Appendix A - Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See JPA Section F) and 8.5" x 11" plan sheets for the proposed impact areas; provide top view, cross section, and/or profile drawings that include dimensions of all structures and fill proposed, including elevation and materials relative to jurisdictional waterway and wetland boundaries." Applicant Response: See attached 8.5" x 11" plan sheets. Appendix A Item 4 Page I of I

Upload: others

Post on 27-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

Appendix A - Item 4

PPL Bell Bend Nuclear Power PlantSalem Township, Luzerne County, PA

ACOE Information Requirement:

"Provide large plans (See JPA Section F) and 8.5" x 11" plan sheets for the proposed impact

areas; provide top view, cross section, and/or profile drawings that include dimensions of all

structures and fill proposed, including elevation and materials relative to jurisdictional waterway

and wetland boundaries."

Applicant Response:

See attached 8.5" x 11" plan sheets.

Appendix AItem 4 Page I of I

Page 2: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

PENNSYLVANIA

BELL BEND NUCLEAR POWERPLANT JPA SUBMISSION

N

IDATUM:H: (NAD 83)V: (NAVD 88)NOTE:

PROJECT LATITUDE/LONGITUDEIS LOCATED AT THE CENTEROF THE REACTOR CONTAINMENTBUILDING.

PROJECT LATITUDE/LONGITUDE:LONG 76"09'57.34"LAT 41"05'21.19"

LEGEND

..... I BBNPP. PROJECT

BOUNDARYEXISTINGROAD

ALE DOCUMENTS PREPRED N.Y PENONI oSSOCTSo DRAWN BY: WCK SCALE: 1 =3000' DATE: 06/15/2011ARE INSTRUMENTS OF SERNICE IN RESPECT OF TOEDRW BY WIK SAE 1=30' AT:6/521PROJECT. THEY ARE NOT INTENDED OR REPRESENTEDTO B SUITABLE FOR REUSE BY OWNER OR OTHERSPennon ON EXTENSIONS OF THE PROJECT OR ON ANY OTHERPROJECT. ANY REUSE WIRDOU WRITTEN VEnFICAUTON CHECKED BY: LGB JPA PERMIT SUBMITTALOR ADAPTATION BY PENNONI ASSOCIATES FOR THE

A aSP ECIFIC PURPOSE INTENDED WILL BE AT OWRERSSOLE RISK AND WITHOUT LIABILITY OR LEGAL _BELL BEND NUCLEAR POWER PLANEXPOSURE TO PENNONI ASSOCIATES; AND OWNER JOB No. PPLS BELL BEND NUCLEAR POWER PLANT100 N. Wilkes-Barre Blvd.. ..... INDEMNIFY AND HOLD HARMLESS PEANONI 0902 LUZERNE COUNTY, PENNSYLVANIAASSOCIATES FROM ALL CLAIMS. DAMAGES, LO•AND

Wilkes-Barre. PA 18702 EXPENSES RISIN.• • T OF OR REULTINGOTNEREFROM,

REV 1 : 10/28/2011 REVISED PROJECT BOUNDARY APPUCATION BY;FIGURE 1 - SITE LOCATION REV 0 : 06/15/2011 INITIAL SUBMISSION PPL NUCLEAR DEVELOPMENT, LLC

Page 3: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

LEGEND

EXISTING

Szrf MAJOR CONTOURLINE (10')

TEMPORARYCONTOUR

LINE (10')

PROPOSED

700

EXISTING PROPOSED

IIil1, M R100 YR.

..- FLOODPLAIN

500 YR..... FLOODPLAIN

TEMPORARYCONTOURLINE (2')

UTILITY POLE

*EVERGREEN TREE

o DECIDUOUS TREE

FENCE

TREE/BRUSH LINE

EDGE OF PAVE

50' EXCEPTIONALVALUE (EV) WETLAND

7/'4-

7

U

BUFFER

ME I

EýA

RAILROAD

BBNPP PROJECTBOUNIDARY

PROPERTY LINE

TRANSMISSIONTOWERS/LINES

& R.O.W.

BUILDING /STRUCTURE

'lll lll

__j

A)41

E=

NON-IMPACTEDWETLANDS/

STREAM

NON-IMPACTEDWATERBODY

IMPACTEDWETLANDS

IMPACTEDSTREAM/

RIVER

CREATED/ENHANCEDWETLANDS

_ CULVERT r,/ N

BRIDGE

ORANGECONSTRUCTION - OCF-

FENCE

BASIN

PUMPED WATERFILTER BAG/

SEDIMENT FILTERPUMP

TEMPORARYCOFFERDAM

N.T.S. NOT TO SCALE

INTAKE/BLOWDOWN

PIPE

INTAKE/BLOWDOWN PIPE

LINE OFEXCAVATION

TEXTWETLAND NUMBER

DESIGNATIONITALICS NON-ITALICS DALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES DRAWN BY: WCK SCALE: N/A DATE: 06/15/2011ARE INSTRUMENTS OF SERNCE IN RESPECT OF OTHE DRAWN BY: WCK SCALE: N/A DATE: 06/15/2011_________PROJECT. THEY ARE NOT INTENDED OR REPRESENTEDTO NE SUITABLE FOR REUSE BY OWNER OR OTHERSP n n o n OW EXTENSIONS OF TNE PROJECT OR ON AEY OTHERPROJECT. ANY REUSE WITHOUT WRITTEN VERFICATION CHECKED BY: LGB JPA PERMIT SUBMITTALOR ADAPTATION BY PENNONI ASSOCIATES FOR THE

A AS SECIFIC PURPOSE INTENDED WILL NE HT OWNERSPennoniAssociaes Inc.SOLE RISE ANE WITHOUT LIABILITY OR LEGAL _ LNEXPOSURE TO PENNONI ASSOCIATES. AND OWNER BELL BEND NUCLEAR POWE

100 N. Wilkes-Barre Blvd. SHALL IN EMNIFY AND HOLD HARMLESS PENNONI JOB No. PPLS 0902 LUZERNE COUNTY, PENNSYLVANIAASSOCIATES FROM ALL CI.MS, DAMAGES. LOSSES ANDWilkes-Barre. PA 18702 EXPENSES ARIONC SUT OF OR RESULTNIN THEREFROM

APPLICA71ON BY;FIGURE 2A - LEGEND REV 0 : 06/15/2011 INITIAL SUBMISSION PPL NUCLEAR DEVELOPMENT, LLC

Page 4: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

NOTES:1. LOCATION OF WETLANDS, STREAMS, WATERBODIES, AND AREAS WAS OBTAINED FROM BBNPP

USACOE THIRD PRELIMINARY JD MAPPING OCTOBER 2011.2. A 50 FOOT BUFFER WAS PROVIDED FOR ALL EV WETLANDS, WHEREVER POSSIBLE, IN AN

EFFORT TO PROTECT THESE AREAS FROM INDIRECT IMPACTS. GRADING AND CLEARING OFVEGETATION IS TO BE AVOIDED TO THE GREATEST EXTENT PRACTICABLE, EXCEPT AS SHOWNON THESE PLANS.

3. WETLANDS ARE TO REMAIN UNDISTURBED UNLESS NOTED ON FIGURES. PROVIDE ORANGECONSTRUCTION FENCE AROUND ALL WETLANDS OR WETLAND BUFFERS FOR PROTECTION. TOMINIMIZE IMPACTS, ATTACH THE ORANGE CONSTRUCTION FENCE TO EXISTING TREES TOREMAIN WHERE APPLICABLE. IF ORANGE CONSTRUCTION FENCE IS NOT ADEQUATE,CONSTRUCT AN EARTHEN BERM AROUND WETLANDS OR WETLAND BUFFERS.

4. EXISTING 500 YR. FLOOD PLAIN MAPPING INFORMATION SHOWN HEREON WAS OBTAINEDFROM FEMA MAP PANEL 4206250020B, EFFECTIVE DATE MARCH 18, 1980. EXISTING ANDPROPOSED 100 YR. FLOODPLAIN LINES ARE BASED ON THE SUSQUEHANNA RIVER FLOODSTUDY REPORT, REVISION .3, AUGUST 2011 AND THE WALKER RUN FLOOD STUDYREPORT, REVISION 2, SEPTEMBER 2011 PROVIDED BY LAND STUDIES INC.

5. TOPOGRAPHIC AND PLANIMETRIC INFORMATION SHOWN IS FROM A SURVEY PERFORMED BYAEROCON PHOTOGRAMMETRIC SERVICES, INC. IN NOVEMBER 2007, JANUARY 2008 AND 2010.ADDITIONAL TOPOGRAPHIC INFORMATION PROVIDED BY PETERS CONSULTANTS.

6. TREE CLEARING AND WETLAND IMPACTS FOR BRIDGES IS ASSUMED TO BE 80 TOTAL FEETOUTSIDE BRIDGE DECK WITH NO LESS THAN 50 FEET ON ONE SIDE. WETLANDS IN THESEAREAS WILL BE MAINTAINED IN AN EMERGENT OR SCRUB/SHRUB CONDITION TO PROTECTTHE INTEGRITY OF THE BRIDGE STRUCTURE.

7. TREE CLEARING FOR OVERHEAD ELECTRIC LINES WILL BE THE FULL WIDTH OF THERIGHT-OF-WAY OR 100 FEET MEASURED HORIZONTALLY FROM THE OUTERMOSTTRANSMISSION LINE WHERE NO RIGHT-OF-WAY EXISTS. WETLANDS IN THESE AREAS WILLBE MAINTAINED IN AN EMERGENT OR SCRUB/SHRUB CONDITION OR PROTECT THE INTEGRITYOF THE TRANSMISSION LINES.

8. INTAKE/BLOWDOWN LINE TRENCH TEMPORARY IMPACTS SHALL BE THE TRENCH WIDTH PLUSANY ADDITIONAL WIDTH REQUIRED FOR EQUIPMENT AND SIDE CAST MATERIAL.

• ~BR IDGE

TYPICAL EXCAVATIONLAYOUT LIMITS,(TEMPORARY IMPACT)

TYPICAL PIERFOUNDATIONCONSTRUCTIONLIMITS (PERMANENTIMPACT)

TYPICAL PIER DETAILN.T.S.

