appendix a field activity reportseng2.lacity.org/whitepoint/data report-appendix a.pdf ·...
TRANSCRIPT
51-1-10079-028
APPENDIX A
FIELD ACTIVITY REPORTS
51-1-10079-028 AA/wp/ADY 51-1-10079-028 A-i
APPENDIX A
FIELD ACTIVITY REPORTS AND HEALTH AND SAFETY PLAN
TABLE OF CONTENTS
FIGURES
ReportNo.
1 Field Activity Report dated April 11, 2013 (2 page)
2 Field Activity Report dated April 12, 2013 (1 page)
3 Field Activity Report dated April 13, 2013 (2 page)
4 Field Activity Report dated April 15, 2013 (2 page)
5 Field Activity Report dated April 16, 2013 (3 page)
PROJECT NO.: 51-1-10079-028 REPORT DATE: 4/11/2013
REPORT NO.: 1 SW FIELD REP.: Stephen D. Diem
PERMIT NO.: E-1386-0002
PROJECT NAME/LOCATION White Point Landslide Boring B-12, San Pedro, Los Angeles, CA
CONSTRUCTION OBSERVATIONS (continued)
LIMITATIONS: The Shannon & Wilson field representative is present on site solely to observe the field activities of the contractor identified and keep our client informed of the progress an quality of the work. The presence and activities of the Shannon & Wilson fiel d representative and our acceptance of any non-conforming work or failure to reject any non-conforming work does not relieve the contractor from complying
provided by the Shannon & Wilson field inspector is intended solely to advice the contractor of the technical requirements of the plans and specifications and/or design concept. The contractor is solely responsible for its means, methods, sequences, construction site safety, quality of work, and adherence to the contract documents.
REVIEW BY (PM initial/date)
NXN 04-24-2013
Page 1 of 2
DAILY FIELD ACTIVITY REPORT
REPORT SUBMITTED TO: CONTRACTOR NAME AND CONTACT: WEATHER & TEMP. Partly cloudy 70°
Client City of Los Angeles, General Gregg Drilling Bureau of Engineering Subcontractors for Geotechnical Construction TIMES OF SITE VISITS:
Mark Oborne, Pedro Garcia, Hi-Way Safety Rentals Inc. from 07:00 to 17:30
Gene Edwards, Chris Johnson, (Hi-Way) from to
Bob Lackaye, Vince Jones, from to
and William Jones
CONSTRUCTION OBSERVATIONS NO. TOPIC AND
LOCATION DESCRIPTION OF FIELD ACTIVITY, OBSERVATIONS AND
RECOMMENDATIONS TO OWNER FURTHER ACTION
RECOMMENDED TO OWNER
1 Personnel Personnel on site included: three drillers with Gregg Drilling; one representative with Hi-Way to provide traffic control; Delfin Zafrafrom the City of Los Angeles (City Inspector); Jeff Farrar, a geologist with Grover-Hollingsworth and Assoc., Inc., representing the City of Los Angeles; and Jeff Hull and Mike, geologists with American Geotechnical, Inc., representing the Bruno residence.
2 B-12 Coring Gregg Drilling and Hi-Way set up the coring operation while S&W finished obtaining the excavation permit at the City of Los Angeles Harbor District office. Coring began at approximately 9:30 and
moved their equipment into the fenced in work area and Hi-Way set up the overnight traffic control.
3 Photograph of drilling operation
PROJECT NO.: 51-1-10079-028 REPORT DATE: 4/11/2013
REPORT NO.: 1 SW FIELD REP.: Stephen D. Diem
PERMIT NO.: E-1386-0002
PROJECT NAME/LOCATION White Point Landslide Boring B-12, San Pedro, Los Angeles, CA
CONSTRUCTION OBSERVATIONS (continued)
LIMITATIONS: The Shannon & Wilson field representative is present on site solely to observe the field activities of the contractor identified and keep our client informed of the progress an quality of the work. The presence and activities of the Shannon & Wilson fiel d representative and our acceptance of any non-conforming work or failure to reject any non-conforming work does not relieve the contractor from complying
provided by the Shannon & Wilson field inspector is intended solely to advice the contractor of the technical requirements of the plans and specifications and/or design concept. The contractor is solely responsible for its means, methods, sequences, construction site safety, quality of work, and adherence to the contract documents.
