Appendix B City of Fort Worth 2008 Sidewalk Survey
2008 Sidewalk Survey i September 2008 City of Fort Worth, Texas
Table of Contents I. Introduction ..........................................................................................................................1 II. Study Methodology ..............................................................................................................1 III. Cost Assessment of Sidewalk Needs ...................................................................................2 IV. Coordination with Other Agencies ......................................................................................5 V. Conclusions and Next Steps.................................................................................................5
APPENDICES A. Key Map B. Field Assessment Maps
List of Tables Table 1 Sidewalk Improvement Cost Projection Summary ...........................................................4
2008 Sidewalk Survey 1 September 2008 City of Fort Worth, Texas
I. INTRODUCTION Study Background “Improve mobility and air quality by providing a multi-modal transportation system” is one of the transportation goals listed in the 2008 City of Fort Worth Comprehensive Plan, adopted by the Fort Worth City Council on February 19, 2008. This goal is reinforced by the recent Mobility and Air Quality Plan objectives to “provide a coordinated transportation system that includes: land use, air quality, public transit, road, bicycle and pedestrian facilities” and “utilize a strategic approach to providing an integrated transportation system that provides seamless travel via multiple modes of transportations.” Sidewalks are a key component of this multi-modal transportation system and are an essential piece in encouraging connectivity in a pedestrian friendly community. In support of these efforts, funds were approved as part of the 2004 Capital Improvement Program (CIP) bond election to construct new sidewalks throughout the City. The Safe Pathways Program was created to allocate these funds toward projects that would be most beneficial. The focus of this program was to enable new sidewalks to be constructed on pedestrian routes that lack sidewalks in the vicinity of bus stops, parks and especially schools. As of Summer 2008, three quarters of the approved funding has been applied on sites identified by City staff, based on field site investigations and input from the public. As the Safe Pathways Program draws to an end, it is important that the City determine the remaining need for new sidewalks and then identify subsequent funding mechanisms. Over the past several years, the Fort Worth’s City Council has also dedicated resources from its General Fund to assist property owners in the repair and replacement of damaged sidewalks. City staff currently receive requests for sidewalk repairs directly from property owners and the volume of requests surpasses the available funding. The City does not have a comprehensive inventory of sidewalk repair needs citywide, only those reported by citizens. Study Goals In order to plan for future sidewalk improvements, the City commissioned this study to identify existing roadways within the City without sidewalks and where sidewalks need repair. The primary goal of the study is to determine the magnitude of sidewalk needs citywide, including an estimated total cost of construction and repair. In addition, this survey will assist City staff in the evaluation of future sidewalk projects and requests from the public, and in determining the levels of funding needed for sidewalks in future bond programs or other City initiatives.
II. STUDY METHODOLOGY Study Area The study area was designed to focus on locations within the City that are expected to have high levels of pedestrian activity. When defining the study area boundaries, several factors were taken into consideration:
2008 Sidewalk Survey 2 September 2008 City of Fort Worth, Texas
• Study areas should include the immediate vicinity of civic buildings, transit stops, schools, large employment centers, and arterial streets;
• The study area radius surrounding these locations should be what a typical person would think is reasonable to travel by foot or wheelchair;
• The majority of the new housing developments outside of Loop 820 will likely have sidewalks since they were built since the implementation of the City’s policy requiring sidewalks on all new streets; and
• Most future bond projects and major developments will include sidewalks, so these cases should not be included in the estimated cost for sidewalk improvements.
These factors were then used to help define the study area boundaries. Based on national research and discussions with the City, it was determined that a ½ mile radius is a reasonable walking distance to and from the locations identified above. As a result, the final study area was determined to be:
• All public streets located within one half mile of all public schools in City of Fort Worth; • All public streets located within one half mile of all Fort Worth Transportation Authority bus /
Trinity Railway Express (TRE) stops and stations within the City of Fort Worth; • All arterial streets within Loop 820 identified on the City’s current Master Thoroughfare Plan; and • All public ROW locations within the Central Business District (CBD) bounded by Summit Ave.,
Lancaster Ave., the BNSF railroad, and Belknap St. The resulting study area was approximately 169 square miles, which is approximately 50% of total land area of the City. The remainder of the City is predominately rural, undeveloped land, or newly developed land outside Loop 820 where transit service is not provided. Many developments outside Loop 820 are relatively new and were required to construct sidewalks under the City’s subdivision ordinance. In-Field Evaluation Field forms were developed using Geographic Information Systems (GIS) data provided by the City. These field forms were then used to conduct a ‘windshield survey’ of the project study area. The windshield survey was conducted to verify the presence or absence of sidewalks and to identify sidewalk segments in need of repair. It should be noted that not all sidewalk repair needs in the study area were documented since an in-depth field assessment was not part of this project. Roads that had a rural cross section (i.e., no curb and gutter with drainage ditches) were also noted. Since sidewalks could not be constructed adjacent to these roadways, they were excluded from the planning level cost projections. Following the completion of all field work, field data were entered into GIS for future use by the City. Copies of the field forms can be found in the Appendix. Based on the results of the survey, approximately 55% of the study area is without sidewalks and less than 1% of existing sidewalks are in need of repair.
