Kenya Electricity Generating Company Limited

APPENDIX 2:

TECHNICAL SCHEDULES

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Table of Contents

Table of Contents

Section I: Instructions to Tenderers (ITT)

Section II: Conditions of contract

Section III: Employer’s Requirements /Specifications

Section IV: Technical Schedules

Section V: Price Schedules

Section VI: bidding and contract forms

APPENDIX

1. Employer’s Requirements /Specifications

2. Technical Schedules

3. Existing Equipment drawings & specifications

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

CONTENTS

SECTION IV: TECHNICAL SCHEDULES .............................................................................................................................................. 5

SCHEDULES GENERAL REQUIREMENTS ............................................................................................................................................ 5

1. GENERAL CONDITIONS ............................................................................................................................................................... 5

2. GUARANREED TECHNICAL PARTICULARS (GTP) ..................................................................................................................... 5

3. PRELIMINARY BILL OF MATERIALS ............................................................................................................................................ 6

GUARANREED TECHNICAL PARTICULARS (GTP) ............................................................................................................................. 9

1. GENERAL SPECIFICATIONS ......................................................................................................................................................... 9

1.5 PROJECT SCOPE ....................................................................................................................................................................... 9

1.6 PROJECT WORK PROGRAM ................................................................................................................................................... 9

1.7 DOCUMENTATION ................................................................................................................................................................. 9

1.8 ENGINEERING SERVICES BEFORE INSTALLATION ............................................................................................................. 10

1.9 MANUFACTURING AND SHIPMENT ................................................................................................................................... 10

1.10 INSTALLATION AND COMMISSIONING ............................................................................................................................ 10

1.11 TRAINING ............................................................................................................................................................................... 10

1.12 WARRANTY............................................................................................................................................................................ 11

3. GENERAL TECHNICAL SPECIFICATIONS ........................................................................................................................................ 13

3.1 STANDARDS ........................................................................................................................................................................... 13

3.2 GENERAL ELECTRICAL REQUIREMENTS ............................................................................................................................. 13

3.3 GENERAL MECHNICAL REQUIREMENTS ............................................................................................................................ 13

3.4 AUXILLIARY POWER SUPPLY EQUIPMENT ........................................................................................................................ 13

3.5 CONTROL DEVICES GENERAL REQUIREMENTS................................................................................................................. 13

3.6 CONTROL PANELS AND CABINETS REQUIREMENTS ........................................................................................................ 15

3.7 CABLES AND CONDUCTORS ............................................................................................................................................... 15

3.8 SOFTWARE ............................................................................................................................................................................. 15

3.9 SWITCHBOARD CUBICLES AND EQUIPMENT SPECIFICATIONS ..................................................................................... 16

3.10 MOTORS ................................................................................................................................................................................ 19

3.11 PIPES AND PIPEWORK .......................................................................................................................................................... 19

3.12 VALVES ................................................................................................................................................................................... 19

3.13 PRESSURE VESSELS/ACCUMULATORS ................................................................................................................................ 19

4. INTAKE GATE CONTROL SYSTEM PARTICULAR SPECIFICATIONS ........................................................................................ 20

4.2 OVERALL SYSTEM REQUIREMENTS .................................................................................................................................... 20

4.3 INTAKE GATE HYDRAULIC SYSTEM REQUIREMENTS ....................................................................................................... 20

4.4 INTAKE GATE ELECTRICAL CONTROL REQUIREMENTS ................................................................................................... 22

4.5 LOW VOLTAGE INTAKE GATE SWITCHBOARD ................................................................................................................. 23

4.6 INTERFACING TO SCADA SYSTEM ...................................................................................................................................... 24

5. SPILLWAY GATE CONTROL SYSTEM PARTICULAR SPECIFICATIONS ......................................................................................... 25

5.2 OVERALL SYSTEM REQUIREMENTS .................................................................................................................................... 25

5.3 SPILLWAY GATES HYDRAULIC SYSTEM REQUIREMENTS ................................................................................................ 25

5.4 SPILLWAY GATES ELECTRICAL CONTROL REQUIREMENTS ............................................................................................. 28

5.5 LOW VOLTAGE INTAKE GATE SWITCHBOARD ................................................................................................................. 29

5.6 INTERFACING TO SCADA SYSTEM ...................................................................................................................................... 30

PRELIMINARY BILL OF MATERIALS ................................................................................................................................................. 32

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

2.3 SUPPLY OF HYDRAULIC CONTROL SYSTEMS .................................................................................................................... 34

2.4 REFURBISHMENT OF SPILLWAY GATES SERVO MOTORS: ............................................................................................... 46

2.5 REFURBISHMENT OF INTAKE GATES SERVO MOTORS: .................................................................................................... 50

2.6 SUPPLY OF ELECTRICAL CONTROL PANELS & SWITCHBOARDS ..................................................................................... 53

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

SECTION IV: TECHNICAL SCHEDULES

SCHEDULES GENERAL REQUIREMENTS

1. GENERAL CONDITIONS

1.1 The following technical schedule forms MUST be completed in their entirety by the Tenderer at

the time of tendering. Any entry not filled (except comments column or dashed entries) will render

the bid unresponsive.

1.2 The Schedules shall be filled in and completed by the Tenderer, and submitted with the Bid as part

of the bidder’s technical proposal

1.3 All data of Informative nature entered in the Schedules are also guaranteed values by the Tenderer.

These data may only be altered following the Project Manager's written consent.

1.4 Bidder shall append their firms seal or stamp on each page of the schedules

1.5 These schedules shall be part of the bidders’ technical offer. Where they are conflicts between what

is stated in these schedules and what is stated elsewhere in another bidder’s document, the

information supplied by the bidder in these schedules shall take precedence. In case of conflict

between what is stated by bidder in the technical schedule and the bill of materials the technical

schedule shall take precedence.

1.6 All apparatus, accessories or fittings which may not have been specifically mentioned, but which

are usual or necessary in the respective equipment for the completeness of the finished work in an

operable status, shall be deemed to be included in the Contract and shall be provided by the

Contractor without any extra charge. All equipment shall be complete in all details, whether or

not such details are mentioned in these schedules or in the tender document.

2. GUARANREED TECHNICAL PARTICULARS (GTP)

2

2.1 All entries in the bidders guaranteed offer MUST be filled with numbers or descriptive statements

illustrating what the bidder is offering for each given employer requirement. Responses such as

“compliant”, “supported”, “yes”, “in agreement” etc. SHALL NOT be accepted as entries in the

bidders guaranteed figure other than where its EXPRESSELY allowed for as indicated in employer

minimum requirements column (as stated in italics). Offers not meeting this requirement will be

rendered unresponsive.

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

2.2 Bidders guaranteed figures shall be supported by documents such as technical data sheets,

technical manuals, type test reports and the relevant manufacturer’s technical specification

documents. Bidders MUST submit documents supporting their entries along with the bid.

2.3 A statement either in the schedules or on the supporting document that is found to be false either

during Bid evaluation, post-qualification or the execution of the Contract may be regarded as

fraudulent and render the Bid unresponsive or a contractor in breach of contract.

2.4 All data (values) entered in the Schedules are guaranteed values by the Tenderer and cannot be

departed from during project implementation.

2.5 After tender award technical schedules shall become part of the contract documents.

2.6 Bids offering equipment/devices with capacity, rating, constituent component quantities or

performance lower than procuring entity requirements by over10% shall be rejected.

2.7 Bids offering equipment/devices/components of higher capacity, rating, constituent component

quantities or performance than the employer minimum requirements stated in these schedules

shall be accepted but shall however not earn any favour during evaluation and shall be treated to

have met minimum requirements as required only.

3. PRELIMINARY BILL OF MATERIALS

3.1 In the column “offered by bidder” the bidder shall indicate whether they are offering the stated

equipment/device i.e., if it’s part of the bidders offer by simply stating YES or NO, no other

responses are acceptable.

3.2 Preliminary bill of materials only summarises the overall scope of supply requirement for the

bidder, the scope of supply requirement is not limited to what is stated in these schedules. Bidder

shall study the technical specifications to ensure they have factored in all the equipment and

materials necessary for the complete systems as defined in the technical specifications.

3.3 The preliminary bill of materials provided shall guide the bidder while costing his bid and to

understand the required scope of supply by the employer.

3.4 The preliminary bill of materials shall be used by the employer to evaluate the bidders offer

compliance to technical specifications. The final bill of materials for project implementation shall

be prepared by the winning bidder at design stage. The contractor shall after design site visit revise

this preliminary bill of materials to the final bill of materials for implementation based on

procuring entity requirements, contract clarifications and other prevailing conditions at site.

3.5 Bidder MUST insert manufacturer and model of equipment proposed for supply for all major

equipment in scope of supply i.e., all undashed entries in the schedule. ALL UNDASHED ENTRIES

MUST BE FILLED Except the bidders’ comments.

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

3.6 Equipment manufacturer and model/type entered by the bidder in the preliminary bill of materials

can be changed prior to contract signing as long as the new proposed equipment meets all

employer requirements or is equivalent to the equipment stated in the preliminary bill of materials.

3.7 During contract clarification meeting, the equipment manufacturer and model/type for the major

equipment shall be agreed upon. The agreed upon equipment manufacturer and model/type shall

become part of the contract and shall not be changed during project implementation without the

express consent of the Project Engineer/Manger. The equipment in the final bill of materials MUST

meet all tender requirements, clarification meeting shall not be used to alter any tender

requirement.

3.8 Technical datasheets shall be provided for all equipment proposed in the preliminary bill of

materials. Datasheets shall be provided in soft copy.

3.9 Quantities in the Preliminary bill of materials are estimates and actual quantities will be computed

by the contractor during design stage. However, as a minimum all materials in the preliminary bill

of materials MUST be supplied, materials that will fail to be utilised in panel assembly and wiring

shall be delivered as spares.

3.10 All devices, materials, and equipment necessary and usual for a completed

equipment/systems/cabinets/panels with the stated number of servers, workstations and network

equipment etc. shall be supplied by the bidder irrespective of whether such materials are listed in

the preliminary bill of materials.

3.11 In case of conflict between the preliminary bill of materials and technical specifications, technical

specifications shall take precedence.

TECHNICAL SCHEDULES

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 9 of 80 …………………….

Bidder’s Seal or Stamp Technical Schedules May 2021

GUARANREED TECHNICAL PARTICULARS (GTP)

1. GENERAL SPECIFICATIONS

Tender

Clause

Particulars Employer Minimum Requirements Bidders Guaranteed offer

1.5 PROJECT SCOPE 1.5 Project Scope The contractor shall provide all the services and

equipment as detailed in the project scope

(deviations from requirements in this clause if

any, shall be clearly spelt out in the offer)

1.6 PROJECT WORK PROGRAM

1.6 Project Work

Program

The contractor shall provide a detailed work

program as detailed in this clause after contract

signing

(bidder to state compliance to these

requirements and indicate any deviations)

1.6.5 Total project

duration Shall not exceed 24 months

1.6.6 Duration of

power plant

outage

Shall not exceed:

(a). 15 days outage time for each unit during

installation and commissioning of the

intake gate control systems

(b). 4 days of total station outage (in separate

days not continuous i.e., 1 or 2 days at a

time) for intake gate works. Total outage

is to be avoided as much as possible. Total

outage shall usually be available at night

from 11pm to 5am and on weekends.

1.7 DOCUMENTATION

1.7 Technical

documentation

The contractor shall provide all technical

documentation in format, manner and timelines

provided for in clause 1.7

(bidder to state compliance to these

requirements and indicate any deviations)

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 10 of 80 …………………….

Bidder’s Seal or Stamp Technical Schedules May 2021

Tender

Clause

Particulars Employer Minimum Requirements Bidders Guaranteed offer

1.8 ENGINEERING SERVICES BEFORE INSTALLATION

1.8 Engineering

services before

installation

The contractor shall provide all the engineering

services detailed in clause 1.8.

(Bidder to state compliance to these

requirements and indicate any deviations)

1.9 MANUFACTURING AND SHIPMENT

1.9 Manufacturing

and shipment

The contractor shall manufacture, test, and ship

the project equipment as described in this

clause

(Bidder to state compliance to these

requirements and indicate any deviations)

1.9 Manufacturing

and shipment

Bidder has in their technical proposal has

provided method statements describing.

