APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS

Upload: others

Post on 19-Jan-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

APPENDIX E

WATER DEMAND DISTRIBUTION AND

NETWORK ANALYSIS

Page 2: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

E-1

APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK

ANALYSIS

E.1 Water Demand Distribution

(1) Target Area

The target area of network analysis for the proposed transmission is Basrah city area and Al Hartha that for

the distribution system is Basrah city area only.

(2) Water Demand Distribution

The estimated total water demand in Basrah District was distributed to sub-districts by following

procedures:

1) The road density of each sub-district is estimated using GIS.

2) It is assumed that the road density is proportional to the population density of each sub-district.

3) The total population is distributed according to the road density of the sub-district and thus the

population of sub-district is calculated.

4) The water demand of sub-district is calculated multiplying by per capita consumption.

5) Distribution zone demand of 13 zones is calculated by aggregating sub-district demand in the zone.

6) Node demand for network analysis is calculated by subdividing and aggregating sub-district

demand.

The population density and water demand of sub-zones in 2006, 2015 and 2025 are shown in Figure E.1

and in Figure E.2.

E.2 Network Model

(1) Distribution Network Model

The distribution and transmission network model including existing and proposed pipelines are shown in

Figure E.3 and Figure E.4.

(2) Network Analysis

The route and diameter of required distribution mains are calculated to convey hourly peak water demand

in 2015 using network analysis software. Those of required transmission mains are calculated to convey the

maximum day water demand in 2015. EPANET 2 (US EPA) is used for network analysis software, where,

Hazen Williams Formula was used for the hydraulic formula.

Page 3: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

E-2

In distribution network analysis, the water demand is assigned to nodes (junctions) and the feeding point of

water in each zone is only one, the elevated tank, from which water is fed to the network at 35 m water

pressure. The diameter of required pipelines is calculated to retaining the water pressure of more than 25 m

at the end of distribution mains. In analysis, the maximum water velocity is set at about 3.0 m/s for snaller

diameter pipeline and the maximum head-loss of pipe is set at about 5 m/km.

In transmission network analysis, the water demand is assigned to a distribution reservoir located in each

distribution zone and the pipelines located on the proposed zone boundaries are closed by valves by which

water cannot move to neighbor zones.

The feeding point is at the proposed transmission pumping station, which is located nearby R-Zero. The

low water level of elevated reservoirs is set as 35 m and the minimum service pressure at the end of zone is

set at 15 m. The diameter of required pipelines is calculated to retaining the water pressure of more than 5

m at distribution reservoirs. Simultaneously, required pump pressure at the transmission pumping station is

calculated. In analysis, the maximum water velocity is set at about 2.0 m/s for large diameter pipeline and

the maximum head-loss of pipe is set at about 2 m/km.

E.3 Results of Network Analysis

The results of distribution network analysis are shown as follows:

Figure E.5 Result of Distribution Network Analysis

Table E.1 Result of Distribution Network Analysis

The results of transmission network analysis are shown as follows:

Figure E.6 Results of Transmission Network Analysis

Table E.2 Results of Transmission Network Analysis

Page 4: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

E-3

Figure E.1 Estimated Population Density of Sub-District

Page 5: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

E-4

Figure E.2 Estimated Water Demand Distribution to Sub-Divisions

Page 6: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

E-5

Figure E.3 Distribution Main Network Model

11

12

14

16

18

20

6

24

25

26

28

29

3031

32

33

3436

37

38

41

42

44

45

46

47

49

50

52

54

57

58

399

60

61

62

64

65

6667

68

70

71

72

7475

76

82

83

86

88

89

90

92

93

94

96101

102

103

104

106

107

108

109

110

111

112

113

114 115116

117

119

121

123

125

126128

129

131

132

133

134

137

140

142

143144

145

146

147

148

154

155

157

158

162

164

165

166

167

169

170

171

172

174

175

178

179

N08-01

193

196

199

201

210

211

213

214

255

256

259

260

262

263

271

272

273

275

2

3

4

5

9

10

188

189

39

40

105

48

63

150

217

219

237

238

239

240

247

267

270

284

287

288

289

291

293

295

297299

302

303

305

307

308

310

311

312

N08-02

N10-04

N07-03

320

324

325

326

327

331

200

337

340

342

343

345

347

348

352

353

355

358

N02-01

361

362

364

365

N04-01

N05-03

N06-02

N07-05

N08-04

N10-06

N10-03

N10-02

376

377

N11-02

379

380

N12-01

384

385

386

387

388

389

390

391

15

17

8

N10-0585

N02-02

122

N03-08

N05-02

N05-04

N07-01

N07-04

181

95

118

176

N09-01

N10-01

21

22

23

N04-02

56

84

97

98

N09-02

100

124

130

N11-01

141

151

N07-02

173

182

183

N12-02

184

185

N07-07

N07-08

N07-09

N08-07

187

190

191

N09-03

1

N03-05

N03-06

N03-07

N04-03

35

55

73

87

N08-05

N05-06

91

99

120

127

N06-01350

7

N11-04

59

4351

53

139

159

218

222

225

236

252

268

274

282

285286

290

292

294

296

298

300

301

304306

313

315

318

321

323

328

330

334

338

341

344

346

354

359

13

27

19

B0201

B0202

B0203

B0204

B0205

B0206

B0207

B0208

B0215

B0301

B0302

B0303

B0304

B0305

B0306

B0307

B0308B0309

B0310

B0311B0312

B0313

B0314

B0315

B0316

B0401

B0402

B0403

B0406

B0407

B0408

B0409

B0410

B0411

B0412

B0413

B0414

B0415

B0417

B0418B0419

B0420

B0421

B0422

B0423B0424

B0427

B0440

B0501B0502

B0503

B0504

B0505

B0506B0507B0508

B0509

B0510

B0511

B0512

B0513B0514

B0515B0516

B0517

B0518

B0519

B0520

B0521

B0522

B0523

B0525

B0526

B0527B0528

B0529

B0530B0531

B0533

B0534

B0536

B0537

B0538

B0539

B0540

B0550

B0601B0602

B0603B0604

B0606

B0608B0609B0610B0611

B0612

B0613B0614

B0615

B0616

B0618

B0619

B0620

B0701B0702

B0703

B0704

B0705

B0706

B0707

B0708

B0709

B0710

B0711

B0713

B0714B0715

B0716

B0717

B0718B0719

B0720

B0721

B0722

B0723

B0724

B0725

B0730

B0738

B0740

B0741

B0750

B0751

B0801B0802

B0803

B0804B0805B0806

B0807

B0808

B0809

B0810

B0811

B0812

B0813

B0814

B0815

B0817

B0901

B0902

B0904

B0905

B0906

B0907

B0908

B0909B0910

B0912B0913

B0914B0915

B0916

B0917B0918

B0919

B0920B0921

B0922

B0923B0924

B0925

B0926

B0927

B0928

B0929

B0930

B0939

B0940B0941B0942

B1001

B1002

B1003

B1005

B1006B1007

B1008

B1009

B1010

B1011

B1012

B1013

B1014

B1015

B1016

B1017

B1019

B1101

B1102

B1103B1104

B1105

B1106

B1107

B1108

B1109

B1201

B1202

B1203

B1204

B1205

B1206

B1207B1208

B1209

B1210B1211

B1212

B1213

B1219

B1301

B1302

B1304

B1305

B1306

B1307

B1308

B1309

B1310

B1311

B1312

B1314

X01

X02

X03

X10

X11

X13

X14

X15

X21

X22

X23

B1020

Res2

Res03

Res04

Res05

Res06

Res07

Res08

Res09

Res10

Res11

Res12

Res131

Res132

Res133

Page 7: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

E-6

Figure E.4 Transmission Main Netowrk Model

R01

R02 R03

R06

R07R08

R10

R11

R12

R13

R14

R15

R16R25

R24

R23

R22R21

R20

R19

R18

R17

B12

B02

B03

B04

B05

B09S01

EH03

ES05

ER11

ER12

ER14

ER15

EB13-2

S03

B06

R09

B07

ER16

R04

R05

B08

ER-Zero01

B01

ER02

ER03 ER04

ER05

ER06ER07

ER01

ER17

B11

EH01

EH02

EH05

EH06

ES06

EWTP-TR1

EWTP-TR2

EH09

EH11

EH12

EH13

EH14

EWTP-TR3EWTP-TR4

ER08

ER-Garma01

ER-Garma02

R28

ER20

ER19

ER18

B10

S02

ER13EB13-1

EB13-3

S04

1

ER-Gamma03

ER-Gamma04

ER-Gammna05

Exist-Jubaila01

Exist-Jubaila02

New-Maqil014

5

2Exist-Ribat01

6Exist-Ribat-02Exist-Ribat03

10

Exist-Bradia01

New-Bradia

EH20

EWTP-TR11EWTP-TR5

JubailaPS01

MaqilPS01MaqilPS02MaqilPS03MaqilPS04MaqilPS05

Maqil022MAqil023Maqil024Maqul021MaqilPS06

jubaila025

RibatPS01

BradiaPS01BradiaPS02BradiaPS03BradiaPS04BradiaPS05

3

Block01

Block02

Block03

Block04

Block05

Block06

Block07

Block08

Block09

Block10

Block11

Block12

Block13-2S01

S02

S03

S05

S06

R21

R22

R3

R24

R25

R26

R27

R28

R29

R30

R31

R32

R33

R34

R35

R36

R37

R38

R39

R40

R41

R42

R43

R44

R46

R48

R49

R50

R51

E1200RT02

E1000Hartha02

EHartha02

E1000Hartha01

R58RZeroEnd

R2

R4

R5

R6

R7

R8

R9

E900Garma03

EHartha01

E1000HarthEndE1200RT03

E900Garma02

Hartha900End

E900Garma04

E1200RTEnd

R47

R54

R56

Block13-1

Block13-3

S04

JubailaWTP23

MaqilWTP5

46

78

9

10

1112

E1200RT05E1200RT06

TRes1

WTP-RZero

WTP-BasrahWTP-NewWT-Hartha25

Garma1

Garma2

Res04

MaqilRes

JubailaRes

RibatWTP

BradiaWTP

Page 8: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

E-7

Figure E.5 Result of Distribution Network Analysis

11

12

14

16

18

20

6

24

25

26

28

29

3031

32

33

3436

37

38

41

42

44

45

46

47

49

50

52

54

57

58

399

60

61

62

64

65

6667

68

70

71

72

7475

76

82

83

86

88

89

90

92

93

94

96101

102

103

104

106

107

108

109

110

111

112

113

114 115116

117

119

121

123

125

126128

129

131

132

133

134

137

140

142

143144

145

146

147

148

154

155

157

158

162

164

165

166

167

169

170

171

172

174

175

178

179

N08-01

193

196

199

201

210

211

213

214

255

256

259

260

262

263

271

272

273

275

2

3

4

5

9

10

188

189

39

40

105

48

63

150

217

219

237

238

239

240

247

267

270

284

287

288

289

291

293

295

297299

302

303

305

307

308

310

311

312

N08-02

N10-04

N07-03

320

324

325

326

327

331

200

337

340

342

343

345

347

348

352

353

355

358

N02-01

361

362

364

365

N04-01

N05-03

N06-02

N07-05

N08-04

N10-06

N10-03

N10-02

376

377

N11-02

379

380

N12-01

384

385

386

387

388

389

390

391

15

17

8

N10-0585

N02-02

122

N03-08

N05-02

N05-04

N07-01

N07-04

181

95

118

176

N09-01

N10-01

21

22

23

N04-02

56

84

97

98

N09-02

100

124

130

N11-01

141

151

N07-02

173

182

183

N12-02

184

185

N07-07

N07-08

N07-09

N08-07

187

190

191

N09-03

1

N03-05

N03-06

N03-07

N04-03

35

55

73

87

N08-05

N05-06

91

99

120

127

N06-01350

7

N11-04

59

4351

53

139

159

218

222

225

236

252

268

274

282

285286

290

292

294

296

298

300

301

304306

313

315

318

321

323

328

330

334

338

341

344

346

354

359

13

27

19

B0201

B0202

B0203

B0204

B0205

B0206

B0207

B0208

B0215

B0301

B0302

B0303

B0304

B0305

B0306

B0307

B0308B0309

B0310

B0311B0312

B0313

B0314

B0315

B0316

B0401

B0402

B0403

B0406

B0407

B0408

B0409

B0410

B0411

B0412

B0413

B0414

B0415

B0417

B0418B0419

B0420

B0421

B0422

B0423B0424

B0427

B0440

B0501B0502

B0503

B0504

B0505

B0506B0507B0508

B0509

B0510

B0511

B0512

B0513B0514

B0515B0516

B0517

B0518

B0519

B0520

B0521

B0522

B0523

B0525

B0526

B0527B0528

B0529

B0530B0531

B0533

B0534

B0536

B0537

B0538

B0539

B0540

B0550

B0601B0602

B0603B0604

B0606

B0608B0609B0610B0611

B0612

B0613B0614

B0615

B0616

B0618

B0619

B0620

B0701B0702

B0703

B0704

B0705

B0706

B0707

B0708

B0709

B0710

B0711

B0713

B0714B0715

B0716

B0717

B0718B0719

B0720

B0721

B0722

B0723

B0724

B0725

B0730

B0738

B0740

B0741

B0750

B0751

B0801B0802

B0803

B0804B0805B0806

B0807

B0808

B0809

B0810

B0811

B0812

B0813

B0814

B0815

B0817

B0901

B0902

B0904

B0905

B0906

B0907

B0908

B0909B0910

B0912B0913

B0914B0915

B0916

B0917B0918

B0919

B0920B0921

B0922

B0923B0924

B0925

B0926

B0927

B0928

B0929

B0930

B0939

B0940B0941B0942

B1001

B1002

B1003

B1005

B1006B1007

B1008

B1009

B1010

B1011

B1012

B1013

B1014

B1015

B1016

B1017

B1019

B1101

B1102

B1103B1104

B1105

B1106

B1107

B1108

B1109

B1201

B1202

B1203

B1204

B1205

B1206

B1207B1208

B1209

B1210B1211

B1212

B1213

B1219

B1301

B1302

B1304

B1305

B1306

B1307

B1308

B1309

B1310

B1311

B1312

B1314

X01

X02

X03

X10

X11

X13

X14

X15

X21

X22

X23

B1020

Res2

Res03

Res04

Res05

Res06

Res07

Res08

Res09

Res10

Res11

Res12

Res131

Res132

Res133

Pressure

15.00

20.00

25.00

30.00

m

Unit Headloss

2.00

3.00

4.00

5.00

m/km

Page 9: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

E-8

Pressure

10.00

20.00

30.00

40.00

m

Unit Headloss

1.00

2.00

3.00

4.00

m/km

Figure E.6 Results of Transmission Network Analysis

Page 10: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

E-9

Table E.1 Result of Distribution Network Analysis

Network Table - Nodes Network Table - Links

Node ID Base Demand Pressure Link ID Length Diameter Flow Velocity Unit

HeadlossStatus

CMD m m mm CMD m/s m/km

Junc B0201 7375 30.52 Pipe 11 58.22 600 0 0 0 Closed

Junc B0202 7375 30.46 Pipe12 785.7 600 0 0 0 Closed

JuncB0203 0 26.97 Pipe14 920.44 500 -10299.9 0.61 0.82 Open

JuncB0204 7375 27.48 Pipe16 791.53 400 3132.13 0.29 0.26 Open

JuncB0205 7375 25.88 Pipe18 524.48 400 4717.6 0.43 0.57 Open

JuncB0206 7375 25.56 Pipe20 361.2 400 19364.72 1.78 9.15 Open

JuncB0207 7375 26.04 Pipe6 525.15 350 336.32 0.04 0.01 Open

JuncB0208 7375 28.24 Pipe24 216.62 350 -4420.78 0.53 0.99 Open

JuncB0215 7375 26.97 Pipe25 825.65 350 -9177.88 1.1 4.19 Open

JuncB0301 4757.1 31.14 Pipe26 490.04 350 -6921.91 0.83 2.4 Open

JuncB0302 4757.1 30.72 Pipe28 248.84 350 -13146.68 1.58 8.53 Open

JuncB0303 4757.1 31.97 Pipe29 597.8 350 10299.9 1.24 5.26 Open

JuncB0304 4757.1 32.69 Pipe30 290.27 350 6866.6 0.83 2.36 Open

JuncB0305 4757.1 29.24 Pipe31 153.65 350 3433.3 0.41 0.61 Open

JuncB0306 4757.1 26.51 Pipe32 750.86 350 9213.7 1.11 4.22 Open

JuncB0307 4757.1 26.38 Pipe33 219.03 350 5780.4 0.7 1.68 Open

JuncB0308 0 27.35 Pipe34 261.41 350 2347.1 0.28 0.29 Open

JuncB0309 4757.1 27.68 Pipe36 506.82 350 -7952.8 0.96 3.16 Open

JuncB0310 0 27.85 Pipe37 926.73 400 4757.1 0.44 0.58 Open

JuncB0311 4757.1 27.85 Pipe38 302.3 350 12124.82 1.46 7.27 Open

JuncB0312 4757.1 27.85 Pipe41 1192.67 450 -10000.18 0.73 1.34 Open

JuncB0313 4757.1 27.84 Pipe42 682.36 450 7375 0.54 0.74 Open

JuncB0314 4757.1 28.06 Pipe44 733.61 800 -6979.91 0.16 0.03 Open

JuncB0315 4757.1 28.21 Pipe45 875.19 800 -28294.39 0.65 0.53 Open

JuncB0316 4757.1 31.52 Pipe46 1172.48 800 18061.68 0.42 0.22 Open

JuncB0401 4717.6 34.83 Pipe47 787.91 500 -19499.82 1.15 2.9 Open

JuncB0402 4717.6 33.28 Pipe49 848.77 500 -6020.09 0.35 0.29 Open

JuncB0403 4717.6 32.21 Pipe50 1973.97 400 479.91 0.04 0.01 Open

JuncB0406 4717.6 32.22 Pipe52 1084.22 300 0 0 0 Open

JuncB0407 4717.6 32.3 Pipe54 543.2 400 -6500 0.6 1.06 Open

JuncB0408 4717.6 32.29 Pipe57 150.52 500 17899.33 1.06 2.44 Open

JuncB0409 4717.6 30.57 Pipe58 923.38 300 1814.47 0.3 0.39 Open

JuncB0410 4717.6 30.59 Pipe399 1129.94 300 958.41 0.16 0.11 Open

JuncB0411 4717.6 30.64 Pipe60 1052.68 500 24399.33 1.44 4.51 Open

JuncB0412 4717.6 30.67 Pipe61 846.82 700 6866.6 0.21 0.07 Open

JuncB0413 0 30.67 Pipe62 2082.74 700 3433.3 0.1 0.02 Open

JuncB0414 0 30.67 Pipe64 263.4 300 5941.78 0.97 3.97 Open

JuncB0415 4717.6 32.22 Pipe65 463.35 300 8012.41 1.31 7.16 Open

JuncB0417 4717.6 30.37 Pipe66 624.73 300 -6806.99 1.11 5.19 Open

JuncB0418 0 30.67 Pipe67 670.41 300 7167.77 1.17 5.75 Open

JuncB0419 4717.6 21.61 Pipe68 643.67 300 3734.47 0.61 1.59 Open

JuncB0420 0 27.63 Pipe70 574.57 300 -9255.52 1.52 9.53 Open

JuncB0421 4717.6 28.85 Pipe71 566.94 300 -3425.1 0.56 1.34 Open

JuncB0422 0 30.66 Pipe72 676.96 300 6437.5 1.05 4.65 Open

JuncB0423 0 30.16 Pipe74 41.13 300 1401.29 0.23 0.24 Open

JuncB0424 4717.6 30.17 Pipe75 58.17 500 -7301.68 0.43 0.42 Open

JuncB0427 4717.6 30.17 Pipe76 570.02 500 -2046.54 0.12 0.04 Open

JuncB0440 4717.6 32.69 Pipe82 374.44 500 -13097.83 0.77 1.32 Open

JuncB0501 0 27.3 Pipe83 473.41 500 25972.65 1.53 5.11 Open

JuncB0502 0 30.19 Pipe86 701.54 500 -3665.4 0.22 0.11 Open

JuncB0503 3665.4 27.48 Pipe88 595.43 500 -14442.77 0.85 1.6 Open

JuncB0504 0 27.44 Pipe89 551.68 500 -25558.55 1.51 4.95 Open

JuncB0505 3665.4 27.51 Pipe90 394.75 500 15888.46 0.94 1.93 Open

JuncB0506 0 27.3 Pipe92 583.32 350 5703.61 0.69 1.64 Open

JuncB0507 0 27.35 Pipe93 577.41 350 6441.4 0.77 2.08 Open

JuncB0508 0 30.19 Pipe94 624.29 350 3220.7 0.39 0.54 Open

JuncB0509 0 27.57 Pipe96 408.53 350 6563.88 0.79 2.16 Open

JuncB0510 0 30.19 Pipe101 857.33 600 0 0 0 Closed

JuncB0511 3665.4 27.91 Pipe102 188.77 600 0 0 0 Closed

JuncB0512 3665.4 27.58 Pipe103 148.38 600 0 0 0 Closed

JuncB0513 3665.4 28.47 Pipe104 230.96 600 9521.88 0.39 0.28 Open

JuncB0514 3665.4 28.76 Pipe106 242.95 350 2191.08 0.26 0.25 Open

JuncB0515 0 28.75 Pipe107 694.15 600 0 0 0 Closed

JuncB0516 3665.4 28.75 Pipe108 703.22 350 -3665.4 0.44 0.69 Open

Page 11: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

E-10

Network Table - Nodes Network Table - Links

Node ID Base Demand Pressure Link ID Length Diameter Flow Velocity Unit

HeadlossStatus

CMD m m mm CMD m/s m/km

JuncB0517 3665.4 28.83 Pipe109 201.14 350 5174.49 0.62 1.35 Open

JuncB0518 3665.4 28.75 Pipe110 252.27 350 3665.4 0.44 0.69 Open

JuncB0519 3665.4 31.46 Pipe111 867.14 600 -9521.88 0.39 0.28 Open

JuncB0520 3665.4 32.15 Pipe112 185.52 500 -7330.8 0.43 0.42 Open

JuncB0521 3665.4 32.81 Pipe113 455.56 500 4678.43 0.28 0.18 Open

JuncB0522 3665.4 33.29 Pipe114 751.52 500 -1391.49 0.08 0.02 Open

JuncB0523 3665.4 33.02 Pipe115 393.68 500 16852.68 0.99 2.17 Open

JuncB0525 3665.4 32.84 Pipe116 653.42 350 822.18 0.1 0.04 Open

JuncB0526 3665.4 26.4 Pipe117 680.73 350 -1029.23 0.12 0.06 Open

JuncB0527 3665.4 26.29 Pipe119 1112.13 700 7379.65 0.22 0.08 Open

JuncB0528 3665.4 26.37 Pipe121 875.94 700 -35806.98 1.08 1.67 Open

JuncB0529 0 26.37 Pipe123 1042.97 700 19312.5 0.58 0.5 Open

JuncB0530 0 26.37 Pipe125 1013.94 700 -16814.85 0.51 0.38 Open

JuncB0531 3665.4 25.86 Pipe126 411.42 700 -33129.32 1 1.43 Open

JuncB0533 3665.4 30.36 Pipe128 955.01 375 -7831.95 0.82 2.14 Open

JuncB0534 3665.4 30.59 Pipe129 925.69 375 3764.92 0.39 0.51 Open

JuncB0536 3665.4 31.81 Pipe131 286.93 450 -7330.8 0.53 0.73 Open

JuncB0537 3665.4 31.6 Pipe132 745.77 450 -10996.2 0.8 1.62 Open

JuncB0538 3665.4 31.51 Pipe133 192.29 500 32760.14 1.93 8.09 Open

JuncB0539 3665.4 28.67 Pipe134 404.12 500 29734.32 1.75 6.68 Open

JuncB0540 0 28.67 Pipe137 619.7 800 1709.37 0.04 0 Open

JuncB0550 3665.4 27.81 Pipe140 684.02 400 7897.66 0.73 1.55 Open

JuncB0601 6500 29.22 Pipe142 713.6 450 -16902.84 1.23 3.78 Open

JuncB0602 6500 32.81 Pipe143 215.95 450 19979.61 1.45 5.26 Open

JuncB0603 6500 32.55 Pipe144 196.65 450 16314.21 1.19 3.52 Open

JuncB0604 6500 29.1 Pipe145 808.43 450 15674.63 1.14 3.25 Open

JuncB0606 0 27.57 Pipe146 321.92 500 18502.02 1.09 2.61 Open

JuncB0608 6500 28.06 Pipe147 348.49 500 8839.92 0.52 0.61 Open

JuncB0609 6500 27.58 Pipe148 606.91 300 6441.4 1.05 4.65 Open

JuncB0610 6500 27.69 Pipe154 303.52 350 2241.25 0.27 0.27 Open

JuncB0611 6500 27.58 Pipe155 997.77 350 -1424.15 0.17 0.11 Open

JuncB0612 6500 27.58 Pipe157 123.74 450 0 0 0 Closed

JuncB0613 6500 27.57 Pipe158 601.33 450 0 0 0 Closed

JuncB0614 0 27.57 Pipe162 823.83 300 6437.5 1.05 4.65 Open

JuncB0615 6500 29.58 Pipe164 1071.81 700 -41250 1.24 2.21 Open

JuncB0616 6500 29.01 Pipe165 486.42 400 0 0 0 Open

JuncB0618 6500 32.32 Pipe166 2449.47 350 0 0 0 Open

JuncB0619 6500 32.31 Pipe167 718.84 350 4660 0.56 1.1 Open

JuncB0620 6500 32.35 Pipe169 263.22 350 5686.7 0.68 1.63 Open

JuncB0701 3433.3 32.88 Pipe170 525.06 500 5482.27 0.32 0.24 Open

JuncB0702 3433.3 31.83 Pipe171 468.72 500 2261.57 0.13 0.04 Open

JuncB0703 3433.3 28.51 Pipe172 582.69 500 9662.1 0.57 0.73 Open

JuncB0704 3433.3 27.49 Pipe174 829.3 500 -2003.5 0.12 0.03 Open

JuncB0705 3433.3 31.75 Pipe175 924.81 500 -13376.9 0.79 1.38 Open

JuncB0706 3433.3 26.15 Pipe178 1591.66 400 13980 1.29 4.8 Open

JuncB0707 0 27.14 Pipe179 1111.94 600 9320 0.38 0.26 Open

JuncB0708 3433.3 31.12 PipeN08-01 1469.88 400 10056.98 0.93 2.5 Open

JuncB0709 0 31.12 Pipe193 624.9 900 -1600.67 0.03 0 Open

JuncB0710 3433.3 31.21 Pipe196 1559.14 600 0 0 0 Open

JuncB0711 3433.3 27.9 Pipe199 103.01 900 4899.33 0.09 0.01 Open

JuncB0713 3433.3 24.94 Pipe201 1168.71 500 0 0 0 Closed

JuncB0714 3433.3 26.88 Pipe210 438.02 600 -4660 0.19 0.07 Open

JuncB0715 3433.3 25.17 Pipe211 1077.38 700 -16087.14 0.48 0.35 Open

JuncB0716 3433.3 25.89 Pipe213 1500.75 700 24750 0.74 0.81 Open

JuncB0717 3433.3 25.96 Pipe214 1453.08 700 8250 0.25 0.09 Open

JuncB0718 3433.3 26.33 Pipe255 1444.27 500 -3220.7 0.19 0.09 Open

JuncB0719 3433.3 27.08 Pipe256 1107.58 300 0 0 0 Open

JuncB0720 3433.3 27.38 Pipe259 1622.83 600 0 0 0 Open

JuncB0721 3433.3 29.5 Pipe260 741.47 500 0 0 0 Open

JuncB0722 3433.3 26.62 Pipe262 644.82 200 2608.41 0.96 6.5 Open

JuncB0723 3433.3 26.35 Pipe263 1032.35 200 -1894.97 0.7 3.46 Open

JuncB0724 3433.3 25.67 Pipe271 985.93 600 0 0 0 Closed

JuncB0725 3433.3 25.58 Pipe272 1213.5 600 -9850.52 0.4 0.29 Open

JuncB0730 3433.3 26.87 Pipe273 507.88 800 -2662.05 0.06 0.01 Open

JuncB0738 3433.3 26.56 Pipe275 2587.4 700 0 0 0 Open

JuncB0740 3433.3 25.04 Pipe2 542.14 350 2898.48 0.35 0.44 Open

JuncB0741 3433.3 31.1 Pipe3 382.54 350 -2191.08 0.26 0.25 Open

JuncB0750 3433.3 26.53 Pipe4 853.55 225 -1711.59 0.5 1.53 Open

Page 12: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

E-11

Network Table - Nodes Network Table - Links

Node ID Base Demand Pressure Link ID Length Diameter Flow Velocity Unit

HeadlossStatus

CMD m m mm CMD m/s m/km

JuncB0751 0 26.53 Pipe5 248.68 350 6257.37 0.75 1.97 Open

JuncB0801 6437.5 32.61 Pipe9 530.26 700 -25750 0.77 0.87 Open

JuncB0802 6437.5 32.52 Pipe10 460.77 900 6500 0.12 0.02 Open

JuncB0803 6437.5 29.37 Pipe188 532.2 225 -4717.6 1.37 11.31 Open

JuncB0804 6437.5 28.69 Pipe189 107.98 225 -4717.6 1.37 11.31 Open

JuncB0805 6437.5 31.14 Pipe39 875.07 350 2625.18 0.32 0.36 Open

JuncB0806 6437.5 30.97 Pipe40 420.96 350 -4749.82 0.57 1.15 Open

JuncB0807 6437.5 25.97 Pipe105 421.65 600 0 0 0 Open

JuncB0808 6437.5 27.29 Pipe48 754.48 700 7375 0.22 0.08 Open

JuncB0809 6437.5 31.76 Pipe63 1232.69 300 3433.3 0.56 1.35 Open

JuncB0810 6437.5 26.28 Pipe150 108.75 500 11399.33 0.67 1 Open

JuncB0811 6437.5 25.8 Pipe217 744.95 500 4757.1 0.28 0.18 Open

JuncB0812 6437.5 32.15 Pipe219 624.58 350 4757.1 0.57 1.15 Open

JuncB0813 6437.5 31.63 Pipe237 867.58 500 6565.43 0.39 0.34 Open

JuncB0814 6437.5 28.38 Pipe238 458.61 700 9435.2 0.28 0.12 Open

JuncB0815 6437.5 31.62 Pipe239 536.62 700 4717.6 0.14 0.03 Open

JuncB0817 6437.5 31.09 Pipe240 522.9 700 4717.6 0.14 0.03 Open

JuncB0901 3220.7 33.09 Pipe247 381.45 700 -3433.3 0.1 0.02 Open

JuncB0902 3220.7 27.14 Pipe267 225.38 700 6437.5 0.19 0.06 Open

JuncB0904 0 27.14 Pipe270 866.69 700 3433.3 0.1 0.02 Open

JuncB0905 3220.7 27.01 Pipe284 863.44 700 6437.5 0.19 0.06 Open

JuncB0906 3220.7 32.33 Pipe287 252.03 300 -3220.7 0.53 1.19 Open

JuncB0907 3220.7 32.13 Pipe288 567.74 300 3220.7 0.53 1.19 Open

JuncB0908 3220.7 31.71 Pipe289 699.83 300 6437.5 1.05 4.65 Open

JuncB0909 3220.7 31.62 Pipe291 479.11 700 0 0 0 Open

JuncB0910 3220.7 31.59 Pipe293 470.42 450 3665.4 0.27 0.19 Open

JuncB0912 3220.7 30.32 Pipe295 529.47 500 3220.7 0.19 0.09 Open

JuncB0913 3220.7 30.36 Pipe297 507.93 500 3220.7 0.19 0.09 Open

JuncB0914 3220.7 29.32 Pipe299 930.31 350 -2404.52 0.29 0.3 Open

JuncB0915 3220.7 29.37 Pipe302 688.08 400 -3665.4 0.34 0.35 Open

JuncB0916 3220.7 27.83 Pipe303 642.84 225 0 0 0 Open

JuncB0917 3220.7 28.16 Pipe305 124.56 225 0 0 0 Open

JuncB0918 3220.7 29.36 Pipe307 728.37 350 3665.4 0.44 0.69 Open

JuncB0919 3220.7 29.32 Pipe308 689.95 350 -5089.56 0.61 1.31 Open

JuncB0920 3220.7 29.34 Pipe310 194.08 400 -7824.76 0.72 1.53 Open

JuncB0921 3220.7 29.36 Pipe311 71.11 500 7895.08 0.47 0.49 Open

JuncB0922 3220.7 29.57 Pipe312 268.81 500 6441.4 0.38 0.33 Open

JuncB0923 3220.7 30.37 PipeN08-02 1386.99 315 6437.5 0.96 3.6 Open

JuncB0924 3220.7 30.41 PipeN10-04 345.51 280 -5686.7 1.07 5.21 Open

JuncB0925 3220.7 32.83 PipeN07-03 242.42 315 6866.6 1.02 4.09 Open

JuncB0926 3220.7 32.34 Pipe320 1447.16 700 8250 0.25 0.09 Open

JuncB0927 3220.7 26.75 Pipe324 363.87 600 -5686.7 0.23 0.1 Open

JuncB0928 3220.7 26.07 Pipe325 625.32 600 -17060.1 0.7 0.86 Open

JuncB0929 3220.7 31.99 Pipe326 532.11 350 -5686.7 0.68 1.63 Open

JuncB0930 3220.7 32.15 Pipe327 77.46 400 -5686.7 0.52 0.82 Open

JuncB0939 3220.7 29.41 Pipe331 131.69 400 -3220.7 0.3 0.27 Open

JuncB0940 0 32.3 Pipe200 1487.6 900 5686.7 0.1 0.01 Open

JuncB0941 3220.7 32.28 Pipe337 1853.79 200 0 0 0 Open

JuncB0942 0 32.29 Pipe340 822.47 200 2354.37 0.87 5.31 Open

JuncB1001 0 33.44 Pipe342 719.03 700 4660 0.14 0.03 Open

JuncB1002 5686.7 29.45 Pipe343 843.18 700 -8275 0.25 0.1 Open

JuncB1003 5686.7 29.43 Pipe345 1089.35 600 12346.36 0.51 0.46 Open

JuncB1005 5686.7 29.38 Pipe347 87.4 350 9320 1.12 4.32 Open

JuncB1006 5686.7 29.88 Pipe348 1545.75 400 0 0 0 Open

JuncB1007 5686.7 29.74 Pipe352 876.15 600 0 0 0 Open

JuncB1008 5686.7 29.37 Pipe353 1014.86 600 -8250 0.34 0.21 Open

JuncB1009 0 28.76 Pipe355 1032.46 400 8250 0.76 1.69 Open

JuncB1010 5686.7 28.79 Pipe358 523.97 300 2818.02 0.46 0.92 Open

JuncB1011 5686.7 28.83 PipeN02-01 506.56 500 34249.81 2.02 8.84 Open

JuncB1012 0 27.9 Pipe361 167.85 400 9514.2 0.88 2.24 Open

JuncB1013 5686.7 27.47 Pipe362 733.24 400 4757.1 0.44 0.58 Open

JuncB1014 5686.7 28.6 Pipe364 684.45 400 -15756.05 1.45 6.08 Open

JuncB1015 5686.7 26.8 Pipe365 230.96 400 16556.08 1.52 6.71 Open

JuncB1016 5686.7 28.57 PipeN04-01 51.69 700 -51010.71 1.53 3.37 Open

JuncB1017 5686.7 30.21 PipeN05-03 324.35 600 45912.66 1.88 6.11 Open

JuncB1019 5686.7 29.71 PipeN06-02 179.55 700 97500.01 2.93 12.21 Open

JuncB1101 0 31.68 PipeN07-05 433.85 700 61557.84 1.85 4.89 Open

JuncB1102 8275 31.54 PipeN08-04 226.04 700 90732.08 2.73 10.58 Open

Page 13: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

E-12

Network Table - Nodes Network Table - Links

Node ID Base Demand Pressure Link ID Length Diameter Flow Velocity Unit

HeadlossStatus

CMD m m mm CMD m/s m/km

JuncB1103 8275 31.04 PipeN10-06 797.4 355 -9369.9 1.1 4.05 Open

JuncB1104 8275 26.85 PipeN10-03 1250.05 400 11373.4 1.05 3.19 Open

JuncB1105 8275 30.42 PipeN10-02 476.37 500 20743.3 1.22 3.27 Open

JuncB1106 8275 24.15 Pipe376 547.96 700 -16550 0.5 0.37 Open

JuncB1107 8275 31.11 Pipe377 1517.07 700 18444.97 0.55 0.45 Open

JuncB1108 8275 30.91 PipeN11-02 716.31 600 43269.97 1.77 5.43 Open

JuncB1109 8275 30.83 Pipe379 712.02 600 -18640 0.76 1.03 Open

JuncB1201 4660 33.54 Pipe380 1031.71 600 23300 0.95 1.59 Open

JuncB1202 4660 33.89 PipeN12-01 126.33 700 46600 1.4 2.82 Open

JuncB1203 4660 33.91 Pipe384 784.34 600 -22587.45 0.92 1.5 Open

JuncB1204 4660 32.74 Pipe385 718.97 600 8250 0.34 0.21 Open

JuncB1205 4660 34.64 Pipe386 258.06 600 -39087.45 1.6 4.44 Open

JuncB1206 4660 33 Pipe387 811.02 600 -26912.55 1.1 2.12 Open

