appendix – i questionnaireshodhganga.inflibnet.ac.in/bitstream/10603/7656/18/18... · 2015. 12....
TRANSCRIPT
287
APPENDIX – I QUESTIONNAIRE
(To be filled by regular users of the Project Road)
1) Name :- ______________________________________________________________
2) Address :- ______________________________________________________________
______________________________________________________________
3) Age :
4) Gender : Male Female
5) Marital Status : Married Unmarried
6) Income Per Annum
a) Less Than Rs. 1,00,000/-
b) More than Rs. 1,00,000/- but less than Rs. 1,50,000/-
c) Above Rs. 1,50,000/-
7) Category :
Transport Operator Driver Passenger
Officer of the STU Booking Agent * Others
* Specify: _____________________________________________________
8) Type of Vehicle :
Car / Jeep / Taxi Bus Truck
Trailer Multi Axle Trailer Tanker
9) Vehicle use since : _______________________________________________
10) The vehicle carries :
Passengers Capital Goods
Consumer Goods Raw Materials
11) If carries consumer Goods, the type of goods it carries is
Agricultural Goods Industrial Goods
12) Whether the project improved the quality of NH3?
Yes No
13) Whether there is saving of time due to the project?
Yes No
288
14) What is your opinion regarding the effect of the project on traffic congestion?
a) It reduced the congestion
b) It increased the congestion
c) It resulted in no change in the congestion
15) What is the average speed you get on the project highway?
30 kmph 60 kmph 80 kmph
Above 80 kmph
16) What is the average speed you get on any other highway having 2 lanes?
30 kmph 60 kmph 80 kmph
Above 80 kmph
17) The NHAI has proposed to improve the project road into 6 lanes by 2022. In your opinion
a) Whether it will save the time?
Yes No
b) Whether it will improve the average speed of the vehicle?
Yes No
18) What is your opinion regarding the riding quality of the project road i.e. the surface of
the road.
Excellent Better Good Bad Worst
19) Do you feel there is sufficient number of flyovers, bridges, underpasses, ROBs & by
passes on the project road?
Yes No
If ‘No’, please specify in short
________________________________________________________________________
20) Whether there are sufficient road side amenities like petrol pumps, food plazas / hotels
/ dhabas, toilets, provision for parking etc.
Yes No
If ‘No’, please specify in short
________________________________________________________________________
289
21) Do you feel there are sufficient number of speed breakers, sign boards, road markings,
road signs, road delineators and traffic signals?
Yes No
If ‘No’, please specify in short
________________________________________________________________________
22) Whether 4 lane divided project road resulted in saving fuel consumption?
Yes No
23) NHAI has proposed to improve and convert the same project road into 6 lane road by
2022. State your views with respect to following statements.
Sr.No. Statement Yes No
i) It is necessary to convert 4 lane roads into 6 lane road.
ii) It will save time
iii) It will reduce traffic congestion
iv) It will make the project road safer.
v) It will save the fuel.
vi) It will a) increase the pollution
b) Reduce the pollution
c) No effect on pollution
24) State your views regarding new Kasara Ghat by pass with respect to following
statements.
Sr.No. Statement Yes No
i) It reduced traffic congestion
ii) It saves time
iii) It made the road safer and less accident prone
iv) It saves fuel consumption
290
25) In your opinion whether the new 4 lane divided project road
Sr.No. Statement Yes No
i) Has increased the air pollution
ii) It has increased the noise pollution
iii) It adversely affected the roadside plantation that absorbs the noise
and air pollution.
Justify your answers in short.
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
26) In your opinion which road is safer for night driving :
The 2 lane undivided road
The 4 lane divided road
Why? (Give your justification in short)
________________________________________________________________________
________________________________________________________________________
27) In your opinion which road is better and safer in rainy season :
The 2 lane undivided road
The 4 lane divided road
28) What is your opinion about the toll rates on the present project road?
Excessively high High Suitable
Moderate Low
29) In case of accident or break-down of vehicle whether the present project road provides
quick services to the drivers, like two way vehicles for removing damaged vehicles,
ambulances to provide quick medical help etc. ?
Yes No
291
30) In your opinion whether the project has adversely affected the flora and fauna of the
location?
Yes No
If ‘Yes’, give details of flora and fauna so affected in short.
________________________________________________________________________
________________________________________________________________________
31) In your opinion whether the present project road should have access to the two
wheelers, three wheelers, pedestrians and cattle?
