appendix a

170
iiJJgnlll1i Saudi Aramco BI-IO-00473 ) UPGRADE WASTEWATER TREATMENT \ FACILITY, PHASEII SOUTH JIDDAH COMPLEX DESIGN BASIS SCOPING PAPER June 2007 INFRASTRUCTURE PLANNING DIVISION FACILITIES PLANNING DEPARTMENT DHAI -IRAN

Upload: kalai-selvan

Post on 01-Dec-2015

91 views

Category:

Documents


6 download

DESCRIPTION

ref

TRANSCRIPT

Page 1: Appendix A

iiJJgnlll1i gS.o~1 Saudi Aramco

BI-IO-00473 ) UPGRADE WASTEWATER TREATMENT

\

FACILITY, PHASEII SOUTH JIDDAH COMPLEX

DESIGN BASIS SCOPING PAPER

June 2007

INFRASTRUCTURE PLANNING DIVISION FACILITIES PLANNING DEPARTMENT

DHAI-IRAN

sa922633
Typewriter
Appendix A
Page 2: Appendix A

Faci lities Planning Department Upgrade \Vastewater Treatment Facilil)' Phase II Soulh Jiddah Complex

1.0

2.0

3.0

4.0

T ABLE OF CONTENTS

PURPOSE OF FACILITIES .......••............... ... ...................... ........... ............ .... ........... .... ............. .. 4

PRESENT SITUATION ............ ............. ........... ................................................................... .......... 4

LOCATION ANALySIS ......................................... ............. ....... ....... ....................... ............... ...... 5 3.1 LOCATION OF PROJ ECT SITE.. ...... .. .. .. .......... ... ............................ .. .......... ...... ........ .. ...... .. ..... 5 3.2 ROADS, ACCESS, AND LAND USE ..................... ....... ........... .......................... .......... .... ........... 5 3.3 SITE CONDITIONS ............ ......................... ......... ...... ................ .. .................... .. .................... 6

~TERF~~:;~~~~~~~~.;;~;:;~ ••••••••.••••••••••••••••••• ::.:::: ::::: ••••• :1 •••••• :: •••••••••••••••••••••••••••••••• ••••• :: ••• ~ 4.2 PROJECT PHYSICAL INTERFACES ..................... ....... ... ............ ...... .... .. .................................... 7 4.3 PROJECT OPERATING INTERFACES .......... .. ....... ........ ... .. .. ........ ...... ... ....................... .............. 7 4.4 DEMOLITION ACTIVITIES ................... ...................... .. ..... ... ........ ....... .. .. ................................... 8

5.0 DESIGN OBJECTIVES ............................................................... ...... ... ...... .. ...................... ............ 8

6.0 GENERAL PROJECT DESIGN BASIS ....................... .. ........................... ...................................... 9

7.0 DESCRJPTION OF FACILITIES .......................................... .... .................................................... 13 7.1 PHASE II WASTEWATER TREATMENT FACILITIES IN MARINE AREA ............................ .. ....... 13 7.2 NEW CRUDE/PRODUCT SKIM TANK SYSTEMS IN TANK FARM AREA ............. ................ ......... 15 7.3 NEW WASTEWATER COOLERS ..... ............................ .......................... ....... .... ...................... 15 7.4 RETROFITTING SEAWATER COOLERS BACKWASH SYSTEM ......................... ....... .. .. .............. 15 7.5 SANITARY WASTEWATER COLLECTION SYSTEM ............ ...... .................. .... .. .......... ............. 16 7.6 MODIFI CATIONS TO EXISTI NG EQU IPMENT AND SYSTEMS.. .. ............... .. ... .. .. .. ... .. ........ 17 7.7 ELECTRICAL REQUIREMENTS ................................................................... ..... ...... ....... .. ....... 18 7.8 INSTRUMENTATION AND CONTROL SySTEMS ............................................... .......... ... ... ...... 21 7.9 COMMUNICATION REQUiREMENTS .................................. ... ..................... ........... .. ... .... ...... 23 7. 10 BUILDINGS AND STRUCTURES ................... .............. : ............................... ............ .... .. ... ...... 23

8.0 SCOPE EVALUATIONS TO DATE ................................ ......... .. .................... .. .. ........... ........ 23

9.0 ADDITIONAL STUDIES DURING PROJECT PROPOSAL DEVELOPMENT.. .. ............... ........ 24 9. 1 BUlLD, OWN, OPERATE, AND TRANSFER (BOOT) OR DESIGN BUILD OPERATE (DBO) .......... 24 9.2 SANITARY SEWER SYSTEM .................... .. ...................... .. ................................................ ... 24 9.3 HYDRAULIC PROFILE AND ANALYSES ............................................................ ...... ..... ......... 25 9.4 ENVIRONMENTAL IMPACT STATEMENT ....................... ........ ... : .... ..... .. ............................... . 25

10.0 CONSTRUCTABILITY AND LOGISTICAL ASSESSMENT.. ........................................ ............ 25

11.0

12.0

AS-BUILT DRAWING ASSESSMENT ......................................... .......................................... 26

VALUE ENGINEERJNG STUDy.... ... .. .. .. .. ................................................................. ........... 26

13.0 SURPLUS AND EXCESS MA TERJAL .. .. ..... .. .. 26

14.0

15.0

PROJECT SCHEDULE .............. ... ..... ..................... ................................................... .. .. ........... 26

APPENDICES ........ ................... ... ........ ........ .. ............... .. ........ .......... ........... .............. .. .. ....... 27 15. 1 15.2 15.3

ApPENDIX - EXISTING FACILITIES ................................................................ .. .. .. .. .............. 27 ApPENDIX - PROPOSED FACILITIES ........................... ........ ......................... .. ............ .. ....... 27 ApPENDIX - BUDGETARY PROJECT SCOPE DEFINITION .... .. ..................................... ... ....... 27

BI-l0-00473 DBSP 3 Jur.e 2007

Page 3: Appendix A

)

Facilities Planning Department Upgrade Wastewater Treatment Facility Phase II South Jiddah Complex

1.0 PURPOSE OF FACILITIES

2.0

The purpose of the facilities is to support the corporate strategy of protecting the environment by providing additional industrial and sanitary wastewater treatment equipment to bring the South Iiddah Complex (SJC) wastewater discharge in full compliance with the Presidency of Meteorology and Environment (PME) and Saudi Aramco Engineering (SAES) environmental standards.

PRESENT SITVA TION

Presently, the industrial wastewater treatment plant (IWTP), located at the SJC Marine Area, discharges into the Red Sea wastewater that does not comply with contaminant limits set forth by PME regulations as determined by EPD assessments, documented in the Environmental Master Plan The SIC IWTP receives wastewater from three facilities - the Ieddah Refinery process unit, the crude and product tank farm, and adjacent Luberef. The existing IWTP, installed in 1982 and designed only to remove oil, grease and suspended solids from industrial wastewater, has become obsolete, deteriorated, and the treated wastewater calmot meet current environmental regulations for direct discharge to the sea. In 2008, a new IWTP, provided by ER- 10-03563 Upgrade Wastewater Treatment Facilities, Jeddah Refinery Complex - Phase I, herein referred to as Phase I, will replace the existing IWTP to treat industrial wastewater from these three facilities for the removal of oil, grease, and suspended solids within the limits set forth in the current environmental regulations for direct discharge to the sea, but will not bring the SJC in full compliance. A Phase II project (i.e., BI-IO-00473) is required to remove unacceptable levels of dissolved organic and inorganic contaminants from the Phase I wastewater effluent. Project phasing strategy was adopted by management in 2004 to reduce capital cost and allow for future expansion or modifications to the wastewater treatment facilities to accommodate potential changes in the operations of the SJc. In January 2007, management approved FPD's recommendation to discontinue the Jeddah Refinery operation of the fluidized catalytic cracking Wlit (FCCU) and platfon11er and continue the operation of the crude distillation and vacuwn units in a topping mode to produce fuel oil and asphalt as long as the Kingdom fuel oil balances are in deficit and JR high sulfur diesel can be supplied to the local power plants. As a result, the refinery will begin to operate as a topping unit in 2010 and the FCCU and the platformer unit will be shutdown Any proposed Phase II wastewater treatment facilities are to be based on such an operating scenario.

Several existing conditions and practices relating to the existing Jeddah Refinery process units and crude/tank farm areas will present challenges to the selected IWTP process that will be used to treat the industrial wastewater to fully meet current discharge standards.

• Current water draw-off practices of settled water in storage tanks in the product and crude tank farm areas allow extraordinary amounts of crude and product directly into the sewer system. Large quantities of crude and product in the sewer system result in performance problems and upsets in the IWTP.

• Seawater coolers in the process units are periodically backflushed with seawater, which is directly disposed into the sewer system. Depending on the IWTP process that is selected, the introduction of seawater, due to its high total dissolved solids content, would result in upsets in the IWTP.

• High temperature discharges from process units directed into the sewer system may upset or damage the selected IWTP.

The Jeddah Refinery sanitary sewage system, installed in 1977 and originaliy consisted of multiple area underground septic sumps (tanks) for anaerobic treatment, has not only deteriorated, but can not function as

BI-10-00473 DBSP 4 June 2007

Page 4: Appendix A

Facilities Planning Department Upgrade Wastewater Treatment Facility Phase II South Jiddah Complex

designed. Sanitary sewage wastewater is now collected in these septic tanks, and hauled periodically by vacuum trucks to Saudi Aramco's AI Rehab community center in liddah for treatment or to a municipal dumping area for disposal. This hauling practice contravenes current environmental regul ations that require onsite treatment for large facilities. Many of the sanitary sewer lines are corroded and pumps are inoperable.

The instrumentation and control system of the existing wastewater treatment facility in the Marine Area is based on hardwired conventional instruments. The Phase I project will replace the existing main control panel located in the existing wastewater treatment control room with a new Distributed Control System (DCS) with a PC based Operator Station and Engineering Workstation. Some spare terminations and space have been provided for future Phase II .

Phase I will utilize the majority of the available spare capacity for its new loads in the existing RB I & RB2 MCC units at Substation RB located in the wastewater treatment plant in the Marine Area. Any significant power requirements for Phase Il work would require the construction of a new substation in the Marine Area.

3.0 LOCATION ANALYSIS

3.1 LOCATION OF PROJECT SITE

Saudi Aramco's leddah Refinery is located on the Red Sea coast in the city of l eddah, Saudi Arabia. The majority of the new BJ-IO-00473 (also referred to herein as Phase II) oily wastewater treatment facilities will be located within and adjacent to the Phase I oily wastewater treatment plant area of the leddah Refinery. Some of the work will be within the refinery process units and tank farm areas of the l eddah Refinery. The location of the new crude and product skim tank systems in Tank Farm Area utilizes existing contaiIUnent areas. Location of equipment shall be optimized during Project Proposal development and detailed design. See Figures I & 2 in the Appendix 15.2 for the overall plot plan of the l eddah Refinery and Marine Area that also indicate the major work areas for Phase II. Figures 3, 6, 8A, 8B, 8C, ll A & li B in the Appendices 15.2 provide more detailed location for the Phase 11 proposed equipment.

3.2 ROADS, ACCESS, AND LAND USE

The majority of the work for this project will be in the Marine Area of the l eddah Refinery and access is via a road patrolled by both Saudi Aramco security and the Saudi Coast Guard. In addition to standard Saudi Aramco plant [Os, persolUlel entering the Marine Area are required to obtain a separate gate pass issued by the Saudi Coast Guard that may take up to several days to process. Working within the main leddah Refinery area is accessed via the main pl ant gate with standard Saudi Ararnco plant IDs. The adjacent goverrunent port facilities can be used for receiving imported materials required for the project.

No Land Use Permits will be required as all work associated with this budget item at the SIPC are within the existing securi ty fence andlor covered by existing permits for work extending outside the securi ty fence.

BI-10-00473 OBSP 5 June 2007

Page 5: Appendix A

)

Facilities Planning Department

3.3 SITE CONDITIONS

Upgrade Wastewater Treatment Facility Phase II South Jiddah Complex

Design ambient air temperatures, wind, precipitation and earthquake zone for tillS budget item will be based on Saudi Aramco Standards (SAES-A-112). The following excerpts some of the pertinent data for reddah.

Criteria Parameter Elevation from Mean Sea Level (ft) See Soils Report - Appendix 15.1 Annual Average Temperature ("F) 82 Monthly Normal Max Temp_- Hottest Month ('F) 102

Winter Design Dry Bulb Temp @99%«oF) 57

Prevailing Wind NNW Rainfall , Average Annual (inches) 2.1

The surficial condition of the reddah Refinery consists of mostly paved areas and sandy soil. High water table and soil contaminated with hydrocarbons may be encountered in the work areas. Major equipment will require pile-type foundations. An abridged version of the soils report is included in Appendix 15.1 and the complete soils report is available from the reddah Refinery.

Construction and laydown areas with required utilities are available in the Marine Area in the vicinity that is currently being used by BI-1O-03S63.

4.0 INTERFACES

The proposed facilities shall interface, and engineering work for this project shall be coordinated with, facilities being constructed in the related budget items, as summarized below. To the extent possible, any physical tie-ins shall be made without materially affecting plant safety or operations.

4.1 RELATED BVDGETITEMS

ER-I0-03653 Upgrade Wastewater Treatment Facilities, Jeddah Refinery Complex -Phase I

This budget item provides for the upgrade of wastewater facilities at the reddah Refinery Complex to comply with the current environmental standards by instaning new IWTP facilities for the removal of oil, grease, and total suspended solids. These IWTP facilities, designed to handle 1450 gpm wastewater from the JR Complex, include, a new elevated API Separator, new Skim Tanks, new Walnut Shell Filters, and associated transfer pumps in the vicinity of the existing IWTP. A new Oily Water Lift Station will be required to consolidate the untreated wastewater streams for transfer to the elevated API Separator. This project will also install associated firewater mins and protection devices, inter-connecting piping, civil works, electrical gear, and distribution control system (DCS) instrumentation required to operate the new IWTP. The existing holding basin will be retrofitted with new stonn water pumps and supplemented with a new storm water/off-spec tank to provide surge for contaminated storm water prior to treatment. The existing API Separator will be modified and re­used for sludge collection, and the remaining existing equipment will be demolished or abandoned in place. ER-1O-03S63 is Phase I and BI-00473 is Phase II of a two-phase project required to fully comply with the direct discharge standards. BI-10-00473 will furthertreat the wastewater discharged from the (ER-1O-03653) Walnut Shell Filters. Refer to Appendix 15.1, Dwg. Nq. V A -444454 for the

BI-10-00473 DBSP 6 June 2007

Page 6: Appendix A

)

Facilities Planning Department Upgrade Wastewater Treatment Faci lity Phase II South Jiddah Complex

4.2

overall process flow and scope and Dwg. No. VA-444567 for the Plot plant for Phase 1. ERA: 10/05; ERC: 3/08 .

BI-10-00476, Upgrade Stormwater Drainage - South Jiddah Complex

This budget item provides for the upgrade of the storm water drainage system at South Ieddah Plants Complex (SJC) to provide safe and reliable operations. The project will upgrade the storm water drainage system at six storm water lift stations in the vicinity of the Tank Fann area. The scope of the project also includes installation of a new stonn water collection network at North AI-Nojoum Roundabout and Refinery Road No. 15 junction, Fire Station, Main Gate Station I and 2, Material Supply Office Gate, Asphalt loading Gate and Marine Area Main Gate. Moreover, the scope wi ll include regrading approximately 7000 square meters of roads in the southem portion of the refinery and around tile retention basin. BI- 10-00473 will require to coordinate and schedule with BI-IO-00476 the construction activities as both budget items may be working in common sites at the Tank Fann area. ERA: 4/10; ERC: 12/12

PROJECT PHYSICAL INTERFACES

Primary interface for this project wi ll be the installation of new wastewater treatment equipment downstream of tile equipment, specifically at tile outlet of the Walnut Shell Filters, which will be installed by ER- 10-03563. Wastewater from the crude and product tank farm areas will be routed to new skim tanks prior to being transferred to the Phase I wastewater treatment equipment. Existing heat exchangers that are back-flushed with seawater into the process sewer will require re-piping to route the seawater to the seawater cooling water return system. The gravity sewer discharges from Zone II (CDU#2, SGCU, and VDU#2), for Zone 3 (MEROX and Amine Units), and Zone IV (CDU#3, CDU#4, and CDU#5) of the Jeddah Refinery will require cooling prior to being sent to the Phase II IWTP. New sanitary sewer lift pumps will replace existing pumps or added on existing septic tanks and new pump discharge lines will be routed to irrigation pond. Installation of firewater protection devices for new Phase II IWTP can be made by extending the firewater headers installed under ER- I 0-03563 and ER-IO-03552. Existing plant and instrument air, potable water, and seawater cooling headers can be used to provide requirements for the new facilities. Primary electrical power supply shall be obtained for existing Substation R in the Marine Area and avai lable substation/sources in the Refinery and Tank Faml areas. Primary interface for the Di stributed Control System will be at the Wastewater Treatment control room in the Marine Area. Physical interfaces are indicated on the process flow schematics and plot plans in Appendices 15.2.

4.3 PROJECT OPERATING INTERFACES

Minimal interruption or shutdown of the Phase I I WTP equipment and other existing equipment is expected when Phase II tie -ins are required. Momentary shutdown of some process heat exchangers will be required to re-route backflush connection into the cooling water retum system. Sewage pits, requiring pumps and bar screens need to be added, will require sections of the pit be isolated to facilitate such modifications and continued operations. Shutdown requirements will be detennined during project proposal and detailed design development as described under Section 10.0 of this DBSP.

81-10-004730BSP 7 June 2007

Page 7: Appendix A

)

Facilities Planning Department Upgrade Wastewater Treatment Facility Phase II South Jiddah Complex

4.4 DEMOLITION ACTIVITIES

The following equipment in the Marine Area shall be removed by this project. This includes, but not limited to the following:

I. Existing Sand Filters (Y54-D- r A thru E), associated chemical addition tanks and pwnps, and backwash tank and pumps

2. Flocculator (Y54-D-5) and Compartment (Y54-D-2) 3. Thickener (Y54-D-I 4. Centrifuge (Y54-D-3AJB) 5. Thickener Feed Pumps (Y54-G-20AJB) - already partially demolished 6. Centrifuge Feed Pumps (Y54-G-21 AJB) - already partially demolished 7. Backwash Wastewater Basin (Y54-D-4) 8. Other equipment noted in Figures 14 and 16 thru 18 in Appendix 15.2

The site for the above equipment items , which are not currently in service or will not be in service post-BI-IO-03563, shall be cleared of all associated aboveground piping, structures, foundations, etc. to allow space for new equipment installed by tins project. Unless complete removal is required for the installa tion of new equipment, existing buried piping, structures, and foundations shall be removed to a level minimum 300nun below grade and the remaining portions abandoned in place. Figures 14 and 16 thru 18 in Appendix 15.2 indicate the general location and details of the abovementioned items required to be demolished.

Existing underground firewater piping at the site of the new Phase II wastewater treatment equipment may require demolition, in part, to accommodate installation of new equipment and new area firewater mams.

Each of the existing sanitary sewer sumps (ST-OI thm ST-07 and tank fanm) consists of oxidation compartments filled with packing and digestion compartments. All solid build-up in each of the digestion compartment and rocks (packing) in each of the oxidation compartments and shall be removed and disposed in approved landfills. Any existing partition or baflles may be removed if they serve no purpose. In some sumps, existing petitioned compartments could be bypassed as volume of the sump could be reduced as these swnps will function only as lift stations in lieu of being self­contained treatment stations. Existing submerged pumps (two per sump) shall be removed. The existing sanitary wastewater lines between the lift stations and the irrigation pond shall be abandoned­in-place or removed if it interferes with the installation of the new lines. A typical existing sanitary sewer sump (ST-OI thru ST-07) is shown in Figure 13 Appendix 15.2.

5.0 DESIGN OBJECTIVES

The overall design objective cf this project is the to provide the necessary lWTP equipment for the removal of organic and inorganic contaminants from the SJC industrial and SJC (excluding Luberef) sanitary wastewater within the limits set forth by PME and SAES direct discharge standards. The SJC industrial wastewater will have already been treated for the removal of oil, grease, and suspended solids from the wastewater within the limits set forth by PME and SAES direct discharge standards under the Phase I IWTP project.

BI-I 0-00473 DBSP 8 JUlie 2007

Page 8: Appendix A

)

Facilities Planning Department Upgrade \Vaslewater Treatment Facility Phase II South Jiddah Complex

The new Phase II IWTP in the Marine Area comprises of the following major elements to achieve the overall design objectives:

• New API Separator, designed for oil and solids removal of the incoming wastewater, will provide additional capacity and meet sparing requirements. (Phase I excluded the required second API due to the uncertainty of the future operation of the Jeddah Refinery process plants).

• New equalization tanks, receiving a mixture of treated water from the Phase I IWTP and screened sanitary waste sewage collected from the SJC are designed to equalize flow into the next treatment step.

• New membrane bioreactor (MBR) units will treat the combined wastewater from the equalization tanks for the removal of organics and inorganic contanlinants. The treated wastewater from the MBR is discharged to the Red Sea via the existing lagoons.

The following requirements complement the operation of the new Phase II IWTP:

• New crude/product skim tank systems , installed in tile tank farm Areas A & B, are designed to allow secondary settlement of bottoms water drawn from crude and product storage tanks and also to ensure, via the installation of interface controllers, that only settled water is discharged into the gravity sewer system and the crude/product is recovered. Minimizing crude and product in the sewer system would mitigate any upsets in the wastewater treatment facilities.

• New retro-fitted pping associated with the existing seawater coolers in the process units is designed to ensure backflushed seawater is routed into the seawater cooling return line (rather into the sewer system).

• The new seawater cooled heat exchangers, installed in specific areas of the Jeddah Refinery, are designed to ensure that high temperature wastewater streams discharged from operating process units are cooled to required temperatures prior to discharge into the sewer system.

• Additionally, new sumps, piping and lift pwnps are designed to allow sanitary sewage to be collected from the various septic sumps and tanks located within the Jeddah Refmery including the Tank Farm, accumulated in the existing irrigation sump, and then transferred to the Phase IJ industrial wastewater facilities for treatment. Existing sewage pits that remotely located and/or considered to generate low volumes of sanitary waste will not be provided with lift pumps and piping; these pits will be continually be evacuated by vacuum tankers and hauled to nearest new Phase IJ sanitary sump/pit or Phase IIlntennediate Sump.

• The adequacy of firewater system, the capability of detection system and the required fire proofing for equipment structures will be considered for phase II IWTP to ensure proper protection of new equipment

6.0 GENERAL PROJECT DESIGN BASIS

The design basis for this project is established by the physical and chemical characteristics of the effluent discharged from the Phase I wastewater treatment equipment, the SJC (excluding Luberef) sanitary wastewater, and the design parameters described in SAER-6129 "Membrane Bioreactor (MBR) Treatability Study."

BI-10-00473 DBSP 9 June 2007

Page 9: Appendix A

)

Facilities Planning Department Upgrade Wastewater Treatment Facility Phase II South Jiddah Complex

6.1 Design Basis for Flow

6.1.1 Industrial Wastewater

The design flow basis for industrial wastewater originating from the South liddah Complex is summarized in the following table. These fl ow numbers are those used for the Phase I project and adjusted for the leddah Refinery operating as topping unit.

Table 6-1 South Jiddah Complex - Flow Design Basis

Wastewater Source Average (gpm) Maximum (gpm)

Base or Nonnal Flow from the Refinery 597 Flow from Luberef 283 Stom1\vater from the Refinery' 0

Total Design Flow 900**

'Based on SAES-S-030

* * Rounded up from 880 gpm and including sanitary wastewater from Section 6.1.2 . ***Rounded up to match ER· 10·03563 design basis

6. 1.2 Sanitary Wastewater

865 283 202

1450***

The design fl ow basis for sanitary wastewater originating from the South liddah Complex, excluding the flow from Luberef is listed below.

Table 6-2. Design Flow Data for Sanitary Wastewater

Parameter Units Maximum Avera!!e Flow Rate gpd (m3/day) 50,000 (190) 12,000 (45)

6.2 Design Basis for Influent

6.2. 1 Influent Physical & Chemical Characteri stics for Industrial Wastewater

The physical and chemical characteristic s for industrial wastewater influent to the Phase II treatment equipment is summarized in the following table. These parameters are based on the eftluent discharging from the outlet of the Phase I wastewater treatment equipment (Walnut Shell Filters), combined with the sanitary sewage.

Table 6-3 Influent Physical & Chemical Characteristics of IWW

Parameter Outlet of Phase I IWTP Equipment

Physical Chemical pH Units 6-9 Total Suspended Solids (TSS)' <25 mgIL Oil & Grease' <10 Temperature <95°F Total Dissolved Solids (TDS) 10,500

BI-I 0-00473 OBSP 10 J une 2007

Page 10: Appendix A

)

Facilities Planning Department Upgrade \Vastewater Treatment Facility Phase II South Jiddah Complex

Parameter Outlet of Phase I IWTP Equipment

Non-Or~anic Pollutants mg/L Ammonia (as N) 20 Total Phosphorous 3.3 TKN 25 Organic Pollutants mg/L

Biochemical Oxygen Demand (BOD5) 360 Chemical Oxygen Demand (COD) 850 Phenols 10

• Compiles With PME standards. It should be noted that upset condit IOns or occasIOnal excursions could result in oil & grease cou ld exceed the noted parameter.

6.2.2 Innuent Specification for Sanitary Sewage

Table 6-4. Design Data for Sanitary Wastewater

Parameter Units Maximum' Average PME Standard

NH3-N mgIL 152 86.3 I

BOD mgIL 200 25 TSS mgIL 200 IS

O&G mgIL 14 9.9 8 Temperature OF 90

* II should be noled that Ihe actual maximum characterIZed values for BOD and TSS are 185 and 51 ,

respective ly .

6.3 Design Basis for Emuent

The treated wastewater discharged from the Phase II IWTP and into the Red Sea shall meet the following requirements, which has been extracted from SAES-A-104 Table and modified to include only the applicable parameters and notes.

Table 6-5 Effluent Discharge Limitations

PMf:1')

Physical -Chemicat Pollutants mgll{')

Floatable None

pH Units 6-9 Total Suspended Solids CTSS) 15 mgIL Turbidity P) 75 NTU

Non-Organic Pollutants mglL

(30 day mean) Ammonia (as N) 1.0 Arsenic 0. 1 Cadmium 0.02 Total Chlorine (residual) ,0) 0.5

BI-10-00473 DBSP 11 June 2007

Page 11: Appendix A

)

)

Facilities Planning Department Upgrade Wastewater Treatment Facility Phase II South Jiddah Complex

PMe'1

Chromium (total) 0.1 Copper 0.2

Cyanide 0.05 H

2S (7) 40

Lead 0.1

Mercury 0.001

Nickel 0.2 Phosphates (total , as P) (6) 1.0

Zinc 1.0 Or<lanic Pollutants mq/l

Biochemical Oxygen Demand 25

(BOD, )

Chemical Oxygen Demand (COD) 150 Total Organic Carbon (TOC) 50

Total Kjeldahl Nitrogen (TKN) 5

Total Chlorinated Hydrocarbons 0.1 Oil & Grease (' ) 8 Phenols 0.1

Biolo<lical Pollutants MPN/100 ml (' I

T alai Coliform 1000 (30-day geometric mean)

Notes: (2) All values represent monthly average unless othelWise indicated. (3) m9"- unless otherwise indicated. (5) Nephelometric Turbidity Units. Also, to be determined on a case-by case basis in areas deemed by EED to

be biologically sensitive. (6) Not applicable for wastewater reuse applications or discharge into evaporation ponds. For Jubail R.C. area ,

this value should read Phosphorus reported as total P (7) Based on the assumption of a security fence located a minimum of 20 meters from the centerline of the

pond's berm (8) Visible oil sheen can be assumed to demonstrate an 8·15 mg/L oil concentration. I.E; Non Compliance

6.4 Estimated Utility Requirements for MBR System

The following table represents operational and utility requirements, assuming 100% flow, for the MBR system, as described in Section 7.1.2 below.

Table 6-6 Estimated Utility Requirements

Utility Quantity

Plant Water 2 M3IHr

Instrument Air 40 NM'lHr

Solids to Disposal, dry WI. basis 1500 kg/day

Powdered Activated Carbon (PAC) 750 kg/day

Sodium Hypochlorite Solution (12.5%) 66.7 L/day

81-10-00473 DBSP 12 June 2007

Page 12: Appendix A

)

Facilities Planning Department Upgrade Wastewater Treatment }<~acjlity Phase II South Jiddah Complex

6.5 New Crude and Product Tank Farm System

6.6

6.7

The current quantities of water draw-off from crude and product tanks are provided in Figure 19 in Appendix 15.2. Two skim tank systems, one for Tank Farm "A" and one for Tank Fann "B," will be provided and the basis for sizing the skim tanks is described in Ole aforementioned figure.

New Coolers for Jeddah Refinery Topping Unit Wastewater

The new MBR unit is designed to operate with a biomass thriving at temperatures less than 95 OF. As such, some of the wastewater streams being generated by specific process units will require cooling prior to di scharge into the gravity sewer system. No specific temperature infonnation is available for the wastewater being discharged from these process units. For design purposes, the average temperature of 120 OF is specified for the wastewater from these process units. The installation of seawater coolers at these process units is intended to cool the majority of the higher temperature wastewater streams. Maximum Inlet seawater temperature is specified to be 87 OF and tile outlet seawater temperature should be limited to 11 5 OF. Due to the existing piping layouts, other high temperature wastewater streams in the process areas may not be cooled; however, it is expected that the total mixed wastewater stream to the wastewater treatment facilities will be on average less than 95 OF.

New Sanitary Wastewater Collection System

Approximately 45 M/day (12,000 gallons/day) of sanitary waste is being collected via vacuum tank trucks from 39 sumps scattered throughout the Jeddah Refinery and Marine Areas. Considering peak usage, the overall maximum design fl ow of I 15 M3/day (30,000 gallons/day) is specified.

7.0 DESCRIPTION OF FACILITIES

The project scope definiti on presented in this section is fixed, uni~ss the Project Proposal engineering contractor is able to successfully demonstrate to FPD that there is a more economical (i.e., cost effecti ve) means of achieving the project's stated purpose (i.e. , Business Objective), given the anticipated operating environment. This restriction, notwithstanding, tile Project Proposal engineering contractor shall further define the actual facilities to be built (i.e., "how" the required capabilities are to be achieved), consistent with the project's stated purpose and the anticipated operating environment.

7 .1 PHASE II WASTEIV ATER TREATMENT FACILITIES IN MARINE AREA

This section describes the specific equipment that will be installed, in the Marine Area, downstream of the Phase I Walnut Shell Filters for the treatment of the industrial wastewater from the SJC and the sanitary sewage from the SJC (excluding Luberef) to comply with the environmental regulations for direct discharge to the Red Sea. The Phase II API Separator is also described in this section. The general location and overall process flow for these systems are shown in Figures 3, 4 & 5 in Appendix 15.2.

7.1.1 New Equalization Tanks and Tank Mixers

Two 2460 M' (650,000 gallon) each Equalization Tanks (EQ), each with four side entry mixers shall be provided to receive and mix the treated SJC industrial wastewater from the Phase I Walnut Shell Filters and sanitary sewage from the SJC (excluding Luberef). A 190 M3/day (50,000 gallon/day) grit

BI-l 0-00473 DBSP 13 June 2007

Page 13: Appendix A

)

)

Facilities Planning Department Upgrade \Vastewater Treatment Facilit)' Phase II South Jiddah Complex

chamber and two (I or 2 operating) 95 M3/day (25,000 gallon/day) each drum screens, located near the inlet of the EQ tanks , shall also be provided to remove debris from the sanitary sewage.

7.1.2 MBR System

The MER unit, consisting of two 75% trains that are designed to process an average daily flow of 3975 M3/day (1,050,000 gallons/day) and a peak hourly flow of 4542 M3/day (1 ,200,000 gallons/day), shall be provided The treated effluent will meet the parameter set forth in Section 6.3 of this DBSP.

The flow of the combined industrial and sanitary sewage from the EQ tanks are pumped via three (2 operating, I spare) MER Feed Pumps and regulated via a splitter box to the two each parallel Aeration Tanks of the new MER units, where diffused aeration, via three 3 (2 operating, I spare) AerationIMOS Blowers, will provide oxygen required for aerobic biological treatment and powder activated carbon (PAC) will be added to enhance removal of wastewater contaminants. The PAC is introduced by a feed system consisting of one Storage Silo and two (I operating, I spare) Slurry Pumps, which uses EQ TalUc water to form slurry. The PAC silo is equipped with the required pneumatic piping/tubing and filters to accept a direct cOlmection from standard bulk PAC delivery trucks equipped with blowers. Acid and Caustic Dosing Units, each consisting of two (I operating, I spare) metering pumps and one acid or caustic storage tank, are provided to adjust the pH of the wastewater in the aeration tanks as required. From the Aeration Tanks, the wastewater is then gravity fed to two Membrane Operating System (MOS) Tanks, which house the membrane fi lter modules. Each MOS Tank is provided with a piping distribution system with jetting nozzles to distribute a mixture of the mixed liquor and air to each of the membrane modules. The aforementioned AerationIMOS blowers also supply this air to the jetting nozzles, where together with the mixed liquor, provide significant agitation and turbulence to keep the membrane bundles free of any accumulated solids, and also provide a wlifonn mixed liquor along the entire length of the membrane bundles. MOS recirculation pumps associated with the MOS Tank maintains the system mixed liquor solids at the required concentration. Sludge, drawn off the MOS circulation line, is diverted to a Sludge Pit, which is provided with two (I operating, I spare) Sludge Pumps to transfer the sludge to Sludge Dying Beds where the dried sludge is being periodically removed and sent to approved landfills. The filtered water drawn through the MOS Tank membrane via two (I operating, I spare) Filtrate Pumps is tilen routed into the Red Sea via existing lagoons for disposal A Sodiwn Hypochlorite Dosing System, consisting two pumps (I operating, I spare) and a hypochlorite storage tank, is provided for the periodic clean-in-place of the membranes to maintain penneability.

