appendix b: monterey highway viaduct, balanced cantilever

9
Appendix B APPENDIX B: MONTEREY HIGHWAY VIADUCT, BALANCED CANTILEVER INSTALLATION California HighSpeed Rail Project March 2019 San Jose to Central Valley Wye Constructability Assessment Report Record PEPD Page | B1

Upload: others

Post on 26-Feb-2022

6 views

Category:

Documents


0 download

TRANSCRIPT

     

 

            

                             

Appendix B

APPENDIX B: MONTEREY HIGHWAY VIADUCT, BALANCED CANTILEVER INSTALLATION

California High‐Speed Rail Project March 2019

San Jose to Central Valley Wye Constructability Assessment Report – Record PEPD Page | B‐1

Appendix B Monterey Highway Viaduct Balanced Cantilever Installation

280+00.00280+00.00275+00.00275+00.00270+00.00270+00.00

B545+00 B550+00 B555+00

CA-85

16.5'

TE

NN

AN

T

AV

E

15.0'

BENT 235

ELEV

B

ST-V0602 ST-Y0001

C

ST-V0602CL

R

410'-0"205'-0"150'-0"8'-0"

22'-1"

110'- 4 SP

150'-0"205'-0"

B545+00 B555+00

SCALE: 1"=200'

SCALE: 1"=200' HOR, 1"=100' VERT

0

50

100

150

200

250

300

-50

0

50

100

150

200

250

300

-50

EDGE OF DECK

• B2

• B1

TYPFOOTING,

TOR

DECKTOP OF

OG

BALANCED CANTILEVER CONSTRUCTION

TE

NN

AN

T

AV

E

CA-85

PLAN - STATE ROUTE 85

PROFILE - STATE ROUTE 85

0100 100 200

1"=200' HOR

050 50 100

1"=100' VERT

230'-0"115'-0"105'-0"110'-O" = 220'-0" 2 SPACES @

86'-8" = 260'-0" 3 SPACES @

" = 440'-0"CES @

150205'-0"

B

_SCALE 1"=20'-0"

SECTION

17'-1"

MI

N27'-4"

MA

X -

20' COLUMN

15'PILE CAP70'x 70'x

• B1 • B2

6

1

• BRIDGE

T/R

43'-0"

SHAFT, TYPDRILLED

010 10 20

1"=20'

STATION B550+00

B1045+00

B1050+00

B1055+00

SCALE: 1"=200' HOR, 1"=100' VERT

050 50 100

1"=100' VERT

0100 100 200

1"=200' HOR

200

250

300

350

400

450

500

650

200

250

300

350

400

450

500

650

ON-RAMP TO SB 101

PLAN - COCHRANE RD

ON-RAMP TO SB 101

PROFILE - COCHRANE RD

EDGE OF DECK

• B1

• B2

EDGE OF DECK

• B1

• B2

TYPFOOTING,

TORDECK

TOP OF

@ 110'-0"

17 SPACES

B1040+00

OG

= 236'-0"@ 76'-8" 3 SPACES

110'-0"88'-0"17 SPACES @ 110'-0" = 1870'-0"

R=45' (TYP)STAGING AREA

CONSTRUCTION

PROPOSED

STAGING AREA

CONSTRUCTION

PROPOSED

B1040+00B1045+00

B1050+00B1055+00

CO

CH

RA

NE

RD

(H

GS-15)

G 4.5"

(HGS-50)TC UG (9)

CO

CH

RA

NE

RD

F

RO

M

CO

CH

RA

NE

RD

SB 101

ON

RA

MP

ON-

RA

MP

SB

LO

OP

16.5'

16.5'

16.5'

BENT 69058'-6"

29'-8"

22'-6"

4 SPACES @ 233'-0" = 932'-0"100'-0"180'-0"138'-0"110'-0"= 170'-0"@ 85'-0" 2 SPACES

'-0"0'-0" CES

C

ST-V0701D

ST-V0701

D

ST-Y0001E

ST-Y0001 ST-Y0001

BENT 695

C

ST-V0701 E

ST-Y0001

BALANCED CANTILEVER OR CIP SHORED CONSTRUCTION

CL

R

CL

R

CL

R

010 10 20

1"=20'

110'-0"88'-0"17 SPACES @ 110'-0" = 1870'-0"

C

_SCALE 1"=20'-0"

SECTION

• BRIDGE

43'

T/R

• B1 • B2

(F) B

EN

T23'-4"

@

80'-0"

15' COLUMN 15' COLUMN

APPROX. OG

ISOLATION CASING

6

1

• COL• COL

13'-1"

SHAFT, TYPDRILLED

CAP, TYP12' PILE 50'x 50'x

STATION B1050+00

B1530+00B1535+00 B1540+00

RU

CK

ER

AV

E

RU

CK

ER

AV

E

100

150

200

250

300

350

400

450

SCALE: 1"=200'

SCALE: 1"=200' HOR, 1"=100' VERT

0100 100 200

1"=200' HOR

050 50 100

1"=100' VERT

B1530+00 B1535+00 B1540+00

100

150

200

250

300

350

400

450

PLAN - US 101

PROFILE - US 101

• B1

• B2

FOOTING, TYP

EDGE OF DECK

TOP OF DECK

TOR

OG

@ 11'-0"

19 SPACES

TC

OH

US 101

SB

US 101

NB

NO

NA

ME

UN

O

RD

16.50'

16.50'

