610.12109 Alternate Viaduct Assessment 20141014.docx
WestConnex Delivery Authority Level 9, 101 Miller Street NORTH SYDNEY NSW 2060
Attention: Steven Bywater
Dear Steven
WestConnex M4 Widening
Potential Alternative Viaduct Design
Operational Noise Impact Assessment
Attached is the acoustic assessment in relation to the potential alternative design of the new viaduct, which has been put forward during the tender design phase of the project.
The assessment compares the predicted noise levels for the potential alternative design with those for the original design of the alignment as contained in the EIS.
I trust this information meets with your immediate requirements; however, please feel free to contact me with any further queries.
Yours sincerely
ROBERT HALL Associate
WestConnex Delivery Authority WestConnex M4 Widening Potential Alternative Viaduct Design Operational Noise Impact Assessment
21 October 2014 610.12109 Alternate Viaduct Assessment
20141021.docx Page 2
SLR Consulting Australia Pty Ltd
This report has been prepared by SLR Consulting Australia Pty Ltd
with all reasonable skill, care and diligence, and taking account of the
timescale and resources allocated to it by agreement with the Client.
Information reported herein is based on the interpretation of data collected,
which has been accepted in good faith as being accurate and valid.
This report is for the exclusive use of WestConnex Delivery Authority.
No warranties or guarantees are expressed or should be inferred by any third parties.
This report may not be relied upon by other parties without written consent from SLR Consulting.
SLR Consulting disclaims any responsibility to the Client and others in respect of any matters outside the agreed scope of the work.
DOCUMENT CONTROL
Reference Status Date Prepared Checked Authorised
610.12109 Letter 21 October 2014 AW TC TC
WestConnex Delivery Authority WestConnex M4 Widening Potential Alternative Viaduct Design Operational Noise Impact Assessment
21 October 2014 610.12109 Alternate Viaduct Assessment
20141021.docx Page 3
SLR Consulting Australia Pty Ltd
1 Introduction
An alternative viaduct design is proposed for the M4 Widening project in the vicinity of the viaduct, between chainage 800 to 2800. The proposed changes include both horizontal and vertical refinements of the concept design that was assessed in the EIS for the project.
The viaduct is shown in Figure 1. The existing M4 Motorway is shown in red and the EIS concept design inclusive of the refinements is shown in blue.
Figure 1 Existing and Potential Alternate Viaduct Design
The main changes in the potential alternative viaduct design are at the two locations indicated in Figure 1 above. In both locations the viaduct has been straightened from the concept design assessed in the EIS, which moves the new viaduct further to the south. Changes to the vertical alignment of the new viaduct have also been made along its length and these differences are also assessed.
The purpose of this report is to reassess the impact of the potential alternative viaduct design compared to the 'No Build' scenario. This report will form part of a Preferred Infrastructure Report (PIR) for the potential alternative viaduct design submitted to Planning along with the submissions report.
The proposed changes to the viaduct design are limited to Noise Catchment Areas NCA.A2_07N to the north of the viaduct and NCA.A2_07S to the south.
2 Assessment
The operational noise impacts for the concept design of the M4 Widening project were assessed in the EIS for the project. This letter report therefore forms an addendum to the EIS and presents the likely impacts and changes in noise level associated with the potential alternative viaduct design. This document will be submitted along with the submissions report for the project.
The impact of the potential alternative viaduct design has been assessed by comparing the predicted sensitive receiver noise levels for the No Build and Build situations in the controlling 2027 daytime assessment scenario.
A comparison of the predicted noise levels in the controlling scenario between the EIS concept design and the potential alternative viaduct design has also been completed for reference.
James Ruse Drive Viaduct straightened
Church Street Viaduct straightened
WestConnex Delivery Authority WestConnex M4 Widening Potential Alternative Viaduct Design Operational Noise Impact Assessment
21 October 2014 610.12109 Alternate Viaduct Assessment
20141021.docx Page 4
SLR Consulting Australia Pty Ltd
The results from the assessment are summarised below in Table 1 and Table 2. The tables provide assessment results for the controlling daytime 2027 scenario only.
Discussion – Barrier Optimisation
For the potential alternative viaduct design the assessment includes a 4.0 m high noise barrier (NW.A02.WB02). The 4.0 m high noise barrier terminates at either end in approximately the same location for both the EIS and the potential alternative viaduct designs.
It is noted that noise barrier (referred to as NW.A02.WB02 in the EIS) has been optimised in its location on the southern edge of the potential alternative viaduct design, in accordance with ENMM and RMS procedures. This process resulted in a barrier height of 4.0 m height being recommended for the alternative design.