7.1.3 Second API Separa tor

One new 330M3/hr (1450 gpm) API Separator shall be provided and is to be identical and installed adjacent to the unit provided WIder Phase 1. Two new 27 M/hr (120 gpm) API Sludge Pumps shall also be provided. Phase [ has also provided the necessary space and piping tie-in requirements for this second API Separator and Sludge Pumps. This unit will be tied into and fed fro·m the Phase [ Splitter Box (Y54-D-1114).

Oi l collected the from the new API Separator oil skimmer will be routed to the Phase I Skimmed Oil Break Tank (YS4-D- 1122) and transferred via Phase I equipment to the existing slop oil tanks. Sludge removed from the bottom hopper of the API Separator will be removed by the new Phase II API Sludge Pumps and discharged to Phase I API Decant Tanks . The treated wastewater from the API Separator is discharged into the two Phase I Skim Tanks for further processing. .

81-10-00473 DBSP 14 June 2007

Page 14: Appendix A

Facilities Planning Department Upgrade Wastewater Treatment Facility Phase II South Jiddah Complex

7.2 NEW CRUDE/PRODUCT SKIM TANK SYSTEMS IN TANK FARM AREA

Two new crude/product skim tank systems shalll be provided. One system will be located in the vicinity of Tank Farm A and the other at Tank Farm B as indicated in Figure 6 in the Appendix 15.2. Tank Fann A will be provided with one new) Skim Tank, two (I operating, I spare) new each Skim Tank Pumps, one new Oil Recovery Tank, and two (I operating, I spare) each Oil Recovery Pumps. Tank B wi ll be provided with same equipment except that the Skim Tank the Skim Tank Pumps will be sized according to requirements. During a dewatering operation, tank bottoms water from a crude or product storage tank will be pumped via existing sumps into one of the two new Skim Tanks. After additional settlement, the oil or crude from the Skim Tank is drawn into the Oil Recovery Tank and pumped via the Oil Recovery Pump to an existing crude (slop) tank . The settled water is then pumped via the Skim Tank Pump to one of the existing main area collection sumps for ultimate transfer to the wastewater treatment facilities. To ensure that only settled water is drawn from the skim tanks, an oil/water detection device shall be installed on the discharge line (immediately downstream of the skim tank outlet /lange) to shutdown the skim tank pump when oil in water is detected. Also, a timer is to be installed to shutdown the ski m tank pump in tlle event oily water sensors are not functional. The general location and overall process /low for the Skim Tank Systems are shown in Figures 6 & 7 in Appendix 15.2.

7 .3 NEW WASTEWATER COOLERS

New Coolers shall be provided by this project to cool the wastewater from the existing Jeddah Refinery topping process units to being disposed into the gravity sewer system. These coolers will ensure that the temperature of the wastewater in the MER system is maintained at less than 95 OF. Three cooling systems are being proposed - one for Zone 1I process area (CDU#2, SGCU, and VDU#2), one for Zone III (MEROX and Amine Units) and one for Zone IV process area (CDU#3, CDU#4, and CDU#5). For each zone, two new self-priming 23 M3IHr (100 gpm) each Wastewater Transfer Pumps shall be provide to draw (regulated via level control) wastewater from hdividual existing area manholes and pump the wastewater through a new plate and frame type s,awater Cooler and then into subsequent existing manholes. Under high flow conditions (rain or firewater) initiated by level indication in the manholes, the wastewater transfer pumps are bypassed and the wastewater is' directed from manhole to manhole via gravity. During high /low, the wastewater combined with rain or firewater would not require cooling. The general location and overall process flow for these coolers are shown in Figures 8A, 8B, 8C & 9 in Appendix 15.2.

It should be noted that the installat ion of the new wastewater coolers requires that a valve box be installed that will contravene the requirements of SAES-B-008, para. 5.2. Preliminary review by Loss Prevention (See E-mail of April I, 2007 in Appendix 15.2) indicates that the acceptance of the design providing that all of the requ irements of para. 5.2 (exceptions) of SAES-B-008 (I through 6) shall be complied with and implemented. Also, drawings shall be submitted during Project Proposal development to Jeddall Area LPD for review and the installation of the proposed heat exchanger & pumps.

7.4 REmOFITTING SEAWATER COOLERS BACKWASH SYSTEM

This project shall retrofit the following seawater cooled heat exchangers in the process units so that, during periodic backtlushing with seawater, the backtlushed fluid is diverted back into the seawater cooling rerum line in lieu of being discharged into the gravity sewer system. These retrofits will

81-10-00473 DBSP 15 JUlie 2007

Page 15: Appendix A

)

Facilities Planning Department Upgrade \Vastewater Treatment Facility Phase II South Jiddah Complex

prevent upsets in the wastewater treatment system by not allowing the wastewater to be subjected to extraordinary swings in TDS during the backflush operation. The general location and typical piping arrangements to achieve the requirements for these coolers are shown in Figures 2 & 10 in Appendix 15.2. PMT may consider using the proponent to perform the tie-in work, but ultimate decision needs to be finalized between the PMT and proponent.

Table 7-1. Coolers to be Retrofitted

Sea Water Service Existing Cooling Existing Cooler Tag# Water Line Size Back

Supply Return Flushing Lines Sizes

Zone II Y02-E-2 16 Crude Column OYHD Condenser 4" 4" 4"

Y06-E-235 Light Yacuwn GasOil Trim Cooler 4" 4" 4"

Y06-E-237C 3" Stage Inter Condenser 6" 6" 6" YI4-E-223 Debutanizer OYHD Sub-Cooler 4" 4" 4" YI4-E-226 Splitter OYHD Cooler 3" 3" 3" YI4-E-230 Deethanizaer OYHD Condenser 3" 3" 3" YI4-E-231 Depropanizer Bottoms Cooler 4" 4" 3" Y I4-E-233 Depropanizr OYHD Condenser 4" 4" 3" YI4-E-243 Splitter Bottom Trim Cooler 4" 4" 6"

Amine Unit Y24-E-4 Amine Trim Cooler 6" 6" 6"

7.S SANITARY WASTEWATER COLLECTION SYSTEM

A new sanitary wastewater collection system shall be provided will transfer sanitary waste from specific existing and new sumps to the new Phase II IWTP. Existing Septic Swnps ST-OI through ST-07 (ST-04 & 7 consists of two sumps each), located within the Jeddah Refinery, are designed with two submerged-type sanitary sewage lift pumps, which mayor may not be existence. For each of these existing sumps, two (I operating, I spare) new 5 M3/Hr (20 gpm) each submerged-type, grinder/trash, Sanitary Sewage Lift Pumps shall be installed. Existing Septic Sump ST-08 shall also be provided two (1 operating, I spare) new 5 M3/Hr (20 gpm) each submerged-type, grinder/trash, Sanitary Sewage Lift Pwnps. For ST-08, ST-09, and ST-lO in the Jeddah Refinery and ST-IOI in the Marine, each system shall consist" of one new Septic Sump and two (1 operating, I spare) new 5 M'/Hr (20 gpm) each submerged-type, grinder/trash, Sanitary Sewage Lift Pumps shall be provided. For the aforementioned exist ing and new sumps, each shall also be provided with new Bar Screens. New discharge piping for the aforementioned submerged sanitary sewage lift pumps shall be installed to convey the sanitary waste to the new Intermediate Sump located in the Marine Area. The new Intermediate Sump is designed to collect both the sanitary wastewater streams from the Septic Sumps provided with pumps and also sanitary wastewater collected by vacuum tank trucks from all other remaining sanitary sewage pits in the Jeddah Refinery and Marine Area. The Intermediate Swnp will be provided with a bar screen, two self-priming, grinder/trash, 8 M3/Hr (35 gpm) each Intermediate Sump Pumps, that will convey the sanitary wastewater to the new Phase II Equalization Tanks, via a

81-\0-00473 DBSP t6 June 2007

Page 16: Appendix A

)

Facilities Planning Department Upgrade Wastewater Treabnent Facility Phase II South Jiddah Complex

grit chamber, and drum screens, as described in Section 7.1. The Intemlediate Sump is also provided with an overflow connection to the existing Holding Basin (YS4-D-3) and also a hard-piped connection to allow vacuum tank trucks to unload their content into the sump. Figures \lA, liB, and 12 in Appendix IS.2 provide the location of the aforementioned equipment 3Jld flow scheme:

Table 7-2 Equipment Summary - Sanitary Sewage System

Sump No. New Lift Pumps * Sump New Bar Screen ST-OI 2 Existing I set

ST-02 2 Existing I set

ST-03 2 Existing I set

ST-04 (I) 2 Existing I set

ST-04 (2) 2 Existing I set

ST-OS 2 Existing 1 set

ST-06 2 Existing 1 set

ST-07 (1) 2 Existing 1 set

ST-07 (2) 2 Existing 1 set

ST-08 2 Existing 1 set

ST-09 2 New 1 set

ST-JO 2 New 1 set

ST-IOI 2 New I set

Interm ediate Sump 2 N ew I set

'Base Case - submerged trash/grinder pumps; altemate, self-prunmg trash/grinder pumps

7.6 MODIFICATIONS TO EX IS TING EQUIPME NT AND SYSTEMS

7.6.1 Sanitary Was tewater Equipment

Existing sewage pits ST-OI thru ST-07 consists of three digestion compartments, a filter tank, an oxidation compartment fill ed with distribution piping packing, and a well for the submerged pumps. This project will be required to remove all solids build-up, packing materials, unnecessary piping, etc. in each of these compartments and dispose in approved landfills. The project may also consider consolidating or bypass compartments to form a single contiguous basin.

7.6.2 Firewater System

The existing 10" underground firewater mains and associated firewater protection devices that cover the primary Phase II Wastewater Treatment Facilities shall be replaced with a new RTR piping. Additional firewater protection devices, such as hydrants, monitors, and hose reels, shall be provided to protect new Phase II equipment as required. Figure 14 & IS in Appendix I S.2 is a layout of the firewater mains.

BI-IO-00473 DBSP \7 June 2007

Page 17: Appendix A

)

Facilities Planning Department Upgrade \Vastewater Treatment Facility Phase II South Jiddah Complex

7.7

New firewater protection devices and firewater laterals shall be installed in the vicinity of the new Wastewater Coolers and CrudelProduct Skim Tank Systems, as required with the collaboration of Loss Prevention.

7.6.3 Other Non-Electrical Utility Systems

Plant/Instrument Air, potable/utility water, and seawater cooling requirements for Phase II are available in the immediate area by extending the existing service headers.

During Project Proposal development, the re-use of the existing chemical storage tanks associated with the existing Sand Filters for chemicals (acid, caustic, and sodium hypochlorite) associated with the MBR system should be considered by this project.

ELECTRICAL REQUIREMENTS

7.7.1 General

Presently, JR facilities receives power supply primarily through onsite power generat ion at 13.8kV, 3 phase, 50Hz. The power is then distributed via circuits installed underground and in cable tray raceways to various distribution substations located throughout the plant. The existing Marine Area Substation RB, which will accommodate the Phase I electrical gear, has insufficient capacity to accommodate the new Phase !l loads. I n addition a number of the proposed new and upgraded loads are located outside of the marine area in the refinery and tank farm areas several kilometers away.

7.7 .2 Electrical Scope Description

The electrical scope of work for this budget item incl udes the addition of a new unit substation fed ITom Substation R in the Marine Area via a single 13.8 kV underground circuit to facilitate the new electrical loads in the Marine Area .

This project will also provide power supply for new and upgraded equipment in the refinery and tank farm areas via new and existing circuits ITom the nearest suitable refinery and tank farm area substations. Preliminary electrical load requirement for this project is estimated to be approximately 1000 KW in the marine area and 70 KW in the refinery and tank farm areas.

Marine Area

7.7.3 New Marine Area Unit Substation

The power supply to the proposed new Marine Area faci lities wi ll be provided from a new substation. The new substation shall be installed in the area currently utilized by an abandoned waste water filter Unit west of the chemical storage warehouse. The preliminary location plan of the proposed substation is shown in the Figure 3. Final location however, shall be confirmed during project proposal after the development of area classification drawings.

The new substation building shall be built with complete substation support faci lities as required by Saudi Aramco standards. See Figure :0. The facilities shall include Battery System, Annuncia tor System, Fire Alarm System, HVAC system, Substation Auxiliary Power Supply, and equipment &

BI-I 0-00473 onsp 18 J une 2007

Page 18: Appendix A

)

Facilities Planning Department Upgrade Wastewater Treatment Facility Phase II South Jiddah Comptex

personnel access doors. The Substation's major electrical equipment shall include but not be limited to the following (See Figure 21):

• 13.8kV / 400V/230V Step- Down Distribution Transfonner

• 400V12081120V Dry Type Transfonner

• 400V Single Ended Switchgear

• 400V Motor Control Center

• 400V Solid State Reduced Voltage Controllers

• Low Voltage Cable-Bus.

• High Voltage and Low Voltage Power Cables.

• Substation Building.

7.7.4 Plant and Substation Grounding

Plant and substation grounding shall be designed and installed in accordance with the general philosophy, principles and installation practice described and referenced in Saudi Aramco standards. A complete and comprehensive grounding calculation and study shall be perfonned and provided. The grounding system shall be designed and installed in such a mrumer that the actual step voltage, touch voltage, mesh voltage or transferred voltage levels should be less than the corresponding maximum allowable by referenced industry standards and Saudi Aramco Standards. The new grounding system shall be cOlmected to the existing grounding system

7.7.5 Sanitary Waste Water Collection System - Marine Area

• ST-101 From the new Marine Area substation install a 400V power supply circuit to connect to the new outdoor combination motor starter associated with the new lift pump motor installation.

Refinery and Tank Farm Areas

7.7.6 Switch racks - Skim Tank System & Waste Water Coolers

From nearest available refinery and tank fann substation, install a 400V power supply circuit to new switchracks installed at the equipment locations indicated below:

• Tank Fann A Skim Trulk Pump Motors (2) Skim Tank Oil Recovery Pump Motors (2)

• Tank Farm B Skim Trulk Pump Motors (2) Skim Trulk Oil Recovery Pump Motors (2)

• Waste Water Coolers Zone 2 & 3 - Waste Transfer Pump Motors (4)

BI-IO-00473 DBSP 19 June 2007

Page 19: Appendix A

)

Facilities Planning Department Upgrade Wastewater Treatment Facilit)· Phase II South Jiddah Complex

• Waste Water Coolers Zone 4 - Waste Transfer Pump Motors (2)

7.7.7 Sanitary Waste Water Collection System

• ST-O I - ST-07 Utilize the existing lift pump motor 400V power supply cables and circuits to COlUlect to new outdoor combination motor starter associated with each new lift pump motor installat ion. Splice the existing cables to new cable segments and extend to the new combinat ion starters. Note that all existing cables and other equipment proposed for reuse shall be tested and veri tied to be in satisfactory condition during the project proposal phase.

• ST-08 From nearest ava ilable substation/power source install a 400V power supply circuit to cOllnect to tile new outdoor combination motor starter associated with the new lift pump motor installation.

• ST-09, & 10 From nearest avai lable substation/power source, install a 400V power supply circuit to connect to each new outdoor combination motor starter associated with each new lift pwnp motor installation.

Other Electrical Requirements

7.7.8 Cathodic Protection System

Cathodic protection shall be provided for new tank bottoms, pipe risers for fire protection devices, buried & submerged metallic structures, and piping within the plant facilities and shall be designed and installed as required by Saudi AIamco Standards.

7.7.9 Plant Lighting System

Plant lighting installations shall be designed to provide average illuminat ion levels not less than that dictated by Saudi AIamco Standards

7.7.10 Area Classification

AIea classification drawings shall be developed based upon guidelines provided under Saudi AIamco standards. E lectrical equipment shall be rated for use in a hazardous location based on the proximity of equipment location and classi tied area.

7.7.11 Electrical Raceway System

Cables, Conduits and Cable Trays will be installed as required to facilitate electrical loads. Specifically, all power and control cables to the field equipments, instruments, motors, and local control panels shall be installed in ladder type cable trays with cover. In the process areas, the cable will continue in condu it or smaller ventilated cable trays as detennined in design. Concrete encased PVC duct banks

BI-10-00473DBSP 20 June 2007

Page 20: Appendix A

)

Facilities Planning Department Upgrade Wastewater Treatment Facility Phase II South Jiddah Comptex

will he provided for all under road crossings. All power, instruments, and control cables in process areas shall be armored PVC jacketed.

7.8 INSTRUMENTATION AND CONTROL SYSTEMS

7.8.1 General

This project will provide for safe and reliable process operations of the Jeddah Waste Waster Treatment facility by expanding the existing Distributed Control System (DCS) and other existing auxiliary monitoring and control systems for new equipment installed by this project. All new processes will be controlled and monitored from the IWTP control room. The project will provide new instrwnentation, control valves, field wiring and junction boxes for the new equipment installed by this project and a network link between the Central Control Room (CCR) DCS located in the Administration Building and the IWTP control room. For equipment installed in the lWTP area, this project will use existing space in lWTP marshalling, analog and digital cabinets to house the DeS and auxilialY systems required to monitor and/or control the new equipment installed by this BJ. The lWTP control room will not require any modifications for the new equipment.

In general, progrrnnmable logic controllers (PLC) mounted on skid-package equipment shall remain on skids and not be relocated. PLC's that are in freestanding cabinets shall be evaluated during PP to detennine if they are suitable for outdoor environment, costs of installing inside, available spare in building, etc.

For equipment installed in the refinel)' and tank farm, i.e. Sanitary Sewage Lift (SSL) pumps, cmde/product skim tank systems, and wastewater cooling systems instrumentation, this project will use space in existing refinel)' PIB marshalling, analog and digital cabinets for tennination of new equipment va installed by this BJ.

7.8.2 Distributed Control System (DCS)

This project will provide va modules as required for new field instrumentation. The new equipment provided by this project will be monitored and controlled fyom tlle lWTP Control Room. The project will not provide ally consoles or workstations as a result of the added equipment. The project will modify the console's graphics and displays to reflect the addition of the new equipment and instmmentation. This project will provide configuration, graphics, reports a1ld trending for all new va installed for this project.

In order to expand and integrate the existing lWTP and CCR Yokowaga systems over a V-Net data highway, a new domain shall be created, the CCR operating system shall require upgrading from CS3000 3.03 to V-Net IP, the controllers IP cards shall be upgraded and the control room cabling shall be replaced by UTP. Two L3 switches will be installed in a new communications cabinet located in the CCR. The communications cabinet shall be installed as part of the system domain upgrade. Redundant fiber optic cables will be installed a1ld cOlUlected to the L3 switches in the CCR and to existing L2 switch in the WWT Control Room.

The new equipment will be composed of the latest version of the control system's vendor's standard hardware which can be configured to meet the systems requirements. The system will be modular, integrated and re-configurable; accepting new expansion or replacement hardware, and data downloads while on-line without interfering with control.

81-10-00473 DSSP 2t June 2007

Page 21: Appendix A

)

Facilities Planning Department

7.8.3 H,S and LEL Monitoring

Upgrade Wastewater Treatment Facilit)' Phase II South Jiddah Complex

New smart H,S and LEL sensors, beacons and field horns shall be provided for new equipment provided under this project and wired directly to the DCS as per Saudi Aramco standards requirements. The project wi ll also provide LEL visual and audible alarms required by applicable Saudi Aramco standards.

7.8.4 Field Instrumentation and Cabling

Field Transmitters

The project will provide new transmitters, as applicable for new equipment installed under this project. New instruments shall have access platfonns installed or expanded as required for accessibility purposes.

Other Instrumentation

New equipment and pumps provided by this project and located in the refinery area shall have as a minimum running, stop and ready status indicators and stop capability from the DCS. SSL pump, oil recovery tanks, and wastewater cooling systems instrumentation wi ll be ternlinated in process area PIB's. Recommended PIB 's for the new process area and tank fann equipment are as follows:

ST-OI Control Room No. 1 ST-02 Control Room No. 1 ST-03 Control Room No. I ST-04 Control Room No.1 ST-05 Control Room NO.4 ST-06 Control Room No. I ST-07 Control Room No.1 ST-08 Tank Farm Control Room ST-09 Control Room No. I ST- IO Control Room No. I CrudeIProduct Tank Fann Control Room Skim Tank Systems WW Cooling System Control Room No.1 (2) WW Cooling System Tank Fann Control Room (I)

SSL pump indications will include sump level, motor winding temperature, seal failure, pump status and hand-off-auto.

Free standing PLC 's provide d as part of a package system shall. be installed in an environment suitable to the equipment and per manufacturer 's requirements.

Field Wiring

New control cables and junction boxes shall be provided for all new equipment installed under this project. Segregation of wiring and junction boxes will be per applicable standards.

BI·10·00473 DBSP 22 June 2007

Page 22: Appendix A

Facilities Planning Department

7.9 COMMUNICATION REQUIREMENTS

Upgrade \Vastewater Treatment Facility Phase II South Jiddah Complex

This project will not provide any additional or new pennanent conununication installations.

The contractor's temporary construction communication requirements will be specified in Ule detailed design and provided by the contractor, with Saudi Aramco assistance, where required. Any construction communications needs of Saudi Aramco PMT will be provided and funded by this project.

7.10 BUILDINGS AND STRUCTUItES

A common building shall be provided with separate rooms for the AerationIMOS Blowers and Sodium Hypochlorite Storage Tank in the Marine Area. The building, with an approximate size 125 M2, shall be constructed of concrete blocks and shall be air-conditioned.

A common sunshade with open sides shall be provided for MBR System (MOS Tank and Filtrate Pumps) in the Marine Area.

A new Substation Building, as described in Section 7.7.3 shall be provided in the Marine Area. The building, with an approximate size 80 M2, shall be constructed of concrete blocks and shall be air­conditioned.

Figure 3 in Appendix 15.2 provides the location of the new buildings and sunshade.

8.0 SCOPE EVALUA nONS TO DATE

8.1 MBR SYSTEM

The MBR technology, which introduces powder activated carbon (PAC) upstream of the MBR membranes, is being selected on the basis as being the most cost effective alternative for treating the wastewater for the SJc. Three other treatment processes were previously evaluated:

I. Conventional Dissolved Air Flotation (OAF), Activated Sludge Treatment (AST) - cylindrical clarifier with sludge rake, and Filters - Using this system would have required the addition of granulated activated carbon columns downstream of the clarifiers so that PME compliance of the treated wastewater can be met. In addition, considerably more equalization would have been required. Replacement of spent carbon would have been costly if such a system was implemented. Reliabi lity and feasibility are questionable and as such, lead to the development of the physical chemical treatment system described below.

2. Physical Chemical Treatment - This system uti lized a resin to remove phenols, an air stripper to remove anmlOnia, and granulated activated carbon to remove all other contaminants at levels in compliance with PME regula tiollS. The system was operationally simplistic, but required a multinlde of unit operations. Though pilot testing continned that the innovative technology is feasible, no commercial faci li ty has been installed. Routine replacement of spent resin and carbon would have been costly if such a system was implemented.

3. Conventional MBR - Similar to Ule conventional DAF/AST described above, conventional MBR would have required the addition of granulated activated carbon columns.

BI-I 0-00473 DBSP 23 June 2007

Page 23: Appendix A

)

Facilities Planning Department Upgrade \Vastewater Treatment FacilitJ Phase II South Jiddah Complex

The PAC for the proposed MBR system is utilized as an aide to the treatment process. However, the quantity of carbon (PAC) used is significantly less than that of the conventional MBR followed by GAC columns.

8.2 SANITARVSEWERSVSTEM

The existing Jeddah Fefinery and Marine Area contains 39 sanitary sewage sumps/pits that are normally emptied by vacuum tank trucks and is hauled to Saudi Aramco's Al Rehab community center in Jiddah for treatment or to a municipal dumping area for disposal In lieu of installing piping and pumps to allow all sanitary sewage pits to be transferred to the new Phase II wastewater treatment facilities, only selected sewage pits, which are currently emptied via tank trucks every one to two days , were provided with such capabilities. In general, sewage pits that generate low volume of waste and/or are remotely located were not provided with piping and pumping facilities. These pits will continue to be emptied via vacuum tank trucks, with the exception that the collected sewage will be hauled to the nearest new Phase II sanitary sewer sump/pump or new Phase II Intermediate Sump.

8.3 ELECfRlCAL POWER REQUIREMENTS FOR MBR BLOWERS

The three new AerationIMOS Blowers for the MBR system are rated at 225 kW (300 HP). Per Aramco Standards, High Voltage (HV) power supply requiring an additional tTansfomler, HY switchgear, and associated motor controllers is speci fi ed for this application. The power supply for tile existing wastewater treatment facilities in the JR Marine Area is stepped down from 13.8kV to 400 V and there are no intennediate voltage levels. In lieu providing high voltage power supply, which includes HY switchgear and other associated HY equipment, it is proposed to utilize the low voltage 400V power supply with solid state reduced voltage controllers for the blower motors. Correspondence (See Appendix 15.2) from CSD has indicated support for a waiver, which is to be processed by PMT during Project Proposal development.

9.0 ADDITIONAL STUDIES DURING PROJECT PROPOSAL DEVELOPMENT

9.1 Bun.o, OWN, OPERATF, AND TRANSFER (BOOT) OR DESIGN BUILD OPERATE(DBO)

During Project Proposal development, FPD, PMT, and other Saudi Aramco organizations shall further develop and evaluate the economic merits for using a third party arrangement via BOOT or DBO to meet the objectives of the Phase II facilities. The evaluation should also include the operations and/or maintenance of the Phase I facilities with a third party.

9.2 SANITARV SEWERSVSTEM

Though selected sewage sumps and pits will be provided with Sanitary Sewage Lift Pumps, the project should consider further consolidating some of these sewer pits to minimize the quantity of Sanitary Sewage Lift Pumps, especially in the Jeddah Refinery area, during project proposal development. Depending on location and hydraulic prome, (an) existing sanitary sewage pits could be modified to gravity flow into another existing pit, where sanitary sewage lift pumps are to be installed.

The location of the grit chamber and drum screens are currently shown to be elevated at the EQ Tanks . Alternate locations, such as placing such equipment at the Intermediate Sump Pit, can be considered if installation is more cost effective.

BI-IO-00473 DBSP 24 June 2007

Page 24: Appendix A

)

Facilities Planning Department Upgrade \Vastewater Treatment Facility Phase II South Jiddah Complex

9.3 HYDRAULIC PROFILE AND ANALYSES

9.4

PMT shall conduct a detailed hydraulic profile and analysis of the new oily wastewater treatm ent (MBR) units during Project Proposal development to ensure that the system flows are me~ especially those units that are dependent on gravity flow . In addition, the hydraulics in accordance with SAES­B-017 for the firewater system should be verified utilizing infonnation available from ER-IO-03552 and ER-10-03563 (See above Section 4.0).

ENVIRONMENTAL IMPACT STATEMENT

An Environmental Impact Assessment (EIA), per SAEP-13, for the project shall be completed at the 30% or initial issuance of the project proposal review package and shall be treated as a primary design objective. EPD has cl assified this project as requiring a Category 3 Environmental Impact Assessment. The project enviromnental assessment shall detail the ambient environmental conditions before the project becomes operational. Wastes and pollutants generated in the construction and operation of the proposed facility shall be described in detail. The control measures and monitoring programs needed to meet the enviromnental protection requirements in the current Saudi Aramco Standards and GI's shall be specifi ed and explained. Potential environmental impacts that must be addressed in the ElA include, but are not limited to:

• Effluent discharged will comply with PME regulations, • Disposal of construction debris, • Disposal of the contaminated soils if any during the excavation,

• Disposal of the hydrotest water • Disposal of industrial solid and hazardous waste, if any, and

• Spills and other non-routine releases.

9.5 ELECTRICAL SYSTEM STUDIES

During the Project Proposal Phase the existing ETAP Model shall be updated and a power systems study implemented that includes analysis of loads, short circuit duty, load flow, voltage drop, motor starting, and protection device coordination settings.

10.0 CONSTRUCTABILITY AND LOGISTICAL ASSESSMENT

The new API Separator will be installed next to the existing Phase I API Separator. As pile -type foundations will be required, the project should ensure that the installation will not disturb the aligmnent of the Phase I API Separator. Coordination with the Phase I wastewater treatment project with respect to the addition of tie -in valves to existing tie- in points would minimize shutdown requirements.

For all other major Phase ]] wastewater treatment equipment in the Marine Area, the demolition of existing area equipment and the minor relocation of roads wou ld facilitate space for new equipment.

The installation of the rew crude/product skim tank systems in Tank Fann Area A and B at the proposed site will require the removal of soil contam inated with hydrocarbons. The existing abandoned elevated flare in the proposed location of the Tank Fann Area B Skim Tank System shall not be demolished by this project.

BI-10-00473 DBSP 25 June 2007

Page 25: Appendix A

)

Facilities Planning Department Upgrade Wastewater Treatment Facilit)' Phase II South Jiddah Complex

The project shall develop a detailed contingency plan to minimize the plant vulnerability during scheduled and unscheduled firewater outages. The objective of this plan is to ensure that the plants and firewater systems remain fully functional during the construction of this project. Temporary measures shall be taken to maintain the firewater supply available to strategic locations undergoing construction. These measures may include providing jumpover spools for firewater coverage and emergency fire fighting equipment such as portable firewater pumps and fire/foam trucks. Coordination should be made with Loss Prevention and Fire Protection Departments to use available firewater pumps. Hydrotesting and backfilling of the new system can be done in sections as construction is completed.

11.0 AS-BUILT DRAWING ASSESSMENT

As Phase I wastewater treatment facility will be under construction during the Phase II Project Proposal work, a limited nwnber of as-built drawings will be available for use.

The availability of a; built drawings required for retrofitting seawater coolers backwash system were not investigated during DBSP development.

In general, some as-built drawings are available for work associated with the new wastewater coolers and new crude and product skim tank systems in Tank Fann Area.

As-built drawings of the existing firewater layout drawings are available (in the Saudi Aranlco QVP system).

12.0 VALUE ENGINEERING STUDY

The value engineering study during DBSP development has been waived (See Appendix 15.2). A value engineering study shall be perfonned no later than the 30% milestone date during the Project Proposal development.

\3.0 SURPLUS AND EXCESS MATERIAL

The availability of surplus and/or excess materials has not been evaluated during DBSP development.

14.0 PROJECT SCHEDULE

The project execution will be based on meeting the following target milestone dates:

Milestone Date

DBSP Approval. ............. . June 2007 Project Proposal Start August 2007 ER Approval.. July 2008 ER Completion ........ ... .. .. . February 2011

8\-10-00473 DBSP 26 June 2007

Page 26: Appendix A

Faci liti es Planning Depar1ment Upgrade \Vaslewater Treatment Facility

Phase II South Jiddah Complex

15.0 APPENDICES

15.1 ApPENDIX- EXISTING FAClLrITES

• Phase I IWTP - Process Flow Diagram Dwg.VA-444454 • Phase I IWTP - Facility Plot Plan Dwg. VA-444567

• Soils Report for Jeddah Refinery (Excepts only)

15.2 ApPEND[)( - PROPOSED FAClLrITES

• l eddah Refinery Marine Area - Overall Plot Plan (Figure I) • Jeddah Refinery - Overall Plot Plant (Figure 2)

• Phase II IWTP Location Plan (Figure 3)

• Phase 1I IWTP PACT -MBR Flow Diagram (Figure 4) • Phase II IWTP API Separator Flow Diagram (Figure 5) • Skim Tank Location Plant (Figure 6)

• Skim Tank Flow Diagram (Figure 7) • Wastewater Cooling Process Area A Location Plan (Figure 8A) • Wastewater Cooling Process Area B Location Plan (Figure 8B)

• Wastewater Cooling Zone 4 Location Plan (Figure 8C) • Wastewater Cooling Flow Diagram (Figure 9) • Cooler Backwash Piping Retrofit (Figure 10)

• Sanitary Sewer Pit Location Plan - l eddah Refinery (Figure II A) • Sanitary Sewer Pit Location Plan - JR Marine Area (Figure II B)

• Sanitary Sewer Wastewater Flow Diagram (Figure 12) • Existing Sanitary Sewer Sump (Figure 13) • Firewater Piping Layout and Equipment Demolition (FigUre 14) • Firewater Piping Layout and Equipment Demolition - Detai ls (Figure 15)

• Ex isting Wastewater Treatment Equipment - Demolition (Figures 16, 17 & 18)

• Tank Farm A & B Skim Tank Sizing (Figure 19) • New Substation Building Layout (Figure 20)

• Conceptual One Line Diagranl (Figure 21) • Use of Valve Boxes: E-Mail, April 1,2007, from leddah Area Loss Prevention • Waive Value Engineering Study during DBSP development (Letter HFPD-IPD-05507)

• DBSP Review Meeting Minutes & Comments Log • Availability of Substation R Spare Breaker: E-Mail, lune 6, 2007 ITom Jeddah Refinery • Support to waive High Voltage Supply for 300 HP Blower Motors: E-Mail, lune 4, 2007 ITom

CSD

15.3 API'ENDlX - BUDGETARY PnOJECT SCOPE DEFINITION

• Budgetary Project Scope Definition • Siemens Budgetary Proposal # I Y0025BPR

• Equipment Cost (Spreadsheet by Siemens) • Sludge Bed Cost (SCEC E-Mai l) • Est imate Figures 4, 5, 7, 9, 10, IIA, li B, 14 & IS

81-10-00473 DBS P 27 June 2007

Page 27: Appendix A

Facilities Planning Department

• Yokogawa DCS Equipment o Quotation Cover - VnetlIP Domain Creation

Upgrade \Vastewater Treatment Facility Phase II South Jiddah Complex

o Bill of Material- Bill of Material for VnetlIP Domain Creation o Priced Quotation Cover R I Item # I - Quote for WWT CS300 Connectivity to CCR CS3000 o Optional BOM for Main DCS Connectivity - Bill of Material for Priced Quotation Cover RI

(HSQ7AMB365-RI), Item #1 o Proposed System Architecture

Ol·t 0-00473 DOSP 28 June 2007

Page 28: Appendix A

Upgrade Wastewater Treatment Facility Phase II South Jidd ah Complex

BI -10-00473 DBSP

Appendix 15.1 -Existing Facilities

• Phase I IWTP - Process Flow Diagram Dwg.VA-4444S4 • Phase I IWTP - Facil ity Plot Plan Dwg. VA-444567 • Soil s Report for l eddah Refinery (Excerpts only - for the complete report,

contact the leddah Refinery)

Page 29: Appendix A
Page 30: Appendix A

, "I .. '

z • " !

