appendix f level of service analysistransportation.ky.gov/planning/planning studies and reports/ky -...
TRANSCRIPT
![Page 1: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/1.jpg)
APPENDIX F
LEVEL OF SERVICE ANALYSIS
![Page 2: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/2.jpg)
![Page 3: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/3.jpg)
Capacity and Level of Service Analysis
Output from HCS+
No-Build Scenario with Year 2007 Traffic Volumes
![Page 4: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/4.jpg)
![Page 5: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/5.jpg)
HCS+: Two-Lane Highways Release 5.21 Phone: Fax: E-Mail: ___________________Two-Way Two-Lane Highway Segment Analysis__________________ Analyst Thomas Witt Agency/Co. KYTC Planning Date Performed 5/9/2007 Analysis Time Period Highway KY 100 From/To MP 16.34 to MP 19.115 Jurisdiction Simpson County Analysis Year 2007 Description No-Build Alternative ___________________________________Input Data_________________________________ Highway class Class 2 Shoulder width 4.0 ft Peak-hour factor, PHF 0.88 Lane width 10.0 ft % Trucks and buses 12 % Segment length 2.8 mi % Recreational vehicles 0 % Terrain type Rolling % No-passing zones 42 % Grade: Length mi Access points/mi 10 /mi Up/down % Two-way hourly volume, V 308 veh/h Directional split 64 / 36 % ____________________________Average Travel Speed______________________________ Grade adjustment factor, fG 0.71 PCE for trucks, ET 2.5 PCE for RVs, ER 1.1 Heavy-vehicle adjustment factor, 0.847 Two-way flow rate,(note-1) vp 582 pc/h Highest directional split proportion (note-2) 372 pc/h Free-Flow Speed from Field Measurement: Field measured speed, SFM - mi/h Observed volume, Vf - veh/h Estimated Free-Flow Speed: Base free-flow speed, BFFS 60.0 mi/h Adj. for lane and shoulder width, fLS 2.4 mi/h Adj. for access points, fA 2.5 mi/h Free-flow speed, FFS 55.1 mi/h Adjustment for no-passing zones, fnp 2.5 mi/h Average travel speed, ATS 48.1 mi/h
![Page 6: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/6.jpg)
__________________________Percent Time-Spent-Following________________________ Grade adjustment factor, fG 0.77 PCE for trucks, ET 1.8 PCE for RVs, ER 1.0 Heavy-vehicle adjustment factor, fHV 0.912 Two-way flow rate,(note-1) vp 498 pc/h Highest directional split proportion (note-2) 319 Base percent time-spent-following, BPTSF 35.5 % Adj.for directional distribution and no-passing zones, fd/np 16.4 Percent time-spent-following, PTSF 51.8 % ________________Level of Service and Other Performance Measures_______________ Level of service, LOS B Volume to capacity ratio, v/c 0.18 Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles of travel, VMT60 862 veh-mi Peak 15-min total travel time, TT15 5.1 veh-h ______________________________________________________________________________ Notes: 1. If vp >= 3200 pc/h, terminate analysis-the LOS is F. 2. If highest directional split vp >= 1700 pc/h, terminate analysis-the LOS is F.
![Page 7: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/7.jpg)
HCS+: Two-Lane Highways Release 5.21 Phone: Fax: E-Mail: ___________________Two-Way Two-Lane Highway Segment Analysis__________________ Analyst Thomas Witt Agency/Co. KYTC Planning Date Performed 5/9/2007 Analysis Time Period Highway KY 100 From/To MP 0 to MP 3.339 Jurisdiction Allen County Analysis Year 2007 Description No-Build Alternative ___________________________________Input Data_________________________________ Highway class Class 2 Shoulder width 4.0 ft Peak-hour factor, PHF 0.88 Lane width 9.0 ft % Trucks and buses 12 % Segment length 3.3 mi % Recreational vehicles 0 % Terrain type Rolling % No-passing zones 79 % Grade: Length mi Access points/mi 16 /mi Up/down % Two-way hourly volume, V 308 veh/h Directional split 64 / 36 % ____________________________Average Travel Speed______________________________ Grade adjustment factor, fG 0.71 PCE for trucks, ET 2.5 PCE for RVs, ER 1.1 Heavy-vehicle adjustment factor, 0.847 Two-way flow rate,(note-1) vp 582 pc/h Highest directional split proportion (note-2) 372 pc/h Free-Flow Speed from Field Measurement: Field measured speed, SFM - mi/h Observed volume, Vf - veh/h Estimated Free-Flow Speed: Base free-flow speed, BFFS 55.0 mi/h Adj. for lane and shoulder width, fLS 3.5 mi/h Adj. for access points, fA 4.0 mi/h Free-flow speed, FFS 47.5 mi/h Adjustment for no-passing zones, fnp 3.4 mi/h Average travel speed, ATS 39.6 mi/h
![Page 8: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/8.jpg)
__________________________Percent Time-Spent-Following________________________ Grade adjustment factor, fG 0.77 PCE for trucks, ET 1.8 PCE for RVs, ER 1.0 Heavy-vehicle adjustment factor, fHV 0.912 Two-way flow rate,(note-1) vp 498 pc/h Highest directional split proportion (note-2) 319 Base percent time-spent-following, BPTSF 35.5 % Adj.for directional distribution and no-passing zones, fd/np 20.9 Percent time-spent-following, PTSF 56.3 % ________________Level of Service and Other Performance Measures_______________ Level of service, LOS C Volume to capacity ratio, v/c 0.18 Peak 15-min vehicle-miles of travel, VMT15 289 veh-mi Peak-hour vehicle-miles of travel, VMT60 1016 veh-mi Peak 15-min total travel time, TT15 7.3 veh-h ______________________________________________________________________________ Notes: 1. If vp >= 3200 pc/h, terminate analysis-the LOS is F. 2. If highest directional split vp >= 1700 pc/h, terminate analysis-the LOS is F.