ALL DOCUMENTS PREPARED BR PENNOTE I ASSOCIATES N/A DATE: 06'15/2011AROE INSTRUMNEITS OF SEoWCE IN RESPECT OF TH DRAWN BY: WCK SCALE: N/61521PRCOJECT. THCEY ME NOT INTENDED OR REPRESENTEDTO BE SUITABLE FOR REUSE BY OWNER OR OTHERSPROJECT. ANY REUSE WOITOUT WRITTEN VERIFICATON CHECKED BY: LGB JPA PERMIT SUBMnITALOR ADAPTATION BY PENNONI ASSOCIAOES FOR THE

!Pennoni Associates Inc. SOLE RS'KAU WIOUT LIABILITY ORLEOON BELL BEND NUCLEAR POWER PLANTEXPOSURE TO PENNONI ASSOCIATES .N WE

100 N. Wilkes-Barre Blvd. SHALLINDEMNIFY.AND ROLDHARMLS ...E.ONI JOB No. PPLS 0902 LUZERNE COUNTY, PENNSYLVANIAASSOCIATES FRO ALL_ MAS DMWES. OSSESAN

Wilkes-Barre, PA 18702 EXPENSES ROSIND CUT Of OR RESULTING. THEREFROMREV 1 : 10/28/2011 REVISED TEXT APPUCATION BY;

FIGURE 2B - GENERAL NOTES REV 0 : 06/15/2011 INITIAL SUBMISSION PPL NUCLEAR DEVELOPMENT, LLC

Page 5: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

rU

8*M3

' 54,C

A-R ,C~uE •TS rRso•• ?E~mSP•ECT•SOFOTH DRAWN BY: WCK SCALE: HORZ. 1"=20o0' DATE: 06/15/2011PROJECT. IS'EK ARE NOT BlNTE•DE OR REPRESEKIDOVRTN/

PROJECT MA REESE ATMO WcRITE VERIFCATION CHECKED BY: LGB JPA PERMIT SUBMITTALPennoni Asoiae Inc. .c. o~s .. E ,< EA *E

SOLE RISK AND WITHOUT LIABILITY OR LEOAL10 .Wle-ar ld XPOSUITETOOPENNONI ASSOCI.TES; AND) OWNER JBN. PL092 BELL BEND NUCLEAR POWER PLANTS0 .Wike-are ld. ,ASS 'OCITE ... AN .OL HeLS EHN O PS00 LUZERNE COUNTY, PENNSYLVANIAE•OPEIOO AISN T OF ORL NECL/€ LON SSTESEOI

REV 1 : 10 28/2011 REVSiED •'n.L&IDS / PRO.ECT BOUNDAR APUCATION BY;FIGURE ,3 - KEY PLAN REV 0 : 06//15//2011 INIT1AL SUBMISSION PPLNUC______DEVELOPMENT____

Page 6: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

"I BBNPP PROJECT(-) Vi)_ --I BOUNDARY-

--- - ---- __ ...

RAILROAD

ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES DARE INSTRUMENTS OF SERVICE IN RESPECT OF THE DRAWN BY: WCKPROJECT. THAC ARE NOT INTENDED OR REPRESENTEDTo BE SUITABLE FOR REUSE BY OWNER OR OTHERSON EXTENSIONS OF TOE PROJECT OR ON MNY OTHERPROJECT. ANY REUSE WITHOUTF WIRITENTVERIFICATION CHECKED BY: LGBOR ADAPTATION BY PENNONI ASSOCIATES FOR THESPECIFIC PURPOSE INTENDED WILL BE AT OWNERSSOLE RISK AND WITHOUT LIAOILITY OR LEGAL

EXPOSURE TO PENNONI ASSOCIATES; AND OWNEXRSHALL INDEMNIFY AND HOLD HARMLESS PENNONI JOB No. PPLS 0902ASSOCIATES FOUR ALL CLAI•S. DRMAGES. LOSSES ANDEXPENSES ARISING OUT OF OR RE•ULTING THEREFROM

Pennoni Associates Inc.100 N. Wilkes-Barre Blvd.Wilkes-Barre, PA 18702

FIGURE 4 - SITE LAYOUT

JPA PERMIT SUBMITTAL

BELL BEND NUCLEAR POWER PLANT-LUZERNE COUNTY. PENNSYLVANIA

APPLICATION BY;PPL NUCLEAR DEVELOPMENT. LLC

Page 7: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

/KR FLODP-LIN NPPR-OJECT

1,00 YEAR-___ &A (14ý-ELb-DPLW N 4v ---

Go G _-CONSc----------- -L -- -YDOWN

FIGURE 5C-

SIMULATION -V - -

= DO

4I*O 3-.)BRIDGI7/I =7I

j'2 ITIEOTOA ]IONN

FERMANEN I -

PROJECT .THEY "I D TR

PIPEBRIDOI

CO S OAD XESOSO"TEPRJC ROAYOH'

BLDG. NO.4 _4

__ ~ ~GURAAR

ORL DOCUMENTS PREPARED BY PENNONI ASSOCIATES DRAWN BY: WCK SCALE: HORZ. 1"=500' DATE: 0/15/2011ARE INSTRUMENTS OF SERAICE IN RESPECT OF T1OEN/PROJECT. TOES ARE NOT INTENDED OR REPRESENTED VERT.N/TO BE SUITABLE FOR REUSE BY OWNER OR OTHERSON EXTENSIONS OF THE PROJECT OR ON AIS OTHERPROJECT. Ný REUSE WITHOUTD WRITTEN VERIFICATION CEKDB: LB JAPRI UMTAOR ADAPTATTON BY PENNONI ASSOCIATES FOR RRE CEKDB: LB JAPRI UMTASPECIFIC PURPOSE INTENDED WILL BE AT OWNERS

)ni Associates Inc. SOLE RISK AND WITHOUT LIARILITY NOR LXPEOLUR BEATL BEND NUCLEAR POWER PLANTWilkes-Barre Blvd. EAPOSREV TO :ENN 10/282011TEVSEA D FOWNER NDWTADS LZRECONYENSLAIWYikes-Barre Blvd. SHALL INDEMNIFY AND HOLD HARMLESS PENNONI JOB No. PPLS 0902

ASSOCLNTES FROM ALL CLMS. DAASCUES. LOSSES P NLD

-arre, PA 1870 EXPENSES ARISING OUT OF OR RESULOTIN THERSEROM

R-V 1 ! 10/28/2011 REVISED FLOOD UNES AND WETLANDS APPLICATION BY;PPL NUCLEAR DEVELOPMENT, LLC

Page 8: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

!-OFFICE B LD G. :%CONSTRUCTION

- PT_.yA•• AL TEMPORA Y/ A'• •~~OF BUFFER --.

DISTURBANCE FOR•x•OAD CONSTRUCTION

\ ~STREAM

RESTORATION-

WALKERELU/ -R

CREATED••_ _•ENHANCED ..\WETLANDS/"C)

ROAD 8

B R IED(GE I/ E

NO. PORTION5.1!.O.4.VIMPACTED-'•P RIN" -.l.0OF ALKE

~ ALL

~RCE__'\RCES ~ i

\ • .__--~~-.- ---

QN 500 IEARF

~~FL OODPLAIN

100 KEAsFLOODPLAIN

I I100 YEARFLOODPLAIN

ALL DOCUMENTS PREPARED RD PENNUNI ASSOCIATES

ARE INSTRUMENTS Or SERDCE IN RESPECT Or THE DRAWN BY: WCK SCALE: HORZ 1 "=100' DATE: 06/15/2011PROJECT. THEY ARE NOT INTENDED OR REPRESENTED VERT. N/ATO BE SUITABLE FOR REUSE BY OWNER OR OTHERSPennoni ON EXTENSIONS OF THE PROJECT OR ON ANY OTHERPROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION CHECKED BY: LGB JPA PERMIT SUBMITTALOR ADAPTATION BY PENNONI ASSOCIATES FOR THE

A J . SPECIFIC PURPOSE INTENDED WILL RE AT OWNERSe n no ni A sso ciates Inc .SOLE RISK AND WITHOUT LIABILIyD OR LEGAL BELL BEND NUCLEAR POWER PLANTEAPOSORE TO PENNONI ASSOCIATES; AND OWNER BELL BEND NUCLEAR POWER PLANTSHALL INDEMNIFY AND HOL HARMLESS PENNONI JOB No. PPLS 0902 LUZERNE COUNTY, PENNSYLVANIAASSOCATES FROM ALL CLAIMS. DAMAGES, LOSSES ANDWilkes-Barre, PA 18702 EXPENSES ,ARISINOUT ov OR RESULTIN THEREFROM,

REV 1 : 10/28/2011 REVISED FLOOD UNES / BASIN NAME APPLICATION BY;FIGURE 5A - SITE LAYOUT REV 0 : 06/15/2011 INITIAL SUBMISSION PPL NUCLEAR DEVELOPMENT. LLC

Page 9: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

ACCESS ROAD W

I'PACT-ED

ACCE OADV WE NDIMPACTED WETLAND

00 YEAR

___ ~~~FLOODPLAIN .. ~ ~ -

ROADK EA R BRIDGE 7

/AP

FIELD

CONSTRUCTION

(b OFFICE

v1l,

N`-

RLL DOCUMENTS PREPARED NPENONI ASSOCIATESARE INSTRUMENTS OF SERMCE .N RESPECT OF THE DRAWN BY: WCK SCALE: HORZ. 1"100 DATE: 06/15/2011

To BE SUrIABLE FOR REUSE BY OWNER OR OTHERS VERT. N/AON EXTENSIONS OF THE PROJECT OR N ANY OTHERPROJECT. MOO REUSE WITNOUT WRITEN VERIFICoN CHECKED BY: LGB JPA PERMIT SUBMITTALSR AD•,PTATWOANODBY PENNON, ASSOCIATEVS FOR THE

Pennoni Associates Inc. SP•ECIFI PUPOEINTENDE[D WIIL IBEy TONREPOSR To PENN tSS 0TO LEGAL100 N. Wilkes-Barre Blvd. OSH E IO PENNONI ASSOCIATERE AND OWNER BELL BEND NUCLEAR POWER PLANT

ASSCITE FROle-.M AND OL R MLESS PENNONI JOB No. PPLS 0902 LUZERNE COUNTY, PENNSYLVANIA

8702 EPENSES AR1ONG OUT O OR RESULTING THEREFROU

FIGURE 5B - SITE LAYOUT REV 1 : 10/28/2011 REVISED FLOOD LINES APPLICATION BY;FREV 0 : 06/15/2011 INITIAL SUBMISSION PPL NUCLEAR DEVELOPMENT, LLC

o

Page 10: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

\ ~ ~ \\ 0Sf4/ / 4///, r///

,-,ENHANCED ""S 9WETLANDS 4'

/Z SCFPU RIT'/ ROAD,-iI / 7 . 7 / /"

/ I IxUSH ,,of 1 / .x__/__,_

tK /

-Q\

IMP TED

I700\ KEAR x

STR EA f FO1O0 YEAR

OR TI FLOODPLAIN

A S)CREATED / x

S ENHANCWETLAN

- -SECURITY,

ROAD 1

DOC.UMENTS PREPREV IC PENN' SSSOC OTES DRAWN BY: WICK SCALE: HORZ. 1"=100 DATE: 06/15/20111. TU AE INENDD O REPESETEDVERT. N/A

PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION CHECKED BY: LGB JPA PERMIT SUBMIT'ALOR ADAPTATON BY PENNON[ ASSOCIATES FOR TEHSPECIFIC PURPOSE INTENDED WILL BE AT OWNERS

PSOLSURE TO PENNONI ASSOCIATEIIAND ONR NAL BELL BEND NUCLEAR POWER PLANT100 N. Wilkes-Barre Blvd SHALL INDEMNIFY AND HOLD AARMLESS PENNOI JOB No. PPLS 0902 LUZERNE COUNTY, PENNSYLVANIAASOIAE -RO AL 870I .M DAMAGES. OSSES MAD

