51-1-10079-028

APPENDIX A

FIELD ACTIVITY REPORTS

Page 2: APPENDIX A FIELD ACTIVITY REPORTSeng2.lacity.org/whitepoint/Data Report-Appendix A.pdf · 2019-09-01 · 51-1-10079-028 AA/wp/ADY 51-1-10079-028 A-i APPENDIX A FIELD ACTIVITY REPORTS

51-1-10079-028 AA/wp/ADY 51-1-10079-028 A-i

APPENDIX A

FIELD ACTIVITY REPORTS AND HEALTH AND SAFETY PLAN

TABLE OF CONTENTS

FIGURES

ReportNo.

1 Field Activity Report dated April 11, 2013 (2 page)

2 Field Activity Report dated April 12, 2013 (1 page)

3 Field Activity Report dated April 13, 2013 (2 page)

4 Field Activity Report dated April 15, 2013 (2 page)

5 Field Activity Report dated April 16, 2013 (3 page)

Page 3: APPENDIX A FIELD ACTIVITY REPORTSeng2.lacity.org/whitepoint/Data Report-Appendix A.pdf · 2019-09-01 · 51-1-10079-028 AA/wp/ADY 51-1-10079-028 A-i APPENDIX A FIELD ACTIVITY REPORTS

PROJECT NO.: 51-1-10079-028 REPORT DATE: 4/11/2013

REPORT NO.: 1 SW FIELD REP.: Stephen D. Diem

PERMIT NO.: E-1386-0002

PROJECT NAME/LOCATION White Point Landslide Boring B-12, San Pedro, Los Angeles, CA

CONSTRUCTION OBSERVATIONS (continued)

LIMITATIONS: The Shannon & Wilson field representative is present on site solely to observe the field activities of the contractor identified and keep our client informed of the progress an quality of the work. The presence and activities of the Shannon & Wilson fiel d representative and our acceptance of any non-conforming work or failure to reject any non-conforming work does not relieve the contractor from complying

provided by the Shannon & Wilson field inspector is intended solely to advice the contractor of the technical requirements of the plans and specifications and/or design concept. The contractor is solely responsible for its means, methods, sequences, construction site safety, quality of work, and adherence to the contract documents.

REVIEW BY (PM initial/date)

NXN 04-24-2013

Page 1 of 2

DAILY FIELD ACTIVITY REPORT

REPORT SUBMITTED TO: CONTRACTOR NAME AND CONTACT: WEATHER & TEMP. Partly cloudy 70°

Client City of Los Angeles, General Gregg Drilling Bureau of Engineering Subcontractors for Geotechnical Construction TIMES OF SITE VISITS:

Mark Oborne, Pedro Garcia, Hi-Way Safety Rentals Inc. from 07:00 to 17:30

Gene Edwards, Chris Johnson, (Hi-Way) from to

Bob Lackaye, Vince Jones, from to

and William Jones

CONSTRUCTION OBSERVATIONS NO. TOPIC AND

LOCATION DESCRIPTION OF FIELD ACTIVITY, OBSERVATIONS AND

RECOMMENDATIONS TO OWNER FURTHER ACTION

RECOMMENDED TO OWNER

1 Personnel Personnel on site included: three drillers with Gregg Drilling; one representative with Hi-Way to provide traffic control; Delfin Zafrafrom the City of Los Angeles (City Inspector); Jeff Farrar, a geologist with Grover-Hollingsworth and Assoc., Inc., representing the City of Los Angeles; and Jeff Hull and Mike, geologists with American Geotechnical, Inc., representing the Bruno residence.

2 B-12 Coring Gregg Drilling and Hi-Way set up the coring operation while S&W finished obtaining the excavation permit at the City of Los Angeles Harbor District office. Coring began at approximately 9:30 and

moved their equipment into the fenced in work area and Hi-Way set up the overnight traffic control.

