appendix a environmental assessment practitioner cv and...

19
Appendix A Environmental Assessment Practitioner CV and Declarations

Upload: others

Post on 02-May-2020

10 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Appendix A Environmental Assessment Practitioner CV and ...infinityenv.co.za/attachments/article/122/167-04_Appendix A.pdf · / Bigen Africa Project manager • Environmental and

Appendix A

Environmental Assessment Practitioner CV and

Declarations

Page 2: Appendix A Environmental Assessment Practitioner CV and ...infinityenv.co.za/attachments/article/122/167-04_Appendix A.pdf · / Bigen Africa Project manager • Environmental and
Page 3: Appendix A Environmental Assessment Practitioner CV and ...infinityenv.co.za/attachments/article/122/167-04_Appendix A.pdf · / Bigen Africa Project manager • Environmental and
Page 4: Appendix A Environmental Assessment Practitioner CV and ...infinityenv.co.za/attachments/article/122/167-04_Appendix A.pdf · / Bigen Africa Project manager • Environmental and
Page 5: Appendix A Environmental Assessment Practitioner CV and ...infinityenv.co.za/attachments/article/122/167-04_Appendix A.pdf · / Bigen Africa Project manager • Environmental and

CURRICULUM VITAE

2019

JEREMY ROSE

3rd Floor

Old Warehouse Building

Black River Park

Observatory 7925

[email protected]

+27 (0) 84 055 5678

Current Position

Director

Environmental Practitioner

Total experience

Six years

Education and

Certifications

• B.Sc. Hons

Environmental and

Geographical Science

• B.Sc. Environmental

and Geographical

Science

• Remote Pilot Licence

Date of Birth

7 December 1991

Nationality

South African

Languages

English

Afrikaans

Xhosa

Professional Associations

and Registrations

• IAIA(SA) 5781

Founding director of Infinity, responsible for project

management and business development, including consulting

services associated with:

• Environmental Impact Assessment (EIA), Strategic

Environmental Assessment (SEA) and environmental

feasibility or screening studies

• Environmental policy development for spatial development

frameworks and municipal planning instruments

• Geographic information systems (GIS), including high-level

spatial information management, data digitising and

analysis, and production of drawings and maps

• Environmental Management Plans (EMP)

• Atmospheric Emission License Applications (AEL)

• Waste Management License Applications (WML)

• Water Use License Applications (WULA)

• Environmental Monitoring as an Environmental Control

Officer (ECO)

• Rehabilitation Plans, Closure Plans and Risk Assessments

• Invasive Alien Species Control Plans

EMPLOYMENT HISTORY

Infinity Environmental (Pty) Ltd

March 2017 – Present

Director

Environmental Practitioner

The Environmental Partnership

Mar 2016 – Feb 2017, Nov 2013 – Dec 2014

Environmental Practitioner

Envirowest Consultants Inc., Vancouver, Canada

Mar 2015 - Feb 2016

Environmental Technician

NCC Environmental Services

Nov 2013 - Dec 2013

Junior Technician / Invasive Species Implementer

Aqua d’UCT Research Group, University Of Cape Town

Dec 2012 - Nov 2013

Project Manager - Gap Analysis of R&D in Water & Wastewater

`

Page 6: Appendix A Environmental Assessment Practitioner CV and ...infinityenv.co.za/attachments/article/122/167-04_Appendix A.pdf · / Bigen Africa Project manager • Environmental and

