Page 1: Appendix 8.1 Details of Construction Noise Impact Assessment · 2010-03-29 · Appendix 8.1 Equipment List and Associated Sound Power Level for Construction Activities (unmitigated)

Agreement No. CE 1/2008 (WS) Environmental Impact Assessment Improvement of Fresh Water Supply to Cheung Chau Final Report - Investigation 2831/B&V/015/Issue 3

January 2010 [2831_EIA_fs_v3_jan10.doc] B&V

Appendix 8.1

Details of Construction Noise Impact Assessment

Page 2: Appendix 8.1 Details of Construction Noise Impact Assessment · 2010-03-29 · Appendix 8.1 Equipment List and Associated Sound Power Level for Construction Activities (unmitigated)
Page 3: Appendix 8.1 Details of Construction Noise Impact Assessment · 2010-03-29 · Appendix 8.1 Equipment List and Associated Sound Power Level for Construction Activities (unmitigated)
Page 4: Appendix 8.1 Details of Construction Noise Impact Assessment · 2010-03-29 · Appendix 8.1 Equipment List and Associated Sound Power Level for Construction Activities (unmitigated)
Page 5: Appendix 8.1 Details of Construction Noise Impact Assessment · 2010-03-29 · Appendix 8.1 Equipment List and Associated Sound Power Level for Construction Activities (unmitigated)

Appendix 8.1Equipment List and Associated Sound Power Level for Construction Activities (unmitigated)

(A) Horizontal Directional Drilling at Cheung ChauA1. Site Clearance / Formation & Equipment mobilizationType of PME TM Code / BS Ref. SWL - dB(A) No. of Units Total SWL - dB(A)Excavator / loader 081 112 2 118Crane 048 112 1Village vehicle # (note 1) 101 2Generator, silenced 102 100 3Derrick barge 061 104 1Tug boat 221 110 1Concrete mixer (petrol) 046 96 1

A2. Drilling (Pilot bore, Forward reaming)Type of PME TM Code / BS Ref. SWL - dB(A) No. of Units Total SWL - dB(A)Crane 048 112 1 119Drilling rig # 110 1Agitator # 90 1Drilling fluid mixer # 90 1Drilling fluid pump # 105 3Bentonite filtering plant 162 105 1Mud tanks and recycling unit (pump) # 105 4Water / mud pump (electric) 281 88 5Hydraulic power pack # 100 3Village vehicle # (note 1) 101 2Generator (for drilling rig) 101 108 1Generator, silenced 102 100 3Air compressor 003 104 2

A3. Pipe installation and connectionsType of PME TM Code / BS Ref. SWL - dB(A) No. of Units Total SWL - dB(A)Crane 048 112 1 119Drilling rig # 110 1Agitator # 90 1Drilling fluid mixer # 90 1Drilling fluid pump # 105 3Bentonite filtering plant 162 105 1Mud tanks and recycling unit (pump) # 105 4Water / mud pump (electric) 281 88 5Hydraulic power pack # 100 3Hand held drill / grinder (electric) 065 98 1Saw, wire # 101 1Village vehicle # (note 1) 101 2Generator (for drilling rig) 101 108 1Generator, silenced 102 100 3Air compressor 003 104 2

A4. Testing and commissioningTM Code / BS Ref. SWL - dB(A) No. of Units Total SWL - dB(A)

Crane 048 112 1 115Village vehicle # (note 1) 101 2Water / mud pump (electric) 281 88 2Hydraulic power pack # 100 3Generator, silenced 102 100 3Air compressor 003 104 2

A5. Demobilization & site reinstatementType of PME TM Code / BS Ref. SWL - dB(A) No. of Units Total SWL - dB(A)Excavator / loader 081 112 1 117Crane 048 112 1Village vehicle # (note 1) 101 2Generator, silenced 102 100 2Derrick barge 061 104 1Tug boat 221 110 1Concrete mixer (petrol) 046 96 1

(B) Construction of land-based water main at Cheung ChauB1. Road breakingType of PME TM Code / BS Ref. SWL - dB(A) No. of Units Total SWL - dB(A)Hand-held breaker 026 114 1 114Air compressor 002 102 1

