ENGINEERING REPORT PINE HARBOUR MARINA - COMMERCIAL/RESIDENTIAL BUILDINGS BEACHLANDS Prepared for: Pine Harbour Marina Ltd July 2017

ENGINEERING REPORT PINE HARBOUR MARINA - COMMERCIAL/RESIDENTIAL BUILDINGS BEACHLANDS Prepared for: Pine Harbour Marina Ltd July 2017 Crang Consulting Ltd Unit 4/517 Mount Wellington Highway, Mount Wellington PO Box 42-089, Orakei, Auckland 1745 Tel: (09) 320 3325

Email: [email protected]   

 

Document Quality Assurance Statement 

File Ref.  1194 

Report 

Name 

Engineering Report 

 

Report No.  1194/1 

File Location  p:\1194 ‐ pine harbour ‐ commercial buildings\word\engineering report rev 

d\engineering report ‐ pine harbour commercial rev d.docx 

       

Action  Personnel  Sign  Date 

Prepared Vaughan Crang 

 Principal   8/7/2016 

Rev. A Mariela Castillero 

Senior Civil Engineer   14/9/2016 

Rev. B Mariela Castillero 

Senior Civil Engineer   31/03/2017

Rev. C Cameron Gifford 

Senior Civil Engineer   20/06/2017

Rev. D Cameron Gifford 

Senior Civil Engineer   06/07/2017

Document Revision Status 

Revision 

No. Description 

Section/ 

Page Author  Date 

0  Final    VPC  11/7/16 

A  S92     MC  14/9/16 

B  Additional Council Comments    MC   30/3/17 

C  Retail FFL Amendment    CG  20/6/17 

D  Change to Residential Use    CG  06/7/17 

Pine Harbour Marina – Commercial Buildings – Engineering Report July 2017 

 

 

Contents  

1. Introduction ................................................................................................................................. 5 

2. Earthworks .................................................................................................................................. 6 

3. Water Supply ............................................................................................................................... 6 

4. Wastewater ................................................................................................................................. 7 

5. Stormwater ................................................................................................................................. 7 

6. Road Design .............................................................................................................................. 12 

7. Utility Services ........................................................................................................................... 13 

8. Conclusion ................................................................................................................................. 13 

 

Appendices 

Appendix A  Preliminary Engineering Drawings 

Appendix B  Extracts from the ICMP 

Appendix C   HEC‐RAS flood analysis 

Appendix D   Wastewater Calculations / Watercare Services  

Appendix E  Power and Telecom Services  

 

Pine Harbour Marina – Commercial Buildings – Engineering Report July 2017 

 

 

1  Introduction 

Crang  Consulting  Ltd  has  been  commissioned  by  Pine  Harbour Marina  Ltd  to  assess  the 

existing infrastructure and complete the civil engineering to service a proposed development 

of 7 commercial/residential buildings at Pine Harbour Marina.    

The  project will  involve  relocating  services,  installation of new  services  and works  to  the 

existing roads to increase car parking numbers and to provide better pedestrian facilities at 

Pine Harbour Marina.   

The site is located to the south of Ranger House and beside the first three marina piers at Pine 

Harbour Marina.  The land is flat and is sealed for car parking.  An aerial photo of the site is 

shown below in Figure 1. 

                          Figure 1.  Existing Site  The  key  infrastructure  issues associated with developing  the  land have been  identified as follows:  

The extent of the flooding along the adjacent watercourse and whether any works are necessary to protect the proposed buildings.   

DEVELOPMENT 

SITE

Pine Harbour Marina – Commercial Buildings – Engineering Report July 2017 

 

 

The ability to relocate and provide adequate services for the development including stormwater and wastewater reticulation, water supply and utility services.  

The  construction  of  additional  parking  areas  and  road  treatment  for  the development.  

These issues are addressed in this report.  

 2  Earthworks 

  The construction site will first be cleared of all existing features.  This will include relocating a 

power transformer, the demolition of a toilet block, removal of kerbs and seal.  All the 

demolition material will be removed off site.  Any trees within the area of works will also be 

removed and mulched.  Some mulch will remain in site for respreads to future garden areas.  

 

Some minor earthworks will then be necessary to prepare the site for the new buildings and 

to construct the additional parking areas.  The work will excavations to new subgrades and 

foundation excavations. The volume is expected to be around 605m3 of cut and 270 m3 of fill 

(total of 975 m3 of earthworks) over an area of approximately 7,000m2.  The excess material 

from the excavations will be carted off site to a cleanfill. 

 

Sediment controls will be installed prior to the works commencing.  This will involve the 

installation of geotextile protection to existing cesspits and the construction of silt fences at 

low points where appropriate.  Once subgrades have been excavated and inspected they will 

be metalled.  This will minimize the time period that any land is left open. 

 

 

3  Water Supply   

3.1  Existing System  An existing private water supply system serves the marina and associated buildings.  Water is supplied from a bore at the end of Tui Brae.  It is treated to NZ drinking water standards prior to being reticulated around the marina.  More information about the water is at the web site www.pineharbourwater.co.nz.   The water supply was recently upgraded to provide the capacity to service the new buildings at Pine Harbour and to also serve future developments in the wider catchment.  The system has sufficient capacity and pressure to provide firefighting supplies.    3.2  Water Reticulation  Water will be supplied to the buildings from an existing 100 dia watermain along the north side of the property. Existing water supply for this site and the adjacent areas are included in Appendix A, Existing Services.  

Pine Harbour Marina – Commercial Buildings – Engineering Report July 2017 

 

 

  

4  Wastewater  4.1  Existing Reticulation  Pine Harbour  is well  serviced with a wastewater  reticulation network  that discharges  to a public pumping  station.   Watercare  recently upgraded  the Pump  Station  to  allow  for  the development  of  Pine  Harbour  and  the  New  Avenues  catchment.  Wastewater  services available  in  the area  from Watercare are  included  in Appendix D. All existing wastewater reticulation is included in Engineering Drawing C140 – C142.    4.2   Proposed Reticulation  New 150 mm dia sewers will be installed under the existing road to replace an existing sewer that  is to be removed as part of the project as  it  is  located under the  line of the proposed buildings.  New connections will be provided off the new line for each building.    Wastewater Design Flow calculations were conducted to account for a commercial building land use on the ground floor and residential use for levels 2 and 3. A total Peak Wet Weather flow was estimated at 7.15 L/s from this proposed site. The proposed 150 mm wastewater pipe at 1% min grade has a total capacity of 15.46 L/s. The reticulation network for this site and wastewater longsections are included in Appendix A Engineering Drawing C500, C501 and C505.  Wastewater design flow calculations are included in Appendix D.    

5  Stormwater  

5.1  Existing Reticulation    

Existing stormwater reticulation exists for the site that currently caters for the sealed parking areas.  This reticulation discharges to the marina basin. The existing Stormwater infrastructure is shown on existing services drawings C140‐C142.   5.2  Discharge Consent  

  A stormwater discharge consent was  issued  for  the discharges occurring  from  the existing sealed areas.  It was issued to Pine Harbour Marina (permit 38642 and 38643 – dated 2004) and has now been transferred to Auckland Council.   

   The  consent  allows  for  the  discharges  occurring  from  the  current marina  and  proposed 

developments.    For  the  catchment  that  the  proposed  development  is  located  the requirements are as follows: 

 ‐ Roof materials are to be constructed of inert materials 

 ‐ Cesspits  located  on  existing  roads  and  sealed  areas  are  to  have  smart  sponge  filter 

enviropods retrofitted to provide stormwater treatment.  

The requirements of the discharge consent will be met as part of the development. 

Pine Harbour Marina – Commercial Buildings – Engineering Report July 2017 

 

 

    5.3  Proposed Reticulation 

 A new stormwater reticulation system will be  installed that discharges to the same existing outlets.   This will  replace  the existing  system  that would otherwise be  located under  the building.  The upstream catchment will be connected to the system.  The proposed reticulation network is included in Appendix A.   New connection will be provided off this system for each building.  5.4  Coastal Inundation  The natural resources and hazards sections of the Auckland Unitary Plan  (AUP) are now  in effect.  The AUP requires that habitable floors of buildings be 0.5m above the current coastal inundation  level (RL 2.44) plus 1m to allow for sea  level rise.   This would set the minimum habitable floor levels at RL 3.94m.    The proposed buildings lower levels do not contain habitable floors. The proposed lower levels will  be  used  for  garage  and  commercial/retail  space,  and  are  proposed  at  RL=3.0m  and RL=2.6m respectively. Residential  levels are at RL 6.0m. A flood protection wall  is proposed along  the existing open drain channel  that runs along  the proposed building. This wall has been designed to provide 500 mm freeboard above the 100‐year flood levels, as discussed in section 5.5.1 below.   The AUP does require that all new buildings in coastal inundation areas must be designed to ensure that structural integrity will be maintained during a 1% AEP storm tide event.  This will be addressed at the building consent stage.  5.5  Stormwater Flooding   On the southern side of the proposed buildings is a formed open channel that has been rock lined.    This  channel  has  a  significant  upstream  catchment  that  includes  the  residential developments of Beachlands New Avenues. 

Beca  on  behalf  of  Auckland  Council  undertook  significant  flood  modelling  and  option assessments to enable the completion of an integrated catchment management plan (ICMP) to enable a discharge consent to be lodged for the catchment.  A copy of parts of the ICMP showing the flood levels and 100 yr ARI flows and maps is included in Appendix B. The report included an assessment of flood risks at Pine Harbour and proposals to mitigate those risks.  Below in Figure 2 is a copy of the flood plain map showing a spill occurring through the Pine Harbour Marina according to the ICMP.  

In order to mitigate the flood risk from the upstream catchment, Auckland Council proposed a bund along the stream edge to prevent the spill.   This bund would prevent  flooding and therefore minimise  any  risk  to  buildings  and  people.    Final  design  of  this  bund was  not undertaken by Auckland Council for the ICMP report, and it was required for this proposal that a final design of the wall be provided by surveying additional cross sections along the existing channel.  

The proposed building floor levels are at RL 2.6 and RL 3.0 meters, part of the lower level will be below the adjacent flood level. The flood plain will however be modified by the proposed flood protection wall, so that the site is free from any inundation from the existing channel at the location where the proposed buildings will be erected, as shown in Engineering Drawing 

Pine Harbour Marina – Commercial Buildings – Engineering Report July 2017 

 

 

C415 in the Appendix.  The proposed location of the wall as well as top of wall elevation and sections are shown  in Engineering Drawings C400 – C410  in Appendix A. The design of the height of this wall is discussed below.  

 

 

 

 

 

 

 

  

Figure 2. Flood Plain through Pine Harbour Marina 

 

Figure 3.  Proposed Wall and Surveyed Channel Cross Sections  

Figure 3 shows the location of the surveyed cross sections by Surveyworx that were used in HEC‐RAS model by Crang Civil to better define the existing topography and levels next to the 

Pine Harbour Marina – Commercial Buildings – Engineering Report July 2017 

 

10 

 

location of the proposed buildings.  Engineering Drawings C110 and C111 in the appendix show these sections in more detail.  