The barrier height for the potential alternative viaduct design is the same as the recommended barrier height for the EIS concept design.
The noise metrics calculated for the noise wall optimisation process, were virtually identical between the EIS concept design and the potential alternative viaduct design. The noise wall optimisation does not appear to be sensitive to the small movements of the alignment proposed in the potential alternative viaduct design.
Discussion – RNP Goals and Acute Properties
Table 1 Summary of Predicted Impacts, Receiver Numbers (All Floors) – 2027 Daytime
NCA No Build Final Build EIS Concept Design
Final Build Potential Alternative Viaduct Design
>RNP >=10 Over RNP
Acute >RNP >=10 Over RNP
Acute >RNP >=10 Over RNP
Acute
NCA.A02_07N 653 33 226 518 24 133 515 24 130
NCA.A02_07S 290 4 93 83 5 11 107 6 16
With reference to Table 1, the potential alternative viaduct design is predicted to result in the following:
Impacts are most apparent to the south of the viaduct in NCA.A02_07S.
In the NCA to the south, approximately 20 additional receivers are predicted to be subject to noise levels above the RNP goals.
The increases to the south result from a combination of the new viaduct moving closer to sensitive receivers and also due to a wider line-of-sight being opened up to the existing viaduct in some locations.
In the NCA to the north, there is typically a marginal reduction in noise levels and corresponding RNP exceedances.
No receivers are predicted to be subject to an increase of more than 2 dB between the No Build and Build scenarios for either the EIS concept design or the potential alternative viaduct design to the south or north of the viaduct.
WestConnex Delivery Authority WestConnex M4 Widening Potential Alternative Viaduct Design Operational Noise Impact Assessment
21 October 2014 610.12109 Alternate Viaduct Assessment
20141021.docx Page 5
SLR Consulting Australia Pty Ltd
Discussion – Change in Residential Property Treatments
Table 2 Summary of Property Treatments – 2027 Daytime
NCA EIS Concept Design Potential Alternative Viaduct Design
Build Final Build Build Final Build
NCA.A02_07N 88 88 86 86
NCA.A02_07S 59 37 63 45
Note: The potential alternative viaduct design results in an additional six property treatments in total in the controlling 2027 Final Build daytime scenario.
With reference to the Table 2, the potential alternative viaduct design is predicted to result in the following:
To the south, eight additional property treatments are predicted over the number presented for the EIS concept design for the Final Build scenario. This is likely a result of the new viaduct section being situated slightly closer to these residents.
A marginal reduction of two property treatments is apparent in the northern catchment over the number presented for the EIS concept Final Build scenario. This is likely a result of the new viaduct section being situated slightly further away from these residents.
Between the Build and Final Build scenarios no change in residential property treatments is identified for the northern catchment when comparing the two designs.
For the southern catchment there is a greater change between the Build and Final Build property treatments for the EIS design compared to the potential alternative viaduct design. This is likely the result of the new viaduct section being situated slightly closer to residents in the alternative design.
Discussion – Change in Noise Level from EIS Design
With regard to the likely change in receiver noise levels, Figure 2, Figure 3 and Figure 4 present the difference from the predicted noise levels for the EIS concept design. Negative results correspond to receivers with a reduction in noise for the potential alternative viaduct design, whilst positive results correspond to an increase.
Reference should also be made to the Change in Noise Level noise map appended to this report.
Figure 2 Change in Noise Level at Individual Receivers: Potential Alternative Viaduct Design Minus EIS Concept Design (OVERALL)
Potential Alternative Viaduct Design Minus EIS Concept Design
WestConnex Delivery Authority WestConnex M4 Widening Potential Alternative Viaduct Design Operational Noise Impact Assessment
21 October 2014 610.12109 Alternate Viaduct Assessment
20141021.docx Page 6
SLR Consulting Australia Pty Ltd
Figure 3 Change in Noise Level at Individual Receivers: Potential Alternative Viaduct Design Minus EIS Concept Design (NORTH NCA)
Figure 4 Change in Noise Level at Individual Receivers: Potential Alternative Viaduct Design Minus EIS Concept Design (SOUTH NCA)
Reference to the above shows that for the majority of receivers, a marginal change in noise level is predicted as a result of the potential alternative viaduct design.
Larger increases (but still typically not significant) are apparent for the receivers to the south of the viaduct than the north. These increases are adjacent to the two locations where the alignment has been shifted.