JuncB1207 4660 28.63 Pipe388 1141.97 600 -3930.37 0.16 0.05 Open

JuncB1208 0 33.54 Pipe389 211.72 600 31232.18 1.28 2.85 Open

JuncB1209 4660 25.36 Pipe390 860.79 600 16500 0.68 0.81 Open

JuncB1210 4660 25.07 Pipe391 226.87 600 28680.38 1.17 2.4 Open

JuncB1211 0 25.07 Pipe15 63.39 300 0 0 0 Open

JuncB1212 0 25.07 Pipe17 854.66 300 0 0 0 Open

JuncB1213 0 25.07 Pipe8 59.43 600 22737.59 0.93 1.52 Open

JuncB1219 4660 25.04 PipeN10-05 738.28 280 -3683.2 0.69 2.22 Open

JuncB1301 8250 33.85 Pipe85 593.92 700 -5686.7 0.17 0.05 Open

JuncB1302 8250 33.7 PipeN02-02 1620.96 500 24750.18 1.46 4.64 Open

JuncB1304 8250 30.17 Pipe122 563.11 600 10621.23 0.43 0.34 Open

JuncB1305 8250 30.31 PipeN03-08 359.1 500 35891.99 2.12 9.7 Open

JuncB1306 8250 32.68 PipeN05-02 1000.49 355 9572.04 1.12 4.23 Open

JuncB1307 8250 34.4 PipeN05-04 242.02 600 49387.74 2.02 7.06 Open

JuncB1308 8250 27.35 PipeN07-01 837.86 400 13733.2 1.26 4.63 Open

JuncB1309 8250 34.45 PipeN07-04 1402.73 500 17408.06 1.03 2.31 Open

JuncB1310 8250 28.96 Pipe181 160.14 350 11386.1 1.37 6.42 Open

JuncB1311 8250 33.76 Pipe95 112.82 600 22931.98 0.94 1.55 Open

JuncB1312 8250 33.55 Pipe118 996.08 300 3619.48 0.59 1.5 Open

JuncB1314 8250 29.09 Pipe176 757.85 300 4889.42 0.8 2.7 Open

JuncX01 0 27.99 PipeN09-01 892.24 280 6441.4 1.21 6.67 Open

JuncX02 0 27.99 PipeN10-01 1143.86 700 58870.5 1.77 4.48 Open

JuncX03 0 27.99 Pipe21 83.82 600 6659.66 0.27 0.14 Open

JuncX10 0 30.87 Pipe22 54.71 600 0 0 0 Open

JuncX11 0 30.87 Pipe23 113.98 300 14814.47 2.43 24.24 Open

JuncX13 0 30.87 PipeN04-02 267.64 500 29188.5 1.72 6.44 Open

JuncX14 0 30.87 Pipe56 818.43 375 0 0 0 Closed

JuncX15 0 30.87 Pipe84 344.57 375 0 0 0 Closed

JuncX21 0 30.62 Pipe97 76.33 500 8001.37 0.47 0.5 Open

JuncX22 0 30.62 Pipe98 84.26 500 3220.7 0.19 0.57 Open

JuncX23 0 30.62 PipeN09-02 252.93 600 51109.11 2.09 7.56 Open

JuncB1020 5686.7 25.57 Pipe100 822.3 300 8275 1.35 7.63 Open

ResvrRes2 #N/A 0 Pipe124 661.27 600 -8275 0.34 0.21 Open

ResvrRes03 #N/A 0 Pipe130 1002.46 600 14655.03 0.6 0.64 Open

ResvrRes04 #N/A 0 PipeN11-01 832.38 500 22930.03 1.35 3.99 Open

ResvrRes05 #N/A 0 Pipe141 61.82 600 27460.54 1.12 2.21 Open

ResvrRes06 #N/A 0 Pipe151 822.21 300 3433.3 0.56 1.35 Open

ResvrRes07 #N/A 0 PipeN07-02 972.98 315 6866.6 1.02 4.09 Open

ResvrRes08 #N/A 0 Pipe173 304.61 350 6866.6 0.83 2.36 Open

ResvrRes09 #N/A 0 Pipe182 366.35 350 3433.3 0.41 0.61 Open

ResvrRes10 #N/A 0 Pipe183 690.19 700 0 0 0 Open

ResvrRes11 #N/A 0 PipeN12-02 857.08 200 2305.63 0.85 5.1 Open

ResvrRes12 #N/A 0 Pipe184 61.38 350 -2398.52 0.29 0.3 Open

ResvrRes131 #N/A 0 Pipe185 52.34 350 -4249.93 0.51 0.92 Open

ResvrRes132 #N/A 0 PipeN07-07 339.06 700 48749.46 1.47 3.08 Open

ResvrRes133 #N/A 0 PipeN07-08 959.47 700 43245.53 1.3 2.43 Open

PipeN07-09 258.73 280 7151.95 1.34 8.2 Open

PipeN08-07 390.61 500 12267.92 0.72 8.3 Open

Pipe187 62.08 400 0 0 0 Open

Pipe190 176.59 350 171.82 0.02 0 Open

Pipe191 38.47 350 1711.59 0.21 0.16 Open

PipeN09-03 417.92 600 42291.18 1.73 5.19 Open

Pipe1 94.44 600 -5093.42 0.21 0.08 Open

PipeN03-05 324.31 500 30707.41 1.81 7.12 Open

PipeN03-06 691.19 400 14271.3 1.31 5 Open

Page 14: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

E-13

Network Table - Nodes Network Table - Links

Node ID Base Demand Pressure Link ID Length Diameter Flow Velocity Unit

HeadlossStatus

CMD m m mm CMD m/s m/km

PipeN03-07 652.32 355 9514.2 1.11 4.18 Open

PipeN04-03 869.14 400 13980.98 1.29 4.8 Open

Pipe35 605.57 350 7723.61 0.93 2.98 Open

Pipe55 360.99 700 -6320.85 0.19 0.06 Open

Pipe73 47.16 500 2404.52 0.14 0.05 Open

Pipe87 507.29 600 3665.4 0.15 0.04 Open

PipeN08-05 74.83 500 -13187.28 0.78 1.34 Open

PipeN05-06 35.23 350 5089.56 0.61 1.31 Open

Pipe91 861.91 350 0 0 0 Open

Pipe99 38.1 600 0 0 0 Open

Pipe120 157.08 450 4621.99 0.34 0.3 Open

Pipe127 144.03 500 5255.15 0.31 0.22 Open

PipeN06-01 1000 400 14600.67 1.34 5.23 Open

Pipe350 1000 300 -5643.93 0.92 3.58 Open

Pipe7 1000 300 5541.59 0.91 3.46 Open

PipeN11-04 1000 250 3771.62 0.89 4.19 Open

Pipe59 1000 250 5686.7 1.34 9.43 Open

Valve43 #N/A 450 0 0 0 Closed

Valve51 #N/A 400 0 0 0 Closed

Valve53 #N/A 500 0 0 0 Closed

Valve139 #N/A 300 0 0 0 Closed

Valve159 #N/A 600 0 0 0 Closed

Valve218 #N/A 500 0 0 0 Closed

Valve222 #N/A 350 0 0 0 Closed

Valve225 #N/A 400 0 0 0 Closed

Valve236 #N/A 700 0 0 0 Closed

Valve252 #N/A 700 0 0 0 Closed

Valve268 #N/A 700 0 0 0 Closed

Valve274 #N/A 700 0 0 0 Closed

Valve282 #N/A 300 0 0 0 Closed

Valve285 #N/A 700 0 0 0 Closed

Valve286 #N/A 300 0 0 0 Closed

Valve290 #N/A 300 0 0 0 Closed

Valve292 #N/A 700 0 0 0 Closed

Valve294 #N/A 450 0 0 0 Closed

Valve296 #N/A 500 0 0 0 Closed

Valve298 #N/A 500 0 0 0 Closed

Valve300 #N/A 350 0 0 0 Closed

Valve301 #N/A 400 0 0 0 Closed

Valve304 #N/A 225 0 0 0 Closed

Valve306 #N/A 350 0 0 0 Closed

Valve313 #N/A 500 0 0 0 Closed

Valve315 #N/A 900 0 0 0 Closed

Valve318 #N/A 900 0 0 0 Closed

Valve321 #N/A 700 0 0 0 Closed

Valve323 #N/A 600 0 0 0 Closed

Valve328 #N/A 350 0 0 0 Closed

Valve330 #N/A 900 0 0 0 Closed

Valve334 #N/A 900 0 0 0 Closed

Valve338 #N/A 200 0 0 0 Closed

Valve341 #N/A 200 0 0 0 Closed

Valve344 #N/A 700 0 0 0 Closed

Valve346 #N/A 600 0 0 0 Closed

Valve354 #N/A 600 0 0 0 Closed

Valve359 #N/A 300 0 0 0 Closed

Valve13 #N/A 300 0 0 0 Closed

Valve27 #N/A 600 0 0 0 Closed

Valve19 #N/A 700 0 0 0 Closed

Page 15: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

E-14

Table E.2 Results of Transmission Network Analysis

NetworkTable-Nodesat0:00Hrs NetworkTable-Linksat0:00Hrs

NodeID BaseDemand Pressure LinkID Length Diameter Flow Velocity UnitHeadloss

CMD m m mm CMD m/s m/km

JuncBlock01 37700 55.08 PipeR01 289.51 2000 407095.6 1.5 0.89

JuncBlock02 36900 53.56 PipeR02 1586.87 2000 407095.6 1.5 0.89

JuncBlock03 41,600 50.65 PipeR03 1134.38 1800 318279.4 1.45 0.94

JuncBlock04 50200 46.28 PipeR06 815.98 1200 94801.27 0.97 0.7

JuncBlock05 59600 42.05 PipeR07 1023.1 1200 94801.27 0.97 0.7

JuncBlock06 60900 55.03 PipeR08 644.73 1200 94801.27 0.97 0.7

JuncBlock07 57,900 47.99 PipeR10 1370.73 1100 113870.2 1.39 1.58

JuncBlock08 64400 41.85 PipeR11 1007.2 900 72270.23 1.31 1.82

JuncBlock09 58400 41.04 PipeR12 477.14 900 72270.23 1.31 1.82

JuncBlock10 53300 35.93 PipeR13 614.88 900 85395.1 1.55 2.53

JuncBlock11 41400 35.07 PipeR14 334.64 700 35195.11 1.06 1.62

JuncBlock12 29200 36.08 PipeR15 903.45 700 35195.11 1.06 1.62

JuncBlock13-2 20600 41.08 PipeR16 533.74 700 35195.11 1.06 1.62

JuncS01 22400 38.11 PipeR25 549.96 600 18177.95 0.74 0.98

JuncS02 22600 36.88 PipeR24 1709.98 600 18177.95 0.74 0.98

JuncS03 10400 42.24 PipeR23 482.08 1000 -62622.06 0.92 0.79

JuncS05 43600 62.48 PipeR22 1250.32 1000 -62622.06 0.92 0.79

JuncS06 50400 63.51 PipeR21 1698.79 1000 -90304.18 1.33 1.64

JuncR21 0 59.74 PipeR20 1804.17 1100 -140495.5 1.71 2.39

JuncR22 0 58.33 PipeR19 937.45 900 -68372.78 1.24 1.63

JuncR3 0 57.27 PipeR18 902.34 1000 -101753.9 1.5 2.07

JuncR24 0 56.45 PipeR17 1215.2 1000 -101753.9 1.5 2.07

JuncR25 0 53.93 PipeB12 759.08 700 29200 0.88 1.12

JuncR26 0 52.06 PipeB02 99.57 700 36900 1.11 1.78

JuncR27 0 50.53 PipeB03 324.98 700 41600 1.25 2.25

JuncR28 0 46.21 PipeB04 261.07 700 50200 1.51 3.27

JuncR29 0 43.43 PipeB05 967.58 800 59600 1.37 2.29

JuncR30 0 42.44 PipeB09 445.76 900 80800.01 1.47 2.27

JuncR31 0 42.05 PipeS01 1986.96 600 22400 0.92 1.48

JuncR32 0 43.73 PipeEH03 3493.75 1000 -72000 1.06 1.05

JuncR33 0 44.26 PipeES05 883.14 700 43600 1.31 2.47

JuncR34 0 45.13 PipeER11 304.63 1000 122999.6 1.81 3.02

JuncR35 0 46.59 PipeER12 3479.57 1000 122999.6 1.81 3.02

JuncR36 0 47.13 PipeER14 1203.12 900 91999.63 1.67 2.94

JuncR37 0 48.69 PipeER15 1463.08 900 71399.63 1.3 1.78

JuncR38 0 49.55 PipeEB13-2 139.7 700 20600 0.62 0.56

JuncR39 0 51.39 PipeS03 2369.35 400 10400 0.96 2.67

JuncR40 0 53.55 PipeB06 184.92 800 60900 1.4 2.39

JuncR41 0 53.73 PipeR09 445.23 1100 57901.28 0.71 0.42

JuncR42 0 54.19 PipeB07 937.63 700 57900 1.74 4.33

JuncR43 0 54.9 PipeER16 1800.54 900 50799.63 0.92 0.91

JuncR44 0 55.47 PipeR04 870.39 1800 318279.4 1.45 0.94

JuncR46 0 36.92 PipeR05 1158.03 1400 155701.3 1.17 0.84

JuncR48 0 48.57 PipeB08 814.19 700 64400 1.94 5.35

JuncR49 0 44.69 PipeER-Zero01 2342.08 1000 96000 1.41 1.85

JuncR50 0 41.16 PipeB01 1753.66 700 37700 1.13 1.85

JuncR51 0 38.56 PipeER02 992.05 1000 66928.1 0.99 0.9

JuncE1200RT02 0 12.97 PipeER03 1709.13 1000 66928.1 0.99 0.9

JuncE1000Hartha02 0 69.01 PipeER04 890.06 1000 66928.1 0.99 0.9

JuncEHartha02 0 64.66 PipeER05 1218.59 1000 102509.2 1.51 2.1

JuncE1000Hartha01 0 73.52 PipeER06 855.11 1000 102509.2 1.51 2.1

JuncR58 0 59.08 PipeER07 73.65 1000 15666.52 0.23 0.05

JuncRZeroEnd 96000 15.67 PipeER01 363.27 1000 66928.1 0.99 0.9

JuncR2 0 59.67 PipeER17 1786.4 900 21599.63 0.39 0.17

JuncR4 0 58.77 PipeB11 1392.08 800 41400 0.95 1.11

JuncR5 0 57.23 PipeEH01 6201.95 1000 72000 1.06 1.05

JuncR6 0 56.42 PipeEH02 4314.37 1000 72000 1.06 1.05

JuncR7 0 53.86 PipeEH05 4521.73 900 93999.99 1.71 3.06

JuncR8 0 52.06 PipeEH06 2218.14 900 43600 0.79 0.67

JuncR9 0 36.62 PipeES06 800.81 700 50400 1.52 3.29

JuncE900Garma03 0 49.1 PipeEWTP-TR1 12404.49 1200 156092.8 1.6 1.88

JuncEHartha01 0 66.15 PipeEWTP-TR2 12437.4 1200 155907.2 1.6 1.87

JuncE1000HarthEnd 72000 65.36 PipeEH09 1504.26 900 37400 0.68 0.5

JuncE1200RT03 0 12.91 PipeEH11 1671.03 900 0 0 0

JuncE900Garma02 0 48.35 PipeEH12 56.24 900 27632.35 0.5 0.27

Page 16: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

E-15

NetworkTable-Nodesat0:00Hrs NetworkTable-Linksat0:00Hrs

NodeID BaseDemand Pressure LinkID Length Diameter Flow Velocity UnitHeadloss

CMD m m mm CMD m/s m/km

JuncHartha900End 0 64.66 PipeEH13 421.88 900 9767.65 0.18 0.04

JuncE900Garma04 0 49.98 PipeEH14 1789.24 900 37400 0.68 0.5

JuncE1200RTEnd 349,400 12.75 PipeEWTP-TR3 96.02 1200 173428.3 1.77 2.31

JuncR47 0 36.81 PipeEWTP-TR4 68.05 1200 175971.7 1.8 2.38

JuncR54 0 38.42 PipeER08 1011.73 1000 86842.71 1.28 1.51

JuncR56 0 41.16 PipeER-Garma01 2057.28 900 51116.2 0.93 0.92

JuncBlock13-1 20600 44.6 PipeER-Garma02 2163.44 900 76359.29 1.39 2.03

JuncBlock13-3 20600 38.47 PipeR28 714.44 900 95700.38 1.74 3.17

JuncS04 47900 31.38 PipeER20 862.75 900 95700.38 1.74 3.17

JuncJubailaWTP 0 -0.22 PipeER19 868.06 900 73100.38 1.33 1.86

Junc2 0 66.98 PipeER18 1288.96 900 19800.38 0.36 0.14

Junc3 0 60.19 PipeB10 478.16 800 53300 1.23 1.84

JuncMaqilWTP 0 -0.05 PipeS02 2282.19 700 22600 0.68 0.68

Junc5 0 60.42 PipeER13 886.98 900 112599.6 2.05 4.38

Junc4 0 -0.13 PipeEB13-1 151.64 700 20600 0.62 0.56

Junc6 0 57.67 PipeEB13-3 149.58 700 20600 0.62 0.56

Junc7 0 55.9 PipeS04 2897.55 700 47900 1.44 2.98

Junc8 0 55.62 Pipe1 89.99 1000 -35581.13 0.52 0.26

Junc9 0 50.79 PipeER-Gamma03 961.39 900 67506.95 1.23 1.59

Junc10 0 54.49 PipeER-Gamma04 1839.24 900 82226.91 1.5 2.35

Junc11 0 -0.42 PipeER-Gammna05 1722.69 900 68018.25 1.24 1.61

Junc12 0 63.84 PipeExist-Jubaila01 1583.81 600 38407.02 1.57 4.29

JuncE1200RT05 0 16.7 PipeExist-Jubaila02 733.58 600 55968.95 2.29 9.05

JuncE1200RT06 0 16.71 PipeNew-Maqil01 251.5 600 17561.92 0.72 0.91

ResvrTRes1 #N/A 0 Pipe4 53.43 600 17561.92 0.72 0.91

ResvrWTP-RZero #N/A 0 Pipe5 50.16 600 38407.02 1.57 4.29

ResvrWTP-Basrah #N/A 0 Pipe2 58 450 13124.88 0.96 2.29

ResvrWTP-New #N/A 0 PipeExist-Ribat01 773.01 450 13124.88 0.96 2.29

ResvrWT-Hartha25 #N/A 0 Pipe6 123.76 450 13124.88 0.96 2.29

ResvrGarma1 #N/A 0 PipeExist-Ribat-02 813.94 375 13124.88 1.38 5.93

ResvrGarma2 #N/A 0 PipeExist-Ribat03 355.18 375 13124.88 1.38 5.93

ResvrRes04 #N/A 0 Pipe10 79.43 600 42582.84 1.74 5.26

ResvrMaqilRes #N/A 0 PipeExist-Bradia01 1778.32 600 42582.84 1.74 5.26

ResvrJubailaRes #N/A 0 PipeNew-Bradia 1943.36 600 42582.84 1.74 5.26

ResvrRibatWTP #N/A 0 PipeEH20 46.05 900 20064.49 0.37 0.15

ResvrBradiaWTP #N/A 0 PipeEWTP-TR11 1591.56 1200 175971.7 1.8 2.38

PipeEWTP-TR5 1615.16 1200 173428.3 1.77 2.31

PumpJubailaPS01 #N/A #N/A 19203.51 0 -67.2

PumpMaqilPS01 #N/A #N/A 2926.99 0 -60.47

PumpMaqilPS02 #N/A #N/A 2926.99 0 -60.47

PumpMaqilPS03 #N/A #N/A 2926.99 0 -60.47

PumpMaqilPS04 #N/A #N/A 2926.99 0 -60.47

PumpMaqilPS05 #N/A #N/A 2926.99 0 -60.47

PumpMaqil022 #N/A #N/A 3840.7 0 -67.2

PumpMAqil023 #N/A #N/A 3840.7 0 -67.2

PumpMaqil024 #N/A #N/A 3840.7 0 -67.2

PumpMaqul021 #N/A #N/A 3840.7 0 -67.2

Pump MaqilPS06 #N/A #N/A 2926.99 0 -60.47

Pump jubaila025 #N/A #N/A 3840.7 0 -67.2

Pump RibatPS01 #N/A #N/A 13124.88 0 -57.81

Pump BradiaPS01 #N/A #N/A 8516.57 0 -64.26

Pump BradiaPS02 #N/A #N/A 8516.57 0 -64.26

Pump BradiaPS03 #N/A #N/A 8516.57 0 -64.26

Pump BradiaPS04 #N/A #N/A 8516.57 0 -64.26

Pump BradiaPS05 #N/A #N/A 8516.57 0 -64.26

Valve 3 #N/A 12 37400 3827.38 31.65

Page 17: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

APPENDIX F

ESTIMATION OF FACILITY CAPACITY AND BENEFITS

BY STAGE

Page 18: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

F-1

APPENDIX F ESTIMATION OF FACILITY CAPACITY AND

BENEFITS BY STAGE

The capacity of proposed facilities and its benefits are estimated in following five stages as attached.

Stage 5 : Full RO plant with existing Al Hartha 25 G, Basrah Unified and R-Zero WTPs

Stage 4 : RO plant with all existing WTPs

Stage 4-2 : Half RO capacity of Stage 4 with all existing WTPs

Stage 3 : Transmission facilities, distribution main facilities and new water treatment plant with all existing

WTPs

Stage 2 : Transmission facilities and new water treatment plant with all existing WTPs

Stage 1 : Transmission facilities and no new water treatment plant with all existing WTPs

The following table presents the summary of facilities and benefits by stage.

Final Goal

Works unit Stage 5 Stage 4 Stage 3 Stage 2-4 Stage 2 Stage 1

New water treatment plant m3/day 465,000 280,000 184,000 231,500 184,000 0

RO plant m3/day 362,000 287,000 0 143,500 0 0

Treated water PS m3/day 348,900 273,900 188,900 188,900 188,900 0

Transmission reservoir (TR) Blending res. m3 64,000 48,000 48,000 48,000 48,000 30,000

Transmission PS (TPS) m3/day 710,000 538,000 538,000 538,000 538,000 328,000

Ring main Yes Yes Yes Yes Yes Yes

Main distribution facilities (13 zones) Yes Yes Yes No No No

Rehabilitation of existing WTP Yes Yes Yes Yes Yes No

Rehabilitation of network Yes Yes Yes Yes Yes Yes

Existing WTP Not Used Used Used Used Used Used

Benefits

Water quality Average TDS in Central Basrah mg/l 595 588 1,289 894 1,289 1,087

TDS in blending reservoir mg/l 602 567 1,437 964 1,437 1,172

Oil, turbidity, color &bacteria - OK Improved Improved Improved Improved Present

Water quantity 360 l/d(urban), 200 l/d (rural) 100% 100% 100% 100% 100% 70%

Water pressure OK OK OK OK Improved Not enough

Leakage Improved Improved Improved Improved Improved Improved

Page 19: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

F

-2

Sta

ge

5 :

Fu

ll R

O p

lan

t w

ith e

xis

tin

g A

l H

arth

a 25

G, B

asra

h U

nif

ied

an

d R

-Zer

o W

TP

s

L

oca

l d

em

an

d (

LD

) b

efo

re T

R1

.00

Vo

lum

eT

DS

67

,10

05

43

SA

AV

olu

me

Ave

. T

DS

12

,00

06

08

,00

05

95

Vo

lum

eT

DS

1,5

00

67

,10

0

Ba

sra

h U

nifie

d7

2,0

00

1,5

00

42

,00

05

43

18

,00

01

,50

05

5,1

00

33

5

Ne

w p

lan

t4

65

,00

01

,50

04

83

,00

0V

olu

me

TD

S

1,5

00

Inp

ut

Ou

tpu

t3

62

,00

03

48

,90

0

48

3,0

00

36

2,0

00

20

02

00

33

5

12

1,0

00

5,4

00

40

4,0

00

03

35

1,5

00

35

,00

0

Al H

art

ha

25

G9

6,0

00

1,5

00

96

,00

09

6,0

00

1,5

00

SA

A

Ga

rma

-1&

20

1,5

00

0

1,5

00

SW

C

R-Z

ero

96

,00

06

70

96

,00

0V

olu

me

TD

S

67

05

40

,90

06

02

54

0,9

00

SW

C6

02

Vo

lum

eT

DS

WT

Ps a

lon

g t

he

SA

06

70

00

54

0,9

00

60

2

67

06

70

WT

PR

OC

WT

CWT+LD

BR

Ba

sra

h C

ity

To

tal f

low

72

9,0

00

36

2,0

00

40

4,0

00

41

6,0

00

54

0,9

00

54

0,9

00

Inp

ut

To

tal a

ve

de

ma

nd

60

8,0

00

Lo

ca

l d

em

an

d6

7,1

00

TD

S o

f S

WC

67

0S

um

ma

ry o

f fa

cili

ty c

ap

acity

TD

S o

f S

AA

1,5

00

15

00

Ne

w W

TP

46

5,0

00

m3

/da

yT

DS

of

RO

tre

ate

d w

ate

r2

00

RO

pla

nt

36

2,0

00

m3

/da

yR

O r

eco

ve

ry r

ate

0.7

5

Tre

ate

d w

ate

r tr

an

sm

issio

n P

S

34

8,9

00

m3

/da

yR

O p

lan

t ca

pa

city

36

2,0

00

36

2,0

00

Tra

nsm

issio

n r

ese

rvo

ir (

TR

)6

4,0

00

m3

Lo

ca

l d

em

an

d3

42

00

31

Tra

nsm

issio

n p

um

pin

g s

tatio

n (

TP

S)

71

0,0

00

m3

/da

yL

oca

l d

em

an

d3

42

00

1.4

Ou

tpu

tT

ota

l su

pp

ly6

08

,00

0

Exis

tin

g W

TP

s2

64

,00

0m

3/d

ay

Ra

tio

of

su

pp

ly to

de

ma

nd

1.0

0

Eff

ects

1W

ate

r q

ua

lity

Ave

rag

e T

DS

in

Ba

sra

h C

ity

59

5m

g/l

TD

S in

ble

nd

ing

re

se

rvo

ir6

02

mg

/lO

il, tu

rbid

ity, co

lor

& b

acte

ria

no

pro

ble

m2

Wa

ter

qu

an

tity

Su

pp

ly q

ua

ntity

of

ave

rag

e w

ate

r d

em

an

d1

00

%P

er

ca

pita

co

nsu

mp

tio

n3

60

l/ca

/d f

or

urb

an

20

0l/ca

/da

y f

or

rura

l o

f A

l H

art

ha

3W

ate

r p

ressu

reIm

pro

ve

d

Ba

sra

h C

ity

BR

Ou

tpu

t

Exis

tin

g

CW

T in

WT

P

Ne

w c

lea

r

wa

ter

tan

k

(CW

T)

Wa

ter

Tre

atm

en

t P

lan

ts

Re

ve

rse

Os

mo

sis

(RO

)

Tra

ns

mis

sio

n R

es

erv

oir

(TR

)

Ce

ntr

al B

asra

hA

l H

art

ha

Wa

ter

Tre

atm

en

t P

lan

t S

ite

F-2

Page 20: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

F

-3

Sta

ge

4 :

RO

pla

nt

wit

h a

ll e

xis

ting

WT

Ps

Lo

ca

l d

em

an

d (

LD

) b

efo

re T

R1

.00

Vo

lum

eT

DS

67

,100

56

9

SA

AV

olu

me

Ave

. T

DS

12

,00

06

08,0

00

58

8

Vo

lum

eT

DS

1,5

00

67,1

00

Ba

sra

h U

nifie

d7

2,0

00

1,5

00

42

,00

05

69

18

,00

01

,50

05

5,1

00

36

6

Ne

w p

lan

t2

80

,00

01

,50

03

83

,00

0V

olu

me

TD

S

1,5

00

Input

Ou

tput

28

7,0

00

27

3,9

00

38

3,0

00

28

7,0

00

20

02

00

36

6

96

,00

05

,40

03

29,0

00

03

66

SA

A85,0

00

1,5

00

35

,000

Al H

art

ha

25

G9

6,0

00

1,5

00

11

,00

096

,000

1,5

00

SA

A

Ga

rma

-1&

23

7,0

00

1,5

00

37

,000

1,5

00

SW

C

R-Z

ero

96

,00

06

70

96

,000

Volu

me

TD

S

67

04

17

,90

05

67

41

7,9

00

SW

C5

67

Vo

lum

eT

DS

WT

Ps a

lon

g t

he

SA

12

3,0

00

67

01

23

,00

01

23

,00

05

40

,90

05

90

67

06

70

WT

PR

OC

WT

CWT+LD

BR

Ba

sra

h C

ity

To

tal f

low

70

4,0

00

28

7,0

00

32

9,0

00

34

1,0

00

41

7,9

00

54

0,9

00

Input

To

tal ave d

em

and

608

,000

Lo

ca

l d

em

an

d6

7,1

00

TD

S o

f S

WC

670

Su

mm

ary

of

facili

ty c

ap

acity

TD

S o

f S

AA

1,5

00

150

0

Ne

w W

TP

28

0,0

00

m3

/da

yT

DS

of

RO

tre

ate

d w

ate

r2

00

RO

pla

nt

28

7,0

00

m3

/da

yR

O r

eco

ve

ry r

ate

0.7

5

Tre

ate

d w

ate

r tr

ansm

issio

n P

S

273,9

00

m3

/day

RO

pla

nt

capa

city

287

,000

Tra

nsm

issio

n r

ese

rvo

ir (

TR

)4

8,0

00

m3

Lo

ca

l d

em

an

d3

42

00

31

Tra

nsm

issio

n p

um

pin

g s

tatio

n (

TP

S)

53

8,0

00

m3

/da

yL

oca

l d

em

an

d3

42

00

1.4

Ou

tpu

tT

ota

l su

pp

ly6

08

,00

0

Exis

ting

WT

Ps

424,0

00

m3

/day

Ra

tio

of

sup

ply

to d

em

and

1.0

0

Eff

ects

1W

ate

r qua

lity

Avera

ge T

DS

in B

asra

h C

ity

588

mg

/lT

DS

in

ble

nd

ing

re

se

rvo

ir5

67

mg

/lO

il, t

urb

idity,

co

lor

& b

acte

ria

no

pro

ble

m

2W

ate

r q

ua

ntity

Su

pp

ly q

ua

ntity

of

ave

rag

e w

ate

r d

em

an

d1

00

%P

er

cap

ita

co

nsum

ption

360

l/ca/d

fo

r u

rba

n200

l/ca/d

ay f

or

rura

l of

Al H

art

ha

3W

ate

r pre

ssure

Impro

ve

d

Wa

ter

Tre

atm

en

t P

lan

ts

Re

ve

rse

Os

mo

sis

(RO

)

Tra

nsm

issio

n R

es

erv

oir

(TR

)

Ce

ntr

al B

asra

h

Ba

sra

h C

ity

BR

Outp

ut

Exis

ting

CW

T 1

in

WT

P

Ne

w c

lea

r

wa

ter

tan

k

(CW

T)

Al H

art

ha

Wa

ter

Tre

atm

en

t P

lan

t S

ite

F-3

Page 21: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

F

-4

S

tage

4-2

: H

alf

RO

cap

acit

y o

f S

tag

e 4

wit

h a

ll e

xis

ting W

TP

s

Local dem

and (

LD

) befo

re T

R

Volu

me

TD

S

67,1

00

872

Volu

me

Ave. T

DS

12,0

00

608,0

00

894

Volu

me

TD

S1,5

00

67,1

00

Basra

h U

nifie

d72,0

00

1,5

00

60,0

00

872

SA

A1,5

00

55,1

00

SA

A735

New

WT

P231,5

00

1,5

00

191,0

00

Volu

me

TD

S

1,5

00

Input

Outp

ut

143,5

00

188,9

00

191,0

00

143,5

00

200

200

735

47,5

00

5,4

00

244,0

00

40,5

00

735

SA

A1,5

00

35,0

00

Al H

art

ha 2

5 G

96,0

00

1,5

00

96,0

00

96,0

00

1,5

00

SA

A

Garm

a-1

&2

37,0

00

1,5

00

37,0

00

1,5

00

SW

C

R-Z

ero

96,0

00

670

96,0

00

Volu

me

TD

S

670

417,9

00

964

417,9

00

SW

C964

Volu

me

TD

S

WT

Ps a

long the S

A123,0

00

670

123,0

00

123,0

00

540,9

00

897

670

670

WT

PR

OC

WT

CW

T+LD

TR

Basra

h C

ity

Tota

l f

low

655,5

00

143,5

00

244,0

00

256,0

00

417,9

00

540,9

00

Inp

ut

para

mete

rsT

ota

l ave d

em

and

608,0

00

Local dem

and in H

art

ha

67,1

00

TD

S o

f S

WC

670

Su

mm

ar y

of

facilit

y c

ap

acit

yT

DS

of

SA

A1,5

00

1500

New

WT

P231,5

00

m3/d

ay

TD

S o

f R

O tre

ate

d w

ate

r200

RO

pla

nt

143,5

00

m3/d

ay

RO

recover y

rate

0.7

5

Tre

ate

d w

ate

r tr

ansm

issio

n P

S

188,9

00

m3/d

ay

RO

pla

nt capacity

143,5

00

143,5

00

Tra

nsm

issio

n r

eserv

oir (

TR

)48,0

00

m3

Local dem

and

34200

31

Tra

nsm

issio

n p

um

pin

g s

tation (

TP

S)

538,0

00

m3/d

ay

Local dem

and

34200

1.4

Ou

tpu

tT

ota

l supply

608,0

00

Exis

ting W

TP

s424,0

00

m3/d

ay

Ratio o

f supply

to d

em

and

1.0

0

Eff

ects

1W

ate

r qualit

yA

vera

ge T

DS

in B

asra

h C

ity

894

mg/l

TD

S in T

ransm

issio

n R

eserv

oir

964

mg/l

Oil,

turb

idity, colo

r &

bacte

ria

no p

roble

m2

Wate

r quantity

Supply

quantity

of avera

ge w

ate

r dem

and

100%

Per

capita c

onsum

ption

360

l/ca/d

for

urb

an

200

l/ca/d

ay

for

rura

l of

Al H

art

ha

3W

ate

r pre

ssure

Impro

ved

Wate

r T

reatm

ent P

lants

Rev

ers

e O

sm

osis

(RO

)

Tra

nsm

issio

n R

eserv

oir

(TR

)

Centr

al B

asra

h

Basra

h C

ity

TR

Outp

ut

Exis

ting

CW

T 1

in

WT

P

New

cle

ar

wate

r ta

nk

(CW

T)

Al H

art

ha W

ate

r T

reatm

ent P

lant S

ite

F-4

Page 22: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

F

-5

Sta

ge

3 :

Tra

nsm

issi

on

fac

ilit

ies,

dis

trib

uti

on

mai

n f

acil

itie

s an

d n

ew w

ater

tre

atm

ent

pla

nt

wit

h a

ll e

xis

ting

WT

Ps

Sta

ge

2 :

Tra

nsm

issi

on

fac

ilit

ies

and

new

wat

er t

reat

men

t p

lan

t w

ith a

ll e

xis

ting

WT

Ps

Lo

ca

l d

em

an

d (

LD

) b

efo

re T

R1

.00

Vo

lum

eT

DS

67

,10

01

,50

0

SA

AV

olu

me

Ave

. T

DS

12

,00

06

08

,00

01

,20

1

Vo

lum

eT

DS

1,5

00

67

,10

0

Ba

sra

h U

nifie

d7

2,0

00

1,5

00

60

,00

01

,50

0

1,5

00

55

,10

0

15

00

Ne

w p

lan

t1

84

,00

01

,50

00

Vo

lum

eT

DS

1,5

00

Inp

ut

Ou

tpu

t0

18

8,9

00

00

20

02

00

1,5

00

0#

DIV

/0!