Page 31: Appendix A

'~.

·vd~.~\ -'-by;.

FUGRO-SUHAIMI LTD. geotechnica l, ma leri a l ~ and NOT engineers

Report No. SA03-5002

FINAL REPORT

GEOTECHNICAL INVESTIGATION FOR ACCESS ROADS AND

DRAINAGE SYSTEM PROJECT AT MARINE AREA

JEDDAH REFINERY, SAUDI ARABIA

SAUDI ARAMCO

Jeddah, Saudi Arabia

.~-

Page 32: Appendix A

)

'vU I~ .l[-""....:..II-'-b.;.:.

FUGRO-SUHAIMI LTD. geotechnical , mllterials and NOT engineers

P. O. Box 2165 Dammam 31451 Saudi Arabia Phone : 03 857 4200 Fax' 03 857 2035 C. R. 2050004 110 E-Mail : info@fugro-suhaimLcom Website : www.fugro-suhaimi.com

Report No. SA03-5002 4 June 2003

Saudi ARAMCO WR Refining, Supply and Distribution Jeddah Admin . Building WJ-130 Jeddah Saudi Arabia

Attention: Me. Jamal A Mandar Contracts Advisor

~GRD -SUHAI"I

• v · ~ - I\ J~ - 'S-'-'-' - -

111 0 ...,.. . ..1'

r \ to' rL...ul ~>.,...-Jlt,....,...nl5J.....11

. 1'" 1>, o ¥ t 1·· : ... ".,u; ·r AoV 1·"0 : vSij 1·0.. t \ \ . ..;... . J"

info@fugro-suhaimi .com : .jJrO-'-I",.JI wwwJugro-suhaimi.com : .:...;.,::.':11 e.""

. Final Report Geotechnical Investigation for

Gentlemen:

Access Roads and Drainage System Project at Marine Area Jeddah Refinery, Saudi Arabia

Fugro-Suhaimi Ltd. (FSL) is pleased to submit this final report of our geotechnical investigation conducted for the proposed Access Roads at Saudi ARAMCO's Jeddah Refinery in Jeddah, Saudi Arabia. The investigation was performed in accordance with our proposal Ref. No. JEDL-001/03 dated 7 January 2003 and your Purchase Order No. 6510016381 dated 11 January 2003.

This report incorporates the comments raised by Saudi ARAMCO on our draft report in their letter dated 10 May 2003.

We appreciate the opportunity to have been of assistance to you on this project. Please do not hesitate to contact us if you have any questions.

MA/OGl/vrk Copies Submitted: (2)

Sincerely,

FUGRO-SUHAIMI LTD.

Mohammed. Arief Dy::;~j~t Manager

·db Dilip G. Lakhani Project Manager

Page 33: Appendix A

)

Report No. SA03-50D2

CONTENTS

Page

EXECUTIVE SUM MARY .................. ... .............. ... ...... ...................... .. .. .................. .

1.0 INTRODUCTION................ .. .. ......... ... ..................................... ........................... 1

1.1 Project Description 1.2 Project Objectives 1.3 Scope of Work ...... 1.4 Report Format.. .

1 1 2

2.0 FI E LD I NVES TlGA TI 0 N ............................................... ..................................... 3

2. 1 Field Investigation Methods ..... 2.2 Surveying ...... 2.3 Boreholes .. '" 2.4 Piezocone Penetrometer Tests .. 2.5 Test Pits .. ............... ....... .. .. 2.6 Asphalt Cores ..

3 3 3 4 5 5

3.0 LABORATORY INVESTIGATION ..................................................................... 6

3.1 General ..... 3.2 Classification and Index Tests .. ....... . 3.3 Earthworks and Pavement Design Tests 3.4 Chemical Tests ..... .. .. ....... ..

4.0 SUBSURFACE CONDITIONS ...... ...... .... ,,,,,,,,,,,,,,,,,,,,,,,,,,, .......... , ................... ..

4.1 Subsurface Stratigraphy .. 4.2 Groundwater.. .. ........ .. 4.3 Limitations ......................... .

5.0 FILL PLACEMENT AND COMPACTION FOR ROAD CONSTRUCTION .........

5.1 General .. . ... .... ... ............................ .. 5.2 Fill Materials ........ ... .. ...... . 5.3 Site Preparation ........................................ .... ... .. ..... .. ........ . 5.4 Fill Compaction .... ... . . 5.5 Compaction Equipment ................................ . 5.6 Fill Slopes ................ .. 57Cut S~~s... . ................. . 5.8 Use of Excavated Materials ................ .

6 6 7 7

8

8 8 9

10

10 10 11 11 11 11 11 12

6.0 PAVEMENT DESIGN AND CONSTRUCTION RECOMMENDATIONS.. ........ ... 13

6.1 General ... 6.2 Soil Improvement 6.3 Subgrade .............. . 6.4 Sub-base and Base ..... 6.5 Wearing Surface and Drainage ......

13 13 13 13 14

Page 34: Appendix A

Report No. SA03-5002

ILLUSTRATIONS

General Location Map ............ ........ ...... .... ..... .. Plan of Exploration Locations ...... .. List of Exploration Coordinates .... .. Logs of Boreholes .. .............. . Symbols and Terms Used on Ihe Borehole Logs Carbonate Classificalion System.......... .. .... .. ...... . Logs of Piezocone Penetrometer Tests . Logs of Tesl Pits .. . Summary of Laboratory Test Results ... .. ...................... ...... .... .. .. Grain Size Distribution Curves . .. ........... . Moisture-Dry densily Relationship Curves .... . CBR Test Results...... .. .. .......................... ..

__ 1 JJGRD-SUHAiftll

Plate

1 2 3

4 thru 11 12 13

14 thru 21 22 thru 24

25 26 thru 32 33 lhru 48 49 lhru 64

Page 35: Appendix A

)

Report No. SA03-5002

Page:

EXECUTIVE SUMMARY

Saudi ARAMCO is planning to construct a new access roads and a drainage system at their marine area in Jeddah Refinery at Jeddah, Saudi Arabia. The new access road will link the marine area east of API Separator to the existing marine roadway bridge inside the Jeddah Refinery. The proposed project will include upgrading the existing API access road and construction of a new pipeline access road . Fugro-Suhaimi Ltd. (FSL) was contracted by Saudi ARAMCO to perform a geotechnical investigation for the proposed access road.

The objectives of the geotechnical investigation were to explore subsurface conditions along the route of the access roads, and develop engineering recommendations to guide the design and construction of the access roads. The objectives were achieved by conducting field and laboratory investigations.

The field investigation comprised drilling 8 No. boreholes, performing 8 No. piezocone penetration tests (PCPT), excavating 3 No. test pits and obtaining samples for laboratory CBR tests from five locations. Boreholes were drilled to 5-m depth, PCPTs were performed to 5-m depth or to practical refusal whichever was shallower and test pits were excavated by hand tools, to depths of up to 1.5 m, or groundwater level, and samples were

. obtained for laboratory testing. In addition, asphalt cores were obtained at three locations along the existing API road.

Laboratory testing was performed to verify soil classifications, and evaluate the chemical and earthworks properties of soils encountered. Tests included sieve analyses, Atterberg limits, water soluble chloride and sulphate content, carbonate content, moisture­density relationships , and CBR tests.

The subsurface soil conditions encountered along the API access road and the pipeline access road are summarized below:

API Access Road

00 1.2t01.5 Fill material (silty sand

with gravel)"

1.2 to 1.5 3.0 to 5.0 and

3.0 to 5.0 5.0 Gravel with si lt and sand

was depth of 5-m in Borehole NO.1 .

00 0.4 to 0.75

0.4 to 0.75 5.0

Fill material (silty sand with gravel)

Sand (SP-SM or SM)

Medium compacted

Very loose to medium dense

Very loose to loose

Medium compacted

Very loose to loose

Page 36: Appendix A

)

Report No. SA03-.5002

Page:

Primary geotechnical considerations for road construction will be:

• availability and suitability of fill materials;

_r,,~a<J! -$IIHAI"I ,

. v · ~'> ...:JI 5 f· ' , - -.:."; " \,~r.-'-' .

• fill compaction requirements and the stability of fill embankment slopes; and

• excavation methods, suitability of excavated materials for use as fill , and the stability of slopes for road cuttings.

Recommendations for fill placement and compaction are given in the report, and should be in accordance with Saudi ARAMCO Engineering Standard SAES-A-114. CBR tests should confirm compliance with Saudi ARAMCO Specification SAES-Q-006.

Recommended road embankment fill material are clean sand and or marl. Clean sand should be compacted to 85 percent of relative density and marl should be compacted to about 95 percent of the maximum dry density.

Because of the presence of very loose to loose subsurface soils at the site, consideration could be given to the use of geomaterials including geotextiles and geogrids for the proposed road constructions. Geomaterials are discussed in the soil improvement section of the report

Based on the laboratory CBR test results, our recommended CBR value for the existing site soils within a depth of 1.5-m from the existing grade is 30 when compacted to 95 percent of the maximum dry density. For bulk fill materials from suppliers, we recommend to perform CBR tests to confirm compliance with Saudi ARAMCO Specification SAES-Q-006.

Marl should be used to protect unpaved bulk sand fill against wind and water erosion. Fill embankment slopes should not be steeper than 1-vertical to 3-horizontaL

Surficial soils can be excavated using a large mechanical backhoe, or bulldozer. Excavations are expected to encounter groundwater. The slopes of excavations in soils should be limited to 1-vertical to 3-horizontaL

Page 37: Appendix A

Report No. $A03-5002

Page:

1.1 Project Description

1.0 INTRODUCTION

Saudi ARAMCO is planning to construct new access roads. a drainage system and two lift stations at their Marine Area in Jeddah Refinery. The proposed project will include upgrading of the existing API access road and construction of a new pipeline access road . The location of the Jeddah Refinery is illustrated on Plate 1.

1.2 Project Objectives

Fugro-Suhaimi Ltd. (FSL) was contracted by Saudi ARAMCO to perform a geotechnical investigation for the proposed access road. The overall objectives of the geotechnical investigation were to explore the subsurface stratigraphy and groundwater conditions along the proposed access road route. and to develop engineering recommendations to guide the design and construction of the access road . Specifically the objectives of the investigation were to evaluate the subsurface conditions beneath the existing API Access Road and to provide the design parameters for the new pipeline access road .

1.3 Scope of Work

The scope of work for this study was developed by Saudi ARAMCO, prior to commencing the project. The objectives of the geotechnical investigation were achieved by performing the following activities:

API Access Road

• drilling 3 boreholes to explore subsurface stratigraphy and groundwater conditions and obtain samples of the subsurface material for laboratory testing;

• performing 3 piezocone penetration tests to assess the subsurface soil density profile;

• excavating 3 test pits to investigate shallow subsurface soil conditions and obtain samples for laboratory CBR tests;

• drilling 3 asphalt cores from the existing road to check the thickness of the asphalt layers;

• performing laboratory tests on selected soil samples recovered from the boreholes and the test pits to determine pertinent classification. chemical and earthworks properties of the subsurface materials; and

• analyzing the field and laboratory data to develop geotechnical recommendations for road design. and construction .

Page 38: Appendix A

Report No. SA03-5002

Page: 2 ' V ' """ _ \ 3.;'·-" -u:-~

New Pipeline Access Road

• drilling 5 boreholes to explore subsurface stratigraphy and groundwater conditions and to obtain samples of the subsurface material for laboratory testing;

• performing 5 piezocone penetration tests to assess the subsurface soil density profile ; and

• coflecting shallow subsurface soil samples from 5 locations for laboratory CBR tests.

1.4 Report Format

The initial sections of the report present brief descriptions of the field and laboratory phases of the study. A discussion of the subsurface conditions along the access road route follows along with geotechnical recommendations for road construction and earthworks operations, including compaction, cut excavations, slope design and subgrade preparation. Illustrations follow the text of the report.

Page 39: Appendix A

Report No. SA03-5002

Page: 2 ' V ' """ _ \ 3.;'·-" -u:-~

New Pipeline Access Road

• drilling 5 boreholes to explore subsurface stratigraphy and groundwater conditions and to obtain samples of the subsurface material for laboratory testing;

• performing 5 piezocone penetration tests to assess the subsurface soil density profile ; and

• coflecting shallow subsurface soil samples from 5 locations for laboratory CBR tests.

1.4 Report Format

The initial sections of the report present brief descriptions of the field and laboratory phases of the study. A discussion of the subsurface conditions along the access road route follows along with geotechnical recommendations for road construction and earthworks operations, including compaction, cut excavations, slope design and subgrade preparation. Illustrations follow the text of the report.

Page 40: Appendix A
Page 41: Appendix A
Page 42: Appendix A

)

R.eport No. SA03-5002

Page: 6

3.1 General

3.0 LABORATORY INVESTIGATION

Laboratory tests were performed on selected soil samples recovered during the field investigation phase of this study. The objectives of the laboratory testing were to verify field classifications, and to determine the index, engineering, and chemical properties of the soil samples. In addition, earthworks tests were conducted on the samples recovered from the test pits. All of the tests were conducted at FSL's Jeddah laboratory, in general accordance with current applicable ASTM specifications.

A summary of laboratory tests conducted for the study is tabulated below:

" :'" , .... -t. . . . SOMMA R:Y~bF· !2ABORA·:rORY. TEST:Si':'<!i; :h,{'i:, :~::) ,4.~ ,'<,: .

,- -, .,'-,~ . .'~:"~ .. ~;{~ .oesc·iiptiQn ~ ,,: _?t~~~.:~U~J ~t;" " ,'M"f(th'od . :\r:ci:;RrQc)f~u~~~.:):·· "'- ~.,.

Soils Grain Size Analysis Full Sieve Analysis ASTM 0-422 Atterberg limit Tests Casagrande ASTM 0-4318 Carbonate Content Calcimeter ASTM 0·4373 Chloride Content Water Soluble AASHTO·T·290 Sulphate Content Water Soluble AASHTO·T·291

Earthwork and Pavement Design Moisture-Dry Density Relationships Modified Proctor ASTM 0·1557 CBR-Dry Density Relationships CBR ASTM 0·1883

A summary of laboratory test results is presented on Plate 25. Most of the test results are also shown on the borehole and test pit logs.

3.2 Classification and Index Tests

Classification and index tesls included grain size analyses, Atterberg limits and carbonate content determinations.

The results of grain size analyses are presented as grain size distribution curves on Plates 26 through 32. The percentage of material passing the No. 200 sieve «0.075 mm), known as the fines content, was determined as a routine part of the grain size analyses. The fines content is tabulated on the borehole and test pit logs, in the column labeled "-200, %".

Atterberg limit test results are presented on the borehole and test pit logs in the column labeled "LL, (PI), %". Moisture content was determined as routine part of the Atterberg limit test and is presented on the borehole and test pit logs in the column labeled "(MC), %".

Carbonate contents are tabulated on the individual borehole and test pit logs, in the column labeled "CO;. In accordance with the carbonate classification on Plate 13, materials containing greater than 12 percent, but less than 50 percent carbonate, are described as "calca reous". Materials with greater than 50 percent carbonate are described as "carbonate".

Page 43: Appendix A

)

Repon No. SA03·5002

Page: 7

3.3 Earthworks and Pavement Design Tests

3.3.1 General. Laboratory earthworks tests were performed on se lected samples to evaluate the performance of the existing fill material within 1.5-m depth along the access road route for use as road embankment fill material. and to evaluate natural subgrade design parameters.

In general, samples used for earthworks tests were subjected to a suite of laboratory tests, including classification and chemical tests, as follows:

• grain size analysis;

• carbonate content;

• water-soluble sulphate and chloride content;

• moisture-dry density relationship (Proctor compaction); and

• CBR test.

Classification and index tests are discussed above, and a summary of the test results is tabulated on Plate 25.

3.3.2 Moisture-Dry Density Relationships. Moisture-dry density relationships were developed for selected soil samples by performing modified Proctor (ASTM 0-1557) compaction tests .

Moisture-<lry density relationship results are presented as graphical plots on Plates 33 through 48. A summary of optimum moisture contents and maximum dry densities established from each test is shown on the plot.

3.3.3 California Bearing Ratio (CBR) Tests. CBR tests were performed on samples obtained from the test pits and for some additional sample.

CBR tests were conducted on a single specimen prepared from each sample compacted to at least 95 percent of the maximum dry density. The samples were compacted in a 150-mm-diameter mold by applying a compaction energy of about 65 blows per layer, 5 layers per specimen, using a 4.5-kg-hammer. CBR tests were performed on the specimen, after soaking.

The results of the CBR tests for each sample are presented as graphs of "stress" versus "penetration" on Plates 49 through 64 in our final report.

3.4 Chemical Tests

Chemical tests were .performed on selected surficial soil samples to establish criteria for protection of buried reinforced concrete . Chemical tests included water-soluble chloride and water-soluble sulphate content determinations.

The results of chemical tests are shown on the borehole and test pit logs, and are also tabulated on Plate 25.

Page 44: Appendix A

)

Report No_ SAP3-5002

Page: 8

4.0 SUBSURFACE CONDITIONS

4.1 Subsurface Stratigraphy

4.1.1 API Access Road. We drilled three boreholes and performed three pePT along the shoulders of the existing API access road . Based on the field and laboratory test results, the subsurface stratigraphy along the road is summarized in the following tabulation.

0.0 1.210 1.5 Fill malerial (silty Medium compacled 90% of max. dry sand wilh gravel)" density

Silty with Very loose to medium

1.2101.5 3.0105.0 shell and coral dense

Nol Recorded

3.0 to 5.0 5.0 Gravel with sill

Very loose 10 loose Nol Recorded and sand

was of 5-m in Borehole No. 1.

In addilion, we drilled three cores from the existing asphalt road. The cores were of about 106-mm diameter. Visual inspection of the cores indicated that the wearing course is about 43-to 47 -mm' thick and the base course is about 50-to 52-mm thick. The asphalt appeared to be placed on marl subbase.

4.1 .2 Pipeline Access Road. We drilled five boreholes and perfonmed five pePTs at the proposed pipeline access road area . Based on the field and laboratory test results, the subsurface stratigraphy at the site is summarized in the following tabulation.

0.0 0.4 to 0.75

0.4 to 0.75 5.0

4.2 Groundwater

Fill material (silty sand with gravel)

Sand (SP-SM or SM)

Medium compacted

Very loose to loose

Groundwater was encountered in all the boreholes drilled at the site. Our water level observations made in the boreholes 24 hours after completion of drilling and sampling operations indicate the following natural groundwater levels at the si te .

Page 45: Appendix A

)

Report No. SA03·5002

Page: 9

API Access Road 0.7 to 0.9

Pipeline Access Road 0.2 to 0.8

Groundwater levels may vary due to tidal variations.

4.3 Limitations

Subsurface conditions have been observed and interpreted at the borehole, pePT and test pit locations only. This information has been used as the basis for our analyses and the recommendations that follow. Although we have allowed for minor variations in subsurface conditions during the development of our recommendations, conditions can vary away from exploration locations. Should this become evident during construction, we should be contacted to review our recommendations, and revise them. if necessary.

Page 46: Appendix A

Report No. SA03-S002

Page: 10

5.0 FILL PLACEMENT AND COMPACTION FOR ROAD CONSTRUCTION

5.1 General

We understand that the proposed access road will be constructed on fill embankments.

Important geotechnical considerations for construction of the access road will be:

• availability and type of suitable road embankment fill materials;

• road embankment fill compaction requirements, stability of fill slopes, and type of compaction equipment;

• excavation of soil in cut areas, including type of excavation equipment required, suitability of excavated materials for use as fill, and stability of slopes for road cuttings; and

• subgrade and base preparation, including design CBR values.

The following sections discuss fill materials and its compaction requirements and equipment used for backfilling. In general, fill placement and compaction should be in accordance with Saudi ARAMCO Specification SAES-A-114. The recommendations given in the following sections of this report are our site specific minimum recommended earthworks requirements. In the event project specifications specify stricter earthworks requirements than recommended by us, the project specification should take precedence.

5.2 Fill Materials

Fill materials required will include:

• Clean sand for bulk fill, required for general site grading; and

• Marl for bulk fill and capping unpaved fill, required for protection against wind and water erosion.

Sources of bulk fill are expected to be dune sand and marl.

Clean sand (bulk fill) should contain less than 10 percent passing the No. 200 (75 f'm) sieve.

Marl, where available, may also be used as bulk fill. According to Saudi ARAMCO Specification SAES-A-114, the definition of marl is:

" ... a wide variety of calcareous soil materials found in Saudi Arabia which may vary from clay to gravel sizes, and often includes cobble and boulder sized pieces ... "

In general, however, suitable marl should consist of material with less than 30 percent passing the No. 200 sieve. The minus 40 fraction should have a maximum liquid limit of 25 and a plasticity index less than 8.

Page 47: Appendix A

Report No. SA03-5002

Page: 11

The material for crushed stone bases and subbase for the pavement should confirm to Section 5.2.1 of Saudi ARAMCO Specification SAES-Q-OOS.

5.3 Site Preparation

Surficial deleterious material including loose soils and vegetation should be removed from areas to receive fill. In general subgrade surface should be prepared in accordance with the gUidelines provided in Section 5.1 of Saudi ARAMCO Specification SAES-Q-006. The natural soils should be tested and prepared prior to fill placement to ensure that the average in situ density is 85 percent of the average relative density (for clean sand), or 95 percent of the maximum dry density established from modified Proctor compaction tests (ASTM D-1557). Field density tests should be performed to evaluate the requirement for compaction of the surficial soils. The density requirements of subgrade surface should confirm to requirements of Section 5.1 of Saudi ARAMCO Specification SAES-Q-OOS.

5.4 Fill Compaction

Compaction of fill should be in ac.cordance with Saudi ARAMCO Specifications SAES-A-114. Below the road pavement fill should be compacted in accordance with requirements for structural fill. Actual compaction requirements will depend on the type of fill material (clean sand or marl).

5.5 Compaction Equipment

The procedures used for fill placement and compaction generally depend upon the material used and equipment available. A 10-ton vibratory roller is most suitable for compacting granular soils. Large quantities of water may be needed to facilitate compaction . The lift thickness that can be effectively compacted will depend on the gradation of the fill material. Lift thickness and compaction should be in accordance with Saudi ARAMCO Specification SAES-A-114.

5.6 Fill Slopes

For the purpose of stability, embankment slopes in soil should not be steeper than 1-vertical on 3-horizontal. Embankment slopes should be protected from wind and water erosion. A marl cap, minimum 150-mm-thick, compacted to 95 percent of the maximum dry density determined from modified Proctor compaction tests (ASTM D-1557) will probably be the most suitable type of erosion protection for road embankment slopes.

5.7 Cut Slopes

For the purpose of stability, road cUllings should be designed as follows:

Temporary Cutting in Soils 1-vertical to 1.5-horizontal

Permanent Cutting in Soils 1-vertcal to 3-horizontal

Page 48: Appendix A

Report No. SA03-S002

Page: 12

Embankment side slopes should not exceed 1-vertical on 3-horizontal. All excavations trenching · and shoring should be done in accordance with Saudi ARAMCO Safety Manual Section 2.0.

5.8 Use of Excavated Materials

We expect that the existing fill material encountered in the boreholes and the test pits at the site can be used either as bulk fill, or marl for surface capping. The carbonate silty sand encountered in the boreholes below the fill material is not recommended for use as fill material.

Page 49: Appendix A

)

Report No. SA03·5002

Page: 13

6.0 PAVEMENT DESIGN AND CONSTRUCTION RECOMMENDATIONS

6.1 General

In the fOllowing sections general geotechnical design considerations for subgrade and base course design applicable to the proposed access road for this project are presented. We recommend that the design of the embankments for the proposed road be based on the results of laboratory earthwork tests, which should be conducted on the fill material for the access road .

6.2 Soil Improvement

Very loose to loose subsurface soils are present at the site below about 0.5-m depth. Improving the subsurface soils at the site by removal and replacement will include dewatering which could be an uneconomical solution. We recommend that the embankment for the proposed road be made of sufficient thickness to safely carry the anticipated loads without influencing or affecting the loose subsurface layers.

Consideration could also be given to the use of geotextiles and geogrids. The geotextiles will serve as a containment for the proposed embankment fill and the geogrids will serve as a reinforcement in the fill material. Most companies marketing these materials offer proprietary software for the design of earthworks systems incorporating geotextiles and geogrids and should be contacted at the detailed design stage for further information about the applications of these material and the design ' considerations. The construction contractor shall be responsible for selecting the appropriate and economical soil improvement technique. In accordance with Saudi ARAMCO Standard SAES-Q-006 the selection and design of soil improvement technique shall be reviewed by Saudi ARAMCO's consulting services division prior to implementation.

6.3 Subgrade

Natural subgrade should be prepared in accordance with the recommendations for site preparation given in Section 5.0 of this report, and compacted to at least 95 percent of the maximum dry density measured from laboratory modified Proctor compaction tests or 85 percent of the relative density measured from laboratory maximum and minimum density tests. The thickness of the compacted subgrade should be based on the expected loading conditions and should be in accordance with Saudi ARAMCO Specifications SAES-Q-006.

On the basis of laboratory CBR results, we recommend a CBR value of 30 for the existing onsite fill materials.

Subgrade design and the CBR values to be used in the design should be in accordance with Saudi ARAMCO Specifications SAES-Q-006. We recommend that CBR tests should be conducted on the fill material for pavement and the access road to confirm compliance with the referenced standard .

6.4 Sub-base and Base

We expect that fill materials consisting of marl will probably be used as sub-base and base course beneath pavements. Appropriate thicknesses for base course material should be selected on the basis of the design traffic and loading conditions anticipated for the new facilities plus consideration of the subgrade and base course CBR values.

Page 50: Appendix A

Report No. SA03·5002

Page: 14 • v' """ _ \

.JJ'~ - w.:-~,

The sub-base and base course material should conform to the gradation and durability requirements as per Saudi ARAMCO Specifications SAES-Q-006,

6,5 Wearing Surface and Drainage

Asphalt and concrete mix and thickness design for wearing surfaces is beyond the scope of this study, Care should be taken to grade roadway and parking areas to provide good surface runoff to drainage ditches, Wearing surfaces for roads and parking areas should be a dense mix nearly impervious to water in order to minimize infiltration of surface runoff into the base course ,

Page 51: Appendix A

Upgrade \Vastewatcr Treatment Facility Phase 11 South Jiddah Complex

Appendix 15.2 -Proposed Facilities

• Jeddah Refinery Marine Area - Overall Plot Plan (Figure I) • Jeddah Refinery - Overall Plot Plant (Figure 2) • Phase II IWTP Location Plan (Figure 3) • Phase II IWTP PACT-MBR Flow Diagram (Figure 4) • Phase II IWTP API Separator Flow Diagram (Figure S) • Skim Tank Location Plant (Figure 6) . • Skim Tank Flow Diagram (Figure 7) • Wastewater Cooling Process Area A Location Plan (Figure 8A) • Wastewater Cooling Process Area B Location Plan (Figure 8B) • Wastewater Cooling Zone 4 Location Plan (Figure 8C) • Wastewater Cooling Flow Diagram (Figure 9) • Cooler Backwash Piping Retrofit (Figure 10) • Sanitary Sewer Pit Location Plan - Jeddah Refinery (Figure IIA) • Sanitary Sewer Pit Location Plan - JR Marine Area (Figure II B) • Sanitary Sewer Wastewater Flow Diagram (Figure 12) • Existing Sanitary Sewer Sump (Figure 13) • Firewater Piping Layout and Equipment Demolition (Figure 14) • Firewater Piping Layout and Equipment Demolition - Details (Figure IS) • Existing Wastewater Treatment Equipment - Demolition (Figures 16, 17 & 18) • Tank Farm A & B Skim Tank Sizing (Figure 19) • New Substation Building Layout (Figure 20) • Conceptual One Line Diagram (Figure 21) • Use of Valve Boxes: E-Mail, April 1,2007, from Jeddah Area Loss Prevention • Waive Value Engineering Study during DBSP development (Letter #FPD-IPD-OSS07) • DBSP Review Meeting Minutes & Comments Log • Availability of Substation R Spare Breaker: E-Mail, June 6, 2007 from Jeddah Refinery • Support to waive High Voltage Supply for 300 HP Blower Motors: E-Mail, June 4, 2007

from CSO

BI-10-00473 DBSP

Page 52: Appendix A

)

'J_.

t N

~L-__ ~~========~==~==~ ______ ~

Page 53: Appendix A

! I

)

i . ,

i I

'i \ll~~~~

I I . I ,

I

.... , .""', ... ,....

Page 54: Appendix A

--r

w Z ~

g ~

" o • ~

TO "ARJ~( B(RTHS

'" VS4-C-lIS,lA/e/c STOR"" OVERfl

._---_.- -,.--,., . _ .. _---. _ ... -.,_ .. _-

WA TER CHANNEL

o

OfSTINC PIPE WAY .CXIS.T. PIPE WA Y

TO REfINERY--

Page 55: Appendix A

lJ.J~''''~· ........ , ' let!/t'/n _ 'I"" "OO·':>i~ 1000,·tl""'\~"'·Ql4'",.)pOOJJ""oN:>lY· I:tc"\n"'5-I~\ ."'\IJ:l<lX .. \ ·t

,! ~ ;1 i " i ; I" -,,;~ "'Rr. Ut

r- r- 1Il §

+nH ~~ +nn ):'0 I Z ~

11 ? " i Wg a :.~

'--- '-- • :;: ' ,S ~ w t~ -1 ! '" fil .}

I-- , ! \ , 1\ \ i '

en ';

, f~ r - I-

en II J, I· ~ -' ii II I I- i- Will ill

' I~ltl'i' t

L lil.,!il!! II I'll';;'i! iii,,!,II:

·!WI'!I: 11'!I'!;', -l f--- 'l'.!:~il rl' Ill-

.... M l"Xltl1, ~",,", If'w" Illl"· " I, !I. i'I'''( 1'1' ;1['/ i : . ~f I ,,11 ..

I ! !

~ I ! ! ,

--1- ! I

! ! I j.

!. I. I I ~ l ,. I'

~~ Ij' 'il ~~ 0 1 , , '1' 1'1' <;' 1<;'

~ t

I

! - - i •

;

- I I . ,

l , I

I , , f& I 'r-' !Ii ~

, ~ !!l"

, I .T..J I" ~ I==<:i

~r s. :,

---. 'l l i ,. ,. ]1\1 ~ i~ II eU -t

--; ----I

ill ill ! - , .- --; I, " £ " " ; 1-

--l • - ,

~ apJ( . ! In! >- -'

----I ----I 0:: <{

<{ >=

I' 11 z z ~~

w 0

I!~ ::; LL

~~ w z

I~ 0:: 0

l~ "- u , ,

Page 56: Appendix A

- --!- --'-

Page 57: Appendix A

)

@

i! ! :

t N

I~

Page 58: Appendix A

,.?~

- «J(,' 1,"«'1'" ",,,, ,_ ~ . "u'~")

I • ..1

i I

E~

~·:u <!>

<$> J ..... ,". T.7 ! .~~

0 1. -

9',."· .. a '. J ~.-' _~D

0 .. <1> ~>r:f J,;;ri

()) I 'w .';',L .....-;:-I ·~' ~ ... ,,., '~I .. " )\ -,-,-

,j) :. "

..... "', ", <1> L..-*f '"'' ."

I . ;," I ? ~1:;'.',1<?t- -"I ~'.' .-, ..... 'If" . r , _ _ -!--",-_ _ €> ! 'oJo..~" . ":D~" I

D;:tl.<S _ • . ", roe- ----, .. _ ,.,.",r. ~ .

U-"-l ~- -I

" I~ ' I +- _, .. _. , , , \ ~ - ..it ~ ---'" .. - - _ ....& -.6-, . , I~r-j 1 ~." :;."" I _ .. -.. I I" .~ . , ... "A:O- '7 . • .