3 Photograph of drilling operation

Page 4: APPENDIX A FIELD ACTIVITY REPORTSeng2.lacity.org/whitepoint/Data Report-Appendix A.pdf · 2019-09-01 · 51-1-10079-028 AA/wp/ADY 51-1-10079-028 A-i APPENDIX A FIELD ACTIVITY REPORTS

PROJECT NO.: 51-1-10079-028 REPORT DATE: 4/11/2013

REPORT NO.: 1 SW FIELD REP.: Stephen D. Diem

PERMIT NO.: E-1386-0002

PROJECT NAME/LOCATION White Point Landslide Boring B-12, San Pedro, Los Angeles, CA

CONSTRUCTION OBSERVATIONS (continued)

LIMITATIONS: The Shannon & Wilson field representative is present on site solely to observe the field activities of the contractor identified and keep our client informed of the progress an quality of the work. The presence and activities of the Shannon & Wilson fiel d representative and our acceptance of any non-conforming work or failure to reject any non-conforming work does not relieve the contractor from complying

provided by the Shannon & Wilson field inspector is intended solely to advice the contractor of the technical requirements of the plans and specifications and/or design concept. The contractor is solely responsible for its means, methods, sequences, construction site safety, quality of work, and adherence to the contract documents.

REVIEW BY (PM initial/date)

NXN 04-24-2013

Page 2 of 2

DAILY FIELD ACTIVITY REPORT

NO. TOPIC AND LOCATION

DESCRIPTION OF FIELD ACTIVITY, OBSERVATIONS AND RECOMMENDATIONS TO OWNER

FURTHER ACTION RECOMMENDED TO OWNER

4 Photograph of overnight setup for traffic control

Page 5: APPENDIX A FIELD ACTIVITY REPORTSeng2.lacity.org/whitepoint/Data Report-Appendix A.pdf · 2019-09-01 · 51-1-10079-028 AA/wp/ADY 51-1-10079-028 A-i APPENDIX A FIELD ACTIVITY REPORTS

PROJECT NO.: 51-1-10079-028 REPORT DATE: 4/12/2013

REPORT NO.: 2 SW FIELD REP.: SDD

PERMIT NO.: E-1386-0002

PROJECT NAME/LOCATION White Point Landslide Boring B-12, San Pedro, Los Angeles, CA

CONSTRUCTION OBSERVATIONS (continued)

LIMITATIONS: The Shannon & Wilson field representative is present on site solely to observe the field activities of the contractor identified and keep our client informed of the progress an quality of the work. The presence and activities of the Shannon & Wilson field representative and our acceptance of any non-conforming work or failure to reject any non-conforming work does not relieve the contractor from complying

ormation provided by the Shannon & Wilson field inspector is intended solely to advice the contractor of the technical requirements of the plans and s pecifications and/or design concept. The contractor is solely responsible for its means, methods, sequences, construction site safety, quality of work, and adherence to the contract documents.

REVIEW BY (PM initial/date)

NXN 04-24-2013

Page 1 of 2

DAILY FIELD ACTIVITY REPORT

REPORT SUBMITTED TO: CONTRACTOR NAME AND CONTACT: WEATHER & TEMP. Partly cloudy 67°

Client City of Los Angeles, General Gregg Drilling Bureau of Engineering Subcontractors for Geotechnical Construction TIMES OF SITE VISITS:

Mark Oborne, Pedro Garcia, Gene Edwards, Chris Johnson, Hi-Way Safety Rentals Inc. from 07:00 to 17:30

Bob Lackaye, Vince Jones, And William Jones (Hi-Way) from to

Geovision Geophysical Services (GeoVision) from to

CONSTRUCTION OBSERVATIONS NO. TOPIC AND

LOCATION DESCRIPTION OF FIELD ACTIVITY, OBSERVATIONS AND

RECOMMENDATIONS TO OWNER FURTHER ACTION

RECOMMENDED TO OWNER

1 Personnel Personnel on site included: three drillers with Gregg Drilling; one representative with Hi-Way to provide traffic control; one representative of GeoVision to perform geophysical logging of B-12; Delfin Zafra from the City of Los Angeles (City Inspector); Jeff Farrar,a geologist with Grover-Hollingsworth and Assoc., Inc., representing the City of Los Angeles; and Mike, a geologist with American Geotechnical, Inc., representing the Bruno residence.