In summary, 104 receivers are predicted to experience an increase of >0.5 dB for the potential alternative viaduct design, whilst 16 are predicted to be subject to an increase of >1.0 dB.
Potential Alternative Viaduct Design Minus EIS Concept Design
Potential Alternative Viaduct Design Minus EIS Concept Design
WestConnex Delivery Authority WestConnex M4 Widening Potential Alternative Viaduct Design Operational Noise Impact Assessment
21 October 2014 610.12109 Alternate Viaduct Assessment
20141021.docx Page 7
SLR Consulting Australia Pty Ltd
Geographical Presentation of Results In addition to the above results, predicted sensitive receiver noise level maps have been generated and are appended to this report. The following maps are presented:
2027, No Build, Daytime LAeq(15hour) with Existing Noise Barriers
2027, Final Build, Daytime LAeq(15hour) - EIS Concept Design, with Noise Barriers (4.0 m)
2027, Final Build, Daytime LAeq(15hour) – Potential Alternative Viaduct Design, with Noise Barriers (4.0 m)
2027, Final Build, Daytime LAeq(15hour) - Change in Noise Level: Potential Alternative Viaduct Design minus EIS Concept Design.
3 Conclusion
Noise levels have been predicted and assessed for the proposed alternative design of the viaduct for the WCX M4 Widening project.
The impact from the potential alternative viaduct design is most apparent to the south of the viaduct in NCA.A2_07S. In this catchment, eight additional property treatments are identified with the alternative design.
To the north, there is typically a marginal reduction in noise levels and corresponding exceedances, with a reduction of two property treatments.
When comparing the potential alternative viaduct design with the EIS concept design, a marginal change in noise level is predicted at the majority of receivers.
The change in noise impacts between the two designs is considered to be very low.
NCA.A02_05N
NCA.A02_07N
NCA.A02_07S
NCA.A03_01S
NCA.A03_01N
NCA.A03_02N
NCA.A03_03
HARR
IS ST
REET
BRIDGE STREET
WIGR
AM S
TREE
T
MARSDEN STREET
GLEBE STREET
PARKES STREET
GOOD
STR
EET
ALFR
ED ST
REET
BOLD
STRE
ET
ELEANOR STREET
VIRGINIA STREET
WESTON STREET
BRISBANE STREET
PROSPECT STREET
COWPER STREET
GRAY STREET
CROWN STREETCHURCH STREET
ALICE STREET
ALLEN STREET
RANDLE STREET
RAYMOND STREET
BOUNDARY STREET
MARION STREET
SOUT
H ST
REET
BOWDEN STREET
LANSDOWNE STREET
JUNCTION STREET
HIGH STREET
PARRAMATTA ROAD
WILLIAMSTREET
HOPE STREET
HASSALL STREET
JAME
S RU
SE D
RIVE
ARTH
UR S
TREE
T
SPRING GARDEN STREET
KAY STREET
GRIM
WOOD
STRE
ET
RAILWAY PARADE
PRINCE STREET
MARYSTREETGR
EGOR
Y PL
ACE
KEMP
STR
EET
WALLACE STREET
WENTW
ORTH
STRE
ET
GREAT WESTERN HIGHWAYUNA STREET
ADA STREET
RAILWAY STREET
ILLAL
ONG
STRE
ET
MILT
ON ST
REET
GRAND AVENUE
HEWLETT STREET
JAMI
ESON
STR
EET
A'BECKETT STREET
ROSEHILL STREET
CRESCENT STREET
BENN
ALON
G ST
REET
DANIEL STREET
DENIE
HY S
TREE
T
INKERMAN STREET
MEEHAN STREET
ALBE
RT S
TREE
T
CAMPBELL STREET
WALT
ER ST
REET
ALMA STREET
MARTHA STREET
RUSE STREET
ONSL
OWST
REET
JORD
AN S
TREE
T
WESTERN MOTORWAY
WALPOLE STREET
SMITH
STR
EET
OAK STREET
SHOR
T ST
REET
VALENTINE AVENUE
PEEL
STR
EET
BERR
Y ST
REET
GEORG
E STR
EET
KEND
ALL S
TREE
TWARA
TAH S
TREE
T
BOOM
ERAN
G ST
REET
TOTT
ENHA
MST
R EET
HARB
ORD S
TREE
T
RITCHIE STREET
LENNOX STREET
EAST STREET
ANDERSON STREET
ALBI
ON S
TREE
T
DIXON STREET
EARLY STREET
WOOD
VILLE
ROAD
STATION STREET
UNION STREET
MARSH
STRE
ET
CARL
TON
STRE
ET
UNWIN STREET
SHIR
LEY
STRE
ET
VICTORIA STREET
TENNYSON STREET
H:\P
rojec
ts-SL
R\63
0-SrvN
TL\61
0-SYD
\610.1
2109
M4 M
anag
ed M
otorw
ay N
oise a
nd Vi
bratio
n\GIS
\SLR
6101
2109
_AV1
_Exis
ting_
02.m
xd
Project No.:Date:Draw n by :Scale:Sh eet Size:Projection:
10/10/2014
GDA 1994 MGA Zone 56
610.12109
NT
A41:11,000
≤ 5960
6162
6364
≥ 65Existing Barriers
WestConnex Delivery Auth orityPredicted Residential Noise Levels (dBA)
2027 Timeframe 2, No BuildDaytime LAeq(15hour)With Existing Noise Barrier
2 LINCOLN STREETLANE COVE
NEW SOUTH WALES 2066AUSTRALIA
T: 61 2 9427 8100F: 61 2 9427 8200
www.slrconsulting.com
The content contained within this document may be based on third party data.SLR Consulting Australia Pty Ltd does not guarantee theaccuracy of such information.