Yes No
Justify your answer in short.
________________________________________________________________________
32) What is your over-all opinion regarding the present project road :
a) It is better than the previous road in terms of time, fuel, safety and pollution
b) It is similar to the previous road in terms of time, fuel, safety and pollution
c) It is worse than the previous in terms of time, fuel, safety and pollution
33) What is your over-all opinion regarding the role of NHAI in improving the NH3 and other
highways?
a) It has contributed in excellent way in development of NH3 and other highways.
b) It brought no change in development of NH3 and other highways.
c) It failed in development of NH3 and other highways.
34) Feel free to give your opinion and suggestions in short regarding the overall
performance of NHAI in improving NH3 and other highways.
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
Signature
292
APPENDIX- II
SOME SELECTED PHOTOGRAPHS TAKEN DURING THE ROAD TRIPS
THE PROJECT HIGHWAY STARTS AT VADAPA (NEAR THANE)
293
CONSTRUCTION OF THE PROJECT HIGHWAY UNDER PPP SCHEME USING BOT MODEL
TOLL PLAZA ON THE PROJECT HIGHWAY
294
USE OF MODERN MACHINE FOR CONSTRUCTION OF THE PROJECT ROAD
CONVERTING OLD 2 LANE NH3 INTO 4LANE PROJECT HIGHWAY
295
USE OF MODERN MACHINES FOR BUILDING STRONG ROAD WITH SMOOTH SURFACE
TRUCK LAY BYE AND TRANSPORTATION OF HEAVY GENERATOR (350 TONS) ON THE PROJECT HIGHWAY BY MULTIAXLE VEHICLE (STORNG ROAD)
296
CUTTING OF THE TREES FOR ROAD WIDENING
COMPENSATORY ROADSIDE PLANTATION
297
SHRUB PLANTATION ON THE ROAD MEDIAN TO REDUCE AIR AND NOISE POLLUTION AND THE BEAM OF HEADLIGHTS DURING NIGHT DRIVING
LIGHT CUTTERS ON THE ROAD MEDIAN TO REDUCE THE BEAM OF HEADLIGHTS DURING NIGHT DRIVING
298
CONSTRUCTION OF ROB (SAFE AND CONGESTION FREE DRIVING)
RIVER OVER BRIDGE (SAFE AND CONGESTION FREE DRIVING)
299
FLYOVER (SAFE AND CONGENCTION FREE DRIVING)
STRONG PILLARS OF THE FLYOVER
300
RIVER OVER BRIDGE (SAFE AND CONGESTION FREE DRIVING)
RADIUM PAINT AND DIAMOND REFLECTORS ON THE ROAD SURFACE (SAFETY DEVICE FOR NIGHT DRIVING)
301
NEW KASARA GHAT BYPASS WITH TWO SEPERATE ROADS EACH WITH TWO LANES
FROM MUMBAI TO NASHIK AND NASHIK TO MUMBAI (CONGESTION FREE SAFE DRIVING)
302
ROAD BOARDS (SAFETY DEVICE)
303
SIGN BORD ON THE PROJECT HIGHWAY (SAFETY DEVICE)
SERVICE ROAD FOR SLOW MOVING LOCAL TRAFFIC WITHOUT DISTURBING SPEED OF THE VEHICLES ON THE PROJECT HIGHWAY (SAFETY DEVICE)
304
BUS SHED WITH SAFE ENTRY AND EXIT (SAFETY DEVICE)
MEDIAN BREAK AT SUITABLE PLACE WITH ROAD MARKINGS (SAFETY DEVICE)
305
WEIGH BRIDGE (ROAD SIDE AMENITY)
PETROL PUMP (ROAD SIDE AMENITY)
306
REPAIR SHOP (ROAD SIDE AMENITY)
FOODHUB AND PETROL PUMP WITH SAFE ENTRY AND EXIT (ROAD SIDE AMENITY)
307
RESORT WITH SAFE ENTRY AND EXIT, AND SUFFICIENT PARKING PLACE (ROAD SIDE AMENITY)
DHABA WITH SAFE ENTRY AND EXIT, AND SUFFICIENT PARKING PLACE (ROAD SIDE AMENITY)
308
END OF THE PROJECT HIGHWAY AT GONDE (NEAR NASHIK)
309
VISITING THE NHAI OFFICE AND HAVING DISCUSSION WITH MR. SURESH HARSOLE (CIVIL ENGINEER, NHAI)