REVIEW BY (PM initial/date)
NXN 04-24-2013
Page 2 of 2
DAILY FIELD ACTIVITY REPORT
NO. TOPIC AND LOCATION
DESCRIPTION OF FIELD ACTIVITY, OBSERVATIONS AND RECOMMENDATIONS TO OWNER
FURTHER ACTION RECOMMENDED TO OWNER
4 Photograph of overnight setup for traffic control
PROJECT NO.: 51-1-10079-028 REPORT DATE: 4/12/2013
REPORT NO.: 2 SW FIELD REP.: SDD
PERMIT NO.: E-1386-0002
PROJECT NAME/LOCATION White Point Landslide Boring B-12, San Pedro, Los Angeles, CA
CONSTRUCTION OBSERVATIONS (continued)
LIMITATIONS: The Shannon & Wilson field representative is present on site solely to observe the field activities of the contractor identified and keep our client informed of the progress an quality of the work. The presence and activities of the Shannon & Wilson field representative and our acceptance of any non-conforming work or failure to reject any non-conforming work does not relieve the contractor from complying
ormation provided by the Shannon & Wilson field inspector is intended solely to advice the contractor of the technical requirements of the plans and s pecifications and/or design concept. The contractor is solely responsible for its means, methods, sequences, construction site safety, quality of work, and adherence to the contract documents.
REVIEW BY (PM initial/date)
NXN 04-24-2013
Page 1 of 2
DAILY FIELD ACTIVITY REPORT
REPORT SUBMITTED TO: CONTRACTOR NAME AND CONTACT: WEATHER & TEMP. Partly cloudy 67°
Client City of Los Angeles, General Gregg Drilling Bureau of Engineering Subcontractors for Geotechnical Construction TIMES OF SITE VISITS:
Mark Oborne, Pedro Garcia, Gene Edwards, Chris Johnson, Hi-Way Safety Rentals Inc. from 07:00 to 17:30
Bob Lackaye, Vince Jones, And William Jones (Hi-Way) from to
Geovision Geophysical Services (GeoVision) from to
CONSTRUCTION OBSERVATIONS NO. TOPIC AND
LOCATION DESCRIPTION OF FIELD ACTIVITY, OBSERVATIONS AND
RECOMMENDATIONS TO OWNER FURTHER ACTION
RECOMMENDED TO OWNER
1 Personnel Personnel on site included: three drillers with Gregg Drilling; one representative with Hi-Way to provide traffic control; one representative of GeoVision to perform geophysical logging of B-12; Delfin Zafra from the City of Los Angeles (City Inspector); Jeff Farrar,a geologist with Grover-Hollingsworth and Assoc., Inc., representing the City of Los Angeles; and Mike, a geologist with American Geotechnical, Inc., representing the Bruno residence.
2 B-12 Coring At 7:00 Hi-Way set up the traffic control and Gregg Drilling began coring. Coring continued to about 15:0was achieved. GeoVision performed the gamma and acoustic logging of B-12 until about 4:30. Gregg Drilling moved their equipment into the fenced in work area and Hi-Way set up the overnight traffic control.
PROJECT NO.: 51-1-10079-028 REPORT DATE: 4/12/2013
REPORT NO.: 2 SW FIELD REP.: SDD
PERMIT NO.: E-1386-0002
PROJECT NAME/LOCATION White Point Landslide Boring B-12, San Pedro, Los Angeles, CA
CONSTRUCTION OBSERVATIONS (continued)
LIMITATIONS: The Shannon & Wilson field representative is present on site solely to observe the field activities of the contractor identified and keep our client informed of the progress an quality of the work. The presence and activities of the Shannon & Wilson field representative and our acceptance of any non-conforming work or failure to reject any non-conforming work does not relieve the contractor from complying
ormation provided by the Shannon & Wilson field inspector is intended solely to advice the contractor of the technical requirements of the plans and s pecifications and/or design concept. The contractor is solely responsible for its means, methods, sequences, construction site safety, quality of work, and adherence to the contract documents.