I "~' · ·: t.-t(j-I + - 1""& - j, .... : " -(9--r:-:J :iiJ -'il ~-. I , r.. -":,:' L 0-= 6- - - - .6...:: - -- -6 - - .-, - - J .... ,. """,.~ ~" ' 1 .... . , ..... ·n ~ AT i? .. ···/ To eJ.l$l ing

\~Jr7 ... : __ ~~:~? .. Skim Tank P.unps (100 gpm each) ~(

N Valye I1J bo e.dd<&d ~o , Kisling

1"'6 can be tt'tpasseO. (Note 2) l.-: : TIe·n.1O fudstin; lk1e

~ -" '. ~

ExisUng PrOduel·CollectiOro SInIP & Pumps

T-1O'C. T·e. T·7. T·8

120,OOO gllbns I ~ _ 8" ·--- - - -·?- _-~~~~~~~~ ~o~~yi.-~~\· ik,~ · ~. , of. I

- -_ . Eit3~ng Crude Collectlorl

Sump & Pump_ T·12, T- 13 , T·UI. T·2·13.

T·21 4, T·215, T·243. T·244, T'2~5

TO edltll1g

\'')-19 .... ; _~~_v~~~ . + I Skim Tank Pvmp, ,{250 gpm IIch)

To T-104

9rndi.J'J:lIm H ~ ToT-104

Recove' e<I Oil Tank.! Pumps 1.000 galton,

Page 59: Appendix A

"" ...

,." ...

t "

. "", ..

i_

; , ~ i .::g H

"

h .'

a f : ~ ~ ,.

., "

i~ -,

r I ,I ! I

" !!

I

i i I! I

I

-'

, • ,

. .. '" ,

.. , ." . .

.... ".

.. , ." ,

Page 60: Appendix A

,. i

! < ! ; i ~ ! , i ! . , l

! , ~ i! !g , ~ .. >:e

I!: .. :: J; • ~ e ! .

~ i ii !i~ :: ': ~ < H :. I , " 1\ ~ ; ;; 3

I i 1i "' I !l ~ --'Ioi,. ; 11, 1. )\ 0:11 ,1° I • 0 I '

!' I

." ... .

... . "

.. " , ..

." ", >

.. " ".

..,.".

"" , ..

Page 61: Appendix A

)

Ul I "

ltOi IL{ 1 M

,I ,

I , ,

I I

ill [j

u{ !" I'"

~i " ,

i

, ill'

"

+

+

" ,. " ;. "

+

I

.' I

I

! 0" I ,

Page 62: Appendix A

-Existing Lines

.. .. 77711Ir:~~~a=> '~~~ ______ + EXisting 10 Wastewater : :

- - - - - - - - - New Valve Box : .. ... .............. .. , From Process Area A New Manhole Manhole MHV-31(Process Area A)

or Process Area C or MHV-1B (Process Area C) (Existing)

WASTEWATER COOLING SYSTEM (Typical for Jeddah Refinerv Process Area A or C)

~.,~~~ Coo", _'"""' 4 .

LIT )~ ••••••• ; •••••••• .••••••• :. • ••• : Existing Lines

~ . ..----- ."

~, 1-h" n-Z:"'/"7·7/ /'T.L,// 'f<777T "m, '1,~711 I I : 16'

Existing 16" Wastewater ~ :.- - - - ----------~

/1 :'\ ------~ ~----------+ I P • : :

From Zone 4 (CDU# 3 & 4, VDU#5)

~ .................. ... : Manhole MHV-37

(Existing)

New Valve Box : ... ..... .. ....... .... : Manhole MHV-35

(Existing)

WASTEWATER COOLING SYSTEM (Jeddah Refinery Zone 4)

Notes: 1. Each Process Area or Zone is provided with two 100 gpm self-priming pumps and one plate and frame cooler. 2. Unless indicated as "existing," manhole level instrumentation, valves. and piping as shown shall be provided.

The valve inside the valve box shall be a full line size ball valve. 3. General piping tie-in locations are shown on Figures BA, BB, & BC.

FIGURE 9 WASTEWATER COOLING SYSTEM

Page 63: Appendix A

Cooling Water Return , X" .-------------- ,- 1.

Isolation valve ...L ~.,.

.~,

Existing Lines

New Lines

Isolation valve

Backwash Supply

Line, X"

I

.-------, I

...L ~-,

6'

~I

~ -I ~11f- ! ,I

-

/ New Backwash Return Line, X"

(Note 2)

- - - - - - - - - L.j r~"-ilf- - - I ____ Cooling Water Supply, X" ,. " Isolation valve Note 3

Notes: 1. See DBSP, Section 7.4, Table 7-1 for the list of coolers requiring backwash piping retrofitting . 2. See DBSP, Section 7.4, Table 7-1 for line sizes. The new backwash return line shall be the same size as the existing

backwash supply line. 3. The existing line, which is routed to gravity sewer, shall be removed .

FIGURE 10 Cooler Backwash Piping Retrofit

Page 64: Appendix A

!. ,

,= J

.t", ,, ,,,,,,,··

L

Page 65: Appendix A

. ,

~~""

t N

~L---~=r========~==~==~------~

Page 66: Appendix A

New Submersible Lift Pumps

2 x 20 9pm (per Sump) (Note 1)

New Trash Screen

Sanitary Waste ........ ...../

('.om E,i,

H0

9 UO" i ~ ~ J~.J-:--------""'~l

Existing ST-Otthru ST-07 Septic Sump (Total Quantity: 9)

New Trash Screen New Submersible Vacuum Truck Connection

--'

2 x20 gpm New Trash Screen New Self-Priming Pumps

/

Lift Pumps ~ . .

Sanitary Waste ..... """= (Note 2) ~ 2 x 30 gpm (From Existing lines) : ] • To New EQ Tanks

It . 1 See Figure 4

~ ~ --J ~. Overflow to Existing Existing ST -08 Septic Sump Holding Basin

New Submersible Lift Pumps

New Trash Screen

Sanitary Waste ....... ...../ : I

('.om E,i"i0

9 L~"I I ~ ~ J I • 2 x 20 gpm (per Sump)

(Note 3)

Notes:

New Septic Sumps ST-09, ST10, ST-101 (Total Quantity: 3)

1. Existing sump pumps, if in existence, to be removed and replaced with new pumps. Existing sumps will require remediation - removal of packing and internals. See Figure 13 for typical existing Septic Sump (Tank)

2. There are no existing pumps; septic tank does not contain packing or internals. 3. New Sumps are proposed, if existing sumps are too small. 4. All new pumps to be trash/grinder sewage type.

New Intermediate Sump {Note 6)

See Figure 5

FIGURE 12 5. All lines and equipment are new except where noted as "existing". 6. Provide accessible area and ramp for vacuum tanker unloading.

PROPOSED SANITARY WASTEWATER TREATMENT BLOCK FLOW DIAGRAM JEDDAH REFINERY

Page 67: Appendix A

-: ..

. 1. .., ~ .

. ~~~·~.:-:-.-'~o1.·L"'_~r':-.r,.!";.; . ... ... . -

' . ,.

- ;;. ....

~ . I '·1 . . '

,

~' .

'-. ,-:U

Page 68: Appendix A

0" 1

O" J

; ;

' j

""

;

-- .. - --.

r

;

II I I I

" '\ " • • !

r :

-.. ,,'-.----"\;-. -, ~,-,,,-, il " ~1

;

--

Page 69: Appendix A

I ~ .. .. • •. _ , 0."

-rTil~ , . " '" o·

- 1--

·-1

Page 70: Appendix A

~I • h ~ ~~~~ ~

~I , &1 . .:~~;~ ,

::~'tu

Page 71: Appendix A
Page 72: Appendix A

i i

II ii (; ~;

~t ~! . , ~J:

w ::l V>

_ia

'" .. ..

--I !I'

1

1

1

1

Page 73: Appendix A

FIGURE 19 - Jeddah Refinery Tank Farm A and 8 Skim Tank System

Tank Farm A Tank No. Service Freq/montt Average Maximum

bbl wtr/month bbls/draw gal/d raw bbls Wtr/month bbls/draw gal/draw T-1 04 crude 6 4172 695 29204 4594 766 32158 T-6 (Note 2) red crude 2 427 214 8967 427 214 8967 T -7 (Note 2) red crude 3 5466 1822 76524 5466 1822 76524 15m Dia X 8m H T-8 (Note 2) red crude 3 7852 2617 109928 7852 2617 109928

Max event 109928 Max event 109928 120000 gallons (Note 4)

Tank Farm B T-215 jet a 4 943 236 9902 1258 315 13209 T-214 jet a 4 941 235 9881 941 235 9881 T-213 jet a 4 1056 264 11088 5366 1342 56343 T-12 crude 3 3770 1257 52780 4094 1365 57316 T-13 crude 4 21369 5342 224375 53115 13279 557708 T -15 (Note 3) diesel 7 1125 161 6750 1125 161 6750 T-18 crude 6 4172 695 29204 4594 766 32158 T-243 diesel 6 480 80 3360 480 80 3360 T-244 diesel 6 480 80 3360 480 80 3360 9m dia X 8m H T-245 diesel 6 480 80 3360 480 80 3360

277155 557708 320000 gallons (Note 5)

Notes: 1. Volumes of water draw-off obtained from JR Wastewater Phase II Study Report Spet. 2005 2. Water drawn from Tanks T-6, T-7, & T-8 is drained into a sump located in the vicinity of T-7. Th is sump is not provided with pumps and is

periodically evacuated by vacuum tanker. Tanker can empty its content into any nearby Lift Station such as the those associated with T-104 or T-105.

3. Water drawn from Tank T-1 5 is drained into a nearby sump. This sump is not provided with pumps and is periodically evacuated by vacuum tankers. Tanker can empty its content into any nearby Lift Station associated with the other crude or product tanks.

4. Sized for T-8 at 109,928 plus 10% margin . In reference to Note 1, water from T-6, T-7, & T-8, could be emptied via tank trucks into Tank Farm B Lift Stations, which are equipped with pumps.

5. Sized for T-1 3 & T-12 drain ing simultaneously plus 15% margin .

Page 74: Appendix A

r--

'--

XFMR

13.BkVl40OV

L.---O

I'

'C f-

t= ~

New Marine Substation Layout Plan

III IIIIIII IIII 400v MCC- l dOOV MCC42 -

7 400VSWGR. SubslaHon A""mary Pow", O;sl. m

I I I I I I I I I I Figure 21 <---.:

For Estjmate Only

Page 75: Appendix A

Conceptual One Line Diagram

From Substation R

I LOAl DISCONNECTING

SWITCH

BuS ouc~l( 1GB' A )

1500 !<:VA 13.8kVl400-230V, 50Hz.

~y'!.e!,,:! . ~ 388'.41

400/230V-2500A Bus T T - - - 1.. r--- -T·--~··--..r:---~-l --_ .. 1.. 'f' 'f' 'f' 'f' 'f' 'f' 'f'

f~:~~' fU::~f~r.~' f~:~~' f~:~~' f~~~' f~:!~'

Spare MCC-' 225 KVV Motor 225 KVV Motor 225KW Motor MCC-2 Spare

Figure 22 For Estimate Only

Page 76: Appendix A

Page I of :

Yee, John G

)m : Sayed, Salah M

Sent: Sunday, April 01 , 2007 4:10 PM

To: Ashoor, Esam A

Cc: Vee, John G; Abusaif, Ehsan H

Subject: FW: 81-10 -00473 Upgrade Wastewater Treatment Facility , South Jiddah Complex Phase II

Good afte rnoon Esam,

We h ave reviewed & evatuated the proposal of the installation of the n ew three below grade valve boxes that related to BI-l0-004 73; and have the following:

• The valves are n orma lly c losed , • The valves will be opened on ly during emergency or ra in season s which is very ra rely, • The type of valves is full line size ba ll va lve, • The existing piping a re buried and n ot vi s ibl e to be re -piped above ground to avoid the below valve

boxes, and • The proposal valve boxes are located in non Fire hazardous Zones .

Based on the above and in light of the ju stifications stat ed, our acceptance is granted for the reasons s tated a bove providing tha t a ll of the require ments of pa ra . 5.2 (exceptions ) of SAES -B -008 (1 through 6 ) s h a ll be complied with and implemented .

• n addition, th e fin a l drawing s h a ll be submitted to JedALPD for review a nd the insta llation of the proposed hea t exchanger & pumps s hall not o bstruct the impla ntatio n of the a bove m entioned requirements.

Regards,

Salah M. AI-Sayed, LFPE

·rom: Vee, John G Sent: Monday, March 26, 2007 2:28 PM To: Abusaif, Ehsan H Ce: Sayed, Salah M; Ashoor, Esam A Subject: FW: 61 -10-00473 Upgrade Wastewater Treatment Facility, South Jiddah Complex Phase II

Ehsan,

As discussed and requested , attached please find the updated drawings showing the proposed valve box schemes and their locations.

Regards,

John

;/1412007

Page 77: Appendix A

FACILITIES PLANNING OEPARTMENT Room 1'-4580, Dhahran, W 374-6888, ~ 873-1227

April 22, 2007

FPO-JPO-055/07

A. Z. AL-ASHBAN General Supervisor (A) PS&CD/Capital Program Optimization Div. ~-6965A

Dhahran

BI-19-00473 UPGRADE Wt\STEWATIj:R TREATMENT FACILITY PHA,SE IT,SJC

Waive VE Study for OHSP

Your concurrence is requested to waive requirements for performing a value engineering study during DBSP development tor the subject ·project. VE study requirements during DBsr development arc stipulated in SAEP-1350 for projects with an initial capital investment exceeding $50MM, unless Fro and PS&CD inutual'ly agree that a 'VE study is not warranled. The current cost estifilate for BI-l0-00473 is $6~MM. .

FPD has worked closely with Ero and a consultant in optimizing the design basis for the BI-IO-00473 DBSP and has detcTfilined that conducting a VE during project proposal would be more beneficial once the design has further progressed. The attached e-mail correspondencc bctween rS&CD, FPD, & EPD also provides other reasons fo r the need to conduct only one VE study for BI-10·00473.

Should you have any question, please contact Ali J('jshi at Tel. 875·6344 or John Yee at Tel. 873-008\.

Concur:

---.,

Attachment

U\GJY \ cc w/a lt: Manager, FPD

Manager, PS&CD Coordinators, Il'[) & MFPD

A. H. AL-KATHIRl, Coordinator Infrastructure Planning Division

BI-10·00473 File/IPD Lettcrbook! AAJIGJY

Page 78: Appendix A

Min utes of Meeting BI-IO-00473 DBSP Review Meeting Date: June 3, 2007 Time: 8:30 AM

Location: Engineering Office Building, E-40S0 (E4-CR), Dhahran

Purpose and Obiective: The purpose of this meeting is to discuss and resolve the received comments on the draft DBSP for BI-IO-00473 Upgrade Wastewater Facility, Phase II SJC

Attendees:

Name Org. Address Tel. e-Mail John Vee FPD E-463 S Dh 873-008 1 YEEGJ Najeeb Kashgari WRPD Musadia Bldg., JR 427- 1612 Kashgama

Mansour Angawi JRDIPCU WJ-130, JR 427-3741 angawimm Dan Foglesong FPDIIT&E E-494S,Dh 875-4354 Foglesdt

Earl B. Ali FPDII&E E-S I80, Dh .873-9225 ALlER

J. Comments and Responses: During the meeting, all comments were discussed Info and resolved as reflected in the attached log of comments and responses, which will be transmitted with the final DBSP. Responses, where noted, will be incorporated in the final DBSP. All other responses in the attached table, including those not directly incorporated in the main DBSP document, shall form the basis for BI-IO-0473

Though the responses to the comments have been revised III the log as discussed in the meeting, the below items highlights some of the issues that were discussed at length or required additional follow-up. Post-Meeting notes reflect the final decision for comments requiring follow-up.

2. Feed Breaker Power Supply from Substation R (Comments Nos. 20 and SO): The spare breaker in Substation 'R' was being planned to be used for supplying power to the new BI-IO-00473 substation in the Marine Area based on a fi eld survey by FPD and JR. However, further investigation by the JR now indicates that this breaker has been reserved by #EWO-OSW228A, a project to install security lighting in the Marine Area. An alternative, suggested by FPD, is io allow BJ-IO-00473 utilize the spare breaker and have the security lighting project take power from the new BJ- 10-00473 substation in the Marine Area. In implementing this alternative, JR shall review with the Security Dept. on the schedule and load requirements of #EWO-OSW228A. If this alternative is not feasible, FPD and JR will require to determine an alternate power source for the new substation.

Post-Meeting Note: Per E-mail of June 6, 2007 (copy attached), the Jeddah Refinery has confirmed that the spare breaker in Substation 'R' is available for use for this project.

lof2

JR (Closed)

Page 79: Appendix A

dfe"n\ TO~iCSO,~ ,e:t0'~;i~!,~t ;" ,;;:{;;~:, ..•. . " .. ·./'::\:J1;s\:;)i':c;';),':;.':i::';~'; 'i' ' A:ctiQn 'B~: h·f~; .•• "'·· .- :." . ;;i" ."'-~ .

, . ." . ' 'm, ~ ~J):(te ) '" .-

3. BI-IO-00473 Substation in Marine Area (Comment No, 21): FPD will clarify FPD whether the new substation will need to be blast resistance and reflect (Closed) requirements in the DBSP,

Post-Meeting Note: Blast Resistance construction is not required, However requirements of SAES-B-068, SAES-M-IOO, and SAES-P-119 shall be fully implemented.

4, Power Source for New Egui~ment in Tank Fann (Comment No, 25): WRPD FPD expressed a concern with the availability power in the tank farm area for the (Closed) new BI-1O-00473 equipment FPD indicated that a site survey has been conducted identifying potential existing substations where spare breakers have identified. FPD will forward this preliminary survey to PMT for infonnation only, as substation loading still needs to be detennined along with the need for an ET AP study during PP development

) Post Meeting Note: FPDIIT &E forwarded via e-mail to the JR and WRPD on June 3, 2007 the survey of available spare breakers/space in existing substations.

5, Existing Power Cables for New SanitarY Sewage Lift PumRs (Comment No, JR

l21 WRPD expressed a concern for the condition of the existing power cable (during PP for the sanitary sewage lift pumps. FPD stated that existing cables (especially development) low voltage) are considered to be in suitable condition unless testing indicates otherwise, However, it was agreed that the JR will take responsibility for checking their condition during PP development

6, Use of Low Voltage for 300 HP motors (Comments Nos, 32, 33, 49 & 51): FPD The current power supply in the Marine Area is stepped down from 13,8kV to (Closed) 400 volts, without any other intennediate voltage level. It proposed to use the 400 volt supply to provide power to the new BI-10-00473 300 HP motors, which would nonnally require to be supplied by a higher voltage level (3300V for the JR). Using the lower voltage will require a waiver to the SAES, FPD will obtain and include correspondence in the DBSP that will basically state that CSD will support a waiver for the proposed arrangement A waiver would then be required to be processed by PMT during PP development

Post-Meeting Note: CSD will support a waiver to operate the 225 KW motors at 400V. (See Email Attachment).

7, Project Schedule for BI-1O-00473 (Comment No. 31): WRPD stated that the Info current schedule cannot be achieved since more time is required to secure a project proposal contractor based on current market conditions, FPD indicated that the current schedule is based on the recent Table Top discussions with the exception of the duration for PP Start to ERA being 8 months instead of 10 months. FPD also stated that, if the PP can start in July 2008 rather than August 2008, then the duration would be 9 months, WRPD indicated that this would be still insufficient time to execute the project WRPD requests that the PP Start date still be August 2008 , but the ERA be July 2008 (in lieu of April 2008) and the ERC be February 2011 (in lieu of November 2010). The ERA-ERC duration (32 months) remains as per the Table Top discussion, The JR did not agree with the revised schedule unless the ERC remains November

20f 2

Page 80: Appendix A

2010.

Post-Meeting Note: FPD further reviewed the above matter with its management. Project schedules are basically set forth by PMT based on what is truly achievable to execute the project. Therefore, the final DBSP will refl ect the above revised dates.

8. The meeting was adjourned at Il:l 5 AM.

Minutes by: John. Vee FPDIlPDIU&EG

) of2

Page 81: Appendix A

Origi na to r Depl/ ln ilia l ~

EPD WGC

EPD WOC

EPD WOC

EPn WOC EPD WOC

EPD WOC

EPD WOC EPO WOC

I.

2.

3.

4.

5.

6.

7.

8.

Section

I. 3.3

2. 6.1.2

3. 6.2.1

4. 6.2.1

5. 6.2.1

6. 6.7

7. 7.2

8. 7.5

C,,\GJY,\BI-IO-00473 DBSPCommentsLog

Comments and l __ .;ponses on Draft DBuA_ BI-IO-00473 Up!!rade Wastewate r Facilitv, Phase II South Jiddah Complex

Comments Responses

The JR is not 36 feet above sea level. Agree. The 36 ft, per SAES-A-112, is for Closed "Jeddah," but does not reflect the conditions of "Jeddah Refinery." DBSP will be revised to indicate that the elevation shall be per the soils report in the Appendix 15.1.

The sanitary wastewater generation is not credible. The Records from the sanitary waste hauler seem to Closed reported value is lower than any other faci lity within Saudi verifY the consistently low average daily sanitary Aramco in terms of per capita wastewater generation. waste flow of 12,000 gpd. However, the design Consideration that the existing collection system is leaking rate for sanitary sewage will be increased from and that the actual sanitary wastewater generation may be 30,000 gpd to 50,000 gpd.

I greater than indicated needs to be considered in the design. It should be footnoted that while the phase I system is Footnote will be added to the final DBSP. Closed designed for PME compliance with oil & grease discharge requirements, I is possible for upsets conditions where oil exceedences occur - this needs to be understood as a design condition for the MBRs. If the values in the Table do not match the test values from These values have been reviewed by Siemens Closed the Bench scale testing, they should be modified to match. and are assume to be the design basis. The sanitary wastewater values represent a higher strength Except for the maximum BOD and TSS, all Closed wastewater than what is to be expected from the facility. other values were based on the analysis

reported in SAER-S830 Wastewater Treatment Facilities Study for JR and MA. Maximum BOD and TSS per SAER-5830 are 185 and 51, respectively. Final DBSP will include clarification.

As indicated earlier, these sanitary wastewater generation See response to Comment No.2. Closed values are not what would be expected from the number of personnel served at this faci I ity. The interface sensor and MOY should be located on the Final OBSP will include requirements. Closed ,

I outlet flange of the tank to eliminate excessive oil discharge. If sanitary wastewater is to be trucked within the Refinery, Final OBSP will include a connection for the Closed there should be some sumps set up to have piping available vacuum tank truck hose at the Intermediate to allow the wastewater to be drained. A simple hose Sump. connection with a drain line into the sump should be provided at a number of sumps in the plant.

Page 1 of 12 June 2007

Page 82: Appendix A

Comments and. .;ponses on Draft D L .......... -.&v-vv ..,. , .., ..... Y6 . ............ yy ... ~ .......... Q ....... ... - .......... !:J-'.& ua"o;; ...... VVU UI .... luuau ....... Vll_~" ........

O rigina tor # Orig Section Comments

I Responses

I Status

D~ptllnitia1s No. .. _-- --

EPD 9. 9. 8.1 Item number 2 refers to conventional "Clarifiers". I believe Final DBSP will include commentary. The tenn Closed WGC that this actually is referring to a conventional STP. The "clarifiers" will be replaced with "Dissolved Air

commentary should also indicate that this system would be Flotation, Activated Sludge Treatment very unreliable - probably to the point of it not being feasible. (cylindrical clarifier with sludge rake)" It was this concern about the reliability that drove us to evaluate physical / chemical methods and the PACT MER. If it was pursued, it would defini tely require the addi tion of a Dissolved Air Floatation system in addition to the GAC filters and considerably more equalization - FPD has a proposed design using this technology that can be referred to. Item #3 refers to a conventional MER - the reference to the "Clarifiers" should be modified as indicated above. Additionally, the phrase " in order to meet PME discharge requirements" should be added to the end of the current paragraph. The final paragraph should have the following added to the end of the paragraph "followed by GAC columns".

EPD 10. 10. 8.2 Dumping stations should be provided for remote sumps to be See response to Comment NO.8. Closed WGC discharged into. EPD II. 11. 94 The EIA should have as its primary focus, compliance with Final DBSP will include requirements. Closed WGC PME discharge requirements. EPD 12. 12. 94 The EIA should be a Category 3 EIA. Final DBSP will include requirements. Closed WGC WRPD 13. I. 5.0 Design The concept of combining treated water from phase I IWTP The mixing is required as sanitary sewage will Closed NMK Objectives and sanitary waste sewage collected from SJC is not promote biological activity for the aerobic step in

acceptable. Each stream to be treated individually the treatment process. WRPD 14. 2. 7. 1.2 MBR Petro Pact-MBR is a new system introduced to Saudi The proposed system is the most cost effective Closed NMK System Aramco The system is only in the pilot stage. It has no system available and also the simplest to

guarantee that it will function successfully. operate. The proposed system is merely a Siemens WTC IS the only licensed supplier of this conventional MER unit with the addition of equipment There is a disadvantage that vendor will PACT upstream. EPD has recommended that monopolize the market the PACT-MER be utilized for this project

WRPD 15. 3. 7.2 New The propose tanks are not feasible due to piping complexity As indicated on Figure 7 (Details "A" and "B") Closed NMK Skim Tanks at the tank farm and huge number of tanks involved of the Appendices, there are minimum tie-ins

required for the system as the existing crude and product tanks are already interconnected_

C:\ GJY\BI-1O-00413 DBSPCommentsLog Page 2 of 12 June 2007

Page 83: Appendix A

Comments and h_,;po nses on Draft D1. ........ - ... v - vv ...... 1 -' "'-' ... Ft . ... u ... ... ... ,;)'" ..... 1' a .. "'" .... A'-III o.J' ........ .3~ ...... .,;JVULII ........ uall '-'VIII l-' I ~'"

Odgin:ltor # Orig Section

I Comments

I Responses Status

D~ptlInitials No. -

WRPD 16. 4. 7.3 New This item is not justified and no need for it. Per the design data sheets of existing coolers in Closed NMK Wastewater Sea water temperature is already more than 95 F=35C the Jeddah Refinery, the design temperature of

Coolers especially at summer time the cooling water is 87 OF. Per the SAES-E standards, west coast design temperature for seawater is 91.4 OF for summer and 48.2 OF for winter.

WRPD 17. 5. 7.4 Retrofit Any retrofitting work to existing operating equipments to be FPD is required to include scope in the DBSP Closed NMK Seawater done by proponent. This activities has high schedule impact that will make the system functional FPD does

Coolers B W if done by Construction Contractor support PMT using the proponent to perform the tie-in work, but ultimate decision needs to be finalized between the PMT and proponent. (PMT may consider having the proponent install the tie-ins during Project Proposal development with an agreement that the cost of work will be reimbursed to the proponent when ER funds become available).

WRPD 18. 6. 7.5 SWwCS Connecting the Septic Sumps is not feasible and high cost. Only certain septic tanks are being provided Closed ,

NMK Collection Alternatives to be consider. One alternative is to connect with new pumps and discharge lines so that the System Sanitary water from SJC to the Jeddah Sanitary System sanitary sewage can be transferred to the new

trealment plant in the Marine Area. I See also response to Comment No. 13.

WRPD 19. 7. 7.6 The condition of existing Septic Sump ST-Ol to ST-07 to be Modifications to existing septic sumps are not Closed NMK Modification verified by proponent. SAPMT will consider building new expected to be a difficult task.

to existing Septic Sumps as needed. No modification to existing ones Sanit System

WRPD 20. 8. 7.7.2 Feeder breaker supplying power from sIs R to the new sIs An existing spare breaker has been identified in Closed NMK Electrical need to be identified in the DBSP. Will the project utilize Substation "R" and the Jeddah Refinery has

Scope exiting spare breaker? Or existing space? Or will the project been requested to reserve it for the project. Description extend the switchgear?

WRPD 21. 9. 7.7.3 Most probably sIs building will be blast resistance. This will Blast Resistance construction is not required. Closed NMK New Marine be costly and FPD/JR should be ware of this and provide However requirements of SAES-B-068, SAES-

Area Unit alternative location in case they will not support blast M-IOO, and SAES-P-119 shall be fully SIS resistance sis implemented.

WRPD 22. 10. 7.7.3 The proposed new sIs is single ended sIs, JR and LP shall There are no critical loads so single ended Closed NMK New Marine confirm that the load are not critical otherwise we need to configuration is appropriate.

Area Unit consider double ended sIs C;\GJY\BI·10·00473 DBSPCommentsLog Page 3 of 12 June 2007

Page 84: Appendix A

Originato r Section Dept/Init ials

SIS WRPD 23. 11. 7.7.3 NMK New Marine

Area Unit SIS

WRPD 24. 12. 7.7.3 NMK New Marine

Area Unit SIS

WRPD 25. 13. 7.7.6 NMK Refinery and

Tankfarm Area

WRPD 26. 14. 7.7.7 Sanitary NMK Water

Collection System

WRPD 27. 15. 7.7.7 Sanitary NMK Water

Collection System

WRPD 28. 16. 7.7.12 NMK EL Sys.

Studies WRPD 29. 17. 9.1 NMK BOOT or

DBO

C:\GJY\BI·]O·00473 DBSPCommentsLog

Com ments and • . .iponses on Draft Dl._.

'" .... "' - ........ vV-"'''' ..... . -~'" ..... "' .. ... .. _ ..... . ...... "-..... ,.II. .. ... .,. .......... vv .... .............................. v ...

Comments Responses

Load disconnect switch proposed at the new sis is not in Load Break switch will be deleted. Only local line with SA standard and this need to be clarified with CSD disconnect switch will be utilized.

SIS building shall include battery room This is a 400V Distribution Substation. DC Power Supply is not required for equipment operation.

Load at tank farm, DBSP shall confirm which sis at tank Nearest available substation with adequate farm will be used to supply power to the new switch rack. capacity shall be utilized. The Conceptual We need to know are we using existing breaker or existing estimates does not address actual loading in the space or extending the existing MCC? These are critical as substations, only available existing spare most of the sis equipment are obsolete breakers. Substation loading will be determined

. and finalized after ET AP Study during the Project Proposal Phase.

ST -01 to ST007 PP is not the venue to check the adequacy of the existing Existing cables in current use are typically cables and equipment for the re-use. This should be done by considered to be in suitable condition for reuse JR maintenance unless appropriate testing indicates otherwise. In

the past this has been confirmed during the Project Proposal.

ST-08, 09 and 10 Since most of the electrical equipment at JR is obsolete it is Adequate numbers of spare breakers have been essential that the DBSP identifY the sis and breaker to be identified in the various nearby substations. Final used for these loads. Also JR sha ll reserve these breakers determination of the actual substation shall be for the project. made after ET AP Study verification of existing

substation loading. ETAP study to confirm the adequacy of the power at sis R Noted, ET AP study will be performed during

to handle the additional load Project Proposal.

SAPMT position is such task to decide for BOOT or DBO The overall responsibi lity is expected to be shall be done separately from PP scope. FPD will take the coordinated by the New Business Evaluation responsibility to conduct this task. SAPMT will be an active Dept. with assistance from SAPMT, FPD,

member with full participation and providing SAPMT _ Contracting, Law, and Finance.

Page 4 of 12

Status

Closed

Closed

Closed

Closed

Closed

! ,

Closed

Closed

June 2007

Page 85: Appendix A

Originator Section DeptlInitials

WRPO 30. 18. 12.0 NMK Value

Engineering Study

WRPO 31. 19. 14.0 NMK Project

Schedule

PDOI 32. 1. 7.7.3 CWPOEUI NBF

POOl 33. 2. Figure 21 CWPOEUI NBF

POOl 34. 3. 7.7.2 CWPOEUI NBF

POOl 35. 4. 7.7.2 CWPDEUI NBF CSDIREU 36. l. 7.0 LAF

C;\ GJY\ BI·10·00473 DBSPCommentsLog

Comments and _ _ ... T T _ ........ T .......... . _ _ _ __ _______ _ __ _ . ~~ .... ..... v ••• BI-IO-00473 UD!!rad

,sponses on Draft DL __

Facilitv. P hase II South J C Comments Responses

- - -- -_ . .

experience in both contractual and execution aspecls. PP will provide the backup data for the cost estimate needed.

The PP schedule is not considering the out come of Value As with any major scope changes, the impact of Engineering Study. If there will be a major changes in the cost and schedule will need to be evaluated and, project scope due to the outcome of VE, then the PP if necessary, adjustments will be made pending duration will be extended accordingly. agreement from all parties. 8 months period for PP and 31 months for ERC is not PMT requires that the schedule be revised as acceptable. 10 months and 32 month to be consider as follows: agreed on tabletop, so ERA: July 2008 (Was: April 2008) ERA: June 2008 & ERC: Feb 2011 ERC: February 2011 (Was: November 2010)

Requirements will be refl ected in the final OBSP.

13 .8/4.16KV Transformers listed as new Substation's major Reference to 4.16 KV Transformer will be electrical equipments but not shown in the conceptual one- deleted. Not required for this project. line diagram or new substation layout plan. This contradiction needs to be verified and section 7.7.3 shall be corrected accordingly. If 225KW motors shown in the conceptual one-line diagram Conceptual one-line diagram reflects 225 KW are not Fire Water Pumps, they have to be fed through A (300 HP) motors with 480V switchgear applied Control gear. for motor starting duty. NEMA Size 6 Starters

are very rare, also 3.3 kV or 6.3 kV distribution are not available in the Jeddah Marine Area.