JEREMY ROSE

Curriculum Vitae: Jeremy Rose 2019

PROJECT EXPERIENCE

Date Client Role

ENVIRONMENTAL IMPACT ASSESSMENTS / ENVIRONMENTAL AUTHORISATIONS

• Basic Assessment for the decommissioning of the Bergkelder

industrial facility in Stellenbosch

2019 Distell Project

lead

• Scoping and EIA for an urban development framework on

the 500-ha Swartklip site, Khayelitsha, Cape Town

2019 Airports

Company SA

Project

lead

• Water Use Licence Application for a pharmaceutical

production facility in Atlantis, Cape Town

2019 Canopy Growth Project

lead

• Environmental assessment for the design and construction of

in-fill housing developments in Bonteheuwel

2018-19 City of Cape

Town

EAP

• Basic Assessment for a proposed residential development on

the Kuils River in Hagley, Cape Town

2018 Private

developer

EAP

• Environmental Impact Assessment for the Distell Facility and

Mixed-Development on Farm 736/RE, Klapmuts, Paarl,

including Maintenance Management Plan

2017-18 Distell Limited/

Bigen Africa

EAP

• Environmental Impact Assessments (Basic Assessments) for

the proposed Integrated Rapid Transit Phase 2A West Trunk

Routes in Cape Town

2016 City of Cape

Town/SMEC

EAP

• Environmental Impact Assessment (Basic Assessment) for a

proposed filling station in Bellville, Cape Town

2016 City of Cape

Town

EAP

• Environmental Impact Assessment and Water Use

Authorisation for the proposed upgrading of the Elizabeth

Park and Elsieskraal River, Bellville

2016 City of Cape

Town

EAP

• Amendment to the Environmental Authorisation for a

fishmeal processing plant in Saldanha Bay

2014 Sea Harvest Project

officer

• An environmental assessment of proposed maintenance

dredging within the Mitchell Channel log handling facility on

the Fraser River, Vancouver, Canada

2015 Fraser River

Pile &

Dredge

Project

officer

• Environmental Impact Assessment for the proposed extension

of the Vygekraal Cemetery in Rylands, Cape Town

2014 Private Project

officer

• Basic Assessment and Atmospheric Emissions Licence

application for the proposed additional jet fuel tank, Cape

Town International Airport

2014 Airports

Company

SA

Project

officer

STRATEGIC ENVIRONMENTAL ASSESSMENT, BASELINE AND FEASIBILITY INPUTS

• Environmental and GIS component of the review of the

Witzenberg Spatial Development Framework, 2019-2024

2019 Witzenberg

Municipality

Project

manager

• Environmental component of the Stellenbosch Municipal

Spatial Development Framework, 2018-2023

2018 Stellenbosch

Municipality

Project

manager

• Environmental baseline studies to inform the development of

Farm 736/RE, Paarl for industrial and mixed-use purposes

2017 Distell

/ Bigen Africa

Project

manager

• Environmental and Heritage Screening for the

decommissioning of Distell’s Bergkelder Facility, located in

Stellenbosch, Western Cape

2018 Distell

/ Bigen Africa

Project

manager

• Environmental, GIS and stakeholder engagement

components of the Drakenstein Municipality Local Spatial

Development Framework for the Paarl CBD, Arboretum, and

Klein Drakenstein Road area

2017 Drakenstein

Municipality

Project

manager

• Environmental and GIS components of the Cape Agulhas

Municipality Spatial Development Framework 2017-2022.

2017 Cape Agulhas

Municipality

Project

manager

Page 7: Appendix A Environmental Assessment Practitioner CV and ...infinityenv.co.za/attachments/article/122/167-04_Appendix A.pdf · / Bigen Africa Project manager • Environmental and

JEREMY ROSE

Curriculum Vitae: Jeremy Rose 2019

PROJECT EXPERIENCE

Date Client Role

• Environmental baseline study for proposed residential

development in Hagley, Kuils River

2017 Private EAP

• Environmental feasibility study for proposed development of

Farm 369 and 366, Stellenbosch

2017 Stellenbosch

Municipality

Project

manager

• Environmental status quo investigation for the Development

Framework Plan for Cape Farm 759, Ottery

2016 Western Cape

Government /

NM & Assoc

EAP

• Environmental status quo investigation for the draft Urban

Design Framework for Masiphumelele

2016 City of Cape

Town / AECOM

EAP

• Environmental Baseline assessments of 15 sites for Human

Settlements Masterplanning in Cape Town

2013-

2014

Western Cape

Government/

AECOM

Project

officer

• Environmental Baseline assessments of 16 sites for Land

Disposal in Cape Town and George

2014 Western Cape

Government/

AECOM

Project

officer

• Environmental Feasibility Assessment for several housing

developments in Sir Lowry Pass Village

2013-

2014

City of Cape

Town/ AECOM

Project

officer

CONSTRUCTION PHASE MONITORING AND MANAGEMENT

• Construction of a pedestrian bridge over the N2 at De Beers

Ave, Somerset West

2019-

present

Western Cape

Government

ECO

• Upgrading of Main Road 535 between Laaiplek and

Elandsbaai, West Coast

2019-

present

Western Cape

Government

ECO

• Sewerage infrastructure upgrades in Gordon’s Bay, Cape

Town

2018-

present

City of Cape

Town / Delta

ECO

• Infrastructure developments for the new administration

building, Kirstenbosch National Botanical Garden

2018-

present

SANBI/Aurecon ECO

• Upgrading of Sir Lowry’s Pass Road and Old Sir Lowry’s Pass

Road, Cape Town

2017-

present

City of Cape

Town / SMEC

ECO

• Replacement of culverts on R44, Somerset West 2016 Western Cape

Government

ECO

• Upgrade of the N1 between Plattekloof and R300 2016-

2017

Western Cape

Government

ECO

• Upgrades to the water distribution system at Klawer Valley,

Simonstown, Cape Town

2016-

2017

Department of

Public Works

ECO

• Erosion and sediment control monitoring for the widening of

the Braid Street Bridge over the Fraser River, Burnaby, BC,

Canada

2015-

2016

Metro

Vancouver

ECO

• Erosion and sediment control monitoring for the construction

of the Glenlyon Business Park, Burnaby, BC, Canada

2015-

2016

Private

developer

ECO

• Erosion and sediment control monitoring for the construction

of the New Haven commercial development, Burnaby, BC,

Canada

2015-

2016

Private

developer

ECO

• Erosion and sediment control monitoring for the construction

of the RedBrick residential development, Burnaby, BC,

Canada

2015-

2016

Private

developer

ECO

• Erosion and sediment control monitoring for the construction

of the Philip Avenue road-over-rail overpass, North

Vancouver, Canada

2015-

2016

District of North

Vancouver

ECO

Page 8: Appendix A Environmental Assessment Practitioner CV and ...infinityenv.co.za/attachments/article/122/167-04_Appendix A.pdf · / Bigen Africa Project manager • Environmental and