 

5.5.1 HEC‐RAS Model of Existing Channel for Flood Protection Wall Design 

The proposal includes the construction of a concrete flood protection wall instead of an earth bund.   This wall will achieve the same requirements as an earth bund while occupying  less space. Crang Civil has prepared a new HEC‐RAS model of the existing open channel  that  is located  south  of  the  proposed  buildings,  based  on  a  report  for  Duckie  Development  by Watershed Engineering Ltd., Beachlands Model Stewardship: 110 Jack Lachlan Drive (26 Feb. 2015). This report updates the 100yr ARI design flows from BECA ICMP and it is included in the Appendix.  

The reason for the update of the ICMP by Duckie Development was the removal of Formosa dam, and adding a new stormwater pond as well as a designed channel with a  larger cross section, which was  re‐routed around  the new pond. These  changes are now  in place and constitute existing conditions for this proposal.  

The HEC‐RAS model by Crang Civil is based on these changes at Duckie Development already in place, and takes into account 100‐yr ARI flows as resulted from Duckie’s model (shown in Table 1 below) without Formosa Dam, with a new pond and designed channel already built, and after the addition of a flood protection wall. The results of the updated HEC‐RAS model by Crang Civil are included in Appendix C.   

 

Table 1 –Duckie Development 100yr flows, Beachlands Model Stewardship, 110 Jack Lachlan Drive (Watershed Engineering Ltd).   

Results of the model indicate that during existing conditions the project site is partially subject to 100‐yr ARI floods (between channel sections 95 to 220) spilling from the existing channel. Figure 3 and Engineering Drawings C110 and C111 show the  location of the surveyed cross sections  by  Surveyworx  that  were  used  in  HEC‐RAS  to  properly  represent  the  existing topography and levels next to the location of the proposed buildings, as well as the location of the proposed flood protection wall.  

As can be observed in Figures 4 and 5 below, 100‐yr ARI water levels would be contained by a proposed wall that is erected above 100 year floods. This resulted in a top of wall of RL 3.1m 

Pine Harbour Marina – Commercial Buildings – Engineering Report July 2017 

 

11 

 

at Ch. 50 and RL 4.1m at Ch 240 for the proposed wall, if using Duckie’s 40% impervious w/ climate change plus a safety freeboard. This freeboard will also allow for protection in the 75% impervious with climate change as modelled by Watershed Engineering Ltd.  

 

Figure 4. HEC‐RAS model with flood protection wall  

 

Figure 5. Sections at Ch. 173 and Ch. 149 adjacent to proposed site, modelled with flood wall above 100yr ARI flows, 40% impervious with climate change  

Tables 2 below  shows  the proposed 100yr ARI water  surface elevations along  the existing channel that will result after the construction of a flood protection wall. Since water will be contained within  the channel by  the wall,  levels would rise during 100 yr  floods  that were previously spilling towards the proposed building location.  

Although the  lower  levels of the proposed development do not contain habitable floors, as discussed in section 5.4 above, the proposed wall has been designed with a 300 mm freeboard above the 100‐yr w/ CC, 40%  impervious flows, which will also protect the buildings  in the 100‐yr w/ CC 75% impervious flows that resulted after Duckie Development.  It must be noted that further development upstream along this catchment can impact these 100yr flood levels and the effectiveness of this wall if not mitigated in the future to the pre‐development 100‐yr 

Pine Harbour Marina – Commercial Buildings – Engineering Report July 2017 

 

12 

 

ARI flood events. Therefore, if development continues, the entire catchment will need to be reassessed in the future for impact on this flood protection wall and existing channel during 100 flood events.   

 

Table 2 –100yr Flood Water Surface Levels (W.S. Elev) based on 100 yr flows for Duckie Development.   

Where the model  indicated that 100‐yr ARI floods would spill more critically (Ch. 140 to Ch 220)  towards  the  proposed  buildings,  the  wall  height  was  increased  to  provide  further protection for the buildings. These results and a long section of the proposed wall are included in Engineering Drawing C415 and in Appendix C.  

6  Road Design   The existing right of way will be used for access to the new buildings.  Some upgrading of that road will be undertaken including the following: ‐ Lowering the existing road long section to allow for proper drainage of the building lower 

(garage) level towards the road.  ‐ Parallel  and  90  degree  parking  on  the  southern  side.    This will  involve widening  the 

carriageway and providing stormwater controls. ‐ A footpath on the southern side to direct pedestrians to crossing points that flow through 

between buildings. 

Pine Harbour Marina – Commercial Buildings – Engineering Report July 2017 

 

13 

 

‐ Replacement of kerbs on the northern side with a dished channel to enable access to the building garages. 

 ‐ Vehicle crossings using different textured materials on the northern side.   Details of the road construction  including typical sections, cross sections and a  long section are shown in Engineering Drawings C300‐315 in Appendix A.    

7  Utility Services  

Power by Vector and telecom by Chorus can be supplied to the buildings from the existing network. Appendix E and Engineering drawings C140 – 142 provide information of the location of existing Vector services and telecom lines.  The work will also include for the relocation of any existing services within the building platform and the relocation of a transformer. 

 8  Conclusion  

The civil engineering for the development of the commercial buildings at Pine Harbour can be summarized as follows:  

Minimal earthworks of approximately 605m3 of cut and 270 m3 of fill will be required for  the  preparation  of  building  subgrades,  car  parking  areas  and  foundations.  Sediment controls will be installed and maintained to TP90 standard.   

Wastewater  servicing  can  be  provided  for  the  development  in  compliance  with Watercare’s  engineering  requirements  and  connected  to  an  existing  adequate system.   

 

New  stormwater  infrastructure  can  be  provided  and  connected  to  the  existing reticulation and outlets.  Stormwater treatment will be provided in accordance with the  discharge  consent.    Stormwater  plans  and  long  sections  are  included  in Engineering Drawing C400‐405 in Appendix A.  

 

Although the proposed buildings are located in an area subject to 100yr floods, the lower levels are not habitable floors, and flood protection for the entire development can be provided by a flood protection wall, which has been designed to convey post‐development flood waters within the existing open channel, based on 100yr ARI flows modelled for Beachlands Model Stewardship: 110 Jack Lachlan Drive (by Watershed Engineering).     

Water can be supplied to the development from the existing 100 mm watermains at Pine Harbour.  The water supply system provides for firefighting pressures. 

 

Road upgrading works are proposed to enable additional car parks to be constructed and to provide a safer environment for pedestrians.  Lowering the existing road long section will be required to properly drain the building garage (lower level).  

 It  is considered  that  there  is adequate existing  infrastructure  in  the  immediate vicinity such that it does not restrict or constrain the proposed development.  The effect of the proposed development on the existing infrastructure is considered to be less than minor. 

Pine Harbour Marina – Commercial Buildings – Engineering Report July 2017 

 

14 

 

  

            

APPENDIX A PRELIMINARY ENGINEERING DRAWINGS 

Pine Harbour Marina – Commercial Buildings – Engineering Report July 2017 

 

15 

 

             

APPENDIX B EXTRACT FROM THE ICMP AND DUCKIE DEVELOPMENT 

BEACHLANDS MODEL BY WATERSHED ENGINEERING   

 

 

 

 

 

 

 

 

Pine Harbour Marina – Commercial Buildings – Engineering Report July 2017 

 

16 

 

 

 

 

 

 

 

 

 

 

APPENDIX C HEC‐RAS FLOOD ANALYSIS 

 

 

 

 

 

 

 

 

Pine Harbour Marina – Commercial Buildings – Engineering Report July 2017 

 

17 

 

 

 

 

 

 

 

 

 

APPENDIX D WASTEWATER CALCULATIONS/ 

WATERCARE SERVICES  

 

 

 

 

 

 

 

Pine Harbour Marina – Commercial Buildings – Engineering Report July 2017 

 

18 

 

 

 

 

 

 

 

 

APPENDIX E POWER AND TELECOM SERVICES 

 

 

 

 

PINE HARBOUR MARINA LTD

LOCALITY PLAN

Phone : +64 09 281 4979

Web : www.crangcivil.co.nz

Address : Unit 4, 517 Mount Wellington Highway, Auckland, NZ

Post : PO Box 42-089, Orakei, Auckland 1745, NZ

AutoCAD SHX Text
CLIENT
AutoCAD SHX Text
PINE HARBOUR MARINA DEVELOPMENT
AutoCAD SHX Text
CONTRACT NO. 1194
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text
PINE HARBOUR COMMERCIAL/RESIDENTIAL BUILDINGS
AutoCAD SHX Text
DAY
AutoCAD SHX Text
MONTH
AutoCAD SHX Text
YEAR
AutoCAD SHX Text
DRAWING NO
AutoCAD SHX Text
DISTRIBUTION
AutoCAD SHX Text
NUMBER OF COPIES
AutoCAD SHX Text
A=APPROVAL X=PRICING I=INFORMATION P=PRELIMINARY E=DXFORDWG C=CONTRUCTION T=TENDER Y=CONSENT R=REQUESTED
AutoCAD SHX Text
REASON FOR ISSUE
AutoCAD SHX Text
DRAWING SIZE
AutoCAD SHX Text
MEDIA
AutoCAD SHX Text
C200
AutoCAD SHX Text
C310
AutoCAD SHX Text
Erosion and Sediment Control Plan
AutoCAD SHX Text
Manukau City Council
AutoCAD SHX Text
C210
AutoCAD SHX Text
C400
AutoCAD SHX Text
Stormwater Plan
AutoCAD SHX Text
Erosion and Sediment Control Standard Details
AutoCAD SHX Text
C300
AutoCAD SHX Text
Roading Plan
AutoCAD SHX Text
Stormwater Long Sections
AutoCAD SHX Text
C410
AutoCAD SHX Text
Stormwater Channel Cross Sections
AutoCAD SHX Text
C500
AutoCAD SHX Text
Sanitary Sewer Plan
AutoCAD SHX Text
C305
AutoCAD SHX Text
Roading Long Section
AutoCAD SHX Text
C700
AutoCAD SHX Text
Standard Details
AutoCAD SHX Text
C405
AutoCAD SHX Text
C130
AutoCAD SHX Text
Cut-Fill Depth Plan
AutoCAD SHX Text
C120
AutoCAD SHX Text
Finished Levels
AutoCAD SHX Text
C110
AutoCAD SHX Text
Existing Topographical Survey
AutoCAD SHX Text
C505
AutoCAD SHX Text
Sanitary Sewer Long Sections
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
ISSUE
AutoCAD SHX Text
DRAWING TITLE
AutoCAD SHX Text
C140
AutoCAD SHX Text
Existing Services Plan
AutoCAD SHX Text
Roading Typical Cross Sections
AutoCAD SHX Text
C311
AutoCAD SHX Text
Roading Typical Cross Sections
AutoCAD SHX Text
C401
AutoCAD SHX Text
Stormwater Plan
AutoCAD SHX Text
C501
AutoCAD SHX Text
Sanitary Sewer Plan
AutoCAD SHX Text
C111
AutoCAD SHX Text
Existing Topographical Survey
AutoCAD SHX Text
C121
AutoCAD SHX Text
Finished Levels
AutoCAD SHX Text
C141
AutoCAD SHX Text
Existing Services Plan
AutoCAD SHX Text
C142
AutoCAD SHX Text
Existing Services Plan
AutoCAD SHX Text
C200
AutoCAD SHX Text
Erosion and Sediment Control Plan
AutoCAD SHX Text
C301
AutoCAD SHX Text
Roading Plan
AutoCAD SHX Text
A
AutoCAD SHX Text
31
AutoCAD SHX Text
03
AutoCAD SHX Text
2017
AutoCAD SHX Text
C315
AutoCAD SHX Text
Roading Cross Sections
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
C415
AutoCAD SHX Text
Proposed Wall Longsection
AutoCAD SHX Text
C
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
A
AutoCAD SHX Text
18
AutoCAD SHX Text
05
AutoCAD SHX Text
2017
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
0
AutoCAD SHX Text
C402
AutoCAD SHX Text
HEC-RAS Cross Sections Layout
AutoCAD SHX Text
20
AutoCAD SHX Text
06
AutoCAD SHX Text
2017
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
0
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
13
AutoCAD SHX Text
07
AutoCAD SHX Text
2017
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
C