CSO will support a waiver to operate the 225 KW motors at 400V. (See Email Attachment).

Protection relays associated with Substation "R" feeder Not required. Should be replaced under annual spare Circuit Breaker to new substation 13.8/0AKV appropriation, NDE, or BI-1900. transformer must be replaced with microprocessor ' based relays. If proponent considers the project loads as critical loads; Loads are not considered critical. new substation configuration shall be double ended switchgear configuration as per SAES-P-IOO; Para. 5.5 . We have reviewed subject project DBSP and have one Some of the pump sizes and capacities will be comment. OBSP includes some details that usually are not removed from the final OBSP, except where

Page 5 of 12

Status

Closed

Closed

,

Closed

Closed

Closed

Closed

Closed

June 2007

Page 86: Appendix A

Originator Dept/Initials

JAISOD AMR

ISP&SSDI PCG

Fl'''lH

JRlPCU

37.

38.

39.

Section

1. General

1. General

1.

C:\GJY\ BI·10-00473 DBSPCommentsLog

Comments and. .sponses on Draft Do. '-' II ... - ... V - VV ...... ,oJ ...... • au .... y • .... ~ ..... n ..... '-' • ... - .... ,.,. ..... , Jl .. ""~ .... JL& UVUU, ........................ v ...

Comments

given during such project stage. Number of pumps and their sizes are given in DBSP which is normally provided in a later project stage (design stage).

I have reviewed this project BI- 10-00473 (Upgrade Wastewater Treatment at SJ Complex) via the link given below. This project is relevant to the same project being upgraded at Marine Area adjacent to API separator. We have conducted site visit to the area, and we submitted our operational comments to the PMT before starting the work, as the area of the project needs additional security measures. We don't have any additional comments from Technical Point of View, and we leave that to PCG for study and evaluation along with their findings and comments. On the other hand, the allocated budget incUded also BI-IO-00476 (Upgrade of Storm water Drainage System at JR Complex). We have already submitted our operational comments to Mansour Angawi to be included in the project. Anyhow, the DBSP approved and included our security gates in the project such as JR Main Gate # I , JR Computerized Gate # 2, MSO Gate # 7, Asphalt Gate # 4 and Marine Main Gate # 8. It seems most of the work will be inside the fenced area, but all SAES-O series standards should be implemented especially when there is some pipes crossing roads or fences. Also bathrooms and kitchens located at JR security gates should be considered and included in this project wastewater treatment. Thanks.

The soil investigation report attached in the DPSB is very old (1982), an updated test was conducted on 2003 (Report attached on E-mail), should be used in the design.

Page 6 of 12

Responses

there are needs to match existing equipment or required to meet specific process conditions. Similarly, some of the equipment capacities will be removed. Requirements will be addressed by the PMT as required prior to construction.

Security standards will be implemented as required for any pipe crossing through security fences during Project Proposal and detailed design development. Since the security area gate generate low volumes of sanitary waste, their septic tanks will be continued to be emptied out by tank trucks. The tank trucks would then empty their content into the new Intermediate Sump at the new wastewater treatment plant inside the Marine Area. Agree. The 2003 report (excerpt only) will be included.

Status

Closed

Closed

Closed

June 2007

Page 87: Appendix A

Comments and . ..sponses on Draft Dl

AlJI.- ....... uv-. . oJ ..... t-'~." .... ~ ...... .., .. ~ ........ " • ... . ............ J, ... ...... .., ... JI.'" .... V ... LH Vi ............. ...... Vll~""' ..... Originator # Orig Section Comments Responses

I Status I Deptllnitials No.

JRlPCU 4O. 2. Item 3.3 The condition of the area consists of HIGH water table not Agree. Final DBSP will include correction. Closed low (to be corrected).

JRlPCU 4L 3. Item 6.3 Design basis for Effluent: Nothing mentioned about the The intent of Table 6-5 in Section 6.3 is only to Closed Existing pit for effluent water. provide the quality of the treated wastewater

effluent from the new Phase II facilities to meet PME regulations.

JRlPCU 42. 4. Item 7.5 & Sanitary wastewater: The existing irrigation pond at road 23 This was considered. However, the Closed 8.2 can be rehabilitated and uti lized as a main collection sump to Intermediate Sump should be somewhat close to

the new system. the existing Holding Basin so that overflow of the Intermediate Sump can flow by gravity into the existing Holding Basin. Also, putting the Intermediate Sump in the Marine Area would allow the monitoring (by operating personnel) to ensure that vacuum trucks are emptying sanitary waste (in lieu of hydrocarbon waste) into the Sump.

JRlPCU 43. 5. Item 7.10 Buildings & Structures: The main civil structures associated The purpose of the DBSP is only to mention Closed with the network system should be mentioned i.e major items. All other requirements will be wastewater collection facilities, pump stations, channels, made part of the Project Proposal or detai led equipment foundations .. etc. design .

JRlPCU 44. 6. Upgrade the area with concrete pavement and access roads Upgrading of existing roads is not part of the Closed for emergency and maintenance vehicles. scope unless new roads are required to access

new equipment installed by this project. JRJPCU 45. 7. Existing pipelines are recommended to be elevated On a Elevation of existing pipelines is not in the scope Closed

Piperack. of this project. JRlPCU 46. 8. DBSP should consider the evaluation of the upper-stream Evaluation of existing equipment on conceptual Closed

electrical equipments and parameters of SIS "R" such as basis has been made. Detailed analysis and primary cables ITom power house to S/S"R", breakers sizing ET AP study will be implemented during Project

, protections, etc. significant impact in the cost and time Proposal to verify adequacy of the proposed

execution for the project will be took place if the existing power supply.

aforementioned electrical equipments are not suitable for the new load (lMW).

JRlPCU 47. 9. Per the electrical equipment obsolescence survey and Available existing spare breaker will be utilized Closed

manufacturer reply, 13.8KV breaker in SIS "R" will be unless determined operationally unsuitable. This

obsolete by 2010. Thus, it is highly recommended to evaluate is not an obsolescence upgrade proj ect.

C,\GJY\ BI·10·00473 DBSPCommentsLog Page 7 of 12 June 2007

Page 88: Appendix A

Originator Dept/ Initia ls

JRlPCU

JRlPCU

JRlPCU

JRlPCU

JRlPCU

JRlPCU

JRlPCU

JRlPCU

# I Orig I ~

Section 1

4S. 10.

49. ]J.

50. 12.

51. 13-

52. 14.

53. I S.

54. 16.

55. 17.

C:\GJY\BI·1O·00473 DBSPCommentsLog

Comments and . .sponses on Draft DR BI-IO-004' J Upgradejyastewate .. Facility, Phase II South~iddah Complex

Comments J Responses I Status

the obsolescence of this breaker with CSD and evauate of adding new circuit breaker at bus 13 .SKV in SIS "R" as spare breaker. As highlighted n DBSP, the new substation is proposed as Single-ended configuration will be utilized as no Closed single-ended substation. Thus, JRlOperation, CSD and FPD critical loads have been identified. shall review the configuration and to study if these loads should be fed from double -ended substation or not DBSP mentioned that some of the motors rating are See Response to Comment No. 33. Closed 230K W. These rating of motors shall not be fed from low voltage rating (400VAC) as per SAES-P-113. If these motors will be supplied from medium \Oltage, the tie-in point shall be clearly mentioned in DBSP. The mentioned spare breaker (l3.SKV) in Substation "R" is See Response to Comment No. 33. Closed proposed to utilize by one of the conceptual design # EWO-05W22SA. Thus, FPD with JR project unit shall evaluate this issue. DBSP mentioned that the Substation equipment shall include Closed 13.SkV I 4.J6kV Step- down Distribution Transformers. Noted. While, in page-9 and new SIS one line diagram it was not Thus, FPD should clarify? 13.SkVl4. 16kV transformer will be deleted. DBSP is not mentioned any UPS, battery charger, Electrical Closed protection, Power Monitoring System and battery. Thus, These items are not required. these equipments shall be added in DBSP if they required by the project As mentioned in DBSP page 20, Skim Tank System & Nearest available substation with adequate Closed Waste Water Coolers will be connected to the nearest capacity shall be utilized. The Conceptual available refinery and tank farm substation through new designs does not address actual loading in the switchracks. This is general statement and if the there are substations, only available existing spare no spare breakers or limited power capacity in these breakers. Substation loading will be determined substations, significant impact in the cost and time execution and finalized after ET AP Study during the for the project will be took place. Project Proposal Phase.

Fire Hazardous zone drawings shall be developed based Requirements will be addressed during Project Closed upon guidelines provided under Saudi Aramco standards. Proposal development JR power system parameters are asfoIlow: All equipment specified for this project will be Closed

Page 8 of 12 June 2007

Page 89: Appendix A

Originator Section Oep tiIniti:ll s

JRlPCU 56. 1 18.

JRlPCU 57. 1 19.

C:\GJY\ BI·10·00473 DBSPComment,Log

Comments and . _sponses on Draft D1 __

,.,..a AV VV --' ,.., ..... • ......... T ... ... ..... T ........................ , ........... ... ............ ........ .. u. v .... ~ ..... ........... . ..

Comments

--------

1. Voltage:( J3 .8KV, 6.3KV, 3.3KV & 400V) Frequency 50Hz

Distributed Control System (DCS)

This project will provide 1/0 modules as required for new field instrumentation. The new equipment provided by this project will be monitored and controlled from the IWTP Control Room and from CCR. The project will not provide any consoles or workstations as a result of the added equipment. The project will modify the console's graphics and displays to reflect the addition of the new equipment and instrumentation. This project will provide configuration, graphics, reports and trending for all new 110 installed for this project.

In order to expand and integrate the existing IWTP and CCR Yokogawa systems over a V-Net data highway, a new domain shall be created, the CCR operating system shall require upgrading from CS3000 3.03 to V-Net IP, the controllers IP cards and JR FCS,s shall be upgraded and the control room cabling shall be replaced by V }Iet e, UTP. New communications interface modules will be installed in existing 1/0 racks in JR CCR CeRtFel Reem #1 and the IWTP control room and new fiber optic cabling will be installed between these two systems.

The new equipment will be composed of the latest version of the control system's vendor 's standard hardware which can be configured to meet the systems requirements. The system will be modular, integrated and re-configurable; accepting new expansion or replacement hardware, and data downloads while on-line without interferin~ with control.

UPS capacity revision shall be considered in the project & included in the scope of work.

Page 9 of 12

Responses

based on noted parameters, as required.

UTP is OK.

Two L3 switches will be installed in new communications cabinet (cabinet will be installed as part of system domain upgrade, part of this project) in the CCR and the new redundant fiber optic cables will be connected to existing L2 switch in the WWT CR.

A new 10 kV A UPS was installed by Phase 1, along with a new battery room. As only I/O modules are being added this UPS is sufficient.

Status

Closed

Closed

June 2007

Page 90: Appendix A

Comments and ,sponses on Draft Dl. .L.O.& .... V 'Vv - w ,..., ..., .... '-"_ T' ... .,.~_., ... ~ ..... & ... _ .. ... , ........... _ ....... '"'v ............................. v ............

Originator # Orig Section Comments Responses Status Dept/Initi als No.

JR/PCU 58. 20. UPS redundancy shall be evaluated I considered in the Refer to the response to Comment No. 57. Closed project & included in the scope of work.

JR/PCU 59. 21. Gas detection & monitoring system in the API separator . This is not included in the scope of work for this Clo·sed should be upgrade to PLC system in order to interface all BI. Gas detectors alarms with DCS in the CCR.

However, for your information, per SAES-J-505, section 6.4.1.1, gas detectors shall be monitored by a logic system. Per SAES-J-505, section 6.4.3.1, a logic systems device is a PLC, TMR, or DCS.

JR/PCU 60. 22. The scope of work shall include upgrade JR lift stations Upgrade of existing JR Lift Stations is not in the Closed

con trol system JR lift stations are considered the back scope of this project.

bone for the WWTP project since they are the source supplying WWTP from the whole refinery. the Existing Such deficiencies shall be handled by the JR

system is consist of Level transmitters capacitance type that before the Phase I (BI-1O-03563) facilities are

do not accurately measure the level of oily water in the Pits commissioned. Moreover the control system is local panels relay based system which dos not function properly & have many frequent failures . These deficiencies resulted a major overflow incident for the Refinery Main lift station in zone #2 in 2000.

JR/PCU 61. 23. Emergency shutdown system (ESD) should be Considered if The equipment being added is not critical and is Closed applicable especially in the Refinery Process Area. not interfaced to the ESD.

JR/PCU 62. 24. The connection to Existing Refinery Automatic tank gauging The new tanks are not required to be connected Closed shall be considered for the new Tanks in the Tank farm to the tank gauging system. Each tank will have Area (The expansion to the Existing system shall be the level signal sent to the appropriate control considered if required) room for monitoring.

JRIPCU 63 . 25. Expansion of the distributed Control System (DCS) shall be The DCS shall be expanded as required (new Closed

considered if required for both Marine & Refinery. The 1/0 modules, 1/0 rack) for the new 1/0. spare capacity should be maintained to minimum 20%.

Spare capacity shall be per standards (10%).

JR/PCU 64. 26. The new process control systems (such as PLC ... ) related to The MBR has a PLC that wi II come in a free Closed the new units shall be installed in an indoor PIB ' s (IWTP standing cabinet and will be installed in the control Room for example). We want to avoid having a local WWTCR. process control cabinets exposed to harsh environment &

C"GJY,BI-IO-00473 DBSPCommentsLog Page 10 of 12 June 2007

Page 91: Appendix A

Orig in ator Sectio n Dept/In itials

JRlPCU 65 . 27.

JRlPCU 66. 28. Item 7.8.4

JRlPCU 67. 29.

JRlPCU 68. 30.

JRlPCU 69. 31.

JRlPCU 70. 32.

JRlPCU 71. 33.

JRlPCU 72. 34.

JRlPCU 73. 35.

JRlPCU 74. 36.

JRlPCU 75. 37.

C:\GJY\ BI·10·00473 DBSP CommentsLog

Com ments and. >.sponses on Draft Dh. ,-, BI-I0-004·73 Voerade Wastewater Facilitv. Phase II South J iddah C VU I " A

Co mmen ts Respo nses

weather conditions The redundancy in new process control systems (such as Redundancy is not required. PLC ... ) related to the new units shall be considered depending in criticality of the units. Control room #2 (PIP#2) shall be considered since it is Final termination location of Lift Stations will be housing the DCS cabinets for Z#I. 2, &3. determined during PP. Expansion of the IWTP control Room shall be considered in Expansion of the control room is not required. the project if required. Include in the DBSP the replacement of API existing This is not in the scope of the project. bladder fixed foam system to balanced-pressure proportioning system with foam concentrate pumps and storage tank complying with SAES-B-018. All fixed bladder foam system currently available at Marine Area is not reliable and required to be upgraded to -pressure proportioning system with foam concentrate pumps and storage tank system.

In case of black out, a lot of drainage will go to the Currently no critical process loads have been separator; hence back up power need to be considered identified that require standby power supply. (back up generator) Substation should not be single ended (both primer and Single-ended configuration will be utilized as no secondary sides) due to the criticality of the facility . critical process loads have been identified.

Motor spec shown as 60 Hz (speed is 1800 rpm), this is Noted. should be revised All equipment specified for this project will be

based upon the actual facility parameters as required.

Substation without DC supply system ( battery bank and No requirement for DC power system. battery charger) All lifting pumps to be supplied with fresh water flushing for Such details will be addressed during PP their bushings to be used prior the start up. development and detailed design. There was no specification for the internal materials of the Such details will be addressed during PP bushing and bearings of the pumps. We prefer t> use the development and detailed design. non-metall ic materials in such services The mechanical seals flushing should util ize fresh water Such details will be addressed during PP

when ever applicable development and detailed design.

Page 11 of 12

Status

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

June 2007

Page 92: Appendix A

" Comments and __ sponses on Draft D _ _ BI-IO-00473 Upgrade Wastewater Facility, Phase II South Jiddah Complex

I O,igi."., I # I O';g Dept/Initi als No.

Section Comments R esponses Status I

LPDIHM 76_ L Rephrased the paragraph as follows (Design Objective): Final DBSP will include requirements. Closed M "The adequacy of firewater system, the capability of

detection system and the required fire proofing for equipment structures will be considered for phase II IWTP to ensure proper protection of new equipment".

LPD/HM 77. 2. Add the following to this paragraph: Provide the dike and The new crude and product skim tanks will be Closed M drainage system for the new crude and product skim tanks in located in existing diked areas.

tank farm A and B per SAES standards. LPDIHM 78. 3. Add the following to this paragraph: Provide emergency If required, these wi ll be addressed during PP Closed M isolation valves at suction side of recovery oil pump. development and detailed design.

-- - - --- --

C:\GJY\BI-IO-00473 DBSPCommentsLog Page 12 of 12 June 2007

Page 93: Appendix A

Yee, John G

)m:

Sent:

To :

Angawi , Mansour M

Wednesday, June 06, 2007 8:16 AM

Yee , John G

Cc: Kashgari , Najeeb M; Foglesong, Daniel T; Ali , Earl B; Hazmi, Yahya R

Subject: FW: BI -10-00473 DBSP Review Meeting Minutes and Comments Log

Page I of:

Attachments: BI-10-00473DBSPReviewMtg .doc; BI-10-00473 DBSPCommentsLog .doc; FW: Security Lightning for JR and Marine Terminal

John

For item # 2, as per the attached email from Security , It seems that the lightening projec t is not available ir th eir project's list currently. According ly, we can use sUb-sta tion R for our project.

ror item # 7, our superintendent will meet with PMT superintendent on June II , 2007 to discuss and finali z( the issue. I wil l feed you back after the meeting with the agreement as we ll as our comments lit any) o r your responses tor all o ther items in the comments log.

Best Regards,

'vIansour M. Angawi ?rojec t Engineer Project Coordination Uni t Jeddah Retinery Tel: 427-3741 Fax: 427-5374 Email: mqoSOLJ[ qOQowj@qrqrncQ com

. (am: Vee, John G Sent: June 03, 2007 4: 10 PM To: Angawi, Mansour M; Kashgari, Najeeb M; Foglesong, Daniel T; Ali , Earl B Subject: BI-1O-00473 DBSP Review Meeting Minutes and Comments Log

Gentlemen:

Please review the attached documents and advise any comments you may have.

The attached meeting minutes indicate action items that need to be resolved . For the comment log, the responses in red font indicate that additional information is required (per the action items in the meeting minutes) before the camments can be closed .

Let's try to wrap everything up before the end of this week sa that we can issue the OBSP for approval by ~ arly next week.

Mansour - Please see Item NO.7 of the attached meeting minutes concerning the schedule . Basically ,

,/6/2007

Page 94: Appendix A

Vee, John G

Jm: Rahbini , Ali M

Sent: Monday, June 04, 2007 2:30 PM

To: Angawi, Mansour M

Subject : FW: Security Lightning for JR and Marine Terminal

:urrently , we don 't have any project handled by security for lighting at Jeddah Refinery and Marine Area.

'rom: Angawi, Mansour M :ent: Monday, June 04, 2007 1:49 PM '0: Rahbini, Ali M :ubject: Security Lightning for JR and Marine Terminal

,s p er our discussion, please advise the status o f the subjec t project .

Regards.

~ansour M. Angawi rojec t Eng ineer roject Coordination Unit eddah Refinery el: 427-374 1 Fax: 427-537 4 mo il : m aQSOlJ( o ogQwj @o ro mcQ com

;/6/2007

Page 1 of

Page 95: Appendix A

Page 1 of:

Vee, John G

am: Ishwait, 8asel A

Sent: Monday, June 04 , 2007 1 :05 PM

To: Al i, Earl 8

Cc: Arnaout, Khalil H

Subject: RE: 8i -10-00473 - Upgrade Water Treatment Facility Phase II- Jeddah

.ii ,

:SD will support different option including a 300 HP , 480 V motor to optimize project cost. Further, CSD will also upport several other options including :

I . A software start option to reduce inrush requirement 2. The use of captive transfo rmer 480/4160V to over come voltage drop and excessive cable system. 3. Since the 13.8 KV is avai lable use of 4 .16 KV transformer to feed a 4 .16 KV motor and a 480 tran sformer.

,se let us know if need further assistance .

tega rds ,

IJase/)l. Isliwazi, <FE ;ngineering Spec iali st :SDI'ESD/EEU, E-7855

i' (9663) 874-5133

(9663} 873-0766 ., ,el ishwait@aramCD com

'rom: Ali, Earl 6 :ent: Sunday, June 03, 2007 2:48 PM '0: i shwait, 6asel A :c: Arnaout, Khalil H :ubject: 6i-10 -00473 - Upgrade Water Treatment Facility Phase II - Jeddah

our conversation, please review the following and advise if CSD concurrence is possible .

• t Jeddah Refinery Substat ion R, one 13.8kV BKR is available for use. This breaker will be use to supply power to a small new ubstation in the Marine Area with the following:

13.8 kV/480V XFMR 480 V Swgr. 480 V MCC SUbstation Auxiliaries Largest Loads - Three motor loads are rated a 225 KW (300HP)

:tandards call for these motors to operate at 4.16 kV. This voltage level is currently not available in the Marine .Area. There is urrently no other application or requirement for 4.16 kV in the Marine Area . In order to be cost effective, could it be proposed that lese motors operate at 400 V with NEMA Size 6 Starters. This would reduce the cost of the installation by eliminating 13.8KV :witchgear, 4 .16kV XFMR, 4.16 kV MCC's, DC Power System, and other associated components.

1l.o.~se advise if you should have any questions or comments . Your quick response is requested .

;/9/2007

Page 96: Appendix A

;;J Regards,

- ~I Bashir Ali 'audi Arabian Oil Company (Aramco) 'acility Planning Department T & Electrical Division

:ngineering Bldg., Rm. 5180 )hahran 31311 - Kingdom of Saudi Arabia 'hone: +966-3-873-9225 'ax: +966-3-873-5198 flobile: +050-396-8126 :mail : alieb@aramco .com

;19/2007

Page 2 of:

Page 97: Appendix A

Upgrade Wastewater Treatment Facil ity Phase]] South Jiddah Complex

Appendix 15.3 -Budgetary Project Scope Definition

BI-10-00473 DBSP

• Budgetary Project Scope Definition • Siemens Budgetary Proposal # I Y0025BPR • Equipment Cost (Spreadsheet by Siemens) • Sludge Bed Cost (SCECE-Mail) • Estimate Figures 4, 5, 7, 9, 10, IIA, lIB, 14 & 15 • Yokogawa DCS Equipment

o Quotation Cover - VnetlIP Domain Creation o Bi ll of Material - Bill of Material for VnetilP Domain Creation o Priced Quotation Cover RI Item #1 - Quote for WWT CS300 Connectivity

to CCR CS3000 o Optional BOM for Main DCS Connectivity - Bill of Material for Priced

Quotation Cover RI (HSQ7AMB365-Rl), Item #1 o Proposed System Architecture

Page 98: Appendix A

Upgrade \Vastcwater Treatment Facility Phase Il South Jiddah Complex

Appendix 15.3 - Budgetary Project Scope Definition

The project scope definition in the body of the DBSP takes precedence over thi s Budgetary Project Scope Definition. This Scope Definition is provided only as a starting point for Project Proposal development. The Construction Agency and Project Proposal engineering contractor shal1 ensure that this Scope Definition is validated during Project Proposal development, as a means of economical1 y achieving the project's stated Business Objective in the anticipated operating environment. This obli gation, notwithstanding, material changes to this Budgetary Project Scope Definition must be approved by FPD.

The description and attached documents provided in this Appendix 15.3 are for information purposes only. The Construction Agency and its designated Contractor(s) shall be responsible for the providing the detailed scope and design for upgrading the wastewater treatment facilities at the South Jiddah Complex.

The following section numbers are taken from the DBSP and are intended to describe, in more detail , the equipment, piping, instrumentation, and electrical requirements for cost estimation purposes.

4.4 DEMOLITION ACTIVITIES

The following equipment in the Marine Area shall be removed by thi s project. This includes, but not limited to the following:

1. Existing Sand Filters (Y54-D-IA thru E), associated chemical addition tanks and pumps, and backwash tank and pumps

2. Flocculator (Y54-D-5) and Compartment (Y54-D-2) 3. Thickener (Y54-D- I 4. Centrifuge (Y54-D-3A/B) 5. Thickener Feed Pumps (Y54-G-20A/B) - already partially demolished 6. Centrifuge Feed Pumps (Y 54-G-21A/B) - already partially demolished 7. Backwash Wastewater Basin (Y54-D-4) 8. Other equipment noted in Figures 14 and 16 thru 18 in Appendix 15.2

The site for the above equipment items, which are not currently in service, shall be cleared of all associated aboveground piping, structures, foundations, etc. to allow space for new equipment installed by this project. Unless complete removal is required for the installation of new equipment, existing buried piping, structures, and foundations shall be removed to a level minimum 300mm below grade and the remaining portions abandoned in place. Figures 14 and 16 thru 18 in Appendix 15.2 indicate the general location and details of the abovementioned items required to be demolished.

Existing underground firewater piping at the site of the new Phase II wastewater treatment equipment may require demolition, in part, to accommodate installation of new equipment and new area firewater mains.

Each of the existing sanitary sewer basins (ST-OI thru ST-07 and tank farm) consists of oxidation compartments filled with packing and digestion compartments. All solid build-up in each of the digestion compartment and rocks (packing) in each of the oxidation compartments and shall be removed and disposed in approved landfills. Any existing partition or baffles which Sumps shaH be inspected and any repairs required shall be carried out by this project. Existing submerged pumps (two per sump) shall be removed. The existing sanitary wastewater lines between the lift stations and the irrigation pond shall be

B-10-00473 DBSP Pages J of II

Page 99: Appendix A

)

Upg rade Wastewater Treatment Facility Phase II South Jiddah Complex

abandoned-ill-place or removed if it interferes with the installation of the new lines. A typical existing sanitary sewer sump (ST-OI thru ST-07) is shown in Figure 13 Appendix 15.2.

7.1 PHASE II WASTEWATER TREATMENT FACILITIES IN MARINE AREA

Equipment costs, noted in parenthesis below, are provided by Siemens (per attached quotation). The cost (FOB jobsite) is for the total number of units specified and does not include interconnecting piping nor installation cost.

7.1.1 New Equalization Tanks and Tank Mixers

Table 7-1. Equalization Tanks and Mixers - Preliminary Design Summ ary

Item .. : :'.': 'SDeCificaiion . .

Eq ualizat ion Tanks (US $ 780,000) Number of Units 2 Tank Volume 650,000 gallons each Dimensions IBM dia. X 10M high (60 FT x 33 FT) Type Atmospheric, Open Top Material Carbon Steel, Internally coated Special Requirements API doors to allow access for cleaning Tank Mixers (US $ 375,000) Number of Units 8 (4 per Tank) Type Propeller Side Entry Material Stainless Steel Shaft and Propeller Motor llkW each Grit Cham ber (US S47 ,000) Number of Units I Capacity 50,000 gallons per day Type Motorized Screw Type Motor l.lkW Drum Screen;; (cost included in MBRUnits) Number of Units 2 (I or 2 operating) Capacity 25,000 gallons per day each Type Perforated Screen cylinder, with spray

system Motor 0.5kWeach Piping Requirements Included under 7.1.2 MER System

7.1.2 MBR System

Table 7 -2. MBR System - Preliminary Design Summary

Item I SDecification MBR Feed Pumps (US $ 140,000) Number of Units I 3 (2 operating, I spare) TypelMaterial I Centrifugal 316SS Impeller/Casing

B-IO-00473 DBSP Pages 2 ofll

Page 100: Appendix A

Upgrade Wastewater Treatment Facility Phase II South Jiddah Complex

Item Specification Capacity 160 M /Hr@80 kPa (70S gpm@12 psi) each Motor 15kW each MBR Units (US $ 6,527,000) Number of Units 2 x 75% (designed for parallel operation) Average Daily Flow 3975 M'/day (1 ,050,000 gallons/day) Peak Hourly Flow 4542 M /day (J ,200,000 gallons/day) Maximum MLSS 20,000 mgIL Concentration Aeration Tanks (cost included in MHR Units) Number of Units 2 Working Volume 1135 M (300,000 gallons) each Dimensions 15M dia. X 7 M high (SO FT x 23 FT) Type Atmospheric, Open Top Material Carbon Steel, Internally coated Special Requirements 316SS bubble diffusers; common inlet splitter box Sludge Handling Equipment Sludge Pumps (US$ 31,000) 2 x 35 M' /Hr@100kPa(150 gpm@15psi) each

Motor: 7.5 kW each Sludge Sump (US$ 50,000) 4.8M W x 12.6M L x 2.7 M H (J6FTx 41FTx 9FT) Sludge Drying Beds (Note Ml) 2 x 600 M each M08Tanks (cost included in MI3R Units) Number of Units 2 Type Rectangular Dimensions 6.3 W x 4.1 M Lx 3.1 M H Material Carbon Steel, Internally Coated Membranes (cost included in MUR Units) Quantity 640 Type Hollow Fiber Type AerationIM08 Blowers (c.ost included in 1\1I3R Units) Number of Units 3 (2 operating, I spare) Type Centrifugal Capacity 7900 NM' /Hr@70 kPa (5000 8CFM@ IOpsi) each Motor 225 kW each M08 Recirculation Pumps (cost included in MHR Units) Number of Units 2 (1 operating, I spare) TypelMaterial Centrifugal 316S8 Impeller/Casing Capacity 2050 1\1' /Hr@80 kPa (9000 gpm@ 12 psi) each Motor ISO kW each Blower Baghouse Filters (cost included in MBR Units) Number of Baghouse Units I Capacity Range 2280- 19150 CFM Filtration Area 4560 ft No. of Filter Elements 24 Cleaning Automatic Air Pulse Filtrate Pumps (cost included in MBR Units) Number of Units 4(2 operating, 2 spare) TypelMaterial Centrifugal 316SS Impeller/Casing Capacity 230 M /Hr@100kPa(1000gpm@15 psi) each

8 -10-00473 DBSP Pages 3 ofl1

Page 101: Appendix A

Upgrade \Vastewater Treatment Facility Phase II So uth Jiddah Complex

Item I Specification Motor 18.75 kW each

PAC Storage Silo (cost included in MBR Units) Number of Units I Capacity 23 M' (815 FT'), - 14 day PAC storage Dimensions 3 M dia. x 10M H (incl. accessories) Type Cylindrical vertical Material Carbon Steel, Internally Coated Accessories Discharge hopper, dust filter, bin activator, rotary

airlock fi lter, wetting cone, eductor, level indicators, ladder

PAC Fill System (cos t inclnded in MBR Units) Pneumatic piping/tubing and Included with PAC Si lo; Direct connection to bulk filter(s) PAC delivery truck with blower PAC Slurry Pump (cost included in MBR Units) .

Number of Uni ts 2(1 operating, I spare) TypelMaterial Centrifugal 316SS Impeller/Casing Capacity 25 M' IHr@300 kPa (110 gpm@45 psi) each Motor 7.5 kW each Acid Dosing Units (cost included in MBR Units) Acid Metering Pumps 2 x 10 IIhr each; 0.6kW each Acid Storage Tank 1, 1600 L, FRP Caustic Dosing Units (cost included in MBRUnits) Caustic Metering Pumps I 2 x 10 IIhr each; 0.6kW each Caustic Storage Tank I I , 1600 L, carbon steel Hypochlorite Cleaning Units cost included in MBR Units) Hypochlorite Metering Pumps 2 x 3 m'/hr each Hypochlorite Storage Tank I, 8000 L (operating Volume), FRP Piping Requirements - See Estimate Figure 4 (this Appendix) & Figure 3 (Appendix 15.2) W' Titanium Tubing 50FT Yo" SS Tubing 100 FT 3" FBE-CS (12LEOU) 150 FT, 10 gate valves 4" CLCS (12LCOU) ISO FT, 5 gate valves 8" CLCS (l2LCOU) 500 FT, 8 gate valves, 3 check valves 10" CLCS (l2LCOU) 180 FT, 9 check valves 12" CLCS (l2LCOU) 100 FT, 8 check valves 24" FBE-CS (12LEOU) 40 FT, 2 gate valves 30" FBE-CS (12LEOU) 40 FT, I gate valves

Noles : Ml. Estimated cost for sludge beds is $255/ M' as provided by SCEC (e-mail 12/18/2005).