(i) Refurbishment of gates large hydraulic

cylinders

(ii) Performance testing of gates large hydraulic

cylinders

1.10 INSTALLATION AND COMMISSIONING

1.10 Installation and

commissioning

The contractor shall install and commission the

systems supplied in this project as described in

this clause.

(Bidder to state compliance to these

requirements and indicate any deviations)

1.10 Installation and

commissioning

Bidder has in their technical proposal provided

method statements describing.

(i) Design, Installation, and commissioning of

specified hydraulic control systems.

(ii) Design, Installation, and commissioning of

specified electrical systems.

1.11 TRAINING

1.11

Training

The contractor shall provide all training in

format, manner and timelines provided for in

this clause

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 11 of 80 …………………….

Bidder’s Seal or Stamp Technical Schedules May 2021

Tender

Clause

Particulars Employer Minimum Requirements Bidders Guaranteed offer

(Bidder to state compliance to these

requirements and indicate any deviations)

1.11 Each type of training as detailed in this clause

shall be offered.

(Bidder to state compliance to these

requirements and indicate any deviations)

1.11 The minimum time duration and content for

each type of training shall be adhered to as spelt

out in this clause.

(Bidder to state compliance to these

requirements and indicate any deviations)

1.12 WARRANTY

1.12.1 Terms of

warranty

The Contractor shall warrant those goods

supplied under the Contract are brand new,

unused, of the most recent or current models,

and that they incorporate all recent

improvements in design and materials unless

provided otherwise in the Contract.

(Bidder to state compliance to these

requirements and indicate any deviations)

1.12.2 Terms of

warranty

The Contractor further shall warrant that all

Goods supplied under this Contract shall have no

defect arising from design, materials, or

workmanship or from any act or omission of the

Contractor, or that may develop under normal

use of the supplied Goods in the conditions

prevailing at Gitaru power station.

(Bidder to state compliance to these

requirements and indicate any deviations)

1.12.3 Terms of

warranty

The contractor shall warrant that the supplied

and commissioned equipment shall have no

adverse effect to the spillway and intake gates

operation under normal utilization by the

employer as per contractor instructions.

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 12 of 80 …………………….

Bidder’s Seal or Stamp Technical Schedules May 2021

Tender

Clause

Particulars Employer Minimum Requirements Bidders Guaranteed offer

(Bidder to state compliance to these

requirements and indicate any deviations)

1.12.4 Terms of

warranty

Warranty shall remain valid for twenty-four

(24) months after the Equipment, or any portion

thereof as the case may be, have been

commissioned and take over certificate signed by

both parties, or for thirty six (36) months after

arrival of equipment at site whichever period

concludes earlier. During warranty period

contractor shall repair or replace any faulty or

mal operating equipment of component due

fault under clauses 1-3 above

(Bidder to state compliance to these

requirements and indicate any deviations)

1.12.5 Terms of

warranty

The bidder guarantees supplying maintenance

spares and services as well as repairing of the

supplied systems if called upon to do so after

expiry of the warranty period at employers’ cost

for a period of 10 years.

(Bidder to state compliance to these

requirements and indicate any deviations)

1.12.6 Terms of

warranty

Contractor shall guarantee that all offered items

shall have a design life of at least twenty years.

(Bidder to state compliance to these

requirements and indicate any deviations)

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 13 of 80 …………………….

Bidder’s Seal or Stamp Technical Schedules May 2021

3. GENERAL TECHNICAL SPECIFICATIONS

Tender

Clause

Particulars Employer Minimum Requirements Bidders Guaranteed offer

3.1 STANDARDS 3.1 Standards All works, electrical and mechanical equipment

shall comply with the provisions and

requirements of standards as stated in clause 3.1

of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

3.2 GENERAL ELECTRICAL REQUIREMENTS

3.2 Electrical

General

Requirements

Electrical equipment and works shall comply

with the provisions and requirements as stated in

clause 3.2 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

3.3 GENERAL MECHNICAL REQUIREMENTS

3.3 Mechanical

General

Requirements

Mechanical equipment and works shall comply

with the provisions and requirements as stated in

clause 3.3 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

3.4 AUXILLIARY POWER SUPPLY EQUIPMENT

3.4 Auxiliary power

supply

equipment

Auxiliary power supply equipment shall comply

with the provisions and requirements as stated in

clause 3.4 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

3.5 CONTROL DEVICES GENERAL REQUIREMENTS

3.5.1 Instruments

/Transducers

Instruments & transducers shall comply with the

provisions and requirements as stated in clause

3.5.1 of the tender document.

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 14 of 80 …………………….

Bidder’s Seal or Stamp Technical Schedules May 2021

Tender

Clause

Particulars Employer Minimum Requirements Bidders Guaranteed offer

(Bidder to state compliance to these

requirements and indicate any deviations)

3.5.2 Indicating

lamps,

pushbuttons

and selector

switches

Indicating lamps, pushbuttons and selector

switches shall comply with the provisions and

requirements as stated in clause 3.5.2 of the

tender document

(Bidder to state compliance to these

requirements and indicate any deviations)

3.5.3 Control

contactor relays

Control contactor relays shall comply with the

provisions and requirements as stated in clause

3.5.3 of the tender document

(Bidder to state compliance to these

requirements and indicate any deviations)

3.5.4 Coupling/

interfacing

relays

Coupling/ interfacing relays shall meet the

requirements stated in clause 3.5.4 of the tender

document.

(Bidder to state compliance to these

requirements and indicate any deviations)

3.5.6 DC supply

supervision

relays

Dc supply supervision relays shall meet the

requirements stated in clause 3.5.6 of the tender

document.

(Bidder to state compliance to these

requirements and indicate any deviations)

3.5.7 AC voltage

monitoring

relays

AC voltage monitoring relays shall meet the

requirements stated in clause 3.5.7 of the tender

document.

(Bidder to state compliance to these

requirements and indicate any deviations)

3.5.8 Panel Indication

Meters

Panel Indication Meters shall meet the

requirements stated in clause 3.5.8 of the tender

document.

(Bidder to state compliance to these

requirements and indicate any deviations)

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 15 of 80 …………………….

Bidder’s Seal or Stamp Technical Schedules May 2021

Tender

Clause

Particulars Employer Minimum Requirements Bidders Guaranteed offer

3.5.9 Digital Panel

Multifunction

Meters

Digital Panel Multifunction Meters shall meet

the requirements stated in clause 3.5.9 of the

tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

3.5.10 Serial device

server

Serial device server shall meet the requirements

stated in clause 3.5.10 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

3.5.11 Industrial

Ethernet

Switches

Industrial Ethernet Switches shall meet the

requirements stated in clause 3.5.11 of the

tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

3.6 CONTROL PANELS AND CABINETS REQUIREMENTS

3.6 Control panels

and cabinets

Control panels and cabinets shall meet the

requirements stated in clause 3.6 of the tender

document.

(Bidder to state compliance to these

requirements and indicate any deviations)

3.7 CABLES AND CONDUCTORS

3.7 Cables and

conductors

Cables and conductors shall meet the

requirements stated in clause 3.7 of the tender

document.

(Bidder to state compliance to these

requirements and indicate any deviations)

3.8 SOFTWARE

3.8 Software Software used in the project shall meet the

requirements stated in clause 3.8 of the tender

document.

(Bidder to state compliance to these

requirements and indicate any deviations)

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 16 of 80 …………………….

Bidder’s Seal or Stamp Technical Schedules May 2021

Tender

Clause

Particulars Employer Minimum Requirements Bidders Guaranteed offer

3.9 SWITCHBOARD CUBICLES AND EQUIPMENT SPECIFICATIONS

3.9.1 LV AC

switchboard

cubicles

structure

LV AC switchboard cubicles structure shall meet

the requirements stated in clause 3.9.1 of the

tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

3.9.2 LV AC

switchboard

cubicles covers

and doors

LV AC switchboard cubicles covers and doors

shall meet the requirements stated in clause

3.9.2 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

3.9.3 LV AC

switchboard

cubicles

compartments

LV AC switchboard cubicles compartments shall

meet the requirements stated in clause 3.9.3 of

the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

3.9.4 Protection and

finish

LV AC switchboard cubicles shall meet the

protection and finish requirements stated in

clause 3.9.4 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

3.9.5 Arc resistance

and protection

LV AC switchboards shall meet the Arc resistance

and protection requirements stated in clause

3.9.5 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

3.9.6 Bus bars LV AC switchboards Bus bars shall meet the

requirements stated in clause 3.9.6 of the tender

document.

(Bidder to state compliance to these

requirements and indicate any deviations)

3.9.7 Cubicle wiring LV AC switchboards cubicle wiring shall meet

the requirements stated in clause 3.9.7 of the

tender document.

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 17 of 80 …………………….

Bidder’s Seal or Stamp Technical Schedules May 2021

Tender

Clause

Particulars Employer Minimum Requirements Bidders Guaranteed offer

(Bidder to state compliance to these

requirements and indicate any deviations)

3.9.8 Withdrawable

plug in modules

LV AC switchboards withdrawable plug in

modules containing switch gear and control

circuits for the feeder circuits shall meet the

requirements stated in clause 3.9.8 of the tender

document.

(Bidder to state compliance to these

requirements and indicate any deviations)

3.9.9 Distribution/

panel board

Distribution/ panel board shall meet the

requirements stated in clause 3.9.9 of the tender

document.

(Bidder to state compliance to these

requirements and indicate any deviations)

3.9.10 Switchboards

Basic Ratings

LV AC switchboards shall have basic ratings

meeting the requirements stated in clause 3.9.10

of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

3.9.11 Molded Case

Circuit

Breakers, MCCB

Molded Case Circuit Breakers shall meet the

requirements stated in clause 3.9.11 of the

tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

3.9.12 Automatic

Transfer

Controllers

(ATC)

Automatic Transfer Controllers (ATC) shall meet

the requirements stated in clause 3.9.12 of the

tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

3.9.13 Motor

Protection

Circuit Breakers

(MPCB)

Motor Protection Circuit Breakers shall meet the

requirements stated in clause 3.9.13 of the

tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 18 of 80 …………………….

Bidder’s Seal or Stamp Technical Schedules May 2021

Tender

Clause

Particulars Employer Minimum Requirements Bidders Guaranteed offer

3.9.14 Digital Power

Monitoring

Device (PMD)

Digital Power Monitoring Device (PMD) shall

meet the requirements stated in clause 3.9.14 of

the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

3.9.15 Current

Transformers,

CT

Current Transformers (CT) shall meet the

requirements stated in clause 3.9.15 of the

tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

3.9.16 Voltage

Transformers,

VT

Voltage Transformers (VT) shall meet the

requirements stated in clause 3.9.16 of the

tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

3.9.17 Motor

Management &

Control Devices

(MMC)

Motor Management & Control Devices (MMC)

shall meet the requirements stated in clause

3.9.17 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

3.9.18 Contactors Contactors shall meet the requirements stated in

clause 3.9.18 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

3.9.19 Withdrawable

Cable Feeder

Modules

Withdrawable Cable Feeder Modules shall meet

the requirements stated in clause 3.9.19 of the

tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

3.9.20 Withdrawable

Motor DOL

(Direct online)

starter feeder

modules

Withdrawable Motor DOL (Direct online)

starter feeder modules shall meet the

requirements stated in clause 3.9.20 of the

tender document.

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 19 of 80 …………………….

Bidder’s Seal or Stamp Technical Schedules May 2021

Tender

Clause

Particulars Employer Minimum Requirements Bidders Guaranteed offer

(Bidder to state compliance to these

requirements and indicate any deviations)

3.10 MOTORS

3.10 Motors All motors shall meet the requirements stated in

clause 3.10 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

3.11 PIPES AND PIPEWORK

3.11 Pipes and

pipework

All pipes and pipework shall meet the

requirements stated in clause 3.11 of the tender

document.