![Page 9: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/9.jpg)
HCS+: Two-Lane Highways Release 5.21 Phone: Fax: E-Mail: ___________________Two-Way Two-Lane Highway Segment Analysis__________________ Analyst Thomas Witt Agency/Co. KYTC Planning Date Performed 5/9/2007 Analysis Time Period Highway KY 100 From/To MP 3.339 to MP 6.586 Jurisdiction Allen County Analysis Year 2007 Description No-Build Alternative ___________________________________Input Data_________________________________ Highway class Class 2 Shoulder width 2.0 ft Peak-hour factor, PHF 0.88 Lane width 10.0 ft % Trucks and buses 12 % Segment length 3.2 mi % Recreational vehicles 0 % Terrain type Rolling % No-passing zones 71 % Grade: Length mi Access points/mi 12 /mi Up/down % Two-way hourly volume, V 265 veh/h Directional split 64 / 36 % ____________________________Average Travel Speed______________________________ Grade adjustment factor, fG 0.71 PCE for trucks, ET 2.5 PCE for RVs, ER 1.1 Heavy-vehicle adjustment factor, 0.847 Two-way flow rate,(note-1) vp 500 pc/h Highest directional split proportion (note-2) 320 pc/h Free-Flow Speed from Field Measurement: Field measured speed, SFM - mi/h Observed volume, Vf - veh/h Estimated Free-Flow Speed: Base free-flow speed, BFFS 55.0 mi/h Adj. for lane and shoulder width, fLS 3.7 mi/h Adj. for access points, fA 3.0 mi/h Free-flow speed, FFS 48.3 mi/h Adjustment for no-passing zones, fnp 3.5 mi/h Average travel speed, ATS 41.0 mi/h
![Page 10: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/10.jpg)
__________________________Percent Time-Spent-Following________________________ Grade adjustment factor, fG 0.77 PCE for trucks, ET 1.8 PCE for RVs, ER 1.0 Heavy-vehicle adjustment factor, fHV 0.912 Two-way flow rate,(note-1) vp 429 pc/h Highest directional split proportion (note-2) 275 Base percent time-spent-following, BPTSF 31.4 % Adj.for directional distribution and no-passing zones, fd/np 21.3 Percent time-spent-following, PTSF 52.7 % ________________Level of Service and Other Performance Measures_______________ Level of service, LOS B Volume to capacity ratio, v/c 0.16 Peak 15-min vehicle-miles of travel, VMT15 241 veh-mi Peak-hour vehicle-miles of travel, VMT60 848 veh-mi Peak 15-min total travel time, TT15 5.9 veh-h ______________________________________________________________________________ Notes: 1. If vp >= 3200 pc/h, terminate analysis-the LOS is F. 2. If highest directional split vp >= 1700 pc/h, terminate analysis-the LOS is F.
![Page 11: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/11.jpg)
HCS+: Two-Lane Highways Release 5.21 Phone: Fax: E-Mail: ___________________Two-Way Two-Lane Highway Segment Analysis__________________ Analyst Thomas Witt Agency/Co. KYTC Planning Date Performed 5/9/2007 Analysis Time Period Highway KY 100 From/To MP 6.586 to MP 10.228 Jurisdiction Allen County Analysis Year 2007 Description No-Build Alternative ___________________________________Input Data_________________________________ Highway class Class 2 Shoulder width 2.0 ft Peak-hour factor, PHF 0.88 Lane width 10.0 ft % Trucks and buses 12 % Segment length 3.6 mi % Recreational vehicles 0 % Terrain type Rolling % No-passing zones 86 % Grade: Length mi Access points/mi 15 /mi Up/down % Two-way hourly volume, V 296 veh/h Directional split 64 / 36 % ____________________________Average Travel Speed______________________________ Grade adjustment factor, fG 0.71 PCE for trucks, ET 2.5 PCE for RVs, ER 1.1 Heavy-vehicle adjustment factor, 0.847 Two-way flow rate,(note-1) vp 559 pc/h Highest directional split proportion (note-2) 358 pc/h Free-Flow Speed from Field Measurement: Field measured speed, SFM - mi/h Observed volume, Vf - veh/h Estimated Free-Flow Speed: Base free-flow speed, BFFS 50.0 mi/h Adj. for lane and shoulder width, fLS 3.7 mi/h Adj. for access points, fA 3.8 mi/h Free-flow speed, FFS 42.5 mi/h Adjustment for no-passing zones, fnp 3.7 mi/h Average travel speed, ATS 34.6 mi/h
![Page 12: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/12.jpg)
__________________________Percent Time-Spent-Following________________________ Grade adjustment factor, fG 0.77 PCE for trucks, ET 1.8 PCE for RVs, ER 1.0 Heavy-vehicle adjustment factor, fHV 0.912 Two-way flow rate,(note-1) vp 479 pc/h Highest directional split proportion (note-2) 307 Base percent time-spent-following, BPTSF 34.4 % Adj.for directional distribution and no-passing zones, fd/np 21.4 Percent time-spent-following, PTSF 55.7 % ________________Level of Service and Other Performance Measures_______________ Level of service, LOS C Volume to capacity ratio, v/c 0.17 Peak 15-min vehicle-miles of travel, VMT15 303 veh-mi Peak-hour vehicle-miles of travel, VMT60 1066 veh-mi Peak 15-min total travel time, TT15 8.8 veh-h ______________________________________________________________________________ Notes: 1. If vp >= 3200 pc/h, terminate analysis-the LOS is F. 2. If highest directional split vp >= 1700 pc/h, terminate analysis-the LOS is F.
![Page 13: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/13.jpg)
HCS+: Two-Lane Highways Release 5.21 Phone: Fax: E-Mail: ___________________Two-Way Two-Lane Highway Segment Analysis__________________ Analyst Thomas Witt Agency/Co. KYTC Planning Date Performed 5/9/2007 Analysis Time Period Highway KY 100 From/To MP 10.228 to MP 12.654 Jurisdiction Allen County Analysis Year 2007 Description No-Build Alternative ___________________________________Input Data_________________________________ Highway class Class 2 Shoulder width 2.0 ft Peak-hour factor, PHF 0.88 Lane width 10.0 ft % Trucks and buses 12 % Segment length 2.4 mi % Recreational vehicles 0 % Terrain type Rolling % No-passing zones 74 % Grade: Length mi Access points/mi 26 /mi Up/down % Two-way hourly volume, V 407 veh/h Directional split 64 / 36 % ____________________________Average Travel Speed______________________________ Grade adjustment factor, fG 0.93 PCE for trucks, ET 1.9 PCE for RVs, ER 1.1 Heavy-vehicle adjustment factor, 0.903 Two-way flow rate,(note-1) vp 551 pc/h Highest directional split proportion (note-2) 353 pc/h Free-Flow Speed from Field Measurement: Field measured speed, SFM - mi/h Observed volume, Vf - veh/h Estimated Free-Flow Speed: Base free-flow speed, BFFS 55.0 mi/h Adj. for lane and shoulder width, fLS 3.7 mi/h Adj. for access points, fA 6.5 mi/h Free-flow speed, FFS 44.8 mi/h Adjustment for no-passing zones, fnp 3.4 mi/h Average travel speed, ATS 37.1 mi/h
![Page 14: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/14.jpg)
__________________________Percent Time-Spent-Following________________________ Grade adjustment factor, fG 0.94 PCE for trucks, ET 1.5 PCE for RVs, ER 1.0 Heavy-vehicle adjustment factor, fHV 0.943 Two-way flow rate,(note-1) vp 522 pc/h Highest directional split proportion (note-2) 334 Base percent time-spent-following, BPTSF 36.8 % Adj.for directional distribution and no-passing zones, fd/np 20.4 Percent time-spent-following, PTSF 57.2 % ________________Level of Service and Other Performance Measures_______________ Level of service, LOS C Volume to capacity ratio, v/c 0.17 Peak 15-min vehicle-miles of travel, VMT15 278 veh-mi Peak-hour vehicle-miles of travel, VMT60 977 veh-mi Peak 15-min total travel time, TT15 7.5 veh-h ______________________________________________________________________________ Notes: 1. If vp >= 3200 pc/h, terminate analysis-the LOS is F. 2. If highest directional split vp >= 1700 pc/h, terminate analysis-the LOS is F.