REV 1 : 10/28/2011 REV. FLOOD UNES/ BASIN 10.2 REM IOOVEDRFIGURE 5C - SITE LAYOUT REV0 : 06/15/2011 INITIAL SUBMISSION " PPL NUCLEAR DEVELOPMENT, LLC

Page 11: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

720715710705700695690685680675670665660655650645640635630625

AuL DOCUMENTS PREPARED .Y PENNONI ASSOCIATES DAARE INSTRUMENTS OF SERAXCE IN RESPECT OF THE DRAWN BY: WCK SCALE: HORZ. 1"=150 DATE: 06,15/201PROJECT. THEY ARE NOT INTENDED OR REPRESENTED VERT. 1 "=30'TO BE SUITABLE FOR REUSE BY OWNER OR OTHERSON EXTEWSIONS OF THE PROJECT OR ON ARNY OTHERPROJECT. ANY REUSE WITHTOU WRATTEN VERIICAON CHECKED BY: LGB JPA PERMIT SUBMITTAL• p OR ADAPTATION BY PENNONI ASSOCIATES FOR THE

ennoni Asociate '--. SPECI.......RPOSE IRTENOED WILL BE AT OWNERS BLPennoni Associates Inc. SOLE RISK AND WITHOUT LIABILITY OR LEGAL BEND NUCLEAR POWER PLANTEXPSURE TO PENNONI ASSOCIATES: AND OWNERBELENNUEAPO RPAT100 N. Wilkes-Barre Blvd. SHALL INDEMNIFY AND HOLD HARMLESS PENNONI JOB No. PPLS 0902 LUZERNE COUNTY, PENNSYLVANIA

ASSOCIATES FROM ALL CLAIMS, A•AUMES. LOSSES ANEWilkes-Barre. PA 18702 EXPEHSES AROSI OUtT OF OR RESULTNG THEREFROM APPLICATION BY;

FIGURE 5D - BRIDGE NO. 4 CROSS SECTION REV 0 : 06/15/2011 INITIAL SUBMISSION PPL NUCLEAR DEVELOPMENT, LLC

Page 12: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

740

735

730

725

720

715

710

705

700

695

690

685

680

675

670

665

660

655

650

645

640

635

630

625

620

740

735

730

725

720

715

710

705

700

695

690

685

680

675

670

665

660

655

650

645

640

635

630

625

620a

NAiL DOCUMENTS PREPARED BY PENNONI ASSOCIATEO DRAWN BY: WCK SCALE: HORZ. 1"= 100' DATE: 06/15/2011ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE______________________________PRJECO. TAEY ARE NOR INTENDED OR REPRESENTED VERT. 1 "=20'TO BE SUITABLE FOR REUSE BY OWNER OR OTHERSPROJECT ANY REUSE WITHOUT WTTRNVERIFCAION CHECKED BY: LGB JPA PERMIT SUBMITTiALOR ADAPTATION BY PENNONI ASSOCIATES FOR THE

Pennoni Associates Inc. SOLE RISK AND WITHOUT LIABILITy OR LEGAL BELL BEND NUCLEAR POWER PLANTEXPOSURE TO PENNONI ASSOCIATES; ANDO OWNERL 92 LZRECUTPNSLAI

100 N. Wilkes-Barre Blvd. SHALL INDEMNIFT AND HOLD HARMLESS PENNONI JOB No. PPLS 0902 LUZERNE COUNTY, PENNSYLVANIAASSO LVIES FROM ALL CLAMS, DAMVGES, LOSSES ANDO

Wilkes-Barre, PA 18702 EXPONSES ARISING OUT OF OR RESULTING THEEROMLF U APPLICARON BY;FIGURE 5E - 13RIDGE NO. 3 CROSS SECTION REV 0 : 06/15/2011 INITIAL SUBMISSION PPL NUCLEAR DEVELOPMENT, LLC

Page 13: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

750745740735730725720715710705700695690685680675670665

750745740735730725720715710705700695690685680675670665

o 0+

0 C'J 0 rF 0 0 ' 0 Ln 0 L0 0 r-Ln Ln un i Ln If+ + +I + + +

ALL DOCUMENTS PREPAD BY PENNONI ASSOCIATES DA. H= DANE INSTRUMENTS OF SERMCE IN RESPECT OF TOE DRAWN BY: WCK SCALE: HORZ ' 1 150' 1 DATE:, 56715/2011______PRO ECT. TO RROEE NOT INTENDED OR REPRESENTED VERT. 1O=20'TO RE SUITABLE FOR REUSE DY OWNER OR OTHERS-Pen oniOH EATENSIONS OF TE PROJECT OR ON AUNTGOTHERPROJECT. HANT REESE WITHOUT WRITITN VRIFICA]ON CHECKED BY: LGB JPA PERM[T SUBMFITALOR ADAPTATION RY PENNONI ASSOCIATES FOR THE

I~ SECITTE PURPOSE INTENDED HILL RE AT OWNERSý Pennoni Associates Inc. SOLE RISK AND HITHOUT LIARILIT SR LEOANEL EDNU" PWE LNEXPOSURE TO PENNONI ASSOCIATESK AND OWNER LL END NCL, PERNPLANT100 N. Wilkes-Barre Blvd. .. HEL INDEMNITY AND HOLD HARMEESS PE.NONI JOB No. PPLS 0902 LUZERNE COUNTY, PENNSYLVANIAASSOCIATES FROM ALL CLAIMS, DAMAGES. LOSSES AND

Wilkes-Barre, PA 18702 ...... ARISINGOTOEOE .. LINN T RO

FIGURE 5F - DISTURBED WETLAND AT APPLICATION BY;POWERBLOCK CROSS SECTION REV 0 : 06/15/2011 INITIAL SUBMISSION PPL NUCLEAR DEVELOPMENT, LLC

Page 14: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

100 YEARFL OODPL AI/A

-SEE LANDSTUDIES INC.CONFERS LANEPLANS FORMITIGATIONLAYOUT &DETAILS.

500 KV

C0LEHAN

BELL BEND NUCLEAR POWER PLANTLUZERNE COUNTY, PENNSYLVANIA

APPLICATION BY;PPL NUCLEAR DEVELOPMENT, LLC

Page 15: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

PORTION OF

5

IIIP

ALL DOCUMENTS PREPARED RY PENRONI ASSOCIATES WCKARE INSTRUMENTS OF SERVICE IN RESPECT OF THEPROJECT. THEY ARE NOT INTENDED OR REPRESENTEDEQ BE SUITABLE FOR REUSE RY OWNER OR OTHERSON EXTENSIONS OF THE PROJECT OR ON ANY OTHER.PROJECT. A1Y REUSE WTTHOUT WROTTEN VERIFICATION CHECKED BY: LGBOR ADAPTATION BY PENNONI ASSOCIATES FOR THESPECIFIC PURPOSE INTENDED WILL BE AT OWNERSSOLE RISK AND WITHOUT LIABILITY OR LEGAL -- -- "EXPOSURE TO PENNONI ASSOCIATES: AND OWNERSHALL INDEMNIFY AND HOLD HARMLESS PENNONI JOB No. PPLS 0902ASSOCTNTES PROM A CLAIMS ORDRAMES. LOOS EDRODEXPENSES ARISING COIT OF OR RESULTING THDEREROM

Pennoni Associates Inc.100 N. Wilkes-Barre Blvd.Wilkes-Barre. PA 18702

JPA PERMIT SUBMITTAL

BELL BEND NUCLEAR POWER PLANTLUZERNE COUNTY, PENNSYLVANIA

FIGURE 6A - SITE LAYOUTAPPUCATION BY;PPL NUCLEAR DEVELOPMENT, LLC

Page 16: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

BELL BEND NUCLEAR POWER PLANTLUZERNE COUNTY, PENNSYLVANIAPennoni Associates Inc.

100 N. Wilkes-Barre Blvd.W"es-B PA 870

FIGURE 6B - SITE LAYOUTAPPLICATION By;PPL NUCLEAR DEVELOPMENT, LLC

Page 17: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

r0A

PIMPACTTD

WWETLAN'D

ORANGE CONS'T. FENCE

ýISTING CULVERTSWILL" REMAIANDDRAINAGE-PATTERNS--WILL -BE MAINTAINED THROUGH

SSEA '• I /••' YIlINSTALLATION AND" •_H -- , z\,\• X, CONNECTION OF NEW

-S'/•O A CULVERT AND INLETS

EXACT SWIT H ARIDIMPROVEMENT EXPAN-SIONARRANGEMEN-JS PENGI -_NG

Q)K

0

-1 -6"t0

__... • •>-•• m I •,1

AOL DOCUMENTS PREPARED MY PENHONI ASSOCIATES DRAWN BY: WICK SCALE:HORZ.V "=150' DATE; 06/15/2011ARI STUESOF SROICE IN REPC OF DRWTYHCECAE OZ "10 AE 6Iqu

PROJECT. TOES ARE NOT INTENDED OR REPRESENTED VERT.N/n TBE SUITABLE FOR REUSE BY OWNER OR OTHERSNDR EXTENSIONS OF THE PROJECT OR ON ANY OTHERPROJECT. MAY REUSE WITHOUT WRITEN VERIFICARON CHECKED BY: LGB JPA PERMIT SUBMITTALOR ADAPTATION BY PENNONI ASSOCIATES FOR THESPECIFIC PURPOSE INTENDED WILL BE AR OWNERSPennoni Associates Inc. SEIADIOEPUTAN B EAOWE100 N. Wilkes-Barre Blvd. EXP ETOPSHALL INDEMNIFY AND COOLTESU ANOW JOB No. PPLS 0902 LL END NYUC, PENNSYLVANIAASSOCATES FROM ALL CLAIMS, DAMAGES, LOSSES AND

Wilkes-Barre, PA 18702 EXPENSES ARISNG OUT OF OR RESULTING THEREFROM

REV 1 : 10/28/2011 REVISED PROJECT BOUNDARY APPLICATION BY;FIGURE 6C - SITE LAYOUT REV 0 : 06/15/2011 INITIAL SUBMISSION PPL NUCLEAR DEVELOPMENT, LLC

Page 18: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

50' EVWETL ANDDUFFER EV WETLAND

50' EVWETLANDBUFFER

CL ACCESS ROAD WSTA. 805+26.04

PIPE BRIDGE NO. 7360.00' C/C ABT. BRGS.