24

4,0

00

18

4,0

00

15

00

1,5

00

35

,00

0

Al H

art

ha

25

G9

6,0

00

1,5

00

96

,00

09

6,0

00

1,5

00

SA

A

Ga

rma

-1&

23

7,0

00

1,5

00

37

,00

0

1,5

00

SW

C

R-Z

ero

96

,00

06

70

96

,00

0V

olu

me

TD

S

67

04

17

,90

01

,31

0

41

7,9

00

SW

C1

31

0V

olu

me

TD

S

WT

Ps a

lon

g t

he

SA

12

3,0

00

67

01

23

,00

01

23

,00

05

40

,90

01

16

4

67

06

70

WT

PR

OC

WT

CW

R+LD

BR

Ba

sra

h C

ity

To

tal f

low

60

8,0

00

02

44

,00

02

56

,00

04

17

,90

05

40

,90

0

Inp

ut

To

tal a

ve

de

ma

nd

60

8,0

00

Lo

ca

l d

em

an

d6

7,1

00

Su

mm

ary

of

facili

ty c

ap

acity

TD

S o

f S

WC

67

0N

ew

WT

P1

84

,00

0m

3/d

ay

TD

S o

f S

AA

1,5

00

18

00

15

00

RO

pla

nt

0m

3/d

ay

TD

S o

f R

O t

rea

ted

wa

ter

20

0T

rea

ted

wa

ter

tra

nsm

issio

n P

S

18

8,9

00

m3

/da

yR

O r

eco

ve

r y r

ate

0.7

5

Tra

nsm

issio

n r

ese

rvo

ir (

TR

)4

8,0

00

m3

Lo

ca

l d

em

an

d3

42

00

31

RO

pla

nt

ca

pa

city

0

Tra

nsm

issio

n p

um

pin

g s

tatio

n (

TP

S)

53

8,0

00

m3

/da

yL

oca

l d

em

an

d3

42

00

1.4

Exis

tin

g W

TP

s4

24

,00

0m

3/d

ay

Ou

tpu

tT

ota

l su

pp

ly6

08

,00

0

Ra

tio

of

su

pp

ly t

o d

em

an

d1

.00

Eff

ects

1W

ate

r q

ua

lity

Ave

rag

e T

DS

in

Ba

sra

h C

ity

12

01

mg

/lT

DS

in

ble

nd

ing

re

se

rvo

ir1

31

0m

g/l

Oil,

tu

rbid

ity,

co

lor

& b

acte

ria

no

pro

ble

m2

Wa

ter

qu

an

tity

Su

pp

ly q

ua

ntity

of

ave

rag

e w

ate

r d

em

an

d1

00

%P

er

ca

pita

co

nsu

mp

tio

n3

60

l/ca

/d f

or

urb

an

20

0l/ca

/da

y f

or

rura

l o

f A

l H

art

ha

3W

ate

r p

ressu

reIm

pro

ve

d

Ba

sra

h C

ity

BR

Ou

tpu

t

Exis

tin

g

CW

T 1

in

WT

P

Ne

w c

lea

r

wa

ter

tan

k

(CW

T)

Wa

ter

Tre

atm

en

t P

lan

ts

Re

ve

rse

Os

mo

sis

(RO

)

Tra

ns

mis

sio

n R

es

erv

oir

(TR

)

Ce

ntr

al B

asra

hA

l H

art

ha

Wa

ter

Tre

atm

en

t P

lan

t S

ite

F-5

Page 23: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

F

-6

Sta

ge

1 :

Tra

nsm

issi

on

fac

ilit

ies

and

no

new

wat

er t

reat

men

t p

lan

t w

ith

all

ex

isti

ng

WT

Ps

L

oca

l d

em

an

d (

LD

) b

efo

re T

R

Vo

lum

eT

DS

67

,10

01

50

0

SA

AV

olu

me

Ave

. T

DS

42

4,0

00

1,0

87

Vo

lum

eT

DS

Vo

lum

eT

DS

Al H

art

ha

25

G9

6,0

00

1,5

00

0In

pu

tO

utp

ut

0

Ba

sra

h U

nifie

d7

2,0

00

1,5

00

1,5

00

00

20

02

00

10

0,9

00

Ne

w p

lan

t0

1,5

00

0#

DIV

/0!

15

00

Su

b-t

ota

l1

68

,00

01

,50

01

68

,00

0

1,5

00

SA

A

Ga

rma

-1&

23

7,0

00

1,5

00

37

,00

0

1,5

00

SW

C

R-Z

ero

96

,00

07

00

96

,00

0V

olu

me

TD

S

70

02

33

,90

01

,17

2

23

3,9

00

SW

C1

17

2V

olu

me

Ave

. T

DS

WT

Ps a

lon

g t

he

SA

12

3,0

00

70

01

23

,00

03

56

,90

01

,00

9

70

0

WT

PR

OC

WT

CWR+LD

BR

Ba

sra

h C

ity

To

tal f

low

42

4,0

00

01

68

,00

02

05

,00

02

33

,90

03

56

,90

0

Inp

ut

To

tal a

ve

de

ma

nd

60

8,0

00

Lo

ca

l d

em

an

d6

7,1

00

TD

S o

f S

WC

70

0T

DS

of

SA

A1

,50

01

80

01

50

0T

DS

of

RO

tre

ate

d w

ate

r2

00

RO

re

co

ve

ry r

ate

0.7

5

Su

mm

ary

of

facili

ty c

ap

acity

RO

pla

nt

ca

pa

city

0

Ne

w W

TP

0m

3/d

ay

RO

pla

nt

0m

3/d

ay

Ou

tpu

tT

ota

l su

pp

ly4

24

,00

0

Tre

ate

d w

ate

r tr

an

sm

issio

n P

S

0m

3/d

ay

Ra

tio

n o

f su

pp

ly t

o d

em

an

d0

.70

Tra

nsm

issio

n r

ese

rvo

ir (

TR

)3

0,0

00

m3

31

Tra

nsm

issio

n p

um

pin

g s

tatio

n (

TP

S)

32

8,0

00

m3

/da

y1

.4E

xis

tin

g W

TP

s4

24

,00

0m

3/d

ay

Eff

ects

1W

ate

r q

ua

lity

Ave

rag

e T

DS

in

Ba

sra

h C

ity

10

90

mg

/lT

DS

in

ble

nd

ing

re

se

rvo

ir1

17

0m

g/l

Oil,

tu

rbid

ity,

co

lor

& b

acte

ria

no

pro

ble

m2

Wa

ter

qu

an

tity

Su

pp

ly q

ua

ntity

of

ave

rag

e w

ate

r d

em

an

d7

0%

Pe

r ca

pita

co

nsu

mp

tio

n2

52

l/ca

/d f

or

urb

an

14

0l/ca

/da

y f

or

rura

l o

f A

l H

art

ha

3W

ate

r p

ressu

reIm

pro

ve

d

Wa

ter

Tre

atm

en

t P

lan

tsR

ev

ers

e O

sm

os

is(R

O)

Ble

nd

ing

/tra

nsm

issio

n

rese

rvo

ir (

TR

)

Ce

ntr

al B

asra

h

Ba

sra

h C

ity

BR

Ou

tpu

t

Exis

tin

g

CW

T 1

in

WT

P

Exis

tin

g

CW

T 2

WT

P

Ne

w c

lea

r

wa

ter

tan

k

(CW

T)

Al H

art

ha

Wa

ter

Tre

atm

en

t P

lan

t S

ite

F-6

Page 24: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

APPENDIX G

FACILITY DESIGN OF FOR WSPCB (WTP)

Page 25: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

G-1

APPENDIX G FACILITY DESIGN FOR WSPCB (WTP)

1. Capacity of WTP

465,000 m3/day= 19,375 m3/hr= 322.9 m3/min= 5.382 m3/sec

2. Receiving Well

1) Detention Time

Detention Time: 1.5 min (1.5-min)

Required Capacity: 355.6*1.5= 533.4 m3

Actual Capacity: 6.50*(5.00+1.50)*6.4*2= 540.8 m3

533.4 < 541 O.K.

2) Dimension

W6.50m*L6.70m*D6.40m*2unit

3. Mixing Basin

1) Detention Time

Detention Time: 1.0 min (1-5min)

Required Capacity: 355.6*1.0= 355.6 m3

Actual Capacity: 4.00*4.00*4.00*6= 384.0 m3

355.6 < 384.0 O.K.

2) Dimension

W4.00m*L4.00m*D4.00m*6unit

4. Flocculation Basin

1) Mean Flow Rate

Mean Flow Rate: 25 cm/sec (15-30cm/sec)

Required Section Area: 5.926/(25/100)= 23.70 m2

Actual Section Area: 1.50*1.50*12= 27.00 m2

23.7 < 27.0 O.K.

2) Detention Time

Detention Time: 30.0 min (20-40min)

Required Capacity: 355.6*30= 10,668.0 m3

Actual Capacity: 1.50*18.00*4.00*9*12= 11,664.0 m3

10,668.0 < 11,664 O.K.

3) Dimension

W1.50m*L(18.00m*9)*D4.00m*12unit

5. Chemical Sedimentation Basin

1) Mean Flow Rate

Mean Flow Rate: 0.4 m/min (~0.4m/min)

Required Section Area: 355.6/0.4= 889.00 m2

Actual Section Area: 19.00*4.00*12= 912.00 m2

889.0 < 912.0 O.K.

Page 26: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

G-2

2) Surface Loading Rate

Surface Loading Rate: 25.0 mm/min (15-30min)

Required Capacity: 355.6/(25/1000)= 14,224.0 m2

Actual Capacity: 18.00*68*12= 14,688.0 m2

14,224.0 < 14,688 O.K.

3) Dimension

W18.00m*L68.00m*D4.00m*12unit

6. Rapid Sand Filter

1) Filtration Rate

Fintration Rate: 150 m/day (120-150m/day)

Required Filtration Area: 512000/150= 3,413.3 m2

Required Filtaration Area of Each Filter:

3413.3/((8-1)*6)= 81.3 m2

Actual Area of Each Filte (4*2)*11= 88.0 m2

81.3 < 88.0 O.K.

2) Dimension

W(4.00*2)m*L11.00*8set*6unit

7. Receiving & Distribution Well

1) Capacity of Receiving & Dsitribution Well

512000+72000+96000 = 680,000 m2

680,000 m3/day= 28,333 m3/hr= 472.2 m3/min= 7.870 m3/sec

2) Detention Time

Detention Time: 1.5 min (1.5-min)

Required Capacity: 472.2*1.5= 708.3 m3

Actual Capacity: 15.00*15.00*4.00 = 900.0 m3

708.3 < 900 O.K.

2) Dimension

W15.00m*L15.00m*D4.00m*1unit

8. Clear Water Reservoir

1) Capacity of Clear Water Reservoir

416,000 m3/day= 17,333 m3/hr

2) Detention Time

Detention Time: 1.0 hr (~1hr)

Required Capacity: 14125*1= 14,125.0 m3

Actual Capacity: 20.00*60.00*4.00*3= 14,400.0 m3

14,125.0 < 14,400 O.K.

3) Dimension

W20.00m*L60.00*3unit

Page 27: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

APPENDIX H

INSTITUTIONAL CAPACITY BUILDING

Page 28: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

H-1

APPENDIX H INSTITUTIONAL CAPACITY BUILDING

H.1 Existing Structure of Organizations

(1) Numbers of Staff of BWD

Table H.1 Number of Staff of BWD

Name of Department Name of Section Numbers of Staff

Director General 1

1. Technical Dept. (1) Head Quarter 17

(2) O&M Section for Basra City 82

(a) Al Basrah

(b) Al Ashar <38>

(c) Al Rabat <11>

(d) Al Maqel <13>

(e) Al Qiblah <7>

(f) Al Khalij <13>

(3) O&M Section for Outside Basra City 577

(a) Shat Al Arab <80>

(b) Abu Al Khasib <72>

(c) Khor Al Zubeir <40>

(d) Al Faw <16>

(e) Al Nashwa <94>

(f) Al Zubeir <24>

(g) Al Quma +Al Kaim <70>

(h) Al Madina+ Al Hewar + Al Sadik <69>

(i) Al Deir <112>

(4) Projects Section 362

(a) Basrah Unified Project <74>

(b) Hartha 25M Project <62>

(c) R Zero Station <78>

(d) Bradhya Project <26>

(e) Jubeilah Project <54>

(f) Garma Project <50>

(g) Ribat Project <18>

2. Financial Dept. (include auditing dept and billing and collection dept) 238

3. Vehicle Dept. 58

4. Administration Dept. 56

5. Computers and IT Dept. 5

6. Laboratories Dept. 14

7. Legal Dept. 5

8. Warehouses Dept. 8

Total 1,423

< >:Brake down

Source: BWD

Page 29: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

H-2

(2) Current Organization of GDW of MMPW

Director General (1)

D.G Assistant Dept.

Workshops

Administration

Storehouse

AccountantCredits

Projects Design Networks Design Atelier Surveying

Ownerships Pretensions & Rights

Planning Accountant Incoming

Quality Control &

Standardization

Immanency &

Training

Type Writing General Papers

D.G Office

Relationships Dept.

Planning and Follow Up

Dept.

Interior Observing Dept.

Secretary Office

Implementation Dept.

Operation Dept.

Quality Control Dept.

Personage Dept.

Administration Dept.

Canonical Dept.

Financial Dept.

Design Dept.

Mechanics Dept.

Storehouse Dept.

Water Directorate in

Governorate

Planning

Project

Implementation

Laboratory

Cadre & Register

Employment

Service

Administration

Contracts

Budget Accountant

Follow Up Statistic Strategic Planning. Importation

Network ImplementationImplementation of

Projects & Networks (5)

Project Operation Network OperationOperation of Projects &

Networks

MMPW

General Directorate Water

Source: MMPW

Figure H.1 Current Organization of GDW of MMPW

Page 30: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

H-3

(3) Existing Organization of Basra Governorate (BG)

( ): Number of Staff

Executive Dept.

(headed by Governor)

Assistant

Governor

Health and

Environment

Chairman of Governorate Council (1)

Clerk Office

Deputy

Governor

(Admin.

Affairs)

Committees

Deputy

Governor

(Technical

Affairs)

Dept. for Registration

and Monitoring

Deputies

Legal and

Admin.Financial

Culture and

Relations

Traffic

Wastewater

Accounting

First Deputy

Deputy for

Municipal

Affairs

Deputy for

Women

Affairs

Secretary

Martyras

Families Care

Unit

Baath

Extermination

Security

Urban

Planning

Police

Agriculture

and Irrigation

Cement Office

Education Water

Post and

CommunicationHealth

Accounting

Security

Committee

Other

Service

Entities

Education

Local

Reconstructi

on Unit

MunicipalitiesAnti-

Corruption

Reconstruction

MMPW

Basra Governorate

Source: BG

Figure H.2 Existing Organization of Basra Governorate (BG)

Page 31: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

H-4

(4) Existing Organization of Ministry of Water Resources (MWR)

Directorate for Assets

Minister

Directorate for Legal Affairs

Directorate for

Administrative Affairs

Directorate for Financial

Affairs

Directorate for Commercial

Affairs

Financial and Administration

Affairs Advisor

Directorate for Planning and

Development

Directorate for Survey

Directorate for Engineering

Designs

Directorate for O&M of

Irrigation Projects

Directorate for Dams and

Reservoirs

Directorate for Executing

Irrigation and Reclamation

Projects

Iraq Company for Executing

Irrigation Projects

Al Fao Company for

Executing Irrigation Projects

Diija Company for Executing

Irrigation Designs

Directorate for Project

Maintenance Works

Directorate for River

Dredging

Rafidain Company for

Irrigation Dams

State Company for

Electromechanical Contracts

Name Title

Directorate for Water

Resource Management

Deputy Minister Minister's Office General Inspecter

Construction and

Maintenance AdvisorCompanies Affair Advosor

Planning and Engineering

Advisor

Directorate for Water Well

Drilling

Ministry of Water Resources

(MWR)

Source: MWR

Figure H.3 Existing Organization of Ministry of Water Resources (MWR)

Page 32: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

H-5

H.2 Results of Project Cycle Management Workshop

(1) Organization and Institution Aspect

The problem trees and the objective trees with the alternative analysis on organization and institution aspect

are shown as below.

Water shortage

Under valued water

tariffInefficient O & M Low water quality

Interference in BWD

business

Core ProblemUndefined Authority

and responsibilities

Little coordination

among MWR, MMPW

and BWD

Little coordination

between Local Gov.,

and Gov. Council

BWD organization is

too centralized

Water projects are

separate

Unclear registration

for water distribution

Very little

communication with

other officials

Little communication.

between MMPW, and

BWD

Organization is not

good for its wide

geographical area

Very old registration

Figure H.4 Problem Trees on Organization and Institution Aspect

Page 33: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

H-6

Adequate water

supply

Fair water tariff Efficient O & M Good water quality

Autonomous body of

BWD

Defined Authority and

responsibilities

Good coordination

among MWR, MMPW

and BWD

Good coordination

between Local Gov.,

and Gov. Council

BWD organization is

decentralized

Water projects are

separate

Clear registration for

water distribution

Good communication

with other officials

Good communication.

between MMPW, and

BWD

Organization is

suitable for its wide

area

Comprehensive

registration

Communication and Coordination

Improvement ApproachesAdministration and Organization

Reform Approaches

Legal Framework Development

Approaches

Figure H.5 Objective Trees with Alternative Analysis on Organization and Institution Aspect

(2) Facility Management and Technical Aspect

The problem trees and the objective trees with the alternative analysis on facility management and technical

aspect are shown as below.

Page 34: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

H-7

Health

problems

implications

Customers not

satisfiedLow revenue

Not enough

water (quality

& quantity)

Shortage in

energy

resources

Low water

level (S.W.C)

Not organized

distribution

network

High NRWLow quality

water

Old Water

Treatment

Plants

Generators

fuel not

sufficient

Electricity is

frequently

interrupted

Insufficient

O&M of

facilities

Not controlled

O&M system

Low water

pressure

No bulk water

meters (DMA)

Illegal

connectionWater leakage

Shortage in

treatment

materials (Cl &

Al)

High TDSMultiple water

resources

Spare parts

are not

sufficient

Spare parts

are from

multiple

sources

Core Problem

Figure H.6 Problem Trees on Facility Management and Technical Aspect

Health

improvement

Customers

satisfiedHigh revenue

Enough water

supplied

(Quality &

quantity)

Enough energy

resources

High water

level (S.W.C)

Distribution

network

organized

Low NRWGood water

quality

Modern Water

Treatment

Plants

Generators

fuel sufficient

Stable

electricity

supplied

Sufficient O&M

of facilities

Controlled

O&M system

Enough water

pressure

Bulk water

meters

installed

All connections

are legal

Little water

leakage

Treatment

materials (Cl &

Al) available

Low TDS

Unified raw

water

resources

Sufficient

spare parts

Spare parts

are from

unified sources

WTPs Project

Approaches

Water Quality Improvement

ApproachesNRW Management

Approaches

Network Management Project

Approaches

Energy Management

Approaches

Figure H.7 Objective Trees with Alternative Analysis on Facility Management and Technical Aspect

(3) Human Resources Development (HRD) Aspect

The problem trees and the objective trees with the alternative analysis on human resources development

(HRD) aspect are shown as below.

Page 35: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

H-8

Not enough

water (quantity

& quality)

Less revenue Poor O & M

HR efficiency

and

effectiveness isnot enough

HR are notsufficiently

developed

HR havingnegative

attitude

Strong tribal

influence

Not enoughnumber of

quality workers

HR not having

a clear career

path

HR systems

are not

computerized

Weak training

programs

Staff appraisal

system is so

weak

Priority is

given to

personal

interest

HR acting

irresponsibleLow discipline

Favoritism and

Nepotism

Non-willing to

work due to

low salary

Lack of proper

customer

relations

Little number

of O&M staff

Absence of

merit system

High rate of

old aged &

disabled staff

Core Problem

Figure H.8 Problem Trees on Human Resources Development (HRD) Aspect

Enough water

(quantity &

quality)

More revenue

collectedProper O & M

HR efficiency

and

effectiveness is

enough

HR are

sufficiently

developed

HR having

positive

attitude

Tribal

influence

reduced

Enough

number of

quality workers

HR having a

clear career

path

HR systems

are

computerized

Appropriate

training

programs

Staff appraisal

system is

sufficient

HR giving

priority to

public interest

HR acting

responsible

HR behaving

with more

discipline

Favoritism and

nepotism

eliminated

Positive willing

to work

Proper

customer

relations

Enough

number of

O&M staff

Merit system

applied

New staff

recruitment

Personnel Administration

Approaches

Motivation Improvement

Approaches

Human Resource (HR) Development

Approaches

Figure H.9 Objective Trees with Alternative Analysis on Human Resources Development (HRD)

Aspect

(4) Financial Management Aspect

The problem trees and the objective trees with the alternative analysis on financial management aspect are

shown as below.

Page 36: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

H-9

Low collection

rate (estimated at

30%)

Weak financial

control

Little

coordination

between Stores

& Accounting

Financial

management is

not efficient

Inefficient

financial

organization

Under staffed

financial

management

Weak revenue

collection

capabilities

Prices Auditing

Committee is not

qualified

Improper

Inventory System

Procurement is

managed by a

committee, not a

division

Computers are

not used for

accounting

Less qualified

accounting staff

No sufficient

number of

accounting staff

Low financial

incentives for

collection staff

No computer

application for

collection

Collection is

done through

collectors

No water meters

to calculate

consumption

Collection

registrations are

inactive

Core Problem

Figure H.10 Problem Trees on Financial Management Aspect

High collection

rate

Proper financial

control

Good

coordination

between Stores

& Accounting

Efficient financial

management

Efficient financial

organization

Financial

management

adequately

staffed

Revenue

collection

capabilities

improved

Prices Auditing

Committee is

qualified

Proper Inventory

System

Procurement is

managed by a

division

Computers are

used for

accounting

Accounting staff

qualification

improved

Sufficient number

of accounting

staff

Financial

incentives for

collection staff

Computer

application for

collection

Collection system

improvement

Customers water

meters installed

Collection

registrations are

active

Collection System Improvement

Approaches

Accounting Staff HRD

Approaches

Financial System Improvement

Approaches

Figure H.11 Objective Trees with Alternative Analysis on Financial Management Aspect

Page 37: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

H-10

H.3 Example of Staff Appraisal Criteria

Introduction of the staff appraisal system is one of the essentials for BWD. The method of the staff

appraisal system is described as below.

The staff appraisal systems should be based on following basic principles:

• Managers should clearly understand the performance of the staff and inform the staff if the

output or skill does not meet the requirements

• Managers shall provide OJT and give advice to make sure the staff performance is

appropriate

• Managers shall analyze the potential of the staff and promote further skill development.

• Managers shall evaluate job performance and willingness to work, which will lead to fair

decision-making regarding promotion and salary.

The staff appraisals can be made based on evaluation criteria. The following table shows the standard five

rankings and points of evaluation. Once the scale of evaluation criteria is set, subjective evaluation will be

minimized.

Table H.2 Criteria for Evaluation (Example)

Rank Points for Evaluation

S Excellent

(Total score:

more than 90)

1. Completing all target items and contributing to improving BWD

performance.

2. Good model to the staff.

3. Not a single failure.

A Good

(Total score:

80-89)

1. Performing above average and showing good output.

2. Other staff should follow the way this one performs the task.

3. Few mistakes.

B Moderate

(Total score:

50-79)

1. Simply performing the task he is responsible for and meeting the

task requirements.

2. Considered average.

C Poor

(Total score:

30-49)

1. Can perform the task with some minor mistakes (careless mistakes)

and with some assistance.

2. Unstable job performance.

3. Without support, the task may not be completed

D Very poor

(Total score:

less than 30)

1. Can not perform the tasks.

2. Output cannot meet the expected target.

3. Cannot be trusted.

4. Always requires assistance.

5. No improvement

Note: For scoring, refer to Table H.3.

The weight of criteria for evaluation should be different depending on the position of the staff.

Evaluation of senior staff and management staff should have more weight on leadership. Besides,

evaluation of junior staff focuses more on discipline and understanding. The following table shows

Page 38: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

H-11

an example of weight of evaluation for evaluation indicators. In the table, the score for each item of

evaluation indicator shows the maximum value.