![Page 15: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/15.jpg)
Capacity and Level of Service Analysis
Output from HCS+
No-Build Scenario with Year 2030 Traffic Volumes
![Page 16: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/16.jpg)
![Page 17: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/17.jpg)
HCS+: Two-Lane Highways Release 5.21 Phone: Fax: E-Mail: ___________________Two-Way Two-Lane Highway Segment Analysis__________________ Analyst Thomas Witt Agency/Co. KYTC Planning Date Performed 5/9/2007 Analysis Time Period Highway KY 100 From/To MP 16.34 to MP 19.115 Jurisdiction Simpson County Analysis Year 2030 Description No-Build Scenario ___________________________________Input Data_________________________________ Highway class Class 2 Shoulder width 4.0 ft Peak-hour factor, PHF 0.88 Lane width 10.0 ft % Trucks and buses 12 % Segment length 2.8 mi % Recreational vehicles 0 % Terrain type Rolling % No-passing zones 42 % Grade: Length mi Access points/mi 10 /mi Up/down % Two-way hourly volume, V 641 veh/h Directional split 64 / 36 % ____________________________Average Travel Speed______________________________ Grade adjustment factor, fG 0.93 PCE for trucks, ET 1.9 PCE for RVs, ER 1.1 Heavy-vehicle adjustment factor, 0.903 Two-way flow rate,(note-1) vp 868 pc/h Highest directional split proportion (note-2) 556 pc/h Free-Flow Speed from Field Measurement: Field measured speed, SFM - mi/h Observed volume, Vf - veh/h Estimated Free-Flow Speed: Base free-flow speed, BFFS 60.0 mi/h Adj. for lane and shoulder width, fLS 2.4 mi/h Adj. for access points, fA 2.5 mi/h Free-flow speed, FFS 55.1 mi/h Adjustment for no-passing zones, fnp 1.8 mi/h Average travel speed, ATS 46.5 mi/h
![Page 18: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/18.jpg)
__________________________Percent Time-Spent-Following________________________ Grade adjustment factor, fG 0.94 PCE for trucks, ET 1.5 PCE for RVs, ER 1.0 Heavy-vehicle adjustment factor, fHV 0.943 Two-way flow rate,(note-1) vp 821 pc/h Highest directional split proportion (note-2) 525 Base percent time-spent-following, BPTSF 51.4 % Adj.for directional distribution and no-passing zones, fd/np 10.5 Percent time-spent-following, PTSF 61.9 % ________________Level of Service and Other Performance Measures_______________ Level of service, LOS C Volume to capacity ratio, v/c 0.27 Peak 15-min vehicle-miles of travel, VMT15 510 veh-mi Peak-hour vehicle-miles of travel, VMT60 1795 veh-mi Peak 15-min total travel time, TT15 11.0 veh-h ______________________________________________________________________________ Notes: 1. If vp >= 3200 pc/h, terminate analysis-the LOS is F. 2. If highest directional split vp >= 1700 pc/h, terminate analysis-the LOS is F.
![Page 19: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/19.jpg)
HCS+: Two-Lane Highways Release 5.21 Phone: Fax: E-Mail: ___________________Two-Way Two-Lane Highway Segment Analysis__________________ Analyst Thomas Witt Agency/Co. KYTC Planning Date Performed 5/9/2007 Analysis Time Period Highway KY 100 From/To MP 0 to MP 3.339 Jurisdiction Allen County Analysis Year 2030 Description No-Build Scenario ___________________________________Input Data_________________________________ Highway class Class 2 Shoulder width 4.0 ft Peak-hour factor, PHF 0.88 Lane width 9.0 ft % Trucks and buses 12 % Segment length 3.3 mi % Recreational vehicles 0 % Terrain type Rolling % No-passing zones 79 % Grade: Length mi Access points/mi 16 /mi Up/down % Two-way hourly volume, V 641 veh/h Directional split 64 / 36 % ____________________________Average Travel Speed______________________________ Grade adjustment factor, fG 0.93 PCE for trucks, ET 1.9 PCE for RVs, ER 1.1 Heavy-vehicle adjustment factor, 0.903 Two-way flow rate,(note-1) vp 868 pc/h Highest directional split proportion (note-2) 556 pc/h Free-Flow Speed from Field Measurement: Field measured speed, SFM - mi/h Observed volume, Vf - veh/h Estimated Free-Flow Speed: Base free-flow speed, BFFS 55.0 mi/h Adj. for lane and shoulder width, fLS 3.5 mi/h Adj. for access points, fA 4.0 mi/h Free-flow speed, FFS 47.5 mi/h Adjustment for no-passing zones, fnp 2.5 mi/h Average travel speed, ATS 38.2 mi/h
![Page 20: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/20.jpg)
__________________________Percent Time-Spent-Following________________________ Grade adjustment factor, fG 0.94 PCE for trucks, ET 1.5 PCE for RVs, ER 1.0 Heavy-vehicle adjustment factor, fHV 0.943 Two-way flow rate,(note-1) vp 821 pc/h Highest directional split proportion (note-2) 525 Base percent time-spent-following, BPTSF 51.4 % Adj.for directional distribution and no-passing zones, fd/np 13.6 Percent time-spent-following, PTSF 65.0 % ________________Level of Service and Other Performance Measures_______________ Level of service, LOS C Volume to capacity ratio, v/c 0.27 Peak 15-min vehicle-miles of travel, VMT15 601 veh-mi Peak-hour vehicle-miles of travel, VMT60 2115 veh-mi Peak 15-min total travel time, TT15 15.7 veh-h ______________________________________________________________________________ Notes: 1. If vp >= 3200 pc/h, terminate analysis-the LOS is F. 2. If highest directional split vp >= 1700 pc/h, terminate analysis-the LOS is F.