705

700

695

690

685

680

675

670

665

660

655

650

645

640

705

700

695

690

685

680

675

670

665

660

655

650

645

6400 0

+

0 C\ 0 rq 0 IT O Ln O Q0IL Ln U-) InI+ + + + +

ALL. DOCUMENTS PREPARED BY PENNONI ASSOCIATES DRAWN BY: WICK SCALE: HORZ. 1" 100' 1DATE: 06/15/2011ARE INSTRUMENTS OF SERACE IN RESPECT OF THE _________________________________SPRoPRJECT. TH: ARE NOT INTENDED OR REPRESENTED VERT. 1"=20'TO RE SUITABLE FOR REUSE By OWNER OR OTHERSP e n n o n if ON EXTENSIONS OF OHE PROJECT OR ONI NERO OATHENRPROJECT. ANY REUSE WTHOUT WRITTEN VERIFICATON CHECKED BY: LGB JPA PERMIT SUBMIITAL )OR ADAPTATON BY PENNONI ASSOCIAES FOR THEiAssociates Inc. SPECIFIC PURPOSE INTENDED WILL BE AT OWNERSPennoni I SOLE RISK AND WITHOUT LIABILITO B BEND NUC POWER PLANTEXPOSURE TO PENNONI ASSOCIATES; AND OWNER JOB No. PPLS 0902100 N. Wilkes-Barre Blvd. 'SHL INDEMNITY AND HOLD HARMLESS PENNONI LUZERNE COUNTY, PENNSYLVANIAASSOCIATES FROM ALL CLAJWS, DAMAGES. LOSSES AND

Wilkes-Barre, PA 18702 EPENSES, ARII NOT OF OR RESULTNOINREROBAPPLICATION BY;

FIGURE 6D - PROPOSED PIPE BRIDGE 7 SUBMISSION PPL NUCLEAR DEVELOPMENT, LLCCROSS SECTION REV 0 : 06/15/2011 INITIAL SUBMISSION

Page 19: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

695 - __ L.695.00690 SLOPEESTAILLLZED 4

6 WITH RIPRAP-i. ±

680--675 - EXISTING I670 - G9AIDE~I__ IVE665

660- _0 0 0 cli 0 rl1

NOTES:1. EXISTING DRAIN PIPE TO BE REMOVED &REPLACED MAINTAINING CURRENT HYDRAULICCONDITIONS.

710705700695690685680675670665660

.678.81 / J,/ APRON' INV.EL.6'6'5. -+

0 .- O, L 0 WO 0 r-- 0 00 0LO / f [fTO L Lf Lfl+/ + + + + +

+/428 LF - 36" RCP

CULVERT 0 3. 14%SEE NOTE 1

ALL DOCUMENTS PREPARED Y PENNONI ASSOCATOES DRAWN BY: WCK SCALE: HORZ. 1"=150' DATE: 06/15/2011ARE INSTRUMENTS oF SERTVICE IN RESPECT OF TOE DATE:__________06/15/2011_____________PROJECT. THEY ARE NOT INTENDED OR REPRESENTED VERT. 1 "=30'TO BE SUITABLE FOR REUSE BO OWNER OR OTHERS(P en n on' mFu ON EXTENSIONS OF THE PROJECR OTREONVEARUT OTHENRPROJECT. ANY REUSE WITHOUT WRIT FICATION CHECKED BY: LB JPA PERMIT SUBMIrALOR ADAPTATION BY PENNONI ASSOCIATES FOR THE

o~ k SPECIFIC PURPOSE INTENDED WILL BE AT OWNERSý pennoni Associates Inc. SOLE RISK AND WITHOUT LIABILITB OR LEGAL BELL BEND NUCLEAR POWER PLANTEXPOSURE TO PENNONI ASSOCOIATE; AND OWNER 0 LL END NCLA PERNPLANT100 N. Wilkes-Barre Blvd. SHALL IDEMNIFY AND HOLD HARMLESS PENNONI JOB No. PPLS 0902 LUZERNE COUNTY, PENNSYLVANIAASSOCIATES FROM ALL CLAM, , DMAGES, LOSSES MADWilkes-Barre, PA 18702 EXPENSES ARISING OUT OF OR RESULTNI THEREFROM

F TEARDROP WETLAND 36" PIPE _ APPUCATION BY;-- CULVERT CROSS SECTION REV 0 : 06/15/2011 INITIAL SUBMISSION PPL NUCLEAR DEVELOPMENT, LLC

Page 20: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

750745740735730725720715710705700695690685680675670665660655650645640635630625620

- 750- 745- 740- 735

7307257207157107056

1700695690685680675670665660655650645640635630625

L20L+

ALL DOCUMENTS PREPARED B Y PENNONI ASSOCIATES FOR TH0ARE INSTRUMENTS OF SERVICE IN RESPECT OF TH DRAWN BY: WCK SCALE: HORZ.' 1=15: DAE 615/2011PROECT. THEY ARE NOT INTENDED OR REPRESENTED VERT. =3rO RE SUITABLE FOR REUSE NY OWNER OR OTHERSP enn ~ON EXTENSIONS OF TOE PROJECT OR ON EANT41 OTHRERennoni Associates Inc. BREUSE THOU WRI N TICNN CHECKED BY: LB JPA PERM SUBMITAL

Pennoni SOLE RISK AND WITHOUT LIABILITY OR LEGAL1-EXPOSURE TO PENNONI ASSOCIATES; AND OWNER LL END NUCLEA PERNPLAITSHASL INDEMNIFY AND HOLD HARMLESS PENNONI JOBLUZERNE COUNY PENNSYLVANIAASSOCIATE FROM ALL CLIM, DAMAGES, LOSSES ANDWilkes-Borre. PA 18702 ERPENSES ,AR9oN OUT OF OR RESULONG TEREOA

BRIDGE NO. 2 & PIPE APPUCATION BY;FIGURE 6F - BRIDGE NO. 6 CROSS SECTION REV 0 : 06/15/2011 INITIAL SUBMISSION PPL NUCLEAR DEVELOPMENT, LLC

Page 21: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

750

745

740

'735

730

725

720

715

,710

705

700

695

690

685

680

675

670

665

660

655

650

645

640

635

630

625

750

745

740

735

730

725

720

715

710

705

700

695

690

685

680

675

670

665

660

655

650

645

640

635

630

625c-i

UPI

0 0 0 0D C) 0 co 0 _ 0 QWY WYQ0 L Lfl WY WY mY u') LY W

+ +Y Lf) + Ufl + WY + Lf) + Lfl

0LnW-

ALL. DOCUMNETS PREPAJEED BY~ PENN DROC A WNS BY C CL:HR.1= AE 615/2011ARl INSTRUMENTS OF SERVICE IN RESPECT OF THE DRAWN__BY:______SCALE: _________1__=_100 ___1_DATE: __06/PR OJECT. T•E• ARE NOT INTENDED OR REPRESENTED VERT. 1 =20'TO BE SUITABLE TOR REUSE BY OWNER OR OTHERS(P/ nno ON EXTENSIONS OF THE PROJECT OR OW ANRY OTRPROJECT. ANY REUSE NMTrOUT WRITTET \IFICAON CHECKED BY: LGB JPA PERMIT SUBMITTALOR ADAPTATION BY PENNONI ASSOCIATES FOR THE

en As SECIFIC PORPOSE INTENDED WILL RE AT OWNERSPennoni As usociates Dnc. SOLE RISK ANE WITHOUT LIABILITY OR LEGAL

EXPOSURE TO PENNONI ASSOCIATES; AND OWNER100 N. Wilkes-Barre Blvd SHALL. INDEMNIFY AND HOLD .AR.LESS PENNONI JOB No. PPLS 0902 LUZERNE COUNTY, PENNSYLVANIASOCRATES FROM ALL CLAIOS, DMAGES. LOSSES ANT

Wilkes-Barre. PA 18702 ExPENSES NONGR OF OR REOLSN TRPR'RO APPUCATION BY;FIGU RE 6 0 RAIL ROAD BRIDGE APPLINUCEATION DEB ELOPMENT;L

NO. 5 CROSS SECTION :REV 0 : 06/15/2011 INITIAL SUBMISSION PPL NUCLEAR DEVELOPMENT, LLC

Page 22: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

EXPANDED SWITCHYARD

695

690

685

680

670

665

660

6550 0 \j0Lfl Ln l

ALL DOCUMENTS PREPARER D BY PENNONI ASSOCTRES DRAWN BY: WCK SCALE: HORZ. 1 "=50' DATE: 06/15/2011ARE INSTRUMENTS OF SERSTCE IN RES ECT OF TOE______________________________PIROJECT. THEY ARE NOT INTENDED OR REPRESENTED VERT. 1 "1'T0 RE SUITABLE FOR REUSE By OWNER OR OTHERSP ennoni ON EUTENSIONS OF THE PROJECT OR ONVER DABOTHERPROJECT. ANY REUSE WITHOUT WRITTEN VERIFICAION CHECKED BY: LGB JPA PERMIT SUBMITTALOR ADAPTATION BY PENNONI ASSOCIATES FOR THE

A ± I SPECIFIC PURPOSE INTENDED WILL RE AT OWNERSS Pennoni Associates Inc. SOLE RISR AND WITHOUT LIABILITIT ORSLEGALEXPOSURE TO PENNONI ASSOCIATES; AND OWNER BELLBEND NUCLER POWER PLANT

100 N. Wilkes-Barre Blvd. ..... ........ A ..HALD.RMLESS PENNONI JOB No. PPLS 0902 LUZERNE COUNTY, PENNSYLVANIArSSOCIATED FROM ALL CLAIMS. DAMAGES. LOSSES AND

Wilkes-Barre, PA 18702 EXPENSES SABIN OT.. OF OR RESULTING THEREFROM

EXISTING SWITCHYARD APPLICATION BY;FIGURE 6H EXPANSION CROSS SECTION REV 0 : 06/15/2011 INITIAL SUBMISSION PPL NUCLEAR DEVELOPMENT, LLC

Page 23: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

710

705

700

695

690

685

680

675

670

665

710

705

700

695

690

685

680

675

670

665

6600 0 0 (\j 0 Fn 0

Li Hi Hi L

660

ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES DRAWN BY: WCK SCALE:HORZ. 1"=100' DATE: 06/15/2011ARE INSTRUMENTS OF SERAVCE IN RESPECT OF THEPROJECT. THEY ARE NOT INTENDED OR REPRESENTED VERT. 1"=20'TO BE SUITABLE FOR REUSE BY OWNER OR OTHERSP en n o n i ON EXTENSIONS OF THE PROJECT OR ON AtNY OTHERPROJECT ANY REUSE WITHOUT WRITTEN VERIFICHOON CHECKED BY: LGB JPA PERMIT SUBMII-ALOR ADAPTATION BY PENNONI ASSOCIATES FOR THE

0S1 SEIFIC PURPOSE INTENDED WILL WE AT OWNERS• " ennoni Associates Inc. SOLEPE RISK AND WITHOUT LIABIL oR LEGAL BELL BEND NUCLEAR POWER PLANT

EXPOSURE TO PENNONI ASSOCIATES HAND OWNER LL END NUE, PERNS LANI100 N. Wilkes-Barre BlvdL . ......... A........ .HARMLESS PENNUNI JOB No. PPLS 0902 LUZERNE COUNTY, PENNSYLVANIA

ASSOCIATES FROM ALL CLAIMS. DAMAGES. LOSSES ANDWilkes-Barre. PA 18702 EXPEONSES ARISANG OT OF OR RESULTING THEREFROM

FIGURE 6J EXISTING SWITCHYARD APPLICATION BY;EXPANSION CROSS SECTION REV 0 : 06/15/2011 INITIAL SUBMISSION PPL NUCLEAR DEVELOPMENT, LLC