(Bidder to state compliance to these

requirements and indicate any deviations)

3.12 VALVES 3.12 Valves All valves shall meet the requirements stated in

clause 3.12 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

3.13 PRESSURE VESSELS/ACCUMULATORS

3.13 Pressure

Vessels/

Accumulators

All Pressure Vessels/ Accumulators shall meet

the requirements stated in clause 3.13 of the

tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 20 of 80 …………………….

Bidder’s Seal or Stamp Technical Schedules May 2021

4. INTAKE GATE CONTROL SYSTEM PARTICULAR SPECIFICATIONS

Tender

Clause

Particulars Employer Minimum Requirements Bidders Guaranteed offer

4.2 OVERALL SYSTEM REQUIREMENTS 4.2 Overall System

Requirements

The gate control scheme shall meet the

requirements stated in clause 4.2 of the tender

document.

(Bidder to state compliance to these

requirements and indicate any deviations)

4.3 INTAKE GATE HYDRAULIC SYSTEM REQUIREMENTS

4.3.1 Hydraulic Power Unit

4.3.1.1 Hydraulic

Power Unit

System

Requirements

The hydraulic power unit (HPU) shall meet the

system requirements stated in clause 4.3.1.1 of

the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

4.3.1.2 Hydraulic

Power Unit

Reservoir (sump

tank)

Hydraulic Reservoir (sump tank) shall meet the

system requirements stated in clause 4.3.1.2 of

the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

4.3.1.2.2 HPU Reservoir

(sump tank)

construction

steel type

EN 1.0038 steel

4.3.1.2.3 HPU Reservoir

(sump tank)

construction

sheet metal

minimum

thickness

6mm

4.3.1.3 Pumping system

requirements

The oil pumping system shall meet the

requirements stated in clause 4.3.1.3 of the

tender document.

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 21 of 80 …………………….

Bidder’s Seal or Stamp Technical Schedules May 2021

Tender

Clause

Particulars Employer Minimum Requirements Bidders Guaranteed offer

(Bidder to state compliance to these

requirements and indicate any deviations)

4.3.1.4 Hydraulic

accumulator

system

Hydraulic accumulator system shall meet the

requirements stated in clause 4.3.1.4 of the

tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

4.3.1.5 Control &

Regulating

valves

HPU Control and regulating hydraulic valves

shall meet the requirements stated in clause

4.3.1.5 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

4.3.2 Hydraulic

Cylinder

Components

The Hydraulic Cylinder Components shall meet

the requirements stated in clause 4.3.2 of the

tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

4.3.2.7.3

A linear

displacement

transducer

linear displacement transducers shall meet

requirements of clause 4.3.2.7.3

(Bidder to state compliance to these

requirements and indicate any deviations)

4.3.2.7.4 Robust IP68

Water resistant

Limit switches

Robust IP68 Water resistant Limit switches for

each gate for position indication shall meet

requirements in clause 4.3.2.7.4

(Bidder to state compliance to these

requirements and indicate any deviations)

4.3.3 Servicing of

Existing

Hydraulic

Cylinder

The existing hydraulic cylinder shall be serviced

according to the provisions and requirements

stated in clause 4.3.3 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

4.3.4 Supply of New

Hydraulic

Cylinder

New Hydraulic Cylinder shall be supplied

according to the requirements stated in clause

4.3.4 of the tender document.

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 22 of 80 …………………….

Bidder’s Seal or Stamp Technical Schedules May 2021

Tender

Clause

Particulars Employer Minimum Requirements Bidders Guaranteed offer

(Bidder to state compliance to these

requirements and indicate any deviations)

4.3.5 Hydraulic

Piping

The contractor shall replace all hydraulic pipes

at the intake with steel plated pipes according to

the requirements stated in clause 4.3.5 of the

tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

4.4 INTAKE GATE ELECTRICAL CONTROL REQUIREMENTS

4.4.1 General

Requirements

The intake gate electrical control shall meet the

general requirements stated in clause 4.4.1 of

the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

4.4.2 Gate Operations

Requirements

The intake gate electrical control scheme shall

enable all the gate operations requirements

stated in clause 4.4.2 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

4.4.3 Gate control

panels

Three Gate control panels/compartments (each

gate shall have a separate control

panel/compartment) shall be provided

according to the requirements stated in clause

4.4.3 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

4.4.4 HPU Control

Panel

The HPU control panel shall meet the

requirements stated in clause 4.4.4 of the tender

document.

(Bidder to state compliance to these

requirements and indicate any deviations)

4.4.5 DC supply

distribution

board

DC supply distribution board shall meet the

requirements stated in clause 4.4.5 of the tender

document.

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 23 of 80 …………………….

Bidder’s Seal or Stamp Technical Schedules May 2021

Tender

Clause

Particulars Employer Minimum Requirements Bidders Guaranteed offer

(Bidder to state compliance to these

requirements and indicate any deviations)

4.4.6 SCADA Panel The bidder shall supply, install and commission

a SCADA panel that shall meet the requirements

stated in clause 4.4.6 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

4.5 LOW VOLTAGE INTAKE GATE SWITCHBOARD

4.5.1 General LV

Switchboard

Requirements

LV switchboard shall meet the general

requirements stated in clause 4.5.1 of the tender

document.

(Bidder to state compliance to these

requirements and indicate any deviations)

4.5.2 Switchboard

Particular

Requirements

LV switchboard shall meet the particular

requirements stated in clause 4.5.2 of the tender

document.

(Bidder to state compliance to these

requirements and indicate any deviations)

4.5.3 Incomers The incomers shall meet the requirements stated

in clause 4.5.3 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

4.5.4 Control,

metering and

protection

Control, metering and protection devices shall be

implemented according to the requirements

stated in clause 4.5.4 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

4.5.5 Feeder Modules Feeder modules shall be implemented according

to the requirements stated in clause 4.5.5 of the

tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 24 of 80 …………………….

Bidder’s Seal or Stamp Technical Schedules May 2021

Tender

Clause

Particulars Employer Minimum Requirements Bidders Guaranteed offer

4.5.6 Lighting and

small power 4

way TPN

Distribution

Panel

Lighting and small power 4 way TPN

Distribution Panel shall meet the requirements

stated in clause 4.5.6 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

4.6 INTERFACING TO SCADA SYSTEM

4.6.1.1 SCADA

Interface

Cabinet

The SCADA interface cabinet shall meet the

requirements stated in clause 4.6.1.1 of the

tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

4.6.1.2 SCADA

Interface

Cabinet

Components

The SCADA interface cabinet components shall

meet the minimum requirements stated in clause

4.6.1.2 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

4.6.1.3 Programmable

logic controller

(PLC) or

Programmable

automation

controller (PAC)

Programmable logic controller (PLC) or

Programmable automation controller (PAC)

shall meet the requirements stated in clause

4.6.1.3 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

4.6.1.4 LV switchboard

signal list

All the signals detailed in clause 4.6.1.4 for LV

switch board shall be connected to the PLC/PAC.

(Bidder to state compliance to these

requirements and indicate any deviations)

4.6.1.5 Serial Device

Server

Serial Device Server shall meet the requirements

stated in clause 4.6.1.5 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

4.6.1.6 Fibre Optic

Cable

The bidder shall supply and install Fibre Optic

Cable to meet the provisions and requirements

stated in clause 4.6.1.6 of the tender document.

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 25 of 80 …………………….

Bidder’s Seal or Stamp Technical Schedules May 2021

Tender

Clause

Particulars Employer Minimum Requirements Bidders Guaranteed offer

(Bidder to state compliance to these

requirements and indicate any deviations)

4.6.1.7 Industrial

Ethernet

Switches

Industrial Ethernet Switches shall meet the

requirements stated in clause 4.6.1.7 of the

tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

4.6.1.8 Operator Panel/

HMI display

Operator Panel/ HMI display shall meet the

requirements stated in clause 4.6.1.8 of the

tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

5. SPILLWAY GATE CONTROL SYSTEM PARTICULAR SPECIFICATIONS

Tender

Clause

Particulars Employer Minimum Requirements Bidders Guaranteed offer

5.2 OVERALL SYSTEM REQUIREMENTS 5.2 Overall System

Requirements

The gate control scheme shall meet the

requirements stated in clause 5.2 of the tender

document.

(Bidder to state compliance to these

requirements and indicate any deviations)

5.3 SPILLWAY GATES HYDRAULIC SYSTEM REQUIREMENTS

5.3.1 HPU

Components

HPU Components shall meet the requirements

stated in clause 5.3.1 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 26 of 80 …………………….

Bidder’s Seal or Stamp Technical Schedules May 2021

Tender

Clause

Particulars Employer Minimum Requirements Bidders Guaranteed offer

5.3.2 Hydraulic Cylinder Control Components

5.3.2.1 Replacement of

hydraulic

components

The contractor shall replace all the hydraulic

components on the spillway gate pier and at the

spillway gate lifting cylinders as stated in clause

5.3.2.1 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

5.3.2.2 Supply of

hydraulic

components

The bidder shall supply all hydraulic control

components necessary for gate lifting function

according to the requirements stated in clause

5.3.2.2 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

5.3.2.3 Spillway Gates

Open Loop

Control

The bidder shall restore the existing open loop

spillway gate control scheme for synchronizing

the two gate cylinder movements according to

the requirements stated in clause 5.3.2.3 of the

tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

5.3.2.4 Spillway Gates

Closed Loop

Control

The bidder shall implement a modern closed

loop control system for synchronizing the two

gate cylinders movement by utilizing the

cylinder piston position transducers according to

the requirements stated in clause 5.3.2.4 of the

tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

5.3.2.5 Outdoor

Cabinets

The bidder shall supply and install outdoor

cabinets for each gate according to the

requirements stated in clause 5.3.2.5 of the

tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 27 of 80 …………………….

Bidder’s Seal or Stamp Technical Schedules May 2021

Tender

Clause

Particulars Employer Minimum Requirements Bidders Guaranteed offer

5.3.2.6 Linear

Displacement

Transducer

The bidder shall supply and install a linear

displacement transducer for accurate

measurement of the cylinder piston position to

the existing and new hydraulic cylinders

according to the requirements stated in

clause5.3.2.6 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

5.3.3 Servicing of

Existing

Hydraulic

Cylinders

The Existing Hydraulic Cylinders shall be

serviced according to the requirements stated in

clause 5.3.3 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

5.3.4 Supply of New

Hydraulic

Cylinder

The contractor shall supply two new hydraulic

cylinders according to the requirements stated in

clause 5.3.4 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

5.3.5 Gas-Driven

Emergency

Backup System

The contractor shall install a gas-driven

emergency backup system composed of a piston

accumulator and nitrogen gas bottles and

interface it into the HPU using appropriate

control and isolation valves according to the

requirements stated in clause 5.3.5 of the tender

document.

(Bidder to state compliance to these

requirements and indicate any deviations)

5.3.6 Piping

Requirements

The contractor shall replace all hydraulic pipes

at the spillway with steel plated pipes according

to the requirements stated in clause 5.3.6 of the

tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 28 of 80 …………………….

Bidder’s Seal or Stamp Technical Schedules May 2021

Tender

Clause

Particulars Employer Minimum Requirements Bidders Guaranteed offer

5.4 SPILLWAY GATES ELECTRICAL CONTROL REQUIREMENTS

5.4.1 General

Requirements

The spillway gate electrical control shall meet

the general requirements stated in clause 5.4.1

of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

5.4.2 Gate Operations

Requirements

The spillway gate electrical control scheme shall

enable all the gate operations requirements

stated in clause 5.4.2 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

5.4.3 Gate control

panels

Three Gate control panels (each gate shall have

a separate control panel) shall be provided

according to the requirements stated in clause

5.4.3 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

5.4.4 HPU Control

Panel

The HPU control panel for HPU local operations

and indications shall be provided according to

the requirements stated in clause 5.4.4 of the

tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

5.4.5 Gate

Instrumentation

The bidder shall supply and install new gate

instruments to replace the existing ones

according to the requirements stated in clause

5.4.5 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

5.4.6 DC supply

distribution

board

DC supply distribution board shall meet the

requirements stated in clause 5.4.6 of the tender

document.

(Bidder to state compliance to these

requirements and indicate any deviations)

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 29 of 80 …………………….