JEREMY ROSE

Curriculum Vitae: Jeremy Rose 2019

PROJECT EXPERIENCE

Date Client Role

• Erosion and sediment control monitoring for the soil

contamination remediation works and construction of a

quay at Lonsdale Quay, North Vancouver, Canada

2015-

2016

City of North

Vancouver

ECO

• Environmental monitoring for road widening at 160th Street,

Surrey, Canada.

2016 City of Surrey ECO

• Environmental monitoring for upgrades to various culverts,

drainage channels, and stormwater infrastructure in Surrey,

Canada.

2015-

2016

City of Surrey ECO

• Environmental Control Officer for the upgrading of the

Stellenbosch Arterial Road, Cape Town

2014 Western Cape

Government

ECO

• Environmental Control Officer for the implementation of

emergency works on the Franschhoek Pass

2014 Western Cape

Government

ECO

• Environmental Control Officer for the upgrade of Philippi Rail

Station

2014 PRASA ECO

• Environmental Control Officer for the construction of a

Shared Services Office Building in Khayelitsha, for the

Western Cape Department of Transport and Public Works

and the Western Cape Department of Health.

2014 Western Cape

Government

ECO

• Environmental monitoring for various private residential

developments in Squamish, Coquitlam, and Burnaby,

Canada.

2015-

2016

Private ECO

• Environmental Control Officer for the construction of the

Southbreak / Dune Crest residential developments in

Muizenberg

2013-

2014,

2016-

2017

Private ECO

• Environmental Control Officer for the implementation of an

Environmental Management Plan during the construction of

the Joe Slovo Phase 3 housing development in Langa

2013-

2014

City of Cape

Town

ECO

• Environmental Control Officer for the implementation of an

Environmental Management Plan during the construction of

the Nuutgevonden residential development in Stellenbosch,

for a private developer.

2014 Private ECO

INVASIVE SPECIES MANAGEMENT

• Invasive Species Monitoring, Control and Eradication Plan:

Bergrivier Local Municipality

2019 Bergrivier

Municipality

Project

manager

• Invasive Species Monitoring, Control and Eradication Plan:

Garden Route District Municipality

2019 Garden Route

District

Municipality

Project

manager

• Preparation of an Invasive Species Control Plan in terms of

the NEMBA AIS Regulations for a private landowner, Hoekwil

2017 Private Project

manager

• Monitoring of implementation of a control plan for the

invasive alien Japanese knotweed along a river corridor in

West Vancouver, Canada

2015 Private ECO

• Implementation of the invasive alien Guttural Toad

eradication project in Cape Town

2013 City of Cape

Town

Technician

Page 9: Appendix A Environmental Assessment Practitioner CV and ...infinityenv.co.za/attachments/article/122/167-04_Appendix A.pdf · / Bigen Africa Project manager • Environmental and

JEREMY ROSE

Curriculum Vitae: Jeremy Rose 2019

PROJECT EXPERIENCE

Date Client Role

IMPACT MONITORING, REHABILITATION, AND COMPLIANCE

• Environmental Risk Assessment and Environmental Closure

Plan for the closure and rehabilitation of a sand mine near

Bredasdorp, Western Cape

2017 Private EAP

• Field sampling programme for marine water quality

monitoring following a pollution incident in Howe Sound

estuary, Canada. Co-authored a Long Term Ecological

Receptor Monitoring Plan for the same estuary.

2016 Private Project

manager

• Application for rectification of unlawful infilling of a wetland

in Schaapkraal

2014 Private EAP

• Environmental site manager for the reconstruction and

rehabilitation of Mackay Creek, North Vancouver, Canada.