7.1.2 Second API Separator and Sludge Pumps

Table 7-3 API Separator - Preliminary Design Summary

Item I Soecification API Separator (US$ 1 200,000)

B-1 0-004 73 DBSP Pages 4 ofl1

Page 102: Appendix A

Upgrade Wastewa ter Treatment Faci lity Phase II South Jiddah Complex

Ite m ~ecification

Type of Oil Skimmed Full range, gasoline to crude oi l Nwnber of Units J Unit Capacity (each) 1450 gpm maximwn Dimensions 26MLx4MWx2MD Design InfluentlEfIluent Oil & Grease <J,OOO mgIL / <200mgIL Design Influent TSS 500 mgIL Design Effluent TSS 50 - 100 mgIL Oil Specific Gravity Range (25 - 40' 0.838 - 0.847 (to be verified) C) Wastewater Density Range (25 - 40' 0.998 - 1.004 g/cm' (to be verified) C) Primary Oi l Skimmer T-Disk type and slotted pipe skimmers

Skimmer Motor: 1.5kW (2 HP) Sludge Removal Chain and Flight Scraper

Bottom hopper equipped with water jets/drain

) Scraper Motor: 1.5kW (2 HP) API Sludge P umps Number of Units 2(1 operating, I spare) TypelMaterial Centrifuga\ 316SS Impeller/Casing, Non-clog Capacity 27 M'1Hr@55 kPa (120 gpm@8 psi) each Motor 2.2 kW each Piping Requirements - See Estimate Figure 5 (this Appendix) and Figure 3 (Appendix 15.2) 4" CLCS (12LCOU) 40 FT, 2 gate valves 8" CLCS (12LCOU) 40 FT, 2 gate valves 12" CLCS (l2LCOU) 40 FT, 2 plug valves

7.2 NEW CRUDE AND PRODUCT SKIM TANK SYSTEMS IN TANK FARM AREA

Table 74. Tank Farm Skim Tank Systems- Preliminary Design Summary

Ite m SpeCification Tank Farm "A" Tank Farm "B"

Skim Tanks (USS 80,000) CUSS 199,500) Number of Units J J Working Volume 450 M' (120,000 gallons) 1200 M' (320,000 gallons) Dimensions 9MDiax 8MH I5MDiax 8 MH Type Atmospheric, Cone Roof Atmospheric, Cone Roof Material Carbon Steel, Intemally coated Carbon Steel, Internally coated Accessories Oily water interface detection Oily water interface detection

Skim Tank Pumps Number of Units 2 (I operating, 1 spare) 2 (I operating, 1 spare) TypelMaterial Centrifugal, 316SS Impell er/Casing Centrifugal, 316SS Impeller/Casing Capacity 23 M IHr@140 kPa M IHr@ 140kPa

(100 gpm@20 psi) each60 (250 gpm(aj20 psi) each Motor . J kW each 3 kW each Oil Recovery Tank Number of Units I I Working Volume 4 M' (1 ,000 gallons) 4 MO (1,000 gallons)

B-IO-00473 DBSP PagesS of 11

Page 103: Appendix A

Upgrade \ Vas tewater Treatm ent Faci lity Ph ase n South Jidd ah Complex

Item Soecification Type Atmospheric,Flat Roof Atmospheric,Flat Roof Material Carbon Steel, Internally coated Carbon Steel, Internally coated Oil Recovery Pump Number of Units 2 ( I operating, I spare) 2 ( I operating, I spare) TypelMaterial Centrifugal, 316SS Impeller/Casi ng Centrifuga l, 316S8 Impeller/Casing Capacity II M IHr@350 kPa II M /Hr@350 kPa

(50 gpm@50 psi) each (50 gpm@50 psi) each Motor I kW each I kW each Piping Requirements (Total for Tank Farm A and B) - See Estimate Figure 7 (this Appendix) & Figure 6 (Appendix 15.2) 3" CS (I CA9P) 2250 FT, 10 gate valves, 4 check valves 4" CLCS (12LCOU) 100 FT, 5 gate valves, 2 check valves 6" CLCS (12LCOU) 200 FT, 6 gate valves, 2 check valves 8" CLCS (l 2LCOU) 100 FT, 2 gate valves

7.3 N EW W ASTEWATER COOLERS

Table 7-5. Wastewater CoolerSystems- Preliminary Design Summary

Item I Soecification I Zone II & III I Zone IV

Wastewater Transfer Pumps Number of Uni ts 4 (2 operating, 2 spare) 2 (l operating, I spare) TypelMaterial Centrifugal, 316SS Impeller/Casing Centrifugal, 316SS Impelle r/Casing

Self-prim ing Self-priming Capacity 23 M'/Hr@IOO kPa 23 M' IHr@100 kPa

(l00 gpm@15 psi) each (100 gpm@15 psi)each Motor I kW each I kW each New Manholes and Valve Boxes for Pumps Manholes 1.5M x I.5M x 2.5M D (2 Each) Valve Boxes I .5M x I.5M x 2.5M D (2 Each); I.5M x 1.5M x 3M D ( I Each) Wastewater Coolers Number of Units 2 I Duty 1.5 mmBTUIhr 1.5 mmBTUIhr Type Plate and Frame Plate and Frame Material Titanium Titanium Area 1000 IT 1000 IT Piping Requirements (Total for all Zones) - See Estimate Figure 9 (this Appendix) & Figures 8A, 8B, & 8C (Appendix 15.2) 3" FBE-CS (12LEOU) 75 FT, 3 control valves 4" CLCS (l 2LCOU) 1830 FT, 12 gate valves 10" RTR (l2FEOU) 60 FT (buried) 16" RTR (l2FEOU) 60 FT (buried)

7.4 RETROFITTING SEAWATER C OOLERS B ACKWASH S YSTEM

B-IO-00473 DBSP Pa ges 6 of] I

Page 104: Appendix A

Upgrade Wastewaler Treatment Facility Phase II South Jiddah Complex

Table 7-6. Coolers to be R etrofitted

Sea Water Service Existing Cooling Existing Cooler Tag# Water Line Size 'Back

Flushing .Supply Return Lines Sizes

Zone II Y02-E-216 Crude Column OVHD Condenser 4" 4" 4" Y06-E-235 Light Vacuum Gas Oi l Trim Cooler 4" 4" 4"

Y06-E-237C 3'" Stage Inter Condenser 6" 6" 6" Y I4-E-223 Debutanizer OVHD Sub-Cooler 4" 4" 4" YI4-E-226 Splitter OVHD Cooler 3" 3" 3" YI4-E-230 Deethanizaer OVHD Condenser 3" 3" 3" YI4-E-231 Depropanizer Bottoms Cooler 4" 4" 3" YI4-E-233 Depropanizr OYHD Condenser 4" 4" 3" YI4-E-243 Splitter Bottom Trim Cooler 4" 4" 6"

) Amine Unit Y24-E-4 Amine Trim Cooler 6" 6" 6"

Piping Requirements (rotal for all Exchangers - assume 50' per coolery - See Figure 10 (this Appendix & Figure 2 (Appendix 15.2) 3" FBE-CS (I2LEOU) 200FT 4" CLCS (l2LCOU) 150 FT 6" CLCS (12LCOU) 150 FT

7.5 SANITARY WASTEWATER COLLECTION SYSTEM

Table 7-7. Sanitary Sewage System- Preliminary Design Summary

Item SpeCification Sanitary Sewage Lift Pumps Number of Units 26 TypelMaterial Submerged, trash/grinder, 316SS Motor 2 kW each Capacity 5 M' IHr@350 kPa (20 gpm@ 50 psi) each New Sumps ST-09 & ST-JO 1.5M x 1.5M x 2.5M D ST-101 1.5M x 1.5M x 2.5M D

Bar Screens for Sanitary and Intermediate Sump Number of Units 12 Type TBD Material Stainless Steel Intermediate Sump Pumps Number of Units 2 TypelMaterial Self-Priming , trash/grinder, 316SS Capacity 8 M' /Hr@ 100 kPa (35 gpm@ 15 psi) each Motor I kW each New Intermediate Sump

I 2.5M x 2.5M x 2.5M D

B-JO-{)0473 DBSP Pages 7 of! J

Page 105: Appendix A

Upgrade 'Wastewater Treatment Facility Phase II Sout h Jiddah Comp lex

Item Specification P iping Requirements - See Estimate F igures llA & 1lB (tbis Appendix) 3" FBE-CS (I2LEOU) 6400 FT (on existing sleeperway); 6 ball valves, 6

check val ves 3" RTR (I2FEOU) 5000 FT (buried), 16 ball valves, 16 check valves

7.6 MODIFICATIONS TO EXISTING EQUIPMENT AND SYSTEMS

7.6 .1 Sanitary Wastewater Equipment

Ex isting sewage pits ST-O I thru ST-07 consists of three digestion compartments, a filter tank, an oxidation compartment filled with distribution piping packing, and a well for the submerged pumps. , This project wi ll be required to remove all solids build-up, packing materials, unnecessary piping, etc. in each of these compartments and dispose in approved landfills, The may also consider consolidating or bypass compartments to form a single contiguous basin.

7.6.2 Firewater systeln Table 7~ Firewater System

. , . Specification Item " ,

Piping Requirements - See Estim ate Figures 14 & 15 (this Appendix) 3" FBE-CS (I2LEOU) 200 FT, 8 gate valves 4" CLCS (l2LCOU) 700 FT (on existing pipe rack), 4 gate valves 6" CLCS (l2LCOU) 400 FT (on existing pipe rack), 8 gate valves 10" RTR (l2FEOU) 4000 FT (buried), 17 hydrants, 6 hose reels

7.6.3 Other Non-Electrical Uti lity Systems

Table 7-9 Non-Electrical Utility System

Item I Snecification Piping Requirements 2" FBE-CS (l2LEOU) water I 1000 FT (on existing pipe rack), 4 gate valves 2" Galvanized CS (l2C GOU) air I 1000 FT (on piperack), 12 gate valves

7.7 ELECTRl CAL AND INSTRUMENTATION REQ Ul REM<NTS

7.7. 1 Electrical

The electrical scope of work for this budget item includes the addition of a new unit substation fed from Substation R via a single 13.8 kY underground circuit to facilitate the new electrical loads in the marine area. This project will also provide power supply for new and upgraded equipment in the Refinery and Tank Farm Area via new and existing circuits from the nearest suitable substation,

B-IO-00473 DBSP Page,S of II

Page 106: Appendix A

Upgrade Wastewater Treatment Facility Phase II South Jiddah CompJex

J6

17 .

18

.:., .. " r~,pti.ol? .. ,

Complete substation (8m x 10m) support facilities as required by Saudi Aramco standards. See Figure 21. The facilities shall include Annunciator System, Fire Alann System, beam type smoke detectors, HV AC system, Substation Auxiliary Power Supply System, and equipment & personnel access doors. The Substation's major electrical equipment shall include but not be limited to Items 2-7.

Circuits

A

4X, with

8-10-00473 D8SP

Each.

Assembly

Assembly 2

Meters 15

Each 3

Each

Each 2

Each 2

meters 1500

meters 1,000

meters 15,300

meters 15,300

Each 28

Each 5

Lot

Lot

Lot

Lot

Pages 9 of I I

Page 107: Appendix A

)

Upgrade Wastewater Treatment Facility Phase II South Jiddah Complex

7.7. 1.2 Cathodic Protection Requirements

Cathodic protection shall be provided for the following items, which may be added, replaced andlor relocated by this project:

• Pipe risers for fire protection devices • Buried isolation valves • Other buried metallic piping • New Tanks Bottoms

7.7.2 Instrumentation

In order to expand and integrate the existing WWT and CCR Yokowaga systems over a V­Net data highway, a new domain shall be created, the CCR operating system shall require upgrading from CS3000 3.03 to V-Net IP, the controllers IP cards shall be upgraded and the control room cabling shall be replaced by V-Net or UTP. New communications interface modules will be installed in existing JlO racks in Control Room #1 and the WWT control room and new fiber optic cabling will be installed between these two systems. Redundant fiber optic cabling will be required from the CCR to the WWT control room .

Estimates and additional information provided by Yokowaga are included in the following files:

• Quotation Cover - VnetIIP Domain Creation

• Bill of Material- Bill of Material for VnetlIP Domain Creation

• Priced Quotation Cover RI Item # I - Quote for WWT CS300 Connectivity to CCR CS3000

• Optional BOM for Main DCS Connectivity - Bill of Material for Priced Quotation Cover RI (HSQ7AMB36S-RI), Item #1

• Proposed System Architecture

Estimated JlOs for this project are as follows:

Equipment DCS

AI AO DI DO Equalization Tanks (2) 8 6 2 1

Equalization Tanks Mixers (4) 12 4

MER Feed Pumps (3) 3 1 18 9

MER Aeration Tanks (4 MixerslTank, 2 Tanks) 8 2 14

MER Air Release 3 I

Sludge Handling - Pumps (2) 6 2

MOS Tanks (2) 8 36 8

AeriationIMOS Blowers (3) 6 3

MOS Recirculation Pumps (2) 2 2 18 6

MOS Filtrate Pumps (4) 4 4 34 12

PAC Slurry Pumps (2) 6 2

Acid Metering Pumps (2) 2 2 6 2

B-JO-00473 DBSP Pages J 0 of 11

Page 108: Appendix A

)

Upgrade Wastewater Treatment Facili ty Phase 11 South Jiddah Complex

Equipment . DCS

AI AO DI DO .

Acid Storage Tank 2

Caustic Metering Pumps (2) 2 2 6 2

Caustic Storage Tank 2

Hypochlorite Metering Pwny..s (2) 2 2 6 2

Hypochlorite Storage Tank 2

API Separator 4 17 5

API Sludge Pumps (2) 6 2

Skim Tank Pumps (2) 6 2

Skim Tank 2

Oil Recovery Pumps (2) 6 2

Oil Recovery Tank (2) 2 2 6 2

WW Transfer Pumps (4) 12 4

WW Coolers (3) 9 3 Sanitary Sewage Lift Pumps (13 Sumps, 2 Pumps Each) 13 104 26

Intermediate Swnp Pumps (2) 2 8 2

Total 77 26 338 99

7.8 COMMUNICATION REQUIREMENTS

This project will not provide any additional or new permanent communication installations.

The contractor's temporary construction communication requirements will be specified in the detailed design and provided by the contractor, with Saudi Aramco assistance, where required . Any construction communications needs of Saudi Aramco PMT will be provided and funded by this project.

7.9 BUILDINGS AND STRUCTURES

A common building shall be provided with separate rooms for the AerationIMOS Blowers and Sodium Hypochlorite Storage Tank. The building, with an approximate size 125 M' (8M x 16M), shall be constructed of concrete blocks and shall be air-conditioned. Approximate HV AC (once through chiller system) requirement is 35 tons (- 60kW).

A common sunshade, approx. 12M x 20M, with open sides shall be provided for MER System (MOS Tank and Filtrate Pumps).

A new Substation Bui lding shall be provided in the Marine Area. The building, with an approximate size 80 M', shall be constructed of concrete blocks and shall be air-conditioned. Approximate HV AC (once through chiller system) requirement is 5 tons (- IOkW).

B-10·00473 DBSP Pages 11 oflI

Page 109: Appendix A

SIEMENS Saudi Aramco

Budgetary Proposal

Jeddah Refinery

Wastewater System

PetroTM PACT-MBR

Proposal # 1 Y0025BPR rev.1

15 March, 2007

L~~I~!~:M0t~~1f:Ji,;'J;iiJ':;,i.. ..... . '. ' ..... :c07[~~~:r~~: p,~s)~O~~.RE ··i\:\':;;}l[i;~~fii{~~t~~~~0~i:;;'··::·'·" ':"'," " Thi.s 'proposal, Inelv'ding illidrawings aecompariyi~g it, containsinformation'lf a e?nfide.ntial:n<ittiie.:. Purchaser agrees not iciu~El' ;the:" infcihna!i6n , 2oiita:inM herein in any mann'er thai may 'be ' detriineritat"to: trl e in(er~~ts ' C;f Sieine'ns Water

~_~~J~lf~~.s."".. '.' ,." ··i[f!j~!ri Siemens Water Technologies Corp. 301 West Milital)' Road

Rothschi ld, WI 54474 Tel: 715-359-3219 Fax: 715-355-3219

Page 110: Appendix A

)

SIEMENS Table of Contents

EXECJjTIVE SUMMARY

1. SYSTEM PROCESS DESCRIPTION

1.1 PACT-MBR Process Description

2. DESIGN BASIS

2.1 Influent Specification

2.2 Effluent Specification

2.3 Design Parameters

2.4 Capacity

2.5 Estimated Operational and Utility Requirements

3. WARRANTIES

3.1 Process Performance Guarantee

3.2 Mechanical Warranty

4. SCOPE OF SUPPLY - COMPLIANT OFFER

4.1 Equipment Description

4.2 Scope of Supply-Services

4.3 Scope of Supply-Excluded Items

5. COMPLIANCE STATEMENT- COMPLIANT OFFER

5.1 Definitions of the Compliance Column

5.2 Compliance Statement Table

6. DRAWINGS

6.1 Plot Plan, PFD

7. COMMERCIAL

Confidenliallnformalion

© 2007 Siemens Waler Technologies Corp.

- 2 -

Private and Confidential

Page 111: Appendix A

)

SIEMENS

AUgUst 6, 2007

Mr. Hesharn A. N Musajid Manager Environmental :protection Department Saudi Ararnco E-3600 Dhahran, 31311 Saudi Arabia

Dear Mr. Al Musaiid:

As per my commitment of Tuesday July 31, 2007, I have followed up wit!) the Siemens Water Technologies (SWT) tearn and would like to cOhfirm the following. swr hereby releases YOll and Sau.di Aramco from any obligations contained in the Confidentiality Agreement dated Septembet21, 2006 covering. ail informatio.n provided under Work Orders #7 and #8, the DBSP for the Jeddah Refinery project (BI-10-00473), conslliting support provided to Sofcon .and Aramco oil the Juaymah Gas Pllmt Project, Work Order #9 (Ras Taililfa Refinery disposal water upgrade conceprual design and cost estimation project) and the technical paper prepared for presentation at WEFrEc for session 76-4PM. You are free to utiliZe all information and drawings contained in these docUments as you deem appropriate.

We apologize fot both th.e inadequate and poor communications as well as the corresponding confusion we generated relating to the technical information coniained in these materials.

Sincerely,

lemens Willer Tee nologies, Corp. Gerald E. Rogers Director HPIICPI and Oil & Gas Systems

Siemens Water Technologies Corp. 301 West Mili tary Road Rothschild. WI 54474

Tel: (7 15) 359·72 11 Fax: (7 15) 355-321 9 www.siemem .comJwClter

Page 112: Appendix A

)

SIEMENS Private and Confidential

EXECUTIVE SUMMARY

We at Siemens would like to thank you for the opportunity to offer Siemens equipment and services for your waste water treatment needs as part of the MBR bench study projects on treating a modified Jeddah refinery wastewater and the Juaymah Gas Plant wastewater.

We understand the important nature of specifications, end user, schedule, engineering and management expertise, and process and mechanical reliability. Our experience with Saudi Aramco will help you finalize procurement, design, and construction of the waste water treatment systems on-time and on­budget. Our offer is compliant with Aramco redundancy, material and inspection standards and specifications, except where specifically noted.

Dependent on project timing, our project manager for this project will be Mr. Joseph Momont. Mr. Momont is not only one of our resident PM experts on Membrane BioReactors, he has recently executed two large orders for Saudi Aramco. He is familiar not only with Saudi Aramco specifications and Saudi fabricators, but also our ISO-9001 project management and fabrication requirements . He will ensure that equipment design, engineering submittals, fabrication techniques, and documentation are carried out per the project and ISO 9001 requirements.

Per SAES A-104, all of the equipment is designed for automatic operation (and automatic switchover) , will be skid mounted, pre-piped and wired, and shop tested wherever feasible .

The Petro™ PACT-MBR Membrane Bioreactor system has been designed with ease of installation and operation in mind.

We have already engineered solutions to meet the requirement for low maintenance, by reducing the amount of rotating equipment. Sludge wasting pumps have been eliminated through multiple duty with the MOS recirculation pumps. Membrane scouring blowers have been eliminated by sharing duty with the bioprocess air blowers-all of which reduce electrical/MCC and other infrastructure costs. We have also suggested alternates to the specifications, in order to minimize capital cost and lead time. In this fashion , we have addressed desire for quick installation, and the need for low maintenance, while supplying an Aramco-approved-Iow cost solution.

The current bench testing program has shown the conventional MBR system to practically remove all of the BOD5 from the Jeddah wastewater. However, COD removal has been marginal to meet PME marine discharge requirements. The Jeddah wastewater was found to be relatively difficult to treat, with a relatively long acclimation phase and lower COD removal than treatment with the PetroTM PACT-MBR, potentially exhibiting symptoms of bio-refractory or bio-inhibitory compounds in the wastewater.

We look forward to discussing our Petro ™ PACT-MBR technology with you in the near future. The following briefly summarizes the advantages of using the Petro™ PACT-MBR.

Confidential Information

© 2007 Siemens Water Technologies Corp .

. 3 .

Page 113: Appendix A
Page 114: Appendix A

SIEMENS Private and Confidential

placed in the aeration tank - the Grease and Scum are in direct contact with the membranes. This results in a build up of scum in the membrane tank as there is no method of removal. Due to scum build up, if membranes have to be removed from the aeration Tank, this grease and scum come in direct contact with the membranes, and cause fouling . The Petro ™ MBR addresses this important design consideration using a vertical flow pattern in the MOS Tank-and uses overflow weirs to return the scum back to the aeration tank for further treatment.

2) The distribution of the mixed liquor is uniform in upward direction. The concentration of the mixed liquor is uniform in the flow direction-across the entire tank cross section. In other designs, where no mixed liquor distribution system is present, the MLSS concentration increases as the flow proceeds to the outlet. As a consequence, the efficiency of the membranes closer to the outlet is reduced-exerting more pressure on the other membranes to keep pace with influent flow. The Petro ™ MBR keeps the sludge viscosity equivalent on all membrane bundles-resulting in even duty and longer operationa l life for each membrane.

) 3) The energy requirement for aeration and scrubbing purposes is lower then in the systems where the membranes are placed in the aeration tank.

4) Membranes are automatically cleaning in-place in the separated MOS Tank. This requires little to no operator intervention, in comparison to systems that require membrane removal for cleaning­or cleaning in an aeration Tank.

5) Siemens' patented two-phase jetting is utilized to ensure membrane bundles remain at peak permeability. With continuous cross flow scouring with both air and mixed liquor, all membranes operate in the same liquid viscosity-which means all membranes operate in an equivalent capacity. The end result is more water produced with less maintenance.

Today, Siemens membrane plants treat more than 3,750,000 m3/day globally in applications ranging from wastewater reclamation to drinking water to high-purity industrial water, proving the long-term stable performance of Siemens' membranes. Siemens' leadership in engineering, research and development, together with the ISO 9000 certification, and the greatest experience in the global membrane market and Petroleum based market, ensures the minimum risk across all facets of project execution.

In addition to installed capacity, it is worth noting that Siemens' hollow-fiber membrane manufacturing facility is the world's largest. Located in Windsor, Australia the facility is capable of producing 22.7 million square feet of membrane area per year .

Siemens is a world-leader in control and instrumentation engineering with unmatched experience in the execution of successful projects. With a considerable amount of instruments and control in these MBR plants, Saudi Aramco can be assured of continued reliable performance with Siemens.

Confidential Information

© 2007 Siemens Water Technologies Corp.

- 5 -

Page 115: Appendix A

SIEMENS Private and Confidential

Thank you for your interest in Siemens. We hope that in your review of our proposal , you will find the information provided complete and that you will conclude that Siemens offers the best overall value for your project. Should you require any additional information please contact:

Siemens Ltd. Saudi Arabia PO Box 719 AI Khobar 31952 Saudi Arabia Mr. Liaqath Shary Baig Business Development Manager Phone: 966 3 882-6506, x 4114

Or

Mr. Bob Wenta Email: [email protected]

Confidential Information

© 2007 Siemens Water Technologies Corp.

- 6 -

Page 116: Appendix A

)

SIEMENS Private and Confidential

1. SYSTEM PROCESS DESCRIPTION

1.1 PACT - MBR PROCESS DESCRIPTION

An average of 4900 m3 per day of waste water will enter the Petro ™ PACT -MBR plant.

The influent will come from two different sources:

1) the sanitary wastewater sewer (sanitary wastewater - average flow: 57 m3/d - 15000 gpd)

2) the Jeddah Refinery (industrial wastewater - average flow: 4843 m3/d)

The industrial wastewater will be treated in a Walnut Shell Filter in order to remove its oil content and will be sent to the equalization tank.

The sanitary wastewater will be coarse screened and de-gritted by means of a mesh (3 mm spacing) coupled with a grit removal chamber. A screw conveyor placed in the feed pipe will carry the separated solids and discharge them into a hopper.

The de-gritted effluent will be screened again by means of an enclosed perforated plate drum screen and sent to the equalizations tank. The screens (1 duty + 1 stand by) will employ 1.5mm perforated plate to remove fibrous material from the water. The screen utilizes high pressure water to backwash the drum. Screened solids removed from the process flow out of the system by gravity into a covered collection bin.

The two streams (sanitary and industrial wastewater) will be equalized in two above grade mixed equalization tanks. MBR feed pumps will then transfer the water (through a flow meter and a temperature probe) to a splitter box and from there to the two 75% treatment trains . PAC will be added to the splitter box.

Each biological treatment system will be made up of one aerated treatment stage dedicated to the oxidation of BOD and ammonia to CO2 and N03-. Denitrification is not required at this time. In the aeration pH will be adjusted by means of a caustic and an acid dosing system.

Aeration tanks 1 and 2 will be equipped with air headers and coarse bubble diffusers to provide dissolved oxygen to the biomass liquor. Dissolved oxygen will be monitored in each aeration tank, the level of which controls the air supply from the blowers. Intake air for blowers will be drawn from the ambient air and filtered by a baghouse filter and an inlet guard filter mounted on each blower.

The mixed liquor will flow by gravity from the Aeration Tanks 1, 2 to the MOS Tanks 1, 2 respectively, which house the membrane filters. Each MOS tank will be equipped with a piping distribution system with Jumbo Jet® diffusers to evenly distribute mixed liquor to each of the membrane modules. Air flow to the MOS tanks-from AerationlMOS Blowers will be controlled by a flow meter, and will enter each membrane rack in the MOS Tanks 1, 2. Internal Membrane Rack piping will distribute air to the bottom of each membrane bundle to provide a two-phased flow of air and sludge across each membrane bundle to continually scour and provide fresh water to the membrane surfaces. The even cross-sectional up-flow of thickening mixed liquor overflows the

Confidential Information

© 2007 Siemens Water Technologies Corp.

- 7 -

Page 117: Appendix A

)

SIEMENS Private and Confidential

MOS tanks 1, 2 and flows by gravity to a suction header from where 2 MOS recirculation pumps will pump it to the splitter box located at the front end of Aeration Tanks 1, 2 to maintain the system mixed liquor solids at the required concentration.

The MOS tank and the Aeration tank will be provided with spray nozzles to avoid foaming issues on the liquid surface.

Mixed liquor solids will be wasted from the system via the discharge of the MOS Recirculation Pumps on a timer-controlled schedule. A flow meter on the wasting line will totalize the waste flow to a pre-controlled set point whereby the wasting valve will be closed. The sludge will be diverted to a sludge sump and from there it will be pumped (by means of sludge transfer pumps) to the drying beds.

The filtered water will be drawn through the membranes by means of Filtrate Pumps. Level transmitters in Aeration tanks 1, 2 control VFDs on the respective Filtrate Pumps, allowing Aeration tank level to fluctuate based on current MOS tank functionality and membrane TMP.

Periodically, based on a timer, the flow from the filtrate pumps will be stopped to allow the membranes to relax. This process allows the fibers to regain their original size and shape. During this period, the MOS Feed flow and MOS scouring air remain on to the MOS tank to continually scrub the membranes. The relaxation and continuing air and sludge feed past the membranes keeps the membrane permeability high.

Maintenance clean will be also carried out on a weekly basis. During MC the flow through the membranes will be reversed (backwash) and a chlorinated solution will be pumped by the filtrate pumps to the membranes' lumens.

After a sustained period of operation, relaxation and MC alone are not enough to maintain membrane permeability. Based on transmembrane pressure and flow, an alarm signal will alert the operator that a Clean-In-Place (CIP) cycle is required to thoroughly clean the membranes . When convenient for the operator, the CIP procedure will initiate, which proceeds automatically. The CIP begins by stopping the associated feed flow to the MOS tank under cleaning, opening the MOS Tank drain valve and allowing the tank to drain to the system drain. After the MOS Tank is empty, the system will utilize plant water to effect a rinse o(the tank and membrane modules. The next step involves a fill of the MOS Tank for rinsing through the MOS feed piping This fill is accomplished via the Filtrate Pump. The MOS Tank is again drained to the system drain. After the MOS Tank is empty, the system will conduct one final spray rinse of the tank and membranes. After completion the MOS tank is once again filled with filtrate from the on-line Filtrate Pump. At this time, hypochlorite is introduced to the MOS Tank via Hypochlorite Transfer Pumps located in the control building. The Sodium hypochlorite transfer pumps will add hypochlorite for a preset period of time during the fill to make up a solution with a preset free chlorine concentration. The Filtrate Pumps corresponding to the train undergoing CIP turns on after the MOS Tank has been filled. The Filtrate Pump will take suction from the MOS Tank and recirculate the hypochlorite solution around the MOS Tank and across the membranes. The recirculation continues for a preset period of time after which the PLC signals the end of the CIP procedure.

After the CIP procedure is complete, the tank is drained to the system equalization tank via the system drain. After the tank is drained, the system will initiate a re-fill of the MOS Tank with the corresponding mixed liquor from the corresponding aeration tank. Once the MOS Tank is full, the Filtrate Pump will resume and the system is back on line.

Confidenliallnformalion

© 2007 Siemens Waler Technologies Corp.

- 8 -

Page 118: Appendix A

)

SIEMENS Private and Confidential

2. DESIGN BASIS

This section details the design basis of the equipment offered.

2.1 Influent Specification

Effluent quality is based on wastewater influent with the following characteristics :

Table 1.1 Influent Water Quality Specifications

Design Max or Range Parameter Units

Temperature Oeg C 35 Not Available

Suspended Solids (TSS) mg/L 30 Not Available

TKN mg/L 25 Not Available

Ammonia-N mg/L 20 Not Available

Total Phosphorous (TP) mg/L 3.3 Not Available

COO mg/L 850 Not Available

BODs mg/L 360 Not Available

TOC mg/L 175 Not Available

pH - 7.5 Not Available

Alkalinity mg/L as CaCO, Not Available Not Available

Oil & Grease mg/L 20 50

TOS mg/L 10500 Not Available

Total Hardness mg/L Not Available Not Available

Phenols mg/L 10 Not Available

Based on the testing conducted in our Laboratories in Rothschild, WI we don't feel the remaining analytes of SAES A 104 Table 1 will be present in the wastewater at concentrations above PME Effluent Discharge Limits.

Confidential Information

© 2007 Siemens Water Technologies Corp.

- 9 .

Page 119: Appendix A

)

SIEMENS Private and Confidential

2.2 Effluent Specification

The equipment offered will meet the Effluent Discharge Limitations specified in the SAES A 104 -PME discharge. With reference to some specific pollutants the PACT-MBR treatment plant will provide the following effluent :

Table 1.2 Effluent Water Quality Specifications

Parameter Units Weekly average Quality

TSS mgtl < 15

Turbidity NTU 75

NH3-N mgtl < 1

TKN mgtl <5

BODs mgll <25

COD mgtl <150

TOC mgll <50

Total Coliform MPN 2.2

pH 6.0 - 8.4

Oil & Grease mgll <8

TP mgll <1

Phenols mgtl <0.1

2.3 Design Parameters

The equipment offered has been designed around the following parameters:

• Instantaneous membrane flux (normalized at 20· C) : 10.6 11m' hr

• Maximum membrane flux (normalized at 20· C):

• SRT in the biological system

• Maximum MLSS in MOS:

2.4 Capacity

Confidential Information

© 2007 Siemens Water Technologies Corp .

. 10 -

12.4 11m' hr

17 days

20,000 mg/L

Page 120: Appendix A

SIEMENS Private and Confidential

Each system shall be made up of two (2) seventy five percent (75%) capacity trains. Each train . will have the following characteristics:

• Average Daily flow to MBR (after EO) :

• Peak Hourly flow to MBR (after EO):

• Volume of the aeration tank (working volume) :

2.5 Estimated Operational and Utility Requirements

3975 m3/day

4542 m3/day

1135 m3

Table 1.3 represents estimated operational and utility requirements .

Table 1.3 Estimated Utility Requirements

Utility Quantity

Plant water (max) 2 m3/h @ >1.5 bar

Instrument air (max) 40 Nm3/h @ >4.8 bar

Electrical Power consumption @ 100% fiow 450 kW

Solids to disposal, dry wt. basis @ 100% flow 1500 kg/d

Powdered Activated Carbon @ 100% flow 750 kg/d

Sodium Hypochlorite Solution (12.5'10)@ 2 m3/month 100% flow

3. WARRANTIES

3.1 Process Performance Guarantee

Effluent quality out of all MBR systems will be guaranteed. The test methods should use the international Standard Methods.

The MBR system shall produce an effluent quality out of the MOS tank that shall meet the quality standards as stipulated under paragraph 2.2 of this proposal. The average concentration of each pollutant contained in the raw wastewater shall be equal or less than the concentration listed as it "design" in Table 1.1 Influent Water Quality Specifications. The average daily flow and peak hourly flow shall be equal or less than specified under paragraph 2.4 of this proposal.

Confidential Information

© 2007 Siemens Water Technologies Corp .

. 11 .

Page 121: Appendix A

SIEMENS Private and Confidential

The performance test plan and conditions related to the plan are stipulated in the Performance Test Plan that will be supplied for contract approval.