Bidder’s Seal or Stamp Technical Schedules May 2021

Tender

Clause

Particulars Employer Minimum Requirements Bidders Guaranteed offer

5.4.7 SCADA

Interface and

Closed Loop

Control

The bidder shall supply, install and commission

a SCADA panel at the spillway control room and

a closed loop control scheme of the spillway gate

cylinders to achieve synchronized travel of the

two cylinders according to the requirements

stated in clause 5.4.7 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

5.5 LOW VOLTAGE INTAKE GATE SWITCHBOARD

5.5.1 General LV

Switchboard

Requirements

LV switchboard shall meet the general

requirements stated in clause 5.5.1 of the tender

document.

(Bidder to state compliance to these

requirements and indicate any deviations)

5.5.2 Switchboard

Particular

Requirements

LV switchboard shall meet the particular

requirements stated in clause 5.5.2 of the tender

document.

(Bidder to state compliance to these

requirements and indicate any deviations)

5.5.3 Incomers The incomers shall meet the requirements stated

in clause 5.5.3 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

5.5.4 Control,

metering and

protection

Control, metering and protection devices shall be

implemented according to the requirements

stated in clause 5.5.4 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

5.5.5 Feeder Modules Feeder modules shall be supplied and

implemented according to the requirements

stated in clause 5.5.5 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 30 of 80 …………………….

Bidder’s Seal or Stamp Technical Schedules May 2021

Tender

Clause

Particulars Employer Minimum Requirements Bidders Guaranteed offer

5.5.6 Lighting and

small power 4

way TPN

Distribution

Panel

Lighting and small power 4 way TPN

Distribution Panel shall meet the requirements

stated in clause 5.5.6 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

5.6 INTERFACING TO SCADA SYSTEM

4.6.1.1 SCADA

Interface

Cabinet

The SCADA interface cabinet shall meet the

requirements stated in clause 4.6.1.1 of the

tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

4.6.1.2 SCADA

Interface

Cabinet

Components

The SCADA interface cabinet components shall

meet the minimum requirements stated in clause

4.6.1.2 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

4.6.1.3 Programmable

logic controller

(PLC) or

Programmable

automation

controller (PAC)

Programmable logic controller (PLC) or

Programmable automation controller (PAC)

shall meet the requirements stated in clause

4.6.1.3 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

4.6.1.4 LV switchboard

signal list

All the signals detailed in clause 4.6.1.4 for LV

switch board shall be connected to the PLC/PAC.

(Bidder to state compliance to these

requirements and indicate any deviations)

4.6.1.5 Serial Device

Server

Serial Device Server shall meet the requirements

stated in clause 4.6.1.5 of the tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

4.6.1.6 Fibre Optic

Cable

The bidder shall supply and install Fibre Optic

Cable to meet the provisions and requirements

stated in clause 4.6.1.6 of the tender document.

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 31 of 80 …………………….

Bidder’s Seal or Stamp Technical Schedules May 2021

Tender

Clause

Particulars Employer Minimum Requirements Bidders Guaranteed offer

(Bidder to state compliance to these

requirements and indicate any deviations)

4.6.1.7 Industrial

Ethernet

Switches

Industrial Ethernet Switches shall meet the

requirements stated in clause 4.6.1.7 of the

tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

4.6.1.8 Operator Panel/

HMI display

Operator Panel/ HMI display shall meet the

requirements stated in clause 4.6.1.8 of the

tender document.

(Bidder to state compliance to these

requirements and indicate any deviations)

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 32 of 80 …………………….

Bidder’s Seal or Stamp Technical Schedules May 2021

PRELIMINARY BILL OF MATERIALS

BILL OF MATERIALS

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 34 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

2.3 SUPPLY OF HYDRAULIC CONTROL SYSTEMS

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.3.1 Supply of Hydraulic Components for Intake Gates. –– –– –– –– –– ––

2.3.1.1.1 Flow control valves for the pressure line

6 Pcs –– ––

2.3.1.1.2 Four by three-way directional control valve

3 Pcs

2.3.1.1.3 Three by two-way directional poppet valves

6 Pcs

2.3.1.1.4 Throttling valves

6 Pcs –– ––

2.3.1.1.5 Check valves

6 Pcs –– ––

2.3.1.1.6 Pilot operated check valves

6 Pcs –– ––

2.3.1.1.7 Two-way ball valves

3 Pcs –– ––

2.3.1.1.8 Normally open gate valve.

3 Pcs –– ––

2.3.1.2.1 Electronic pressure switch and transmitter

3 pcs –– ––

2.3.1.2.2 Mechanical pressure gauge

3 Pcs –– ––

2.3.1.2.3

Linear displacement transducer for cylinder piston position 3 pcs

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 35 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.3.1.2.4

Robust IP68 Water resistant gate position Limit switches 18 pcs

2.3.1.3

Outdoor cabinet for housing the gate control valves 3 Units –– ––

2.3.2 Supply of New Intake Gate Hydraulic Power Units

2 Units

2.3.2.1

Reservoir Tank, each with a minimum of the following components: 2 Set –– ––

2.3.2.1.1 Oil filler port, filter, and strainer

1 set –– –– 2.3.2.1.2 Oil purifier connections.

1 set –– –– 2.3.2.1.3 Breather with an oil moisture vapour filter and

dehumidifier. 1 unit –– ––

2.3.2.1.4 Dual changeover filter with clogging indicator and electrical contacts on the tank return lines.

1 set –– –– 2.3.2.1.5 Reservoir drain valve with plug.

1 set –– –– 2.3.2.1.6 Mechanical Sight oil gauge (sight glass)

1 unit –– –– 2.3.2.1.7 PT100 temperature detector

1 pc –– –– 2.3.2.1.8 Electronic float Level switches

1 pc –– –– 2.3.2.1.9 Electronic Oil Level transmitter

1 pc –– ––

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 36 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.3.2.1.10 Oil temperature transmitter

1 pc –– ––

2.3.2.2

Complete Pumping set of similar type and rating to the existing mounted outside the reservoir including but not limited to: 2 Set –– ––

2.3.2.2.1 Motor

1 pc –– ––

2.3.2.2.2 Gear pump

1 pc

2.3.2.2.2 Mechanical pressure gauge

1 pc –– ––

2.3.2.2.3

Oil Pressure transmitter type Hydac EDS 1700 or equivalent 1 pc

2.3.2.3

Piston accumulator system sized for 300mm travel of one gate including but not limited to the following components 1 Set

2.3.2.3.1 Piston accumulator

1 unit –– ––

2.3.2.3.2 Safety and shutoff block

1 unit –– –– 2.3.2.3.2.1 Pneumatic pressure relief valve with auxiliary

contacts 1 pc –– ––

2.3.2.3.2.1 Test & charging ports,

1 set –– –– 2.3.2.3.2.1 Pressure transducer ports

1 set –– ––

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 37 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.3.2.3.2.1 Pneumatic isolation valve

1 pc –– –– 2.3.2.3.2.1 Nitrogen bottle connection points

1 set –– ––

2.3.2.3.3 Transducers as follows

1 Lot –– ––

2.3.2.3.3.1

Mechanical pressure gauge.

1 pc –– ––

2.3.2.3.3.2

Electronic pneumatic pressure switch and transmitter.

1 pc –– ––

2.3.2.3.3.3

Accumulator Oil level switches (piston position)

1 pc –– ––

2.3.2.3.4 Backup nitrogen bottle/s

1 Lot –– ––

2.3.2.4 Minimum of the following valves

2 Set –– ––

2.3.2.4.1 Manifold valve blocks

2 units

⎯ ⎯

2.3.2.4.2 Manually operated Flow control valve.

1 pc

⎯ ⎯

2.3.2.4.3 Pressure relief valves each with an auxiliary

contact 2 pc

⎯ ⎯

2.3.2.4.4 Pressure actuated (piloted) Unloading valve.

1 pc

⎯ ⎯

2.3.2.4.5 Solenoid actuated Unloading valve.

1 pc

⎯ ⎯

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 38 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.3.2.4.6 Solenoid operated directional poppet control valve (or equivalent) with limit switches.

4 pc

2.3.2.4.7 Ball valves with extended handles for isolation

4 pc

⎯ ⎯

2.3.2.4.8 Check valves

2 pc

⎯ ⎯

2.3.2.5

New hydraulic oil to fill all cylinders for each HPU, plus spare capacity equivalent to all oil in the three gates cylinders 1 Lot

⎯ ⎯

2.3.3

Supply Of New Hydraulic Pipes Clamps and Fittings for Intake Gates –– –– –– –– –– ––

2.3.3.1

Hydraulic pipes, clamps and fittings at the intake as detailed in clause 4.3.5 with steel plated pipes painted to marine specifications suited for outdoor application (adverse conditions.) and meeting requirements in clause 3.11. Isolation valves specified shall also be included.

1 Lot

⎯ ⎯

2.3.4

Supply Of New Intake Large Hydraulic Cylinder (Servomotor) –– –– –– –– –– ––

2.3.4.1

Hydraulic cylinder as detailed in clause 4.3.4 with the same specifications, features, sizes, performance, and ratings as the existing cylinders and with all attachment components including but not limited to spherical bearing, transfer tubes, support clamps, valves, linear displacement transducer.

1 Pc

2.3.5

Supply of Hydraulic components for spillway gates. –– –– –– –– –– ––

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 39 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.3.5.1

Minimum of the following devices as detailed in clause 5.3.1, on the existing reservoir 1 Lot

⎯ ⎯

2.3.5.1.1

Breather with an oil moisture vapour filter and dehumidifier 1 Pc

⎯ ⎯

2.3.5.1.2

Dual changeover filter on the tank return line with clogging indicator flag and electrical contacts 1 Pc

⎯ ⎯

2.3.5.1.3

Pressure line filters one on each pump each with clogging indicator flag and electrical contacts 3 Pc

⎯ ⎯

2.3.5.1.4 PT100 temperature detector

1 Pc

⎯ ⎯

2.3.5.1.5 Electronic float Level switches

1 Pc

⎯ ⎯

2.3.5.1.6 Electronic Oil Level transmitter

1 Pc

⎯ ⎯

2.3.5.1.7 Oil temperature transmitter

1 Pc

⎯ ⎯

2.3.5.1.8

Manifold valve blocks one for each pump each with a minimum of: 4 Pc

⎯ ⎯

2.3.5.1.8.1 Pressure relief valve

1 Pc

⎯ ⎯

2.3.5.1.8.2 Check valve

1 Pc

⎯ ⎯

2.3.5.1.8.3 Analogue pressure gauge

1 Pc

⎯ ⎯

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 40 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.3.5.1.8.4 Electronic pressure switch & transducer

1 Pc

⎯ ⎯

2.3.5.1.9 2-way isolating ball valves for the pressure pumps

12 Pc

⎯ ⎯

2.3.5.1.10 Return line 2-way isolating ball valves

2 Pc

⎯ ⎯

2.3.5.1.11

Return line pressure relief valve rated for continuous duty 1 Pc

⎯ ⎯

2.3.5.1.12

New hydraulic oil to fill all the six cylinders while fully closed plus a spare capacity equivalent to half the six cylinders volume. 1 Lot

⎯ ⎯

2.3.5.2

Hydraulic components for restoration of existing spillway open loop control as detailed in clause 5.3.2, this shall include but not limited to supply of:

⎯ ⎯ ⎯ ⎯ ⎯ ⎯

2.3.5.2.1

Sets of devices at the pier, one set for each gate, each set shall consist of: 3 Set

⎯ ⎯

2.3.5.2.1.1 Two-way ball valve

2 Pc

⎯ ⎯

2.3.5.2.1.2 Flow control valve pressure line

1 Pc

2.3.5.2.1.3 Flow control valve return line

1 Pc

2.3.5.2.1.4

Fine flow control valves for the synchronous control 1 Pc

2.3.5.2.1.5 Four by three-way directional control valve

1 Pc

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 41 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.3.5.2.1.6 Three by two directional poppet valves