2015 Private ECO

Page 10: Appendix A Environmental Assessment Practitioner CV and ...infinityenv.co.za/attachments/article/122/167-04_Appendix A.pdf · / Bigen Africa Project manager • Environmental and

CURRICULUM VITAE

2019

TARRYN SOLOMON

3rd Floor

Old Warehouse Building

Black River Park

Observatory 7925

[email protected]

+27 (0) 76 223 4533

Current Position

Managing Director

Principal Environmental

Practitioner

Total experience

Twelve years

Education and

Certifications

• B.Sc., Environmental

and Water Science

(UWC)

• Quality Management

Systems and Audit

• Safety Management

Systems

• Train the Trainer

(Facilitator)

Date of Birth

29 June 1985

Nationality

South African

Languages

English

Afrikaans

Professional Associations

and Registrations

• IAIA(SA) 5838

Founding director of Infinity, responsible for management and

oversight of all projects, including overall project and client

management. Expertise and experience in:

• Strategic environmental inputs to spatial development

frameworks and urban design frameworks

• Environmental Impact Assessment, Strategic Environmental

Assessment and feasibility studies

• Environmental Auditing as part of an Environmental

Management System

• Environmental Management Plans (EMP)

• Atmospheric Emission License Applications (AEL)

• Waste Management License Applications (WML)

• Water Use License Applications (WULA)

• Environmental Monitoring - Environmental Control Officer

• Environmental Risk Assessments/Investigations

• Environmental Awareness Training and Mentorship

• Public Participation Facilitation

• Environmental Rehabilitation

EMPLOYMENT HISTORY

Infinity Environmental (Pty) Ltd

March 2017 – Present

Managing Director

Principal Environmental Practitioner

The Environmental Partnership

August 2007 – June 2010, January 2011– February 2017

Senior Environmental Practitioner

`

Page 11: Appendix A Environmental Assessment Practitioner CV and ...infinityenv.co.za/attachments/article/122/167-04_Appendix A.pdf · / Bigen Africa Project manager • Environmental and

TARRYN SOLOMON

Curriculum Vitae: Tarryn Solomon 2019

PROJECT EXPERIENCE

Date Client Role

ENVIRONMENTAL IMPACT ASSESSMENTS / ENVIRONMENTAL AUTHORISATIONS

• Scoping and EIA for an urban development

framework on the 500-ha Swartklip site, Khayelitsha,

Cape Town

2019 Airports

Company SA

Principal EAP

• Environmental Assessment for the design and

construction of in-fill housing developments in

Bonteheuwel.

2018 City of Cape

Town

Principal EAP

• Environmental Impact Assessment for the Distell

Facility and Mixed-Development on Farm 736/RE,

Klapmuts, Paarl

2017/18 Distell Limited/

Bigen Africa

Principal EAP

• Environmental Impact Assessments (Basic

Assessments) for the proposed Integrated Rapid

Transit Phase 2A West Trunk Routes in Cape Town

2016 City of Cape

Town/SMEC

EAP

• Environmental Impact Assessment (Basic Assessment)

for a proposed filling station in Bellville, Cape Town

2016 City of Cape

Town

EAP

• Statutory applications for the upgrade of the Sir

Lowry’s Pass Road Bridge, associated with the

rehabilitation and upgrade of Old Sir Lowry’s Pass

Road

2016 City of Cape

Town

EAP

• Co-ordination and management of a Freshwater

Baseline Report, Environmental Management

Programme and Water Use Licence Application for

the Replacement of culverts within a tributary of the

Eerste River, crossing the R44, Stellenbosch

2015/16 Western Cape

Government/

SMEC

EAP

• Basic Assessment for the upgrade of the

administration office for the Paarl Taal Mounument,

Paarl

2015 Department of

Public Works

EAP

• Co-ordination and management of the

Environmental Assessments associated with Sir Lowry’s

Pass Housing Development Projects

2015 City of Cape

Town

EAP

• Co-ordination and management of the Basic

Assessment process for the upgrade of the N1 from

Plattekloof to the R300 Interchange

2015 Western Cape

Government

EAP

• Compilation of the Environmental Management Plan

for the exploration and restoration of the Wooden

Bridge cross the Diep River at Woodbridge Island,

Cape Town

2015 City of Cape

Town

EAP

• Environmental Management Programme for the

replacement of the water distribution system at

Klawer Valley, Simonstown Cape Town

2015 Department of

Public Works

EAP

• Review work for an EIA of a bioethanol plant in

Cradock, Eastern Cape

2014 Private EAP

• An Environmental Basic Assessment for the proposed

Mfuleni Urban Node Development in Mfuleni

2013 City of Cape

Town

EAP

• Environmental Impact Assessment for the

Amendment of the Environmental Authorisation for

the Commercialisation of the Cape Town Stadium

2013 City of Cape

Town

EAP

• Co-ordination and management of the

Environmental Basic Assessment and Air Emissions

Licence for Fuel Tank 7 at Cape Town International

Airport

2013 Airports

Company SA

EAP

Page 12: Appendix A Environmental Assessment Practitioner CV and ...infinityenv.co.za/attachments/article/122/167-04_Appendix A.pdf · / Bigen Africa Project manager • Environmental and