Page 24: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

695

695

695

695

690

685

680

675

695

695

695

695

690

685

680

675

00 0

C'j

ALL OOCUMENrS PREPARED BY PENNONI ASSOCIATES DRAWN BY: WCK SCALE: HORZ. 1 "=50' DATE: 06/15/2011ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE _J"_________1_=50__ 1_DATE:____________PROJECT. THEY ARE ROT INTENDED OR REPRESENTED VERT. 1 "=10'TO RE SUITABLE FOR REUSE By OWNER OR OTHERSennon ON EXTENSIONS OF THE PROJECT OTREONVEARNY OTHERPROJECT. ANY REUSE WITHOUT WRITTN ERFICHION CHECKED BY: LGB JPA PERMIT SUBMITTALOR EDAPTATION OFY TEO, ASSOCIETE O ON S OTHEennoni~~~~ Ascae '-.PECFC PURPOSE INTENDED WILL BE AT OWNERS

Pennoni Associates Inc. SOLE RISK AND WITHOUT LIABILIT OR LEGAL BELL BEND NUCLEAR POWER PLANTEXPOSURE TO PENNONI ASSOCIATES; ANOD OWNGR 90 UERN OWPNSLAI100 N. Wilkes-Barre Blvd. SHALL INDEMNIFY AND HOLD HARMLESS PENNON[ JOB No. PPLS 0902 LUZERNE COUNTY, PENNSYLVANIA

AOSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND

Wilkes-Barre. PA 18702 EXPEDSES ARISIOGS oU O OR RESULTIN THEREFROM

EXISTING SWITCHYARD APPLICATION BY;FIGURE 6K - EXPANSION CROSS SECTION REV 0 : 06/15/2011 INITIAL SUBMISSION PPL NUCLEAR DEVELOPMENT, LLC

Page 25: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

TOOLKEAWH IOK--WE

48BTC PLANTIP

BASI

ý'2i ( K H, I L

ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES DRAWN BY: WCK SCALE: HORZ. 1 =150 DATE: 06/15/2011ARE INSTRUMENTS OF SERVICE IN RESPECT OF ORE PRAWN BY: WICK SCALE:HORZ. 1"=150' DATE: 06/15/2011____PROJECT. OREY MRE NOT INTENDED OR REPRESENATED VERT.N/TO RE SUITABLE FOR REUSE BY OWNER OR OTHERSPROJECT. ANY REUSE WTHOUT WRITTEN VERIFICAON CHECKED BY: LGB JPA PERMIT SUBMRN/ALOR ADAPTATION BY60 ON SOCAE FOR THE SB [TIS PEIFIC PURPOSE INTENDED WILL BE AT OWNERSP e n n o n i A s s o c ia t e s In c . S O LE R IS K A N D W ITH O U T LIAB ILIT OH LE G A L B E L L B E N D N U C L E A R P O W E R P L A N TEXPOSURE TO PENNONI ASSOCIATES; ANO OWNERJ BELL BEND NUCLEAR POWER PLANT

1 0 0 N . W ilk e s - B a rre B lv d . . ..... ........ ... .... ........ .PENN JO B N o . PPNLS 0902 LUZERNE COUNTY , PENNSYLVAN IAASS ATES FROM RU CLAIMS. DAMAGES, LOSSES RAIDWilkes-Barre, PA 18702 EXPE ,_____,_Uoo__o _O_

REV 1 : 10/28/2011 REVISED STREAM NAME APPUCATION BY;FIGURE 7A - SITE LAYOUT IREV 0 06/15/2011 INITIAL SUBMISSION PPL NUCLEAR DEVELOPMENT, LLC

Page 26: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

690685

680

675

670

665

660

655

650

645

640

635

630

625

620

615

610

605

690

685

680

675

670

665

660

655

650645

640

635

630625

620

615

61.0

6050 0

+0L+

C\J 0LC)

ALL DOCUMENTS PREPARED Y PENORNI A RSOCIoTES DRAWN BY: WCK SCALE: HORZ. 1" 100' DATE: 06/15/2011ARE INSTRUMENTS OF SERMCE IN RESPECT OF THE______________________________PRNEC. TOE ARE NOT INTENDED OR REPRESENTED VERT. 1"=20'TO BE SUITABLE FOR REUSE BY OWNER OR OTHERSennon ON EXTENSIONS OF THE PROJECT OR ON ANY OTHERPROJECT. ANY REUSE WITHOUT WRTTEN VERIICATION CHECKED BY: LGB JPA PERMIT SUBMrITALOR ADAPTATION BY PENNONI ASSOC•ATES FOR THE

o j.SPECIFIC PURPOSE IRTENDED WILL BE AT FOWNTERSLennoni Associates Inc. SOLEIRISK AND WITHOUT LIABILITWYIL D LE AoROWNREGARL BELL BEND NUCLEAR POWER PLAN

EXPOSURE TO PENNONI ASSOCITES AND E BELL BEND NUCLEAR POWER PLANT100 N. Wilkes-Barre Blvd. SHALL INDEMNIFY AND HOLD HARMLESS PENRONI JOB No. PPLS 0902 LUZERNE COUNWY, PENNSYLVANIAASSO ATES FROM AU_ CILNMS. DAAES. LOSSES AND

Wilkes-Barre, PA 18702 ERXPESES ARSING OUT O OR RESULTING THEREFROMN

FIGURE 7B - RAILROAD TRACK AT STREAM REV 1 : 10/28/2011 REVISED STREAM NAME APPLICATION BY;

CROSSING CROSS SECI1ON REV 0 06/15/2011 INITIAL SUBMISSION PPL NUCLEAR DEVELOPMENT, LLC

Page 27: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

685

680

675

670

o. 3

669'

660

655

650

645

640

635

630

625

685

680

675

670

665

660

655

650

645

640

635

630

625

0 o -0 0Ln LT Ln+ + +

ALL DOCUMENTS PREPARED BN PENNONI ASSOCIATENOS DRAWN BY: WCK SCALE: HORZ. 1 "=50' DATE: 06/15/2011ARE INSTRUMENTS OF SERVI.CE IN RESPECT OF THE 50'_____1___DATE:______0___ /15/2011______PIROECT. THEY MRE NOT INTENDED OR REPRESENTED VERT. 1 "=10'TO BE SUITABLE FOR REUSE BY OWNER OR OTHERSPROJECT. ANY REUSE WITHOUT WRITTEN VERIFCATON CHECKED BY: LGB JPA PERMIT SUBMITrAL

ý Pennoni Associates Inc. SOLE RISK AND WITHOUT LIABITTD ORSLEGAL BELL BEND NUCLEAR POWER PLANTEXPOSURE TO PENNON 0 ASSOCIATES; AND OWENGARL O o S00 ULA OE LN

100 N. Wilkes-Barre Blvd. . ...L. IDEMNIFY AN..HOLD HARMLESSP.... JOB No. PPLS 0902 LUZERNE COUNTY, PENNSYLVANIAASSOCIATES FROM ALL CLAIMS. DAMAGES. LOSSES AND

Wilkes-Barre, PA 18702 EXPENSES AISING OUT OF OR RESULTING THEREFROM

FIGURE 7C - RAILROAD TRACK AT REV 1 : 10/28/2011 REVISED STREAM NAME APPLICATION BY;

STREAM CROSSING PROFILE *REV 0 : 06/15/2011 INITIAL SUBMISSION PPL NUCLEAR DEVELOPMENT, LLC

Page 28: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

N

IN,

IMPACTEDWETLAND

/

III I

/

IAREA

E

izE:

K

ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES WCKARE INSTRUMENTS OF SERVICE IN RESPECT OF THE DRAWN BY:PROJECT. THEY ARE NOT INTENDED OR REPRESENTEDTO BE SUITABLE FOR REUSE BY OWNER OR OTHERSON EXTENSIONS OF THE PROJECT OR ON ANY OTHERPROJECT. ANY REUSE WNITOUT WRTTEN VERIFICADON CHECKED BY: LGBOR ADAPTATION BY PENNONI ASSOCIATES FOR THESPECIFIC PURPOSE INTENDED WILL BE AT OWNERSSOLE RISK AND WITHOUT LIABILITY OR LEU __EXPOSURE TO PENNONI ASSOCIATESK AND OWNEARSHALL INDEMNIFY AND HOLD HARMLESS PENNONI JOB No. PPLS 0902ASSOCLIAES FROM ALI CLAIMS. DA MAGES, LOSSES A•lOEXPENSES ARISING OUT OF OR RESULTING THE•DFROM

Pennoni Associates Inc.100 N. Wilkes-Barre Blvd.Wilkes-Barre, PA 18702

FIGURE 8A - SITE LAYOUT

SCALE:HORZ. 1`=200' DATE:VERT. N/A

JPA PERMIT SUBMITTAL

BELL BEND NUCLEAR POWER PLANTLUZERNE COUNTY, PENNSYLVANIA

APPLICATION BY;PPL NUCLEAR DEVELOPMENT, LLC

FLOOD UNES

Page 29: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

I(THIE RESULTANT E&S DREDGEMATERIAL, ONICE DRIED, WILL BE'USED AS TOP DRESSING ON THEBELL BEND PPL PROPERTYNORTH OF US RT. 11.

N

ITEMPORARYCOFFERDAMTOP EL. 526

-DREDGEAREA

RIVER EDGE

S. S. S.SL OWDOWN LINE K

K

CONTRACTOR TO INSTALLSEDIMENT FILTER PUMPAS NEEDED (TYP.)

TEMPORARY DREDGEDEWATERING POND

*TEM PORARY

03

/ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATESDRAWN BY: WCKARE INSTRUMENTS OF SERVICE IN RESPECT OF THEPROJECT. THEY ARE NOT INTENDED OR REPRESENTEDTO RE SUITABLE FOR REUSE BY OWNER OR OTHERSON EXTENSIGONS OF THE PROJECT OR ON ANY OTHERPROJECT. ANY REUSE WITHOUJT WRITTEN VERIFICATION CHECKED BY: LGBOR ADAPTATION BY PENNONI ASSOCIATES FOR OHESPECIFIC PURPOSE INTENDED WILL BE AT OWNERSSOLE RISK AND WITHOUT LIABILITY OR LEGALEXPOSURE TO PENNONI ASSOCIATES; AND OWNERSHALL INDEMNIFY AND HOLD HARMLESS PENNONI JOB No. PPLS 0902ASSOCIATES FROM AUL CIMS. DAMAGES, LOSSES ANDEXPENSES ARISING OUT OF OR RESULTING THERXEROM

VERT. N/A

JPA PERMIT SUBMITTAL

Pennoni Associates Inc.100 N. Wilkes-Barre Blvd.