EXISTING RIGHT OF WAY

BOUNDARY

BO

UN

DA

RY

MARINA BASIN

EXISTING

PUMP STATION

C110

EXISTING RIGHT OF WAY

BOUNDARY

BO

UN

DA

RY

EXISTING

PUMP STATION

FOOTPATH

FOOTPATH

F

O

O

T

P

A

T

H

F

O

O

T

P

A

T

H

TOILET+

LAUNDRY

D

C

D

C

DC

D

C

DC

DC

D

C

MARINA BASIN

F

O

O

T

P

A

T

H

1

.

0

1

.

0

1.0

2

.

0

2.0

2.0

3.0

3

.

0

3.0

4.0

5.0

6

.0

7

.0

8

.0

9

.0

10.0

11.0

1

2

.

0

1

3

.

0

14.0

1

5

.0

1

6

.

0

1

7

.

0

1

.

0

1

.

0

1.0

2

.

0

2

.

0

2.0

3

.

0

3.0

3

.

0

4

.

0

4

.

0

4.0

4

.

0

4

.

0

4.0

4

.

0

5

.

0

6

.

0

7

.

0

8

.

0

9

.

01

0

.

0

1

1

.

01

2

.

0

1

3

.

0

1

4

.

0

1

5

.0

1.0

2

.

0

2

.

0

2.0

3

.

0

4

.

0

5

.

0

6

.

0

7

.

0

8

.

0

9

.

0

1

0

.

0

1

1

.

0

1

2

.

0

1

3

.

0

1

4

.

0

1

5

.

0

D

B

PROPOSED

WALL

DRAWING No REVISION

TITLE

PROJECT

CLIENT

SCALE

This document and the copyright in this document remain the

property of Crang Consulting Ltd. The contents of this document

may not be reproduced either in whole or in part by any means

whatsoever without the prior written consent of Crang Consulting.

COPYRIGHT:

A1

A3DESIGNED

DRAWN

DATE

REVISION CHANGES CHECKED DATE

Unit 4, 517 Mount Wellington Highway, Auckland

PO Box 42-089, Orakei, Auckland 1745, NZ

+64 09 320 3325

www.crangcivil.co.nz

PINE HARBOUR

COMMERCIAL/RESIDENTIAL

JULY 2017

SA

CG

phone

web

address

post

PROJECT No

1194

SA

VE

D: P

:\1

19

4 - P

in

e H

arb

ou

r - C

om

me

rcia

l B

uild

in

gs\D

RA

WIN

GS

\C

11

0 E

XIS

TIN

G S

UR

VE

Y.d

wg - Ju

ly 1

3, 2

01

7. P

RIN

TE

D: Ju

ly 1

3, 2

01

7

PINE HARBOUR

MARINA DEVELOPMENT

0 ORIGINAL ISSUE

A S92 COMMENTS MC

13/09/16

VC

07/07/16

BUILDINGS

C110 D

1:500

1:250

EXISTING SURVEY

VC 07/07/16

MC 31/03/17REVISIONB

CG 20/06/17UPDATEDC

CG 13/07/17PROJECT TITLE UPDATEDD

AutoCAD SHX Text
CH 3.55
AutoCAD SHX Text
CH 21.82
AutoCAD SHX Text
CH 53.81
AutoCAD SHX Text
CH 95.24
AutoCAD SHX Text
CH 125.94
AutoCAD SHX Text
CH 148.38
AutoCAD SHX Text
%%uLEGEND
AutoCAD SHX Text
19.0
AutoCAD SHX Text
19.1
AutoCAD SHX Text
EXISTING CONTOURS
AutoCAD SHX Text
Survey Legend: GL = ground level BOR = bottom of rocks TOR = top of rocks BOK = back of kerb CHAN = channel CONC = concrete

BO

UN

DA

RY

EXISTING

PUMP STATION

C111

BO

UN

DA

RY

EXISTING

PUMP STATION

FOOTPATH

D

C

D

C

D

C

1.0

2

.

0

2

.

0

2.0

3

.

0

4

.

0

5

.

0

6

.

0

7

.

0

8

.

0

9

.

0

1

0

.

0

1

1

.

0

1

2

.

0

1

3

.

0

1

4

.

0

1

5

.

0

1

6

.

0

1

7

.

0

1

8

.

0

2

.

0

2

.

0

3

.

0

3

.0

4

.

0

4

.

0

4

.

0

4

.

0

4

.

0

4

.

0

4.0

4

.

0

4

.

0

4

.

0

5

.

0

6

.

0

7

.

0

8

.0

9

.

0

10.0

11.0

12.0

1

3

.

0

1

4

.

0

2.0

2.0

3.0

3.0

4.0

4.0

5.0

5.0

6

.0

7

.0

8

.

0

9

.0

D

BA

B

PROPOSED

WALL

C111

1:500

1:250

EXISTING SURVEY

VC 07/07/16

MC 31/03/17REVISIONB

DRAWING No REVISION

TITLE

PROJECT

CLIENT

SCALE

This document and the copyright in this document remain the

property of Crang Consulting Ltd. The contents of this document

may not be reproduced either in whole or in part by any means

whatsoever without the prior written consent of Crang Consulting.

COPYRIGHT:

A1

A3DESIGNED

DRAWN

DATE

REVISION CHANGES CHECKED DATE

Unit 4, 517 Mount Wellington Highway, Auckland

PO Box 42-089, Orakei, Auckland 1745, NZ

+64 09 320 3325

www.crangcivil.co.nz

PINE HARBOUR

COMMERCIAL/RESIDENTIAL

JULY 2017

SA

CG

phone

web

address

post

PROJECT No

1194

SA

VE

D: P

:\1

19

4 - P

in

e H

arb

ou

r - C

om

me

rcia

l B

uild

in

gs\D

RA

WIN

GS

\C

11

0 E

XIS

TIN

G S

UR

VE

Y.d

wg - Ju

ly 1

3, 2

01

7. P

RIN

TE

D: Ju

ly 1

3, 2

01

7

PINE HARBOUR

MARINA DEVELOPMENT

0 ORIGINAL ISSUE

A S92 COMMENTS MC

13/09/16

VC

07/07/16

BUILDINGS

D

CG 20/06/17UPDATEDC

CG 13/07/17PROJECT TITLE UPDATEDD

AutoCAD SHX Text
CH 148.38
AutoCAD SHX Text
CH 173.01
AutoCAD SHX Text
CH 200.30
AutoCAD SHX Text
CH 230.66
AutoCAD SHX Text
CH 261.78
AutoCAD SHX Text
CH 297.84
AutoCAD SHX Text
%%uLEGEND
AutoCAD SHX Text
19.0
AutoCAD SHX Text
19.1
AutoCAD SHX Text
EXISTING CONTOURS
AutoCAD SHX Text
Survey Legend: GL = ground level BOR = bottom of rocks TOR = top of rocks BOK = back of kerb CHAN = channel CONC = concrete

C120

EXISTING RIGHT OF WAY

BOUNDARY

BO

UN

DA

RY

MARINA BASIN

EXISTING

PUMP STATION3.0

4.0

2.8

2.8

3.2

3.4

3.6

3.8

4.2

4.4

1

.

0

1.0

1.0

1

.

0

1.0

1.0

1.0 1.0

2

.

0

2.0

2

.0

2.0

2.0

2

.

0

2.0

2

.0

2.0

2.0

3

.

0

3

.

0

3

.

0

3.0

3.0

3.0

3

.0

3.0

3

.

0

4

.

0

4

.

0

4.0

4

.0

4.0

4.0

4

.

0

4

.0

4

.

0

5

.

0

5

.0

5

.

0

6

.

0

6

.0

6

.

0

7

.

0

7

.0

7

.

0

8

.

0

8

.0

8

.

0

9

.

0

9

.0

9

.0

1

0

.

0

1

0

.

0

1

0

.

0

1

1

.

0

1

1

.

0

1

1

.0

1

2

.

0

1

2

.

0

12.0

1

3

.

0

1

3

.

0

13.0

1

4

.

0

1

4

.

0

1

4

.

0

1

5

.

0

1

5

.

0

1

6

.

0

1

6

.

0

1

7

.0

1

7

.

0

1

8

.

0

1

8

.

0

1

8

.0

2.8 2.8

C120

1:500

1:250

FINISHED LEVELS

DRAWING No REVISION

TITLE

PROJECT

CLIENT

SCALE

This document and the copyright in this document remain the

property of Crang Consulting Ltd. The contents of this document

may not be reproduced either in whole or in part by any means

whatsoever without the prior written consent of Crang Consulting.