2 B-12 Coring At 7:00 Hi-Way set up the traffic control and Gregg Drilling began coring. Coring continued to about 15:0was achieved. GeoVision performed the gamma and acoustic logging of B-12 until about 4:30. Gregg Drilling moved their equipment into the fenced in work area and Hi-Way set up the overnight traffic control.

Page 6: APPENDIX A FIELD ACTIVITY REPORTSeng2.lacity.org/whitepoint/Data Report-Appendix A.pdf · 2019-09-01 · 51-1-10079-028 AA/wp/ADY 51-1-10079-028 A-i APPENDIX A FIELD ACTIVITY REPORTS

PROJECT NO.: 51-1-10079-028 REPORT DATE: 4/12/2013

REPORT NO.: 2 SW FIELD REP.: SDD

PERMIT NO.: E-1386-0002

PROJECT NAME/LOCATION White Point Landslide Boring B-12, San Pedro, Los Angeles, CA

CONSTRUCTION OBSERVATIONS (continued)

LIMITATIONS: The Shannon & Wilson field representative is present on site solely to observe the field activities of the contractor identified and keep our client informed of the progress an quality of the work. The presence and activities of the Shannon & Wilson field representative and our acceptance of any non-conforming work or failure to reject any non-conforming work does not relieve the contractor from complying

ormation provided by the Shannon & Wilson field inspector is intended solely to advice the contractor of the technical requirements of the plans and s pecifications and/or design concept. The contractor is solely responsible for its means, methods, sequences, construction site safety, quality of work, and adherence to the contract documents.

REVIEW BY (PM initial/date)

NXN 04-24-2013

Page 2 of 2

DAILY FIELD ACTIVITY REPORT

NO. TOPIC AND LOCATION

DESCRIPTION OF FIELD ACTIVITY, OBSERVATIONS AND RECOMMENDATIONS TO OWNER

FURTHER ACTION RECOMMENDED TO OWNER

3 Photograph of drilling operation

Page 7: APPENDIX A FIELD ACTIVITY REPORTSeng2.lacity.org/whitepoint/Data Report-Appendix A.pdf · 2019-09-01 · 51-1-10079-028 AA/wp/ADY 51-1-10079-028 A-i APPENDIX A FIELD ACTIVITY REPORTS

PROJECT NO.: 51-1-10079-028 REPORT DATE: 4/13/2013

REPORT NO.: 3 SW FIELD REP.: SDD

PERMIT NO.: E-1386-0002

PROJECT NAME/LOCATION White Point Landslide Boring B-12, San Pedro, Los Angeles, CA

CONSTRUCTION OBSERVATIONS (continued)

LIMITATIONS: The Shannon & Wilson field representative is present on site solely to observe the field activities of the contractor identified and keep our client informed of the progress an quality of the work. The presence and activities of the Shannon & Wilson field representative and our acceptance of any non-conforming work or failure to reject any non-conforming work does not relieve the contractor from complying

ormation provided by the Shannon & Wilson field inspector is intended solely to advice the contractor of the technical requirements of the plans and s pecifications and/or design concept. The contractor is solely responsible for its means, methods, sequences, construction site safety, quality of work, and adherence to the contract documents.

REVIEW BY (PM initial/date)

NXN 04-24-2013

Page 1 of 2

DAILY FIELD ACTIVITY REPORT

REPORT SUBMITTED TO: CONTRACTOR NAME AND CONTACT: WEATHER & TEMP. Mostly cloudy 65°

Client City of Los Angeles, General Gregg Drilling Bureau of Engineering Subcontractors for Geotechnical Construction TIMES OF SITE VISITS:

Mark Oborne, Pedro Garcia, Gene Edwards, Chris Johnson, Bob Lackaye, Vince Jones, And William Jones

Hi-Way Safety Rentals, Inc. from 08:00 to 17:00

(Hi-Way) from to

from to

CONSTRUCTION OBSERVATIONS NO. TOPIC AND

LOCATION DESCRIPTION OF FIELD ACTIVITY, OBSERVATIONS AND

RECOMMENDATIONS TO OWNER FURTHER ACTION

RECOMMENDED TO OWNER

1 Personnel Personnel on site included: three drillers with Gregg Drilling; one representative with Hi-Way to provide traffic control; Delfin Zafra from the City of Los Angeles (City Inspector); and Mike, a geologist with American Geotechnical, Inc., representing the Bruno residence.