REVIEW BY (PM initial/date)
NXN 04-24-2013
Page 2 of 2
DAILY FIELD ACTIVITY REPORT
NO. TOPIC AND LOCATION
DESCRIPTION OF FIELD ACTIVITY, OBSERVATIONS AND RECOMMENDATIONS TO OWNER
FURTHER ACTION RECOMMENDED TO OWNER
3 Photograph of drilling operation
PROJECT NO.: 51-1-10079-028 REPORT DATE: 4/13/2013
REPORT NO.: 3 SW FIELD REP.: SDD
PERMIT NO.: E-1386-0002
PROJECT NAME/LOCATION White Point Landslide Boring B-12, San Pedro, Los Angeles, CA
CONSTRUCTION OBSERVATIONS (continued)
LIMITATIONS: The Shannon & Wilson field representative is present on site solely to observe the field activities of the contractor identified and keep our client informed of the progress an quality of the work. The presence and activities of the Shannon & Wilson field representative and our acceptance of any non-conforming work or failure to reject any non-conforming work does not relieve the contractor from complying
ormation provided by the Shannon & Wilson field inspector is intended solely to advice the contractor of the technical requirements of the plans and s pecifications and/or design concept. The contractor is solely responsible for its means, methods, sequences, construction site safety, quality of work, and adherence to the contract documents.
REVIEW BY (PM initial/date)
NXN 04-24-2013
Page 1 of 2
DAILY FIELD ACTIVITY REPORT
REPORT SUBMITTED TO: CONTRACTOR NAME AND CONTACT: WEATHER & TEMP. Mostly cloudy 65°
Client City of Los Angeles, General Gregg Drilling Bureau of Engineering Subcontractors for Geotechnical Construction TIMES OF SITE VISITS:
Mark Oborne, Pedro Garcia, Gene Edwards, Chris Johnson, Bob Lackaye, Vince Jones, And William Jones
Hi-Way Safety Rentals, Inc. from 08:00 to 17:00
(Hi-Way) from to
from to
CONSTRUCTION OBSERVATIONS NO. TOPIC AND
LOCATION DESCRIPTION OF FIELD ACTIVITY, OBSERVATIONS AND
RECOMMENDATIONS TO OWNER FURTHER ACTION
RECOMMENDED TO OWNER
1 Personnel Personnel on site included: three drillers with Gregg Drilling; one representative with Hi-Way to provide traffic control; Delfin Zafra from the City of Los Angeles (City Inspector); and Mike, a geologist with American Geotechnical, Inc., representing the Bruno residence.
2 B-12 Coring At 8:00 Hi-Way set up the traffic control and Gregg Drilling began
Reaming continued to about 16:30 . Gregg Drilling moved their equipment into the fenced in work area and Hi-Way set up the overnight traffic control.
PROJECT NO.: 51-1-10079-028 REPORT DATE: 4/13/2013
REPORT NO.: 3 SW FIELD REP.: SDD
PERMIT NO.: E-1386-0002
PROJECT NAME/LOCATION White Point Landslide Boring B-12, San Pedro, Los Angeles, CA
CONSTRUCTION OBSERVATIONS (continued)
LIMITATIONS: The Shannon & Wilson field representative is present on site solely to observe the field activities of the contractor identified and keep our client informed of the progress an quality of the work. The presence and activities of the Shannon & Wilson field representative and our acceptance of any non-conforming work or failure to reject any non-conforming work does not relieve the contractor from complying
ormation provided by the Shannon & Wilson field inspector is intended solely to advice the contractor of the technical requirements of the plans and s pecifications and/or design concept. The contractor is solely responsible for its means, methods, sequences, construction site safety, quality of work, and adherence to the contract documents.
REVIEW BY (PM initial/date)
NXN 04-24-2013
Page 2 of 2
DAILY FIELD ACTIVITY REPORT
Photo 1: View of coring setup.