3.2 Mechanical Warranty

Subject to the following sentence, Seller warrants to Buyer that the Equipment shall materially conform to the description in Seller's Documentation and shall be free from defects in material and workmanship. The foregoing warranty shall not apply to any Equipment that is specified or otherwise demanded by Buyer and is not manufactured or selected by Seller, as to which (i) Seller hereby assigns to Buyer, to the extent assignable, any warranties made to Seller and (ii) Seller shall have no other liability to Buyer under warranty, tort or any other legal theory. If Buyer gives Seller prompt written notice of breach of this warranty before 3 years after commissioning (the "Warranty Period") , Seller shall, at its sole option and as Buyer's sole remedy, repair or replace the subject parts or refund the purchase price therefore. If Seller determines that any claimed breach is not, in fact, covered by this warranty, Buyer shall pay Seller its then customary charges for any repair or replacement made by Seller. Seller's warranty is conditioned on Buyer's (a) operating and maintaining the Equipment in accordance with Seller's instructions, (b) not making any unauthorized repairs or alterations, and (c) not being in default of any payment obligation to Seller. Seller's warranty does not cover damage caused by chemical action or abrasive material, misuse or improper installation (unless installed by Seller). THE WARRANTIES SET FORTH IN THIS SECTION ARE SELLER'S SOLE AND EXCLUSIVE WARRANTIES. SELLER MAKES NO OTHER WARRANTIES OF ANY KIND, EXPRESS OR IMPLIED, INCLUDING WITHOUT LIMITATION, ANY WARRANTY OF MERCHANTABILITY OR FITNESS FOR PURPOSE.

Confidential Information

© 2007 Siemens Water Technologies Corp .

. 12 ·

Page 122: Appendix A

)

SIEMENS Private and Confidential

4. SCOPE OF SUPPLY - COMPLIANT OFFER

Please also refer to the Layout for details regarding skids and the scope of supply in section 6 of this proposal.

4.1 Equipment Description

Course screening and grit removal system

One Course screening and grit removal system (located on top of the Equalization Tanks) will be provided.

The system will consist of the following components:

1) Micro Strainer (3mm spacing) : For separation of floating and suspended materials from the wastewater by means of an inclined screen surface, transport of screenings by means of a screw conveyor and discharge into a skip.

2) Grit Trap: for grit separation based on difference in density of lighter organic particles and dense grit particles. Grit trap without aeration. Controlled grit removal by means of two hand valves- one to discharge supernatant liquor one to remove the grit from the conical bottom hopper.

All components shall be SS304 . The instrumentation will come pre-wired to a control panel complete with all the components for fully automatic operation .

IDrum Screen

Confidential Information

© 2007 Siemens Water Technologies Corp.

- 13 -

Page 123: Appendix A

SIEMENS Private and Confidential

Two Perforated screen assemblies (1 .5mm holes) of internally fed design, complete with support structure and helicoid fiight sections for solids removal will be provided (located on top of the Equalization Tanks) . End plates and support rings of 7 gauge stainless steel construction.

The perforated screen cylinder will be 24" dia. x 55". A spray system complete with manifold, spray extensions and nozzles located externally to the screen cylinder will also be supplied.

The unit is fully enclosed and designed for odour abatement system connection if required in the future .

An IEEE severe duty 0.75 HP 50· C duty motor shall be supplied pre-wired and tested.

Equalization Tank

Two (2) vertical cylindrical Equalization tanks will be supplied. Each tank shall have a diameter of 18 m and a side wall neight of 10m. The material of construction will be Carbon Steel. . Each equalization tank shall be provided with nozzles and a 600 mm manway. Each equalization tank will also be provided with nozzles for the installation of side entry mixers .. Site erection of the tank is excluded from this proposal. Primed rolled plates will be supplied.

Equalization Tank Mixer

Quantity Operating Material of construction Service Motor

RPM Manufacturer Type

I MBR Feed Pumps

8 8 Stainless Steel propeller and shaft EQ tank Mixing

11 kW, IEEE severe duty 400V/50 Hzl3 Phase, 50C duty TBD Ughtnin or equivalent Propeller side entry

Confidential Information

© 2007 Siemens Water Technologies Corp.

- 14 -

Page 124: Appendix A

SIEMENS Quantity Operating Size Differential Head NPSH required Material Of Construction Seal Gaskets Bearings Service

3 2 15 kW - 1180 rpm 80 kPa

SS316 Impeller , SS316 Casing

Bronze cage thrust bearing Wastewater

Private and Confidential

Motor IEEE Severe Duty (IP55) 400V/50 Hz/3 Phase -VFD Compatible 50C duty

Paint

Seal Flush Flow Manufacturer Type Base plate :

Aeration Tank

Manufacturer's Standard- Outdoor Marine Environment

160 m3/h Flowserve or Equivalent ANSI Centrifugal Steel, Type A, continuous welded

Two (2) vertical cylindrical Aeration tanks will be supplied to effect 2 x 75% aeration capacity. Each tank shall have a diameter of 15 m and a side wall height of 7 m. The material of construction will be Carbon Steel.. Each Aeration tank shall be provided with nozzles and a 600 mm manway. Each Aeration tank will also be provided with a platform on top and a ladder to access the splitter box and the instrumentation . Site erection of the tank is excluded from this proposal. Primed rolled plates will be supplied.

Return Sludge Tank

One rectangular shop fabricated steel tank will be supplied. The tank shall have the following dimensions: 4.8 m W x 12.6 m Lx 2.7m H. The material of construction will be painted Carbon Steel. The tank shall be provided with the nozzles, a platform on top and a 600 mm manway.

Aeration Tanks Aeration E ui ment Internals

Confidential Information

© 2007 Siemens Water Technologies Corp.

- 15 -

Page 125: Appendix A

)

SIEMENS Private and Confidential

Approximately 120 coarse bubble diffusers will be supplied for EACH aeration tank (therefore a total quantity of 240 diffusers will be supplied).

The material of construction for the air header will be 88316. The diffusers will be coarse bubble type. The aeration equipment will be supplied complete with anchors and supports.

Confidential Information

© 2007 Siemens Water Technologies Corp .

. 16 ·

Page 126: Appendix A

SIEMENS

Membrane Operating System

MOS Tanks

Private and Confidentiat

The Membrane Operating System (MOS) is the differentiating process in the Petro TM MBR packaged system. And the B30R membrane modules are the heart of the MOS. These modules are assembled into racks, shown at left, with a maximum number of 16 modules per rack . In addition to the membrane modules, there are other important components of the MOS.

The main components of the treatment process are listed and described below.

Two (2) MOS tanks will be supplied . The rectangular shop fabricated steel tank will be equipped with nozzles and access hatches. Each MOS tank will be 6.3 m x 4.1 m x 3.1 m H and will accommodate the membrane modules required for each 75% train . The material of construction will be Carbon Steel A36, 6 mm wall thickness. Each MOS tank will be provided with nozzles. The tank will be provided with a platform to access the membrane racks.

Membrane Modules

Twenty (20) B30R membrane racks will be provided for each tank. Each rack will include 16 membrane modules. The modules will be fabricated of oxidant-resistant polyvinylidinedifiuoride (PVDF) membrane material will be installed in each membrane tank during erection. Membrane modules incorporate filtrate and air supply header integrally.

The air supply and the filtrate header are integrally located on top of the membrane modules. An air distribution line will connect the air header with the bottom of each module (see pictures).

Confidential Information

© 2007 Siemens Water Technologies Corp .

- 17 -

Page 127: Appendix A

SIEMENS

Membrane Specifications

Module Name

Membrane Area

Membrane Material

Pore size

Maximum transmembrane pressure

Typical operating pressure

Maximum operating temperature

Operating pH range

Maximum pH range

Maximum chlorine exposure

Design loading rate

B30R

37.6 m' per module

PVDF, hydrophilic

0.04 micron nominal

50 kPa

10- 50 kPa

40° C

5-9 2 - 10

100,000 ppm-hours I year

10-40 11m' h

MOS Tank Sludge Distribution Equipment Internals

Private and Confidential

Twenty (20) mixed liquor distribution assemblies for installation in each steel M08 tanks. The material of construction for the sludge header will be 88316.

Confidential Information

© 2007 Siemens Water Technologies Corp.

- 18 -

Page 128: Appendix A

SIEMENS

Confidential Information

© 2007 Siemens Water Technologies Corp_

. 19 .

Private and Confidential

Page 129: Appendix A

SIEMENS Private and Confidential

Bag House filters

A painted housing designed in compliance with IBC2003 and provided with legs will accommodate bag filters. Cartridges are automatically cleaned by periodic pulses of compressed instrument air.

The system is provided with instrument air connections and with a control box with timer.

Aeration/MOS Blowers

Quantity Operating Size Differential Head Flow Service Manufacturer Type Drive- Bet With Guard Paint Inlet Filter Motor

Material of Construction Silencers Filters Accessories

MOS Recirculation Pumps

Quantity Operating Size Differential Head NPSH required Material Of Construction Seal Gaskets Bearings

3 2 225 kW - 1800 rpm 70 kPa 7900 Nm3/h Ambient Temp 0 - 65 C Hibon or Equal Centrifugal Required Manufacturer's Standard - Outdoor Marine Environment Required IEEE Severe Duty 3.3 kV/50 Hz/3 Phase -VFD Compatible-50C duty Manufacturer standard Required Inlet and outlet Cartridge filters on the intake Anti-vibration pads pressure relief valve, pressure gauge on the discharge, check valve, inlet filter differential pressure switch

2 1 1 50 kW - 11 80 rpm 80 kPa

SS316 Impeller , SS316 Casing

Bronze cage thrust bearing

Confidenlial Informalion

© 2007 Siemens Waler Technologies Corp .

. 20 •

Page 130: Appendix A

SIEMENS Service Motor

Paint

Seal Flush Flow Manufacturer Type Base late:

Filtrate Pumps

Quantity Operating Size Differential Head NPSH required Material Of Construction Seal Gaskets Bearings Service Motor

Paint

Seal Flush Flow Manufacturer Type Base plate:

Sludge Transfer Pumps

Quantity Operating Size Differential Head NPSH required Material Of Construction Seal Gaskets Bearings

Private and ConfIdential

Mixed liquor 2% solids IEEE Severe Duty (IP55) 3.3 kV/50Hz/3 Phase -VFD Compatible 50C duty Manufacturer's Standard- Outdoor Marine Environment

2050 m'/h Flowserve or Equivalent ANSI Centrifugal

Steel, TeA, continuous welded

4 2 18.75 kW - 1800 rpm 100 kPa, NPSH Negative 60 kPaG

SS316 Impeller , SS316 Casing Single (type A) - Pusher Multispring

Bronze cage thrust bearing Filtered Water IEEE Severe Duty (IP55) 400V/50Hzl3 Phase -VFD Compatible 50C duty Manufacturer's Standard- Outdoor Marine Environment

230 m' /h Flowserve or Equivalent ANSI Centrifugal Steel, Tvpe A. continuous welded

2

4 kW - 1800 rpm 100 kPa

SS Impeller, Shaft AISI 304, support head CI NA Casing Gasket: NTLISYN, Impeller Gasket: TFE Carbon Steel

Confidential Information

© 2007 Siemens Water Technologies Corp.

- 21 -

Page 131: Appendix A

SIEMENS Sludge Transfer Pumps

Service

Motor

Paint

Flow Manufacturer Type Base plate:

PAC Storage Silo

Quantity Storage capacity Volume Type Diameter Height Material Nozzles Accessories

PAC Slurry Pumps

Quantity Operating Size Differential Head NPSH required Material Of Construction Seal Gaskets Bearings Service Motor

Paint

Private and Confidential

Sludge 2% - intermittent service between high level and low level IEEE Severe Duty (IPSS) 400V/SOHz/3 Phase -VFD Compatible SOC duty Manufacturer's Standard- Outdoor Marine Environment 3S m'/h Flowserve or Equivalent Vertical Suspended Pumps Steel

1 9000 kg 23 m' cylindrical vertical 3m 10m (including accessories) Painted Carbon Steel

Discharge hopper, dust filter, bin activator, rotary airlock filter, wetting cone, eductor, access ladder with safety cage, silo roof railing with safety gate, level indicators, target fill line with target box, piping

2 1 7.S kW - 3S00 rpm 400 kPa

. SS316 Impeller, SS316 Casing

WasteWater IEEE Severe Duty (IPS5) 400V/50Hzl3 Phase -VFD Compatible 50C duty Manufacturer's Standard- Outdoor Marine

Confidential Information

© 2007 Siemens Water Technologies Corp.

- 22 -

Page 132: Appendix A

SIEMENS Seal Flush Flow Manufacturer Type Base late:

Environment

25 m3/h Flowserve or Equivalent ANSI Centrifugal Steel , TeA, continuous welded

Hypochlorite CIP Transfer Pumps

Quantity Operating Size Differential Head NPSH required Material Of Construction Seal Gaskets Bearings Service

2 1 1.5 kW - 3500 rpm 100 kPa

Suitable for Hypochlorite NA

Hypochlorite solution

Private and Confidential

Motor TEFC Severe Duty (IP55) 400V/50Hz/3 Phase -VFD Compatible- closed coupled

Paint

Seal Flush Flow Manufacturer Type Base plate:

Manufacturer's Standard- Outdoor Marine Environment NA 3 m3/h March or Equivalent Magnetic Drive Centrifugal Steel

Hypochlorite Storage Tank

Quantity Storage capacity Type Diameter Height Material Nozzles Comments

1 1600 I cylindrical vertical TBD TBD GRP

With GRP coated steel legs visual level indication

Confidential Information

© 2007 Siemens Water Technologies Corp .

- 23 -

Page 133: Appendix A

SIEMENS Acid Metering Pumps

Quantity Operating Material Of Construction

Service Motor Paint

Flow Manufacturer Type Accessories

Acid Storage Tank

Quantity Storage capacity Type Diameter Height Material Nozzles Comments

Caustic Metering Pumps

Quantity Operating Material Of Construction

Service Motor Paint

Flow Manufacturer Type Accessories

2 1 Alloy 20 liquid end , ceramic balls and Teflon diaphragm Sulfuric Acid 0.6 kW, 1800 rpm, 400V, Manufacturer's Standard - Outdoor Marine Environment .10 I/h @ 100% stroke Milton Roy or equivalent

Private and Confidential

Metering pumps w adjustable stroke 0-100% BackDressure valve, relief valve, calibration column

1 1600 I Cylindrical vertical 1 m 2.5 m Polyethylene

Visual level indication

2 1 316SS liquid end, ceramic balls and Teflon diaphragm Caustic Soda 0.6 kW, 1800 rpm, 400V Manufacturer's Standard - Outdoor Marine Environment 10 I/h @ 100% stroke Milton Roy or equivalent Metering pumps w adjustable stroke 0-100% BackDressure valve, relief valve , calibration column

Confidential Information

© 2007 Siemens Water Technologies Corp.

- 24 -

Page 134: Appendix A

)

SIEMENS Caustic Storage Tank

Quantity Storage capacity Type Diameter Height Material Nozzles Comments

Instrumentation

Skid mounted instrumentation.

Valves

1 1600 I Cylindrical vertical 1 m 2.5 m Carbon Steel

Visual level indication

Private and Confidential

All skid mounted valves: manual valves, automatic butterfly valves with spring pneumatic actuators, and check valves.

Confidential Information

© 2007 Siemens Water Technologies Corp.

·25 ·

Page 135: Appendix A

SIEMENS Private and Confidential

Control Panel

The control panel will be a NEMA 4X , 316 SS, 2-door, free-standing enclosure. This panel shall include a Siemens S7300 PLC containing the required number of discrete and analog I/O poinls plus 20% spare of each type. The panel will also house a 24VDC power supply sized to provide the required loads, both discrete and analog .

The PLC will have an Ethernet communication port to connect to the plant control/telemetry system.

The control panel will contain 24VDC power supplies to power the field discrete and analog I/O. The panel will have 120VAC circuit breakers to provide power for the four-wire transmitters such as pH and Magnetic flow meters. The control panel will contain terminals for connection of signals from field devices. Each terminal strip will be flanked by wireway on both sides. The control panel will have an Emergency Stop (E-Stop) pushbutton mounted through the door.

The system will be provided with a touchscreen.

MCC (optional):

. The power distribution system comprises the following components :

• 3300V MCC with the following circuits: o 200A Incomer (One) o 250 kW Sludge Tank Blower Motor Starter (Two) o 150 kW MOS Recirculation Pump Motor Starter (Two) o 50A Transformer Feeder (One)

• 100 kVA 3,300/400V Transformer

• 400V MCC with the following circuits: o Incomer (One) o 20 kW Filtrate Pump Motor Starter (Two) o All other pumps, mixers, motors (see above) o 20 A Auxiliary Power Feeder (One)

Skids Description

Filtrate Pumps:

Confidential Information

© 2007 Siemens Water Technologies Corp .

- 26 -

Page 136: Appendix A

SIEMENS Private and Confidential

Two skids will accommodate 2 filtrate pumps each with the relevant valves and piping. The structural steel and plate shall be painted ASTM A36 or equivalent. The skid instrumentation will be pre-wired to a local Junction Box.

MOS Recirculation Pumps:

Two MOS recirculation Pumps will be mounted on one skid together with the associated piping and valves. The structural steel and plate shall be painted ASTM A36 or equivalent. The skid instrumentation will be pre-wired to a local Junction Box.

Hypochlorite Dosing Skid:

This Skid will accommodate: two (2) Sodium Hypochlorite CIP Transfer Pumps relevant CPVC interconnecting piping, valves and instrumentation . The skid instrumentation and controls will be pre-wired to local Junction Boxes. The structural steel and plate shall be epoxy painted ASTM A36 or equivalent. The skid will be provided with containment capacity of 1.5 x pipe/pump volume.

Acid Dosing Skid:

This Skid will accommodate: two (2) Acid Dosing Pumps, storage tank, relevant CPVC interconnecting piping, valves and instrumentation. The skid instrumentation and controls will be pre-wired to local Junction Boxes. The structural steel and plate shall be epoxy painted ASTM A36 or equivalent. The skid will be provided with containment with a capacity of 1.5 x pipe/pump volume.

Caustic Dosing Skid:

This Skid will accommodate: two (2) Caustic Dosing Pumps, one storage tank, relevant CPVC (with additional UV protection) interconnecting piping, valves and instrumentation. The skid instrumentation and controls will be pre-wired to local Junction Boxes. The structural steel and plate shall be painted ASTM A36 or equivalent. The skid will be provided with containment with a capacity of 1.5 x pipe/pump volume.

PAC Storage Silo:

The Skid will accommodate the skirt supported silo and all the ancillary equipment (see data sheet above). It will be factory mounted, piped, wired to minimize onsite construction. The structural steel and plate shall be painted ASTM A36 or equivalent.

PAC Slurry Pumps:

One skid will accommodate 2 PAC slurry pumps with the relevant valves and piping . The structural steel and plate shall be painted ASTM A36 or equivalent. The skid instrumentation will be pre­wired to a local Junction Box.

Spare Parts

The Spare Parts provided will be in accordance with the manufacturer's recommendations. The included spares are only for commissioning and start up. Two years spare parts are NOT included in this quotation.

Confidential Information

© 2007 Siemens Water Technologies Corp.

· 27 -

Page 137: Appendix A

SIEMENS Private and Confidential

4.2 Scope of Supply-Services

4.2.1 Engineering Drawings (NMR 601)

The calendar weeks shown on the NMRs (forthcoming with firm bid) and the delivery schedule are based on a two week document review period .

4.2.2 Certified Drawings (NMR 602)

The calendar weeks shown on the NMRs (forthcoming with firm bid) and the delivery schedule are based on a two week document review period.

4.2.3 Miscellaneous Documents (NMR 603)

The calendar weeks shown on the NMRs (forthcoming with firm bid) and the delivery schedule are based on a two week document review period.

4.2.4 Spare Parts Data Package

A Spare Parts Data Package is included for all equipment supplied under this proposal. The package will include the following:

• Purchase Order Copies to Vendors

• Certified Equipment and Instrument Data Specification sheets

• Nameplate data

• Certified cross sectional and general arrangement drawings for applicable equipment

• Bill of Materials including part numbers certified by manufacturer

• Recommended priced parts list certified by manufacturer

Manufacturer's catalogue cuts as applicable

Electronic copies of the above information will be provided in lieu of the ESP.

4.2.5 Incidental Services

4.2 .5.1 Installation Support

See commercial section.

4.2 .5.2 Start-up & Commissioning-Support

Confidentiat Information

© 2007 Siemens Water Technologies Corp.

·28·

Page 138: Appendix A

SIEMENS Private and Confidential

See commercial section.

4 .2 .5 .3 Six Months Operation (optional)

Operational service will be provided by Siemens Ltd. One full time senior technician will supervise the operations on a daily basis, and make daily visits to the site-as required . Site operational services during each visit will consist of:

1. Monitoring of critical operational parameters and critical equipment check 2. Oversight of Aramco's contractor to remove dry sludge 3. Sludge wasting to drying bed 4. Filling of chemical tanks and monitoring of inventory 5. Procurement of operational chemicals 6. Sampling as necessary

Supply of operational chemicals and manpower and equipment to empty drying beds will be by others, but scheduled and supervised by Siemens.

4.3 Scope of Supply- Excluded Items

All other works and equipment necessary to complete the project and not specifically included per the Siemens Scope of Supply shall be supplied by others. Such items include but are not limited to:

4.3.1 Civil Works, Building Modifications and Installation of Equipment

No. Description Concrete works, sun shades, and buildings to support the MBR system and/or

1 lot other equipment supplied by Siemens. N/A Embedded pipes 1 lot Sludge drying bed system N/A UnloadinQ/storage of equipment at site .

Engineering and/or supervision of all equipment and labor for civil works N/A including building, anchor bolts and/or expansion anchors, if required .

Positioning and installation of all equipment supplied by Siemens or Others, N/A including the Petro ™ MBR system. N/A Protected storage of equipment at jobsite.

4.3.2 Mechanical

No.

4

Description Interconnecting piping Valves not included in the skids Erection of the aeration tanks and equalization tanks

Confidentiat Information

© 2007 Siemens Water Technologies Corp .

- 29 -

Page 139: Appendix A

)

SIEMENS Private and Confidential

4.3.3 Electrical

No. Descriotion Power to the MBR system and all other equipment. This includes any and all

1 lot Dower supply cables to motors, cablinq trays, fittinqs and supports, if required. Supply and installation of building power, lighting, main service disconnects, if

N/A reauired.

4.3.4 Instrumentation

No. Description 1 lot All influent instrumentation not included in Siemens' Scope of Supply. 1 lot All instrumentation non skid mounted.

4.3.5 Miscellaneous

No. Description All chemicals required for MBR system cleaning, maintenance, and operation (if reauired) after the end of the commissionina activities (carried out bv Siemens)· All lubricants reauired for olant startuo and ooeration . Installation of eauioment Embedded eauioment Analvtical testina costs for oerformance verification testinq

Confidential Information

© 2007 Siemens Water Technologies Corp.

·30 ·

Page 140: Appendix A

SIEMENS Private and Confidential

5. COMPLIANCE STATEMENTS -COMPLIANT OFFER

These compliance statements apply to the MBR base offering by Siemens Water Technologies. Please note that the statements are made on the basis that all trains in each plant will be identical (not mirrored) and will meet the same specifications.

Only specifications listed in Document Bl 10 00087 dated July 2006 Rev D are considered . Embedded and Second generation specifications are specifically excluded.

5.1 Definition of the Compliance Column

Compliance terms are defined as follows:

Exceeded: Vendor exceeds the requirement of the Specification as written

Compliant Vendor meets the requirements of the Specification as written.

Alternative: Vendor meets the intent of the requirement of the Specific<ltion with an alternate solution . The alternate solution shall be described in enough detail to allow for evaluation

Noted : Vendor is aware of the requirements and takes no exceptions.

Not applicable: The requirement of the Specification does not apply to the Vendor"s scope of supply.

Non-Compliant Vendor does not comply and cannot meet requirements of the Specification as written.

Confidential Information

© 2007 Siemens Water Technologies Corp.

- 31 -

Page 141: Appendix A

SIEMENS Private and Confidential

5.2

Clause #

4.5.3.2

4.6.2

6. 1.2

6.2.1

8.2.4.4.1

Compliance Statement Table

Requirement

Alarms

Sanitary Facilities

Design

Grit Removal

Subsurface

Alternative Costs associated with : Sets of installation loperationl maintenance instructions, material certificates. commissioning consumables list, GA and detail dwgs, sets of final inspection reports and tests results, sets of equipment! material catalogues are included in the total price as they are

NMR.

Non- Delivery Schedule will be supplied with the Firm Proposal

Non Start up operation and spare parts data package duly filled, compliant inspectioh/test ing requirements, NMR forms , pre­

commissioning forms and manuals will be supplied with the

Alarms outside of the HMI and independent alarm power are I I

Sanitary Facilities are provided by others and not included in SWT scope of supply.

Altern ative A bar screen has been excluded from the scope of supply. Vendor has based the design on a feed with suspended solids with a maximum diameter of 5 em.

Not Compliant

Not

Manual Screens are not

Grit washing equipment is not included for th is small equipment.

The diffuser System is removable only when the tank is drained. All diffusers are SS 316.

Confidential Information

© 2007 Siemens Water Technologies Corp.

- 32 -

Page 142: Appendix A

SIEMENS Private and Confidential

Clause # Requirement

All Alternate This proposal is based on providing all requirements of this NMR with the exception of the following items:

• Technical information provided in accordance with the applicable specifications and standards of this RFQ will be considered "detailed and complete" .

• An explosion proof certificate is not applicable with an area electrical classification of Class-1, Zone II, Group 2N2B

• Pressure and functional test certificates will be provided after the final hydrostatic test is performed with all interconnecting piping in place. All bench testing is excluded.

Vendor's scope of supply is limited to certified calibration curves in section 603, item 2.

Confidential Information

© 2007 Siemens Water Technologies Corp.

- 33 -

Page 143: Appendix A

SIEMENS Private and Confidential

Clause # Requirement

All

Compliance

Statement Description

Not There are no special service size valves offered Applicable

Confidential Information

© 2007 Siemens Water Technologies Corp.

- 34 -

Page 144: Appendix A

SIEMENS 6. DRAWINGS

PFD, Plot Plan

Confidential Information

© 2007 Siemens Water Technologies Corp.

- 35-

Private and Confidential

Page 145: Appendix A

SIEMENS Private and Confidential

7. COMMERCIAL

To: Reference: PACT-Membrane Bio·Reactor

Aramco

Attn: Jeddah Refinery Wastewater Treatment Plant

Proposal Date: March 15,2007

Siemens proposes to furnish materials, equipment andlor technical service in accordance with Budgetary Proposal Number #1 Y0025BPR rev.1 dated March 15th, 2007. Materials, equipment and technical service not specifically li sted under the Scope of Supply or on attachments to this proposal are EXCLUDED.

Lump Sum Price:

Siemens Petro ™ PACT· Membrane Bioreactor (MBR): $ 7,900,000

License Fee $ 425,000

License Fee Deduction for Saudi Aramco $ (425,000)

MCC: $ 300,000

Six Months Operation : $ 175,000

Duties and Freight for DDP Jeddah Refinery Site compliant offer: $ 405,000

Note: The offer excludes any taxes, duties or other related charges unless specifically documented by Siemens.

Validity: This is a budgetary proposal that remains valid for 120 days.

Payment/Letter of Credit Terms

Our proposed payment terms are net 30 days via wire. Payment shall be guaranteed with an irrevocable letter of credit issued in favor of the seller according to the following :

TERMS FOR LETTER OF CREDIT

An Irrevocable Letter of Credit (LlC) shall be used to guarantee payment. The following terms shall apply:

Irrevocable letter of Cred it (LlC) shall be issued in favor of: Seller

Confidential Information

© 2007 Siemens Water Technologies Corp .

. 36 .

Page 146: Appendix A

SIEMENS UC for the purchase order amount shall be advised through: Seller's bank

Notes:

Private and Confidential

1. Funds shall be available against presentation of Commercial Invoice, Packing List, Bill of lading, Certificate of Origin

2. The UC shall expire 60 days after the shipping date for the equipment and allow for 30 days for presentation of documents.

3. Partial shipments shall be permitted .

4. Trans-shipment shall be allowed.

Payment Milestones:

15% at time of purchase order acceptance/project kick off 10% at time of submittal of first engineering 25% at time of release to fabricate/procure · 45% at offer to ship

5% with final documentation

Freight: Ex-works point of fabrication. Freight and duties for DDP Jeddah Refinery Site have been quoted separately (see above).

Manuals: Operation & maintenance manuals will be provided ·per inquiry requirements .

Terms: Our offer is based on Siemens Water Technologies' standard terms and conditions as attached.

Per Diem Rates for On-Site Services: Site services for installation of membranes in the membrane tanks are included in our offer.

Per Diem rates for start-up and commissioning services will be $750/day per person. Living, transportation and other local expenses will be charged separately at cost plus 10%.

Per Diem rates for erection supervision services will be $1 ,500/day per person. Living , transportation and other local expenses will be charged separately at cost plus 10%.

Condition of Per Diem Services

1. Rates are applicable for normal working time respectively working day.

Normal working time is 48 hours per week distributed over 6 working days a week running from Saturday to Wednesday, 3 hours Thursday with Friday as regular day off. A surcharge of 25% on the rates applies for overtime worked in excess of 9 hours a day as well as on Thursdays, Fridays and Public Holidays.

During the month of Ramadan, the normal working time is 36 hours per week distributed over 6 working days a week running from Saturday to Thursday with Friday as regular day off. A surcharge of 25% on the rates applies for overtime worked in

Confidential Information

© 2007 Siemens Water Technologies Corp.

- 37 -

Page 147: Appendix A

)

SIEMENS Private and Confidential

excess of 36 hours a week respectively 6 hours a day as well as on Fridays and Public Holidays.

Assignment of personnel will be in full compliance with the rules and regulation of the Labor and Workmen Law of the Kingdom of Saudi Arabia.

Rates and conditions applicable for Siemens Ltd. I AEL (E) Service personnel will follow this provision by which each working day counts as 9 hours normal working time whether actually spent or not due to different working arrangements for the clients at their various sites.

Minimum assignment of the personal will be for 1 full day even if the actual number of hours worked are less than normal daily working hours.

Travelling, waiting and preparation time will be charged at the rate of normal working hours, regardless the hours worked for normal I overtime.

2. The rates given are depending on the category, qualification, experience of our personnel as well as on the duration of service which is to be fixed before start of the work along with the project name and scope of services required . This nominates automatically the rate applicable for the relevant personnel category and period of service.

3. Rates are to be understood net for services rendered in the area.

If the AEL Service personnel have to be transferred to other places in or outside Saudi Arabia from his permanent location, the transportation and accommodation costs will be charged at actual plus 5% overhead . In addition a food allowance according to category will be charged for each calendar day.

4. Rates include standard hand tools and safety gear.

5. Rental Charges for tools or instruments (subject to availability in I&S Logistics Dept.) including transportation cost and custom duties will be charged ex1ra (with 10% handling charges) when required.

6. Local tickets cost, accommodation and transportation of our specialists will be charged ex1ra.

7. For the use of company car outside Jeddah/Alkhobar area, the charges will be:

• SR 2.00 per km passenger car I pickup

• SR 3.00 per km mini bus

8. The Purchaser shall provide insurance cover for all risks for materials and equipments for a period to cover up to end of the work. There is no separate erection I service insurance covered by the Division .

9. Rates and conditions may change subject to prior notice and will be communicated accordingly.

Confidentiat Information

© 2007 Siemens Water Technologies Corp .

·38·

Page 148: Appendix A

SIEMENS Private and Confidential

STAI'o'DARD TERMS OF SALE

1. Aoollcable Terms These terms govern the purchase and sale of the equipment and related services, if any (collectively, "Equipment"), referred to in Seller's purchase order, quotation, proposal or acknowledgment, as the case may be ("Seller's Documentation"). Whether these terms are included in an offer or an acceptance by Seiler, such offer or acceptance is conditioned on Buyer's assent to these terms. Seiler rejects all additional or different terms in any of Buyer's forms or documents.

2. Payment. Buyer shall pay Seiler the full purchase price as sel forth in Seller's Documentation. Unless Seller's Documentation provides otherwise, freight, storage, insurance and all taxes, duties or other governmental charges relating to the Equipment shall be paid by Buyer. If Seller is required to pay any such charges, Buyer shall immediately reimburse Seller. A ll payments are due within 30 days after receipt of invoice. Buyer shall be charged the lower of 1 'X% interest per month or the maximum legal rate on all amounts not received by the due date and shall pay all of Seller's reasonable costs (including attorneys' fees) of collecting amounts due but unpaid. All orders are subject to credit approval.

3. Delivery. Delivery of the Equipment shall be in material compliance with the schedule in Seller's Documentation. Unless Seller's Documentation provides otherwise, Delivery terms are F.O.B. Seller's facility.

4. Ownership of Materials. All devices, designs (including drawings, plans and specifications), estimates, prices, notes, electronic data and other documents or information prepared or disclosed by Seller, and all related intellectual property rights, shall remain Seller's property. Seller grants Buyer a non~exctusive, non~transferable license to use any such material solely for Buyer's use of the Equipment. Buyer shalt not disclose any such material to third parties without Seller's prior written consent.

5. Changes. Seller shall not implement any changes in the scope of work described in Seller's Documentation unless Buyer and Seller agree in writing to the detailS of the change and any resulting price, schedule or other contractual modifications. This includes any changes necessitated by a change in applicable law occurring after the effective date of any contract including these terms.