B2. Trench excavationType of PME TM Code / BS Ref. SWL - dB(A) No. of Units Total SWL - dB(A)Excavator 081 112 1 113Village vehicle # (note 1) 101 1Water pump, submersible 283 85 1Generator, silenced 102 100 1

B3. Pipe layingType of PME TM Code / BS Ref. SWL - dB(A) No. of Units Total SWL - dB(A)Excavator 081 112 1 113Village vehicle # (note 1) 101 1Power pack (for pipe fusion machine) 168 100 1Hand held drill / grinder (electric) 065 98 1Water pump, submersible 283 85 1Generator, silenced 102 100 1

B4. BackfillingType of PME TM Code / BS Ref. SWL - dB(A) No. of Units Total SWL - dB(A)Excavator 081 112 1 113Power rammer 169 108 1

B4. Road reinstatementType of PME TM Code / BS Ref. SWL - dB(A) No. of Units Total SWL - dB(A)Village vehicle # (note 1) 101 1 102Concrete mixer (petrol) 046 96 1

PME = Powered Mechanical EquipmentSWL = Sound Power LevelTM = Technical Memorandum on Noise from Construction Work other than Percussive PilingBS = BS 5228# = Sound power level of other commonly used PME (source: EPD website on Guidance Notes for Licence Application under the NCO)note 1 = equivalent to light goods vehicle

2831_EIA_CNOISE_dec09.xls Page 1 of 6 eqmt

Page 6: Appendix 8.1 Details of Construction Noise Impact Assessment · 2010-03-29 · Appendix 8.1 Equipment List and Associated Sound Power Level for Construction Activities (unmitigated)

Appendix 8.1Equipment List and Associated Sound Power Levels for the Construction Activities (Level 1 mitigation : Use of Quiet Plant)

(A) Horizontal Directional Drilling at Cheung ChauA1. Site Clearance / Formation & MobilizationType of PME TM Code / BS Ref. SWL - dB(A) No. of Units Total SWL - dB(A)Excavator / loader C.4-64 103 2 114Crane C.4-50 99 1Village vehicle # (note 1) 101 2Generator, silenced 102 100 3Derrick barge 061 104 1Tug boat 221 110 1Concrete mixer (petrol) 046 96 1

A2. Drilling (Pilot bore, Forward reaming)Type of PME TM Code / BS Ref. SWL - dB(A) No. of Units Total SWL - dB(A)Crane C.4-50 99 1 118Drilling rig # 110 1Agitator # 90 1Drilling fluid mixer # 90 1Drilling fluid pump # 105 3Bentonite filtering plant 162 105 1Mud tanks and recycling unit (pump) # 105 4Water / mud pump 281 88 5Hydraulic power pack # 100 3Village vehicle # (note 1) 101 2Generator (for drilling rig) 101 108 1Generator, silenced 102 100 3Air compressor 003 104 2

A3. Pipe installation and connectionsType of PME TM Code / BS Ref. SWL - dB(A) No. of Units Total SWL - dB(A)Crane C.4-50 99 1 118Drilling rig # 110 1Agitator # 90 1Drilling fluid mixer # 90 1Drilling fluid pump # 105 3Bentonite filtering plant 162 105 1Mud tanks and recycling unit (pump) # 105 4Water / mud pump 281 88 5Hydraulic power pack # 100 3Hand held drill / grinder (electric) 065 98 1Saw, wire # 101 1Village vehicle # (note 1) 101 2Generator (for drilling rig) 101 108 1Generator, silenced 102 100 3Air compressor 003 104 2

A4. Testing and commissioningTM Code / BS Ref. SWL - dB(A) No. of Units Total SWL - dB(A)

Crane C.4-50 99 1 112Village vehicle # (note 1) 101 2Water / mud pump 281 88 2Hydraulic power pack # 100 3Generator, silenced 102 100 3Air compressor 003 104 2

A5. Demobilization & site reinstatementType of PME TM Code / BS Ref. SWL - dB(A) No. of Units Total SWL - dB(A)Excavator / loader C.4-64 103 1 113Crane C.4-50 99 1Village vehicle # (note 1) 101 2Generator, silenced 102 100 2Derrick barge 061 104 1Tug boat 221 110 1Concrete mixer (petrol) 046 96 1

(B) Construction of land-based water main at Cheung ChauB1. Road breakingType of PME TM Code / BS Ref. SWL - dB(A) No. of Units Total SWL - dB(A)Hand-held breaker (note 2) 107 1 108Air compressor 002 100 1