Table H.3 Weight of Evaluation for Scoring (Example)

Man

agem

ent

Tec

hn

ical

Sta

ff

(S

enio

r)

Tec

hn

ical

Sta

ff

(J

un

ior)

Tec

hn

ical

Sta

ff

(F

resh

man

)

Ad

min

istr

ativ

e S

taff

(S

enio

r)

Ad

min

istr

ativ

e S

taff

(Ju

nio

r)

Ad

min

istr

ativ

e S

taff

(F

resh

man

)

Knowledge, Skill 5 10 15 10 15 10 5

Understanding 10 5 10 15 5 10 15

Planning, Development 10 10 5 - 10 5 -

Leadership 20 15 5 - 15 5 -

Op

erat

ion

al S

kil

ls

Negotiation 10 10 10 5 10 10 5

Responsibility 20 20 15 10 15 15 10

Initiative 10 15 10 10 15 10 5

Cooperation 5 5 5 10 5 10 20

Morale 5 5 15 20 5 15 20

Att

itu

de

Diligence 5 5 10 20 5 10 20

Total 100 100 100 100 100 100 100

Page 39: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

H-12

H.4 JBIC Loan Procedures

(1) JICB Loan Procedure

Project Cycle

Mid-Term Strategy

Country Strategy Paper

Research by JBIC Institute

Country/Sector Survey

Procurement Special

Supervision Assistance

for

Disbursement Procurement

Management

Mid-Term

Supervision

Ex-Post

Evaluation

Follow-Up

Monitoring

Source:JBIC

Environmental Review and Ex-Ante

Evaluation Findings Made

Governmental Mission

Prior Notification

Environmental Categorization

Made Public

Appraisal Mission

Loan Negotiation

Fact Finding (FF) Mission

Project Identification and

Formation

Feasibility Study (F/S)

EIALoan

Request

Identification

and Preparation

Appraisal

and

L/A

Detailed Design

(D/D)

Project

Implementation

Aid Policy

Country/Sector Study

Project Formulation

Study/Development Study

Expert Dispatch Program

Ex-Post

Evaluation &

Follow-Up

Monitoring

Acceptance of Trainees

Project Implementation

and Management

Project Completion

Project Evaluation

Operation and

Maintenance

Japanese

GovernmentJICA JBIC Recipient Country

(Borrower)

SAPROF

Supervisory

Committee

Loan Agreement

(L/A)

Expert Dispatch Program

Exchange of Notes

(E/N)

Expert Dispatch Program

SAPI

Project Completion

Report

SAPS

Grant Aid for

Rehabilitation

Expert Dispatch Program

Figure H.12 JBIC Loan Procedures

Page 40: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

H-13

(2) Procedures for Employment of Consultant

Figure H.13 Procedures for Employment of Consultant

a

b

c

d Evaluation of proposals, and 1

e Negotiation of a contract.

2

3

4

5

7

8

6 Contract Negotiations

Informing Unsuccessful

Consultants

Selection of a Consultant

Preparation of a Short List of

Consultants

Sending the Letter of

Invitation to Consultants

Submission of Proposal

Evaluation of Proposals

Preparation of Letter of

Invitation

JBIC Borrowers Consultants

Preparation of the Terms of

Reference and cost estimates,

Preparation of the Terms of

Reference and cost estimates

Request to Borrowers

Preparation of a Short List of

Consultants,

Invitation to submit proposals,

Page 41: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

H-14

(3) Procedures for Procurement of Contractor

Figure H.14 Procedures for Procurement of Contractor

a 1

2

b

c 3

4

5

d 6

7

Submission of PQ Documents

Prequalification of Bidders

Contract

Preparation (Assistance) of

Prequalification (PQ) Form

Preparation (Assistance) of

PQ Evaluation

Preparation (Assistance) of

Bidding Documents Form

Preparation (Assistance) of

Evaluation Report

Contract Negotiations

Preparation of Evaluation Report

Prequalification (PQ) Evaluation

Request for Bidding Documents

Submission of Bidding

Documents

Opening of Bids

Consultant to be Employed Borrowers Contractors

Advertising for Prequalification

(PQ)

Page 42: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

APPENDIX I

COST ESTIMATION FOR WSPCB

Page 43: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

I-1

APPENDIX I COST ESTIMATION FOR WSPCB

I.1 Estimated Unit Direct Construction Cost

Unit Unit Cost

(L/C) Unit Cost

(F/C) Unit Cost

(Total)

1. Pipeline

Diameter 110mm US$/m 26 US$ 16 US$ 42 US$

Diameter 125mm US$/m 27 US$ 20 US$ 47 US$

Diameter 140mm US$/m 28 US$ 25 US$ 53 US$

Diameter 160mm US$/m 30 US$ 32 US$ 62 US$

Diameter 180mm US$/m 31 US$ 41 US$ 72 US$

Diameter 200mm US$/m 35 US$ 50 US$ 85 US$

Diameter 225mm US$/m 36 US$ 64 US$ 99 US$

Diameter 250mm US$/m 37 US$ 78 US$ 115 US$

Diameter 280mm US$/m 38 US$ 98 US$ 137 US$

Diameter 315mm US$/m 41 US$ 124 US$ 165 US$

Diameter 355mm US$/m 44 US$ 157 US$ 201 US$

Diameter 400mm US$/m 156 US$ 186 US$ 343 US$

Diameter 450mm US$/m 159 US$ 225 US$ 384 US$

Diameter 500mm US$/m 163 US$ 267 US$ 430 US$

Diameter 600mm US$/m 169 US$ 368 US$ 537 US$

Diameter 700mm US$/m 176 US$ 483 US$ 659 US$

Diameter 800mm US$/m 208 US$ 618 US$ 825 US$

Diameter 900mm US$/m 215 US$ 760 US$ 975 US$

Diameter 1000mm US$/m 226 US$ 932 US$ 1,158 US$

Diameter 1100mm US$/m 235 US$ 1,112 US$ 1,347 US$

Diameter 1200mm US$/m 245 US$ 1,302 US$ 1,547 US$

Diameter 1400mm US$/m 278 US$ 1,747 US$ 2,040 US$

Diameter 1500mm US$/m 293 US$ 1,991 US$ 2,284 US$

Diameter 1600mm US$/m 317 US$ 2,464 US$ 2,781 US$

Diameter 1800mm US$/m 363 US$ 3,027 US$ 3,390 US$

Diameter 2000mm US$/m 375 US$ 3,870 US$ 4,245 US$

2. Water Treatment Plant US$/m3/day refer to Figure 1

3. Distribution Pump Station US$/m3/day refer to Figure 2

4. Grand Reservoir US$/m3 refer to Figure 3

5. Elevated Tank US$/m3 refer to Figure 4

6. RO Plant US$/m3/day 40 US$ 570 US$ 610 US$

Page 44: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

I-2

Figure 1. Direct Constrution Cost of Water Treatment Plant

0

20,000,000

40,000,000

60,000,000

80,000,000

100,000,000

120,000,000

140,000,000

160,000,000

0 100,000 200,000 300,000 400,000 500,000 600,000 700,000 800,000

Capacity (m3/day)

Direct

Constr

uction C

ost

(US$)

Local Currency

Foreign Currency

Total Cost

Figure 2. Direct Construction Cost of Distribution Pump Station

0

1,000,000

2,000,000

3,000,000

4,000,000

5,000,000

6,000,000

7,000,000

8,000,000

0 50,000 100,000 150,000 200,000 250,000 300,000 350,000

Capacity (m3/day)

Direct

Constr

uction C

ost

(US$)

Local Currency

Foreign Currency

Total Cost

Page 45: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

I-3

Figure 3. Direct Constrution Cost of Ground Reservoir

0

2,000,000

4,000,000

6,000,000

8,000,000

10,000,000

12,000,000

14,000,000

16,000,000

18,000,000

20,000,000

0 10,000 20,000 30,000 40,000 50,000 60,000

Capacity (m3/day)

Direct

Constr

uction C

ost

(US$)

Local Currency

Foreign Currency

Total Cost

Figure 4. Direct Construction Cost of Elevated Tank

0

500,000

1,000,000

1,500,000

2,000,000

2,500,000

3,000,000

0 500 1,000 1,500 2,000 2,500 3,000 3,500

Capacity (m3/day)

Direct

Constr

uction C

ost

(US$)

Local Currency

Foreign Currency

Total Cost

Page 46: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

I-4

I.2 Cost Estimation for WSPCB (Stage 5)

Unit Rate (US$) Amount (US$) Item Description Unit Quantity

L.C F.C L.C F.C

Total Amount (US$)

1 Direct Construction Cost

-1 Rehabilitation of Distribution Network

DCIP dia.700mm m 7,000 176 483 1,232,000 3,381,000 4,613,000

DCIP dia.500mm m 6,500 163 267 1,059,500 1,735,500 2,795,000

DCIP dia.400mm m 1,000 156 186 156,000 186,000 342,000

HDPE dia.225mm m 18,500 36 64 666,000 1,184,000 1,850,000

HDPE dia.160mm m 54,000 30 32 1,620,000 1,728,000 3,348,000

HDPE dia.110mm m 198,500 26 15 5,161,000 2,977,500 8,138,500

Sub Total of -1 9,894,500 11,192,000 21,086,500

-2 Rehabilitation of WTP

1) R-Zero 25 compact units

Sub Total of 1) 175,000 1,003,000 1,178,000

2) R-Zero Raw Water Pumps

Sub Total of 2) 250,000 298,000 548,000

3) Al Hartha 25 C.U.

Sub Total of 3) 175,000 881,500 1,056,500

4) Basra Unified

Sub Total of 4) 90,000 1,188,500 1,278,500

5) Garma1

Sub Total of 5) 35,000 329,000 364,000

6) Garma 2

Sub Total of 6) 25,000 206,000 231,000

7) Ribat

Sub Total of 7) 35,000 159,000 194,000

8) Al Maqil 1

Sub Total of 8) 0 96,000 96,000

9) Jubaila 1

Sub Total of 9) 40,000 591,500 631,500

10) Jubaila 2

Sub Total of 10) 25,000 186,000 211,000

11) Bradiah 1

Sub Total of 11) 60,000 647,000 707,000

12) Bradiah 2

Sub Total of 12) 60,000 707,000 767,000

13) Bradiah C.U.

Sub Total of 13) 25,000 66,000 91,000

Sub Total of -2 995,000 6,358,500 7,353,500

-3 Construction of Transmission System

1) Ring Transmission Mains and Branch

DCIP dia.2000mm m 1,900 375 3,870 712,500 7,353,000 8,065,500

DCIP dia.1800mm m 2,000 363 3,027 726,000 6,054,000 6,780,000

DCIP dia.1600mm m 0 317 2,464 0 0 0

DCIP dia.1500mm m 0 293 1,991 0 0 0

DCIP dia.1400mm m 1,200 278 1,747 333,600 2,096,400 2,430,000

DCIP dia.1200mm m 2,500 245 1,302 612,500 3,255,000 3,867,500

DCIP dia.1100mm m 3,600 235 1,112 846,000 4,003,200 4,849,200

DCIP dia.1000mm m 5,500 226 932 1,243,000 5,126,000 6,369,000

DCIP dia.900mm m 4,200 215 760 903,000 3,192,000 4,095,000

DCIP dia.800mm m 3,000 208 618 624,000 1,854,000 2,478,000

DCIP dia.700mm m 6,800 176 483 1,196,800 3,284,400 4,481,200

DCIP dia.600mm m 2,300 169 368 388,700 846,400 1,235,100

Sub Total of 1) 7,586,100 37,064,400 44,650,500

2) Transmission Reservoir

Transmission Reservoir m3 64,000 - - 19,806,000 3,144,000 22,950,000

Sub Total of 2) 19,806,000 3,144,000 22,950,000

3) Transmission Pump Station

Transmission Pump Station m3/day 710,000 - - 1,589,000 9,411,000 11,000,000

Sub Total of 3) 1,589,000 9,411,000 11,000,000

Sub Total of -3 28,981,100 49,619,400 78,600,500

-4 Construction of Water Treatment Plant

1) Water Treatment Plant

Page 47: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

I-5

Unit Rate (US$) Amount (US$) Item Description Unit Quantity

L.C F.C L.C F.C

Total Amount (US$)

Water Treatment Plant m3/day 465,000 - - 44,312,000 51,411,000 95,723,000

Sub Total of 1) 44,312,000 51,411,000 95,723,000

2) Transmission Pump Station

Transmission Pump Station m3/day 348,900 - - 1,084,000 5,364,000 6,448,000

Sub Total of 2) 1,084,000 5,364,000 6,448,000

3) Pipeline to Transmission Reservoir

DCIP dia.1600mm m 0 317 2,464 0 0 0

DCIP dia.1200mm m 0 245 1,302 0 0 0

Sub Total of 3) 0 0 0

Sub Total of -4 45,396,000 56,775,000 102,171,000

-5 Construction of Distribution System

1) Distribution Pipe

1 DCIP dia.700mm m 3,500.0 176 483 616,000 1,690,500 2,306,500

2 DCIP dia.600mm m 2,000.0 169 368 338,000 736,000 1,074,000

3 DCIP dia.500mm m 6,300.0 163 267 1,026,900 1,682,100 2,709,000

4 DCIP dia.450mm m 0.0 159 225 0 0 0

5 DCIP dia.400mm m 6,100.0 156 186 951,600 1,134,600 2,086,200

6 DCIP dia. 355mm m 2,500.0 44 157 110,000 392,500 502,500

7 HDPE dia.315 mm m 2,600.0 41 124 106,600 322,400 429,000

8 HDPE dia.280 mm m 2,200.0 39 98 85,800 215,600 301,400

9 HDPE dia.250 mm m 1,000.0 37 78 37,000 78,000 115,000

10 HDPE dia.225 mm m 0.0 36 64 0 0 0

11 HDPE dia.200 mm m 900.0 35 50 31,500 45,000 76,500

Sub Total of 1) 3,303,400 6,296,700 9,600,100

2) Distribution Reservoir

Distribution Reservoir (Zone1) m3 12,000 - - 3,798,000 640,000 4,438,000

Distribution Reservoir (Zone2) m3 12,000 - - 3,798,000 640,000 4,438,000

Distribution Reservoir (Zone3) m3 13,000 - - 4,106,000 688,000 4,794,000

Distribution Reservoir (Zone4) m3 16,000 - - 5,029,000 833,000 5,862,000

Distribution Reservoir (Zone5) m3 19,000 - - 5,953,000 977,000 6,930,000

Distribution Reservoir (Zone6) m3 19,000 - - 5,953,000 977,000 6,930,000

Distribution Reservoir (Zone7) m3 18,000 - - 5,645,000 929,000 6,574,000

Distribution Reservoir (Zone8) m3 20,000 - - 6,261,000 1,025,000 7,286,000

Distribution Reservoir (Zone9) m3 18,000 - - 5,645,000 929,000 6,574,000

Distribution Reservoir (Zone10) m3 17,000 - - 5,337,000 881,000 6,218,000

Distribution Reservoir (Zone11) m3 13,000 - - 4,106,000 688,000 4,794,000

Distribution Reservoir (Zone12) m3 9,000 - - 2,874,000 496,000 3,370,000

Sub Total of 2) 58,505,000 9,703,000 68,208,000

3) Distribution Pump Station

Distribution Pump Station (Zone1) m3/day 60,000 - - 497,000 2,248,000 2,745,000

Distribution Pump Station (Zone2) m3/day 59,000 - - 493,000 2,225,000 2,718,000

Distribution Pump Station (Zone3) m3/day 67,000 - - 522,000 2,404,000 2,926,000

Distribution Pump Station (Zone4) m3/day 80,000 - - 565,000 2,678,000 3,243,000

Distribution Pump Station (Zone5) m3/day 95,000 - - 609,000 2,973,000 3,582,000

Distribution Pump Station (Zone6) m3/day 97,000 - - 615,000 3,011,000 3,626,000

Distribution Pump Station (Zone7) m3/day 93,000 - - 604,000 2,935,000 3,539,000

Distribution Pump Station (Zone8) m3/day 103,000 - - 632,000 3,123,000 3,755,000

Distribution Pump Station (Zone9) m3/day 93,000 - - 604,000 2,935,000 3,539,000

Distribution Pump Station (Zone10) m3/day 85,000 - - 580,000 2,779,000 3,359,000

Distribution Pump Station (Zone11) m3/day 66,000 - - 519,000 2,382,000 2,901,000

Distribution Pump Station (Zone12) m3/day 47,000 - - 446,000 1,938,000 2,384,000

Sub Total of 3) 6,686,000 31,631,000 38,317,000

4) Elevated Tank

Elevated Tank (Zone1) m3 800 - - 806,000 152,000 958,000

Elevated Tank (Zone2) m3 800 - - 806,000 152,000 958,000

Elevated Tank (Zone3) m3 900 - - 864,000 163,000 1,027,000

Elevated Tank (Zone4) m3 1,000 - - 922,000 174,000 1,096,000

Elevated Tank (Zone5) m3 1,200 - - 1,039,000 196,000 1,235,000

Elevated Tank (Zone6) m3 1,300 - - 1,098,000 207,000 1,305,000

Elevated Tank (Zone7) m3 1,200 - - 1,039,000 196,000 1,235,000

Elevated Tank (Zone8) m3 1,300 - - 1,098,000 207,000 1,305,000

Elevated Tank (Zone9) m3 1,200 - - 1,039,000 196,000 1,235,000

Elevated Tank (Zone10) m3 1,100 - - 981,000 185,000 1,166,000

Elevated Tank (Zone11) m3 900 - - 864,000 163,000 1,027,000

Elevated Tank (Zone12) m3 600 - - 689,000 130,000 819,000

Sub Total of 4) 11,245,000 2,121,000 13,366,000

Sub Total of -5 79,739,400 49,751,700 129,491,100

Page 48: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

I-6

Unit Rate (US$) Amount (US$) Item Description Unit Quantity

L.C F.C L.C F.C

Total Amount (US$)

-6 Construction of RO Plant

RO Plant m3/day 362,000 40 570 14,480,000 206,340,000 220,820,000

Sub Total of -6 14,480,000 206,340,000 220,820,000

Sub Total of -1+-2+-3+-4+-5+-6 179,486,000 380,036,600 559,522,600

2 Administration Cost

-1 Security

Security Issue of Transportation L.S 0 6,527,000 6,527,000

Security Issue of Construction Site L.S 12,035,000 0 12,035,000

Sub-Total of -1 12,035,000 6,527,000 18,562,000

-2 Insurance

Insurance for Transportation % 3.5 0 13,301,000 13,301,000

Insurance for Construction % 3.5 6,282,000 0 6,282,000

Sub-Total of -2 6,282,000 13,301,000 19,583,000

-3 Administration Cost

Administration Cost 10% of Direct Cost % 10.0 17,949,000 38,004,000 55,953,000

Sub-Total of -3 17,949,000 38,004,000 55,953,000

Sub-Total of -1+-2+-3 36,266,000 57,832,000 94,098,000

3 Tax and Duty

-1 Import Duty of Material Procurement % 5.0 19,002,000 0 19,002,000

and Supply

-2 Contract of Civil Works % 10.0 65,362,000 0 65,362,000

Sub-Total of -1+-2+-3 84,364,000 0 84,364,000

4 Engineering Cost

-1 Engineering Cost

Engineering Cost (11.0% of Direct Cost) % 11.0 19,743,000 41,804,000 61,547,000

Sub-Total of -1 19,743,000 41,804,000 61,547,000

-2 Contingency

Price Contingency (9.0%of LC&1.7%of FC) L.S. 1.0 14,815,000 5,069,000 19,884,000

Physical Contingency (20% of LC & FC) L.S. 1.0 6,912,000 9,375,000 16,287,000

Sub-Total of -2 21,727,000 14,444,000 36,171,000

Sub-Total of -1+-2 41,470,000 56,248,000 97,718,000

5 Price Contingency (Escalation Cost)

-1 For Local Portion of Item 1and 2 % 9.0 189,828,000 0 189,828,000

-2 For Foreign Portion of Item 1and 2 % 1.7 0 60,147,000 60,147,000

Sub-Total of -1+-2 189,828,000 60,147,000 249,975,000

Sub-Total (Item 1, 2 and 5) 405,580,000 498,015,600 903,595,600

6 Physical Contingency

-1 For Local Portion of Item 1, 2 and 5 % 20.0 81,116,000 0 81,116,000

for Construction Cost

-2 For Foreign Portion of Item 1, 2 and 5 % 20.0 0 99,603,000 99,603,000

for Construction Cost

Sub-Total of -1+-2 81,116,000 99,603,000 180,719,000

Total

With Tax (1+2+3+4+5+6) 612,530,000 653,866,600 1,266,396,600

Without Tax (1+2+4+5+6) 528,166,000 653,866,600 1,182,032,600

Page 49: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

I-7

I.3 Breakdown of Rehabilitation Cost of Water Treatment Plants

Unit Rate (US$) Amount (US$) Item Description Unit Quantity

L.C F.C L.C F.C

Total Amount (US$)

1) R-Zero 25 compact units

Rehabilitation of C.U. nr 25 30,000 750,000 750,000

Rehabilitation of storage tank - - 75,000 75,000

Rehabilitation of high lift p.s. nr 8 3,000 24,000 24,000

Rehabilitation of low lift p.s. nr 9 3,000 27,000 27,000

Rehabilitation of chlorine system - - 10,000 10,000

Rehabilitation of electrical equipments(33kv/11kv) substation & low tension equipments - - 150,000 150,000

Rehabilitation of diesel generators - - 30,000 30,000

Rehabilitation of the plant buildings - - 100,000 100,000

Rehabilitation of waste water pumps nr 4 3,000 12,000 12,000

Sub Total of 1) 175,000 1,003,000 1,178,000

2) R-Zero Raw Water Pumps

Rehabilitation of Al Hartha pumps nr 6 4,000 24,000 24,000

Rehabilitation of Basra Unified. pumps nr 6 4,000 24,000 24,000

Rehabilitation of Al Jubaila pumps nr 4 4,000 16,000 16,000

Rehabilitation of Bradiah pumps nr 3 4,000 12,000 12,000

Rehabilitation of Shuaiba pumps nr 4 4,000 16,000 16,000

Rehabilitation of Abu Al khaseeb pumps nr 6 4,000 24,000 24,000

Rehabilitation of Kor Al Zubair pumps nr 3 4,000 12,000 12,000

Rehabilitation of the plant buildings - - 250,000 250,000

Rehabilitation of electrical equipments - - 80,000 80,000

Rehabilitation of mechanical equipments - - 90,000 90,000

Sub Total of 2) 250,000 298,000 548,000

3) Al Hartha 25 C.U.