COPYRIGHT:

A1

A3DESIGNED

DRAWN

DATE

REVISION CHANGES CHECKED DATE

Unit 4, 517 Mount Wellington Highway, Auckland

PO Box 42-089, Orakei, Auckland 1745, NZ

+64 09 320 3325

www.crangcivil.co.nz

PINE HARBOUR

COMMERCIAL/RESIDENTIAL

JULY 2017

SA

CG

phone

web

address

post

PROJECT No

1194

SA

VE

D: P

:\1

19

4 - P

in

e H

arb

ou

r - C

om

me

rcia

l B

uild

in

gs\D

RA

WIN

GS

\C

12

0 F

IN

IS

HE

D L

EV

EL

S.d

wg

- Ju

ly 1

3, 2

01

7. P

RIN

TE

D: Ju

ly 1

3, 2

01

7

PINE HARBOUR

MARINA DEVELOPMENT

0 ORIGINAL ISSUE

A S92 COMMENTS MC

13/09/16

VC

07/07/16

BUILDINGS

VC07/07/16

MC 31/03/17REVISIONB

D

CG 20/06/17FINISHED FLOOR LEVELSC

CG 13/07/17PROJECT TITLE UPDATEDD

AutoCAD SHX Text
FINISHED FLOOR LEVEL = RL 3.0m
AutoCAD SHX Text
FFL RETAIL RL 2.6m
AutoCAD SHX Text
FFL CARPARK RL 3.0m
AutoCAD SHX Text
FFL RETAIL RL 2.6m
AutoCAD SHX Text
FFL CARPARK RL 3.0m
AutoCAD SHX Text
FFL RETAIL RL 2.6m
AutoCAD SHX Text
FFL CARPARK RL 3.0m
AutoCAD SHX Text
%%uLEGEND
AutoCAD SHX Text
19.0
AutoCAD SHX Text
19.1
AutoCAD SHX Text
EXISTING CONTOURS
AutoCAD SHX Text
20.0
AutoCAD SHX Text
20.1
AutoCAD SHX Text
PROPOSED CONTOURS
AutoCAD SHX Text
NOTES 1.LEVELS SHOWN REPRESENT FINISHED LEVELS SHOWN REPRESENT FINISHED SURFACE LEVELS. ADDITIONAL EXCAVATION WILL BE REQUIRED TO ACHIEVE BUILDING SUBGRADE LEVELS (SUBJECT TO FLOOR SLAB DESIGN BY GEOTECHNICAL ENGINEER).

C121

BO

UN

DA

RY

EXISTING

PUMP STATION

3.0

4.0

2.8

2.83.

2

3.4

3.6

3.8

4.2

1.0 1.0

2

.0

2

.

0

2

.

0

2

.

0

2

.

0

2.0

2.0

2.0

3

.

0

3

.

0

3

.

0

3

.

0

3

.

0

3

.

0

3

.

0

3

.0

4

.

0

4

.

0

4

.

0

5

.

0

5.0

5

.

0

6

.

0

6

.

0

6

.

0

7

.

0

7

.0

7

.

0

8

.

0

8

.0

8

.

0

9

.

0

9

.

0

9

.

0

1

0

.0

1

0

.

0

1

0

.

0

1

1

.

0

1

1

.

0

1

1

.

0

1

2

.

0

1

2

.

0

1

2

.

0

1

3

.

0

1

3

.0

1

3

.

0

14.0

1

4

.0

1

4

.

0

1

5

.0

1

5

.

0

1

5

.

0

16.0

1

6

.

0

1

6

.

0

2.8

C121

1:500

1:250

FINISHED LEVELS

DRAWING No REVISION

TITLE

PROJECT

CLIENT

SCALE

This document and the copyright in this document remain the

property of Crang Consulting Ltd. The contents of this document

may not be reproduced either in whole or in part by any means

whatsoever without the prior written consent of Crang Consulting.

COPYRIGHT:

A1

A3DESIGNED

DRAWN

DATE

REVISION CHANGES CHECKED DATE

Unit 4, 517 Mount Wellington Highway, Auckland

PO Box 42-089, Orakei, Auckland 1745, NZ

+64 09 320 3325

www.crangcivil.co.nz

PINE HARBOUR

COMMERCIAL/RESIDENTIAL

JULY 2017

SA

CG

phone

web

address

post

PROJECT No

1194

SA

VE

D: P

:\1

19

4 - P

in

e H

arb

ou

r - C

om

me

rcia

l B

uild

in

gs\D

RA

WIN

GS

\C

12

0 F

IN

IS

HE

D L

EV

EL

S.d

wg

- Ju

ly 1

3, 2

01

7. P

RIN

TE

D: Ju

ly 1

3, 2

01

7

PINE HARBOUR

MARINA DEVELOPMENT

0 ORIGINAL ISSUE

A S92 COMMENTS MC

13/09/16

VC

07/07/16

BUILDINGS

VC07/07/16

MC 31/03/17REVISIONB

D

CG 20/06/17FINISHED FLOOR LEVELSC

CG 13/07/17PROJECT TITLE UPDATEDD

AutoCAD SHX Text
FINISHED FLOOR LEVEL = RL 3.0m
AutoCAD SHX Text
FFL RETAIL RL 2.6m
AutoCAD SHX Text
FFL CARPARK RL 3.0m
AutoCAD SHX Text
%%uLEGEND
AutoCAD SHX Text
19.0
AutoCAD SHX Text
19.1
AutoCAD SHX Text
EXISTING CONTOURS
AutoCAD SHX Text
20.0
AutoCAD SHX Text
20.1
AutoCAD SHX Text
PROPOSED CONTOURS
AutoCAD SHX Text
NOTES 1.LEVELS SHOWN REPRESENT FINISHED LEVELS SHOWN REPRESENT FINISHED SURFACE LEVELS. ADDITIONAL EXCAVATION WILL BE REQUIRED TO ACHIEVE BUILDING SUBGRADE LEVELS (SUBJECT TO FLOOR SLAB DESIGN BY GEOTECHNICAL ENGINEER).

EXISTING RIGHT OF WAYBOUNDARYBOUNDARYMARINA BASINEXISTINGPUMP STATION

Surface Analysis: Elevation Ranges

Number

1

2

3

4

Color Minimum Elevation(m)

-1.257

-1.000

0.000

1.000

Maximum Elevation(m)

-1.000

0.000

1.000

2.128

Area(m²)

49.2

5529.8

1214.8

46.9

Volume(m³)

4.6

1066.2

170.1

12.5

EXISTING RIGHT OF WAY

BOUNDARY

BO

UN

DA

RY

MARINA BASIN

EXISTING

PUMP STATION

DRAWING No REVISION

TITLE

PROJECT

CLIENT

SCALE

This document and the copyright in this document remain the

property of Crang Consulting Ltd. The contents of this document

may not be reproduced either in whole or in part by any means

whatsoever without the prior written consent of Crang Consulting.

COPYRIGHT:

A1

A3DESIGNED

DRAWN

DATE

REVISION CHANGES CHECKED DATE

Unit 4, 517 Mount Wellington Highway, Auckland

PO Box 42-089, Orakei, Auckland 1745, NZ

+64 09 320 3325

www.crangcivil.co.nz

PINE HARBOUR

COMMERCIAL/RESIDENTIAL

JULY 2017

SA

CG

phone

web

address

post

PROJECT No

1194

SA

VE

D: P

:\1194 - P

ine H

arbour - C

om

mercial B

uildings\D

RA

WIN

GS

\C

130 C

UT

-F

ILL D

EP

TH

P

LA

N.dw

g - July 13, 2017. P

RIN

TE

D: July 13, 2017

PINE HARBOUR

MARINA DEVELOPMENT

0 ORIGINAL ISSUE

BUILDINGS

C130

1:1000

1:500

CUT FILL DEPTH PLAN

VC 07/07/16

MC 31/03/17REVISIONB

²²

³³

D

CG 20/06/17FINISHED FLOOR LEVELSC

CG 13/07/17PROJECT TITLE UPDATEDD

AutoCAD SHX Text
%%uLEGEND
AutoCAD SHX Text
EARTHWORKS BOUNDARY
AutoCAD SHX Text
QUANTITIES TOTAL CUT AREA : 5579.0m² TOTAL FILL AREA : 1261.7m² TOTAL CUT VOLUME : 1070.8m³ TOTAL FILL VOLUME : 182.6m³

SW

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

SW SWSW SW

SW SWSW

SW SWSW SW

SW SWSW SW

SW SWSW SW

SW SWSW SW

S

W

S

W

S

W

SW

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

SW

SW

SW

SW

SW

SW

SW

SS SS SS SS SS SS SS SS SSSS SS SS SS SS SS SS SS SS SS SS SS

SS SS SS

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

R

R

R

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

SS

SS

SS

SS

SS

SS

S

S

S

S

S

S

S

S

R

R

RR

SW

SW

SW

SW

SW

SW

SW

SSSS

SS SSSS

SSSS SS

SSSS

SS SS

R

EXISTING RIGHT OF WAY

BOUNDARY

BO

UN

DA

RY

MARINA BASIN

EXISTING

PUMP STATION

C140

C140 C

1:500

1:250

EXISTING SERVICES

PLAN

DRAWING No REVISION

TITLE

PROJECT

CLIENT

SCALE

This document and the copyright in this document remain the

property of Crang Consulting Ltd. The contents of this document

may not be reproduced either in whole or in part by any means

whatsoever without the prior written consent of Crang Consulting.

COPYRIGHT:

A1

A3DESIGNED

DRAWN

DATE

REVISION CHANGES CHECKED DATE

Unit 4, 517 Mount Wellington Highway, Auckland

PO Box 42-089, Orakei, Auckland 1745, NZ

+64 09 320 3325

www.crangcivil.co.nz

PINE HARBOUR

COMMERCIAL/RESIDENTIAL

JULY 2017

SA

CG

phone

web

address

post

PROJECT No

1194

SA

VE

D: P

:\1

19

4 - P

in

e H

arb

ou

r - C

om

me

rcia

l B

uild

in

gs\D

RA

WIN

GS

\C

14

0 E

XIS

TIN

G S

ER

VIC

ES

P

LA

N.d

wg - Ju

ly 1

3, 2

01

7. P

RIN

TE

D: Ju

ly 1

3, 2

01

7

PINE HARBOUR

MARINA DEVELOPMENT

0 ORIGINAL ISSUE

A S92 COMMENTS MC

13/09/16

VC

07/07/16

BUILDINGS

MC

VC

13/09/16

07/07/16

S92 COMMENTSA

MC 31/03/17REVISIONB

CG 13/07/17PROJECT TITLE UPDATEDC

AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
P
AutoCAD SHX Text
CESSPIT
AutoCAD SHX Text
LL. 2.43
AutoCAD SHX Text
SWMH
AutoCAD SHX Text
LL. 2.58
AutoCAD SHX Text
250mm%%C SW
AutoCAD SHX Text
300mm%%C
AutoCAD SHX Text
SW OUTLET
AutoCAD SHX Text
SWMH
AutoCAD SHX Text
CESSPIT
AutoCAD SHX Text
LL. 2.76
AutoCAD SHX Text
LL. 2.57
AutoCAD SHX Text
300mm%%C
AutoCAD SHX Text
SW OUTLET
AutoCAD SHX Text
250mm%%C SW
AutoCAD SHX Text
SWMH
AutoCAD SHX Text
CESSPIT
AutoCAD SHX Text
LL. 3.17
AutoCAD SHX Text
IL. 2.36
AutoCAD SHX Text
CESSPIT
AutoCAD SHX Text
LL. 2.83
AutoCAD SHX Text
IL. 0.83
AutoCAD SHX Text
IL. 1.12
AutoCAD SHX Text
LL. 3.85
AutoCAD SHX Text
225mm%%C
AutoCAD SHX Text
SW OUTLET
AutoCAD SHX Text
IL. 1.94
AutoCAD SHX Text
225mm%%C
AutoCAD SHX Text
SW OUTLET
AutoCAD SHX Text
SEWER
AutoCAD SHX Text
STATION
AutoCAD SHX Text
SSMH
AutoCAD SHX Text
SSMH
AutoCAD SHX Text
LL. 3.00
AutoCAD SHX Text
150mm%%C SS
AutoCAD SHX Text
150mm%%C SS
AutoCAD SHX Text
SSMH
AutoCAD SHX Text
LL. 2.95
AutoCAD SHX Text
PUMP
AutoCAD SHX Text
LL. 2.99
AutoCAD SHX Text
SSMH
AutoCAD SHX Text
SSMH
AutoCAD SHX Text
LL. 3.05
AutoCAD SHX Text
150mm%%C SS
AutoCAD SHX Text
LL. 3.81
AutoCAD SHX Text
150mm%%C SS
AutoCAD SHX Text
ABANDONED
AutoCAD SHX Text
150mm%%C SS
AutoCAD SHX Text
SSMH
AutoCAD SHX Text
LL. 3.15
AutoCAD SHX Text
2x50mm DUCTS
AutoCAD SHX Text
2x50mm DUCTS
AutoCAD SHX Text
2x50mm DUCTS
AutoCAD SHX Text
2x50mm DUCTS
AutoCAD SHX Text
DISTRIBUTION
AutoCAD SHX Text
PILLAR
AutoCAD SHX Text
POWER
AutoCAD SHX Text
LID
AutoCAD SHX Text
LID
AutoCAD SHX Text
LID
AutoCAD SHX Text
LID
AutoCAD SHX Text
LID
AutoCAD SHX Text
LID
AutoCAD SHX Text
LID
AutoCAD SHX Text
CESSPIT
AutoCAD SHX Text
LL. 2.49
AutoCAD SHX Text
DISTRIBUTION
AutoCAD SHX Text
PILLAR
AutoCAD SHX Text
POWER
AutoCAD SHX Text
4 X 100
AutoCAD SHX Text
COMMS
AutoCAD SHX Text
DISTRIBUTION
AutoCAD SHX Text
PILLAR
AutoCAD SHX Text
POWER
AutoCAD SHX Text
150mm SS RISING MAIN
AutoCAD SHX Text
SSMH
AutoCAD SHX Text
LL. 3.13
AutoCAD SHX Text
SSMH
AutoCAD SHX Text
LL. 2.83
AutoCAD SHX Text
CESSPIT
AutoCAD SHX Text
LL. 3.72
AutoCAD SHX Text
CESSPIT
AutoCAD SHX Text
LL. 4.23
AutoCAD SHX Text
CESSPIT
AutoCAD SHX Text
LL. 2.74
AutoCAD SHX Text
CESSPIT
AutoCAD SHX Text
LL. 4.39
AutoCAD SHX Text
LID
AutoCAD SHX Text
LID
AutoCAD SHX Text
DISTRIBUTION
AutoCAD SHX Text
PILLAR
AutoCAD SHX Text
POWER
AutoCAD SHX Text
100mm WATER MAIN
AutoCAD SHX Text
100mm WATER MAIN
AutoCAD SHX Text
100mm WATER MAIN
AutoCAD SHX Text
DISTRIBUTION
AutoCAD SHX Text
SUBSTATION
AutoCAD SHX Text
POWER
AutoCAD SHX Text
100mm WATER MAIN
AutoCAD SHX Text
100mm WATER MAIN
AutoCAD SHX Text
150mm SS RISING MAIN
AutoCAD SHX Text
OD PE 355mm
AutoCAD SHX Text
250mm%%C SW
AutoCAD SHX Text
250mm%%C SW
AutoCAD SHX Text
250mm%%C SW
AutoCAD SHX Text
250mm%%C SW
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
TO RELOCATE
AutoCAD SHX Text
PROPOSED TRANSFORMER
AutoCAD SHX Text
PROPOSED POWER LINE
AutoCAD SHX Text
150mm%%C SW
AutoCAD SHX Text
%%uLEGEND
AutoCAD SHX Text
SANITARY SEWER PIPE
AutoCAD SHX Text
SEWER MANHOLE
AutoCAD SHX Text
STORMWATER PIPE
AutoCAD SHX Text
STORMWATER
AutoCAD SHX Text
MANHOLE
AutoCAD SHX Text
RISING MAIN PIPE
AutoCAD SHX Text
WATERCOURSE/
AutoCAD SHX Text
OPEN CHANNEL
AutoCAD SHX Text
WATER MAIN
AutoCAD SHX Text
POWER LINE
AutoCAD SHX Text
TELECOM LINE
AutoCAD SHX Text
DUCT LINE
AutoCAD SHX Text
FIRE HYDRANT
AutoCAD SHX Text
STREET LIGHTS

SW

SW SWSW SW

SW SWSW SW

SW SWSW

SW SW

SW

SW

SW

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

SS SS SS SS SS SS SSSS SS SS SS SS

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

R

R

R

R

R

R

R

R

R

R

R

R

R

RR

R

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

SS

SS

SS

SS

SS

SS

SS

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

SS

SS

SS

SS

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

RR

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

R

R

R

R

R

R

R

R

R

R

R

R

R

R

BO

UN

DA

RY

EXISTING

PUMP STATION

C141

C141 C

1:500

1:250

EXISTING SERVICES

PLAN

DRAWING No REVISION

TITLE

PROJECT

CLIENT

SCALE

This document and the copyright in this document remain the

property of Crang Consulting Ltd. The contents of this document

may not be reproduced either in whole or in part by any means

whatsoever without the prior written consent of Crang Consulting.

COPYRIGHT:

A1

A3DESIGNED

DRAWN

DATE

REVISION CHANGES CHECKED DATE

Unit 4, 517 Mount Wellington Highway, Auckland

PO Box 42-089, Orakei, Auckland 1745, NZ

+64 09 320 3325

www.crangcivil.co.nz

PINE HARBOUR

COMMERCIAL/RESIDENTIAL

JULY 2017

SA

CG

phone

web

address

post

PROJECT No

1194

SA

VE

D: P

:\1

19

4 - P

in

e H

arb

ou

r - C

om

me

rcia

l B

uild

in

gs\D

RA

WIN

GS

\C

14

0 E

XIS

TIN

G S

ER

VIC

ES

P

LA

N.d

wg - Ju

ly 1

3, 2

01

7. P

RIN

TE

D: Ju

ly 1

3, 2

01

7

PINE HARBOUR

MARINA DEVELOPMENT

0 ORIGINAL ISSUE

A S92 COMMENTS MC

13/09/16

VC

07/07/16

BUILDINGS

MC

VC

13/09/16

07/07/16

S92 COMMENTSA

MC 31/03/17REVISIONB

CG 13/07/17PROJECT TITLE UPDATEDC

AutoCAD SHX Text
150mm%%C SS
AutoCAD SHX Text
SWMH
AutoCAD SHX Text
SWMH
AutoCAD SHX Text
CESSPIT
AutoCAD SHX Text
LL. 2.76
AutoCAD SHX Text
LL. 2.57
AutoCAD SHX Text
LL. 4.36
AutoCAD SHX Text
LL. 4.19
AutoCAD SHX Text
CESSPIT
AutoCAD SHX Text
CESSPIT
AutoCAD SHX Text
LL. 3.29
AutoCAD SHX Text
300mm%%C
AutoCAD SHX Text
SW OUTLET
AutoCAD SHX Text
IL. 1.12
AutoCAD SHX Text
IL. 1.94
AutoCAD SHX Text
225mm%%C
AutoCAD SHX Text
SW OUTLET
AutoCAD SHX Text
IL. 2.02
AutoCAD SHX Text
450mm%%C
AutoCAD SHX Text
SW OUTLET
AutoCAD SHX Text
SEWER
AutoCAD SHX Text
STATION
AutoCAD SHX Text
150mm%%C SS RISING MAIN
AutoCAD SHX Text
SSMH
AutoCAD SHX Text
LL. 3.22
AutoCAD SHX Text
SSMH
AutoCAD SHX Text
150mm%%C
AutoCAD SHX Text
150mm%%C SS
AutoCAD SHX Text
LL. 3.00
AutoCAD SHX Text
150mm%%C SS
AutoCAD SHX Text
150mm%%C SS
AutoCAD SHX Text
150mm%%C SS
AutoCAD SHX Text
SSMH
AutoCAD SHX Text
LL. 2.95
AutoCAD SHX Text
PUMP
AutoCAD SHX Text
REDUNDANT
AutoCAD SHX Text
SSMH
AutoCAD SHX Text
LL. 2.99
AutoCAD SHX Text
ABANDONED
AutoCAD SHX Text
150mm%%C SS
AutoCAD SHX Text
SSMH
AutoCAD SHX Text
LL. 3.15
AutoCAD SHX Text
2x50mm DUCTS
AutoCAD SHX Text
2x50mm DUCTS
AutoCAD SHX Text
AIRCON/GAS CABLES
AutoCAD SHX Text
PUMPING STATION
AutoCAD SHX Text
ELECTRICAL SUPPLY
AutoCAD SHX Text
FROM DIST. PILLAR A
AutoCAD SHX Text
LID
AutoCAD SHX Text
LID
AutoCAD SHX Text
LID
AutoCAD SHX Text
375mm%%C SW
AutoCAD SHX Text
300mm%%C SW
AutoCAD SHX Text
CESSPIT
AutoCAD SHX Text
LL. 2.49
AutoCAD SHX Text
DISTRIBUTION
AutoCAD SHX Text
PILLAR
AutoCAD SHX Text
POWER
AutoCAD SHX Text
COMMS
AutoCAD SHX Text
2 X 100
AutoCAD SHX Text
4 X 100
AutoCAD SHX Text
COMMS
AutoCAD SHX Text
4 X 100
AutoCAD SHX Text
COMMS
AutoCAD SHX Text
LID
AutoCAD SHX Text
STONES
AutoCAD SHX Text
POWER MAIN
AutoCAD SHX Text
150mm SS RISING MAIN
AutoCAD SHX Text
150mm SS RISING MAIN
AutoCAD SHX Text
150mm SS RISING MAIN
AutoCAD SHX Text
OD PE 355mm
AutoCAD SHX Text
SSMH
AutoCAD SHX Text
LL. 3.13
AutoCAD SHX Text
SSMH
AutoCAD SHX Text
LL. 2.83
AutoCAD SHX Text
CESSPIT
AutoCAD SHX Text
LL. 2.74
AutoCAD SHX Text
100mm WATER MAIN
AutoCAD SHX Text
DISTRIBUTION
AutoCAD SHX Text
SUBSTATION
AutoCAD SHX Text
POWER
AutoCAD SHX Text
150mm SS RISING MAIN
AutoCAD SHX Text
OD PE 355mm
AutoCAD SHX Text
250mm%%C SW
AutoCAD SHX Text
250mm%%C SW
AutoCAD SHX Text
CESSPIT
AutoCAD SHX Text
LL. 3.09
AutoCAD SHX Text
225mm%%C
AutoCAD SHX Text
SW OUTLET
AutoCAD SHX Text
IL. 1.52
AutoCAD SHX Text
150mm%%C SW
AutoCAD SHX Text
%%uLEGEND
AutoCAD SHX Text
SANITARY SEWER PIPE
AutoCAD SHX Text
SEWER MANHOLE
AutoCAD SHX Text
STORMWATER PIPE
AutoCAD SHX Text
STORMWATER
AutoCAD SHX Text
MANHOLE
AutoCAD SHX Text
RISING MAIN PIPE
AutoCAD SHX Text
WATERCOURSE/
AutoCAD SHX Text
OPEN CHANNEL
AutoCAD SHX Text
WATER MAIN
AutoCAD SHX Text
POWER LINE
AutoCAD SHX Text
TELECOM LINE
AutoCAD SHX Text
DUCT LINE
AutoCAD SHX Text
FIRE HYDRANT
AutoCAD SHX Text
STREET LIGHTS