![Page 21: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/21.jpg)
HCS+: Two-Lane Highways Release 5.21 Phone: Fax: E-Mail: ___________________Two-Way Two-Lane Highway Segment Analysis__________________ Analyst Thomas Witt Agency/Co. KYTC Planning Date Performed 5/9/2007 Analysis Time Period Highway KY 100 From/To MP 3.339 to MP 6.586 Jurisdiction Allen County Analysis Year 2030 Description No-Build Scenario ___________________________________Input Data_________________________________ Highway class Class 2 Shoulder width 2.0 ft Peak-hour factor, PHF 0.88 Lane width 10.0 ft % Trucks and buses 12 % Segment length 3.2 mi % Recreational vehicles 0 % Terrain type Rolling % No-passing zones 71 % Grade: Length mi Access points/mi 12 /mi Up/down % Two-way hourly volume, V 469 veh/h Directional split 64 / 36 % ____________________________Average Travel Speed______________________________ Grade adjustment factor, fG 0.93 PCE for trucks, ET 1.9 PCE for RVs, ER 1.1 Heavy-vehicle adjustment factor, 0.903 Two-way flow rate,(note-1) vp 635 pc/h Highest directional split proportion (note-2) 406 pc/h Free-Flow Speed from Field Measurement: Field measured speed, SFM - mi/h Observed volume, Vf - veh/h Estimated Free-Flow Speed: Base free-flow speed, BFFS 55.0 mi/h Adj. for lane and shoulder width, fLS 3.7 mi/h Adj. for access points, fA 3.0 mi/h Free-flow speed, FFS 48.3 mi/h Adjustment for no-passing zones, fnp 3.1 mi/h Average travel speed, ATS 40.3 mi/h
![Page 22: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/22.jpg)
__________________________Percent Time-Spent-Following________________________ Grade adjustment factor, fG 0.94 PCE for trucks, ET 1.5 PCE for RVs, ER 1.0 Heavy-vehicle adjustment factor, fHV 0.943 Two-way flow rate,(note-1) vp 601 pc/h Highest directional split proportion (note-2) 385 Base percent time-spent-following, BPTSF 41.0 % Adj.for directional distribution and no-passing zones, fd/np 19.4 Percent time-spent-following, PTSF 60.5 % ________________Level of Service and Other Performance Measures_______________ Level of service, LOS C Volume to capacity ratio, v/c 0.20 Peak 15-min vehicle-miles of travel, VMT15 426 veh-mi Peak-hour vehicle-miles of travel, VMT60 1501 veh-mi Peak 15-min total travel time, TT15 10.6 veh-h ______________________________________________________________________________ Notes: 1. If vp >= 3200 pc/h, terminate analysis-the LOS is F. 2. If highest directional split vp >= 1700 pc/h, terminate analysis-the LOS is F.
![Page 23: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/23.jpg)
HCS+: Two-Lane Highways Release 5.21 Phone: Fax: E-Mail: ___________________Two-Way Two-Lane Highway Segment Analysis__________________ Analyst Thomas Witt Agency/Co. KYTC Planning Date Performed 5/9/2007 Analysis Time Period Highway KY 100 From/To MP 6.586 to MP 10.228 Jurisdiction Allen County Analysis Year 2030 Description No-Build Scenario ___________________________________Input Data_________________________________ Highway class Class 2 Shoulder width 2.0 ft Peak-hour factor, PHF 0.88 Lane width 10.0 ft % Trucks and buses 12 % Segment length 3.6 mi % Recreational vehicles 0 % Terrain type Rolling % No-passing zones 86 % Grade: Length mi Access points/mi 15 /mi Up/down % Two-way hourly volume, V 537 veh/h Directional split 64 / 36 % ____________________________Average Travel Speed______________________________ Grade adjustment factor, fG 0.93 PCE for trucks, ET 1.9 PCE for RVs, ER 1.1 Heavy-vehicle adjustment factor, 0.903 Two-way flow rate,(note-1) vp 727 pc/h Highest directional split proportion (note-2) 465 pc/h Free-Flow Speed from Field Measurement: Field measured speed, SFM - mi/h Observed volume, Vf - veh/h Estimated Free-Flow Speed: Base free-flow speed, BFFS 50.0 mi/h Adj. for lane and shoulder width, fLS 3.7 mi/h Adj. for access points, fA 3.8 mi/h Free-flow speed, FFS 42.5 mi/h Adjustment for no-passing zones, fnp 3.1 mi/h Average travel speed, ATS 33.8 mi/h
![Page 24: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/24.jpg)
__________________________Percent Time-Spent-Following________________________ Grade adjustment factor, fG 0.94 PCE for trucks, ET 1.5 PCE for RVs, ER 1.0 Heavy-vehicle adjustment factor, fHV 0.943 Two-way flow rate,(note-1) vp 688 pc/h Highest directional split proportion (note-2) 440 Base percent time-spent-following, BPTSF 45.4 % Adj.for directional distribution and no-passing zones, fd/np 17.5 Percent time-spent-following, PTSF 62.8 % ________________Level of Service and Other Performance Measures_______________ Level of service, LOS C Volume to capacity ratio, v/c 0.23 Peak 15-min vehicle-miles of travel, VMT15 549 veh-mi Peak-hour vehicle-miles of travel, VMT60 1933 veh-mi Peak 15-min total travel time, TT15 16.2 veh-h ______________________________________________________________________________ Notes: 1. If vp >= 3200 pc/h, terminate analysis-the LOS is F. 2. If highest directional split vp >= 1700 pc/h, terminate analysis-the LOS is F.
![Page 25: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/25.jpg)
HCS+: Two-Lane Highways Release 5.21 Phone: Fax: E-Mail: ___________________Two-Way Two-Lane Highway Segment Analysis__________________ Analyst Thomas Witt Agency/Co. KYTC Planning Date Performed 5/9/2007 Analysis Time Period Highway KY 100 From/To MP 10.228 to MP 12.654 Jurisdiction Allen County Analysis Year 2030 Description No-Build Scenario ___________________________________Input Data_________________________________ Highway class Class 2 Shoulder width 2.0 ft Peak-hour factor, PHF 0.88 Lane width 10.0 ft % Trucks and buses 12 % Segment length 2.4 mi % Recreational vehicles 0 % Terrain type Rolling % No-passing zones 74 % Grade: Length mi Access points/mi 26 /mi Up/down % Two-way hourly volume, V 599 veh/h Directional split 64 / 36 % ____________________________Average Travel Speed______________________________ Grade adjustment factor, fG 0.93 PCE for trucks, ET 1.9 PCE for RVs, ER 1.1 Heavy-vehicle adjustment factor, 0.903 Two-way flow rate,(note-1) vp 811 pc/h Highest directional split proportion (note-2) 519 pc/h Free-Flow Speed from Field Measurement: Field measured speed, SFM - mi/h Observed volume, Vf - veh/h Estimated Free-Flow Speed: Base free-flow speed, BFFS 55.0 mi/h Adj. for lane and shoulder width, fLS 3.7 mi/h Adj. for access points, fA 6.5 mi/h Free-flow speed, FFS 44.8 mi/h Adjustment for no-passing zones, fnp 2.6 mi/h Average travel speed, ATS 35.9 mi/h
![Page 26: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/26.jpg)
__________________________Percent Time-Spent-Following________________________ Grade adjustment factor, fG 0.94 PCE for trucks, ET 1.5 PCE for RVs, ER 1.0 Heavy-vehicle adjustment factor, fHV 0.943 Two-way flow rate,(note-1) vp 768 pc/h Highest directional split proportion (note-2) 492 Base percent time-spent-following, BPTSF 49.1 % Adj.for directional distribution and no-passing zones, fd/np 14.6 Percent time-spent-following, PTSF 63.7 % ________________Level of Service and Other Performance Measures_______________ Level of service, LOS C Volume to capacity ratio, v/c 0.25 Peak 15-min vehicle-miles of travel, VMT15 408 veh-mi Peak-hour vehicle-miles of travel, VMT60 1438 veh-mi Peak 15-min total travel time, TT15 11.4 veh-h ______________________________________________________________________________ Notes: 1. If vp >= 3200 pc/h, terminate analysis-the LOS is F. 2. If highest directional split vp >= 1700 pc/h, terminate analysis-the LOS is F.
