appendix b - transport scotland · selbie ordiefauld balhalgardy hillbrae battle of barra...

4
Appendix B Engineering plans

Upload: others

Post on 21-Mar-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Appendix B - Transport Scotland · Selbie Ordiefauld Balhalgardy Hillbrae Battle of Barra Battlefield Shadowside Uryside Lethenty House Bourtie House V3 V2 Tullochmor Battle of Harlaw

Appendix B

Engineering plans

Page 2: Appendix B - Transport Scotland · Selbie Ordiefauld Balhalgardy Hillbrae Battle of Barra Battlefield Shadowside Uryside Lethenty House Bourtie House V3 V2 Tullochmor Battle of Harlaw

V3

G2

V2

V1

V1

V2

G1

G2

G1

P3

SG

N M

P

Barra Junction

(J15)

Uryside (Inverurie North)

Junction (J22)

Daviot

Junction (J19)

Daviot

Junction (J62)

Existing A920

Existing A96

Existing B9001

Existing B9170

Burn of Durno

Lochter Burn

Existing B9001

Hillbrae

Daviot

Extents of Pairing

Assessment

Pitcaple

Lumphart

Hill

Inverurie

Mill of

Lumphart

Lochend

of Barra

Tullochmor

Balhalgardy

Battle of Barra

Battlefield

Battle of Harlaw

Battlefield

Shadowside

Uryside

Lethenty House

Muirton

Ides Burn

Hill of Den

Mossfield

Pitscurry Moss

Pitscurry Cairn

Bourtie House

Bructor

Mackstead

National Grid High

Pressure Gas Main

Hillhead of

Lethenty

King's Burn

Project Name

Revision

Scale :

Drawing Title

Dimensions :

Client

Suitability

@ A1Project Ref. No. Stage

Project Originator Volume

Location Type

|

Number

-

|

-

-

||

-

Role

-

|

Drawing Number

Suitability Description

ApprovedReviewed

Revision details

Checked AuthorisedCreated

dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy

Revision

|

-

Designer

McNeil Drive

Motherwell

ML1 4UR

58 Port Dundas Road

Glasgow

G4 0HF

A96 Dualling East of Huntly to

Aberdeen

Sheet 1 of 2

Pairing Green / Violet

Proposed Alignments

250002-92 STAGE 2

1:10000

M

A96PEA AMAR HGN

SWI DR CH 300037

S4 Fit for Stage Approval P01

P01

J.Marsh

29/03/19

R.Oakley

29/03/19

R.Oakley

01/04/19

F.Molloy

05/04/19

G.MacDonald

05/04/19

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

LEGEND

Fill Slope (1 in 3)

Cut Slope (1 in 3)

SSE HV OH Lines

National Grid High Pressure Gas Main

Structure Location

© Crown copyright (and database rights) 2019. OS 100046668.

Mapping obtained from Transport Scotland 13 August 2018

N

Notes:

1. The route options and junctions layout will be subject to

further development as the scheme progresses.

Connections to local accesses and Non-Motorised User

routes will be developed following the identification of the

preferred route option. Earthworks shown are indicative only.

Page 3: Appendix B - Transport Scotland · Selbie Ordiefauld Balhalgardy Hillbrae Battle of Barra Battlefield Shadowside Uryside Lethenty House Bourtie House V3 V2 Tullochmor Battle of Harlaw

V3

G3

G3

G3

G2

Inverurie

V2

Existing B9170

Existing B993

Existing B9001

Uryside (Inverurie North)

Junction (J22)

Extents of Pairing

Assessment

Lochend

of Barra

Bructor

Smithycroft

Sunnybrae

Isaactown and

Ashlea Grange

Barra Junction

(J15)

Existing B9170

Hill of

Selbie

Ordiefauld

Balhalgardy

Hillbrae

Battle of Barra

Battlefield

Shadowside

Uryside

Lethenty House

Bourtie House

V3

V2

Tullochmor

Battle of Harlaw

Battlefield

Boynds

Keith Hall GDL

Side Road diversion

Project Name

Revision

Scale :

Drawing Title

Dimensions :