Rehabilitation of C.U. nr 25 30,000 750,000 750,000

Rehabilitation of storage tank - - 75,000 75,000

Rehabilitation of high lift p.s. nr 8 3,000 24,000 24,000

Rehabilitation of low lift p.s. nr 7 2,500 17,500 17,500

Rehabilitation of chlorine system - - 10,000 10,000

Rehabilitation of electrical equipments - - 50,000 50,000

Rehabilitation of diesel generators - - 30,000 30,000

Rehabilitation of the plant buildings - - 100,000 100,000

Sub Total of 3) 175,000 881,500 1,056,500

4) Basra Unified

Rehabilitation of gravity sand filters nr 20 30,000 600,000 600,000

Rehabilitation of storage tank - - 30,000 30,000

Rehabilitation of high lift p.s. nr 7 3,000 21,000 21,000

Rehabilitation of low lift p.s. nr 5 2,500 12,500 12,500

Rehabilitation of chlorine system - - 10,000 10,000

Rehabilitation of electrical equipments - - 25,000 25,000

Rehabilitation of diesel generators - - 30,000 30,000

Rehabilitation of the plant buildings - - 60,000 60,000

Rehabilitation of the sedimentation tanks nr 4 50,000 200,000 200,000

Rehabilitation of the alum dosing system - - 15,000 15,000

Rehabilitation of the pack washing system - - 25,000 25,000

Rehabilitation of the pneumatic system & measuring equipments - - 250,000 250,000

Sub Total of 4) 90,000 1,188,500 1,278,500

5) Garma1

Rehabilitation of C.U. nr 8 30,000 240,000 240,000

Rehabilitation of low lift p.s. nr 3 3,000 9,000 9,000

Rehabilitation of chlorine system - - 10,000 10,000

Rehabilitation of electrical equipments - - 40,000 40,000

Rehabilitation of diesel generators - - 30,000 30,000

Rehabilitation of the plant buildings - - 35,000 35,000

Sub Total of 5) 35,000 329,000 364,000

6) Garma 2

Rehabilitation of C.U. nr 7 20,000 140,000 140,000

Page 50: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

I-8

Unit Rate (US$) Amount (US$) Item Description Unit Quantity

L.C F.C L.C F.C

Total Amount (US$)

Rehabilitation of low lift p.s. nr 2 3,000 6,000 6,000

Rehabilitation of chlorine system - - 10,000 10,000

Rehabilitation of electrical equipments - - 20,000 20,000

Rehabilitation of diesel generators - - 30,000 30,000

Rehabilitation of the plant buildings - - 25,000 25,000

Sub Total of 6) 25,000 206,000 231,000

7) Ribat

Rehabilitation of C.U. nr 3 30,000 90,000 90,000

Rehabilitation of low lift p.s. nr 3 3,000 9,000 9,000

Rehabilitation of chlorine system - - 10,000 10,000

Rehabilitation of electrical equipments - - 20,000 20,000

Rehabilitation of diesel generators - - 30,000 30,000

Rehabilitation of the plant buildings - - 35,000 35,000

Sub Total of 7) 35,000 159,000 194,000

8) Al Maqil 1

Rehabilitation of C.U. nr 3 20,000 60,000 60,000

Rehabilitation of low lift p.s. nr 2 3,000 6,000 6,000

Rehabilitation of chlorine system - - 10,000 10,000

Rehabilitation of electrical equipments - - 20,000 20,000

Sub Total of 8) 0 96,000 96,000

9) Jubaila 1

Rehabilitation of pressure sand filters nr 12 30,000 360,000 360,000

Rehabilitation of high lift p.s. nr 3 3,000 9,000 9,000

Rehabilitation of low lift p.s. nr 3 2,500 7,500 7,500

Rehabilitation of chlorine system - - 10,000 10,000

Rehabilitation of electrical equipments - - 25,000 25,000

Rehabilitation of diesel generators - - 30,000 30,000

Rehabilitation of the plant buildings - - 40,000 40,000

Rehabilitation of the sedimentation tanks nr 2 40,000 80,000 80,000

Rehabilitation of the alum dosing system - - 15,000 15,000

Rehabilitation of the pack washing system - - 25,000 25,000

Rehabilitation of the inlet piping system - - 30,000 30,000

Sub Total of 9) 40,000 591,500 631,500

10) Jubaila 2

Rehabilitation of C.U. nr 4 30,000 120,000 120,000

Rehabilitation of low lift p.s. nr 2 3,000 6,000 6,000

Rehabilitation of chlorine system - - 10,000 10,000

Rehabilitation of electrical equipments - - 20,000 20,000

Rehabilitation of diesel generators - - 30,000 30,000

Rehabilitation of the plant buildings - - 25,000 25,000

Sub Total of 10) 25,000 186,000 211,000

11) Bradiah 1

Rehabilitation of pressure sand filters nr 14 30,000 420,000 420,000

Rehabilitation of high lift p.s. nr 4 3,000 12,000 12,000

Rehabilitation of low lift p.s. nr 4 2,500 10,000 10,000

Rehabilitation of chlorine system - - 10,000 10,000

Rehabilitation of electrical equipments - - 25,000 25,000

Rehabilitation of diesel generators - - 30,000 30,000

Rehabilitation of the plant buildings - - 60,000 60,000

Rehabilitation of the sedimentation tanks nr 2 50,000 100,000 100,000

Rehabilitation of the alum dosing system - - 15,000 15,000

Rehabilitation of the pack washing system - - 25,000 25,000

Sub Total of 11) 60,000 647,000 707,000

12) Bradiah 2

Rehabilitation of pressure sand filters nr 14 30,000 420,000 420,000

Rehabilitation of high lift p.s. nr 4 3,000 12,000 12,000

Rehabilitation of low lift p.s. nr 4 2,500 10,000 10,000

Rehabilitation of chlorine system - - 10,000 10,000

Rehabilitation of electrical equipments - - 25,000 25,000

Rehabilitation of diesel generators - - 30,000 30,000

Rehabilitation of the plant buildings - - 60,000 60,000

Rehabilitation of the sedimentation tanks nr 2 80,000 160,000 160,000

Rehabilitation of the alum dosing system - - 15,000 15,000

Rehabilitation of the pack washing system - - 25,000 25,000

Page 51: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

I-9

Unit Rate (US$) Amount (US$) Item Description Unit Quantity

L.C F.C L.C F.C

Total Amount (US$)

Sub Total of 12) 60,000 707,000 767,000

13) Bradiah C.U.

Rehabilitation of C.U. nr 1 30,000 30,000 30,000

Rehabilitation of low lift p.s. nr 2 3,000 6,000 6,000

Rehabilitation of chlorine system - - 10,000 10,000

Rehabilitation of electrical equipments - - 20,000 20,000

Rehabilitation of the plant buildings - - 25,000 25,000

Sub Total of 13) 25,000 66,000 91,000

Total of 1) - 13) 995,000 6,358,500 7,353,500

I.4 Cost Estimation by Stage

Item Stage 5 Stage 4 Stage 3 Stage 2-4 Stage 2 Stage 1

1. Rehabilitation of network 21 21 21 21 21 21

2. Rehabilitation of existing WTP 7 7 7 7 7 0

3. Transmission system 79 71 71 74 74 62

(1) Transmission reservoir (TR) 23 17 17 17 17 9

(2) Transmission PS (TPS) 11 9 9 12 12 8

(3) Ring mains 45 45 45 45 45 45

4. New water treatment plant 102 66 46 58 46 0

(1) Treatment plant 96 60 41 53 41 0

(2) Treated water PS 6 6 5 5 5 0

5. Main distribution facilities (13 zones) 129 129 129 0 0 0

6. RO plant 221 175 0 88 0 0

Total of Direct Construction Cost 559 469 274 248 148 83

Construction administration expenses 94 82 55 46 32 21

Tax and Duty 84 71 40 38 23 13

Engineering Cost 98 86 52 40 24 13

Price Contingency 250 250 167 82 55 28

Physical Contingency 181 160 99 75 47 26

Total of indirect Cost 707 649 413 281 181 101

Total 1,266 1,118 687 529 329 184

Page 52: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

APPENDIX J

FINANCIAL AND ECONOMIC EVALUATION

Page 53: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

J-1

APPENDIX J FINANCIAL AND ECONOMIC EVALUATION

J.1 Standard Conversion Factor

Table J.1 Calculation of Standard Conversion Factor

Year

(A)

Import Amount

(billion USD FOB)

(B)

Export Amount

(billion USD FOB)

Import

Duties 1)

Export

Duties

Export

SubsidiesTotal

Standard Conversion

Factor

((A+B)/Total)

2003 6.5 7.5 0.359 0 0 14.4 0.975

2004 9.9 10.1 0.545 0 0 20.5 0.973

1) 5 % as reconstruction surcharge on the all imported goods except for humanitarian products.

An import tax of 0.5 % for capital and consumer goods. (Certain consumer goods are taxed at 0.75%)

Foods, Books, medicines and humanitarian goods are excepted from this import taxation.

Standard Conversion Factor (Average) 0.974

J.2 Results of Financial Analysis (Full Cost Recovery)

Table J.2 Summary of Financial Indicators (Full Cost Recovery)

Case

Water price

(USD/ m

3)

Net Present value

1)

FIRR B/C ratio 1) Remarks

The existing price level (EPL)

Million US$

Times of

EPL, % of house income

2)

(1) 0.0074 -576 #DIV/0! 0.010 1 0.11%

(2) 0.372 -283 #NUM! 0.514 50 5.5%Stage 5

(3) 0.743 16 10.4% 1.027 100 11.0%

(1) 0.0074 -298 #DIV/0! 0.020 1 0.11%

(2) 0.372 -5 9.8% 0.983 50 5.5%Stage 3

(3) 0.743 294 20.7% 1.967 100 11.0%

(1) 0.0074 -199 #DIV/0! 0.029 1 0.11%

(2) 0.372 94 15.1% 1.460 50 5.5%Stage 2

(3) 0.743 393 27.1% 2.919 100 11.0%

(1) 0.0074 -304 #DIV/0! 0.019 1 0.11%

(2) 0.372 -11 9.5% 0.966 50 5.5%Stage 2-4

(3) 0.743 288 21.0% 1.932 100 11.0%

1) in the condition of discount rate at 10 %

2) This value is percentage of expenditure for water in the monthly household income

Average of monthly household income is 836,000 ID/household/month (around 557 USD/household/month)

Average size of family is 7.9 persons. Planned water consumption is 338 litter/person/day.

According to the above condition,

Water consumption of household = 7.9 person/hh x 338 lcd x 30 days = 80.1 m3/month

Expenditure for water = 80.1 m3/household/month x 0.0074 USD/m

3 = 0.59 USD/household/month

This amount is equivalent to 0.11% of the average monthly household income.

Page 54: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

J-2

Table J.3 Calculation of Financial Indicator (Stage 5 (3))

F/C

portion

L/C

portion

2006 807,000 -

1 2007 0.0 0.0 876,500 338 -

2 2008 0.5 0.3 0.8 946,000 338 - -1

3 2009 5.9 4.3 10.2 1,015,500 338 - -10

4 2010 15.4 13.4 28.8 1,085,000 338 - -29

5 2011 55.8 52.0 107.8 1,119,400 338 - -108

6 2012 53.9 48.2 102.1 1,153,800 338 - -102

7 2013 54.2 49.1 103.3 1,188,200 338 - -103

8 2014 159.1 90.9 6.3 256.3 1,222,600 338 30% 215.5 60% 96.1 -160

9 2015 159.3 91.6 6.3 257.2 1,257,000 338 30% 221.5 60% 98.8 -158

10 2016 17.2 17.2 1,296,800 332 29% 221.6 62% 101.3 84

11 2017 17.2 17.2 1,336,600 327 28% 221.4 63% 103.7 86

12 2018 17.2 17.2 1,376,400 321 27% 221.0 65% 105.9 89

13 2019 17.2 17.2 1,416,200 316 26% 220.5 66% 108.1 91

14 2020 17.2 17.2 1,456,000 310 25% 219.7 68% 110.2 93

15 2021 17.2 17.2 1,502,400 304 24% 219.6 69% 112.6 95

16 2022 17.2 17.2 1,548,800 299 23% 219.4 71% 114.9 98

17 2023 17.2 17.2 1,595,200 293 22% 218.9 72% 117.1 100

18 2024 17.2 17.2 1,641,600 288 21% 218.1 74% 119.1 102

19 2025 17.2 17.2 1,688,000 282 20% 217.2 75% 121.0 104

20 2026 17.2 17.2 1,688,000 282 20% 217.2 75% 121.0 104

21 2027 17.2 17.2 1,688,000 282 20% 217.2 75% 121.0 104

22 2028 17.2 170.2 187.4 1,688,000 282 20% 217.2 75% 121.0 -66

23 2029 17.2 17.2 1,688,000 282 20% 217.2 75% 121.0 104

24 2030 17.2 17.2 1,688,000 282 20% 217.2 75% 121.0 104

25 2031 17.2 17.2 1,688,000 282 20% 217.2 75% 121.0 104

26 2032 17.2 17.2 1,688,000 282 20% 217.2 75% 121.0 104

27 2033 17.2 17.2 1,688,000 282 20% 217.2 75% 121.0 104

28 2034 17.2 17.2 1,688,000 282 20% 217.2 75% 121.0 104

29 2035 17.2 17.2 1,688,000 282 20% 217.2 75% 121.0 104

30 2036 17.2 17.2 1,688,000 282 20% 217.2 75% 121.0 104

31 2037 17.2 17.2 1,688,000 282 20% 217.2 75% 121.0 104

32 2038 17.2 17.2 1,688,000 282 20% 217.2 75% 121.0 104

33 2039 17.2 17.2 1,688,000 282 20% 217.2 75% 121.0 104

34 2040 17.2 17.2 1,688,000 282 20% 217.2 75% 121.0 104

35 2041 17.2 17.2 1,688,000 282 20% 217.2 75% 121.0 104

36 2042 17.2 17.2 1,688,000 282 20% 217.2 75% 121.0 104

37 2043 17.2 170.2 187.4 1,688,000 282 20% 217.2 75% 121.0 -66

38 2044 17.2 17.2 1,688,000 282 20% 217.2 75% 121.0 104

39 2045 17.2 17.2 1,688,000 282 20% 217.2 75% 121.0 104

40 2046 17.2 17.2 1,688,000 282 20% 217.2 75% 121.0 104

Total 504 350 546 340.4 1,740 3,850.2 2,110

in the condition of discount rate at 10 %

Net Present Value 582 598 16

Internal rate of return (FIRR) 10.4%

B/C 1.027

Condition of calculation

100 times of the existing water rate (11 ID/m3, or 0.0074 USD/m3)

unit water

consumption

(l/person

/day)

Water supply

amount

(x106 m3/year)

Assumed water rate:

Financial Cost (Million USD)

Construction Cost

O & M

Cost

Re-place

-ment CostTotal

Ratio of

Leakage

(%)

743

Revenue

Cash

BalanceServed

population

Collection

rate

(%)

Revenue

unit

water rate

(USD

/1000 m3)

Year in

OrderFiscal Year

Page 55: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

J-3

Table J.4 Calculation of Financial Indicator (Stage 3 (3))

F/C

portion

L/C

portion

2006 807,000 -

1 2007 0.0 0.0 876,500 338 -

2 2008 0.5 0.3 0.8 946,000 338 - -1

3 2009 5.0 3.2 8.2 1,015,500 338 - -8

4 2010 14.7 12.4 27.1 1,085,000 338 - -27

5 2011 43.5 35.7 79.2 1,119,400 338 - -79

6 2012 35.2 31.0 66.2 1,153,800 338 - -66

7 2013 35.0 31.2 66.2 1,188,200 338 - -66

8 2014 31.6 64.1 7.1 102.8 1,222,600 338 30% 215.5 60% 96.1 -7

9 2015 31.7 64.6 7.1 103.4 1,257,000 338 30% 221.5 60% 98.8 -5

10 2016 7.1 7.1 1,296,800 332 29% 221.6 62% 101.3 94

11 2017 7.1 7.1 1,336,600 327 28% 221.4 63% 103.7 97

12 2018 7.1 7.1 1,376,400 321 27% 221.0 65% 105.9 99

13 2019 7.1 7.1 1,416,200 316 26% 220.5 66% 108.1 101

14 2020 7.1 7.1 1,456,000 310 25% 219.7 68% 110.2 103

15 2021 7.1 7.1 1,502,400 304 24% 219.6 69% 112.6 106

16 2022 7.1 7.1 1,548,800 299 23% 219.4 71% 114.9 108

17 2023 7.1 7.1 1,595,200 293 22% 218.9 72% 117.1 110

18 2024 7.1 7.1 1,641,600 288 21% 218.1 74% 119.1 112

19 2025 7.1 7.1 1,688,000 282 20% 217.2 75% 121.0 114

20 2026 7.1 7.1 1,688,000 282 20% 217.2 75% 121.0 114

21 2027 7.1 7.1 1,688,000 282 20% 217.2 75% 121.0 114

22 2028 7.1 67 74.1 1,688,000 282 20% 217.2 75% 121.0 47

23 2029 7.1 7.1 1,688,000 282 20% 217.2 75% 121.0 114

24 2030 7.1 7.1 1,688,000 282 20% 217.2 75% 121.0 114

25 2031 7.1 7.1 1,688,000 282 20% 217.2 75% 121.0 114

26 2032 7.1 7.1 1,688,000 282 20% 217.2 75% 121.0 114

27 2033 7.1 7.1 1,688,000 282 20% 217.2 75% 121.0 114

28 2034 7.1 7.1 1,688,000 282 20% 217.2 75% 121.0 114

29 2035 7.1 7.1 1,688,000 282 20% 217.2 75% 121.0 114

30 2036 7.1 7.1 1,688,000 282 20% 217.2 75% 121.0 114

31 2037 7.1 7.1 1,688,000 282 20% 217.2 75% 121.0 114

32 2038 7.1 7.1 1,688,000 282 20% 217.2 75% 121.0 114

33 2039 7.1 7.1 1,688,000 282 20% 217.2 75% 121.0 114

34 2040 7.1 7.1 1,688,000 282 20% 217.2 75% 121.0 114

35 2041 7.1 7.1 1,688,000 282 20% 217.2 75% 121.0 114

36 2042 7.1 7.1 1,688,000 282 20% 217.2 75% 121.0 114

37 2043 7.1 67 74.1 1,688,000 282 20% 217.2 75% 121.0 47

38 2044 7.1 7.1 1,688,000 282 20% 217.2 75% 121.0 114

39 2045 7.1 7.1 1,688,000 282 20% 217.2 75% 121.0 114

40 2046 7.1 7.1 1,688,000 282 20% 217.2 75% 121.0 114

Total 197 243 234 134 808 3,850.2 3042

in the condition of discount rate at 10 %

Net Present Value 304 598 294

Internal rate of return (FIRR) 20.7%

B/C 1.967

Condition of calculation

100 times of the existing water rate (11 ID/m3, or 0.0074 USD/m3)

743

Revenue

Cash

BalanceServed

population

Collection

rate

(%)

Revenue

unit

water rate

(USD

/1000 m3)

Year in

OrderFiscal Year

unit water

consumption

(l/person

/day)

Water supply

amount

(x106 m3/year)

Assumed water rate:

Financial Cost (Million USD)

Construction Cost

O & M

Cost

Re-place

-ment CostTotal

Ratio of

Leakage

(%)

Page 56: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

J-4

Table J.5 Calculation of Financial Indicator (Stage 2 (3))

F/C

portion

L/C

portion

2006 807,000 -

1 2007 0.0 0.0 876,500 338 -

2 2008 0.5 0.3 0.8 946,000 338 - -1

3 2009 5.1 3.2 8.3 1,015,500 338 - -8

4 2010 14.9 12.6 27.5 1,085,000 338 - -28

5 2011 45.2 36.6 81.8 1,119,400 338 - -82

6 2012 35.4 28.1 63.5 1,153,800 338 - -64

7 2013 35.2 28.1 63.3 1,188,200 338 - -63

8 2014 0.0 0.0 7.0 7.0 1,222,600 338 30% 215.5 60% 96.1 89

9 2015 0.0 0.0 7.0 7.0 1,257,000 338 30% 221.5 60% 98.8 92

10 2016 7.0 7.0 1,296,800 332 29% 221.6 62% 101.3 94

11 2017 7.0 7.0 1,336,600 327 28% 221.4 63% 103.7 97

12 2018 7.0 7.0 1,376,400 321 27% 221.0 65% 105.9 99

13 2019 7.0 7.0 1,416,200 316 26% 220.5 66% 108.1 101

14 2020 7.0 7.0 1,456,000 310 25% 219.7 68% 110.2 103

15 2021 7.0 7.0 1,502,400 304 24% 219.6 69% 112.6 106

16 2022 7.0 7.0 1,548,800 299 23% 219.4 71% 114.9 108

17 2023 7.0 7.0 1,595,200 293 22% 218.9 72% 117.1 110

18 2024 7.0 7.0 1,641,600 288 21% 218.1 74% 119.1 112

19 2025 7.0 7.0 1,688,000 282 20% 217.2 75% 121.0 114

20 2026 7.0 7.0 1,688,000 282 20% 217.2 75% 121.0 114

21 2027 7.0 7.0 1,688,000 282 20% 217.2 75% 121.0 114

22 2028 7.0 46.3 53.3 1,688,000 282 20% 217.2 75% 121.0 68

23 2029 7.0 7.0 1,688,000 282 20% 217.2 75% 121.0 114

24 2030 7.0 7.0 1,688,000 282 20% 217.2 75% 121.0 114

25 2031 7.0 7.0 1,688,000 282 20% 217.2 75% 121.0 114

26 2032 7.0 7.0 1,688,000 282 20% 217.2 75% 121.0 114

27 2033 7.0 7.0 1,688,000 282 20% 217.2 75% 121.0 114

28 2034 7.0 7.0 1,688,000 282 20% 217.2 75% 121.0 114

29 2035 7.0 7.0 1,688,000 282 20% 217.2 75% 121.0 114

30 2036 7.0 7.0 1,688,000 282 20% 217.2 75% 121.0 114

31 2037 7.0 7.0 1,688,000 282 20% 217.2 75% 121.0 114

32 2038 7.0 7.0 1,688,000 282 20% 217.2 75% 121.0 114

33 2039 7.0 7.0 1,688,000 282 20% 217.2 75% 121.0 114

34 2040 7.0 7.0 1,688,000 282 20% 217.2 75% 121.0 114

35 2041 7.0 7.0 1,688,000 282 20% 217.2 75% 121.0 114

36 2042 7.0 7.0 1,688,000 282 20% 217.2 75% 121.0 114

37 2043 7.0 46.3 53.3 1,688,000 282 20% 217.2 75% 121.0 68

38 2044 7.0 7.0 1,688,000 282 20% 217.2 75% 121.0 114

39 2045 7.0 7.0 1,688,000 282 20% 217.2 75% 121.0 114

40 2046 7.0 7.0 1,688,000 282 20% 217.2 75% 121.0 114

Total 136 109 231 92.6 569 3,850.2 3281

in the condition of discount rate at 10 %

Net Present Value 205 598 393

Internal rate of return (FIRR) 27.1%

B/C 2.919

Condition of calculation

100 times of the existing water rate (11 ID/m3, or 0.0074 USD/m3)

unit water

consumption

(l/person

/day)

Water supply

amount

(x106 m

3/year)

Assumed water rate:

Financial Cost (Million USD)

Construction Cost

O & M

Cost

Re-place

-ment CostTotal

Ratio of

Leakage

(%)

743

Revenue

Cash

BalanceServed

population

Collection

rate

(%)

Revenue

unit

water rate

(USD

/1000 m3)

Year in

OrderFiscal Year

Page 57: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

J-5

Table J.6 Calculation of Financial Indicator (Stage 4-2 (3))

F/C

portion

L/C

portion

2006 807,000 -

1 2007 0.0 0.0 876,500 338 -

2 2008 0.5 0.3 0.8 946,000 338 - -1

3 2009 5.3 3.4 8.7 1,015,500 338 - -9

4 2010 14.8 12.7 27.5 1,085,000 338 - -28

5 2011 46.8 39.3 86.1 1,119,400 338 - -86

6 2012 39.6 31.3 70.9 1,153,800 338 - -71

7 2013 39.5 31.4 70.9 1,188,200 338 - -71

8 2014 51.4 11.2 7.0 69.6 1,222,600 338 30% 215.5 60% 96.1 26

9 2015 51.5 11.2 7.0 69.7 1,257,000 338 30% 221.5 60% 98.8 29

10 2016 12.6 12.6 1,296,800 332 29% 221.6 62% 101.3 89

11 2017 12.6 12.6 1,336,600 327 28% 221.4 63% 103.7 91

12 2018 12.6 12.6 1,376,400 321 27% 221.0 65% 105.9 93

13 2019 12.6 12.6 1,416,200 316 26% 220.5 66% 108.1 96

14 2020 12.6 12.6 1,456,000 310 25% 219.7 68% 110.2 98

15 2021 12.6 12.6 1,502,400 304 24% 219.6 69% 112.6 100

16 2022 12.6 12.6 1,548,800 299 23% 219.4 71% 114.9 102

17 2023 12.6 12.6 1,595,200 293 22% 218.9 72% 117.1 104

18 2024 12.6 12.6 1,641,600 288 21% 218.1 74% 119.1 107

19 2025 12.6 12.6 1,688,000 282 20% 217.2 75% 121.0 108

20 2026 12.6 12.6 1,688,000 282 20% 217.2 75% 121.0 108

21 2027 12.6 12.6 1,688,000 282 20% 217.2 75% 121.0 108

22 2028 12.6 84.8 97.4 1,688,000 282 20% 217.2 75% 121.0 24

23 2029 12.6 12.6 1,688,000 282 20% 217.2 75% 121.0 108

24 2030 12.6 12.6 1,688,000 282 20% 217.2 75% 121.0 108

25 2031 12.6 12.6 1,688,000 282 20% 217.2 75% 121.0 108

26 2032 12.6 12.6 1,688,000 282 20% 217.2 75% 121.0 108

27 2033 12.6 12.6 1,688,000 282 20% 217.2 75% 121.0 108

28 2034 12.6 12.6 1,688,000 282 20% 217.2 75% 121.0 108

29 2035 12.6 12.6 1,688,000 282 20% 217.2 75% 121.0 108

30 2036 12.6 12.6 1,688,000 282 20% 217.2 75% 121.0 108

31 2037 12.6 12.6 1,688,000 282 20% 217.2 75% 121.0 108

32 2038 12.6 12.6 1,688,000 282 20% 217.2 75% 121.0 108

33 2039 12.6 12.6 1,688,000 282 20% 217.2 75% 121.0 108

34 2040 12.6 12.6 1,688,000 282 20% 217.2 75% 121.0 108

35 2041 12.6 12.6 1,688,000 282 20% 217.2 75% 121.0 108

36 2042 12.6 12.6 1,688,000 282 20% 217.2 75% 121.0 108

37 2043 12.6 84.8 97.4 1,688,000 282 20% 217.2 75% 121.0 24

38 2044 12.6 12.6 1,688,000 282 20% 217.2 75% 121.0 108

39 2045 12.6 12.6 1,688,000 282 20% 217.2 75% 121.0 108

40 2046 12.6 12.6 1,688,000 282 20% 217.2 75% 121.0 108

Total 249 141 405 169.6 964 3,850.2 2886

in the condition of discount rate at 10 %

Net Present Value 310 598 288

Internal rate of return (FIRR) 21.0%

B/C 1.932

Condition of calculation

100 times of the existing water rate (11 ID/m3, or 0.0074 USD/m3)

unit water

consumption

(l/person

/day)