![Page 27: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/27.jpg)
Capacity and Level of Service Analysis
Output from HCS+
Year 2007 Traffic Volumes with All Segments Rebuilt
![Page 28: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/28.jpg)
![Page 29: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/29.jpg)
HCS+: Two-Lane Highways Release 5.21 Phone: Fax: E-Mail: ___________________Two-Way Two-Lane Highway Segment Analysis__________________ Analyst Thomas Witt Agency/Co. KYTC Planning Date Performed 11/26/2007 Analysis Time Period Highway KY 100 From/To MP 16.34 to MP 19.115 Jurisdiction Simpson County Analysis Year 2007 Description Rebuild All Segments ___________________________________Input Data_________________________________ Highway class Class 2 Shoulder width 8.0 ft Peak-hour factor, PHF 0.88 Lane width 12.0 ft % Trucks and buses 12 % Segment length 2.8 mi % Recreational vehicles 0 % Terrain type Rolling % No-passing zones 30 % Grade: Length mi Access points/mi 10 /mi Up/down % Two-way hourly volume, V 308 veh/h Directional split 64 / 36 % ____________________________Average Travel Speed______________________________ Grade adjustment factor, fG 0.71 PCE for trucks, ET 2.5 PCE for RVs, ER 1.1 Heavy-vehicle adjustment factor, 0.847 Two-way flow rate,(note-1) vp 582 pc/h Highest directional split proportion (note-2) 372 pc/h Free-Flow Speed from Field Measurement: Field measured speed, SFM - mi/h Observed volume, Vf - veh/h Estimated Free-Flow Speed: Base free-flow speed, BFFS 60.0 mi/h Adj. for lane and shoulder width, fLS 0.0 mi/h Adj. for access points, fA 2.5 mi/h Free-flow speed, FFS 57.5 mi/h Adjustment for no-passing zones, fnp 2.0 mi/h Average travel speed, ATS 51.0 mi/h
![Page 30: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/30.jpg)
__________________________Percent Time-Spent-Following________________________ Grade adjustment factor, fG 0.77 PCE for trucks, ET 1.8 PCE for RVs, ER 1.0 Heavy-vehicle adjustment factor, fHV 0.912 Two-way flow rate,(note-1) vp 498 pc/h Highest directional split proportion (note-2) 319 Base percent time-spent-following, BPTSF 35.5 % Adj.for directional distribution and no-passing zones, fd/np 13.9 Percent time-spent-following, PTSF 49.3 % ________________Level of Service and Other Performance Measures_______________ Level of service, LOS B Volume to capacity ratio, v/c 0.18 Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles of travel, VMT60 862 veh-mi Peak 15-min total travel time, TT15 4.8 veh-h ______________________________________________________________________________ Notes: 1. If vp >= 3200 pc/h, terminate analysis-the LOS is F. 2. If highest directional split vp >= 1700 pc/h, terminate analysis-the LOS is F.
![Page 31: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/31.jpg)
HCS+: Two-Lane Highways Release 5.21 Phone: Fax: E-Mail: ___________________Two-Way Two-Lane Highway Segment Analysis__________________ Analyst Thomas Witt Agency/Co. KYTC Planning Date Performed 11/26/2007 Analysis Time Period Highway KY 100 From/To MP 0 to MP 3.339 Jurisdiction Allen County Analysis Year 2007 Description Rebuild All Segments ___________________________________Input Data_________________________________ Highway class Class 2 Shoulder width 8.0 ft Peak-hour factor, PHF 0.88 Lane width 12.0 ft % Trucks and buses 12 % Segment length 3.3 mi % Recreational vehicles 0 % Terrain type Rolling % No-passing zones 30 % Grade: Length mi Access points/mi 16 /mi Up/down % Two-way hourly volume, V 308 veh/h Directional split 64 / 36 % ____________________________Average Travel Speed______________________________ Grade adjustment factor, fG 0.71 PCE for trucks, ET 2.5 PCE for RVs, ER 1.1 Heavy-vehicle adjustment factor, 0.847 Two-way flow rate,(note-1) vp 582 pc/h Highest directional split proportion (note-2) 372 pc/h Free-Flow Speed from Field Measurement: Field measured speed, SFM - mi/h Observed volume, Vf - veh/h Estimated Free-Flow Speed: Base free-flow speed, BFFS 60.0 mi/h Adj. for lane and shoulder width, fLS 0.0 mi/h Adj. for access points, fA 4.0 mi/h Free-flow speed, FFS 56.0 mi/h Adjustment for no-passing zones, fnp 2.0 mi/h Average travel speed, ATS 49.5 mi/h
![Page 32: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/32.jpg)
__________________________Percent Time-Spent-Following________________________ Grade adjustment factor, fG 0.77 PCE for trucks, ET 1.8 PCE for RVs, ER 1.0 Heavy-vehicle adjustment factor, fHV 0.912 Two-way flow rate,(note-1) vp 498 pc/h Highest directional split proportion (note-2) 319 Base percent time-spent-following, BPTSF 35.5 % Adj.for directional distribution and no-passing zones, fd/np 13.9 Percent time-spent-following, PTSF 49.3 % ________________Level of Service and Other Performance Measures_______________ Level of service, LOS B Volume to capacity ratio, v/c 0.18 Peak 15-min vehicle-miles of travel, VMT15 289 veh-mi Peak-hour vehicle-miles of travel, VMT60 1016 veh-mi Peak 15-min total travel time, TT15 5.8 veh-h ______________________________________________________________________________ Notes: 1. If vp >= 3200 pc/h, terminate analysis-the LOS is F. 2. If highest directional split vp >= 1700 pc/h, terminate analysis-the LOS is F.
![Page 33: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/33.jpg)
HCS+: Two-Lane Highways Release 5.21 Phone: Fax: E-Mail: ___________________Two-Way Two-Lane Highway Segment Analysis__________________ Analyst Thomas Witt Agency/Co. KYTC Planning Date Performed 11/26/2007 Analysis Time Period Highway KY 100 From/To MP 3.339 to MP 6.586 Jurisdiction Allen County Analysis Year 2007 Description Rebuild All Segments ___________________________________Input Data_________________________________ Highway class Class 2 Shoulder width 8.0 ft Peak-hour factor, PHF 0.88 Lane width 12.0 ft % Trucks and buses 12 % Segment length 3.2 mi % Recreational vehicles 0 % Terrain type Rolling % No-passing zones 30 % Grade: Length mi Access points/mi 12 /mi Up/down % Two-way hourly volume, V 265 veh/h Directional split 64 / 36 % ____________________________Average Travel Speed______________________________ Grade adjustment factor, fG 0.71 PCE for trucks, ET 2.5 PCE for RVs, ER 1.1 Heavy-vehicle adjustment factor, 0.847 Two-way flow rate,(note-1) vp 500 pc/h Highest directional split proportion (note-2) 320 pc/h Free-Flow Speed from Field Measurement: Field measured speed, SFM - mi/h Observed volume, Vf - veh/h Estimated Free-Flow Speed: Base free-flow speed, BFFS 60.0 mi/h Adj. for lane and shoulder width, fLS 0.0 mi/h Adj. for access points, fA 3.0 mi/h Free-flow speed, FFS 57.0 mi/h Adjustment for no-passing zones, fnp 2.1 mi/h Average travel speed, ATS 51.0 mi/h
![Page 34: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/34.jpg)
__________________________Percent Time-Spent-Following________________________ Grade adjustment factor, fG 0.77 PCE for trucks, ET 1.8 PCE for RVs, ER 1.0 Heavy-vehicle adjustment factor, fHV 0.912 Two-way flow rate,(note-1) vp 429 pc/h Highest directional split proportion (note-2) 275 Base percent time-spent-following, BPTSF 31.4 % Adj.for directional distribution and no-passing zones, fd/np 14.2 Percent time-spent-following, PTSF 45.6 % ________________Level of Service and Other Performance Measures_______________ Level of service, LOS B Volume to capacity ratio, v/c 0.16 Peak 15-min vehicle-miles of travel, VMT15 241 veh-mi Peak-hour vehicle-miles of travel, VMT60 848 veh-mi Peak 15-min total travel time, TT15 4.7 veh-h ______________________________________________________________________________ Notes: 1. If vp >= 3200 pc/h, terminate analysis-the LOS is F. 2. If highest directional split vp >= 1700 pc/h, terminate analysis-the LOS is F.