© 0 100 200 300 400m
NCA.A02_05N
NCA.A02_07N
NCA.A02_07S
NCA.A03_01S
NCA.A03_01N
NCA.A03_02N
NCA.A03_03
HARR
IS ST
REET
BRIDGE STREET
WIGR
AM S
TREE
T
MARSDEN STREET
GLEBE STREET
PARKES STREET
GOOD
STR
EET
ALFR
ED ST
REET
BOLD
STRE
ET
ELEANOR STREET
VIRGINIA STREET
WESTON STREET
BRISBANE STREET
PROSPECT STREET
COWPER STREET
GRAY STREET
CROWN STREETCHURCH STREET
ALICE STREET
ALLEN STREET
RANDLE STREET
RAYMOND STREET
BOUNDARY STREET
MARION STREET
SOUT
H ST
REET
BOWDEN STREET
LANSDOWNE STREET
JUNCTION STREET
HIGH STREET
PARRAMATTA ROAD
WILLIAMSTREET
HOPE STREET
HASSALL STREET
JAME
S RU
SE D
RIVE
ARTH
UR S
TREE
T
SPRING GARDEN STREET
KAY STREET
GRIM
WOOD
STRE
ET
RAILWAY PARADE
PRINCE STREET
MARYSTREETGR
EGOR
Y PL
ACE
KEMP
STR
EET
WALLACE STREET
WENTW
ORTH
STRE
ET
GREAT WESTERN HIGHWAYUNA STREET
ADA STREET
RAILWAY STREET
ILLAL
ONG
STRE
ET
MILT
ON ST
REET
GRAND AVENUE
HEWLETT STREET
JAMI
ESON
STR
EET
A'BECKETT STREET
ROSEHILL STREET
CRESCENT STREET
BENN
ALON
G ST
REET
DANIEL STREET
DENIE
HY S
TREE
T
INKERMAN STREET
MEEHAN STREET
ALBE
RT S
TREE
T
CAMPBELL STREET
WALT
ER ST
REET
ALMA STREET
MARTHA STREET
RUSE STREET
ONSL
OWST
REET
JORD
AN S
TREE
T
WESTERN MOTORWAY
WALPOLE STREET
SMITH
STR
EET
OAK STREET
SHOR
T ST
REET
VALENTINE AVENUE
PEEL
STR
EET
BERR
Y ST
REET
GEORG
E STR
EET
KEND
ALL S
TREE
TWARA
TAH S
TREE
T
BOOM
ERAN
G ST
REET
TOTT
ENHA
MST
R EET
HARB
ORD S
TREE
T
RITCHIE STREET
LENNOX STREET
EAST STREET
ANDERSON STREET
ALBI
ON S
TREE
T
DIXON STREET
EARLY STREET
WOOD
VILLE
ROAD
STATION STREET
UNION STREET
MARSH
STRE
ET
CARL
TON
STRE
ET
UNWIN STREET
SHIR
LEY
STRE
ET
VICTORIA STREET
TENNYSON STREET
H:\P
rojec
ts-SL
R\63
0-SrvN
TL\61
0-SYD
\610.1
2109
M4 M
anag
ed M
otorw
ay N
oise a
nd Vi
bratio
n\GIS
\SLR
6101
2109
_AV2
_FBE
IS_02
.mxd
Project No.:Date:Draw n by :Scale:Sh eet Size:Projection:
10/10/2014
GDA 1994 MGA Zone 56
610.12109
NT
A41:11,000
≤ 5960
6162
6364
≥ 65EIS Barrier
WestConnex Delivery Auth orityPredicted Residential Noise Levels (dBA)
2027 Timeframe 2Final Build - EIS Concept DesignDaytime LAeq(15hour)With Recommended Noise Barrier
2 LINCOLN STREETLANE COVE
NEW SOUTH WALES 2066AUSTRALIA
T: 61 2 9427 8100F: 61 2 9427 8200
www.slrconsulting.com
The content contained within this document may be based on third party data.SLR Consulting Australia Pty Ltd does not guarantee theaccuracy of such information.