TARRYN SOLOMON

Curriculum Vitae: Tarryn Solomon 2019

PROJECT EXPERIENCE

Date Client Role

• Environmental Basic Assessment and Waste

Management Licence for the Beaconvale Waste

Drop-off Facility, Parow

2013 City of Cape

Town

EAP

• Environmental Impact Assessment and Atmospheric

Emissions License for a proposed fish meal plant,

Saldanha Bay

2013 City of Cape

Town

EAP

• Environmental investigation for the installation of

backup diesel generators for I&J at both their

Waterfront and Woodstock offices, in Cape Town

2013 I&J EAP

• Five Basic Assessment Reports for the Drakenstein

Municipality for the “Upgrade of Informal

Settlements” Programme

2012 Drakenstein

Municipality

EAP

• Environmental Impact Assessment for the Boulevard

Precinct Package Plan at the Bram Fischer

International Airport, Bloemfontein

2012 Airports

Company SA

EAP

• Environmental Impact Assessment and Waste

Management License for a proposed sewerage

treatment Plant at the Bloemfontein Airport

2012 Airports

Company SA

EAP

• Environmental Impact Assessment for the upgrade of

port facilities at the Port of Port Elizabeth

2012 Transnet

National Ports

Authority

EAP

• Environmental Impact Assessments undertaken for

several places of worship in Khayelitsha, Langa and

Gugulethu

2012 City of Cape

Town

EAP

• Basic Assessment for the upgrade of a bridge and

road in Dysselsdorp, Oudsthoorn

2012 Western Cape

Government/

SMEC

EAP

• Environmental Impact Assessment for the proposed

upgrade of the Vygekraal Cemetery in Vygekraal

2011-2014 Private EAP

• Basic Assessment for the upgrade of Philippi Station in

Philippi

2011-2012 PRASA EAP

• Basic Assessment for the upgrade of Bellville Station in

Bellville

2011-2012 PRASA EAP

• Basic Assessment for the upgrade of Stellenbosch

Arterial (M177) between Range road and Polkadraai

road

2011 Western Cape

Government

/RHDHV

EAP

• Water use license application for boreholes at the

Vodacom Commercial Park in Midrand, Gauteng

2011 Vodacom EAP

• Water use license application for the development of

the National South African Police Service’s

headquarters in Maitland

2011 Department of

Public Works

EAP

• Basic Assessments for proposed Infill Housing

Development in Manenberg

2009-2010 City of Cape

Town

Project officer

• Basic Assessment for the proposed development of

Phases 5a & 5b of the Emergency Housing Project in

Mfuleni, as well as for the proposed upgrade of

Khwezi Avenue

2009 City of Cape

Town

EAP

• Assisted with an Environmental Impact Assessment for

the proposed additional diesel generators, Koeberg

2009 ESKOM Project officer

• Basic Assessment for the proposed North Access Link

in Pinelands, Cape Town

2009 Old Mutual EAP

Page 13: Appendix A Environmental Assessment Practitioner CV and ...infinityenv.co.za/attachments/article/122/167-04_Appendix A.pdf · / Bigen Africa Project manager • Environmental and