PROJECT NO.: 51-1-10079-028 REPORT DATE: 4/15/2013
REPORT NO.: 4 SW FIELD REP.: SDD, BAF
PERMIT NO.: E-1386-0002
PROJECT NAME/LOCATION White Point Landslide Boring B-12, San Pedro, Los Angeles, CA
CONSTRUCTION OBSERVATIONS (continued)
LIMITATIONS: The Shannon & Wilson field representative is present on site solely to observe the field activities of the contractor identified and keep our client informed of the progress an quality of the work. The presence and activities of the Shannon & Wilson field representative and our acceptance of any non-conforming work or failure to reject any non-conforming work does not relieve the contractor from complying
ormation provided by the Shannon & Wilson field inspector is intended solely to advice the contractor of the technical requirements of the plans and s pecifications and/or design concept. The contractor is solely responsible for its means, methods, sequences, construction site safety, quality of work, and adherence to the contract documents.
REVIEW BY (PM initial/date)
NXN 04-24-2013
Page 1 of 2
DAILY FIELD ACTIVITY REPORT
REPORT SUBMITTED TO: CONTRACTOR NAME AND CONTACT: WEATHER & TEMP. Mostly cloudy 65°
Client City of Los Angeles, General Gregg Drilling Bureau of Engineering Subcontractors for Geotechnical Construction TIMES OF SITE VISITS:
Mark Oborne, Pedro Garcia, Gene Edwards, Chris Johnson, Bob Lackaye, Vince Jones, And William Jones
Hi-Way Safety Rentals, Inc. from 07:00 to 15:30
(Hi-Way) from to
from to
CONSTRUCTION OBSERVATIONS NO. TOPIC AND
LOCATION DESCRIPTION OF FIELD ACTIVITY, OBSERVATIONS AND
RECOMMENDATIONS TO OWNER FURTHER ACTION
RECOMMENDED TO OWNER
1 Personnel Personnel on site included: three drillers with Gregg Drilling; one representative with Hi-Way to provide traffic control; Delfin Zafra from the City of Los Angeles (City Inspector); and Brian Forrester of S&W.
2 Boring B-12 Coring
At 7:00 Hi-Way set up the traffic control and Gregg Drilling continued reaming out the hole rculated through the hole. The inclinometer sections. Three vibrating wire piezometers were installed at ap . The hole was then backfilled with a cement grout mixture .
The cuttings and drilling mud were put in drums and moved to inside the gated area. Gregg Drilling moved their equipment into the fenced in work area and Hi-Way set up the overnight traffic control.
PROJECT NO.: 51-1-10079-028 REPORT DATE: 4/15/2013
REPORT NO.: 4 SW FIELD REP.: SDD, BAF
PERMIT NO.: E-1386-0002
PROJECT NAME/LOCATION White Point Landslide Boring B-12, San Pedro, Los Angeles, CA
CONSTRUCTION OBSERVATIONS (continued)
LIMITATIONS: The Shannon & Wilson field representative is present on site solely to observe the field activities of the contractor identified and keep our client informed of the progress an quality of the work. The presence and activities of the Shannon & Wilson field representative and our acceptance of any non-conforming work or failure to reject any non-conforming work does not relieve the contractor from complying
ormation provided by the Shannon & Wilson field inspector is intended solely to advice the contractor of the technical requirements of the plans and s pecifications and/or design concept. The contractor is solely responsible for its means, methods, sequences, construction site safety, quality of work, and adherence to the contract documents.
REVIEW BY (PM initial/date)
NXN 04-24-2013
Page 2 of 2
DAILY FIELD ACTIVITY REPORT
Photo 1: View of coring setup.
PROJECT NO.: 51-1-10079-028 REPORT DATE: 4/16/2013
REPORT NO.: 5 SW FIELD REP.: BAF
PERMIT NO.: E-1386-0002
PROJECT NAME/LOCATION White Point Landslide Boring B-12, San Pedro, Los Angeles, CA
CONSTRUCTION OBSERVATIONS (continued)
LIMITATIONS: The Shannon & Wilson field representative is present on site solely to observe the field activities of the contractor identified and keep our client informed of the progress an quality of the work. The presence and activities of the Shannon & Wilson field representative and our acceptance of any non-conforming work or failure to reject any non-conforming work does not relieve the contractor from complying
ormation provided by the Shannon & Wilson field inspector is intended solely to advice the contractor of the technical requirements of the plans and s pecifications and/or design concept. The contractor is solely responsible for its means, methods, sequences, construction site safety, quality of work, and adherence to the contract documents.