2 Pc

2.3.5.2.1.7 Constant flow divider valves

1 Pc

2.3.5.2.1.8 Mechanical pressure gauge

2 Pc

⎯ ⎯

2.3.5.2.1.9 Electronic pressure switch and transmitter

2 Pc

⎯ ⎯

2.3.5.2.2

Set of Devices at Cylinder base, one set for each gate, each set shall consist of: 3 Set

⎯ ⎯

2.3.5.2.2.1 Three by two poppet valves with solenoid

2 Pc

2.3.5.2.2.2 Pilot operated check valves

2 Pc

⎯ ⎯

2.3.5.2.2.3 Two-way ball valve

2 Pc

⎯ ⎯

2.3.5.2.2.4 Normally open ball valve

2 Pc

⎯ ⎯

2.3.5.3

Modern closed loop control system for synchronising the two gate cylinders movement by utilising the cylinder piston position transducers clause 5.3.2. This shall include but not limited to the following for each gate: 3 Lots

⎯ ⎯

2.3.5.3.1

Proportional directional control valve suitable for outdoor harsh environments, one for each cylinder 2 Pc

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 42 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.3.5.3.2

Suitable solenoid directional control poppet valves, one for each cylinder 2 Pc

2.3.5.3.3 Manifold Valve block

1 Pc

⎯ ⎯

2.3.5.3.4 Isolation valves for maintenance isolation

2 Pc

⎯ ⎯

2.3.5.4.1

Outdoor cabinets at the gate pier of each gate for housing the gate control valves. 3 Pc

⎯ ⎯

2.3.5.4.2

Outdoor cabinets at each cylinder base for housing the gate control valves. 6 Pc

⎯ ⎯

2.3.5.5

Linear displacement transducer for accurate measurement of the cylinder piston position retrofitted to the existing cylinders. New cylinders to be supplied with inbuilt linear displacement transducers. 6 Pc

2.3.6

Supply of a new accumulator system for the spillway HPU. –– –– –– –– –– ––

2.3.6.1

Accumulator system sized for six (6) meters travel of one gate equivalent to two (2) meters travel of all the three gates including but not limited to the following components as detailed in clause 5.3.5 1 Lot

2.3.6.1.1

Piston accumulator

1

Pc ⎯ ⎯

2.3.6.1.2

Safety and shutoff block at the top of the accumulator with a minimum of the following devices: 1

Pc

⎯ ⎯

2.3.6.1.2.1

Pneumatic pressure relief valve with auxiliary contacts

1

Pc

⎯ ⎯

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 43 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.3.6.1.2.2 Test & charging ports

1 Pc

⎯ ⎯

2.3.6.1.2.3 Nitrogen Charging port

1 Pc

⎯ ⎯

2.3.6.1.2.4 Pressure transducer ports

1 Pc

⎯ ⎯

2.3.6.1.2.5 Pneumatic isolation valve

1 Pc ⎯ ⎯

2.3.6.1.2.6 Nitrogen bottle connection points

1 Pc ⎯ ⎯

2.3.6.2

Valves manifold block with a minimum of the following devices 1 Lot

⎯ ⎯

2.3.6.2.1

Solenoid directional control poppet valves or equivalent each with manual override with an extended handle and with an auxiliary contact for open position status 3

Pc

2.3.6.2.2

Flow control valves for gate pressure supply

3

Pc

2.3.6.2.3

Pressure relief valve with auxiliary contact for operated status

1

Pc ⎯ ⎯

2.3.6.2.4

Manual flow control valve for maintenance pressure discharge

1

Pc ⎯ ⎯

2.3.6.2.5

Oil Pressure transmitter type Hydac EDS 1700 or equivalent

1

Pc

2.3.6.3

Isolation ball valves with lockable handles

4 Pc

⎯ ⎯

2.3.6.4

Accumulator shall be equipped with a minimum of the following instruments.

1 Lot

⎯ ⎯

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 44 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.3.6.4.1

Mechanical pressure gauge

1

Pc ⎯ ⎯

2.3.6.4.2

Electronic pneumatic pressure switch and transmitter

1

Pc ⎯ ⎯

2.3.6.4.3

Oil level switches for accumulator oil level (piston position) measurement

1

Pc ⎯ ⎯

2.3.6.4.4

Pneumatic pressure relief valve with auxiliary contacts

1

Pc ⎯ ⎯

2.3.6.5

Set of Nitrogen bottles each equipped with a lockable shut off pneumatic isolation valve.

1 Set

⎯ ⎯

2.3.7

Supply Of New Hydraulic Pipes Clamps and Fittings for Spillway Gates –– –– –– –– –– ––

2.3.7.1

Hydraulic pipes, clamps and fittings at the spillway as detailed in clause 5.3.6 with steel plated pipes painted to marine specifications suited for outdoor application (adverse conditions.) and meeting requirements in clause 3.11. 1 Lot

⎯ ⎯

2.3.8

Supply Of New Spillway Large Hydraulic Cylinder (Servomotor) –– –– –– –– –– ––

2.3.8.1

Hydraulic cylinder as detailed in clause 5.3.4 with the same specifications, features, sizes, performance, and ratings as the existing cylinders and with all attachment components including but not limited to spherical bearing, transfer tubes, support clamps, valves, linear displacement transducer. 2 Lots

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 45 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.3.9

Supply Of Spare Hydraulic Components, Pipes & Pipe Fittings, Tools& Equipment. –– –– –– –– –– ––

2.3.9.1

Complete sets of control valves of each type used- for every type of control valve (directional, flow, check, pressure relief &. unloading) 2 Set

⎯ ⎯

2.3.9.2

Directional proportional valves for the spillway gate control. 3 Pc

2.3.9.3 Complete sets of isolation valves of each type used

2 Set

⎯ ⎯

2.3.9.4

Complete intake gate pump including motor, pump, coupling & fittings. 1 Set

2.3.9.5

Set of each type of Hydraulic cylinder seals and fittings.

2 Set

⎯ ⎯

2.3.9.6

A set of each type of accumulator fittings

1 Set

⎯ ⎯

2.3.9.7

Vacuum Dehydration Unit – HYDAC Fluid Aqua Mobil FAM 10 or equivalent with aqua sensor for continuous water content monitoring and particle sensor for simultaneous monitoring of particle contamination) 1 Unit

2.3.9.8

Thermal Camera – Bosch Thermo Camera GTC 400 C or equivalent 1 Pc

2.3.9.9

Pressure test kit including (SA Gauge set (3 pieces) TKQ, with pressure range 0 up to 5000 psi, Test hoses (1m, 2m & 3m lengths with fittings)), minimess hoses and gauges fittings 1 Set

2.3.9.10

Nitrogen Charging & testing unit – HYDAC FPU-1 or equivalent (including valve body, spindle, check valve, release valve & pressure gauge) 1 Unit

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 46 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

2.4 REFURBISHMENT OF SPILLWAY GATES SERVO MOTORS:

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 47 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.4.1 MANDATORY ITEMS ⎯ ⎯ ⎯ ⎯

2.4.1.1.1 Removal Of Servo Motor From Spillway 6 Pc ⎯ ⎯

2.4.1.1.2 Transportation / Freight To And From Repair Centre

6 Pc ⎯ ⎯

2.4.1.1.3 Stripping & Assessing Of Servo Motor 6 Pc ⎯ ⎯

2.4.1.1.4 Replace Seal Kit 6 SET ⎯ ⎯

2.4.1.1.5 Replace Fasteners 6 SET ⎯ ⎯

2.4.1.1.6 Replace Valves On Servo Manifold 6 SET ⎯ ⎯

2.4.1.1.7 Replace Bearings / Bushes 6 SET ⎯ ⎯

2.4.1.1.8 Replace Hoses & Adapters 6 SET ⎯ ⎯

2.4.1.1.9 Assemble & Test 6 AU ⎯ ⎯

2.4.1.1.10 Paint & Package 6 AU ⎯ ⎯

2.4.1.1.11 Consumables 6 Lot ⎯ ⎯

2.4.1.1.12 Performance testing at the repair center 6 AU ⎯ ⎯

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 48 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.4.1.1.13 Reinstallation Of Servo Motor In Spillway 6 AU ⎯ ⎯

2.4.1.1.14 Commissioning & Testing On Site 6 AU ⎯ ⎯

2.4.2 REPAIR / REFURBISHMENT OPTIONS ⎯ ⎯ ⎯ ⎯

2.4.2.2.1 Rod Assembly ⎯ ⎯ ⎯ ⎯

2.4.2.2.1.1 Repair Rod - Grind / Chrome / Grind 6 AU ⎯ ⎯

2.4.2.2.1.2 Repair Rod - Linnish Only 6 AU ⎯ ⎯

2.4.2.2.1.3 Repair Rod Clevis 6 AU ⎯ ⎯

2.4.2.2.1.4 Replace Rod Assembly (New) 6 AU ⎯ ⎯

2.4.2.2.1.5 Replace Rod Clevis (New) 6 AU ⎯ ⎯

2.4.2.2.2 Barrel Assembly ⎯ ⎯ ⎯ ⎯

2.4.2.2.2.1 Repair Barrel - Hone & Polish 6 AU ⎯ ⎯

2.4.2.2.2.2 Repair Barrel - Other 6 AU ⎯ ⎯

2.4.2.2.2.3 Repair Base Clevis 6 AU ⎯ ⎯

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 49 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.4.2.2.2.4 Repair Transfer Tubes & Adapters 6 AU ⎯ ⎯

2.4.2.2.2.5 Replace Barrel (New) 6 AU ⎯ ⎯

2.4.2.2.2.6 Replace Base Clevis (New) 6 AU ⎯ ⎯

2.4.2.2.2.7 Replace Transfer Tubes & Adapters (New) 6 AU ⎯ ⎯

2.4.2.3 Gland / Head Assembly ⎯ ⎯ ⎯ ⎯

2.4.3.2.3.1 Repair Main Gland 6 AU ⎯ ⎯

2.4.3.2.3.2 Repair Gland Retainer 6 AU ⎯ ⎯

2.4.3.2.3.3 Replace Gland (New) 6 AU ⎯ ⎯

2.4.3.2.3.4 Replace Gland Retainer (New) 6 AU ⎯ ⎯

2.4.4 Piston Assembly ⎯ ⎯ ⎯ ⎯

2.4.2.4.1 Repair Piston 6 AU ⎯ ⎯

2.4.2.4.2 Repair Piston Retainer Nut 6 AU ⎯ ⎯

2.4.2.4.3 Replace Piston (New) 6 AU ⎯ ⎯

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 50 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.4.2.4.4 Replace Piston Retainer Nut (New) 6 AU ⎯ ⎯

2.5 REFURBISHMENT OF INTAKE GATES SERVO MOTORS:

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.5.1 MANDATORY ITEMS ⎯ ⎯ ⎯ ⎯

2.5.1.1.1 Removal Of Servo Motor From Spillway 3 AU ⎯ ⎯

2.5.1.1.2 Transportation / Freight To And From Repair Centre

3 AU ⎯ ⎯

2.5.1.1.3 Stripping & Assessing Of Servo Motor 3 AU ⎯ ⎯

2.5.1.1.4 Replace Seal Kit 3 SET ⎯ ⎯

2.5.1.1.5 Replace Fasteners 3 SET ⎯ ⎯

2.5.1.1.6 Replace Valves On Servo Manifold 3 SET ⎯ ⎯

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 51 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.5.1.1.7 Replace Bearings / Bushes 3 SET ⎯ ⎯

2.5.1.1.8 Replace Header Tank breather 3 PC ⎯ ⎯

2.5.1.1.9 Refurbish Front Base Mounting Assembly 3 PC ⎯ ⎯

2.5.1.1.10 Assemble & Test 3 PC ⎯ ⎯

2.5.1.1.11 Paint & Package 3 PC ⎯ ⎯

2.5.1.1.12 Consumables 1 Lot ⎯ ⎯

2.5.1.1.13 Performance testing at the repair center 3 AU ⎯ ⎯

2.5.1.1.14 Reinstallation Of Servo Motor at the Intake 3 AU ⎯ ⎯

2.5.1.1.15 Commissioning & Testing On Site 3 AU ⎯ ⎯

2.5.2 REPAIR / REFURBISHMENT OPTIONS ⎯ ⎯ ⎯ ⎯

2.5.2.1 Rod Assembly ⎯ ⎯ ⎯ ⎯

2.5.2.1.1 Repair Rod - Grind / Chrome / Grind 3 AU ⎯ ⎯

2.5.2.1.2 Repair Rod - Linnish Only 3 AU ⎯ ⎯

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 52 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.5.2.1.3 Repair Rod Clevis 3 AU ⎯ ⎯