III. COST ASSESSMENT OF SIDEWALK NEEDS An opinion of probable construction cost (OPCC) was prepared to help the City plan for future sidewalk improvements. GIS was used to determine the total linear feet of missing sidewalk and existing sidewalk
2008 Sidewalk Survey 3 September 2008 City of Fort Worth, Texas
that was visually in need of repair. An average cost per linear foot of concrete sidewalk was then applied to determine the total cost of the improvements. The average cost per linear foot was derived from recent City and Texas Department of Transportation (TxDOT) bid tabulations. Table 1 summarizes the projected sidewalk improvement costs by sidewalk condition and street classification. Due to the City’s interest in improving walkability and in providing facilities in accordance with the Access Board’s accessibility guidelines, the City may consider changing the minimum sidewalk width design standard from four feet to five feet. Cost projections were prepared for both four and five foot wide sidewalks. The total estimated cost to construct and repair the sidewalks identified in the survey is approximately $183 million for four foot sidewalk and $205 million for five foot sidewalk. It should be noted that the City will construct sidewalks as regular project components of several on-going and future street projects. The cost of sidewalks to be constructed in these projects was excluded from the calculation of citywide sidewalk cost projections. These costs should be considered conservative since they assume sidewalks are constructed along both sides of every public street within the study area. For example, collectors ($33 million) and local streets ($129 million) account for approximately 88% of the $183 million. It is highly likely that some neighborhoods will elect to not have sidewalks or only have them installed on one side of the street. If improvements are limited to arterial projects only, the projected sidewalk construction cost is approximately $22 million.
2008 Sidewalk Survey 4 September 2008 City of Fort Worth, Texas
Table 1. Sidewalk Improvement Cost Projection Summary
Sidewalk Condition
Arterial Non-Arterials
Principal Major Minor Collector Local Total
No Sidewalk Present (ft) 358,854 587,230 370,833 2,053,101 7,999,375 11,370,044
Sidewalk needs Repair (ft) 784 4,540 920 12,202 28,662 47,108
Total Length (ft) 359,638 591,770 371,753 2,065,303 8,027,037 11,417,152
Total Length (miles) 68.1 112.0 70.4 391.1 1520.4 2,162
Cost ($16/ft) 4' sidewalk
$5,754,000 $9,468,000 $5,948,000 $33,045,000 $128,433,000
$183,000,000
$21,170,000 $161,478,000
Cost ($18/ft) 5' sidewalk
$6,473,000 $10,652,000 $6,692,000 $37,175,000 $144,487,000
$205,000,000
$23,817,000 $181,662,000
2008 Sidewalk Survey 5 September 2008 City of Fort Worth, Texas
IV. COORDINATION WITH OTHER AGENCIES Before committing resources to future sidewalk improvements, the City should consider other City programs such as the ADA Compliant Curb Ramp Improvement Program and coordinate with local agencies such as The T and TxDOT. Both The T and TxDOT are currently implementing sidewalk and ADA improvements throughout the City. Coordination with these agencies will reduce the potential for the City to budget money for a project that TxDOT or The T already has programmed. In addition, if the City receives funding from TxDOT’s Safe Routes to School (SRTS) program, the results of this survey should be used to identify potential sidewalk improvement projects near public schools throughout the City. The amount of funding available to implement sidewalk improvements is limited, so additional funding opportunities should be explored including leveraging funds from private organizations and other public agencies. By combining efforts with other agencies, the City can implement a more cohesive transportation system that provides connectivity between pedestrian traffic generators such as transit stations, employment and shopping centers, neighborhoods, government facilities, parks and schools.
V. CONCLUSIONS AND NEXT STEPS Much of the study area is without sidewalks. The estimated cost to install new sidewalks and/or repair existing sidewalk within the study area exceeds $180 million. If improvements are limited to only arterial projects, these costs may be reduced to approximately $22 million. While some neighborhoods may elect to not want sidewalks, the cost to provide sidewalks throughout the City will be significant. The City of Fort Worth’s Transportation and Public Works Department should undertake the following steps to implement the citywide sidewalk program:
• Explore and secure additional funding for implementation of the sidewalk program, including grant partnerships with private and other public entities, and City resources such as future bond programs, certificates of obligation, gas well lease revenues, and the general fund.
• Utilizing the project scoring methodology developed for the ADA-Compliant Pedestrian Curb Ramp Improvement Program, identify a prioritized list of sidewalk needs for implementation as funding becomes available, with consideration of funding distribution across the City.
• Consider the implementation of a program that would allow residents to schedule and pay for sidewalk repairs done by one of the City’s Sidewalk Repair and Replacement Program contractors. The City could collect the same rate from residents that it is charged by the contractor. This would result in savings for residents who currently must acquire a parkway permit and hire a contractor licensed by the City – these minor jobs are often unattractive to such contractors – or wait for the City to address the request as funding becomes available.