2 B-12 Coring At 8:00 Hi-Way set up the traffic control and Gregg Drilling began

Reaming continued to about 16:30 . Gregg Drilling moved their equipment into the fenced in work area and Hi-Way set up the overnight traffic control.

Page 8: APPENDIX A FIELD ACTIVITY REPORTSeng2.lacity.org/whitepoint/Data Report-Appendix A.pdf · 2019-09-01 · 51-1-10079-028 AA/wp/ADY 51-1-10079-028 A-i APPENDIX A FIELD ACTIVITY REPORTS

PROJECT NO.: 51-1-10079-028 REPORT DATE: 4/13/2013

REPORT NO.: 3 SW FIELD REP.: SDD

PERMIT NO.: E-1386-0002

PROJECT NAME/LOCATION White Point Landslide Boring B-12, San Pedro, Los Angeles, CA

CONSTRUCTION OBSERVATIONS (continued)

LIMITATIONS: The Shannon & Wilson field representative is present on site solely to observe the field activities of the contractor identified and keep our client informed of the progress an quality of the work. The presence and activities of the Shannon & Wilson field representative and our acceptance of any non-conforming work or failure to reject any non-conforming work does not relieve the contractor from complying

ormation provided by the Shannon & Wilson field inspector is intended solely to advice the contractor of the technical requirements of the plans and s pecifications and/or design concept. The contractor is solely responsible for its means, methods, sequences, construction site safety, quality of work, and adherence to the contract documents.

REVIEW BY (PM initial/date)

NXN 04-24-2013

Page 2 of 2

DAILY FIELD ACTIVITY REPORT

Photo 1: View of coring setup.

Page 9: APPENDIX A FIELD ACTIVITY REPORTSeng2.lacity.org/whitepoint/Data Report-Appendix A.pdf · 2019-09-01 · 51-1-10079-028 AA/wp/ADY 51-1-10079-028 A-i APPENDIX A FIELD ACTIVITY REPORTS

PROJECT NO.: 51-1-10079-028 REPORT DATE: 4/15/2013

REPORT NO.: 4 SW FIELD REP.: SDD, BAF

PERMIT NO.: E-1386-0002

PROJECT NAME/LOCATION White Point Landslide Boring B-12, San Pedro, Los Angeles, CA

CONSTRUCTION OBSERVATIONS (continued)

LIMITATIONS: The Shannon & Wilson field representative is present on site solely to observe the field activities of the contractor identified and keep our client informed of the progress an quality of the work. The presence and activities of the Shannon & Wilson field representative and our acceptance of any non-conforming work or failure to reject any non-conforming work does not relieve the contractor from complying

ormation provided by the Shannon & Wilson field inspector is intended solely to advice the contractor of the technical requirements of the plans and s pecifications and/or design concept. The contractor is solely responsible for its means, methods, sequences, construction site safety, quality of work, and adherence to the contract documents.

REVIEW BY (PM initial/date)

NXN 04-24-2013

Page 1 of 2

DAILY FIELD ACTIVITY REPORT

REPORT SUBMITTED TO: CONTRACTOR NAME AND CONTACT: WEATHER & TEMP. Mostly cloudy 65°

Client City of Los Angeles, General Gregg Drilling Bureau of Engineering Subcontractors for Geotechnical Construction TIMES OF SITE VISITS:

Mark Oborne, Pedro Garcia, Gene Edwards, Chris Johnson, Bob Lackaye, Vince Jones, And William Jones

Hi-Way Safety Rentals, Inc. from 07:00 to 15:30

(Hi-Way) from to

from to

CONSTRUCTION OBSERVATIONS NO. TOPIC AND

LOCATION DESCRIPTION OF FIELD ACTIVITY, OBSERVATIONS AND

RECOMMENDATIONS TO OWNER FURTHER ACTION

RECOMMENDED TO OWNER

1 Personnel Personnel on site included: three drillers with Gregg Drilling; one representative with Hi-Way to provide traffic control; Delfin Zafra from the City of Los Angeles (City Inspector); and Brian Forrester of S&W.