2.5.2.1.4 Replace Rod Assembly (New) 3 AU ⎯ ⎯

2.5.2.1.5 Replace Rod Clevis (New) 3 AU ⎯ ⎯

2.5.2.2 Barrel Assembly ⎯ ⎯ ⎯ ⎯

2.5.2.2.1 Repair Barrel - Hone & Polish 3 AU ⎯ ⎯

2.5.2.2.2 Repair Barrel - Other 3 AU ⎯ ⎯

2.5.2.2.3 Repair Base Clevis 3 AU ⎯ ⎯

2.5.2.2.4 Repair Transfer Tubes & Adapters 3 AU ⎯ ⎯

2.5.2.2.5 Replace Barrel (New) 3 AU ⎯ ⎯

2.5.2.2.6 Replace Base Clevis (New) 3 AU ⎯ ⎯

2.5.2.2.7 Replace Transfer Tubes & Adapters (New) 3 AU ⎯ ⎯

2.5.2.3 Gland / Head Assembly ⎯ ⎯ ⎯

2.5.2.3.1 Repair Main Gland 3 AU ⎯ ⎯

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 53 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.5.2.3.2 Repair Gland Retainer 3 AU ⎯ ⎯

2.5.2.3.3 Replace Gland (New) 3 AU ⎯ ⎯

2.5.2.3.4 Replace Gland Retainer (New) 3 AU ⎯ ⎯

2.5.2.4 Piston Assembly ⎯ ⎯ ⎯

2.5.2.4.1 Repair Piston 3 AU ⎯ ⎯

2.5.2.4.2 Repair Piston Retainer Nut 3 AU ⎯ ⎯

2.5.2.4.3 Replace Piston (New) 3 AU ⎯ ⎯

2.5.2.4.4 Replace Piston Retainer Nut (New) 3 AU ⎯ ⎯

2.6 SUPPLY OF ELECTRICAL CONTROL PANELS & SWITCHBOARDS

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 54 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.6.1

Supply of Intake gate low voltage supply switchboard and distribution boards

–– –– –– –– –– ––

2.6.1.1 LV switchboard with at least two (2) cubicles with all the compartments i.e. bus bar, cable, circuit breaker, Control & metering etc. with all internal wiring and mounting accessories e.g. terminal blocks, DIN rails, glanding plates, base plates, internal wires, trunking, doors, frames, bus bars, cable termination accessories, etc. The cubicle/s shall contain two incomer circuits with all the components and devices for a complete incomer cubicle/s as specified in particular specifications, a minimum of the following equipment shall be included in the incomer switch board cubicle/s: 1 Lot

2.6.1.2.1 Incomer circuits with all the components

and devices for complete switch board incomers as per clause 4.5 with a module rating of 300A containing but not limited to the following devices:

2 Lot

⎯ ⎯

2.6.1.2.1.1 400A Moulded case circuit breaker

MCCB and its associated gear

2 Pc ⎯ ⎯

2.6.1.2.1.2

200KW DOL starter contactor 2 Pc

⎯ ⎯

2.6.1.2.1.3 Mechanical interlocking device for the contactors.

1 Pc ⎯ ⎯

2.6.1.2.1.4 Current transformers one per phase for

each incomer

8 Pc ⎯ ⎯

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 55 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.6.1.2.1.5 Three phase voltage transformers

3 Pc ⎯ ⎯

2.6.1.2.2 Control and metering compartment

containing incomer control and metering devices including but not limited to:

1 Lot

⎯ ⎯

2.6.1.2.2.1 Automatic transfer controller 1 Pc

⎯ ⎯

2.6.1.2.2.2 Digital panel AC voltmeter 1 Pc ⎯ ⎯

2.6.1.2.2.3 Digital panel multifunctional meters 2 Pc

⎯ ⎯

2.6.1.2.2.4 Three pole, three position key operated switch

1 Pc ⎯ ⎯

2.6.1.2.2.5 Three phase AC voltage monitoring relay 3 Pc

⎯ ⎯

2.6.1.2.2.6 Set of contactor relays for control & interlocks

1 set ⎯ ⎯

2.6.1.2.2.7 Set of miniature interface relays with 4

SPDT contacts for interfacing 1 set

⎯ ⎯

2.6.1.2.2.8 DC DP Miniature circuit breakers 2 Pc ⎯ ⎯

2.6.1.2.2.9 AC DP Miniature circuit breakers 1 Pc

⎯ ⎯

2.6.1.2.2.10 Motor protection circuit breakers (MPCB)

3 Pc ⎯ ⎯

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 56 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.6.1.2.2.11 Illuminated push buttons. 6 Pc ⎯ ⎯

2.6.1.2.2.12 Status indication LED lamps 8 Pc

⎯ ⎯

2.6.1.2.3 11 KW standard sized withdrawable motor DOL starter modules meeting requirements of clause 3.9.20 each including but not limited to the following main components:

5 Lots

⎯ ⎯

2.6.1.2.3.1 32A MPCB 1 Pc

⎯ ⎯

2.6.1.2.3.2 MPCB rotary door operator and knob at the compartment door.

1 Pc ⎯ ⎯

2.6.1.2.3.3 18.5KW contactor 1 Pc

⎯ ⎯

2.6.1.2.3.4 Set of motor management and control devices.

1 Set ⎯ ⎯

2.6.1.2.3.5 Miniature circuit-breakers for control

circuit protection 2 Pc

⎯ ⎯

2.6.1.2.3.6 Contactor relays 2 Pc ⎯ ⎯

2.6.1.2.3.7 Set of interface relays with SPDT contacts 1 Set

⎯ ⎯

2.6.1.2.3.8 Current transformer for external panel meter

1 Pc ⎯ ⎯

2.6.1.2.3.9 Compartment door with a minimum of

the following devices

1 Lot ⎯ ⎯

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 57 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.6.1.2.3.9.1 Motor management control device HMI display unit

1 Pc ⎯ ⎯

2.6.1.2.3.9.2 Illuminated pushbuttons (ON/OFF/TRIP

RESET) 3 Pc

⎯ ⎯

2.6.1.2.3.9.3 Status LED lamps (service position and test position)

2 Pc ⎯ ⎯

2.6.1.2.3.9.4 Running hour’s counter. 1 Pc

⎯ ⎯

2.6.1.2.3.9.5 Three pole, three position key-operated switch

1 Pc ⎯ ⎯

2.6.1.2.4 125A standard sized withdrawable cable

feeder modules meeting requirements of clause 3.9.19 each containing but not limited to the following main components:

4 Lots

⎯ ⎯

2.6.1.2.4.1 160A MCCB 1 Pc

⎯ ⎯

2.6.1.2.4.2 Set of MCCB communication module/s 1 Set ⎯ ⎯

2.6.1.2.4.3 MCCB rotary door operator and knob at

the compartment door 1 Pc

⎯ ⎯

2.6.1.2.5 32A standard/small sized withdrawable cable feeder modules meeting requirements of clause 3.9.19 each including but not limited to the following main components:

2 Lots

⎯ ⎯

2.6.1.2.5.1 32A MPCB 1 Pc

⎯ ⎯

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 58 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.6.1.2.5.2 Three-phase digital power monitoring device

1 Pc ⎯ ⎯

2.6.1.2.5.3 MPCB rotary door operator and knob at

the compartment door 1 Pc

⎯ ⎯

2.6.1.2.6 A 4-way TPN distribution board module complete with all devices as specified including but not limited to:

1 Lot

⎯ ⎯

2.6.1.2.6.1 32A MPCB 2 Pc ⎯ ⎯

2.6.1.2.6.2 32A AC SP Miniature circuit breakers

with Icu ≥10KA @ 400VAC and at least one SPDT auxiliary contacts

3 Pc

⎯ ⎯

2.6.1.2.6.3 16A AC SP Miniature circuit breakers with Icu ≥10KA @ 400VAC and at least one SPDT auxiliary contacts

3 Pc

⎯ ⎯

2.6.1.3 LV copper power cables

1 Lot ⎯ ⎯

2.6.2

Supply of Intake gate electrical control panels & cabinets –– ––

–– –– –– ––

2.6.2.1

Complete intake gate control panels each with all internal wiring and mounting accessories e.g. terminal blocks, DIN rails, glanding plates, base plates, internal wires, trunking, doors, frames etc. Each panel shall contain but not limited to the following major devices:

3 Lots

2.6.2.1.1

Set of contactor relays meeting requirements of clause 3.5.3, for implementation all the gate operations described in clause 4.4.2.

1 Set

⎯ ⎯

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 59 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.6.2.1.2

Set of Robust contactor type or equivalent timer relays for implementation all the gate operations described in clause 4.4.2.

1 Set

⎯ ⎯

2.6.2.1.3

Set of interfacing relays for contact multiplication

1 Set ⎯ ⎯

2.6.2.1.4

LED lamps 5 Pc ⎯ ⎯

2.6.2.1.5

Pushbuttons 5 Pc ⎯ ⎯

2.6.2.1.6

Mushroom head emergency pushbutton 1 Pc ⎯ ⎯

2.6.2.1.7

Three pole, Three position key switches 1 Pc ⎯ ⎯

2.6.2.1.8

Two pole, Two position selector switches 1 Pc ⎯ ⎯

2.6.2.1.9

Digital panel indication meters as per clause 3.5.8.3

2 Pc ⎯ ⎯

2.6.2.1.10

Contactor relays as per clause 3.5.3 for valve control

5 Pc ⎯ ⎯

2.6.2.1.11

Double pole DC MCB’s for 24 V DC and 110V DC supply

2 Pc ⎯ ⎯

2.6.2.1.12

AC MCB’s shall be provided for AC supplies.

2 Pc ⎯ ⎯

2.6.2.1.13

British type socket 1 Pc ⎯ ⎯

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 60 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.6.2.1.14

LED panel lighting with door switches 1 Pc ⎯ ⎯

2.6.2.1.15

Panel heater and hygrostat 1 Set ⎯ ⎯

2.6.2.2

Complete intake gate control outdoor cabinets one for each gate as detailed in clause 4.4.3. Each cabinet shall be complete with enclosure, double door, terminal blocks, and all wiring and wiring accessories as per clause 3.6. Panel shall contain but not limited to the following major devices.

3 Lots

⎯ ⎯

2.6.2.2.1

Illuminated pushbuttons (with integrated LED)

3 Pc ⎯ ⎯

2.6.2.2.2

Mushroom head emergency pushbutton 1 Pc ⎯ ⎯

2.6.2.2.3

Panel heater and hygrostat 1 Set ⎯ ⎯

2.6.2.3

Complete intake gate HPU control cabinets as detailed in clause 4.4.4. Each cabinet shall be complete with enclosure, door, terminal blocks, and all wiring and wiring accessories as per clause 3.6. Cabinet shall contain but not limited to the following major devices.

2 Lots

2.6.2.3.1

Set of contactor relays meeting requirements of clause 3.5.3, for implementation all the pump operations described in clause 4.4.2.

1 Set

⎯ ⎯

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 61 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.6.2.3.2

Set of Robust contactor type or equivalent timer relays for implementation all the pump operations described in clause 4.4.2.

1 Set

⎯ ⎯

2.6.2.3.3

Set of interfacing relays for contact multiplication

1 Set ⎯ ⎯

2.6.2.3.4

LED lamps 4 Pc ⎯ ⎯

2.6.2.3.5

pushbuttons 4 Pc ⎯ ⎯

2.6.2.3.6

Mushroom head emergency pushbutton 1 Pc ⎯ ⎯

2.6.2.3.7

Contactor relays as per clause 3.5.3 for valve control

2 Pc ⎯ ⎯

2.6.2.3.8

Double pole DC MCB’s for 24 V DC and 110V DC supply

2 Pc ⎯ ⎯

2.6.2.3.9

AC MCB’s shall be provided for AC supplies.