![Page 35: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/35.jpg)
HCS+: Two-Lane Highways Release 5.21 Phone: Fax: E-Mail: ___________________Two-Way Two-Lane Highway Segment Analysis__________________ Analyst Thomas Witt Agency/Co. KYTC Planning Date Performed 11/26/2007 Analysis Time Period Highway KY 100 From/To MP 6.586 to MP 10.228 Jurisdiction Allen County Analysis Year 2007 Description Rebuild All Segments ___________________________________Input Data_________________________________ Highway class Class 2 Shoulder width 8.0 ft Peak-hour factor, PHF 0.88 Lane width 12.0 ft % Trucks and buses 12 % Segment length 3.6 mi % Recreational vehicles 0 % Terrain type Rolling % No-passing zones 30 % Grade: Length mi Access points/mi 15 /mi Up/down % Two-way hourly volume, V 296 veh/h Directional split 64 / 36 % ____________________________Average Travel Speed______________________________ Grade adjustment factor, fG 0.71 PCE for trucks, ET 2.5 PCE for RVs, ER 1.1 Heavy-vehicle adjustment factor, 0.847 Two-way flow rate,(note-1) vp 559 pc/h Highest directional split proportion (note-2) 358 pc/h Free-Flow Speed from Field Measurement: Field measured speed, SFM - mi/h Observed volume, Vf - veh/h Estimated Free-Flow Speed: Base free-flow speed, BFFS 60.0 mi/h Adj. for lane and shoulder width, fLS 0.0 mi/h Adj. for access points, fA 3.8 mi/h Free-flow speed, FFS 56.3 mi/h Adjustment for no-passing zones, fnp 2.0 mi/h Average travel speed, ATS 49.9 mi/h
![Page 36: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/36.jpg)
__________________________Percent Time-Spent-Following________________________ Grade adjustment factor, fG 0.77 PCE for trucks, ET 1.8 PCE for RVs, ER 1.0 Heavy-vehicle adjustment factor, fHV 0.912 Two-way flow rate,(note-1) vp 479 pc/h Highest directional split proportion (note-2) 307 Base percent time-spent-following, BPTSF 34.4 % Adj.for directional distribution and no-passing zones, fd/np 14.0 Percent time-spent-following, PTSF 48.3 % ________________Level of Service and Other Performance Measures_______________ Level of service, LOS B Volume to capacity ratio, v/c 0.17 Peak 15-min vehicle-miles of travel, VMT15 303 veh-mi Peak-hour vehicle-miles of travel, VMT60 1066 veh-mi Peak 15-min total travel time, TT15 6.1 veh-h ______________________________________________________________________________ Notes: 1. If vp >= 3200 pc/h, terminate analysis-the LOS is F. 2. If highest directional split vp >= 1700 pc/h, terminate analysis-the LOS is F.
![Page 37: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/37.jpg)
HCS+: Two-Lane Highways Release 5.21 Phone: Fax: E-Mail: ___________________Two-Way Two-Lane Highway Segment Analysis__________________ Analyst Thomas Witt Agency/Co. KYTC Planning Date Performed 11/26/2007 Analysis Time Period Highway KY 100 From/To MP 10.229 to MP 11.931 Jurisdiction Allen County Analysis Year 2007 Description Rebuild All Segments ___________________________________Input Data_________________________________ Highway class Class 2 Shoulder width 8.0 ft Peak-hour factor, PHF 0.88 Lane width 12.0 ft % Trucks and buses 12 % Segment length 1.7 mi % Recreational vehicles 0 % Terrain type Rolling % No-passing zones 30 % Grade: Length mi Access points/mi 15 /mi Up/down % Two-way hourly volume, V 407 veh/h Directional split 64 / 36 % ____________________________Average Travel Speed______________________________ Grade adjustment factor, fG 0.93 PCE for trucks, ET 1.9 PCE for RVs, ER 1.1 Heavy-vehicle adjustment factor, 0.903 Two-way flow rate,(note-1) vp 551 pc/h Highest directional split proportion (note-2) 353 pc/h Free-Flow Speed from Field Measurement: Field measured speed, SFM - mi/h Observed volume, Vf - veh/h Estimated Free-Flow Speed: Base free-flow speed, BFFS 60.0 mi/h Adj. for lane and shoulder width, fLS 0.0 mi/h Adj. for access points, fA 3.8 mi/h Free-flow speed, FFS 56.3 mi/h Adjustment for no-passing zones, fnp 2.0 mi/h Average travel speed, ATS 49.9 mi/h
![Page 38: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/38.jpg)
__________________________Percent Time-Spent-Following________________________ Grade adjustment factor, fG 0.94 PCE for trucks, ET 1.5 PCE for RVs, ER 1.0 Heavy-vehicle adjustment factor, fHV 0.943 Two-way flow rate,(note-1) vp 522 pc/h Highest directional split proportion (note-2) 334 Base percent time-spent-following, BPTSF 36.8 % Adj.for directional distribution and no-passing zones, fd/np 13.8 Percent time-spent-following, PTSF 50.6 % ________________Level of Service and Other Performance Measures_______________ Level of service, LOS B Volume to capacity ratio, v/c 0.17 Peak 15-min vehicle-miles of travel, VMT15 197 veh-mi Peak-hour vehicle-miles of travel, VMT60 692 veh-mi Peak 15-min total travel time, TT15 3.9 veh-h ______________________________________________________________________________ Notes: 1. If vp >= 3200 pc/h, terminate analysis-the LOS is F. 2. If highest directional split vp >= 1700 pc/h, terminate analysis-the LOS is F.