© 0 100 200 300 400m
NCA.A02_05N
NCA.A02_07N
NCA.A02_07S
NCA.A03_01S
NCA.A03_01N
NCA.A03_02N
NCA.A03_03
HARR
IS ST
REET
BRIDGE STREET
WIGR
AM S
TREE
T
MARSDEN STREET
GLEBE STREET
PARKES STREET
GOOD
STR
EET
ALFR
ED ST
REET
BOLD
STRE
ET
ELEANOR STREET
VIRGINIA STREET
WESTON STREET
BRISBANE STREET
PROSPECT STREET
COWPER STREET
GRAY STREET
CROWN STREETCHURCH STREET
ALICE STREET
ALLEN STREET
RANDLE STREET
RAYMOND STREET
BOUNDARY STREET
MARION STREET
SOUT
H ST
REET
BOWDEN STREET
LANSDOWNE STREET
JUNCTION STREET
HIGH STREET
PARRAMATTA ROAD
WILLIAMSTREET
HOPE STREET
HASSALL STREET
JAME
S RU
SE D
RIVE
ARTH
UR S
TREE
T
SPRING GARDEN STREET
KAY STREET
GRIM
WOOD
STRE
ET
RAILWAY PARADE
PRINCE STREET
MARYSTREETGR
EGOR
Y PL
ACE
KEMP
STR
EET
WALLACE STREET
WENTW
ORTH
STRE
ET
GREAT WESTERN HIGHWAYUNA STREET
ADA STREET
RAILWAY STREET
ILLAL
ONG
STRE
ET
MILT
ON ST
REET
GRAND AVENUE
HEWLETT STREET
JAMI
ESON
STR
EET
A'BECKETT STREET
ROSEHILL STREET
CRESCENT STREET
BENN
ALON
G ST
REET
DANIEL STREET
DENIE
HY S
TREE
T
INKERMAN STREET
MEEHAN STREET
ALBE
RT S
TREE
T
CAMPBELL STREET
WALT
ER ST
REET
ALMA STREET
MARTHA STREET
RUSE STREET
ONSL
OWST
REET
JORD
AN S
TREE
T
WESTERN MOTORWAY
WALPOLE STREET
SMITH
STR
EET
OAK STREET
SHOR
T ST
REET
VALENTINE AVENUE
PEEL
STR
EET
BERR
Y ST
REET
GEORG
E STR
EET
KEND
ALL S
TREE
TWARA
TAH S
TREE
T
BOOM
ERAN
G ST
REET
TOTT
ENHA
MST
R EET
HARB
ORD S
TREE
T
RITCHIE STREET
LENNOX STREET
EAST STREET
ANDERSON STREET
ALBI
ON S
TREE
T
DIXON STREET
EARLY STREET
WOOD
VILLE
ROAD
STATION STREET
UNION STREET
MARSH
STRE
ET
CARL
TON
STRE
ET
UNWIN STREET
SHIR
LEY
STRE
ET
VICTORIA STREET
TENNYSON STREET
H:\P
rojec
ts-SL
R\63
0-SrvN
TL\61
0-SYD
\610.1
2109
M4 M
anag
ed M
otorw
ay N
oise a
nd Vi
bratio
n\GIS
\SLR
6101
2109
_AV3
_FBA
V_02
.mxd
Project No.:Date:Draw n by :Scale:Sh eet Size:Projection:
10/10/2014
GDA 1994 MGA Zone 56
610.12109
NT
A41:11,000
≤ 5960
6162
6364
≥ 65Alternative Viaduct Barrier
WestConnex Delivery Auth orityPredicted Residential Noise Levels (dBA)
2027 Timeframe 2Final Build - Potential Alternative DesignDaytime LAeq(15hour)With Recommended Noise Barrier
2 LINCOLN STREETLANE COVE
NEW SOUTH WALES 2066AUSTRALIA
T: 61 2 9427 8100F: 61 2 9427 8200
www.slrconsulting.com
The content contained within this document may be based on third party data.SLR Consulting Australia Pty Ltd does not guarantee theaccuracy of such information.