2 Pc ⎯ ⎯

2.6.2.3.10

British type socket 1 Pc ⎯ ⎯

2.6.2.3.11

LED panel lighting with door switches 1 Pc ⎯ ⎯

2.6.2.3.12

Panel heater and hygrostat 1 Set ⎯ ⎯

2.6.2.4

Complete intake gate SCADA panel as detailed in clause 4.4.6 and 4.6. The panel shall be complete with enclosure,

1 Lot

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 62 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

door, terminal blocks, and all wiring and wiring accessories as per clause 3.6. Panel shall contain but not limited to the following major devices.

2.6.2.4.1

Complete Programmable Logic Controller unit with the following modules:

1 Unit

2.6.2.4.1.1

Set of PLC CPU module/s 1 Set ⎯ ⎯

2.6.2.4.1.2

Set of PLC external network communication module/s

1 Set ⎯ ⎯

2.6.2.4.1.3

Set of PLC IO communication module/s 1 Set ⎯ ⎯

2.6.2.4.1.4

Set of Digital input modules 1 Set ⎯ ⎯

2.6.2.4.1.5

Set of Digital output modules 1 Set ⎯ ⎯

2.6.2.4.1.6

Set of analogue input modules 1 Set ⎯ ⎯

2.6.2.4.1.7

Set of analogue output modules 1 Set ⎯ ⎯

2.6.2.4.1.8

PLC OPC UA/IEC61850 communication gateway module (optional if CPU inbuilt)

1 Pc ⎯ ⎯

2.6.2.4.1.9

Set of PLC module connectors, termination modules and or mounting back planes

1 Set

⎯ ⎯

2.6.2.4.2

Operator panel 1 Pc ⎯ ⎯

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 63 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.6.2.4.3

Serial devices gateway 1 Pc ⎯ ⎯

2.6.2.4.4

Industrial ethernet switches 2 Pc ⎯ ⎯

2.6.2.4.5

240V AC/110V DC to 24V DC power supply units

2 Pc ⎯ ⎯

2.6.2.4.6

24V DC redundancy diode block. 1 Pc ⎯ ⎯

2.6.2.4.7

Two pole, Two position key switches 1 Pc ⎯ ⎯

2.6.2.4.8

Status signalling tower/s 1 Pc ⎯ ⎯

2.6.2.4.9

Set of interfacing relays for all digital outputs wiring

1 Set ⎯ ⎯

2.6.2.4.10

Set of fibre optic patch chords with flexible conduits

1 Set ⎯ ⎯

2.6.2.4.11

Set of double pole DC and AC MCB’s for supply protection

1 Set ⎯ ⎯

2.6.2.4.12

Panel cooling fans each with Air throughput of at least 750m3 /h

2 Pc ⎯ ⎯

2.6.2.4.13

Ventilation and filter units 4 Pc ⎯ ⎯

2.6.2.4.14

Thermostats for fans control 2 Pc ⎯ ⎯

2.6.2.4.15

British type socket 1 Pc ⎯ ⎯

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 64 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.6.2.4.16

European type socket 1 Pc ⎯ ⎯

2.6.2.4.17

LED panel lighting with door switches 1 Set ⎯ ⎯

2.6.2.4.18

Panel heater and hygrostat 1 Set ⎯ ⎯

2.6.2.5

Complete intake gate patch panel cabinet as detailed in clause 4.6. The panel shall be complete with enclosure, door, terminal blocks, and all wiring and wiring accessories as per clause 3.6. Panel shall contain but not limited to the following major devices.

1 Lot

⎯ ⎯

2.6.2.5.1

Twenty-four (24) port fibre optic patch panels.

2 Pc ⎯ ⎯

2.6.2.5.2

24 core OS2 fibre, uni-tube steel wire armoured cable for indoor or outdoor duct or direct buried installation with full rodent protection

500 Meters

⎯ ⎯

2.6.2.6

Complete intake gate DC supply cabinet as detailed in clause 4.4.5. The cabinet shall be complete with enclosure, door, terminal blocks, and all wiring and wiring accessories as per clause 3.6. Panel shall contain but not limited to the following major devices.

1 Lot

⎯ ⎯

2.6.2.6.1

240V AC/110V DC to 24V DC power supply units

2 Pc ⎯ ⎯

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 65 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.6.2.6.2

24V DC redundancy diode block. 1 Pc ⎯ ⎯

2.6.2.6.3

110V DC redundancy diode block. 1 Pc ⎯ ⎯

2.6.2.6.4

Double pole 110V DC MCB 10 Pc ⎯ ⎯

2.6.2.6.5

Double pole 24V DC MCB 9 Pc ⎯ ⎯

2.6.2.6.6

Double pole 240V AC MCB 2 Pc ⎯ ⎯

2.6.2.6.7

110V DC supply monitoring relay 1 Pc ⎯ ⎯

2.6.2.6.8

LED panel lighting with door switches 1 Set ⎯ ⎯

2.6.2.6.9

Panel heater and hygrostat 1 Set ⎯ ⎯

2.6.2.7

Wiring cables and wiring accessories. All control wiring within the intake gate area shall be replaced with new wiring except for wiring to the main control building which shall be re used. All power cabling within the intake gate area that is too short to be reused shall be replaced. Contractor shall supply all cables necessary for the wiring.

1 Lot

⎯ ⎯

2.6.3

Supply of spillway gate low voltage supply switchboard and distribution boards ––

–– –– –– ––

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 66 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.6.3.1

Complete switchboard with at least two (2) cubicles with all the compartments i.e., bus bar, cable, circuit breaker, Control & metering etc with all internal wiring and mounting accessories e.g., terminal blocks, DIN rails, glanding plates, base plates, internal wires, trunking, doors, frames, bus bars, cable termination accessories, etc. shall be supplied as detailed in clause 5.5. The cubicles shall contain but not limited to the following devices:

1

Lot

2.6.3.2.1

300A incomer circuits with all the components and devices for complete switch board incomers as per clause 5.5., including but not limited to:

2 Lot

⎯ ⎯

2.6.3.2.1.1

400A Moulded case circuit breaker and its associated gear

2 Pc ⎯ ⎯

2.6.3.2.1.2

200KW DOL starter contactor 2 Pc ⎯ ⎯

2.6.3.2.1.3

A mechanical interlocking device for the contactors

1 Pc ⎯ ⎯

2.6.3.2.1.4

Current transformers 8 Pc ⎯ ⎯

2.6.3.2.1.5

Three phase voltage transformers 3 Pc ⎯ ⎯

2.6.3.2.2

Control and metering compartment containing incomer control and metering devices including but not limited to:

1 Lot

⎯ ⎯

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 67 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.6.3.2.2.1

Automatic transfer controller 1 Pc ⎯ ⎯

2.6.3.2.2.2

Digital panel AC voltmeter 1 Pc ⎯ ⎯

2.6.3.2.2.3

Digital panel multifunctional meters 2 Pc ⎯ ⎯

2.6.3.2.2.4

Three pole, three position key operated switch

1 Pc ⎯ ⎯

2.6.3.2.2.5

Three phase AC voltage monitoring relay 3

Pc ⎯ ⎯

2.6.3.2.2.6

A set of contactor relays for control & interlocks

1 Set ⎯ ⎯

2.6.3.2.2.7

A set of miniature interface relays with 4 SPDT contacts for interfacing

1 Set ⎯ ⎯

2.6.3.2.2.8

DC DP Miniature circuit breakers 2 Pc ⎯ ⎯

2.6.3.2.2.9

AC DP Miniature circuit breakers 1 Pc ⎯ ⎯

2.6.3.2.2.10

Motor protection circuit breakers (MPCB)

3 Pc ⎯ ⎯

2.6.3.2.2.11

Illuminated push buttons. 6 Pc ⎯ ⎯

2.6.3.2.2.12

Status indication LED lamps 8 Pc ⎯ ⎯

2.6.3.2.2.13

Thermostat, heater and one single phase British type socket outlet

1 Lot ⎯ ⎯

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 68 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.6.3.2.3

11 KW standard sized withdrawable motor DOL starter modules meeting requirements of clause 3.9.20 each including but not limited to the following main components:

8 Lot

⎯ ⎯

2.6.3.2.3.1

32A MPCB 1 Pc ⎯ ⎯

2.6.3.2.3.2

MPCB rotary door operator and knob at the compartment door.

1 Pc ⎯ ⎯

2.6.3.2.3.3

18.5KW contactor 1 Pc ⎯ ⎯

2.6.3.2.3.4

Set of motor management and control devices.

1 Set ⎯ ⎯

2.6.3.2.3.5

Miniature circuit-breakers for control circuit protection

2 Pc ⎯ ⎯

2.6.3.2.3.6

Contactor relays 2 Set ⎯ ⎯

2.6.3.2.3.7

A set of interface relays with SPDT contacts

1 Set ⎯ ⎯

2.6.3.2.3.8

Current transformer for external panel meter

1 Pc ⎯ ⎯

2.6.3.2.3.9

Compartment door with a minimum of the following devices

1 Lot ⎯ ⎯

2.6.3.2.3.9.1 Motor management control device HMI

display unit 1 Pc

⎯ ⎯

2.6.3.2.3.9.2 Illuminated pushbuttons (ON/OFF/TRIP RESET)

3 Pc ⎯ ⎯

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 69 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.6.3.2.3.9.3 Status LED lamps (service position and test position)

2 Pc ⎯ ⎯

2.6.3.2.3.9.4 Running hour’s counter. 1 Pc

⎯ ⎯

2.6.3.2.3.9.5 Three pole, three position key-operated switch

1 Pc ⎯ ⎯

2.6.3.2.4 125A standard sized withdrawable cable

feeder modules meeting requirements of clause 3.9.19 each containing but not limited to the following main components:

6 Lots

⎯ ⎯

2.6.3.2.4.1 160A MCCB 1 Pc

⎯ ⎯

2.6.3.2.4.2 Set of MCCB communication module/s 1 Set ⎯ ⎯

2.6.3.2.4.3 MCCB rotary door operator and knob at

the compartment door 1 Pc

⎯ ⎯

2.6.3.2.5 32A standard/small sized withdrawable cable feeder modules meeting requirements of clause 3.9.19 each including but not limited to the following main components:

2 Lots

⎯ ⎯

2.6.3.2.5.1 32A MPCB 1 Pc

⎯ ⎯

2.6.3.2.5.2 Three-phase digital power monitoring device

1 Pc ⎯ ⎯

2.6.3.2.5.3 MPCB rotary door operator and knob at

the compartment door 1 Pc

⎯ ⎯

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 70 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.6.3.2.6 A 4-way TPN distribution board module complete with all devices as specified including but not limited to:

1 Lot

⎯ ⎯

2.6.3.2.6.1 32A MPCB 2 Pc ⎯ ⎯

2.6.3.2.6.2 32A AC SP Miniature circuit breakers

with Icu ≥10KA @ 400VAC and at least one SPDT auxiliary contacts

3 Pc ⎯ ⎯

2.6.3.2.6.3 16A AC SP Miniature circuit breakers

with Icu ≥10KA @ 400VAC and at least one SPDT auxiliary contacts

3 Pc ⎯ ⎯

2.6.3.3 LV copper power cables

1 Lot ⎯ ⎯

2.6.4

Supply of spillway gate electrical control panels & cabinets

–– –– ––

–– ––

2.6.4.1

Complete spillway gate control panels one for each gate as detailed in clause 5.4.3. Each panel shall be complete with enclosure, door, terminal blocks, and all wiring and wiring accessories as per clause 3.6. Panel shall contain but not limited to the following major devices.

3 Lot

2.6.4.1.1

Set of contactor relays meeting requirements of clause 3.5.3, for implementation all the gate operations described in clause 5.4.2.

1 Set

⎯ ⎯

2.6.4.1.2

Set of Robust contactor type or equivalent timer relays for implementation all the gate operations described in clause 5.4.2.