![Page 39: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/39.jpg)
Capacity and Level of Service Analysis
Output from HCS+
Year 2030 Traffic Volumes with All Segments Rebuilt
![Page 40: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/40.jpg)
![Page 41: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/41.jpg)
HCS+: Two-Lane Highways Release 5.21 Phone: Fax: E-Mail: ___________________Two-Way Two-Lane Highway Segment Analysis__________________ Analyst Thomas Witt Agency/Co. KYTC Planning Date Performed 11/26/2007 Analysis Time Period Highway KY 100 From/To MP 16.34 to MP 19.115 Jurisdiction Simpson County Analysis Year 2030 Description Rebuild All Segments ___________________________________Input Data_________________________________ Highway class Class 2 Shoulder width 8.0 ft Peak-hour factor, PHF 0.88 Lane width 12.0 ft % Trucks and buses 12 % Segment length 2.8 mi % Recreational vehicles 0 % Terrain type Rolling % No-passing zones 30 % Grade: Length mi Access points/mi 10 /mi Up/down % Two-way hourly volume, V 641 veh/h Directional split 64 / 36 % ____________________________Average Travel Speed______________________________ Grade adjustment factor, fG 0.93 PCE for trucks, ET 1.9 PCE for RVs, ER 1.1 Heavy-vehicle adjustment factor, 0.903 Two-way flow rate,(note-1) vp 868 pc/h Highest directional split proportion (note-2) 556 pc/h Free-Flow Speed from Field Measurement: Field measured speed, SFM - mi/h Observed volume, Vf - veh/h Estimated Free-Flow Speed: Base free-flow speed, BFFS 60.0 mi/h Adj. for lane and shoulder width, fLS 0.0 mi/h Adj. for access points, fA 2.5 mi/h Free-flow speed, FFS 57.5 mi/h Adjustment for no-passing zones, fnp 1.5 mi/h Average travel speed, ATS 49.2 mi/h
![Page 42: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/42.jpg)
__________________________Percent Time-Spent-Following________________________ Grade adjustment factor, fG 0.94 PCE for trucks, ET 1.5 PCE for RVs, ER 1.0 Heavy-vehicle adjustment factor, fHV 0.943 Two-way flow rate,(note-1) vp 821 pc/h Highest directional split proportion (note-2) 525 Base percent time-spent-following, BPTSF 51.4 % Adj.for directional distribution and no-passing zones, fd/np 8.9 Percent time-spent-following, PTSF 60.3 % ________________Level of Service and Other Performance Measures_______________ Level of service, LOS C Volume to capacity ratio, v/c 0.27 Peak 15-min vehicle-miles of travel, VMT15 510 veh-mi Peak-hour vehicle-miles of travel, VMT60 1795 veh-mi Peak 15-min total travel time, TT15 10.4 veh-h ______________________________________________________________________________ Notes: 1. If vp >= 3200 pc/h, terminate analysis-the LOS is F. 2. If highest directional split vp >= 1700 pc/h, terminate analysis-the LOS is F.
![Page 43: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/43.jpg)
HCS+: Two-Lane Highways Release 5.21 Phone: Fax: E-Mail: ___________________Two-Way Two-Lane Highway Segment Analysis__________________ Analyst Thomas Witt Agency/Co. KYTC Planning Date Performed 11/26/2007 Analysis Time Period Highway KY 100 From/To MP 0 to MP 3.339 Jurisdiction Allen County Analysis Year 2030 Description Rebuild All Segments ___________________________________Input Data_________________________________ Highway class Class 2 Shoulder width 8.0 ft Peak-hour factor, PHF 0.88 Lane width 12.0 ft % Trucks and buses 12 % Segment length 3.3 mi % Recreational vehicles 0 % Terrain type Rolling % No-passing zones 30 % Grade: Length mi Access points/mi 16 /mi Up/down % Two-way hourly volume, V 641 veh/h Directional split 64 / 36 % ____________________________Average Travel Speed______________________________ Grade adjustment factor, fG 0.93 PCE for trucks, ET 1.9 PCE for RVs, ER 1.1 Heavy-vehicle adjustment factor, 0.903 Two-way flow rate,(note-1) vp 868 pc/h Highest directional split proportion (note-2) 556 pc/h Free-Flow Speed from Field Measurement: Field measured speed, SFM - mi/h Observed volume, Vf - veh/h Estimated Free-Flow Speed: Base free-flow speed, BFFS 60.0 mi/h Adj. for lane and shoulder width, fLS 0.0 mi/h Adj. for access points, fA 4.0 mi/h Free-flow speed, FFS 56.0 mi/h Adjustment for no-passing zones, fnp 1.5 mi/h Average travel speed, ATS 47.7 mi/h
![Page 44: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/44.jpg)
__________________________Percent Time-Spent-Following________________________ Grade adjustment factor, fG 0.94 PCE for trucks, ET 1.5 PCE for RVs, ER 1.0 Heavy-vehicle adjustment factor, fHV 0.943 Two-way flow rate,(note-1) vp 821 pc/h Highest directional split proportion (note-2) 525 Base percent time-spent-following, BPTSF 51.4 % Adj.for directional distribution and no-passing zones, fd/np 8.9 Percent time-spent-following, PTSF 60.3 % ________________Level of Service and Other Performance Measures_______________ Level of service, LOS C Volume to capacity ratio, v/c 0.27 Peak 15-min vehicle-miles of travel, VMT15 601 veh-mi Peak-hour vehicle-miles of travel, VMT60 2115 veh-mi Peak 15-min total travel time, TT15 12.6 veh-h ______________________________________________________________________________ Notes: 1. If vp >= 3200 pc/h, terminate analysis-the LOS is F. 2. If highest directional split vp >= 1700 pc/h, terminate analysis-the LOS is F.
![Page 45: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/45.jpg)
HCS+: Two-Lane Highways Release 5.21 Phone: Fax: E-Mail: ___________________Two-Way Two-Lane Highway Segment Analysis__________________ Analyst Thomas Witt Agency/Co. KYTC Planning Date Performed 11/26/2007 Analysis Time Period Highway KY 100 From/To MP 3.339 to MP 6.586 Jurisdiction Allen County Analysis Year 2030 Description Rebuild All Segments ___________________________________Input Data_________________________________ Highway class Class 2 Shoulder width 8.0 ft Peak-hour factor, PHF 0.88 Lane width 12.0 ft % Trucks and buses 12 % Segment length 3.2 mi % Recreational vehicles 0 % Terrain type Rolling % No-passing zones 30 % Grade: Length mi Access points/mi 12 /mi Up/down % Two-way hourly volume, V 469 veh/h Directional split 64 / 36 % ____________________________Average Travel Speed______________________________ Grade adjustment factor, fG 0.93 PCE for trucks, ET 1.9 PCE for RVs, ER 1.1 Heavy-vehicle adjustment factor, 0.903 Two-way flow rate,(note-1) vp 635 pc/h Highest directional split proportion (note-2) 406 pc/h Free-Flow Speed from Field Measurement: Field measured speed, SFM - mi/h Observed volume, Vf - veh/h Estimated Free-Flow Speed: Base free-flow speed, BFFS 60.0 mi/h Adj. for lane and shoulder width, fLS 0.0 mi/h Adj. for access points, fA 3.0 mi/h Free-flow speed, FFS 57.0 mi/h Adjustment for no-passing zones, fnp 1.9 mi/h Average travel speed, ATS 50.1 mi/h
![Page 46: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/46.jpg)
__________________________Percent Time-Spent-Following________________________ Grade adjustment factor, fG 0.94 PCE for trucks, ET 1.5 PCE for RVs, ER 1.0 Heavy-vehicle adjustment factor, fHV 0.943 Two-way flow rate,(note-1) vp 601 pc/h Highest directional split proportion (note-2) 385 Base percent time-spent-following, BPTSF 41.0 % Adj.for directional distribution and no-passing zones, fd/np 13.4 Percent time-spent-following, PTSF 54.4 % ________________Level of Service and Other Performance Measures_______________ Level of service, LOS B Volume to capacity ratio, v/c 0.20 Peak 15-min vehicle-miles of travel, VMT15 426 veh-mi Peak-hour vehicle-miles of travel, VMT60 1501 veh-mi Peak 15-min total travel time, TT15 8.5 veh-h ______________________________________________________________________________ Notes: 1. If vp >= 3200 pc/h, terminate analysis-the LOS is F. 2. If highest directional split vp >= 1700 pc/h, terminate analysis-the LOS is F.