B2. Trench excavationType of PME TM Code / BS Ref. SWL - dB(A) No. of Units Total SWL - dB(A)Excavator C.4-64 103 1 106Village vehicle # (note 1) 101 1Water pump, submersible 283 85 1Generator, silenced 102 100 1

B3. Pipe layingType of PME TM Code / BS Ref. SWL - dB(A) No. of Units Total SWL - dB(A)Excavator C.4-64 103 1 108Village vehicle # (note 1) 101 1Power pack (for pipe fusion machine) 168 100 1Hand held drill / grinder (electric) 065 98 1Water pump, submersible 283 85 1Generator, silenced 102 100 1

B4. BackfillingType of PME TM Code / BS Ref. SWL - dB(A) No. of Units Total SWL - dB(A)Excavator C.4-64 103 1 107Power rammer D.3-119 105 1

B4. Road reinstatementType of PME TM Code / BS Ref. SWL - dB(A) No. of Units Total SWL - dB(A)Village vehicle # (note 1) 101 1 102Concrete mixer (petrol) 046 96 1

PME = Powered Mechanical EquipmentSWL = Sound Power LevelTM = Technical Memorandum on Noise from Construction Work other than Percussive PilingBS = BS 5228# = Sound power level of other commonly used PME (source: EPD website on Guidance Notes for Licence Application under the NCO)note 1 = equivalent to light goods vehiclenote 2 = use hand-held breaker with noise level of 107 dB(A) or below.

2831_EIA_CNOISE_dec09.xls Page 2 of 6 eqmt (quiet)

Page 7: Appendix 8.1 Details of Construction Noise Impact Assessment · 2010-03-29 · Appendix 8.1 Equipment List and Associated Sound Power Level for Construction Activities (unmitigated)

Appendix 8.1Equipment Lists and Associated Sound Power Level for Construction Activities (Level 2 Mitigation : Quiet Plant + Temporary Barrier)

(A) Horizontal Directional Drilling at Cheung ChauA1. Site Clearance / Formation & MobilizationType of PME TM Code / BS Ref. SWL - dB(A) Barrier Correction Corrected SWL No. of Units Total SWL - dB(A)Excavator / loader C.4-64 103 -5 98 2 112Crane C.4-50 99 -5 94 1Village vehicle # (note 1) 101 -5 96 2Generator, silenced 102 100 -10 90 3Derrick barge 061 104 0 104 1Tug boat 221 110 0 110 1Concrete mixer (petrol) 046 96 -10 86 1

A2. Drilling (Pilot bore, Forward reaming)Type of PME TM Code / BS Ref. SWL - dB(A) Barrier Correction Corrected SWL No. of Units Total SWL - dB(A)Crane C.4-50 99 -5 94 1 108Drilling rig # 110 -10 100 1Agitator # 90 -10 80 1Drilling fluid mixer # 90 -10 80 1Drilling fluid pump # 105 -10 95 3Bentonite filtering plant 162 105 -10 95 1Mud tanks and recycling unit (pump) # 105 -10 95 4Water / mud pump 281 88 -10 78 5Hydraulic power pack # 100 -10 90 3Village vehicle # (note 1) 101 -5 96 2Generator (for drilling rig) 101 108 -10 98 1Generator, silenced 102 100 -10 90 3Air compressor 003 104 -10 94 2

A3. Pipe installation and connectionsType of PME TM Code / BS Ref. SWL - dB(A) Barrier Correction Corrected SWL No. of Units Total SWL - dB(A)Crane C.4-50 99 -5 94 1 108Drilling rig # 110 -10 100 1Agitator # 90 -10 80 1Drilling fluid mixer # 90 -10 80 1Drilling fluid pump # 105 -10 95 3Bentonite filtering plant 162 105 -10 95 1Mud tanks and recycling unit (pump) # 105 -10 95 4Water / mud pump 281 88 -10 78 5Hydraulic power pack # 100 -10 90 3Hand held drill / grinder (electric) 065 98 -10 88 1Saw, wire # 101 -10 91 1Village vehicle # (note 1) 101 -5 96 2Generator (for drilling rig) 101 108 -10 98 1Generator, silenced 102 100 -10 90 3Air compressor 003 104 -10 94 2