REVIEW BY (PM initial/date)
NXN 04-24-2013
Page 1 of 3
DAILY FIELD ACTIVITY REPORT
REPORT SUBMITTED TO: CONTRACTOR NAME AND CONTACT: WEATHER & TEMP. Mostly cloudy 62°
Client City of Los Angeles, General Gregg Drilling Bureau of Engineering Subcontractors for Geotechnical Construction TIMES OF SITE VISITS:
Mark Oborne, Pedro Garcia, Gene Edwards, Chris Johnson, Bob Lackaye, Vince Jones, And William Jones
Hi-Way Safety Rentals, Inc. from 07:00 to 15:00
(Hi-Way) from to
from to
CONSTRUCTION OBSERVATIONS NO. TOPIC AND
LOCATION DESCRIPTION OF FIELD ACTIVITY, OBSERVATIONS AND
RECOMMENDATIONS TO OWNER FURTHER ACTION
RECOMMENDED TO OWNER
1 Personnel Personnel on site included: three drillers with Gregg Drilling; one representative with Hi-Way to provide traffic control; Delfin Zafra from the City of Los Angeles (City Inspector); and Brian Forrester of S&W.
2 Boring B-12 At 7:00 Hi-Way set up the traffic control. Gregg Drilling topped off the cement and specifications, and installed the inclinometer and vibrating wire piezometer vaults. In order to install the boxes, a rectangular section of pavement was saw cut and broken out using trailer mounted air compressor and jackhammer. The existing AC in this location was on the order -inch diameter brooks well boxes were installed and cut section of pavement backfilled with quickset concrete.
PROJECT NO.: 51-1-10079-028 REPORT DATE: 4/16/2013
REPORT NO.: 5 SW FIELD REP.: BAF
PERMIT NO.: E-1386-0002
PROJECT NAME/LOCATION White Point Landslide Boring B-12, San Pedro, Los Angeles, CA
CONSTRUCTION OBSERVATIONS (continued)
LIMITATIONS: The Shannon & Wilson field representative is present on site solely to observe the field activities of the contractor identified and keep our client informed of the progress an quality of the work. The presence and activities of the Shannon & Wilson field representative and our acceptance of any non-conforming work or failure to reject any non-conforming work does not relieve the contractor from complying
ormation provided by the Shannon & Wilson field inspector is intended solely to advice the contractor of the technical requirements of the plans and s pecifications and/or design concept. The contractor is solely responsible for its means, methods, sequences, construction site safety, quality of work, and adherence to the contract documents.
REVIEW BY (PM initial/date)
NXN 04-24-2013
Page 2 of 3
DAILY FIELD ACTIVITY REPORT
NO. TOPIC AND LOCATION
DESCRIPTION OF FIELD ACTIVITY, OBSERVATIONS AND RECOMMENDATIONS TO OWNER
FURTHER ACTION RECOMMENDED TO OWNER
3 Photograph of boxes prior to backfilling
PROJECT NO.: 51-1-10079-028 REPORT DATE: 4/16/2013
REPORT NO.: 5 SW FIELD REP.: BAF
PERMIT NO.: E-1386-0002
PROJECT NAME/LOCATION White Point Landslide Boring B-12, San Pedro, Los Angeles, CA
CONSTRUCTION OBSERVATIONS (continued)
LIMITATIONS: The Shannon & Wilson field representative is present on site solely to observe the field activities of the contractor identified and keep our client informed of the progress an quality of the work. The presence and activities of the Shannon & Wilson field representative and our acceptance of any non-conforming work or failure to reject any non-conforming work does not relieve the contractor from complying
ormation provided by the Shannon & Wilson field inspector is intended solely to advice the contractor of the technical requirements of the plans and s pecifications and/or design concept. The contractor is solely responsible for its means, methods, sequences, construction site safety, quality of work, and adherence to the contract documents.
REVIEW BY (PM initial/date)
NXN 04-24-2013
Page 3 of 3
DAILY FIELD ACTIVITY REPORT
NO. TOPIC AND LOCATION
DESCRIPTION OF FIELD ACTIVITY, OBSERVATIONS AND RECOMMENDATIONS TO OWNER
FURTHER ACTION RECOMMENDED TO OWNER
4 Photograph of finished surface around boxes (lids removed)