TARRYN SOLOMON

Curriculum Vitae: Tarryn Solomon 2019

PROJECT EXPERIENCE

Date Client Role

• Environmental Impact Assessment for a proposed

20MVA Substation, 132kV loop in line and a 22kV

transmission line in Schmidtsdrift, Northern Cape

2009-2010 ESKOM EAP

• Basic Assessment for the Golden Oaks Housing

Development in Kuilsriver

2008-2009 Private EAP

• Environmental Impact Assessment for a proposed

mixed-use development on Erf 1901, Blue Downs

2008 -2011 JV ABSA

Standard Bank

EAP

• Environmental Impact Assessment for a private

developer for the proposed construction of a mixed

use residential development (approximately 2000

residential units), Bardale Village, Kuilsriver

2008 Private Project officer

• Basic Assessment for a proposed residential

development on erf 521/1 in Kuilsriver

2008 Private Project officer

• Basic Assessment for Remote Car Rental Facilities

(Precinct 5) at Cape Town International Airport

2008 Airports

Company SA

EAP

• Basic Assessment for the installation of a 5.5km 66kV

feeder route Cable from the Golf Course Substation

to Markötter Substation to the University Substation, in

Stellenbosch

2008 Stellenbosch

Municipality

EAP

• Basic Assessment for the upgrade of the stormwater

system at Cape Town International Airport

2008 Airports

Company SA

EAP

• Basic Assessment for the proposed Waste Depot

Facility at Cape Town International Airport

2008 Airports

Company SA

EAP

• Basic Assessment for a proposed mixed-use

development in Philippi, Cape Town

2007 Private Project officer

STRATEGIC ENVIRONMENTAL ASSESSMENT, BASELINE AND FEASIBILITY INPUTS

• Environmental baseline studies to inform the

development of Farm 736/RE, Paarl for industrial and

mixed-use purposes

2017 Distell Limited/

Bigen Africa

Principal

• Environmental status quo investigation for the

Development Framework Plan for Cape Farm 757,

Ottery

2015 Western Cape

Government /

NM & Assoc

EAP

• Environmental baseline investigation for proposed

roundabouts, Kimberley

2016 SANRAL/ SMEC EAP

• Environmental status quo investigation for the

Development Framework Plan for Cape Farm 759,

Ottery

2016 Western Cape

Government /

NM & Assoc

EAP

• Environmental status quo investigation for the draft

Urban Design Framework for Masiphumelele

2016 City of Cape

Town / AECOM

EAP

• Environmental Baseline Investigation for the proposed

upgrading of Elizabeth Park, Bellville

2015 City of Cape

Town/AECOM

EAP

• Environmental Baseline Investigation for the

construction of a 9-kilometre sewer line for the

Wolwerivier Housing Development

2014 City of Cape

Town

EAP

• Environmental Baseline Investigations of 16 sites in the

Western Cape for disposal and human settlements

purposes

2013-2014 Western Cape

Government/

AECOM

EAP

• Co-ordination and management of the

Environmental Baseline Investigation undertaken for

the Farm 101-5 housing development in Wolwerivier

2013-2014 City of Cape

Town/AECOM

EAP

Page 14: Appendix A Environmental Assessment Practitioner CV and ...infinityenv.co.za/attachments/article/122/167-04_Appendix A.pdf · / Bigen Africa Project manager • Environmental and

TARRYN SOLOMON

Curriculum Vitae: Tarryn Solomon 2019

PROJECT EXPERIENCE

Date Client Role

• Provided environmental input into the conceptual

plans for the regeneration of Mfuleni Urban Node

2013 City of Cape

Town

EAP

• Environmental Feasibility Assessment for several

housing developments in Sir Lowry Pass Village

2013 City of Cape

Town/ AECOM

EAP

• Environmental Feasibility Assessment for the proposed

mixed-use development on the Swartklip site,

Khayelitsha

2011 City of Cape

Town

EAP

• Phase 1: Status Quo for the Environmental

Management Framework for the Central Karoo

District Municipality

2010-2012 Central Karoo

District

Municipality

EAP

• Assisted with the research and compilation of a Status

Quo report for several housing developments in the

Manenberg area

2009 City of Cape

Town

EAP

• Environmental Review of several ‘Quality Open

Spaces’ undertaken for the 2010 world cup

2008 City of Cape

Town

EAP

CONSTRUCTION PHASE MONITORING AND MANAGEMENT

• Maintenance management activities at Lamberts

Bay Harbour

2018 Dept of Public

Works

ECO

• Maintenance management activities at St. Helena

Bay

2018 Dept of Public

Works

ECO

• Upgrade of the N1 between Plattekloof and R300 2015-2017 Western Cape

Government

ECO

• Upgrade of the 40 ton slipway to a 90 ton ship hoist

at the Port of Port Elizabeth

2015-2016 National Ports

Authority

ECO

• Reconstruction of the north and south lead-in

Jetties at the Port of Port Elizabeth

2015-2016 National Ports

Authority

ECO

• Exploration phase of the restoration of the Wooden

Bridge in Woodbridge Island, Milnerton

2015-2016 City of Cape

Town

ECO

• Michigan and Tower Roads upgrades at the Cape

Town International Airport

2015-2016 Airports

Company SA

ECO

• Azure, Big Bay Housing Development in Big Bay

Cape Town

2015 Private ECO

• Reconstruction and rehabilitation of the stormwater

ponds at the Jack Muller Park, Bellville

2015 City of Cape

Town

ECO

• Emergency slope repairs along Franschhoek Pass 2014-2015 Western Cape

Government

ECO

• Construction of Heritage Park, Somerset West 2014 Private ECO

• Construction of the Hout Bay Toll Plaza, Chapman’s

Peak Drive, Hout Bay

2014 Western Cape

Government

ECO

• Construction of Nuutgevonden Residential

Development in Stellenbosch

2013-2015 Private ECO

• Upgrade of Philippi Station 2013-2014 PRASA ECO

• Western Cape Government Shared Services Office

Building in Khayelitsha, Cape Town

2013-2014 Western Cape

Government

ECO

• Construction of a residential development in

Pelikan Park

2013 City of Cape

Town

ECO

• Bulk infrastructure installation at Bram Fischer

International Airport, Bloemfontein

2013 Airports

Company SA

ECO

• Upgrade of Main Road 559, between Langebaan

and Saldahna Bay

2013 Western Cape

Government

ECO

• Upgrade of Stellenbosch Arterial between Range

Road and Polkadraai, Kuilsriver

2012-2015 Western Cape

Government

ECO

Page 15: Appendix A Environmental Assessment Practitioner CV and ...infinityenv.co.za/attachments/article/122/167-04_Appendix A.pdf · / Bigen Africa Project manager • Environmental and