A4. Testing and commissioningTM Code / BS Ref. SWL - dB(A) Barrier Correction Corrected SWL No. of Units Total SWL - dB(A)

Crane C.4-50 99 -5 94 1 103Village vehicle # (note 1) 101 -5 96 2Water / mud pump 281 88 -10 78 2Hydraulic power pack # 100 -10 90 3Generator, silenced 102 100 -10 90 3Air compressor 003 104 -10 94 2

A5. Demobilization & site reinstatementType of PME TM Code / BS Ref. SWL - dB(A) Barrier Correction Corrected SWL No. of Units Total SWL - dB(A)Excavator / loader C.4-64 103 -5 98 1 112Crane C.4-50 99 -5 94 1Village vehicle # (note 1) 101 -5 96 2Generator, silenced 102 100 -10 90 2Derrick barge 061 104 0 104 1Tug boat 221 110 0 110 1Concrete mixer (petrol) 046 96 -10 86 1

(B) Construction of land-based water main at Cheung ChauB1. Road breakingType of PME TM Code / BS Ref. SWL - dB(A) Barrier Correction Corrected SWL No. of Units Total SWL - dB(A)Hand-held breaker (note 2) 107 0 107 1 108Air compressor 002 100 0 100 1

B2. Trench excavationType of PME TM Code / BS Ref. SWL - dB(A) Barrier Correction Corrected SWL No. of Units Total SWL - dB(A)Excavator C.4-64 103 0 103 1 106Village vehicle # (note 1) 101 0 101 1Water pump, submersible 283 85 0 85 1Generator 102 100 0 100 1

B3. Pipe layingType of PME TM Code / BS Ref. SWL - dB(A) Barrier Correction Corrected SWL No. of Units Total SWL - dB(A)Excavator C.4-64 103 0 103 1 108Village vehicle # (note 1) 101 0 101 1Power pack (for pipe fusion machine) 168 100 0 100 1Hand held drill / grinder (electric) 065 98 0 98 1Water pump, submersible 283 85 0 85 1Generator 102 100 0 100 1

B4. BackfillingType of PME TM Code / BS Ref. SWL - dB(A) Barrier Correction Corrected SWL No. of Units Total SWL - dB(A)Excavator C.4-64 103 0 103 1 107Power rammer D.3-119 105 0 105 1

B4. Road reinstatementType of PME TM Code / BS Ref. SWL - dB(A) Barrier Correction Corrected SWL No. of Units Total SWL - dB(A)Village vehicle # (note 1) 101 0 101 1 102Concrete mixer (petrol) 046 96 0 96 1

PME = Powered Mechanical EquipmentSWL = Sound Power LevelTM = Technical Memorandum on Noise from Construction Work other than Percussive PilingBS = BS 5228# = Sound power level of other commonly used PME (source: EPD website on Guidance Notes for Licence Application under the NCO)note 1 = equivalent to light goods vehiclenote 2 = use hand-held breaker with noise level of 107 dB(A) or below.

2831_EIA_CNOISE_dec09.xls Page 3 of 6 eqmt (quiet+barrier+restrict)

Page 8: Appendix 8.1 Details of Construction Noise Impact Assessment · 2010-03-29 · Appendix 8.1 Equipment List and Associated Sound Power Level for Construction Activities (unmitigated)

Appendix 8.1Predicted Construction Noise Levels (unmitigated) at Representative NSRs

NSR Construction Activities Total SWLdB(A)

HorizontalDistance

(m)

VerticalDistance

(m)

DistanceCorrection

dB(A)

FacadeCorrection

dB(A)

Predicted Noise Level dB(A)