A well-connected, well-maintained network of sidewalks is a critical component of the City of Fort Worth’s transportation network. The information and recommendations in this report should help guide the City on its mission to improve the health and quality of life of its citizens and expand mobility options for commuters, residents, visitors, and persons with disabilities.
2008 Sidewalk Survey September 2008 City of Fort Worth, Texas
APPENDICES
A. KEY MAP
B. FIELD ASSESSMENT MAPS
2008 Sidewalk Survey September 2008 City of Fort Worth, Texas
Appendix A – Key Map
(See separate Appendix document)
987
6
54
321
999897969594
939291908988
8786858483828180
787774 76 797573727170696867
666564636261605958575655
545352515049
48474645444342
4140393837363534
33323129 30
27 2826252423
2221
2019
1311
17
12
18
16151410
543
540
541
144143142141140139138137136135134133132131130129128
542
539538
535 537536534533532
531530529528527526525524523
522521520519518517516515514513512
511510509508507506505504503502501500499498
497496495494493492491490489488487
486485484483482481480479478477476475
474473472471470469468467466465464463462461460459
458457456455454453452451450449448447446445444443
442441440439438437436435434433432431430429428427426425424
423422421420419418417416415414413412411410409408407406405404403
402401400399398397396395394393392391390389388387386385384383382381380
379378377376375374373372371370369368367366365364363362361360359358357356355354353352
351350349348347346345344343342341340339338337336335334333332331330329328327326325324323322
321320319318317316315314313312311310309308307306305304303302301300299298297296295294293292291290289288
287286285284283282281280279278277276275274273272271270269268267266265264263262261260259
258257256255254253252251250249248247246245244243242241240239238237236235234233232
231230229228227226225224223222221220219218217216215214213212211210209208
207206205204203202201200199198197196195194193192191190189188
186 187185184183182181180179178177176175174173172171170169168
167166165164163162161160159158157156155154153152151150149148147146145
127126125124123122121120119118117116115
114113112111110109108107106105104103102
101100
ADA Compliant PedestrianCurb Ramp Improvement
Program Study
August 2008
2008 Sidewalk Survey
´0 4 82Miles
2008 Sidewalk Survey September 2008 City of Fort Worth, Texas
Appendix B – Field Assessment Maps
(See separate Appendix document)
n
BEA
CH
BASSWOOD
WH
ITE
WO
OD
SUN
NYB
ANK
BUCKEYE
LONGSTRAW
HEATH
MANZINITA
WINTERHAZEL
BIGLEAF
CR
EEK
FALL
DOGWOOD
BLUE FLAG
JUNEBERRY
BAYB
ERRY
BUCKWHEAT
BUTTO
NW
OO
D
DRAKE
MARSARIE
SHAGBARK
MIS
TY R
IDG
E
BRISTLECONE
BRIARWYCK
WIL
DH
AVEN
WAT
ER
WAY
WATERBIRD
HAWTHORN
PAR
K C
RE
EK
NEG
RIL
ENGLEMAN
GOLDROCK
SOR
RE
LL
PARKHAVEN
CAT
BRIE
R
GREENFERN
CR
EEK
HO
LLO
W
PARK VILLAGE
OC
HO
RIO
S
WRENWOOD
MOSS ROSE
MU
LBE
RR
Y
BRACKEN
CR
EEK
HAV
EN
CHINA ROSE
BUTT
ER
NU
T
WINDFLOWER
PROFESSIONAL
WILD ROSEPARKVIEW ES
ADA Compliant PedestrianCurb Ramp Improvement
Program Study
February 2008
2008 Sidewalk Survey
´0 500 1,000250 Feet
84 86
76
92
(85)
PVT
PVT
LegendNo SidewalkRepair SidewalkRural SectionFunded Improvement
Study Limits within City
n Public Schools
1 Bus Stops
BIRD
YUCCA
RIV
ER
SID
E
CLARY
SPRINGDALE
ASTER
EAGLE
MARIGOLD
PRIMROSE
CH
AND
LER
JEFF
BOLT
ON
HONEYSUCKLE
CARNATION
DAISY
BAR
CLA
Y
WESTBROOK
DALFORD
CLE
CK
LER
BON
NIE
BR
AE
GOLDENROD
GW
YNN
E
DAV
ID
NEL
SO
N
KAR
NE
S
GR
AC
E
HU
DG
INS
BROWNING
BLA
ND
IN
FAIR
VIE
W
WILLIAMS
DAY
TON
BLA
ND
IN
CARNATION
ASTER
GOLDENROD
GR
AC
E
DALFORD
CH
AND
LER
CARNATION
BLA
ND
INDAISY
CH
AND
LER
BONN
IE B
RAE
BON
NIE
BR
AE
BLA
ND
IN
BLA
ND
IN
OAKHURST ES
RIVERSIDE MS
CARTER-RIVERSIDE HS
ADA Compliant PedestrianCurb Ramp Improvement
Program Study
February 2008
2008 Sidewalk Survey
´0 500 1,000250 Feet
200 202
181
218
(201)
LegendNo SidewalkRepair SidewalkRural SectionFunded Improvement
Study Limits within City
n Public Schools
1 Bus Stops