TARRYN SOLOMON

Curriculum Vitae: Tarryn Solomon 2019

PROJECT EXPERIENCE

Date Client Role

• Construction of Phase 3 of Joe Slovo housing

development, Langa

2011-2017 Western Cape

Government

ECO

• Environmental monitoring and implementation of

the Chapman’s Peak Drive Environmental

Management System

2010-2017 Western Cape

Government

Environmental

auditor

• Construction of the Khayelitsha District Hospital 2009-2011 Western Cape

Government

ECO

• Construction of Cape Town Film Studios, Faure 2007-2010 Cape Town

Film Studios

ECO

• Bardale Village Phase 2, installation of bulk services 2007-2008 Private ECO

• Construction of two hotels, residential units and

commercial units at the Roggebaai Canal Tourism

Precinct

2007-2008 Private ECO

• Reinforcement of the factory wall and parking area

along the coastline in Lamberts Bay

2007 Department of

Public Works

ECO

IMPACT MONITORING, REHABILITATION, AND COMPLIANCE

• Rehabilitation Plan for wetlands affected by illegal

dumping in Eerste River

2015 Western Cape

Government

EAP

• The compilation of an Environmental Action Plan as

well as the development of an Operational

Environmental Management Plan and site

remediation for a Spoornet site being utilised for

boiler-making activities in Foreshore, Cape Town

2014 Private EAP

• Soil and groundwater quality assessment on a site in

Bellville for the company Blastec.

2007 Private Environmental

Officer

PUBLIC PARTICIPATION

• Drakenstein Municipality Local Spatial Development

Framework for the Paarl CBD, Arboretum, and Klein

Drakenstein Road area

2017/18 Drakenstein

Municipality

Stakeholder

lead

• Public Participation Facilitation for the Robertson CBD

Transport Plan

2015 Cape Winelands

District

Municipality

Facilitator

• Public Participation Facilitation for the Ceres CBD

Transport Plan

2014 Cape Winelands

District

Municipality

Facilitator

• Public Participation Facilitation for the updating of the

Overberg District Municipality Integrated Transport

Plan

2014 Overberg District

Municipality

Facilitator

• Public Participation Facilitation for the updating

process of the Stellenbosch and Franschhoek

Integrated Transport Plan

2013 Western Cape

Government

Facilitator

• Public Participation Facilitation for the updating

process for the Eden District Municipality Integrated

Transport Plan

2012 Western Cape

Government

Facilitator

• Facilitation of the Environmental Management

Committee for the Construction phase of Chapmans

Peak Hout Bay Toll Plazas

2012 Western Cape

Government

Facilitator

• Public Participation Facilitation for the Cape

Winelands District Municipality Integrated Transport

Plan

2010 Western Cape

Government

Facilitator

Page 16: Appendix A Environmental Assessment Practitioner CV and ...infinityenv.co.za/attachments/article/122/167-04_Appendix A.pdf · / Bigen Africa Project manager • Environmental and

TARRYN SOLOMON

Curriculum Vitae: Tarryn Solomon 2019

PROJECT EXPERIENCE

Date Client Role

• Assisted with public participation for two proposed

residential developments in Sweet Valley and

Firgrove, Constantia

2009 Western Cape

Government

Facilitator

• Assisted with public participation for a proposed

residential development in Bo-Kaap

2007 Private Facilitator

• Assisted with public participation for proposed

sustainable neighbourhood (residential development)

at Oude Molen Village at the Valkenburg East Site

2007-2008 Western Cape

Government

Facilitator

• Assisted with public participation for the proposed

Mupine residential in Pinelands

2008-2009 Old Mutual Life Facilitator

Page 17: Appendix A Environmental Assessment Practitioner CV and ...infinityenv.co.za/attachments/article/122/167-04_Appendix A.pdf · / Bigen Africa Project manager • Environmental and

CURRICULUM VITAE

2019

LUZUKO SIDONDI

3rd Floor

Old Warehouse Building

Black River Park

Observatory 7925

[email protected]

+27 (0)71 824 5749

Current Position

Environmental Consultant

Total experience

Four years

Education and

Certifications

• BTech: Environmental

Management (cum

laude)

• National Diploma

(NDip): Environmental

Management

• Management of

Estuaries in South Africa

(Certificate)

• Marine Protected Area

Management

(Certificate)

• IAIAsa member (No.

6245)

Date of Birth

27 January 1992

Nationality

South African

Languages

English

isiXhosa

isiZulu

Environmental Consultant at Infinity, providing a range of

environmental management services including:

• Environmental Impact Assessments (EIA)

• Environmental feasibility or screening studies

• Geographic information systems (GIS)

• Environmental Management Plans (EMP)

• Water Use License Applications (WULA)

• Environmental Monitoring as an Environmental Control

Officer (ECO)

• Rehabilitation Plans

EMPLOYMENT HISTORY

Infinity Environmental (Pty) Ltd

November 2018 – Present

Environmental Practitioner

The Environmental Partnership

Nov 2016 – Oct 2018

Environmental Practitioner

Department of Environmental Affairs

Apr 2015 - Mar 2016

Environmental Officer

Xtreme Projects

Aug 2013 – January 2014

Health, Safety and Environmental Officer

`

Page 18: Appendix A Environmental Assessment Practitioner CV and ...infinityenv.co.za/attachments/article/122/167-04_Appendix A.pdf · / Bigen Africa Project manager • Environmental and