6. Warranty . Subject to the following sentence, Seller warrants to Buyer that the Equipment shall materially conform to the description in Seller's Documentation and shall be free from defects in material and workmanship. The foregoing warranty shall not apply to any Equipment that is specified or otherwise demanded by Buyer and is not manufactured or selected by Seiler, as to which (i) Seller hereby assigns to Buyer, to the extent assignable, any warranties made to Seller and (ii) Seiler shall have no other liability to Buyer under warranty , tort or any other legal theory . If Buyer gives Seller prompt written notice of breach of this warranty within 18 months from ~elivery or 1 year from acceptance, whichever occurs first (the 'Warranty Period") , Seiler shall, at its sale option and as Buyer's sale remedy, repair or replace the subject parts or refund the purchase price therefor. If Seller determines that any claimed breach is not, in fact, covered by this warranty, Buyer shall pay Seller its then customary charges for any repair or replacement made by Seller. Seller's warranty is conditioned on Buyer's (a) operating and maintaining the Equipment in accordance with Seller's instructions, (b) not making any unauthorized repairs or alterations, and (c) not being in default of any payment obligation to Seller. Seller's warranty does not cover damage caused by chemical action or abrasive material, misuse or improper installation (unless installed by Seller). THE WARRANTIES SET FORTH IN THIS SECTION ARE SELLER'S SOLE AND EXCLUSIVE WARRANTIES AND ARE SUBJECT TO SECTION 10 BELOW. SELLER MAKES NO OTHER WARRANTIES OF ANY KIND, EXPRESS OR IMPLIED, INCLUDING WITHOUT LIMITATION, ANY WARRANTY OF MERCHANTABILITY OR FITNESS FOR PURPOSE.

7. Indemnity. Seller shall indemnify, defend and hold Buyer harmless from any claim, cause of action or liability incurred by Buyer as a result of third party claims for personal injury, death or damage to tangible property, to the extent caused by Seiler'S negligence. Seller shall have the sole authority to direct the defense of and settle any indemnified claim . Seller's indemnification is conditioned on Buyer (a) promptly, within the Warranty Period, notifying Seller of any claim, and (b) providing reasonable cooperation in the defense of any claim.

8. Force Majeure. Neither Seller nor Buyer shall have any liability for any breach (except for breach of payment obligations) caused by extreme weather or other act of God, strike or other labor shortage or disturbance, fire, accident, war or civil disturbance, delay of carriers, failure of normal sources of supply, act of government or any other cause beyond such party's reasonable control.

9. Cancellation_ If Buyer cancels or suspends its order for any reason other than Seller's breach, Buyer shall promptly pay Seller for work pertormed prior to cancellation or suspension and any other direct costs incurred by Seller as a result of such cancellation or suspension .

10. Reservation Clause. Buyer acknowledges that Seller is required to comply with applicable export laws and regulations relating to the sale, exportation, transfer, assignment, disposal and usage of the Equipment provided under this Agreement, including any export license requirements . Buyer agrees that such Equipment shall not at any time directly or indirectly be used, exported, sold, transferred ,

Confidential Information

© 2007 Siemens Water Technologies Corp.

- 39 -

Page 149: Appendix A

SIEMENS Private and Confidential

assigned or otherwise disposed of in a manner which will result in non-compliance with such applicable export laws and regulations. It shall be a condition of the continuing performance by Seller of its obligations hereunder that compliance with such export laws and regulations be maintained at all times. BUYER AGREES TO INOEMNIFY ANO HOLD SELLER HARMLESS FROM ANY AND ALL COSTS, LIABILITIES, PENAL TIES, SANCTIONS AND FINES RELATED TO NON·COMPLIANCE WITH APPLICABLE EXPORT LAWS AND REGULATIONS.

11 . LIMITATION OF LIABILITY. NOTWITHSTANDING ANYTHING ELSE TO THE CONTRARY, SELLER SHALL NOT BE LIABLE FOR ANY CONSEQUENTIAL, INCIDENTAL, SPECIAL, PUNITIVE OR OTHER INDIRECT DAMAGES , AND SELLER'S TOTAL LIABILITY ARISING AT ANY TIME FROM THE SALE OR USE OF THE EQUIPMENT SHALL NOT EXCEED THE PURCHASE PRICE PAID FOR THE EQUIPMENT. THESE LIMITATIONS APPLY WHETHER THE LIABILITY IS BASED ON CONTRACT, TORT, STRICT LIABILITY OR ANY OTHER THEORY.

12. Miscellaneous. If these terms are issued in connection with a government contract, they shall be deemed to include those federal acquisition regulations that are required by law to be included. These terms, together with any quotation, purchase order Of

acknowledgement issued or Signed by the Seller, comprise the complete and exclusive statement of the agreement between the parties (the "Agreement") and supersede any terms contained in Buyer's documents, unless separately signed by Seller. No part of the Agreement may be changed or cancelled except by a writlen document signed by Setler and Buyer. No course of dealing or performance, usage of trade or failure to enforce any term shall be used to modify the Agreement. If any of these terms is unenforceable, such term shall be limited only to the extent necessary to make it enforceable, and all other terms shall remain in full force and effect. Buyer may not assign or permit any other transfer of the Agreement without Seller's prior written consent. The Agreement shall be governed by the laws of the Commonwealth of Pennsylvania without regard to its conflict of laws provisions.

Confidential Information

© 2007 Siemens Water Technologies Corp.

· 40 ·

Page 150: Appendix A

-"

Major Equipment List

Equip Cost Installation Factor Installed cost

2nd API Separator· 1 each FOB Job Site 999,734 Latest negotiated non Aramco compl iant cost • This is the firm cost for the first separator. 2nd separator can be 10-20% lower pending when PO is issued and fabricated

EQ tank Volume Dimension Tank Mixers

Grit Chamber

Screening of Sanitary Waste'"

2 each 650,000 gal. Each

18m Dia X 10 m H, each 4 each 15 HP each

Included as part of the MBR package

780,000

375,000 47,000

•• The non-sanitary wastewater is pretreated with API separators and filtered through Walnut shell filters and should not require additional screening

Uti lity Slowdown Cooler

MBR Feed Pumps

MBR Aeration Tanks MaS Tanks MOS Transfer Pumps Filtrate Pumps Btowers (in CTR BLDG) Chlorination (in CTR BLDG)

PAC Storage Silo and Feed Sanitary Wastewater Screen

. Sludge Xler Pump

Waste Sludge Pit

SCADA

Crude Water Draw Tank 3Bm Dia X 29.4m H Return Oil Pump (2)

Product Water Draw Tank 1Bm dia X B.5m H Return Oit Pump (2)

Have not sized any required c:oolers, WoN temp

2 + 1 spare 700 gpm 10HP

2 each 75% flow 2 each 300,000gal operating volume each (21 ft SWD) 2 each 17000 gal operating volume each (9ft SWD) 2 (1 +1 spare) 9,000, 200 HP 4 (2+2 spare) 1000 gpm, 25 HP 3 (2+ 1 spare) 15,000 SCFM, 300 HP 2 each 1 each ?X?X? 2 (1 +1 spare) each 5 HP

1 each 15' X 15' X?' D

320,000 ga/lons

100 gpm @ 100 psi, 5HP?

120, 0000 ga/lons

25 gpm @ 50 psi, 2HP?

Equipment Price This estimate does not include interconnection piping material or installation costs.

140,000

6,527,000

31 ,000

50,000

80,000

199,500

5,320

BO,OOO

1,995

9,316,549

2.3 . 2.S7.!. OO-S

2.{.1 75-:] [<OD

3.3 Q

..., '.> L16200D

32 2 ·t .S:::~9.1 DQ

3.3 -:0£ 3DD

' ' v . • ) ~ 6 5 .000

40 3:2.G.000

33 I.J5c.350

2.3 17.556

2. ~ 264.-)00

J.J 5 55.)

25 .. 352-.590

Page 151: Appendix A

Page 1 of

Yee, John G

~m: Greg Welch [gregw@scecka .com]

Sent: Sunday, December 18, 2005 7:58 AM

To: Yee, John G

Subject: Re: Cost, Size, Description of Sludge Beds for 600,000 gpd MBR Plant

John,

At Udhailiyah STP (0.85 mgd plant), there are two sludge drying beds, each 465 m2

I have attached an excerpt from the PP for Rahimah STP, where we are putting in new drying beds:

2.5.12 Sludge DQling Bedl

The existing sludge drying beds will be demolished to provide space for new equipment andfacilities. New sludge 'jlying beds will be provided near the south perimeter of the STP. A total of 54 dlying beds will be provided. Each

bed will provide 250 1// of drying area. The beds will be a concrete, at-grade structure, provided with a hard boltOI/, of concrete. A decant adjustable weir gate and drain box will allow for decant of the separated water to a plant sewer, which will drain to the influent pump station. A perforated covered drain along the low side of each basin wili collect boltom drainage into the same drain.

We estimated the beds at Rahimah at $3.3 million, for 13,000 m2 of bed area, which translates to about $2551m2

Yope this helps. Let me know if you need anything further.

Greg

--.- Original Message --­From: yee John G To: gregw@scecka com Sent: Saturday, December 17, 2005 4:08 PM Subject: Cost, Size, Description of Sludge Beds for 600,000 gpd MBR Plant

Greg,

Just in case you do not have my e-mail address, you can attach your response accordingly.

Tomorrow AM is OK, if you cannot respond by today. Thanks.

Regards,

John

;/14/2007

Page 152: Appendix A

,. l~

"

1\ I- ! ~ :\ l-

'-- ~

I I-

L 1-1 ~~~i l»'l'lS ~·I.'\IlOI

~ '!i I. 1-'il e~ 1

- -

-

~ ~ ~ ---. ~f " vW 2~ -\ !i ,! II! ill \.

-!

- , 1-, , l j l

----l " , • • ----l ----l

I'~ I. ]I 'l

,

I--i"

11 ~ !! ,j II !-f---,

c:::j !l

I I ! , " I , i , , ,

3

~ I~ ~ I~

I

!ii 1= I

!!i~ ! i

'Ii

,!" .i. il!\I"I!' ~ 'II':-li ! ! 'l.!i,.ld" fi II I ,ii.,,,, ""1'."\1'

" " 'lli '111/",il -1"1",11"1' I' litlll ' la" t· ~; II'" !i 1""i'i",,I' '>'1' · ' ~

",'''i:!,'!I,I,II,,' I : . ~, .. 11 ..

! i ! , ! " , i i , , I

~

Page 153: Appendix A

., .. n • •••• .• .: .. .

, ,

, Illill

I ..

I ! .F

)!i! ,

)

. il :' i ~' ; : : I: : : :

!! II!! !~ , . .... _ ... ... __ .. _-----

"I'O:'..=:r.:._ ..

- ---._-------- "~ ----.. _ ________ . ______ L.:""""'""'~~-~r.~~~~_ JoonO om.~".o:IQ

Page 154: Appendix A

!-

,., .. ".,r.\ '~~~~" .0(0 _ \

, '.

r.·!

i EI ;Y

I-";,:,,j T -'''~''-'

I : ;; 1-1 -"'--

o , 0~ ? ~l'~'~ " ':~ -'" <S> I ":" ,, .. ,!~. T.> I ," --

~:I ~

[iL. ] i'-o-. ",,; ,",.,-.,0-. ' 1

n'

-t> ,.

0 1.,

<9 .........,.....~-..-~

~\~ .!:..R.... )~ 7'

<;y ~""""'''''''''''''~' !1r ,--

o r- ."._ .. ,,-. ., .!~ .... -., ~.

" .1 'f'.::, .~ t l:~ \ 'i1j

<$ •• :~--, , . "

" L.;1:.iJ 51_ =-y {y _,}:" I I - - "y ' <Y --:::---"I I '" I m'''_ J

''l I -L L ' -.-

. • ....• _ _ ...s!_ · . • h r- - "-6 ,,~.~ I . 1

_~ o$I~ J <Y 1

.~ ,I" ""«(I: "'EO - T''''''·'· '" ~ .0:. / 0'

" _ ~""; ;;;:-J 0 -" -.Y ~. . ' ~ I _~,-'Lj ~':: ... 1 . - - ...s!_.,!;."." _9;-- _ '''- -..6-'= --b ._n:.,. T

_ .. _ _ "_. _ .•. » __ <:' _ _ -1' Valve 10 be 8ddeiho emli!'l\! line can be ~ ,,1$$&(1 (NOI82) ....... ,------ --~- ------- ------- ------_. ------- --,

6': --- " -- - -~~~-~"""'\""''''.: - : :- .~ : 6·: :~;- -- ----;" , ~ : i ~T-" " ,I /' ,

To Gxlsting MI"W·l7 ... ----.. "( • : : TIe-n.1o eXIsting line

~---'.; ;:I1(lm 'a!"t Punp3 (100 gpm lIacl'l) V. llle 10 be addeQ' so eiCsttilg

"" '"'' ' y., ... ". (~~~-'! --\4. -- ----. -. -.---- --- ---- --- --c- --'-, 8' C?. Tie·," to eltl.tlng lin, •

....: --- ~ -_ ..

'T----;; Tie-II'! to ellis llng

~ ~~ . Ex), tll'! g Crude Colteetlon

SUIT'P'" P ump, T·1 2, T·13, T·l l!! , T·213,

T·214, T·215, T·2.3, T·2«, T'2~S

, ·1 To exlJtlng

\'1'PI .. , ~ ~~_v~~~ .... I Skim Tank Pump,·(250 gpm each)

H Ei.lsting PrOduct COIleetlon

Sump &-'pumps l-104. T-e, T-Y, t-8

120,000 gllllQris 9m dill ·x·am H ~ftl @ • ToT104

~.~;;: Recover", OIl Tank &. P umps

1,000 \Ialtons

1 ' 1<.<rnl1r.T~ 1) 1

Page 155: Appendix A

LIT H ....... : ...... ~ ... ~ :.:.: Existing lines

~'""W", ~ 0000,._"",,

:"rr" . ~ ~, ---~, "-

~ r7777 , L /I " :«'/7

10' ____ Z :... __________ .. Existin\!. 1.9"_ ~a.2t'l.w!!t~ - - - - - L .................... ;

New Valve Box From Process Area A New Manhole or Process Area C

Manhole MHV-31 (Process Area A) or MHV-18 (Process Area C)

(Existing)

WASTEWATER COOLING SYSTEM (Typical for Jeddah Refinery Process Area A or C)

m'::~~~ 000"_""" Existing Lines

-''''T-:>=-T7~7-:~' . '/J/7/l l y "'-/ 'y I I I I , "n, I ,9?-711 Ii

: 16' Existi~g -.: ~ yy~t~wl't~r _~ >- - - - -

/: :\ ------~ ~----------+ I - - : :

New Valve Box : ................ .... . i From Zone 4 (CDU# 3 & 4, VDU#5)

~ ..................... .. Manhole MHV-37

(Existing) Manhole MHV-35

(Existing)

WASTEWATER COOLING SYSTEM (Jeddah Refinery Zone 4)

Notes: 1. Each Process Area or Zone is provided with two 100 gpm self-priming pumps and one plate and frame cooler. 2. Unless indicated as "existing ," manhole level instrumentation, valves, and piping as shown shall be provided.

The valve inside the valve box shall be a full line size ball valve.

FIGURE 9 WASTEWATER COOLING SYSTEM

Page 156: Appendix A

Cooling Water Return, X" .-------------- ,- l.

Isolation valve ...L "IIii:!;' ~,

Existing lines

New lines

Isolation valve

Backwash Supply

Line X" ,

1 ...L ~~,

6'

.1

- - __ I

1 I 1 .

I r -I ~~It- ~ •

-

/ New Backwash Return Line , X"

(Note 2)

- - - - - - - - - L~ I:-""l f- - - 1 ____ Cooling Water Supply, X" ... " Isolation valve Note 3

Notes: 1. See DBSP, Section 7.4, Table 7-1 for the list of coolers requiring backwash piping retrofitting , 2. See DBSP, Section 7.4 , Table 7-1 for line sizes. The new backwash return line shall be the same size as the existing

backwash supply line. 3. The existing line, which is routed to gravity sewer, shall be removed .

FIGURE 10 Cooler Backwash Piping Retrofit

Page 157: Appendix A

I! I~~ I-lf J I ~

U I ~ -Ii I I . . ' ,

! ~ ! ~l

~ -l:. . H · 1 . . ,-'1 .'- '

,t .. , ... ", .. ·•

~~"'li~I~~:::~ ! --... -, i

~;~,~'=~' 0'--" "I ::::::~~ ! :.:r.::ff! ~~jilU;;=..,;"',~i l ! -""I'i

! -..... '" ! !

""'f ,W'

Page 158: Appendix A

j I

)

t : N

~L---~=r========~===r==~------~

Page 159: Appendix A

''' '

)

"" )

"1,

"1 ,

,~

--, .

[

'j. . . l

! I

, , ,

,- , -- -,--".! .. " ,,-:~~.,­

;,

.. --

; ,II i ;

; ; ""'!I, -".1," ,

I :1 , j

I i

.j 'I

I 'I I

i ' j , II • l ... .. ' ~

I i , !

11

I'

i.

Page 160: Appendix A

,'.' ", ,," "1

- 1--

~

I ~!

." ,. ; . ,

.t I

Page 161: Appendix A

======== QUOTATION

Yokogawa Middle East B.S.c.(c) P.o . Box 10070

Bldg 557, Road 2516, Busaiteen225 Muharraq, Bahrain

========

REF. NO :· HSQ6LMB316-RI DATE :-_______ ...::J':;n:.:":=' "'YL ':;3,,,.::' ,,00=-,'-______ _ Please use thIS no. when ordering

EffECTIVE UNTIL :-_______ 6"'0"De:A'-'Y'-"S'-'O~N-"L"-\'-' _____ _

SEND TO

SUBJECT FINAL USER INQUIRY NO. PLACE OF DELI VERY TIME OF DELlVER Y

TERMS OF PA YMENT

ATTACHED DOCUMENT

CIS NO. ITEM

: PETROCON ARABIA LTD. Attn: Mr.\Vency Barreda : Jeddah Refinery - VnetlIP Domain. : Saudi Arabian Oil Company - Jeddah Refinery :Emai l : Jeddah Refinery, DDP : 6 months upto delivery to Si te.

: AS PE R SAUDI ARAMCO VDPA AGREEMENT

: Bi ll of Materials. Project Comments, System Configuration Diagram

Ril wan Shab Genera l Manager-Sales Sa udi Arabia Yokogawa Middle East B.S.c.(c)

DESCRIPTION QTY Unit Price V.SS

TEL: 973-358 100 FAX: 973-336100

Amount V.SS

I. VnetllP Domain Creal ion & other Upgrades/additions as $623,339.00 per BOM enclosed includ ing Technical Services & Project Eng ineering

2. Estimated Customs Duty for DeS Items. 19,334.00

Grand Total in U.S $ DDP, Jeddah Refinery $642,673.00

I) The country o f Origin for offered goods is from Yokoga,,'a Si nga pore for DeS.

2) Our quotalion is based on DDP basis and includes all transpon charges & custom duties 10 Jeddah Refinery ,

3) The proposal is based on existing VDPA agreement between YME & Saudi Aramco. 4) Warranty for the Offered Items shall be 12 Months from System commissioning or 18 Months from date of S hipment which ever is earl ier, 5) This Proposal Shall be considered as the Basis of ContracL

6) All Site Services shall be as Per Diem rates ofVDPA Agreement.

Page 162: Appendix A

Client : Peu-ocon Ar~bia Ltd End User : Saudi Aramco Upgrade Jeddah Refrnery DeS

Item

BILL OF MATERI ALS

I

YOKDGAWA ," Propo~a1 No. :HSQ6BMBJ 16·R 1

£' ;; « , 0

AT SEGREGA TE CONTROL NElWORK DOMAIN & UPGRADE CONTROL NEnVORK TO VNETlIP I REPLACEMENT OF EX ISTING PC, WITI! LATEST SPECIFICATION PC,

Ll REPLACEMENT OF PC, FOR HIS IN CCR 13

.) HISPC I DELUHP/Enuivalent Pentium-IV 34 GHz (as ner current available snecs as ncr the fo llowin" snecifications: fOb SDRAM, 40GB HOD, ) ,5"FDD, T INo. PCI slot free for V -netlip interface card, 2 Nos RS232C free ports, I No. parallel ort, and mouse Ethemet ort, Windows XP and Office 2000, 40X CD-Drive Tane drive, 10120GB backuD drive·intemal System to onerate on I 15VAC 19" LCD Monitor. ,-

b VnetlIP Interface Card for Ihe HIS PCs V1701) 13 I

L2 REPLACEMENT OF PC, FOR ENG IN CCR I 2

.) ENG PC ,-DELLIHP/E-:::-uivalent Pentium-IV 34 GHz as ocr current available s ecs a~er the followim! soecifications: ) gb SDRAM, 40GB HOD, ),5"FDD, I No. PCI slot free for V-netlin interface card, 2 Nos.RS232C free orts, I NO~Oaral leTDort, arid mouse, Ethernet DOrt, Windows 2003 and Office 2000, 40X CD-Drive Tane drive, 10120GB backun drive~intemal System to operate on 115VAC. 19" LCD Monitor. I

I b VnetlIP Interface Card for the ENG PCs(V1701) 2 ,-

I,) REPLACEMENT OF PC, FOR EXAOPC IN CCR 4

• EXAOPC PC

DELLIHP/Enuivalent Pentium-IV 34 GHz as ner current available snecs as ner the follow!n" snecifications' C,b SDRAM, 40GB HOD, ) ,5"FDD, INo. PCI slot free for V-netiJD-interface card, 2 Nos.RS232C freeoorts, 1 No~raller;::;-or1, and mouse, Ethemetnort, Windows 2003 and Office 2000 , 40X CD-Drive Tape drive, 10120GB backup drive-internal Svstem to ooerate on 115VAC. 19" LCD Monitor.

b) Vneti lP Interface Card for Ihe EXAOPC PCs (VI701 ) . 4

1,4 REPLACEMENT OF PFCDOI06 WITH AFVIOD VNETnp) CONTROLLER I I

2 VNETnp NETWORK COMPONENTS & VNET ROUTER

U Duplexed Vnet Router 2 AVR IOD-QI21O

2,2 L3 Switch for Enet Connection 10 Vnct-IP (CISCOI AlcateVNetgear) I

2,) UTP Cable with RJ45 conneclols, 30 Mus 50

2,4 24 Pon L2 Switch (IGBPS fOl VnetlIP (CISCOI A1cateVNel ear) with I FO Pon 4

25 Vnet Cables Model ' VCBJ J J-MOlO )0 Base 5, Vnet cablc, LCMth 10 meterS") 4

2,6 Vnet Terminator for 10 Base 5 Cables Model ' YCBI 18 4

2lrd Janu~ry 2007

Page 163: Appendix A

Clien! PWo<:on Arabia Ltd

End User : Saudi Arameo Upgrade l eddah Rerlflt ry DCS

Hem

BILL OF MATERIALS

I I 2.7 Cabinet for mounting the New Hardware in CCR

Make : Rittal

I 3 SOFTWARE I

3.1 Upgrade of Existing System Revision from R3.02 to R3.0S I

L I B UPGRADE CDU II & FCCU FIELD CONTROL STATIONS FCSOJOJ & FCSOJ02

1.1 CPU FOR FIELD CONTROL STATIONS I I , CP345 Processor Card for AFS 200

C) INTERFACE ZONE n UPS TO DCS IN PIB II I , AKBI41·MOI 5 Serial interface Cable

D) ADDITION OF 2 HIS IN PI.B#2 FOR CDU II & FCCU I 1.1 OPERATION WORKSTATIONS IN PIB-2

a HIS Human interface Station for Operation DELlJHP/Eauivalent Pentium-IV 3.4 GHz as oer current available soecs as oer the followine: soecifications: SI2MB SDRAM, 40GB HDD, 3.5"FDD, INo. PCI slot free for V-net interface card, 2 Nos.RS232C free ports, I No. parallel port, and mouse, Ethernet ort, Windows XP and Office 2000 40X CD-Drive Tape drive, 1OJ20GB backup drive-internal System to operate on I 15VAC. 19" LCD Monitor

bj AiP827· i USB Operation Keyboard for HIS J 00-120V AC powersupply

c VF701 Vnet interface Card

dj Vnet CabIn & Ten J Model : YCBJ4J -005 ( 10 Base 2, Vnet cable, Length 5 meters

ii Model : YCB146 (TEES

e Open Desktop Consoles for t Vnet interface Card

2 SOFTWARE LICENSE FOR OPERA TOR STATION HIS) AT pm#2

2.1 Standard Oprr2tion and Monitoring Function New Installation) LHSIIOO·C II Multi Ie software license . English version INOO99 The total control station is 5 or more

2.2 Control Drawine. Status Display Packae.t I LHS4410·CII Multiple software license. English version

2.3 Logi( Chart Status Package I LHS4420·CII Multi Ie software license . En lish version

2.3 Report Package I LHS6S30·CII Multiple software license . English version Softwart Media For HIS I

2.4 LHSKM02·CII CD-ROM. English version IWIN·XP For Windows XP I

E) ADDITION OF I HIS INSIDE DISASTER C ONTROL CENTER (DCC) I 1.1 OPERATION WORKST A nON IN DCC I

aj HIS Human Interface Station for Operation I DELUHPIEQuivaJent Pentium-IV 3.4 GHz. ( as per current avai lable snecs ) as per the following spec ifications: I SI2MB SDRAM, 40GB HDD, 3.S"FDD, I INo. PCI slot free for V-net interface card, 2 Nos.RS232C free orts, 1 No. parallel port, and mouse, Ethernet port, Windows XP and Office 2000 , 40X CD· Drive Tape drive, 10/20GB backup drive-internal System to operate on 11 5VAC

n rd January 200 ") v,

Proposal No . . HSQ6BJo,mJ16·RI

.t-." 0 • 0 <::1

I

I

4

I

2

2

2

4 4

2

2 2

2

2

2

I

I

Page 164: Appendix A

CJiell~ : Pell'OCOll Arllbil Ltd End User : Saudi Aram~o Ullgrlde Jeddah RefInery DCS

BILL OF MATERIALS

USB i 100· 120VAC

IV1701 IVncUlP

:.2

. 3

Op, n Desktop Con, oles fo,Vnet intenace C

tJ1l> e . bl, wi" RJ45

1&

: FORO

10M",

I ATPIB#l

, license . En.li,h ve"ion IThe total contml station i, 5 0' moce

. Di,ploy Pack • • , IMuitiDI , sofiwace license . Enolish v",ion

cD.i, C " Status Pack ... IMultiDle sofiwace ~

I----F,.j'----+--til KCii}&i'l s30 IMultiple ,oftwa" license . Eneli ' h vetSion

'J IREP

1.2

,3

2lrd Jannry 2007

r OF OTHER ; PC HAR IWARE

I.) IHtS PC DE LIH

n" the

'OF'us PCs I PlBil2

. 40GB :DD. 3.5'FI)[ . PC lot free for ""d,

'0 . • amUel port, an, 1 mouse, Ethernet port, , XP and Office 2000 ,40X D·D,i"

Tape d,ive, 10120GB backuD i Syst, m to owate on 11 5VA 19' LCD MonitoL

. UF US PC I~ PlBilI

. ) HIS PC DELLIH i " tOH, , ne,

'" the I . 40GB. DD~FDD

10. P'" let pon, an I mouse.' ~et pon , XP and , lOX D·D,ive

10120GB backuD , System to opemte on 11 5VA 19' CD MonitoL

.) HIS PC OELLIHI , 3.4 GHz

oe,the~ DO. 3.5"FDD

. PCI , lot f,ee mi ,c"d.

, and ~ , toort.

10120GB baCkUP" i System to OPeLate on 11 SVAC 19' : D MOnitoL

'"

.

YOKDGAWA ;; Prollosll No. :HSQ6BMB316-RI

I

2

2

I I

I

I

1

2

I

Page 165: Appendix A

Clien! : Peuocon Atabi l Ltd End UKr : Sludi Atamco Upgrade Jeddah ReflneJ)' DCS

Iltm

BILL OF MATERIALS

G) PROJECT & SOFTWARE ENGINEERI NG SERVI CES FOR ABOVE

Siudy of exi stinS!. documents & to understand DeS tie-in to existing system DeS system back-u Preparation of manufacturing databook as per Aramco standards YME's Project Engineel in~ Expenses related to Order handling. T&L for Pro'ect meetings, site visit Imeetings Software Engineering Pro'eet Management

H Lee:alisalion & Sea-fre~ght cha.!:ges from Singapl?re factory 10 Bahrain of DeS maltri al, Repac king & Load ing onlo tru cks; T ransportation rrom Bahrain to Jtddah by road including customs clearanct & Custom Dut), I

I J) Co ntrol room install at ion activitits for DCS I

YOKOGAWA Proposal No. :HSQ6BMB} 16-R I

.£ ;; • 0

<:> J

J

per This will be in the scope of Installation contractor of Saudi AramcolPetrocon ' YME engineer can provide installat1 0n diem All site su ort are charJ!:ed on er diem basis as er unit rales .

I Systt m powtr-on, SAT & commissio ning assistanct per All site support are charged Oil per diem basis as per unit rates. diem

I

23rdJanulry 2007 ."

Page 166: Appendix A

Yokogawa Midd le East B.S.C.(c) P.O. Box 10070, Manama, Bahrain QUOTATION Bldg. 511, Road 2516, Busaiteen 225, Muharraq, $t;lte. Of Bahrain TEL: 973 (17) 358100 FAX: 973 (17) 336 100

REF. NO :· HSQ7AMB36S·R1 Please use this no. when ordering

DATE :. _ _ _ _____ J"'0"n"u"0,,"',,3,,',,, ',,0"'0'-' ______ _

ATIENTION

SUBJECT

FINAL USER

INQUIRY NO.

PLACE OF DELIVERY

TIME OF DELIVERY

TERMS OF PAYMENT

ATIACHED DOCUMENT

LINE I

EFFECTIVE UNTIL :. ________ M="'"c"h-=''-, '::0,,0"-' ______ _ _

: Mr. Ashraf Kathlan· Vice President M R AL KATHLAN

: Proposal for Wasle Waler Treatment Conlrol Room for Jeddah Refinery

: Saudi Arabian Oil Company

: Quotation Request No.: QR·770·06·YK4

: DOP, Jeddah RefineryWof1(s

: 6 months from receipt of firm Purchase Order (Provided a!1 Design Inputs are received in time)

With the following milestones against irrevocable Letter of Credit at sight In favour of

Yokogawa Middle East from a reputed bank of European origin.

-20%

- 20%

·20%

-30%

·10%

advance against Purchase Order

on approva l of PDR

on approval of CDR

against successful FAT completion

against Ex-Works , Bahrain Delivery of the system

: As per attached Table of Conlents

I Di,tribul,"" 'C""trol Syslem for the Upgrade of Jeddah ReI. Wasle waler trealment plant which includes : CS 3000 DCS Hardware, basic software and appliCation software

projecl engineering, project management, testing, documentation, as per the Proposal.

.,'

I.

Saudi Arabianl GCe Customs Duty Freight & Insurance

.,'

YOf<OGAWA

$ 4042,444

Note We have quoted for this project as per Saudi Aramco VDPA agreement (Ref". OOO-B1503/SAlYEC dtd.12 December 2004). However considering our long standing relationshiping with MRK. we are pleased to offer following disooun\

Discount

S..a!Dn 1.\ " "'00 SU""""'Y

° 2% Oiscount (US$ 8,939) on the quoted price, provided all Milestone Payments are made in time. This discount amount will be deducted from the final invoice of 10% against System Delivery (Ex-works. Bahrain) (We will invoice MRK for 8%, If alilhe Milestone Payments have been made in Time)

3% additional discount (USS 13,0408) in case MRK places the Field Instrument Order on Gas Arabian Services for the b full value as per their Quotation Reference No. : QTN-932A-06-YK12 dtd.17/12/2006.

This discount will be deducted from the first Milestone Invoice (20% Advance), provided the order for field Instruments is received . (We will Invoice MRK for 17%, if the field instl'\Jrnenls order is received .)

"age '1 2 J.nu",", 31. 200 7

Page 167: Appendix A

Yokogawa Middle East B.S.C.lc} P.O. Bo)( 10070. Manama. Bahrain Bldg. 577. Road 2516. Blisalteen 225. MlIha~q , Stale Ql ,Bahrain TEL: 973(17) 358 100 FAX: 973 (17)336100

R'EF. NO:· HSQ7AMB365·R1 Please use this no. when ordering

Contractua l Terms & Conditions :

COUNTRY OF ORIGIN:

2 Terms & Conditions :

3 WARRAN1Y:

4 Site Services

S~~" 1.1 P~"" Summ try

QUOTATION

DATE .-_______ --$J,"'""U"""ryc:3,,1.L. 2,,0,,0"-7 ______ _

EFFECTIVE UNTil March 2, 2007

1) Yokogawa DCS Hardware/Software Components - Singapore

2) PCs aJ'ld Printers - .rom Middle East sources

3) Panels -'rom Middle East sources or other Yokogawa suppliers

Please note that Yokogawa reserves the right to change the location of sourcing of above

materials. ·

Standard YOKOGAWA term & conditions shall be applicable for Ihis proposal

1 e months from delivery or 12 months tram System Commissioning whichever is earlier

All site serviCes 'Pr~oommissioning Commissioning SAT Supervision of Installation .elc) will be based on per diem basis

P3oQ.212 h "u.1')' l1 . 2001

Page 168: Appendix A

Item

Customer: AI-Khatlan End User: Saudi Aramco Project: Proposal for Waste Water Treatment Control Room for Jeddah Refinery

DeS HARDWARE BILL OF MATERIAL

Mod eU Desc ription

1 i I

I,

Yokogawa Middle East B.S.C.(c) Proposal No.: HSQ7AMB365·RO

Tota l

have not considered FO cables between the Main DeS Control Room & the WWTP DeS Con trol Room. The same ca n be MRK. . . termination & of this FO cable is out of

above BOM is under assumption that the Main Jeddah DeS is upgraded to VnetlIP (presently under act ive discussions with

MB: 31 January 2007 Page 111