2 Boring B-12 Coring

At 7:00 Hi-Way set up the traffic control and Gregg Drilling continued reaming out the hole rculated through the hole. The inclinometer sections. Three vibrating wire piezometers were installed at ap . The hole was then backfilled with a cement grout mixture .

The cuttings and drilling mud were put in drums and moved to inside the gated area. Gregg Drilling moved their equipment into the fenced in work area and Hi-Way set up the overnight traffic control.

Page 10: APPENDIX A FIELD ACTIVITY REPORTSeng2.lacity.org/whitepoint/Data Report-Appendix A.pdf · 2019-09-01 · 51-1-10079-028 AA/wp/ADY 51-1-10079-028 A-i APPENDIX A FIELD ACTIVITY REPORTS

PROJECT NO.: 51-1-10079-028 REPORT DATE: 4/15/2013

REPORT NO.: 4 SW FIELD REP.: SDD, BAF

PERMIT NO.: E-1386-0002

PROJECT NAME/LOCATION White Point Landslide Boring B-12, San Pedro, Los Angeles, CA

CONSTRUCTION OBSERVATIONS (continued)

LIMITATIONS: The Shannon & Wilson field representative is present on site solely to observe the field activities of the contractor identified and keep our client informed of the progress an quality of the work. The presence and activities of the Shannon & Wilson field representative and our acceptance of any non-conforming work or failure to reject any non-conforming work does not relieve the contractor from complying

ormation provided by the Shannon & Wilson field inspector is intended solely to advice the contractor of the technical requirements of the plans and s pecifications and/or design concept. The contractor is solely responsible for its means, methods, sequences, construction site safety, quality of work, and adherence to the contract documents.

REVIEW BY (PM initial/date)

NXN 04-24-2013

Page 2 of 2

DAILY FIELD ACTIVITY REPORT

Photo 1: View of coring setup.

Page 11: APPENDIX A FIELD ACTIVITY REPORTSeng2.lacity.org/whitepoint/Data Report-Appendix A.pdf · 2019-09-01 · 51-1-10079-028 AA/wp/ADY 51-1-10079-028 A-i APPENDIX A FIELD ACTIVITY REPORTS

PROJECT NO.: 51-1-10079-028 REPORT DATE: 4/16/2013

REPORT NO.: 5 SW FIELD REP.: BAF

PERMIT NO.: E-1386-0002

PROJECT NAME/LOCATION White Point Landslide Boring B-12, San Pedro, Los Angeles, CA

CONSTRUCTION OBSERVATIONS (continued)

LIMITATIONS: The Shannon & Wilson field representative is present on site solely to observe the field activities of the contractor identified and keep our client informed of the progress an quality of the work. The presence and activities of the Shannon & Wilson field representative and our acceptance of any non-conforming work or failure to reject any non-conforming work does not relieve the contractor from complying

ormation provided by the Shannon & Wilson field inspector is intended solely to advice the contractor of the technical requirements of the plans and s pecifications and/or design concept. The contractor is solely responsible for its means, methods, sequences, construction site safety, quality of work, and adherence to the contract documents.

REVIEW BY (PM initial/date)

NXN 04-24-2013

Page 1 of 3

DAILY FIELD ACTIVITY REPORT

REPORT SUBMITTED TO: CONTRACTOR NAME AND CONTACT: WEATHER & TEMP. Mostly cloudy 62°

Client City of Los Angeles, General Gregg Drilling Bureau of Engineering Subcontractors for Geotechnical Construction TIMES OF SITE VISITS:

Mark Oborne, Pedro Garcia, Gene Edwards, Chris Johnson, Bob Lackaye, Vince Jones, And William Jones

Hi-Way Safety Rentals, Inc. from 07:00 to 15:00

(Hi-Way) from to

from to

CONSTRUCTION OBSERVATIONS NO. TOPIC AND

LOCATION DESCRIPTION OF FIELD ACTIVITY, OBSERVATIONS AND

RECOMMENDATIONS TO OWNER FURTHER ACTION

RECOMMENDED TO OWNER

1 Personnel Personnel on site included: three drillers with Gregg Drilling; one representative with Hi-Way to provide traffic control; Delfin Zafra from the City of Los Angeles (City Inspector); and Brian Forrester of S&W.