A1 Site clearance / formation & equipment mobilization 118 86 35 47 + 3.0 74

A2 Drilling (pilot bore & forward reaming) 119 86 35 47 + 3.0 74

A3 Pipe installation and connections 119 86 35 47 + 3.0 74

A4 Testing and commissioning 115 86 35 47 + 3.0 70

A5 Demobilization & site reinstatement 117 86 35 47 + 3.0 73

B1 Road breaking 114 90 35 48 + 3.0 70

B2 Trench excavation 113 90 35 48 + 3.0 68

B3 Pipe laying 113 90 35 48 + 3.0 68

B4 Backfilling 113 90 35 48 + 3.0 69

B5 Road reinstatement 102 90 35 48 + 3.0 57

A1 Site clearance / formation & equipment mobilization 118 62 10 44 + 3.0 77

A2 Drilling (pilot bore & forward reaming) 119 62 10 44 + 3.0 78

A3 Pipe installation and connections 119 62 10 44 + 3.0 78

A4 Testing and commissioning 115 62 10 44 + 3.0 74

A5 Demobilization & site reinstatement 117 62 10 44 + 3.0 76

B1 Road breaking 114 22 10 36 + 3.0 82

B2 Trench excavation 113 22 10 36 + 3.0 80

B3 Pipe laying 113 22 10 36 + 3.0 80

B4 Backfilling 113 22 10 36 + 3.0 81

B5 Road reinstatement 102 22 10 36 + 3.0 70

A1 Site clearance / formation & equipment mobilization 118 166 16 52 + 3.0 69

A2 Drilling (pilot bore & forward reaming) 119 166 16 52 + 3.0 69

A3 Pipe installation and connections 119 166 16 52 + 3.0 69

A4 Testing and commissioning 115 166 16 52 + 3.0 65

A5 Demobilization & site reinstatement 117 166 16 52 + 3.0 67

B1 Road breaking 114 48 16 42 + 3.0 75

B2 Trench excavation 113 48 16 42 + 3.0 74

B3 Pipe laying 113 48 16 42 + 3.0 74

B4 Backfilling 113 48 16 42 + 3.0 74

B5 Road reinstatement 102 48 16 42 + 3.0 63

A1 Site clearance / formation & equipment mobilization 118 192 2 54 + 3.0 68

A2 Drilling (pilot bore & forward reaming) 119 192 2 54 + 3.0 68

A3 Pipe installation and connections 119 192 2 54 + 3.0 68

A4 Testing and commissioning 115 192 2 54 + 3.0 64

A5 Demobilization & site reinstatement 117 192 2 54 + 3.0 66

B1 Road breaking 114 75 2 46 + 3.0 72

B2 Trench excavation 113 75 2 46 + 3.0 70

B3 Pipe laying 113 75 2 46 + 3.0 70

B4 Backfilling 113 75 2 46 + 3.0 71

B5 Road reinstatement 102 75 2 46 + 3.0 60

Notes:Daytime construction noise criteria: residential premises 75 dB(A)Please refer to Figure 8.1 for location of NSR.Figures in BOLD denote exceedance of the daytime construction noise standards

NSR 1

NSR 2

NSR 3

NSR 4

2831_EIA_CNOISE_dec09.xls Page 4 of 6 PNL (unmit)

Page 9: Appendix 8.1 Details of Construction Noise Impact Assessment · 2010-03-29 · Appendix 8.1 Equipment List and Associated Sound Power Level for Construction Activities (unmitigated)

Appendix 8.1Predicted Construction Noise Levels (Level 1 Mitigation : Use of Quiet Plant) at Representative NSRs

NSR Construction Activities Total SWLdB(A)

HorizontalDistance

(m)

VerticalDistance

(m)

DistanceCorrection

dB(A)

FacadeCorrection

dB(A)

Predicted Noise Level dB(A)