LUZUKO SIDONDI

Curriculum Vitae: Luzuko Sidondi 2019

PROJECT EXPERIENCE

Date Client Role

ENVIRONMENTAL IMPACT ASSESSMENTS / ENVIRONMENTAL AUTHORISATIONS

• Environmental Baseline Report for the Swartklip Site, Cape

Town, Western Cape 2019

Airports

Company South

Africa

Project

officer

• Environmental Baseline Study for a proposed mixed-use

development at the Paardevlei Site, Somerset West 2018

City of Cape

Town EAP

• Environmental Impact Assessment (Basic Assessment) for

proposed Integrated Rapid Transit (IRT) along Govan Mbeki

Road, Cape Town

2018 City of Cape

Town

Project

officer

• Environmental Impact Assessment (Basic Assessment) for

proposed upgrading of the National Route 2 (N2) / Section 7

between George and Wilderness, Western Cape Province

2018 SANRAL/ SMEC EAP

• Proposed Mixed-Use Development on Portion of Erf 1694,

Melkbosstrand 2018

City of Cape

Town

Project

officer

• Proposed Mixed-Use Development on Cape Farms 738 & 767

Philippi, Cape Town 2017 Private

Project

officer

• Environmental Impact Assessment (Basic Assessment) for

proposed infrastructure in Ottery, Cape Town for the Western

Cape Department of Education

2017

Western Cape

Department of

Transport and

Public Works

Project

officer

• Environmental Impact Assessment (Basic Assessment) for

proposed sand mining on erf 12414 and a portion of erf 9930-

RE, Wesbank, Kuils River

2017 Private EAP

• Environmental Amendment Report for the construction of the

Wolwerivier Incremental Development Area 2018

City of Cape

Town / SMEC

Project

officer

• Applicability Checklist for proposed upgrading of the MR535

between Laaiplek and Elands Bay, West Coast 2018

Dept of

Transport &

Public Works

Project

officer

• Applicability Checklist for proposed IRT trunk route along

Racecourse Road, Kenilworth 2017

City of Cape

Town

Project

officer

GEOGRAPHIC INFORMATION SYSTEMS

• GIS support for the Garden Route District Municipality’s

Invasive Species Monitoring, Control and Eradication Plan 2019

Garden Route

District

Municipality

GIS

technician

• GIS support for the Spatial Development Framework for the

Stellenbosch Municipality 2018

Stellenbosch

Municipality /

GAPP

GIS

technician

• GIS support for the Spatial Development Framework for the

Witzenberg Municipality

2019 –

Ongoing

Witzenberg

Municipality /

Built

Environment

Partnership

GIS

technician

CONSTRUCTION PHASE MONITORING AND MANAGEMENT

• Slipways and Marine Infrastructure Repairs at St Helena and

Lambert’s Bay habours 2019

Coega

Development

Corporation /

Aurecon

ECO

• Periodic maintenance of Main Road (MR) 535 between

Laaiplek and Elands Bay, West Coast 2019

Western Cape

department of

Transport and

ECO

Page 19: Appendix A Environmental Assessment Practitioner CV and ...infinityenv.co.za/attachments/article/122/167-04_Appendix A.pdf · / Bigen Africa Project manager • Environmental and

LUZUKO SIDONDI

Curriculum Vitae: Luzuko Sidondi 2019

PROJECT EXPERIENCE

Date Client Role

Public Works /

SMEC

• Upgrading and rehabilitation of Elizabeth Park, Bellville 2017 –

2018

City of Cape

Town/ AECOM

ECO

• Upgrading of Philippi Train Station 2017 -

2018

PRASA ECO

• Upgrading of Langverwacht road, Kuils River 2018 City of Cape

Town / ITS

ECO

• Construction of an industrial park in Sarepta, Bellville 2017 -

2018

Private ECO

• Construction of an IRT trunk route along Jan Smuts Drive 2018 City of Cape

Town

ECO

• Construction of N2 Gateway (Joe Slovo) Low Cost Housing 2017-

2018

City of Cape

Town/

Sobambisana

ECO

OCEAN CONSERVATION STRATEGY

• Clean-up Plan report for the International Coastal Clean Day 2015

Department of

Environmental

Affairs

Project

Assistant

• Socio-economic impact assessment study for the Marine

Spatial Planning Bill 2016

Department of

Environmental

Affairs

Project

Assistant

• Development of South Africa’s National Framework on

Marine Spatial Planning 2016

Department of

Environmental

Affairs

Project

Assistant

• Stakeholder engagement and facilitation of government

consulting process

2015 -

2016

Department of

Environmental

Affairs

Project

Assistant