2 Boring B-12 At 7:00 Hi-Way set up the traffic control. Gregg Drilling topped off the cement and specifications, and installed the inclinometer and vibrating wire piezometer vaults. In order to install the boxes, a rectangular section of pavement was saw cut and broken out using trailer mounted air compressor and jackhammer. The existing AC in this location was on the order -inch diameter brooks well boxes were installed and cut section of pavement backfilled with quickset concrete.

Page 12: APPENDIX A FIELD ACTIVITY REPORTSeng2.lacity.org/whitepoint/Data Report-Appendix A.pdf · 2019-09-01 · 51-1-10079-028 AA/wp/ADY 51-1-10079-028 A-i APPENDIX A FIELD ACTIVITY REPORTS

PROJECT NO.: 51-1-10079-028 REPORT DATE: 4/16/2013

REPORT NO.: 5 SW FIELD REP.: BAF

PERMIT NO.: E-1386-0002

PROJECT NAME/LOCATION White Point Landslide Boring B-12, San Pedro, Los Angeles, CA

CONSTRUCTION OBSERVATIONS (continued)

LIMITATIONS: The Shannon & Wilson field representative is present on site solely to observe the field activities of the contractor identified and keep our client informed of the progress an quality of the work. The presence and activities of the Shannon & Wilson field representative and our acceptance of any non-conforming work or failure to reject any non-conforming work does not relieve the contractor from complying

ormation provided by the Shannon & Wilson field inspector is intended solely to advice the contractor of the technical requirements of the plans and s pecifications and/or design concept. The contractor is solely responsible for its means, methods, sequences, construction site safety, quality of work, and adherence to the contract documents.

REVIEW BY (PM initial/date)

NXN 04-24-2013

Page 2 of 3

DAILY FIELD ACTIVITY REPORT

NO. TOPIC AND LOCATION

DESCRIPTION OF FIELD ACTIVITY, OBSERVATIONS AND RECOMMENDATIONS TO OWNER

FURTHER ACTION RECOMMENDED TO OWNER

3 Photograph of boxes prior to backfilling

Page 13: APPENDIX A FIELD ACTIVITY REPORTSeng2.lacity.org/whitepoint/Data Report-Appendix A.pdf · 2019-09-01 · 51-1-10079-028 AA/wp/ADY 51-1-10079-028 A-i APPENDIX A FIELD ACTIVITY REPORTS

PROJECT NO.: 51-1-10079-028 REPORT DATE: 4/16/2013

REPORT NO.: 5 SW FIELD REP.: BAF

PERMIT NO.: E-1386-0002

PROJECT NAME/LOCATION White Point Landslide Boring B-12, San Pedro, Los Angeles, CA

CONSTRUCTION OBSERVATIONS (continued)

LIMITATIONS: The Shannon & Wilson field representative is present on site solely to observe the field activities of the contractor identified and keep our client informed of the progress an quality of the work. The presence and activities of the Shannon & Wilson field representative and our acceptance of any non-conforming work or failure to reject any non-conforming work does not relieve the contractor from complying

ormation provided by the Shannon & Wilson field inspector is intended solely to advice the contractor of the technical requirements of the plans and s pecifications and/or design concept. The contractor is solely responsible for its means, methods, sequences, construction site safety, quality of work, and adherence to the contract documents.

REVIEW BY (PM initial/date)

NXN 04-24-2013

Page 3 of 3

DAILY FIELD ACTIVITY REPORT

NO. TOPIC AND LOCATION

DESCRIPTION OF FIELD ACTIVITY, OBSERVATIONS AND RECOMMENDATIONS TO OWNER

FURTHER ACTION RECOMMENDED TO OWNER

4 Photograph of finished surface around boxes (lids removed)