1 Set ⎯ ⎯

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 71 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.6.4.1.3

Set of interfacing relays for contact multiplication

1 Set ⎯ ⎯

2.6.4.1.4

LED lamps 13 Pc ⎯ ⎯

2.6.4.1.5

Pushbuttons 6 Pc ⎯ ⎯

2.6.4.1.6

Mushroom head emergency pushbutton 1 Pc ⎯ ⎯

2.6.4.1.7

Three pole, Three position key switches 1 Pc ⎯ ⎯

2.6.4.1.8

Three pole Two position Key switch 2 Pc ⎯ ⎯

2.6.4.1.9

Two pole, Three position selector switches

1 Pc ⎯ ⎯

2.6.4.1.10

Digital panel indication meters as per clause 3.5.8.3

5 Pc ⎯ ⎯

2.6.4.1.11

Contactor relays as per clause 3.5.3 for valve & pump control

7 Pc ⎯ ⎯

2.6.4.1.12

Double pole DC MCB’s for 24 V DC and 110V DC supply

2 Pc ⎯ ⎯

2.6.4.1.13

AC MCB’s shall be provided for AC supplies.

2 Pc ⎯ ⎯

2.6.4.1.14

British type socket 1 Pc ⎯ ⎯

2.6.4.1.15

LED panel lighting with door switches 1 Pc ⎯ ⎯

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 72 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.6.4.1.16

Panel heater and hygrostat 1 Set ⎯ ⎯

2.6.4.2

Complete spillway gate control outdoor cabinets one for each gate as detailed in clause 5.4.3. Each cabinet shall be complete with enclosure, double door, terminal blocks, and all wiring and wiring accessories as per clause 3.6. Panel shall contain but not limited to the following major devices.

3 Lot

⎯ ⎯

2.6.4.2.1

Illuminated pushbuttons (with integrated LED)

5 Pc ⎯ ⎯

2.6.4.2.2

Mushroom head emergency pushbutton 1 Pc ⎯ ⎯

2.6.4.2.3

LED lamps 4 Pc ⎯ ⎯

2.6.4.2.4

Panel heater and hygrostat 1 Set ⎯ ⎯

2.6.4.3

Complete spillway gate HPU control cabinet as detailed in clause 5.4.4. Each panel shall be complete with enclosure, door, terminal blocks, and all wiring and wiring accessories as per clause 3.6. Panel shall contain but not limited to the following major devices.

1 Lot

2.6.4.3.1

Set of contactor relays meeting requirements of clause 3.5.3, for implementation all the accumulator operations described in clause 5.4.2.

1 Set

⎯ ⎯

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 73 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.6.4.3.2

Set of Robust contactor type or equivalent timer relays for implementation all the accumulator operations described in clause 5.4.2.

1 Set

⎯ ⎯

2.6.4.3.3

Set of interfacing relays for contact multiplication

1 Set ⎯ ⎯

2.6.4.3.4

LED lamps 4 Pc ⎯ ⎯

2.6.4.3.5

Illuminated pushbuttons (with integrated LED)

14 Pc ⎯ ⎯

2.6.4.3.6

Push button 1 Pc ⎯ ⎯

2.6.4.3.7

Mushroom head emergency pushbutton 4 Pc ⎯ ⎯

2.6.4.3.8

Contactor relays as per clause 3.5.3 for valve control

3 Pc ⎯ ⎯

2.6.4.3.9

Double pole DC MCB’s for 24 V DC and 110V DC supply

2 Pc ⎯ ⎯

2.6.4.3.10

AC MCB’s shall be provided for AC supplies.

2 Pc ⎯ ⎯

2.6.4.3.11

British type socket 1 Pc ⎯ ⎯

2.6.4.3.12

LED panel lighting with door switches 1 Pc ⎯ ⎯

2.6.4.3.13

Panel heater and hygrostat 1 Set ⎯ ⎯

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 74 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.6.4.4

Complete spillway gate SCADA panel as detailed in clause 5.4.7 and 4.6. The panel shall be complete with enclosure, door, terminal blocks, and all wiring and wiring accessories as per clause 3.6. Panel shall contain but not limited to the following major devices.

1 Lot

2.6.4.4.1

Complete Programmable Logic Controller unit with the following modules:

2.6.4.4.1.1

Set of PLC CPU module/s 1 Set ⎯ ⎯

2.6.4.4.1.2

Set of PLC external network communication module/s

1 Set ⎯ ⎯

2.6.4.4.1.3

Set of PLC IO communication module/s 1 Set ⎯ ⎯

2.6.4.4.1.4

Set of Digital input modules 1 Set ⎯ ⎯

2.6.4.4.1.5

Set of Digital output modules 1 Set ⎯ ⎯

2.6.4.4.1.6

Set of analogue input modules 1 Set ⎯ ⎯

2.6.4.4.1.7

Set of analogue output modules 1 Set ⎯ ⎯

2.6.4.4.1.8

PLC OPC UA/IEC61850 communication gateway module (optional if CPU inbuilt)

1 Pc ⎯ ⎯

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 75 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.6.4.4.1.9

Set of PLC module connectors, termination modules and or mounting back planes

1 Set

⎯ ⎯

2.6.4.4.2

Proportional directional control valves electronic control modules

3 Pc

2.6.4.4.3

Operator panel 1 Pc ⎯ ⎯

2.6.4.4.4

Serial devices gateway 1 Pc ⎯ ⎯

2.6.4.4.5

Industrial ethernet switches 2 Pc ⎯ ⎯

2.6.4.4.6

240V AC/110V DC to 24V DC power supply units

2 Pc ⎯ ⎯

2.6.4.4.7

24V DC redundancy diode block. 1 Pc ⎯ ⎯

2.6.4.4.8

Two pole, Two position key switches 1 Pc ⎯ ⎯

2.6.4.4.9

Two pole, Three position selector switches

1 Pc ⎯ ⎯

2.6.4.4.10

Digital panel indication meters as per clause 3.5.8.3

3 Pc ⎯ ⎯

2.6.4.4.11

Status signalling tower/s 1 Pc ⎯ ⎯

2.6.4.4.12

Set of interfacing relays for all digital outputs wiring

1 Set ⎯ ⎯

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 76 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.6.4.4.13

Set of fibre optic patch chords with flexible conduits

1 Set ⎯ ⎯

2.6.4.4.14

Set of double pole DC and AC MCB’s for supply protection

1 Set ⎯ ⎯

2.6.4.4.15

Panel cooling fans each with Air throughput of at least 750m3 /h

2 Pc ⎯ ⎯

2.6.4.4.16

Ventilation and filter units 4 Pc ⎯ ⎯

2.6.4.4.17

Thermostats for fans control 2 Pc ⎯ ⎯

2.6.4.4.18

British type socket 1 Pc ⎯ ⎯

2.6.4.4.19

European type socket 1 Pc ⎯ ⎯

2.6.4.4.20

LED panel lighting with door switches 1 Set ⎯ ⎯

2.6.4.4.21

Panel heater and hygrostat 1 Set ⎯ ⎯

2.6.4.5

Complete spillway gate patch panel cabinet as detailed in clause 4.6. The panel shall be complete with enclosure, door, terminal blocks, and all wiring and wiring accessories as per clause 3.6. Panel shall contain but not limited to the following major devices.

1 Lot

⎯ ⎯

2.6.4.5.1

Twenty-four (24) port fibre optic patch panels.

2 Pc ⎯ ⎯

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 77 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.6.4.5.2

24 core OS2 fibre, uni-tube steel wire armoured cable for indoor or outdoor duct or direct buried installation with full rodent protection

500 Meters

⎯ ⎯

2.6.4.6

Complete spillway gate instruments detailed in clause 5.4.5. This shall include but not limited to the following.

1 Lot

⎯ ⎯

2.6.4.6.1

Gate position transducers 3 Pc

2.6.4.6.2

Robust IP68 Proximity switches 18 Pc

2.6.4.7

Complete spillway gate DC supply cabinet as detailed in clause 5.4.6. The cabinet shall be complete with enclosure, door, terminal blocks, and all wiring and wiring accessories as per clause 3.6. Panel shall contain but not limited to the following major devices.

1 Lot

⎯ ⎯

2.6.4.7.1

240V AC/110V DC to 24V DC power supply units

2 Pc ⎯ ⎯

2.6.4.7.2

24V DC redundancy diode block. 1 Pc ⎯ ⎯

2.6.4.7.3

110V DC redundancy diode block. 1 Pc ⎯ ⎯

2.6.4.7.4

Double pole 110V DC MCB 9 Pc ⎯ ⎯

2.6.4.7.5

Double pole 24V DC MCB 8 Pc ⎯ ⎯

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 78 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.6.4.7.6

Double pole 240V AC MCB 2 Pc ⎯ ⎯

2.6.4.7.7

110V DC supply monitoring relay 1 Pc ⎯ ⎯

2.6.4.7.8

LED panel lighting with door switches 1 Set ⎯ ⎯

2.6.4.7.9

Panel heater and hygrostat 1 Set ⎯ ⎯

2.6.4.8

All control wiring within the spillway gate area shall be replaced with new wiring except for wiring to the main control building which shall be re used. All power cabling within the intake gate area that is too short to be reused shall be replaced. Contractor shall supply all cables necessary for the wiring.

1 Lot

⎯ ⎯

2.6.5

Supply of electrical component spares. ––

–– –– –– ––

2.6.5.1

400A MCCB 2 Pc ⎯ ⎯

2.6.5.2

200KW/400A contactor 2 Pc ⎯ ⎯

2.6.5.3

160A MCCB 2 Pc ⎯ ⎯

2.6.5.4

32A MPCB 4 Pc ⎯ ⎯

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 79 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.6.5.5

MCCB/MPCB door-coupling rotary operating mechanism

2 Pc ⎯ ⎯

2.6.5.6

18.5KW/32A contactor 2 Pc ⎯ ⎯

2.6.5.7

32A SP AC MCB 4 Pc ⎯ ⎯

2.6.5.8

16A SP AC MCB 4 Pc ⎯ ⎯

2.6.5.9

Switchboard current transformers for each CT ratio

2 Pc ⎯ ⎯

2.6.5.10

Switchboard voltage transformers, for each burden rating

2 Pc ⎯ ⎯

2.6.5.11

Automatic transfer controller/switch 1 Pc ⎯ ⎯

2.6.5.12

Serial device server with at least four Ethernet ports and four serial ports

1 Pc ⎯ ⎯

2.6.5.13

Industrial ethernet switches 2 Pc ⎯ ⎯

2.6.5.14

Panel digital multifunctional meter 2 Pc ⎯ ⎯

2.6.5.15

Digital AC voltmeter with serial output 1 Pc ⎯ ⎯

2.6.5.16

Three-phase voltage monitoring relays 2 Pc ⎯ ⎯

2.6.5.17

Digital panel indication meter 3 Pc ⎯ ⎯

Tender for Refurbishment of Gitaru Intake & Spillway Gates Hydraulic Control System

Page 80 of 80 …………………….

Bidder’s seal or stamp Preliminary Bill of Materials May 2021

No Equipment/part Description Estimated quantity

UOM manufacturer model/type Offered by bidder (YES/NO)

Bidders' comments

2.6.5.18

Digital power monitoring devices with serial output, of each type or rating.

2 Pc ⎯ ⎯

2.6.5.19

Sets of PLC modules- Two modules of each type of PLC module shall be provided.

2 Set ⎯

2.6.5.20

Proportional directional control valves electronic control modules.

3 Pc

2.6.5.21

Motor management controllers for each rating or type

2 Pc ⎯ ⎯

2.6.5.22

Intake gate hydraulic cylinder linear position transducers

2 Pc

2.6.5.23

Spillway gate hydraulic cylinder linear position transducers

3 Pc

2.6.5.24

Intake gate position limit switches 5 Pc

2.6.5.25

Robust IP68 spillway gate proximity switches

6 Pc

2.6.5.26

Spillway gate position transducers 2 Pc

2.6.5.27

Electronic pressure switches & transmitters of each type to be used.

2 Pc ⎯ ⎯

2.6.5.28

Electronic level switches & transmitters of each type to be used.

2 Pc ⎯ ⎯

2.6.5.29

Electronic temperature switches & transmitters of each type to be used.

2 Pc ⎯ ⎯