Wil,=S--inrre PA 187()9

BELL BEND NUCLEAR POWER PLANTLUZERNE COUNTY, PENNSYLVANIA

FIGURE 8B - COFFERDAM LOCATIONSAPPLICATION BY;PPL NUCLEAR DEVELOPMENT, LLC

Page 30: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

SUSQUEHANNA RIVERFLOW DIRECTION

BAR GRATING(TYP) -

_-TRAVEUNG SCREENCONTROL PANEL

-'--•.DUAL FLOWTRAVELING SCREEN

.- " ~STOP LOGS

04

0 A

_---PUMPHOUSE AIR COMPRESSORAND AIR RECEIVER

-4 SCREEN WASH PUMPS.. SELF-CLEANING STRAINER (TYP)

-1 RWSS INTAKE PUMPS

-4 CWS MAKEUP PUMPS

-AIR INTAKELOUVER

-BATTERY CHARGER

EXHAUST 1 I1.AIR LOUVER

12" THICK GRADE SLAB.T/SLAB 6" ABOVE GRADEW112- HIGH CONTAINMENTWALL ALL AROUND

8 FEET HIGH SECURITYFENCE W/DOUBLE SWING GATES

(2) TRANSFORMERS

13.8 KV/6.9 KV

UPPER PLANTOP CONCRETE EL 528'-0"

N.T.S.

DRAWING SOURCE: S&L DRAWING NO.12198-004-RWSS-004, REV. 2

ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES DRAWN BY: WCKARE INSTRUMENTS OF SERVICE IN RESPECT OF TREPROJECT. THEY ARE NOT INTENDED OR REPRESENTEDTO BE SUITABLE FOR REUSE BY OWNER OR OTHERSON EUTONS ONS OF THE PROJECT OR ON ANY OTHERPROJECT. ANY REUSE WITHOUT WRITTEN VERIFICAION CHECKED BY: LGBDR ADAPTATION BY PENNONI ASSOCIATES FOR THESPECIFIC PURPOSE INTENDED WILL BE AT OWNERSSOLE RISK AND WITHOUT LIABILITY OR LEGALEXPOSURE TO PENNONI ASSOCIATES; AND OWNERSHALL INDEMNIFY AND HOLD HARMLESS PENNONI JOB No. PPLS 0902ASSOCATES FROM ALL CLAIMS, DANMGES. LOSSES ANDEXPENSES ARISING OUT OF OR RESULTING THEREFROM

-Pennoni Associates Inc.100 N. Wilkes-Barre Blvd.Wilkes-Bgrre, PA 18702

FIGURE 8C - INTAKE STRUCTURE PLAN

BELL BEND NUCLEAR POWER PLANTLUZERNE COUNTY, PENNSYLVANIA

APPLICATION BY;PPL NUCLEAR DEVELOPMENT, LLC

Page 31: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

SUSQUEHANNA RIVERFLOW DIRECTION

90'-0"

30o-0" 30'-o" 30'- 0"

TRENCH FORBAR GRATING

-4STOP LOGS & GATES

DUAL FLOW

TRAVELING SCREEN

STOP LOGS & GATES

-- 4(3) SCREEN WASH PUMPS

ý(2) 60"x72" SUDING GATES--"(73) RWSS INTAKE PUMPS

-4 (3) CWS MAKEUP PUMPS

LOWER PLANTOP OF MAT EL 474'-0"

N.T.S.

FOR SECTION A-ASEE FIGURE 8E

DRAWING SOURCE: S&L DRAWING NO.12198-004-RWSS-004, REV. 2

&LL DOCUMENTS PREPARED NY PENNONI ASOIAE DRAWN BY: WCK SCALE: NTS DATE: 06/15/2011ARE INSTRUMENTS OF SERVICE IN RESPECT OF TOE _____________________________PWDECT. THEY ORE NOT INTENDED OR REPRESENTEDTO BE SUITABLE FOR EREUSE BY OWNER OR OTHERS(PenlnlOfni ON EXTENSIONS OF TOE PROJECT OR ONRES OATHOERPROJECT. ANY REUSE WTHOUOT WRITTEN OCRIFIClON CHECKED BY: LGB JPA PERMIT SUBMFITALOR ADAPTATION BY PENNONI ASSOCIATES FOR THES ECIFIC PURPOSE INTENDED WILL RE OR OWNERSPe o n. SOLE RIOR AND WITHOUT LIANILITY OR LEGALBELENNULAPORPANEXPOSURE TO PENNONI ASSOCIATES R BELL BEND NUCLEAR POWER PLANT100 N. Wilkes-Barre IScL INDENIFY AND WITHOLD HRLES.. .. . ENO JOB No. PPLS 0902 LUZERNE COUNTY, PENNSYLVANIA.100 N. Wilkes-Barre Blvd. HL DMIYADHL AMESPNO)JBN. PLASSOCIATES FROM ALL CLAI .,DAMGES. LOSSES A

Wilkes-Barre. PA 18702 EXPENSES ARISING OUT OF"OR REoSTLNG THEREFROM APPUC•lON BY;

FIGURE 8D - INTAKE STRUCTURE PLAN REV 0 : 06/15/2011 INITIAL SUBMISSION PPL NUCLEAR DEVELOPMENT, LLC

Page 32: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

DUAL FLOWTRAVELINGSCREEN

SECTION A-AN.T.S.

FOR SECTION LOCATIONSEE FIGURE 8D

DRAWING SOURCE: S&L DRAWING NO.12198-004-RWSS-004, REV. 2

AUL DOCUMENTS PREPARED BY PENNONI ASSOCIATES DRAWN BY: WCK SCALE: NTS DATE: 06/15/2011ARE INSTRUMENTS OF SERVCE IN RESPECT OF THE DRAWN BY: WCK SCALE: NTS 15/2011PROJECT. THEY ARE NOT INTENDED OR REPRESENTEDTo BE SUITABLE FOR REUSE BY OWNER OR OTHERSON EXTENSIONS OF THE PROJECT OR ON MVE O(THERPROJECT. ANY REUSE W0THOUT WR1 N VERIFCAION CHECKED BY: LGB JPA PERMIT SUBMITTAL• p - OR ,ADATATION BY PENNON, ASSOCIAT ES FOR THE

Pennoni Associates Inc. SOLE RISE AND WITHOUT LIBNILITY OR LEGA BELL BEND NUCLEAR POWER PLANTEXPOSURE TO PENNONI ASSOCIATES: AND OWNER 0902 LUBEND NUCE PERNPLANT100 N. Wilkes-Barre Blvd. SHALL.I.........AN....................N JOB No. PPLS092 LZRECUTPNSVAIASSOAITS FROM ALL CLAIMS, DANAGES, LOSSES AND

Wilkes-Barre, PA 18702 EXPE•NSES ARISINC OM OF OR RESUTINO THEREFRO APPLICATION BY;

FIGURE 8E - INTAKE STRUCTURE PLAN REV 0 : 06/15/2011 INITIAL SUBMISSION PPL NUCLEAR DEVELOPMENT, LLC

Page 33: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

100- YRFLOODPLAIN

100-YRFLOODPLA IN

I- I- I-

550 CR-E-ATD/ENHANCEQ D~ MPAC 0 TE4D VETLANDhiOU~

5451535525151550.49ý4948A484747

I5 INITAKE HWL L. 525DW

10 LOPE DRIVI WAY STRUCTURE TOP OF-i? 5 T ' SF t H E .n S E ET P I L ý

WITH R P RA'-.E

15 DROP / 12('

0 R _ O RADED

90 NORTH 84,B5

10 H; T AK-E 7f NA t/ - k"-'5 BOWDON -3 )UTFA 474

P PES I :HANN L 17__

SUSQUEHANNARIVER

555550545540535530525520515510505500495490485480475470

oo0 0Ln

0In+

Ln+

rc) 0,Ln

0Ln+-

NORTH BRANCHCANAL OUTFAL.CHANNEL

rl- 0Ln

100' +FOREBAY

NOTE: FLOOD ELEVATION FROMFEMA FIRM MAP PANEL NUMBER420625 0020 B IS 512.5.

ALLno iDUET P RRED BYPENNO SOIAE

MAE INSRENTS OFSEP •cE N RESPE CT OC THE DRAWN BY: WCK SCALE: HORZ. 1"=150' 1 DATE: 06/15/2011PROJECT. THEY ARE NOT INTENOED OR REPRESENTEO VERT. 1"=30'TO BE SUITABLE FOR REUSE BY OWNER OR OTHERSPennoni ON EXTENSIONS OF THE PROJECT OR ON ANY 0THERPROJECT. ANY REUSE WITHOUT WRITEN NcTn CHECKED BY: LGB JPA PERMIT SUBMITTALOR ADAPTATION BY PENRONI ASSOCIATES FOR THE

A U . SPECIFIC PURPOSE INATENDED WILL BE AT OWNERSennoni Associates Inc. SOLE RISK ANO WITHOUT LIABIITY ORSLEOAI. BELLBENDNUCLEARPOW___PLAN

EXPOSURE TO PENNONI ASSOCIATES. NE BELL BEND NUC R POWER PLANT100 N. Wilkes-Barre Blvd. SHALL INDEMNIFY OAT HOLR HO. MLESS PENNONI JOB No. PPLS 0902 LUZERNE COUNTY, PENNSYLVANIAASSOCIATES FROM ALL CLA NS. (MMAGES, LOSSES AND

Wilkes-Barre. PA 18702 ENSTSARISIG OUT OFR RESoLT•NO• . THREROM

FIGURE 8F - INTAKE STRUCTURE REV 1 : 10/28/2011 REVISED STREAM NAME / FLOODWAY APPUCATION BY;

CROSS SECTION REV 0 : 06/15/2011 INITIAL SUBMISSION PPL NUCLEAR DEVELOPMENT, LLC

Page 34: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

IIMPACTED WETLANDEXISTING

SUSQUEHANNAINTAKE ROAD

100-YR FLOODPLAIN__

525

520

515

510

505

500

495

525

520

515

510

505

500

4950 0

+0 IJN 0 0 'q- 0 Ln+Lf L+ L+

AL Pe nDn OCUMENTS PREPAREDOB PENNON, SOCAEARE INSTRUMENTS OF SEREDCE IN RESPECT OF HIE DRAWN BY: WCK SCALE: HORZ. 1"=lOO DATE: 06/15/2011PROJECT. THEY ARE NOT INTENDEO OR REPRESENTED VERT. 1"=20'TO BE SUITABLE FOR REUSE BY OWNER OR OTHERSPennon ON EXATNSIONS OF THE PROJECT OR ON ANr OTHIERPROJECT. AN REUSE WITHOUT TTEN VEIFICATON CHECKED BY: LGB JPA PERMIT SUBMITTALOR ADAPTATION BY PENNONI ASSOCIATES FOR THEe o A c ' SPECIFIC PURPOSE INTENDED WILL BE AT OWNERSr ennoni Associates Ifc. SOLE RISK AND WITHOUT LIABILITY OR LEGRAL BELL BEND NUCLEAR POWER PLANTEXPOSURE TO PENNONI ASSOCIATES: ANDP OWNER092 LZRECUTPNSVAI

100 N. Wilkes-Barre Blvd. s TO... IE NNNI AND HOLD HAR. MESS ..ONI JOB No. PPLS 0902 LUZEND COUTY PERNPLANTASSOCIATES FROM ALL CIAIMS, DAMAGES, LOSSES AND