Client

Suitability

@ A1Project Ref. No. Stage

Project Originator Volume

Location Type

|

Number

-

|

-

-

||

-

Role

-

|

Drawing Number

Suitability Description

ApprovedReviewed

Revision details

Checked AuthorisedCreated

dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy

Revision

|

-

Designer

McNeil Drive

Motherwell

ML1 4UR

58 Port Dundas Road

Glasgow

G4 0HF

A96 Dualling East of Huntly to

Aberdeen

Sheet 2 of 2

Pairing Green / Violet

Proposed Alignments

250002-92 STAGE 2

1:10000

M

A96PEA AMAR HGN

SWI DR CH 300038

S4 Fit for Stage Approval P01

P01

J.Marsh

29/03/19

R.Oakley

29/03/19

R.Oakley

01/04/19

F.Molloy

05/04/19

G.MacDonald

05/04/19

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

LEGEND

Fill Slope (1 in 3)

Cut Slope (1 in 3)

SSE HV OH Lines

National Grid High Pressure Gas Main

Structure Location

© Crown copyright (and database rights) 2019. OS 100046668.

Mapping obtained from Transport Scotland 13 August 2018

N

Notes:

1. The route options and junctions layout will be subject to

further development as the scheme progresses.

Connections to local accesses and Non-Motorised User

routes will be developed following the identification of the

preferred route option. Earthworks shown are indicative only.

Page 4: Appendix B - Transport Scotland · Selbie Ordiefauld Balhalgardy Hillbrae Battle of Barra Battlefield Shadowside Uryside Lethenty House Bourtie House V3 V2 Tullochmor Battle of Harlaw

V2

B3

B3

G2

SG

N M

P

V1

G1

B3

P3

V3

Daviot

Extents of Pairing

Assessment

Daviot

Junction (J62)

Extents of Pairing

Assessment

Junction 16

Existing A920

Existing A96

Pitcaple

Lumphart

Hill

Existing B9001

Existing B9170

Uryside (Inverurie North)

Junction (J22)

Balhalgardy

Mill of

Lumphart

Burn of Durno

G1

G2

Daviot

Junction (J19)

Lochter Burn

Existing B9001

Lethenty House

Muirton

Ides Burn

Hill of Den

Mossfield

Pitscurry Moss

Pitscurry Cairn

Bructor

Mackstead

King's Burn

Hillhead of

Lethenty

Uryside

Lochend

of Barra

Battle of Barra

Battlefield

Battle of Harlaw

Battlefield

Lethenty House

Shadowside

Bourtie House

V1

V2

V3

V2

Tullochmor

National Grid High

Pressure Gas Main

Lochter Burn

King's Burn

Project Name

Revision

Scale :

Drawing Title

Dimensions :

Client

Suitability

@ A1Project Ref. No. Stage

Project Originator Volume

Location Type

|

Number

-

|

-

-

||

-

Role

-

|

Drawing Number

Suitability Description

ApprovedReviewed

Revision details

Checked AuthorisedCreated

dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy

Revision

|

-

Designer

McNeil Drive

Motherwell

ML1 4UR

58 Port Dundas Road

Glasgow

G4 0HF

A96 Dualling East of Huntly to

Aberdeen

Pairing Green & Blue / Violet

Proposed Alignments

250002-92 STAGE 2

1:10000

M

A96PEA AMAR HGN

SWI DR CH 300044

S4 Fit for Stage Approval P01

P01

J.Marsh

29/03/19

R.Oakley

29/03/19

R.Oakley

01/04/19

F.Molloy

05/04/19

G.MacDonald

05/04/19

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

© Crown copyright (and database rights) 2019. OS 100046668.

Mapping obtained from Transport Scotland 13 August 2018

LEGEND

Fill Slope (1 in 3)

Cut Slope (1 in 3)

SSE HV OH Lines

National Grid High Pressure Gas Main

Structure Location

Notes:

1. The route options and junctions layout will be subject to

further development as the scheme progresses.

Connections to local accesses and Non-Motorised User

routes will be developed following the identification of the

preferred route option. Earthworks shown are indicative only.