Water supply

amount

(x106 m3/year)

Assumed water rate:

Financial Cost (Million USD)

Construction Cost

O & M

Cost

Re-place

-ment CostTotal

Ratio of

Leakage

(%)

743

Revenue

Cash

BalanceServed

population

Collection

rate

(%)

Revenue

unit

water rate

(USD

/1000 m3)

Year in

OrderFiscal Year

Page 58: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

J-6

Table J.7 Calculation of Financial Costs for Financial Evaluation

F/C

portion

L/C

portion

F/C

portion

L/C

portion

F/C

portion

L/C

portion

F/C

portion

L/C

portion

2006 0

2007 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0

2008 0.5 0.3 0.8 0.5 0.3 0.8 0.5 0.3 0.8 0.5 0.3 0.8

2009 5.9 4.3 10.2 5.0 3.2 8.2 5.1 3.2 8.3 5.3 3.4 8.7

2010 15.4 13.4 28.8 14.7 12.4 27.1 14.9 12.6 27.5 14.8 12.7 27.5

2011 55.8 52.0 107.8 43.5 35.7 79.2 45.2 36.6 81.8 46.8 39.3 86.1

2012 53.9 48.2 102.1 35.2 31.0 66.2 35.4 28.1 63.5 39.6 31.3 70.9

2013 54.2 49.1 103.3 35.0 31.2 66.2 35.2 28.1 63.3 39.5 31.4 70.9

2014 159.1 90.9 6.3 256.3 31.6 64.1 7.1 102.8 0.0 0.0 7.0 7.0 51.4 11.2 7.0 69.6

2015 159.3 91.6 6.3 257.2 31.7 64.6 7.1 103.4 0.0 0.0 7.0 7.0 51.5 11.2 7.0 69.7

2016 17.2 17.2 7.1 7.1 7.0 7.0 12.6 12.6

2017 17.2 17.2 7.1 7.1 7.0 7.0 12.6 12.6

2018 17.2 17.2 7.1 7.1 7.0 7.0 12.6 12.6

2019 17.2 17.2 7.1 7.1 7.0 7.0 12.6 12.6

2020 17.2 17.2 7.1 7.1 7.0 7.0 12.6 12.6

2021 17.2 17.2 7.1 7.1 7.0 7.0 12.6 12.6

2022 17.2 17.2 7.1 7.1 7.0 7.0 12.6 12.6

2023 17.2 17.2 7.1 7.1 7.0 7.0 12.6 12.6

2024 17.2 17.2 7.1 7.1 7.0 7.0 12.6 12.6

2025 17.2 17.2 7.1 7.1 7.0 7.0 12.6 12.6

2026 17.2 17.2 7.1 7.1 7.0 7.0 12.6 12.6

2027 17.2 17.2 7.1 7.1 7.0 7.0 12.6 12.6

2028 17.2 170.2 187.4 7.1 67 74.1 7.0 46.3 53.3 12.6 84.8 97.4

2029 17.2 17.2 7.1 7.1 7.0 7.0 12.6 12.6

2030 17.2 17.2 7.1 7.1 7.0 7.0 12.6 12.6

2031 17.2 17.2 7.1 7.1 7.0 7.0 12.6 12.6

2032 17.2 17.2 7.1 7.1 7.0 7.0 12.6 12.6

2033 17.2 17.2 7.1 7.1 7.0 7.0 12.6 12.6

2034 17.2 17.2 7.1 7.1 7.0 7.0 12.6 12.6

2035 17.2 17.2 7.1 7.1 7.0 7.0 12.6 12.6

2036 17.2 17.2 7.1 7.1 7.0 7.0 12.6 12.6

2037 17.2 17.2 7.1 7.1 7.0 7.0 12.6 12.6

2038 17.2 17.2 7.1 7.1 7.0 7.0 12.6 12.6

2039 17.2 17.2 7.1 7.1 7.0 7.0 12.6 12.6

2040 17.2 17.2 7.1 7.1 7.0 7.0 12.6 12.6

2041 17.2 17.2 7.1 7.1 7.0 7.0 12.6 12.6

2042 17.2 17.2 7.1 7.1 7.0 7.0 12.6 12.6

2043 17.2 170.2 187.4 7.1 67 74.1 7.0 46.3 53.3 12.6 84.8 97.4

2044 17.2 17.2 7.1 7.1 7.0 7.0 12.6 12.6

2045 17.2 17.2 7.1 7.1 7.0 7.0 12.6 12.6

2046 17.2 17.2 7.1 7.1 7.0 7.0 12.6 12.6

Total 504.1 349.8 545.8 340.4 1740.1 197.2 242.5 234.3 134 808.0 136.3 108.9 231 92.6 568.8 249.4 140.8 404.6 169.6 964.4

Stage 4-2

Construction CostO & M

Cost

Re-place

-ment

Cost

Total

Stage -2

Construction CostO & M

Cost

O & M

Cost

unit: Million USD

Stage -5

Re-place

-ment

Cost

TotalYear

Stage -3

Construction CostO & M

Cost

Re-place

-ment

Cost

Total

Construction Cost Re-place

-ment

Cost

Total

Page 59: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

J-7

J.3 Results of Financial Analysis (O&M Cost Recovery with Generator Option)

Table J.8 Results of Financial Analysis (O&M cost recovery with generator option)

Water price

(USD/ m3)Times of EPL

Percentage of

house income 2)

Net Present

value 1)FIRR B/C ratio

Stage-5 0.223 30 3.3% 16 - 1.10

Stage-3 0.104 14 1.5% 9 - 1.12

Stage-2 0.082 11 1.2% 6 - 1.11

Stage 2-4 0.126 17 1.9% 6 - 1.06

Stage-5 0.149 20 2.2% 8 - 1.10

Stage-3 0.052 7 0.8% 4 - 1.09

Stage-2 0.052 7 0.8% 4 - 1.11

Stage 2-4 0.104 14 1.5% 1 - 1.01

1) in the condition of discount rate at 10 %

2) This value is percentage of expenditure for water in the monthly household income

Average of monthly household income is 836,000 ID/household/month (around 557 USD/hh/month)

Average size of family is 7.9 persons. Planned water consumption is 338 litter/person/day.

According to the above condition,

Water consumption of household = 7.9 person/hh x 338 lcd x 30 days = 80.1 m3/month

Expenditure for water = 80.1 m3/hh/month x 0.0074 USD/m3 = 0.59 USD/hh/month

This amount is equivalent equivalent to 0.11% of the average monthly household income.

O&M cost recovery

with generator

option

Case

O&M cost recovery

without generator

option

Table J.9 Operation and Maintenance Cost

Million US$/year

YearStage-5 Stage-3 Stage-2 Stage 2-4 Stage-5 Stage-3 Stage-2 Stage 2-4

2014 15.6 13.8 11 10.9 6.3 7.1 7 7

2015 15.6 13.8 11 10.9 6.3 7.1 7 7

2016 33.4 13.8 11 19.3 17.2 7.1 7 12.6

2017

- 2046 33.4 13.8 11 19.3 17.2 7.1 7 12.6

Recovery of

the O/M cost (with Generator)

Recovery of

the O/M cost (without Generator)

Page 60: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

J-8

Table J.10 Calculation of Financial Indicator (Stage 2)

(O&M cost recovery with generator option)

F/C

portion

L/C

portion

2006 807,000 -

1 2007 876,500 338 -

2 2008 0.0 946,000 338 - 0

3 2009 0.0 1,015,500 338 - 0

4 2010 0.0 1,085,000 338 - 0

5 2011 0.0 1,119,400 338 - 0

6 2012 0.0 1,153,800 338 - 0

7 2013 0.0 1,188,200 338 - 0

8 2014 11.0 11.0 1,222,600 338 30% 215.5 60% 10.6 0

9 2015 11.0 11.0 1,257,000 338 30% 221.5 60% 10.9 0

10 2016 11.0 11.0 1,296,800 332 29% 221.6 62% 11.1 0

11 2017 11.0 11.0 1,336,600 327 28% 221.4 63% 11.4 0

12 2018 11.0 11.0 1,376,400 321 27% 221.0 65% 11.7 1

13 2019 11.0 11.0 1,416,200 316 26% 220.5 66% 11.9 1

14 2020 11.0 11.0 1,456,000 310 25% 219.7 68% 12.1 1

15 2021 11.0 11.0 1,502,400 304 24% 219.6 69% 12.4 1

16 2022 11.0 11.0 1,548,800 299 23% 219.4 71% 12.6 2

17 2023 11.0 11.0 1,595,200 293 22% 218.9 72% 12.9 2

18 2024 11.0 11.0 1,641,600 288 21% 218.1 74% 13.1 2

19 2025 11.0 11.0 1,688,000 282 20% 217.2 75% 13.3 2

20 2026 11.0 11.0 1,688,000 282 20% 217.2 75% 13.3 2

21 2027 11.0 11.0 1,688,000 282 20% 217.2 75% 13.3 2

22 2028 11.0 11.0 1,688,000 282 20% 217.2 75% 13.3 2

23 2029 11.0 11.0 1,688,000 282 20% 217.2 75% 13.3 2

24 2030 11.0 11.0 1,688,000 282 20% 217.2 75% 13.3 2

25 2031 11.0 11.0 1,688,000 282 20% 217.2 75% 13.3 2

26 2032 11.0 11.0 1,688,000 282 20% 217.2 75% 13.3 2

27 2033 11.0 11.0 1,688,000 282 20% 217.2 75% 13.3 2

28 2034 11.0 11.0 1,688,000 282 20% 217.2 75% 13.3 2

29 2035 11.0 11.0 1,688,000 282 20% 217.2 75% 13.3 2

30 2036 11.0 11.0 1,688,000 282 20% 217.2 75% 13.3 2

31 2037 11.0 11.0 1,688,000 282 20% 217.2 75% 13.3 2

32 2038 11.0 11.0 1,688,000 282 20% 217.2 75% 13.3 2

33 2039 11.0 11.0 1,688,000 282 20% 217.2 75% 13.3 2

34 2040 11.0 11.0 1,688,000 282 20% 217.2 75% 13.3 2

35 2041 11.0 11.0 1,688,000 282 20% 217.2 75% 13.3 2

36 2042 11.0 11.0 1,688,000 282 20% 217.2 75% 13.3 2

37 2043 11.0 11.0 1,688,000 282 20% 217.2 75% 13.3 2

38 2044 11.0 11.0 1,688,000 282 20% 217.2 75% 13.3 2

39 2045 11.0 11.0 1,688,000 282 20% 217.2 75% 13.3 2

40 2046 11.0 11.0 1,688,000 282 20% 217.2 75% 13.3 2

Total 0 0 363 0 363 423.5 61

in the condition of discount rate at 10 %

Net Present Value 59 66 6

Internal rate of return (FIRR) -

B/C 1.107

Condition of calculation

11 times of the existing water rate (11 ID/m3, or 0.0074 USD/m3)

82

Revenue

Cash

BalanceServed

population

Collection

rate

(%)

Revenue

unit

water rate

(USD

/1000 m3)

Year in

OrderFiscal Year

unit water

consumption

(l/person

/day)

Water supply

amount

(x106 m

3/year)

Assumed water rate:

Financial Cost (Million USD)

Construction Cost

O & M

Cost

Re-place

-ment CostTotal

Ratio of

Leakage

(%)

Page 61: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

J-9

Table J.11 Calculation of Financial Indicator (Stage 2)

(O&M cost recovery without generator option)

F/C

portion

L/C

portion

2006 807,000 -

1 2007 876,500 338 -

2 2008 0.0 946,000 338 - 0

3 2009 0.0 1,015,500 338 - 0

4 2010 0.0 1,085,000 338 - 0

5 2011 0.0 1,119,400 338 - 0

6 2012 0.0 1,153,800 338 - 0

7 2013 0.0 1,188,200 338 - 0

8 2014 7.0 7.0 1,222,600 338 30% 215.5 60% 6.7 0

9 2015 7.0 7.0 1,257,000 338 30% 221.5 60% 6.9 0

10 2016 7.0 7.0 1,296,800 332 29% 221.6 62% 7.1 0

11 2017 7.0 7.0 1,336,600 327 28% 221.4 63% 7.3 0

12 2018 7.0 7.0 1,376,400 321 27% 221.0 65% 7.4 0

13 2019 7.0 7.0 1,416,200 316 26% 220.5 66% 7.6 1

14 2020 7.0 7.0 1,456,000 310 25% 219.7 68% 7.7 1

15 2021 7.0 7.0 1,502,400 304 24% 219.6 69% 7.9 1

16 2022 7.0 7.0 1,548,800 299 23% 219.4 71% 8.0 1

17 2023 7.0 7.0 1,595,200 293 22% 218.9 72% 8.2 1

18 2024 7.0 7.0 1,641,600 288 21% 218.1 74% 8.3 1

19 2025 7.0 7.0 1,688,000 282 20% 217.2 75% 8.5 1

20 2026 7.0 7.0 1,688,000 282 20% 217.2 75% 8.5 1

21 2027 7.0 7.0 1,688,000 282 20% 217.2 75% 8.5 1

22 2028 7.0 7.0 1,688,000 282 20% 217.2 75% 8.5 1

23 2029 7.0 7.0 1,688,000 282 20% 217.2 75% 8.5 1

24 2030 7.0 7.0 1,688,000 282 20% 217.2 75% 8.5 1

25 2031 7.0 7.0 1,688,000 282 20% 217.2 75% 8.5 1

26 2032 7.0 7.0 1,688,000 282 20% 217.2 75% 8.5 1

27 2033 7.0 7.0 1,688,000 282 20% 217.2 75% 8.5 1

28 2034 7.0 7.0 1,688,000 282 20% 217.2 75% 8.5 1

29 2035 7.0 7.0 1,688,000 282 20% 217.2 75% 8.5 1

30 2036 7.0 7.0 1,688,000 282 20% 217.2 75% 8.5 1

31 2037 7.0 7.0 1,688,000 282 20% 217.2 75% 8.5 1

32 2038 7.0 7.0 1,688,000 282 20% 217.2 75% 8.5 1

33 2039 7.0 7.0 1,688,000 282 20% 217.2 75% 8.5 1

34 2040 7.0 7.0 1,688,000 282 20% 217.2 75% 8.5 1

35 2041 7.0 7.0 1,688,000 282 20% 217.2 75% 8.5 1

36 2042 7.0 7.0 1,688,000 282 20% 217.2 75% 8.5 1

37 2043 7.0 7.0 1,688,000 282 20% 217.2 75% 8.5 1

38 2044 7.0 7.0 1,688,000 282 20% 217.2 75% 8.5 1

39 2045 7.0 7.0 1,688,000 282 20% 217.2 75% 8.5 1

40 2046 7.0 7.0 1,688,000 282 20% 217.2 75% 8.5 1

Total 0 0 231 0 231 269.5 39

in the condition of discount rate at 10 %

Net Present Value 38 42 4

Internal rate of return (FIRR) -

B/C 1.107

Condition of calculation

7 times of the existing water rate (11 ID/m3, or 0.0074 USD/m3)

52

Revenue

Cash

BalanceServed

population

Collection

rate

(%)

Revenue

unit

water rate

(USD

/1000 m3)

Year in

OrderFiscal Year

unit water

consumption

(l/person

/day)

Water supply

amount

(x106 m

3/year)

Assumed water rate:

Financial Cost (Million USD)

Construction Cost

O & M

Cost

Re-place

-ment CostTotal

Ratio of

Leakage

(%)

Page 62: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

J-10

J.4 Results of Economic Analysis

Table J.12 Results of Economic Analysis

Economic Cost Economic Benefit Stage without

project with project

without project

with project EIRR

Willingness to pay for the satisfied condition (0.73 USD/person/month)

-

2% of the average household income (1.41 USD/person/month)

- Stage-5 Construction and

O&M of total project components

3% of the average household income (2.11 USD/person/month)

-

Willingness to pay for the satisfied condition (0.73 USD/person/month)

-

2% of the average household income (1.41 USD/person/month)

- Stage-3

Construction and O&M of total project

components without RO plant

3% of the average household income (2.11 USD/person/month)

6.3%

Willingness to pay for the satisfied condition (0.73 USD/person/month)

-

2% of the average household income (1.41 USD/person/month)

5.8% Stage-2

Construction and O&M of total project

components without RO plant and distribution main facilities

3% of the average household income (2.11 USD/person/month)

11.2%

Willingness to pay for the satisfied condition (0.73 USD/person/month)

-

2% of the average household income (1.41 USD/person/month)

- Stage

2-4

Existing water supply system

Stage 2 components and half a capacity

of RO plant

Willingness to pay for

the existing situation

0.21 USD/

person/month

3% of the average household income (2.11 USD/person/month)

5.9%

Page 63: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

J-1

1

Ta

ble

J.1

3 C

alc

ula

tio

n o

f E

co

nom

ic I

nd

ica

tor

(Sta

ge 5

(3

))

F/C

port

ion

L/C

port

ion

F/C

port

ion

L/C

port

ion

20

06

12

00

70

.00

.00

.00

0.0

87

6,5

00

0

22

00

80

.00

.30

.30.6

0.6

94

6,0

00

-1

32

00

90

.04

.24

.38.5

8.5

1,0

15

,50

0-9

42

01

08

.27

8.3

11

.011

.32

2.3

14

.01

,08

5,0

00

-14

52

01

10

.03

9.9

41

.18

18

1.0

1,1

19

,40

0-8

1

62

01

20

.03

8.2

39

.47

7.6

77

.61

,15

3,8

00

-78

72

01

30

.03

8.9

40

.17

97

9.0

1,1

88

,20

0-7

9

82

01

43

.13

.16

2.2

64

.118

.81

45.1

142

.01

,22

2,6

00

2.2

31

.02

8.7

-11

3

92

01

53

.13

.16

2.8

64

.718

.81

46.3

143

.21

,25

7,0

00

2.2

31

.82

9.6

-11

4

10

20

16

3.1

3.1

18

.81

8.8

15

.71

,29

6,8

00

2.2

32

.83

0.6

15

11

20

17

3.1

3.1

18

.81

8.8

15

.71

,33

6,6

00

2.2

33

.83

1.6

16

12

20

18

3.1

8.2

71

1.4

18

.81

8.8

7.4

1,3

76

,40

02

.234

.93

2.6

25

13

20

19

3.1

3.1

18

.81

8.8

15

.71

,41

6,2

00

2.2

35

.93

3.6

18

14

20

20

3.1

3.1

18

.81

8.8

15

.71

,45

6,0

00

2.2

36

.93

4.7

19

15

20

21

3.1

3.1

18

.81

8.8

15

.71

,50

2,4

00

2.2

38

.03

5.8

20

16

20

22

3.1

3.1

18

.81

8.8

15

.71

,54

8,8

00

2.2

39

.23

7.0

21

17

20

23

3.1

3.1

18

.81

8.8

15

.71

,59

5,2

00

0.2

12

.22

.11

40

.43

8.2

22

18

20

24

3.1

3.1

18

.81

8.8

15

.71

,64

1,6

00

US

D/

2.2

US

D/

41

.63

9.4

24

19

20

25

3.1

3.1

18

.81

8.8

15

.71

,68

8,0

00

pe

rso

n/

2.2

pe

rso

n/

42

.74

0.5

25

20

20

26

3.1

8.2

71

1.4

18

.81

8.8

7.4

1,6

88

,00

0m

on

th2

.2m

on

th42

.74

0.5

33

21

20

27

3.1

3.1

18

.81

8.8

15

.71

,68

8,0

00

2.2

42

.74

0.5

25

22

20

28

3.1

3.1

18

.81

8.8

15

.71

,68

8,0

00

2.2

42

.74

0.5

25

23

20

29

3.1

3.1

18

.81

8.8

15

.71

,68

8,0

00

2.2

42

.74

0.5

25

24

20

30

3.1

3.1

18

.81

75

.41

94

.18

191

.11

,68

8,0

00

2.2

42

.74

0.5

-15

1

25

20

31

3.1

3.1

18

.81

8.8

15

.71

,68

8,0

00

2.2

42

.74

0.5

25

26

20

32

3.1

3.1

18

.81

8.8

15

.71

,68

8,0

00

2.2

42

.74

0.5

25

27

20

33

3.1

3.1

18

.81

8.8

15

.71

,68

8,0

00

2.2

42

.74

0.5

25

28

20

34

3.1

8.2

71

1.4

18

.81

8.8

7.4

1,6

88

,00

02

.242

.74

0.5

33

29

20

35

3.1

3.1

18

.81

8.8

15

.71

,68

8,0

00

2.2

42

.74

0.5

25

30

20

36

3.1

3.1

18

.81

8.8

15

.71

,68

8,0

00

2.2

42

.74

0.5

25

31

20

37

3.1

3.1

18

.81

8.8

15

.71

,68

8,0

00

2.2

42

.74

0.5

25

32

20

38

3.1

3.1

18

.81

8.8

15

.71

,68

8,0

00

2.2

42

.74

0.5

25

33

20

39

3.1

3.1

18

.81

8.8

15

.71

,68

8,0

00

2.2

42

.74

0.5

25

34

20

40

3.1

3.1

18

.81

8.8

15

.71

,68

8,0

00

2.2

42

.74

0.5

25

35

20

41

3.1

3.1

18

.81

8.8

15

.71

,68

8,0

00

2.2

42

.74

0.5

25

36

20

42

3.1

8.2

71

1.4

18

.81

8.8

7.4

1,6

88

,00

02

.242

.74

0.5

33

37

20

43

3.1

3.1

18

.81

8.8

15

.71

,68

8,0

00

2.2

42

.74

0.5

25

38

20

44

3.1

3.1

18

.81

8.8

15

.71

,68

8,0

00

2.2

42

.74

0.5

25

39

20

45

3.1

3.1

18

.81

75

.41

94

.18

191

.11

,68

8,0

00

2.2

42

.74

0.5

-15

1

40

20

46

3.1

3.1

18

.81

8.8

15

.71

,68

8,0

00

2.2

42

.74

0.5

25

To

tal

00

10

241

.35

14

42

58

26

56

20

35

11

,49

41,3

50

73

1,3

37

1,2

64

-87

Un

it w

ate

r p

rice

1)

will

ingn

ess t

o p

ay

Inte

rna

l ra

te o

f re

turn

(E

IRR

)#

DIV

/0!