Wilkes-Barre, PA 18702 EXPENSES ARINOC 0EST OF OR RESULTING THEREFROM

FIGURE 8G - INTAKE AREA REV 1 : 10/28/2011 REVISED STREAM NAME APPLICALnON BY;CROSS SECTION REV 0 : 06/15/2011 INITIAL SUBMISSION PPL NUCLEAR DEVELOPMENT. LLC

Page 35: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

SLOPE 0IMPACTED

535 -

530 -

5 2 5 SHEET

520 PILING

515 -

510

505

500

495

490

485

480

475

4700 0

Ln

535

530

525

520

515

510

505

.500

495

490

485

480

475

4700 IN 0 n 0LO LF) Ln-I ± ±

ALL DOCUMENTS PREPARED PY PENNONI ASSOCIATES DRW Y C CL:HR.1"100, DATE: 0/521ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE EDRAWN BY: WCK SCALE: HORZBEL BENDVRT'NuCRI20 A 06/15/2011PROJECT. THEY ARE NOT INTENDED OR REPRESENTED VERT. 1"=20'TO RE SUITABLE FOR REUSE RY OWNER OR OTRERS

/P n ON EXTENSIONS OF THE PROJECT OR ON ANY OTHERPROJECt. ANY REUSE WITHOUT WRITTEN VERIFICATO HCE BY: LGB JPA PERMIT SUBMITrALOR ADAPATION BY PENNONI ASSOCIATES FOR THEe As i SPECIFIC PURPOSE INTENDED WILL BE AT OWNERSSOLE RISK AND WITHOUT LIABILITY OR LEGAL BELL BEND NUCLEAR POWER PLANTEXPOSURE TO PENNONI ASSOCIATES; AND OWNER LL END NCER PERNPLANT100 N. Wilkes-Barre Blvd. H ARMLDEMNIFY AND...........ESS PENNONI JOB No. PPLS 0902 LUZERNE COUNTY, PENNSYLVANIAASSOATES FROM ALL CLAIMS, DMAhAES, LOSSES AND

Wilkes-Barre, PA 18702 EXPENSES AXRISI OUT OF OR RESULTIN THEREFROM

FIGURE 8H - INTAKE STRUCTURE REV 1 : 10/28/2011 REVISED STREAM NAME APPUCAIlON BY;

CROSS SECTION REV 0 : 06/15/2011 INITIAL SUBMISSION - PPL NUCLEAR DEVELOPMENT, LLC

Page 36: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

530

525

510

515

510

505

500

495

490

485

480

475

470

465

460

SUSQUEHANNARIVER

TOP OF SHEETPILE HWLELEV. 526' ELEV.

525'

EXISTING

G RADE

530

525

520

515

510

505

500

495

490

485

480

475

470

465

460

286'

24" PIPEELEV. 476' r-PORT HOLES a

1' -6"RIVERBED

"j- - - -

DIFFUSER PIPEFLAP GATE

0±n

0 0Ln

0L+

INJ 0 0LI•+

SECTION 81

-DIFFUSER PIPE

'- EXCAVATPLAN TO INSTA

N.T.S.

3'

E AS REQUIREDLL THE PIPE

PLAN NOTESt

1. DRAWING SOURCE, S&L DRAWING NO.COLA-FIGURE-3.4-12.

2. SEE FIGURE BN FOR DIFFUSER PIPEDETAIL.

RoEcT. W REUSE WITOUT WRITTE YER..AKo CHECKED BY: LOB JPA PERMIT SUBMITTAL

OR ADAPTRTEON BY PENN RRI ASSOCIATES FOR THESPCII PREPOSIAE IORTENDED WILE AWTR OWNOTERS

Inc. SOLE RISK AND WITHOUT LIABILITY OR LEGALEXPOSURE TO PERROI ASSOCIATEY ART OWNER BELL BEND NUCLEAR POWER PLANT

100 N. Wilkes-Barre Blvd. SHALL IRNDERIFY AND HOLO HARMLESS PINRORI JOB No. PPLS 0902 LUZERNE COUNTY, PENNSYLVANIAASSOEIATES FHROMi TALLCAS DAMRAGES LOSSES MAR

W ilkes- B a rre, PA 18 7 0 2 E ,PENSE S ARISIC OJT O r OR RE SULOTIG T HERE ROC

FIGURE 81 - END OF BLOWDOWN LINE REV 0 : 06/15/2011 INITIAL SUBMISSION PPL NUCLEAR DEVELOPMENT, LLC

Page 37: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

IMPACTED NORTH

540

530

520

5,10

500

490

540

530

520

510

500

490

ALL DOCUMENTS PREPARED RY PENNON, ASSOCIATE' DRAWN BY: WCK SCALE: HORZ. 1 "=200' DATE: 06/15/2011ARE INSTRUENTS OF SER"CE IN RESPEClT OF T* 1PROJECT. THEY ARE NOT INTENDED OR REPRESENTED VERT. 1 "=40TO BE SUITABLE FOR REUSE RO OWNER OR OTRERSe n n o n ON EXTENSIONS OF THE PROJECT OR OW BAT OTHERPROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION CHECKED BY: LGB JPA PERMIT SUBMIT-ALOR ADAPTATION BY PENNONI ASSOCIATES POR TOE

SPECIFIC PURPOSEW INTENDED WILL RE AT OWNERSPennoni Associates Inc. SDOLE RISK AND WITROUT LIARILIyB OR LEGA. BELL BEND NUCLEAR POWER PLANTEXPOSURE TO PENNO"I ASOITS BELL BEDWNLERPOEEP

100 N. Wilkes-Borre Blvd. SHAL INDEUMPY AN HOSOCAARTMESS PENNONR JOB No. PPLS 0902 LUZERNE COUNTY, PENNSYLVANIAASSOCIATES FROM ALL CUIAS. AJCOOTESY LOSSESPNSVD

Wilkes-Barre, PA 18702 EXPENSES ARISN, OUT OF OR RELOLTIN EREPS•ROM0

FIGURE 8J - UTILITY CORRIDOR REV 1 : 10/28/2011 REVISED STREAM NAME APPUCATION BY;

CROSS SECTION REV 0.: 06/15/2011 INITIAL SUBMISSION PPL NUCLEAR DEVELOPMENT, LLC

Page 38: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

520

510

500

490

IMPACTED WETLAND

EXISTINGGRADE

/ mw_10 F-

-I -- -INTAKE/I

_ BLOWDOWN

0 0 0±n +

520

510

500

490

•J

SDOCUMENTS PREPARED BY PENNONI ASSOCIA TES DRAWN BY: WCK SCALE: HORZ. 1"=100' IDATE: 06/15/2011MAE INSTRUMENTS or SERVICE IN RESPECT Or THE ______________________________PROJECT. THY AMOE NOT INTENDED OR REPRESETED VERT. 1"=20'TO E SUITABLE FOR EUSE BY OWNER OR OTHERS,P en n o n i ON EXTENSIONS Or TOE PROJECT OR ON ANY OTHERPROJECT. ANY REUSE WITHOUT WARITEN VERIFICATION CHECKED BY: LGB JPA PERMIT SUBMI1TALOR ADAPTATION By PENNONI ASSOCIATES FOR THE

0 1~ SECIFIC PURPOSE INTENDED BILL BE AT OWNERSý Pennoni Assoiates Inc. SOLE RISK AND WITHOUT LIABILIT OR BELEENGUCEA OWR.LEXPOSURE TO PENNONI ASSOCIATEK. ANOD OWNER 0 LL END NCL, PERNPLANT100 N. Wilkes-Barre Blvd. SHALL INDEMNIFY ND AiOLD HA.RMLESS PENNONI JOB No. PPLS 0902 LUZERNE COUNTY, PENNSYLVANIAASSOCIATES FROM ALL CLAMS. DAMAGES. LOSSES ANDWilkes-Barre. PA 18702 EXPENSES M.ONS OUT Of OR REO•TINO THEREFROM

APPUCA1lON. BY;" ,FIGURE 8K - INTAKE AREA CROSS SECTION REV 0 : 06/15/2011 INITIAL SUBMISSION PPL NUCLEAR DEVELOPMENT, LLC

Page 39: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

SUSQUEHANNA FLOWRIVER

530

525

520

515

510

505

500

495

490

485

480

475

470

465

460

530

525

520

515

510

505

500

495

490

485

480

475

470

465

4600 0 - 0

+ +-)C.j

ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES DRAWN BY: WCK SCALE: HORZ. 1=100' 1DATE: 06/15/2011ARE INSTRUMENTS OF SERVICE IN RESPECT OF THEPROJECT. THEY ARE NOT INTENDED OR REPRESENTED VERT. 1=20TO BE SUITABLE FOR REUSE BY OWNER OR OTHERSON EXTENSIGNS OF THE PROJECT OR ONg OANYTHIENRPROJECT. ANY REUSE PRTHOUT WRIOTEN A\RFICTN CHECKED BY: LGB JPA PERMIT SUBMITTAL• p OR ADAPTATION BY PENNONI ASSOCIATES FOR THE

Pennoni Associates Inc. SOLE RISK AND WITHOUT LIABILITE AoROWRLEGA BELL BEND NUCLEAR POWER PLANTEXPOSURE TO PENNONI ASSOCIATES; AND OWNER

100 N. Wilkes-Barre Blvd. SHALL INDEMNIFY AND HOLD HARML.ESS PENNONI JOB No. PPLS 0902 LUZERNE COUNTY, PENNSYLVANIAASSOCIATES FROM ALL CLAIMS. DAMAGES. LOSSES AND

Wilkes-Barre, PA 18702 EXPENSES ,SoNS OUT OF OR RESULTING THEREFROM

FIGURE 8L BLOWDOWN LINE DREDGE APPUCATION BY;-- AREA CROSS SECTION REV 0 : 06/15/2011 INITIAL SUBMISSION PPL NUCLEAR DEVELOPMENT, LLC

Page 40: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

555-550-545-540 H535 E530-5525-520-515510505-500-495-490485480475-470-

0

555550545540535530525520515510505500495490485480475470

0 0 cli 0in Ln Lfl

NOTE: FLOOD ELEVATIONFROM FEMA FIRM MAP PANELNUMBER 420625 0020 B IS512.5.

ARLL DOCUMENTS PREPARED BY PENNONI ASSOCIATES DRAWN BY: WCK SCALE: HORZ. 1"=150' DATE: 06/15/2011ARE INSTRUMENTS OF SERVICE IN RESPECT OF ITE D T:_________________________________________PROJECT. THEY ARE NOT INTENDED OR REPRESENTED VERT. 1"=30TO BE SUITABLE FOR REUSE BY OWNER OR OTHERSennon ON EXTENSIONS OF THE PROJECT OR ON AN OTHERPROJECT. ANY REUSE WRTHKXOT WRITTEN VERIFICATION CHECKED BY: LGB JPA PERMIT SUBMITTALOR ADAPTATION BY PENNONI ASSOCIATES FOR THE

I~ SECIFIC PURPOSE INTENDED WILL BE AT OWNERSPennoni Associates Inc. SOLE RISK AND WITHOUT LIABILITy OR LEGAL BELL BEND NUCLEAR POWER P"1ks BEXPOSURE TO PENNONI ASSOCIATES. AND OWNER LL END COCLEY, PERNPLANT100 N. Wilkes-Barre Blvd. SPEN L...DE AND..................NONI JOB No. PPLS 0902 LUZERNE COUNlY, PENNSYLVANIA

ASSOCIATES FROM AULL ELAI ,O DWAUBES. LOSSES ANDWilkes-Barre, PA 18702 EXPENSES ARISING OUT OFMOR RESULTING THEREFROM

INTAKE STRUCTURE DREDGE APPLICATIONFIGURE 8M - AREA CROSS SECTION RHEV 0 : 06/15/2011 INITIAL SUBMISSION PPL NUCLEAR DEVELOPMENT, LLC

Page 41: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

It DIFFLISER

RIVER FLOW

RIP RAP

ANCHOR(TYP)

REBAR

SECTION A-AN. T. S.

