improvement Program Environmental Impact Statement and Final Section 4(f) Evaluation

    Table K.3-1 Water Quality at T.F. Green Airport Outfall 10A1,2,3

    Oil & Propylene TSS2 BOD2 COD2 Grease glycol Iron

    Date1 (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) VOCs (µg/L) (mg/L) 9/14/2006 59

  • T.F. Green Airport Improvement Program Environmental Impact Statement and Final Section 4(f) Evaluation

    Table K.3-2 Water Quality at T.F. Green Airport Outfall 11A/12A1,2,3

    Oil & Propylene TSS2 BOD2 COD2 Grease glycol Iron

    Date1 (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) VOCs (µg/L) (mg/L) 9/14/2006

  • T.F. Green Airport Improvement Program Environmental Impact Statement and Final Section 4(f) Evaluation

    This Page Intentionally Left Blank

    Appendix K – Water Quality K-24 July 2011 \\Mawatr\ev\09228.00\reports\FEIS_Final_July_2011\PVD_App_K_WQ\PVD_Appendix_K_WQ_JUL_2011.doc

    Appendix K: Water QualityTable of ContentsK.1 HydroCAD CalculationsK.2 Pond Sizing AnalysisK.3 Water Quality Monitoring Data