2)

3 %

of a

ve

rage

ho

use

ho

ld in

co

me

(a

ve

rage

inco

me=

83

6,0

00

ID

/ho

use

ho

ld/m

on

th,

3%

of in

co

me

= 2

.11

US

D/p

ers

on

/mon

th)

Unit

wate

r

price 2

)

Benefit

Year

in

Ord

er

Fis

cal

Year

Constr

uction C

ost

O &

M

Cost

Re-p

lace

-ment

Cost

Tota

l

Without

Pro

ject

Cash

Balance

Additio

nal

Benefit

With P

roje

ct

Additio

nal

Cost

Econom

ic C

ost (M

illio

n U

S$)

Econom

ic B

enefit (U

S$)

Serv

ed

Popula

tion

Without

Pro

ject

Unit

wate

r

price 1

)

Benefit

With P

roje

ct

Constr

uction C

ost

O &

M

Cost

Re-p

lace

-ment C

ost

Tota

l

J-11

Page 64: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

J-1

2

Ta

ble

J.1

4 C

alc

ula

tio

n o

f E

co

nom

ic I

nd

ica

tor

(Sta

ge 3

(3

))

F/C

port

ion

L/C

port

ion

F/C

port

ion

L/C

port

ion

2006

12

007

0.0

0.0

0.0

00.0

876

,50

00

22

008

0.0

0.5

0.3

0.8

0.8

946

,00

0-1

32

009

0.0

5.0

3.1

8.1

8.1

1,0

15

,50

0-8

42

010

8.2

78

.31

4.7

10.0

24.7

16.4

1,0

85

,00

0-1

6

52

011

0.0

43.5

26.9

70.4

70.4

1,1

19

,40

0-7

0

62

012

0.0

35.2

24.4

59.6

59.6

1,1

53

,80

0-6

0

72

013

0.0

35.0

24.4

59.4

59.4

1,1

88

,20

0-5

9

82

014

3.1

3.1

31.6

53.4

8.3

93.3

90.2

1,2

22

,60

02

.231

.028.7

-61

92

015

3.1

3.1

31.7

53.9

8.3

93.9

90.8

1,2

57

,00

02

.231

.829.6

-61

10

2016

3.1

3.1

8.3

8.3

5.2

1,2

96

,80

02

.232

.830.6

25

11

2017

3.1

3.1

8.3

8.3

5.2

1,3

36

,60

02

.233

.831.6

26

12

2018

3.1

8.2

711

.48.3

8.3

-3.1

1,3

76

,40

02

.234

.932.6

36

13

2019

3.1

3.1

8.3

8.3

5.2

1,4

16

,20

02

.235

.933.6

28

14

2020

3.1

3.1

8.3

8.3

5.2

1,4

56

,00

02

.236

.934.7

29

15

2021

3.1

3.1

8.3

8.3

5.2

1,5

02

,40

02

.238

.035.8

31

16

2022

3.1

3.1

8.3

8.3

5.2

1,5

48

,80

02

.239

.237.0

32

17

2023

3.1

3.1

8.3

8.3

5.2

1,5

95

,20

00.2

12

.22.1

140

.438.2

33

18

2024

3.1

3.1

8.3

8.3

5.2

1,6

41

,60

0U

SD

/2

.2U

SD

/41

.639.4

34

19

2025

3.1

3.1

8.3

8.3

5.2

1,6

88

,00

0pers

on/

2.2

pers

on/

42

.740.5

35

20

2026

3.1

8.2

711

.48.3

8.3

-3.1

1,6

88

,00

0m

onth

2.2

month

42

.740.5

44

21

2027

3.1

3.1

8.3

8.3

5.2

1,6

88

,00

02

.242

.740.5

35

22

2028

3.1

3.1

8.3

8.3

5.2

1,6

88

,00

02

.242

.740.5

35

23

2029

3.1

3.1

8.3

8.3

5.2

1,6

88

,00

02

.242

.740.5

35

24

2030

3.1

3.1

8.3

106

.211

4.5

21

11.4

1,6

88

,00

02

.242

.740.5

-71

25

2031

3.1

3.1

8.3

8.3

5.2

1,6

88

,00

02

.242

.740.5

35

26

2032

3.1

3.1

8.3

8.3

5.2

1,6

88

,00

02

.242

.740.5

35

27

2033

3.1

3.1

8.3

8.3

5.2

1,6

88

,00

02

.242

.740.5

35

28

2034

3.1

8.2

711

.48.3

8.3

-3.1

1,6

88

,00

02

.242

.740.5

44

29

2035

3.1

3.1

8.3

8.3

5.2

1,6

88

,00

02

.242

.740.5

35

30

2036

3.1

3.1

8.3

8.3

5.2

1,6

88

,00

02

.242

.740.5

35

31

2037

3.1

3.1

8.3

8.3

5.2

1,6

88

,00

02

.242

.740.5

35

32

2038

3.1

3.1

8.3

8.3

5.2

1,6

88

,00

02

.242

.740.5

35

33

2039

3.1

3.1

8.3

8.3

5.2

1,6

88

,00

02

.242

.740.5

35

34

2040

3.1

3.1

8.3

8.3

5.2

1,6

88

,00

02

.242

.740.5

35

35

2041

3.1

3.1

8.3

8.3

5.2

1,6

88

,00

02

.242

.740.5

35

36

2042

3.1

8.2

711

.48.3

8.3

-3.1

1,6

88

,00

02

.242

.740.5

44

37

2043

3.1

3.1

8.3

8.3

5.2

1,6

88

,00

02

.242

.740.5

35

38

2044

3.1

3.1

8.3

8.3

5.2

1,6

88

,00

02

.242

.740.5

35

39

2045

3.1

3.1

8.3

106

.211

4.5

21

11.4

1,6

88

,00

02

.242

.740.5

-71

40

2046

3.1

3.1

8.3

8.3

5.2

1,6

88

,00

02

.242

.740.5

35

To

tal

00

102

41

.35

14

4197

196

274

21

2880

736.3

73

1,3

37

1,2

64

527

Un

it w

ate

r pri

ce

1)

will

ingn

ess t

o p

ay

Inte

rna

l ra

te o

f re

turn

(E

IRR

)6

.3%

2)

3 %

of

avera

ge h

ouse

hold

in

com

e

Unit

wate

r

price 2

)

Benefit

Year

in

Ord

er

Fis

cal

Year

Constr

uction C

ost

O &

M

Cost

Re-p

lace

-ment

Cost

Tota

l

Without

Pro

ject

Cash

Ba

lance

Additio

nal

Benefit

With P

roje

ct

Additio

nal

Cost

Econom

ic C

ost (M

illio

n U

S$)

Econom

ic B

enefit (U

S$)

Serv

ed

Popula

tion

Without P

roje

ct

Unit

wate

r

price 1

)

Benefit

With P

roje

ct

Constr

uction C

ost

O &

M

Cost

Re-p

lace

-ment C

ost

Tota

l

J-12

Page 65: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

J-1

3

Ta

ble

J.1

5 C

alc

ula

tio

n o

f E

co

nom

ic I

nd

ica

tor

(Sta

ge 2

(3

))

F/C

po

rtio

n

L/C

port

ion

F/C

po

rtio

n

L/C

port

ion

2006

12007

0.0

0.0

0.0

00.0

876,5

00

0

22008

0.0

0.5

0.3

0.8

0.8

946,0

00

-1

32009

0.0

5.1

3.1

8.2

8.2

1,0

15,5

00

-8

42010

8.2

78.3

14.9

10.1

25

16.7

1,0

85,0

00

-17

52011

0.0

45.2

27.5

72.7

72.7

1,1

19,4

00

-73

62012

0.0

35.4

21.4

56.8

56.8

1,1

53,8

00

-57

72013

0.0

35.2

21.2

56.4

56.4

1,1

88,2

00

-56

82014

3.1

3.1

0.0

0.0

8.1

8.1

5.0

1,2

22,6

00

2.2

31.0

28.7

24

92015

3.1

3.1

0.0

0.0

8.1

8.1

5.0

1,2

57,0

00

2.2

31.8

29.6

25

10

2016

3.1

3.1

8.1

8.1

5.0

1,2

96,8

00

2.2

32.8

30.6

26

11

2017

3.1

3.1

8.1

8.1

5.0

1,3

36,6

00

2.2

33.8

31.6

27

12

2018

3.1

8.2

711.4

8.1

8.1

-3.3

1,3

76,4

00

2.2

34.9

32.6

36

13

2019

3.1

3.1

8.1

8.1

5.0

1,4

16,2

00

2.2

35.9

33.6

29

14

2020

3.1

3.1

8.1

8.1

5.0

1,4

56,0

00

2.2

36.9

34.7

30

15

2021

3.1

3.1

8.1

8.1

5.0

1,5

02,4

00

2.2

38.0

35.8

31

16

2022

3.1

3.1

8.1

8.1

5.0

1,5

48,8

00

2.2

39.2

37.0

32

17

2023

3.1

3.1

8.1

8.1

5.0

1,5

95,2

00

0.2

12.2

2.1

140.4

38.2

33

18

2024

3.1

3.1

8.1

8.1

5.0

1,6

41,6

00

US

D/

2.2

US

D/

41.6

39.4

34

19

2025

3.1

3.1

8.1

8.1

5.0

1,6

88,0

00

pe

rson

/2.2

pers

on

/42.7

40.5

36

20

2026

3.1

8.2

711.4

8.1

8.1

-3.3

1,6

88,0

00

mo

nth

2.2

mon

th42.7

40.5

44

21

2027

3.1

3.1

8.1

8.1

5.0

1,6

88,0

00

2.2

42.7

40.5

36

22

2028

3.1

3.1

8.1

8.1

5.0

1,6

88,0

00

2.2

42.7

40.5

36

23

2029

3.1

3.1

8.1

8.1

5.0

1,6

88,0

00

2.2

42.7

40.5

36

24

2030

3.1

3.1

8.1

106.2

114.3

2111.2

1,6

88,0

00

2.2

42.7

40.5

-71

25

2031

3.1

3.1

8.1

8.1

5.0

1,6

88,0

00

2.2

42.7

40.5

36

26

2032

3.1

3.1

8.1

8.1

5.0

1,6

88,0

00

2.2

42.7

40.5

36

27

2033

3.1

3.1

8.1

8.1

5.0

1,6

88,0

00

2.2

42.7

40.5

36

28

2034

3.1

8.2

711.4

8.1

8.1

-3.3

1,6

88,0

00

2.2

42.7

40.5

44

29

2035

3.1

3.1

8.1

8.1

5.0

1,6

88,0

00

2.2

42.7

40.5

36

30

2036

3.1

3.1

8.1

8.1

5.0

1,6

88,0

00

2.2

42.7

40.5

36

31

2037

3.1

3.1

8.1

8.1

5.0

1,6

88,0

00

2.2

42.7

40.5

36

32

2038

3.1

3.1

8.1

8.1

5.0

1,6

88,0

00

2.2

42.7

40.5

36

33

2039

3.1

3.1

8.1

8.1

5.0

1,6

88,0

00

2.2

42.7

40.5

36

34

2040

3.1

3.1

8.1

8.1

5.0

1,6

88,0

00

2.2

42.7

40.5

36

35

2041

3.1

3.1

8.1

8.1

5.0

1,6

88,0

00

2.2

42.7

40.5

36

36

2042

3.1

8.2

711.4

8.1

8.1

-3.3

1,6

88,0

00

2.2

42.7

40.5

44

37

2043

3.1

3.1

8.1

8.1

5.0

1,6

88,0

00

2.2

42.7

40.5

36

38

2044

3.1

3.1

8.1

8.1

5.0

1,6

88,0

00

2.2

42.7

40.5

36

39

2045

3.1

3.1

8.1

106.2

114.3

2111.2

1,6

88,0

00

2.2

42.7

40.5

-71

40

2046

3.1

3.1

8.1

8.1

5.0

1,6

88,0

00

2.2

42.7

40.5

36

Tota

l0

0102

41.3

5144

136

84

267

212

700

556.0

73

1,3

37

1,2

64

708

Unit w

ate

r price

1)

will

ingness to p

ay

Inte

rnal ra

te o

f re

turn

(E

IRR

)11.2

%

2)

3 %

of

avera

ge h

ousehold

incom

e

With

Pro

ject

Constr

uction

Cost

O &

M

Cost

Re-p

lace

-ment

Co

st

Tota

l

Cash

Bala

nce

Add

itio

na

l

Be

ne

fit

With P

roje

ct

Ad

ditio

nal

Co

st

Econom

ic C

ost

(Mill

ion U

S$)

Econ

om

ic B

ene

fit (U

S$

)

Serv

ed

Po

pu

lation

Without

Pro

ject

Un

it

wa

ter

pri

ce 1

)

Be

ne

fit

Unit

wate

r

price

2)

Ben

efit

Yea

r in

Ord

er

Fis

ca

l

Ye

ar

Co

nstr

uction

Co

st

O &

M

Cost

Re-p

lace

-me

nt

Cost

Tota

l

Without P

roje

ct

J-13

Page 66: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

J-1

4

Ta

ble

J.1

6 C

alc

ula

tio

n o

f E

co

nom

ic I

nd

ica

tor

(Sta

ge 4

-2 (

3))

F/C

po

rtio

n

L/C

po

rtio

n

F/C

po

rtio

n

L/C

po

rtio

n

2006

12007

0.0

0.0

0.0

00.0

876,5

00

0

22008

0.0

0.5

0.3

0.8

0.8

946,0

00

-1

32009

0.0

5.3

3.3

8.6

8.6

1,0

15,5

00

-9

42010

8.2

78.3

14.8

10.3

25.1

16.8

1,0

85,0

00

-17

52011

0.0

46.8

29.7

76.5

76.5

1,1

19,4

00

-77

62012

0.0

39.6

24.0

63.6

63.6

1,1

53,8

00

-64

72013

0.0

39.5

23.9

63.4

63.4

1,1

88,2

00

-63

82014

3.1

3.1

51.4

3.9

13.2

68.5

65.4

1,2

22,6

00

2.2

31.0

28.7

-37

92015

3.1

3.1

51.5

4.0

13.2

68.7

65.6

1,2

57,0

00

2.2

31.8

29.6

-36

10

2016

3.1

3.1

13.2

13.2

10.1

1,2

96,8

00

2.2

32.8

30.6

21

11

2017

3.1

3.1

13.2

13.2

10.1

1,3

36,6

00

2.2

33.8

31.6

22

12

2018

3.1

8.2

711.4

13.2

13.2

1.8

1,3

76,4

00

2.2

34.9

32.6

31

13

2019

3.1

3.1

13.2

13.2

10.1

1,4

16,2

00

2.2

35.9

33.6

24

14

2020

3.1

3.1

13.2

13.2

10.1

1,4

56,0

00

2.2

36.9

34.7

25

15

2021

3.1

3.1

13.2

13.2

10.1

1,5

02,4

00

2.2

38.0

35.8

26

16

2022

3.1

3.1

13.2

13.2

10.1

1,5

48,8

00

2.2

39.2

37.0

27

17

2023

3.1

3.1

13.2

13.2

10.1

1,5

95,2

00

0.2

12.2

2.1

140.4

38.2

28

18

2024

3.1

3.1

13.2

13.2

10.1

1,6

41,6

00

US

D/

2.2

US

D/

41.6

39.4

29

19

2025

3.1

3.1

13.2

13.2

10.1

1,6

88,0

00

pe

rso

n/

2.2

pe

rso

n/

42.7

40.5

30

20

2026

3.1

8.2

711.4

13.2

13.2

1.8

1,6

88,0

00

mo

nth

2.2

mo

nth

42.7

40.5

39

21

2027

3.1

3.1

13.2

13.2

10.1

1,6

88,0

00

2.2

42.7

40.5

30

22

2028

3.1

3.1

13.2

13.2

10.1

1,6

88,0

00

2.2

42.7

40.5

30

23

2029

3.1

3.1

13.2

13.2

10.1

1,6

88,0

00

2.2

42.7

40.5

30

24

2030

3.1

3.1

13.2

78.8

92

88.9

1,6

88,0

00

2.2

42.7

40.5

-48

25

2031

3.1

3.1

13.2

13.2

10.1

1,6

88,0

00

2.2

42.7

40.5

30

26

2032

3.1

3.1

13.2

13.2

10.1

1,6

88,0

00

2.2

42.7

40.5

30

27

2033

3.1

3.1

13.2

13.2

10.1

1,6

88,0

00

2.2

42.7

40.5

30

28

2034

3.1

8.2

711.4

13.2

13.2

1.8

1,6

88,0

00

2.2

42.7

40.5

39

29

2035

3.1

3.1

13.2

13.2

10.1

1,6

88,0

00

2.2

42.7

40.5

30

30

2036

3.1

3.1

13.2

13.2

10.1

1,6

88,0

00

2.2

42.7

40.5

30

31

2037

3.1

3.1

13.2

13.2

10.1

1,6

88,0

00

2.2

42.7

40.5

30

32

2038

3.1

3.1

13.2

13.2

10.1

1,6

88,0

00

2.2

42.7

40.5

30

33

2039

3.1

3.1

13.2

13.2

10.1

1,6

88,0

00

2.2

42.7

40.5

30

34

2040

3.1

3.1

13.2

13.2

10.1

1,6

88,0

00

2.2

42.7

40.5

30

35

2041

3.1

3.1

13.2

13.2

10.1

1,6

88,0

00

2.2

42.7

40.5

30

36

2042

3.1

8.2

711.4

13.2

13.2

1.8

1,6

88,0

00

2.2

42.7

40.5

39

37

2043

3.1

3.1

13.2

13.2

10.1

1,6

88,0

00

2.2

42.7

40.5

30

38

2044

3.1

3.1

13.2

13.2

10.1

1,6

88,0

00

2.2

42.7

40.5

30

39

2045

3.1

3.1

13.2

78.8

92

88.9

1,6

88,0

00

2.2

42.7

40.5

-48

40

2046

3.1

3.1

13.2

13.2

10.1

1,6

88,0

00

2.2

42.7

40.5

30

Tota

l0

0102

41.3

5144

249

99

436

158

942

798

73

1,3

37

1,2

64

465

Unit w

ate

r price

1)

will

ingness to p

ay

Inte

rnal ra

te o

f re

turn

(E

IRR

)5.9

%

2)

3 %

of

avera

ge h

ousehold

incom

e (

avera

ge incom

e=

836,0

00 ID

/household

/month

, 3%

of

incom

e=

2.1

1 U

SD

/pers

on/m

onth

)

Un

it

wa

ter

pri

ce

2)

Be

ne

fit

Ye

ar

in

Ord

er

Fis

ca

l

Ye

ar

Co

nstr

uctio

n C

ost

O &

M

Co

st

Re

-pla

ce

-me

nt

Co

st

To

tal

With

ou

t P

roje

ct

Cash

Bala

nce

Ad

ditio

na

l

Be

ne

fit

With

Pro

ject

Ad

ditio

na

l

Co

st

Eco

no

mic

Co

st

(Mill

ion

US

D)

Fin

an

cia

l B

en

efit

Se

rve

d

Po

pu

latio

n

With

ou

t P

roje

ct

Un

it

wa

ter

pri

ce

1)

Be

ne

fit

With

P

roje

ct

Co

nstr

uctio

n C

ost

O &

M

Co

st

Re

-pla

ce

-me

nt

Co

st

To

tal

J-14

Page 67: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

J-15

J.5 Data Source of Electricity Cost for Economic Evaluation

Data Source: Middle East Economic Survey

VOL. XLIX, No 33, 14-Aug-2006

The Real Cost To Iraq Of Imported Electricity

By Isam AlKhalisi

The following article was written for MEES by Isam AlKhalisi, an independent consultant who worked in the construction,

operation and management of power plants for Iraq’s National Electricity Administration, subsequently on design and project

management of power plants and other public utility systems. Email: [email protected]

Iraq’s public electricity system has not satisfied consumers’ needs since the 1991 war. But whilst the level of supply slowly

climbed towards satisfying around 75% of the citizens’ needs by March 2003, since then the demand for electricity has risen by a

further 50%. There have been many expedient and short-fix solutions to the shortfall, some of which have been at best ineffectual,

and others of vast waste to Iraqi and donors’ funds.

Western press and official inspectors’ and auditors’ reports, as well as those in the Iraqi media, have covered some of the failings

of the industry, but none has raised the implications of the long-term cost of imported electricity on Iraq’s economy, one of the

world’s major producers of the primary feed for electricity production. Yet, at the official level, electricity importation is being

proceeded with and promoted as being a major, even indispensable, factor to improve Iraq’s public electricity supply situation for

years to come.

In a recent article in an Arab newspaper, based on interviews with Iraqi officials on the state of the country’s electricity industry, it

was stated that “the Iraqis will have to request help from their neighbor Iran to extricate them from the energy crisis, sooner or

later”. Such a fatalistic declaration of helplessness provides negative hope for the future of the industry in Iraq and its

management.

Jordanian Model

In order to put the cost of electricity imports to Iraq’s national economy in the right perspective, the following observation is put

forward:

The Jordanian Central Electricity Generation Company, in its published accounts for 2004, showed the inclusive cost elements of

sold (exported) electricity from power stations to the national network per kWhr to be:

Cost Of Exported Power To

The Jordanian Network

Fils/KWr %

Fuel 20.15 70.91

Depreciation 4.33 15.24

Interests on Loans 1.63 5.74

Operation and Maintenance 0.69 2.42

Salaries and Wages 0.84 2.94

Others 0.78 2.75

Unit Cost JFils/kWhr 28.42 100.00

Unit Cost USCent/kWhr 4.01

The above figures are consistent with other international costing calculations for similar installations. No comparative

calculations for the Iraqi system are known to exist or can be used with confidence.

Using the Jordanian figures as benchmarks, it will be noted that, when applied for Iraq, the cost per unit to the national economy

of indigenously-generated electricity – which would include only capital payback, interests and O & M – would be 6.6 Jordanian

fils per kWhr, less than 1 US cent. Other costs such as fuel, salaries and overheads are locally generated, and do not impose a

drain on the national economy.

Indeed, if local elements, which range from 15% to 25% of the capital cost, are taken into consideration, and if the capital is

treated as an outgoing expense as it is when purchasing electricity for consumption from abroad, ie no interest payable, then net

generation cost to the country will be even less than 0.8 US cents per unit.

Page 68: APPENDIX E WATER DEMAND DISTRIBUTION AND NETWORK ANALYSIS · B1314 X01 X02 X03 X10 X11 X13 X14 X15 X21 X22 X23 B1020 Res2 Res03 Res04 Res05 Res06 Res07 Res08 Res09 Res10 Res11 Res12

J-16

Power Supplied By Turkey

On the other hand, in February 2005 during the caretaker phase of the Provisional Government, a no-bid contract was signed

with a Turkish electricity wholesale company to (1) supply 300mw for five years at 7.00 cents per unit, and (2) supply an

additional 700mw for five years at 5.85 cents per unit. Both tariff figures are subject to annual escalation. The cost to Iraq’s

economy of buying imported electricity from the Turkish company is, therefore, up to seven times more than if the electricity was

generated locally. Furthermore, nationally owned assets are normally financed by long-term loans, rather than on monthly

accounts as is the case for the purchased electricity.

The potential total cost of the Turkish contract is $2.6bn, enough to engineer, purchase, install and set to work more than

2,000mw of generation capacity installed around the country, with all appurtenances and connections to the grid and all the

long-term benefits that would entail.

As well as the Turkish imports, Iraq also imports smaller amounts of electricity from Syria and Iran, with plans to raise imports

from the latter from the present 100mw to 1,500mw. Moreover, negotiations were ongoing for over a year until early 2006 to

import electricity from a specially-formed private Virgin Islands/Kuwaiti company, also on a no-bid basis, of 100mw+500mw at

5.999 cents per unit for seven years. The potential minimum “take-or-pay” total cost of this contract to Iraq would be $1.89bn.

The level of tariff(s) for electricity imports from Iran have not been made public, but are assumed to be in the range of the

imported or projected Turkish and Kuwaiti companies’ tariffs. The Jordanian model above shows the actual cost of exporting

electricity to the network is 28.42 J fils/kWhr (approximately 4.01 US cents/kWhr).

Jordan produces a modest amount of natural gas, and Turkey has hydroelectric power stations, but the majority of electricity

produced in both countries is derived from imported fossil fuels. The cost of electricity generation in Turkey and Jordan must,

therefore, be similar as both are related to fuel costs prevailing in the international market. Surpluses for the Turkish exporting

company from sales of over 8.5bn kWhr units per annum can, therefore, be reasonably estimated even after allowing for a small

amount of wheeling cost to the Iraqi borders. It also explains the willingness of Iran, with its own indigenous fuel sources, to invest

$1bn in preparation for the ultimate export to Iraq of 1,500mw, or over 13bn kWhr units per annum.

Short-Term Imports Only

Imported electricity may be necessary for Iraq’s immediate and urgent needs but it should not be allowed for the long-term

periods envisaged at present. Most advanced countries are interconnected in grid systems and have two-way energy exchanges,

mostly on a daily basis, to catch shifting peak loads. Only in exceptional circumstances where vast differences in production cost,

such as from hydro sources against imported oils, is one-way electricity feed through national boundaries normally contemplated,

as is the case in Italy and Switzerland. Even there, Italy is reviewing its energy policy so as not to be dependant on a foreign

country.

In Iraq, with its unique primary energy production potential, electricity imports of such magnitude and long-term duration – and at

international pricing levels – will drain considerable liquid assets. Such measures also deprive its people, at a time of such high

unemployment, of thousand of quality job opportunities. Employment opportunities will also be lost in the related sector of the oil

industry. Nor will imported electricity be more reliable than local generation, since it still has to be transported through long

transmission lines which are the most vulnerable link in the chain of public electricity supply.