ELEVATIONN.T.S.

DRAWING SOURCE: FIGURE 3.4-6 OF THEBELL BEND NUCLEAR POWER PLANT COMBINEDLICENSE APPLICATION, PART 3:ENVIRONMENTAL REPORT, REV. 2.

ANL DOCUMENTS PREPARED BY PEBNONI ASSOCIATES DRAWN BY: WCK SCALE: NTS DATE: 06/15/2011ARE INSTRUMENTS OF SERVICE IN RESPECT OF TiHE DATE:06/15/2011PROJECT. TRHEY ARE NOT INTENDED OR REPRESENTEDTO BE SUITABLE FOR REOSE BT ORNER OR OTHERS

ON EXTENSIONS OF THE PROJECT OR ON ANY OTHERPROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION CHECKED BY: LGB JPA PERMIT SUBMITTAL_p ,~O ,ADAo P TATION BY PENNO., ASSOCIATES FOR THEennon•~ ~~ Asocaes'-.ICOn PURPOSE INTENDED WILL BE AT OWNERS

LPennoni Associates Inc. SOE RISK AND WITHOUT LIABILITYRLEAL R OBELL BEND NUCLEAR POWER PLANTEXPOSURE TO PENNONI ASSOCIATES; AND OWNERGAR 0902 LL END NULR PERNPLANT100 N. Wilkes-Barre Blvd. SHALL......................RMLES PE ..... JOB No. PPLS092 LZRECUfPNSVAI

ASSOCIATES FROM ALL CtNLRIS RUES, LOSSES AG S

Wilkes-Barre, PA 18702 EXPENSES ARISNC OUT OR RESALD M THEREFROMAP TO ;APPLIUCATON BY;FIGURE 8N - DIFFUSER PIPE DETAIL REV 0 : 06/15/2011 INITIAL SUBMISSION PPL NUCLEAR DEVELOPMENT. LLC

Page 42: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

PROVIDE SHEETPILING IN WETLAND AREASAS INDICATED ON THE PLAN SHEETS.DEPTH OF SHEETPILING VARIES BY DESIGN

RESTORE DISTURBED WETLAND AREA TO ORIGINA

MINIMUM OF 8 INCHES OF SUITABLE TOPSOIL ANFLOODPLAIN SEED MIXTURE SPECIFIED FOR THEAREA (LSI PLANS DATED 10-29-10) AT A RATEACRE.

45' M

•FINISH

•L GRADE. PROVIDE AID SEED WITH THERIVERLANDS MITIGATION

OF 20 LBS. PER

AX.

ED GRADE

BACKFILL ZONE 2:COMPACT MATERIALEXCAVATED FROMTRENCH IN LAYERS NOTEXCEEDING 6" LOOSETHICKNESS TO 90%ASTM D-1557.

BACKFILL ZONE 1:BOTTOM OF EXCAVATION TO12" ABOVE TOP OF PIPE:HAND PLACE SELECTGRANULAR MATERIAL IN6" LOOSE-LAYERS ANDCOMPACT TO 90% ASTMD-1557.

BEDDING AND BACKFILL REOUIREMENTS

NOTE:THE BLOWDOWN LINE, WATER INTAKE LINES,AND ASSOCIATED DUCTBANKS SHALL BECOMBINED INTO A SINGLE TRENCH IN ALLLOCATIONS,

ALL DOCUMENTS PREPARED BY PENNONI ASSOCOTE DRAWN BY: WCK SCALE: NTS DATE: 06/15/2011ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE DRAWN BY: WICK SCALE: NTS DATE: 06/15/2011PROJECT. THEY ARE NOT INTENDED OR REPRESENTEDTO BE SUITABLE FOR REUSE BY OWNER OR OTHERS

FP en n on i ON EXTENSIONS OF THE PROJECT OR ON ANY OTHERPROJECT. ANY REUSE WITHOUT WRITTEN VE RRCATCON CHECKED BY: LGB JPA PERMIT SUBMITTALOR ADAPTATION BY PENNONI ASSOCIATES FOR THESPECIFIC PURPOSE INTENDED WILL BE UT OWNERSPennonl A Inc. SOLE RISK AND WITHOUT LIABILITY OR LEGAL BELL BEND NUCLEAR POWER PLANTEXPOSURE TO PENNONI ASSOCIATES: AND OWNER

100 N. Wilkes-Barre Blvd. SRALL INDEMNIFY AND HOLD HARMLESS PENNONI JOB No. PPLS 0902 LUZERNE COUNTY. PENNSYLVANIAASSOCATES FROM ALL CLAM DAMAGES, LOSSES ANDWilkes-Barre. PA 18702 EXPENSES oASING OUT OFMOR REoULN•IN TEREFROMI APPUIBILOWDOW & WATERCATION BY;

BLOWDOWN & WATER REV 1: 11/4/2011 UPDATED CIRC. WATER LINE PPL NUCLEAR DEVELOPMENT, LLCFIGURE BP - INTAKE LINE SECTION REV 0 : 06/15/2011 INITIAL SUBMISSION

Page 43: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

IILI1,E)'CF -Y

I G EI

ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES 'ARE INSTRUMNETS OF SERVICE IN RESPECT OF THE DRAWN BY: WCI< SCALE: HORZ.' 1`"500' 1DATE: 06/15/2011PROJECT. THEU ARE NOT INTENDED OR REPRESENTED VERT. N/ATO RE SUITABLE FOR REUSE BY OWNER OR OTHERS<P enno i ON EXTERTONS OF THE PROJECT OR ON ASHY OTHEREPROJECT, ANY REUSE WITHOUT WRITTEN VERIFICATOON CHECKED BY: LGB JPA PERMIT SUBMITTALOR ADAPTATION BY PENNONI ASSOCIATES FOR THE

A 5.~ SECIFIC PURPOSE INTENDED WILL BE RI OWNERSý pnoiAscae n. SOLE RISK ANT WITHOUT LIARILITOýYAN ORLWEIA' __________________

EXPOSURE TO PENNTNI ASSOCITE ART OWER -~BELL BEND NUCLEA POWER PLAN100 N. Wilkes-Barre Blvd. SHALL INDEMNIFY AND HOLD HARMLESS PENNONI JOB No. PPLS 0902 LUZERNE COUNTY, PENNSYLVANIAWilkes-Barre. PA 18702 EXPENSESSARSHONC ORUT OF OR RESJLTINAC RERETROMI

REV 1 :10/28/2011 REVISED FLOOD LINES APPLICATION BY;FIGURE 9 - SITE LAYOUT REV 0 06/15/2011 INITIAL SUBMISSION -PPL NUCLEAR DEVELOPMENT, LLC

Page 44: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

'GENERALWAREHOUSE

ROADBRIDGENO. 1 WETLANDS

-BBNPPPROJECTBOUNDARY

N

II&L DlOCUMENTS PREPARED BY PENNONLOIASSOCARiE IN~STRUMENTS OF SERVICE IN RESPECTam OF , RAWN BY: WICKPRWJEC1. THEY ARE NOT INTENED 0R REPRESENTEDTo 8E SUITABLE FOR RCUst 9Y OWNER OR OTHERS

PU T AYRO USEVM WRITEN OICAIEON CHECKED BY: OOR ROAPI#TONA Ely PENNONS ASSOCIATES FOP THlE GSPECIFIC PURPOSE INTENVE0 WILL Of AT OWNERSSOLE RISK AN D WITHOUT LIAIITS I001 LES'*____________________

$HIALL.INDEMNAIFYANID HOLD HAOI4LSS PENNONI JOB No. PPLS 0902ASSOCIATES FROM1 AL. CLAIMS, ORINES, LOSSES ANDEXPENSES ARISING CUT3o Of R RESULIONG THE150604

BELL BEND NUCLEAR POWER PLANTLUZERNE COUNTY, PENNSYLVANIA

APPLICATION BY;PPL NUCLEAR DEVELOPMENT, LLC

Page 45: Appendix A -Item 4 · 2012. 7. 31. · Appendix A -Item 4 PPL Bell Bend Nuclear Power Plant Salem Township, Luzerne County, PA ACOE Information Requirement: "Provide large plans (See

730

725

720

715

710

705

700

695

690

685

680

675

670

665

660

655

650

645

640

635

630

625

620

730

725

720

715

710

705

700

695

690

685

680

675

670

665

660

655

650

645

640

635

630

625

6200Ln+

rn 0 'T 0 Lfl 0 L-0 0 fl cc 0 oIn n In n In) u-) T~ n Iný r- U)±y) + r + rn + r) + r + + fn~

ALL DOCUMENTS PREPARER Ry PETAWONI ASSOCIATES C CL:HR.1=0ARE INSTRUMENTS OF SERVICE IN RESPECT OF TOSE DRAWN BY: WC CL:HR.1 p. DATE: 061/21PROJECT. THEU ARE NOT INTENDED OR REPRESENTED VERT. 1"=5'rO RE SUITABLE FOR REUSE RY OWNRER OR OTHERS(Pennoni ON EXTENSIONS OF TOE PROJCT OR ON ANT 00THPROJECT. ART REUSE WITHIOUR WRITTEN NCRIFIC RON CHECKED BY: LGB JPA PERMIT SUBMITTALOR RADATATION BY PENNONI ASSOCINTES FOR THES SECIFIC PURPOSE INTENDED WILL RE OR OWNERSPennoni Associates Inc. SOLE RISK AND WITHOUT LIABILITY OR LEGAL BL EDNCERPWRP.NL0O.Wle-BreBv. SPOSORE TO PENNONI ASSOCIATES. ANT OWNER 09 EL0EDNUL2RPWR LN100 N. Wilkes-Barre Blvd. HALL RINEMNIFT AND HOLD HARMLESS PENNON, JOB No. PPLS0D2 LZRECUlPNSVAI

ASOIAE RMALL MA. DAMAGOES. LOSS D LUE CUT, ENYLAIWilkes-Barre, PA 18702 EXPENSES AR19ON OUT OF OR RESUTING THEREFROM APPLIATON BY;

FIGURE 983 -,,BRIDGE NO. 1 CROSS SECTION IREV 0 : 06/15/2011 INIMAL SUBMISSION -PPL NUCLEAR DEVELOPMENT. LLC