© 0 100 200 300 400m
NCA.A02_05N
NCA.A02_07N
NCA.A02_07S
NCA.A03_01S
NCA.A03_01N
NCA.A03_02N
NCA.A03_03
HARR
IS ST
REET
BRIDGE STREET
WIGR
AM ST
REET
MARSDEN STREET
GLEBE STREET
PARKES STREET
GOOD
STR
EET
ALFR
ED S
TREE
T
BOLD
STRE
ET
ELEANOR STREET
VIRGINIA STREET
WESTON STREET
BRISBANE STREET
PROSPECT STREET
COWPER STREET
GRAY STREET
CROWN STREETCHURCH STREET
ALICE STREET
ALLEN STREET
RANDLE STREET
RAYMOND STREET
BOUNDARY STREET
MARION STREET
SOUT
H ST
REET
BOWDEN STREET
LANSDOWNE STREET
JUNCTION STREET
HIGH STREET
PARRAMATTA ROAD
WILLIAMSTREET
HOPE STREET
HASSALL STREET
JAME
S RU
SE D
RIVE
ARTH
UR S
TREE
T
SPRING GARDEN STREET
KAY STREET
GRIM
WOOD
STRE
ET
RAILWAY PARADE
PRINCE STREET
MARYSTREETGR
EGOR
Y PL
ACE
KEMP
STR
EET
WALLACE STREET
WENTW
ORTH
STRE
ET
GREAT WESTERN HIGHWAYUNA STREET
ADA STREET
RAILWAY STREET
ILLAL
ONG S
TREE
T
MILT
ON ST
REET
GRAND AVENUE
HEWLETT STREET
JAMI
ESON
STR
EET
A'BECKETT STREET
ROSEHILL STREET
CRESCENT STREET
BENN
ALON
G ST
REET
DANIEL STREET
DENIE
HY S
TREE
T
INKERMAN STREET
MEEHAN STREET
ALBE
RT S
TREE
T
CAMPBELL STREET
WALT
ER S
TREE
T
ALMA STREET
MARTHA STREET
RUSE STREET
ONSL
OWST
REET
JORD
AN S
TREE
T
WESTERN MOTORWAY
WALPOLE STREET
SMITH
STR
EET
OAK STREET
SHOR
T ST
REET
VALENTINE AVENUE
PEEL
STR
EET
BERR
Y ST
REET
GEORG
E STR
EET
KEND
ALL S
TREE
TWARA
TAH S
TREE
T
BOOM
ERAN
G ST
REET
TOTT
ENHA
MST
R EET
HARB
ORD S
TREE
T
RITCHIE STREET
LENNOX STREET
EAST STREET
ANDERSON STREET
ALBI
ON S
TREE
T
DIXON STREET
EARLY STREET
WOOD
VILLE
ROAD
STATION STREET
UNION STREET
MARSH
STREE
T
CARL
TON
STRE
ET
UNWIN STREET
SHIR
LEY
STRE
ET
VICTORIA STREET
TENNYSON STREET
H:\P
rojec
ts-SL
R\63
0-SrvN
TL\61
0-SYD
\610.1
2109
M4 M
anag
ed M
otorw
ay N
oise a
nd V
ibrati
on\G
IS\S
LR61
0121
09_A
V4_C
hang
e_01
.mxd
Project No.:Date:Drawn by:Scale:Sheet Size:Projection:
02/10/2014
GDA 1994 MGA Zone 56
610.12109
NT
A41:11,000
-0.5 to -0.10.0 to 0.4
0.5 to 0.91.0 to 1.4
1.5 to 1.9 Alternative Viaduct Barrier
WestConnex Delivery AuthorityChange in Noise Level (dBA)
2 LINCOLN STREETLANE COVE
NEW SOUTH WALES 2066AUSTRALIA
T: 61 2 9427 8100F: 61 2 9427 8200
www.slrconsulting.com
The content contained within this document may be based on third party data.SLR Consulting Australia Pty Ltd does not guarantee theaccuracy of such information.
© 0 100 200 300 400m