A1 Site clearance / formation & equipment mobilization 114 86 35 47 + 3.0 69

A2 Drilling (pilot bore & forward reaming) 118 86 35 47 + 3.0 73

A3 Pipe installation and connections 118 86 35 47 + 3.0 73

A4 Testing and commissioning 112 86 35 47 + 3.0 67

A5 Demobilization & site reinstatement 113 86 35 47 + 3.0 69

B1 Road breaking 108 90 35 48 + 3.0 63

B2 Trench excavation 106 90 35 48 + 3.0 62

B3 Pipe laying 108 90 35 48 + 3.0 63

B4 Backfilling 107 90 35 48 + 3.0 62

B5 Road reinstatement 102 90 35 48 + 3.0 57

A1 Site clearance / formation & equipment mobilization 114 62 10 44 + 3.0 73

A2 Drilling (pilot bore & forward reaming) 118 62 10 44 + 3.0 77

A3 Pipe installation and connections 118 62 10 44 + 3.0 77

A4 Testing and commissioning 112 62 10 44 + 3.0 71

A5 Demobilization & site reinstatement 113 62 10 44 + 3.0 72

B1 Road breaking 108 22 10 36 + 3.0 75

B2 Trench excavation 106 22 10 36 + 3.0 74

B3 Pipe laying 108 22 10 36 + 3.0 75

B4 Backfilling 107 22 10 36 + 3.0 74

B5 Road reinstatement 102 22 10 36 + 3.0 70

A1 Site clearance / formation & equipment mobilization 114 166 16 52 + 3.0 64

A2 Drilling (pilot bore & forward reaming) 118 166 16 52 + 3.0 68

A3 Pipe installation and connections 118 166 16 52 + 3.0 68

A4 Testing and commissioning 112 166 16 52 + 3.0 62

A5 Demobilization & site reinstatement 113 166 16 52 + 3.0 64

B1 Road breaking 108 48 16 42 + 3.0 69

B2 Trench excavation 106 48 16 42 + 3.0 67

B3 Pipe laying 108 48 16 42 + 3.0 69

B4 Backfilling 107 48 16 42 + 3.0 68

B5 Road reinstatement 102 48 16 42 + 3.0 63

A1 Site clearance / formation & equipment mobilization 114 192 2 54 + 3.0 63

A2 Drilling (pilot bore & forward reaming) 118 192 2 54 + 3.0 67

A3 Pipe installation and connections 118 192 2 54 + 3.0 67

A4 Testing and commissioning 112 192 2 54 + 3.0 61

A5 Demobilization & site reinstatement 113 192 2 54 + 3.0 62

B1 Road breaking 108 75 2 46 + 3.0 65

B2 Trench excavation 106 75 2 46 + 3.0 64

B3 Pipe laying 108 75 2 46 + 3.0 65

B4 Backfilling 107 75 2 46 + 3.0 65

B5 Road reinstatement 102 75 2 46 + 3.0 60

Notes:Daytime construction noise criteria: residential premises 75 dB(A)Please refer to Figure 8.1 for location of NSR.Figures in BOLD denote exceedance of the daytime construction noise standards

NSR 1

NSR 2

NSR 3

NSR 4

2831_EIA_CNOISE_dec09.xls Page 5 of 6 PNL (mit 1)

Page 10: Appendix 8.1 Details of Construction Noise Impact Assessment · 2010-03-29 · Appendix 8.1 Equipment List and Associated Sound Power Level for Construction Activities (unmitigated)

Appendix 8.1Predicted Construction Noise Levels (Level 2 Mitigation : Use of Quiet Plant + Temporary Noise Barrier) at Representative NSRs

NSR Construction Activities Total SWLdB(A)

HorizontalDistance

(m)

VerticalDistance

(m)

DistanceCorrection

dB(A)

FacadeCorrection

dB(A)

Predicted Noise Level dB(A)

A1 Site clearance / formation & equipment mobilization 112 62 10 44 + 3.0 71

A2 Drilling (pilot bore & forward reaming) 108 62 10 44 + 3.0 67

A3 Pipe installation and connections 108 62 10 44 + 3.0 67

A4 Testing and commissioning 103 62 10 44 + 3.0 62

A5 Demobilization & site reinstatement 112 62 10 44 + 3.0 71

Notes:Daytime construction noise criteria: residential premises 75 dB(A)Please refer to Figure 8.1 for location of NSR.Figures in BOLD denote exceedance of the daytime construction noise standards

NSR 2

2831_EIA_CNOISE_dec09.xls Page 6 of 6 PNL (mit 2)

Page 11: Appendix 8.1 Details of Construction Noise Impact Assessment · 2010-03-29 · Appendix 8.1 Equipment List and Associated Sound Power Level for Construction Activities (unmitigated)

Agreement No. CE 1/2008 (WS) Improvement of Fresh Water Supply to Cheung Chau - Investigation

[Appendix8.1_Fig_1_Photos of NSRs.doc] B&V

APPENDIX 8.1

NSR 1 NSR 2

NSR 3 NSR 4

Figure 1 Photographs of the Representative Noise Sensitive Receivers

Page 12: Appendix 8.1 Details of Construction Noise Impact Assessment · 2010-03-29 · Appendix 8.1 Equipment List and Associated Sound Power Level for Construction Activities (unmitigated)