15.00'

BENT 1070A

ST-V1101 C

ST-Y0001

B

ST-Y0001

1075

BENT

BALANCED CANTILEVER OR CIP SHORED CONSTRUCTION

36'-3"

60'-0"75'-0"2 SPACES @ 220'-0" = 220'-0"= 172'-6"@ 86'-3"4 SPACES

CL

R

B1539

+33.51

BV

C

EL

EV 302.28

A

-SCALE 1"=20'-0"

SECTION 010 10 20

1"=20'

= 1045'-0"

• BRIDGE

• B1 • B2

18' COLUMN

PILE CAP60'x 60'x 14'

13'-0"

MI

N22'-0"

MA

X -

6

1

43'-0"

T/R

MI

N3'-0"

SHAFT, TYPDRILLED

STATION B1535+00

B4+

00

B5+

00

B6+

00

B4+

00

B5+

00

B7+

00

B8+

00

B9

+00

B10

+00

B11+

00B12+00 B13+00 B14+00

B15+00

B0

+00

B1+

00

B2+

00

B3+00

B3295+00 B3300+00 B3305+00

C231A

P-12)

CH

EC

O

OA

D

SCALE: 1"=200'

• B2

• B1

TYP

FOOTING,

TYP

EDGE OF DECK,

PLAN - PACHECO CONDUIT 0100 100 200

1"=200' HOR

CO

ND

UIT (P

P-

(E) 120" P

AC

H

15.00'

SE

RVIC

E

RO

AD

SE

RVIC

E

RO

A

15.00'

BENT 50

C

ST-V1401

BENT 55

B

ST-V1401

D

ST-V1401

N

ST-Y0001

180'-0" 300'-0" 150'-0"135'-0"135'-0"150'-0"180'-0"

BALANCED CANTILEVER OR CIP SHORED CONSTRUCTION

B3295+00

SCALE: 1"=200' HOR, 1"=100' VERT

B3305+00B3300+00

100

150

200

250

300

350

400

450

100

150

200

250

300

350

400

450

TOP OF DECK TOR

OG

PROFILE - PACHECO CONDUIT

050 50 100

1"=100' VERT

24'-2"

13'-6" 10'-8"

24'-2"

10'-8" 13'-6"

• COL

• COL

T/R T/R

C

_SCALE 1"=20'-0"

SECTION

165'-0"

• B1• B2

PILE CAP, TYP60'x 60'x 14'

18' COLUMN, TYP

CONDUIT(E) 10' DIA WATER

(F) B

EN

T20'-0"

@

20'-0" MIN

20'-0" MIN

SHAFT, TYPDRILLED

STATION B3300+00

STATION B4240+00

T

NI

A

B4235+00 B4240+00 B4245+00

B1 •

AQ

UE

DU

CT

CA

LIF

OR

NIA

SCALE: 1"=200'

• B2

TYP

FOOTING,

TYP

EDGE OF DECK,

AQUEDUCT

PLAN - CALIFORNIA

TYPWALL,

RETAINING

0100 100 200

1"=200' HOR

(P

P-14)

AQ

UA

DU

C

CA

LIF

OR

15.00'

AC

CE

SS

RD

ABUT 6

A

ST-V1402

1260'-0" TOTAL LENGTH MEASURED ALONG • B2

R

ST-Y0001BENT 5

180'-0"225'-0"450'-0"225'-0"180'-0"

BALANCED CANTILEVER OR CIP SHORED CONSTRUCTION

B4235+00 B4245+00

SCALE: 1"=200' HOR, 1"=100' VERT

50

100

150

200

250

300

350

400

50

100

150

200

250

300

350

400

TOP OF DECKTOR

OG

PROFILE - CALIFORNIA AQUEDUCT 050 50 100

1"=100' VERT

A

_SCALE 1"=20'-0"

SECTION

24'-2"

T/R

24'-2"

T/R

• B1• BRIDGE

• B2• BRIDGE

TYP18' COLUMN,

TY

P14'PILE CAP50'x 165'x

30'-0" T

O 18'-9"

SHAFT, TYPDRILLED

010 10 20

1"=20'

B4285+00

B4290+00

DE

LT

A

ME

ND

OT

A

CA

NA

L

SCALE: 1"=200'

• B2

• B1

TYP

FOOTING, TYP

EDGE OF DECK,

PLAN - DETLA MENDOTA

TYPWALL,

RETAINING

0100 100 200

1"=200' HOR

DELTA MENDOTA CANAL (PP-13)

AC

CE

SS

RD

15.00'

ABUT 1 ABUT 4

150'-0"300'-0"150'-0"

B

ST-V1402

600'-0" TOTAL LENGTH MEASURED ALONG • B2

BALANCED CANTILEVER OR CIP SHORED CONSTRUCTION

B4285+00 B4290+00

SCALE: 1"=200' HOR, 1"=100' VERT

50

100

150

200

250

300

350

400

50

100

150

200

250

300

350

400

TOR TOP OF DECK

OG

PROFILE - DELTA MENDOTA

050 50 100

1"=100' VERT

B

_SCALE 1"=20'-0"

SECTION

24'-2"

T/R

24'-2"

T/R

• B1• BRIDGE

• B2• BRIDGE

TYP18' COLUMN,

14'PILE CAP50'x 135'x

12'-6", T

YP

20'-0" -

SHAFT, TYPDRILLED

010 10 20

1"=20'

STATION B4290+00