![Page 47: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/47.jpg)
HCS+: Two-Lane Highways Release 5.21 Phone: Fax: E-Mail: ___________________Two-Way Two-Lane Highway Segment Analysis__________________ Analyst Thomas Witt Agency/Co. KYTC Planning Date Performed 11/26/2007 Analysis Time Period Highway KY 100 From/To MP 6.586 to MP 10.228 Jurisdiction Allen County Analysis Year 2030 Description Rebuild All Segments ___________________________________Input Data_________________________________ Highway class Class 2 Shoulder width 8.0 ft Peak-hour factor, PHF 0.88 Lane width 12.0 ft % Trucks and buses 12 % Segment length 3.6 mi % Recreational vehicles 0 % Terrain type Rolling % No-passing zones 30 % Grade: Length mi Access points/mi 15 /mi Up/down % Two-way hourly volume, V 537 veh/h Directional split 64 / 36 % ____________________________Average Travel Speed______________________________ Grade adjustment factor, fG 0.93 PCE for trucks, ET 1.9 PCE for RVs, ER 1.1 Heavy-vehicle adjustment factor, 0.903 Two-way flow rate,(note-1) vp 727 pc/h Highest directional split proportion (note-2) 465 pc/h Free-Flow Speed from Field Measurement: Field measured speed, SFM - mi/h Observed volume, Vf - veh/h Estimated Free-Flow Speed: Base free-flow speed, BFFS 60.0 mi/h Adj. for lane and shoulder width, fLS 0.0 mi/h Adj. for access points, fA 3.8 mi/h Free-flow speed, FFS 56.3 mi/h Adjustment for no-passing zones, fnp 1.8 mi/h Average travel speed, ATS 48.8 mi/h
![Page 48: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/48.jpg)
__________________________Percent Time-Spent-Following________________________ Grade adjustment factor, fG 0.94 PCE for trucks, ET 1.5 PCE for RVs, ER 1.0 Heavy-vehicle adjustment factor, fHV 0.943 Two-way flow rate,(note-1) vp 688 pc/h Highest directional split proportion (note-2) 440 Base percent time-spent-following, BPTSF 45.4 % Adj.for directional distribution and no-passing zones, fd/np 11.5 Percent time-spent-following, PTSF 56.9 % ________________Level of Service and Other Performance Measures_______________ Level of service, LOS C Volume to capacity ratio, v/c 0.23 Peak 15-min vehicle-miles of travel, VMT15 549 veh-mi Peak-hour vehicle-miles of travel, VMT60 1933 veh-mi Peak 15-min total travel time, TT15 11.2 veh-h ______________________________________________________________________________ Notes: 1. If vp >= 3200 pc/h, terminate analysis-the LOS is F. 2. If highest directional split vp >= 1700 pc/h, terminate analysis-the LOS is F.
![Page 49: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/49.jpg)
HCS+: Two-Lane Highways Release 5.21 Phone: Fax: E-Mail: ___________________Two-Way Two-Lane Highway Segment Analysis__________________ Analyst Thomas Witt Agency/Co. KYTC Planning Date Performed 11/26/2007 Analysis Time Period Highway KY 100 From/To MP 10.229 to MP 11.931 Jurisdiction Allen County Analysis Year 2030 Description Rebuild All Segments ___________________________________Input Data_________________________________ Highway class Class 2 Shoulder width 8.0 ft Peak-hour factor, PHF 0.88 Lane width 12.0 ft % Trucks and buses 12 % Segment length 1.7 mi % Recreational vehicles 0 % Terrain type Rolling % No-passing zones 30 % Grade: Length mi Access points/mi 15 /mi Up/down % Two-way hourly volume, V 599 veh/h Directional split 64 / 36 % ____________________________Average Travel Speed______________________________ Grade adjustment factor, fG 0.93 PCE for trucks, ET 1.9 PCE for RVs, ER 1.1 Heavy-vehicle adjustment factor, 0.903 Two-way flow rate,(note-1) vp 811 pc/h Highest directional split proportion (note-2) 519 pc/h Free-Flow Speed from Field Measurement: Field measured speed, SFM - mi/h Observed volume, Vf - veh/h Estimated Free-Flow Speed: Base free-flow speed, BFFS 60.0 mi/h Adj. for lane and shoulder width, fLS 0.0 mi/h Adj. for access points, fA 3.8 mi/h Free-flow speed, FFS 56.3 mi/h Adjustment for no-passing zones, fnp 1.6 mi/h Average travel speed, ATS 48.3 mi/h
![Page 50: APPENDIX F LEVEL OF SERVICE ANALYSIStransportation.ky.gov/Planning/Planning Studies and Reports/KY - 10… · Peak 15-min vehicle-miles of travel, VMT15 245 veh-mi Peak-hour vehicle-miles](https://reader033.vdocuments.us/reader033/viewer/2022060523/60533b95e11c6654dd0cf3cd/html5/thumbnails/50.jpg)
__________________________Percent Time-Spent-Following________________________ Grade adjustment factor, fG 0.94 PCE for trucks, ET 1.5 PCE for RVs, ER 1.0 Heavy-vehicle adjustment factor, fHV 0.943 Two-way flow rate,(note-1) vp 768 pc/h Highest directional split proportion (note-2) 492 Base percent time-spent-following, BPTSF 49.1 % Adj.for directional distribution and no-passing zones, fd/np 9.7 Percent time-spent-following, PTSF 58.8 % ________________Level of Service and Other Performance Measures_______________ Level of service, LOS C Volume to capacity ratio, v/c 0.25 Peak 15-min vehicle-miles of travel, VMT15 289 veh-mi Peak-hour vehicle-miles of travel, VMT60 1018 veh-mi Peak 15-min total travel time, TT15 6.0 veh-h ______________________________________________________________________________ Notes: 1. If vp >= 3200 pc/h, terminate analysis-the LOS is F. 2. If highest directional split vp >= 1700 pc/h, terminate analysis-the LOS is F.