SW

SW

SW

SW

SSSS

SSSS SS

SSSS

SS SS SSSS

SSSS SS

SSSS

SS SSSS

SSSS

SS SSSS

SSSS SS

SSSS

SS SSSS

SSSS

SS SSSS

SSSS SS

SSSS

SS SS

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

SW

SW

C142 C

1:500

1:250

EXISTING SERVICES

PLAN

DRAWING No REVISION

TITLE

PROJECT

CLIENT

SCALE

This document and the copyright in this document remain the

property of Crang Consulting Ltd. The contents of this document

may not be reproduced either in whole or in part by any means

whatsoever without the prior written consent of Crang Consulting.

COPYRIGHT:

A1

A3DESIGNED

DRAWN

DATE

REVISION CHANGES CHECKED DATE

Unit 4, 517 Mount Wellington Highway, Auckland

PO Box 42-089, Orakei, Auckland 1745, NZ

+64 09 320 3325

www.crangcivil.co.nz

PINE HARBOUR

COMMERCIAL/RESIDENTIAL

JULY 2017

SA

CG

phone

web

address

post

PROJECT No

1194

SA

VE

D: P

:\1

19

4 - P

in

e H

arb

ou

r - C

om

me

rcia

l B

uild

in

gs\D

RA

WIN

GS

\C

14

0 E

XIS

TIN

G S

ER

VIC

ES

P

LA

N.d

wg - Ju

ly 1

3, 2

01

7. P

RIN

TE

D: Ju

ly 1

3, 2

01

7

PINE HARBOUR

MARINA DEVELOPMENT

0 ORIGINAL ISSUE

A S92 COMMENTS MC

13/09/16

VC

07/07/16

BUILDINGS

MC

VC

13/09/16

07/07/16

S92 COMMENTSA

MC 31/03/17REVISIONB

CG 13/07/17PROJECT TITLE UPDATEDC

AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
150mm%%C SS
AutoCAD SHX Text
SSMH
AutoCAD SHX Text
LL. 4.44
AutoCAD SHX Text
150mm%%C SS
AutoCAD SHX Text
CESSPIT
AutoCAD SHX Text
LL. 4.23
AutoCAD SHX Text
CESSPIT
AutoCAD SHX Text
LL. 2.45
AutoCAD SHX Text
CESSPIT
AutoCAD SHX Text
LL. 2.83
AutoCAD SHX Text
CESSPIT
AutoCAD SHX Text
LL. 3.93
AutoCAD SHX Text
CESSPIT
AutoCAD SHX Text
LL. 4.26
AutoCAD SHX Text
300mm%%C
AutoCAD SHX Text
SW OUTLET
AutoCAD SHX Text
IL. 1.18
AutoCAD SHX Text
300mm%%C
AutoCAD SHX Text
SW OUTLET
AutoCAD SHX Text
IL. 1.08
AutoCAD SHX Text
SWMH
AutoCAD SHX Text
LL. 2.40
AutoCAD SHX Text
SWMH
AutoCAD SHX Text
LL. 4.37
AutoCAD SHX Text
CESSPIT
AutoCAD SHX Text
LL. 4.39
AutoCAD SHX Text
LID
AutoCAD SHX Text
LID
AutoCAD SHX Text
LID
AutoCAD SHX Text
LID
AutoCAD SHX Text
LID
AutoCAD SHX Text
LID
AutoCAD SHX Text
LID
AutoCAD SHX Text
LID
AutoCAD SHX Text
DISTRIBUTION
AutoCAD SHX Text
PILLAR
AutoCAD SHX Text
POWER
AutoCAD SHX Text
DISTRIBUTION
AutoCAD SHX Text
PILLAR
AutoCAD SHX Text
POWER
AutoCAD SHX Text
DISTRIBUTION
AutoCAD SHX Text
PILLAR
AutoCAD SHX Text
POWER
AutoCAD SHX Text
DISTRIBUTION
AutoCAD SHX Text
PILLAR
AutoCAD SHX Text
POWER
AutoCAD SHX Text
2x50mm DUCTS
AutoCAD SHX Text
2x50mm DUCTS
AutoCAD SHX Text
100mm WATER MAIN
AutoCAD SHX Text
100mm WATER MAIN
AutoCAD SHX Text
100mm WATER MAIN
AutoCAD SHX Text
100mm WATER MAIN
AutoCAD SHX Text
250mm%%C SW
AutoCAD SHX Text
250mm%%C SW
AutoCAD SHX Text
PROPOSED TRANSFORMER
AutoCAD SHX Text
PROPOSED POWER LINE
AutoCAD SHX Text
%%uLEGEND
AutoCAD SHX Text
SANITARY SEWER PIPE
AutoCAD SHX Text
SEWER MANHOLE
AutoCAD SHX Text
STORMWATER PIPE
AutoCAD SHX Text
STORMWATER
AutoCAD SHX Text
MANHOLE
AutoCAD SHX Text
RISING MAIN PIPE
AutoCAD SHX Text
WATERCOURSE/
AutoCAD SHX Text
OPEN CHANNEL
AutoCAD SHX Text
WATER MAIN
AutoCAD SHX Text
POWER LINE
AutoCAD SHX Text
TELECOM LINE
AutoCAD SHX Text
DUCT LINE
AutoCAD SHX Text
FIRE HYDRANT
AutoCAD SHX Text
STREET LIGHTS

SW

SW

SW

SW

SW

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

SW SW

SW SW SW SW SW SW

SW SW SW SW SW SW

SW SW SW SW SW SW

SW SW SW SW SW

SW SW SW SW SW SW

SW SW SW SW SW SW

SW SW SW SW SW SW

SW SW SW SW SW SW

SW SW SW SW SW SW

SW SW SW SW SW SW

SW SW SW SW SW SW

SW SW

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

SW

SW

SW

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

S

W

SW

SW

SW

SW

SW

SW

SS SS SS SS SS SS SS SS

SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS

SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS

SS

SS

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

R

R

R

R

R

R

R

R

R

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

S

S

S

S

SS

S

S

S

S

S

S

S

S

S

S

S

S

R

R

R

R

R

R

R

R

R

R

R

R

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SS

SS SS SS

SS SS

SS SS SS

SS SS

SS SS

SS SS SS

SS SS

SS SS SS

SS SS

SS SS SS

SS SS

SS SS SS

SS SS

SS SS

SS

R

R

EXISTING RIGHT OF WAY

BOUNDARY

BO

UN

DA

RY

MARINA BASIN

EXISTING

PUMP STATION

C200

1

.

0

1

.

0

1.01.0

2

.

0

2

.

0

2

.

0

2

.

0

2.02.0

3

.

0

3

.

0

3.0

3

.

0

3.0

3.0

3.0

3.0

3

.

0

3

.

0

3

.

0

3

.

0

3

.

0

4

.

0

4

.

0

5

.

0

5

.

0

6

.

0

6

.

0

7

.

0

7

.

0

8

.0

8

.

0

9

.0

9

.

0

1

0

.0

1

0

.

0

1

1

.0

1

1

.

0

1

2

.0

1

2

.

0

1

3

.0

1

3

.

0

14.0

1

4

.

0

1

5

.0

1

5

.

0

1

6

.0

17.0

1

8

.0

3.0

4.0

2.8

2.8

3.2

3.4

3.6

3.8

4.2

4.4

C200

1:500

1:250

EROSION AND

SEDIMENT CONTROL

PLAN

DRAWING No REVISION

TITLE

PROJECT

CLIENT

SCALE

This document and the copyright in this document remain the

property of Crang Consulting Ltd. The contents of this document

may not be reproduced either in whole or in part by any means

whatsoever without the prior written consent of Crang Consulting.

COPYRIGHT:

A1

A3DESIGNED

DRAWN

DATE

REVISION CHANGES CHECKED DATE

Unit 4, 517 Mount Wellington Highway, Auckland

PO Box 42-089, Orakei, Auckland 1745, NZ

+64 09 320 3325

www.crangcivil.co.nz

PINE HARBOUR

COMMERCIAL/RESIDENTIAL

JULY 2017

SA

CG

phone

web

address

post

PROJECT No

1194

SA

VE

D: P

:\1

19

4 - P

in

e H

arb

ou

r - C

om

me

rcia

l B

uild

in

gs\D

RA

WIN

GS

\C

20

0 E

RO

SIO

N A

ND

S

ED

IM

EN

T C

ON

TR

OL

P

LA

N.d

wg

- Ju

ly 1

3, 2

01

7. P

RIN

TE

D: Ju

ly 1

3, 2

01

7

PINE HARBOUR

MARINA DEVELOPMENT

0 ORIGINAL ISSUE

A S92 COMMENTS MC

13/09/16

VC

07/07/16

BUILDINGS

VC 07/07/16

MC 31/03/17REVISIONB

D

CG 20/06/17C

FINISHED FLOOR LEVELS

& NORTH SILT FENCE

CG 13/07/17PROJECT TITLE UPDATEDD

AutoCAD SHX Text
CATCHMENT AREA: 7654m²
AutoCAD SHX Text
SILT FENCE
AutoCAD SHX Text
SILT FENCE
AutoCAD SHX Text
%%uLEGEND
AutoCAD SHX Text
EXISTING SANITARY SEWER
AutoCAD SHX Text
EXISTING SEWER MANHOLE
AutoCAD SHX Text
PROPOSED SANITARY SEWER
AutoCAD SHX Text
PROPOSED SEWER MANHOLE
AutoCAD SHX Text
19.0
AutoCAD SHX Text
20.0
AutoCAD SHX Text
19.1
AutoCAD SHX Text
20.1
AutoCAD SHX Text
EXISTING CONTOURS
AutoCAD SHX Text
PROPOSED CONTOURS
AutoCAD SHX Text
EXISTING STORMWATER
AutoCAD SHX Text
PROPOSED STORMWATER
AutoCAD SHX Text
NOTES 1.All clean water runoff from upstream All clean water runoff from upstream catchments shall be diverted away from the works and towards stabilized drains to prevent surface erosion. 2.Erosion and Sediment Control Plans shall Erosion and Sediment Control Plans shall comply with the “Erosion and Sediment Erosion and Sediment Control Guidelines for Land Disturbing Activities” also known as AC TP90. also known as AC TP90. 3.Erosion and Sediment Control measures Erosion and Sediment Control measures shall be in place and fully operational prior to start of earthworks. The contractor shall arrange for and attend a preliminary sediment control meeting on-site with AC representative and the Engineer. 4.Contractor shall ensure that a copy of Contractor shall ensure that a copy of Erosion and Sediment Control plans is available on site at all times and that all sub-contractors and personnel involved in earthworks or other activities related to erosion and sediment control have access to these plans and are familiar with the measures to be undertaken. 5.The main erosion and sediment control The main erosion and sediment control measures to be undertaken on this site are as shown on drawing C200, C201 and C210. These include, but are not limited to, geotextile protection for stormwater cesspits and silt fence where applicable.
AutoCAD SHX Text
CATCHMENT BOUNDARY
AutoCAD SHX Text
SILT FENCE
AutoCAD SHX Text
EXISTING STORMWATER
AutoCAD SHX Text
MANHOLE
AutoCAD SHX Text
PROPOSED STORMWATER
AutoCAD SHX Text
MANHOLE
AutoCAD SHX Text
STORMWATER INLET
AutoCAD SHX Text
PROTECTION
AutoCAD SHX Text
EXISTING RISING MAIN

SW

SW

SW

SW

SW

SW SW

SW SW SW SW SW SW

SW SW SW SW SW SW

SW SW SW SW SW SW

SW SW SW SW SW

SW SW SW SW SW SW

SW SW SW SW SW SW

SW SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

SS SS SS

SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

SS

SS

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

RR

RR

R

R

R

R

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

S

S

S

S

SS

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

SS

SS

S

S

S

S

S

S

SS

SS

SS

SS

S

S

S

S

S

S

SS

SS

SS

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

BO

UN

DA

RY

EXISTING

PUMP STATION

C201

2

.

0

2

.

0

2

.

0

2

.

0

3

.

0

3

.

0

3

.

0

3.0

3

.

0

3

.

0

3.0

3

.0

3

.

0

3

.

0

3

.

0

3

.

0

3

.

0

4

.0

4

.

0

4

.

0

4

.

0

4

.

0

5

.

0

5

.

0

5

.

0

6

.

0

6

.

0

6

.

0

7

.

0

7

.

0

7

.

0

8

.

0

8

.

0

8

.0

9

.

0

9

.

0

9

.0

1

0

.0

1

0

.

0

1

0

.0

11.0

1

1

.

0

1

1

.0

12.0

1

2

.

0

1

3

.

0

1

3

.

0

1

3

.

0

1

4

.

0

1

5

.

0

1

6

.

0

1

7

.

0

1

8

.0

3.0

4.0

2.8

3.2

3.4

3.6

3.8

4.2

C201

1:500

1:250

EROSION AND

SEDIMENT CONTROL

PLAN

DRAWING No REVISION

TITLE

PROJECT

CLIENT

SCALE

This document and the copyright in this document remain the

property of Crang Consulting Ltd. The contents of this document

may not be reproduced either in whole or in part by any means

whatsoever without the prior written consent of Crang Consulting.

COPYRIGHT:

A1

A3DESIGNED

DRAWN

DATE

REVISION CHANGES CHECKED DATE

Unit 4, 517 Mount Wellington Highway, Auckland

PO Box 42-089, Orakei, Auckland 1745, NZ

+64 09 320 3325

www.crangcivil.co.nz

PINE HARBOUR

COMMERCIAL/RESIDENTIAL

JULY 2017

SA

CG

phone

web

address

post

PROJECT No

1194

SA

VE

D: P

:\1

19

4 - P

in

e H

arb

ou

r - C

om

me

rcia

l B

uild

in

gs\D

RA

WIN

GS

\C

20

0 E

RO

SIO

N A

ND

S

ED

IM

EN

T C

ON

TR

OL

P

LA

N.d

wg

- Ju

ly 1

3, 2

01

7. P

RIN

TE

D: Ju

ly 1

3, 2

01

7

PINE HARBOUR

MARINA DEVELOPMENT

0 ORIGINAL ISSUE

A S92 COMMENTS MC

13/09/16

VC

07/07/16

BUILDINGS

VC 07/07/16

MC 31/03/17REVISIONB

D

CG 20/06/17C

FINISHED FLOOR LEVELS

& NORTH SILT FENCE

CG 13/07/17PROJECT TITLE UPDATEDD

AutoCAD SHX Text
CATCHMENT AREA: 7654m²
AutoCAD SHX Text
SILT FENCE
AutoCAD SHX Text
%%uLEGEND
AutoCAD SHX Text
EXISTING SANITARY SEWER
AutoCAD SHX Text
EXISTING SEWER MANHOLE
AutoCAD SHX Text
PROPOSED SANITARY SEWER
AutoCAD SHX Text
PROPOSED SEWER MANHOLE
AutoCAD SHX Text
19.0
AutoCAD SHX Text
20.0
AutoCAD SHX Text
19.1
AutoCAD SHX Text
20.1
AutoCAD SHX Text
EXISTING CONTOURS
AutoCAD SHX Text
PROPOSED CONTOURS
AutoCAD SHX Text
EXISTING STORMWATER
AutoCAD SHX Text
PROPOSED STORMWATER
AutoCAD SHX Text
NOTES 1.All clean water runoff from upstream All clean water runoff from upstream catchments shall be diverted away from the works and towards stabilized drains to prevent surface erosion. 2.Erosion and Sediment Control Plans shall Erosion and Sediment Control Plans shall comply with the “Erosion and Sediment Erosion and Sediment Control Guidelines for Land Disturbing Activities” also known as AC TP90. also known as AC TP90. 3.Erosion and Sediment Control measures Erosion and Sediment Control measures shall be in place and fully operational prior to start of earthworks. The contractor shall arrange for and attend a preliminary sediment control meeting on-site with AC representative and the Engineer. 4.Contractor shall ensure that a copy of Contractor shall ensure that a copy of Erosion and Sediment Control plans is available on site at all times and that all sub-contractors and personnel involved in earthworks or other activities related to erosion and sediment control have access to these plans and are familiar with the measures to be undertaken. 5.The main erosion and sediment control The main erosion and sediment control measures to be undertaken on this site are as shown on drawing C200, C201 and C210. These include, but are not limited to, geotextile protection for stormwater cesspits and silt fence where applicable.
AutoCAD SHX Text
CATCHMENT BOUNDARY
AutoCAD SHX Text
SILT FENCE
AutoCAD SHX Text
EXISTING STORMWATER
AutoCAD SHX Text
MANHOLE
AutoCAD SHX Text
PROPOSED STORMWATER
AutoCAD SHX Text
MANHOLE
AutoCAD SHX Text
STORMWATER INLET
AutoCAD SHX Text
PROTECTION
AutoCAD SHX Text
EXISTING RISING MAIN

DRAWING No REVISION

TITLE

PROJECT

CLIENT

SCALE

This document and the copyright in this document remain the

property of Crang Consulting Ltd. The contents of this document

may not be reproduced either in whole or in part by any means

whatsoever without the prior written consent of Crang Consulting.

COPYRIGHT:

A1

A3DESIGNED

DRAWN

DATE

REVISION CHANGES CHECKED DATE

Unit 4, 517 Mount Wellington Highway, Auckland

PO Box 42-089, Orakei, Auckland 1745, NZ

+64 09 320 3325

www.crangcivil.co.nz

PINE HARBOUR

COMMERCIAL/RESIDENTIAL

JULY 2017

SA

CG

phone

web

address

post

PROJECT No

1194

SA

VE

D: P

:\1194 - P

ine H

arbour - C

om

mercial B

uildings\D

RA

WIN

GS

\C

210 E

RO

SIO

N A

ND

S

ED

IM

EN

T C

ON

TR

OL S

TA

ND

AR

D D

ET

AILS

.dw

g - July 13, 2017. P

RIN

TE

D: July 13, 2017

PINE HARBOUR

MARINA DEVELOPMENT

0 ORIGINAL ISSUE

BUILDINGS

C210 B

N.T.S

N.T.S

EROSION AND SEDIMENT

CONTROL STANDARD

DETAILS

CGPROJECT TITLE UPDATEDB

A S92 COMMENTS MC

13/09/16

VC

07/07/16

13/07/17

AutoCAD SHX Text
SILT FENCE CONSTRUCTION
AutoCAD SHX Text
PERSPECTIVE VIEW
AutoCAD SHX Text
PROVIDE LEAKPROOF JOINT AT
AutoCAD SHX Text
THE JUNCTION OF THE RETURN
AutoCAD SHX Text
AND MAIN SILT FENCE ALIGNMENT
AutoCAD SHX Text
WHERE REQUIRED RETURNS A
AutoCAD SHX Text
MINIMUM OF 2 METRES IN
AutoCAD SHX Text
LENGTH TO REDUCE VELOCITY
AutoCAD SHX Text
ALONG THE SILT FENCE AND
AutoCAD SHX Text
PROVIDE INTERMEDIATE
AutoCAD SHX Text
IMPOUNDMENT
AutoCAD SHX Text
ENDS OF RETURNED WIRED BACK
AutoCAD SHX Text
TO STAKE OR WARATAH
AutoCAD SHX Text
STANDARD FABRIC JOINT
AutoCAD SHX Text
SECTION A
AutoCAD SHX Text
SECTION B
AutoCAD SHX Text
OVERLAP WOODEN BATTENS
AutoCAD SHX Text
STAPLE
AutoCAD SHX Text
STAPLE
AutoCAD SHX Text
CROSS SECTION
AutoCAD SHX Text
400mm MINIMUM
AutoCAD SHX Text
HEIGHT OF GEOTEXTILE
AutoCAD SHX Text
400mm MINIMUM
AutoCAD SHX Text
POST DEPTH
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
COMPACTED BACKFILL
AutoCAD SHX Text
TRENCH GEOTEXTILE 200mm
AutoCAD SHX Text
MINIMUM INTO GROUND
AutoCAD SHX Text
GEOTEXTILE FIXED
AutoCAD SHX Text
FIRMLY TO POST/WARATAH
AutoCAD SHX Text
ELEVATION
AutoCAD SHX Text
400mm MINIMUM
AutoCAD SHX Text
HEIGHT OF GEOTEXTILE
AutoCAD SHX Text
200mm MINIMUM
AutoCAD SHX Text
TRENCH GEOTEXTILE A
AutoCAD SHX Text
MINIMUM OF 200mm
AutoCAD SHX Text
INTO THE GROUND
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
2m MINIMUM
AutoCAD SHX Text
GROUND LEVEL
AutoCAD SHX Text
STEEL STANDARDS SUCH AS
AutoCAD SHX Text
WARATAHS OR STANDARD WOODEN
AutoCAD SHX Text
FENCEPOST DRIVEN A MINIMUM
AutoCAD SHX Text
OF 400mm INTO THE GROUND
AutoCAD SHX Text
(VI)
AutoCAD SHX Text
FOLLOWING THE CONSTRUCTION OF THE CONTROLS.
AutoCAD SHX Text
MEASURES ARE INSTALLED WILL BE SUBMITTED TO AC WITHIN 7 DAYS
AutoCAD SHX Text
A CERTIFICATE INDICATING THAT ALL THE APPROPRIATE SEDIMENT CONTROL
AutoCAD SHX Text
5.
AutoCAD SHX Text
THE SITES FOR SEDIMENT RETENTION BUNDS SHALL BE SELECTED
AutoCAD SHX Text
ONSITE BY THE AC OFFICER, THE ENGINEER AND THE
AutoCAD SHX Text
CONTRACTOR WITH DUE CONSIDERATION TO THE NATIVE VEGETATION,
AutoCAD SHX Text
TOPOGRAPHY AND ANY OTHER SPECIFIC REQUIREMENTS.
AutoCAD SHX Text
THE MAIN SILT CONTROL MEASURES FOR THIS SITE ARE:
AutoCAD SHX Text
DIVERSION OF "CLEAN WATER" FROM THE ABOVE CATCHMENTS
AutoCAD SHX Text
AROUND THE EARTHWORKS AREA BY MEANS OF DIVERSION DRAINS,
AutoCAD SHX Text
AND/OR OTHER APPROVED METHOD.
AutoCAD SHX Text
(I)
AutoCAD SHX Text
CONSTRUCTION OF EARTH BUNDS TO COLLECT SILT
AutoCAD SHX Text
FROM (II) ABOVE WITH THE ADDITIONAL TEMPORARY CONSTRUCTION
AutoCAD SHX Text
OF HAY BALE BARRIER/SILT FENCES AS REQUIRED.
AutoCAD SHX Text
(II)
AutoCAD SHX Text
THAT THE SITE BE STABILISED AGAINST EROSION AS SOON AS PRACTICABLE
AutoCAD SHX Text
AND IN A PROGRESSIVE MANNER AS EARTHWORKS ARE FINISHED OVER
AutoCAD SHX Text
VARIOUS AREAS OF THE SITE. REVEGETATION IS TO BE COMPLETED BY
AutoCAD SHX Text
30 APRIL IN THE YEAR OF EARTHWORKS CONSTRUCTION, UNLESS A
AutoCAD SHX Text
LATER DATE IS APPROVED IN WRITING BY AC.
AutoCAD SHX Text
MAINTAIN ALL SEDIMENT CONTROL FACILITIES AS REQUIRED.
AutoCAD SHX Text
(IV)
AutoCAD SHX Text
(V)
AutoCAD SHX Text
FURTHER SEDIMENT CONTROL WORKS MAY BE REQUIRED BY THE ENGINEER
AutoCAD SHX Text
AS THE PROJECT ADVANCES. THESE WILL BE INSTALLED AS
AutoCAD SHX Text
AND WHERE DIRECTED BY THE ENGINEER. THE CONTRACTOR IS
AutoCAD SHX Text
SOLELY RESPONSIBLE FOR ENSURING THAT THE SITE HAS
AutoCAD SHX Text
EFFECTIVE SILT DETENTION FACILITIES OPERATING AT ALL TIMES.
AutoCAD SHX Text
6.
AutoCAD SHX Text
STORMWATER INLET PROTECTION - FILTER MEDIA DESIGN
AutoCAD SHX Text
CROSS SECTION
AutoCAD SHX Text
COARSE GEOTEXTILE
AutoCAD SHX Text
AGGREGATE
AutoCAD SHX Text
SEDIMENT
AutoCAD SHX Text
BUILD UP
AutoCAD SHX Text
CESSPIT
AutoCAD SHX Text
GRATE
AutoCAD SHX Text
RUNOFF
AutoCAD SHX Text
WATER
AutoCAD SHX Text
%%UNOTES:
AutoCAD SHX Text
ALL EROSION AND SEDIMENT CONTROL MEASURES MUST BE
AutoCAD SHX Text
OPERATIONAL PRIOR TO ANY OTHER WORKS COMMENCING ON
AutoCAD SHX Text
SITE. THE CONTRACTOR SHALL ARRANGE FOR AND ATTEND A
AutoCAD SHX Text
PRELIMINARY SEDIMENT CONTROL MEETING ON-SITE WITH
AutoCAD SHX Text
THE ENGINEER AND THE AC SOIL CONSERVATOR.
AutoCAD SHX Text
1.
AutoCAD SHX Text
A COPY OF THE EROSION MANAGEMENT PLAN SHALL BE
AutoCAD SHX Text
AVAILABLE ON THE SITE DURING WORK HOURS AND ALL
AutoCAD SHX Text
PERSONNEL INVOLVED IN EARTHWORK ACTIVITIES ON THE SITE
AutoCAD SHX Text
(INCLUSIVE OF SUB-CONTRACTORS) SHALL BE FAMILIAR WITH
AutoCAD SHX Text
THE CONSENT AND PLAN REQUIREMENTS AS THEY RELATE
AutoCAD SHX Text
TO EROSION AND SEDIMENT CONTROL.
AutoCAD SHX Text
THAT ALL ``CLEANWATER" RUNOFF FROM STABILISED SURFACES
AutoCAD SHX Text
INCLUDING CATCHMENT AREAS ABOVE THE SITE SHALL BE
AutoCAD SHX Text
DIVERTED AWAY FROM EARTHWORK AREAS VIA STABILISED
AutoCAD SHX Text
SYSTEM, SO AS TO PREVENT SURFACE EROSION.
AutoCAD SHX Text
2.
AutoCAD SHX Text
3.
AutoCAD SHX Text
ALL EROSION AND SEDIMENT CONTROL SHALL COMPLY WITH THE
AutoCAD SHX Text
``EROSION AND SEDIMENT CONTROL GUIDELINES FOR LAND
AutoCAD SHX Text
DISTURBING ACTIVITIES" ARC TECHNICAL PUBLICATION NO. 90
AutoCAD SHX Text
UPDATED MARCH 1999 AND ANY AMENDMENTS TO THIS DOCUMENT.
AutoCAD SHX Text
(COPY AVAILABLE FROM ARC ON REQUEST).
AutoCAD SHX Text
4.

EXISTING RIGHT OF WAY

BOUNDARY

BO

UN

DA

RY

MARINA BASIN

EXISTING

PUMP STATION

TP: 1

08.5

TP: 1

85.5

Mid: 202.5

TP: 219.6

TP: 244.4

Mid: 261.4

TP: 2

78.5

C300

K

&

N

K

&

N

K

&

N

K

&

N

K&N

K

&

N

K&N

K

&

N

K&

N

K&N

K&

N

K&

N

K&N

EXCP

EXCP EXDCP

E

X

D

C

P

EXDCP

EXDCP

EXDCP

EXCP

2

C310

3

C311

1

C

3

1

0

C

h: 100.00

Ch

: 1

50

.0

0

C

h

:

2

0

0

.

0

0

C

h

:

2

5

0

.

0

0

1.00

1.001.00

1.00

1.00 1.00 1.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00 2.00 2.00

3.00

3.003.003.00

3.003.00

3.00

3.00

3.00

4.00

4.00

4.00

5.00

5.00

5.00

6.00

6.00

6.00

7.00

7.00

7.00

8.00

8.00

8.00

9.00

9.00

9.00 10.00

10.00

10.00 11.00

11.00

11.00 12.00

12.00

12.00 13.0013.0013

.00 14.00

14.00

14.00 15.00

15.00

15.00 16.00

16.0016.0

0

17.00

17.00

18.00

18.00

3.00

4.00

2.80

2.80

3.20

3.40

3.60

3.80

4.20

4.40

3.00 3.

00

3.00

2.80

CH: 1

00.0

CH: 1

10.0

CH: 1

20.0

CH: 1

30.0

CH: 1

40.0

CH: 1

50.0

CH: 1

60.0

CH: 1

70.0

CH: 1

80.0

CH: 1

90.0

CH: 200.0CH: 210.0

CH: 220.0

CH: 230.0

CH: 240.0

CH: 250.0

CH: 260.0

CH: 2

70.0

CH: 2

80.0

LEGEND

C300 D

1:500

1:250

ROADING PLAN

EXISTING CONTOURS

VC07/07/16

PROPOSED KERB

PROPOSED FOOTPATH

PROPOSED CHANNEL

DRAWING No REVISION

TITLE

PROJECT

CLIENT

SCALE

This document and the copyright in this document remain the

property of Crang Consulting Ltd. The contents of this document

may not be reproduced either in whole or in part by any means

whatsoever without the prior written consent of Crang Consulting.

COPYRIGHT:

A1

A3DESIGNED

DRAWN

DATE

REVISION CHANGES CHECKED DATE

Unit 4, 517 Mount Wellington Highway, Auckland

PO Box 42-089, Orakei, Auckland 1745, NZ

+64 09 320 3325

www.crangcivil.co.nz

PINE HARBOUR

COMMERCIAL/RESIDENTIAL

JULY 2017

SA

CG

phone

web

address

post

PROJECT No

1194

SA

VE

D: P

:\1

19

4 - P

in

e H

arb

ou

r - C

om

me

rcia

l B

uild

in

gs\D

RA

WIN

GS

\C

30

0 R

OA

DIN

G P

LA

N.d

wg - Ju

ly 1

3, 2

01

7. P

RIN

TE

D: Ju

ly 1

3, 2

01

7

PINE HARBOUR

MARINA DEVELOPMENT

0 ORIGINAL ISSUE

A S92 COMMENTS MC

13/09/16

VC

07/07/16

BUILDINGS

PROPOSED CONTOURS

EXCP = EXISTING CESSPITS

K & N = VERTICAL KERB & NIB

EXDCP = EXISTING DOUBLE CESSPITS

DC = DISHED CHANNEL

EXISTING KERB TO BE REMOVED

MC 31/03/17REVISIONB

CG 20/06/17FINISHED FLOOR LEVELSC

CG 13/07/17PROJECT TITLE UPDATEDD

AutoCAD SHX Text
PROPOSED CONCRETE BLOCK WALL FOR FLOOD PROTECTION
AutoCAD SHX Text
EXISTING KERB TO BE REMOVED
AutoCAD SHX Text
PROPOSED KERB
AutoCAD SHX Text
EXISTING KERB TO BE REMOVED
AutoCAD SHX Text
PROPOSED KERB
AutoCAD SHX Text
EXISTING RIGHT OF WAY
AutoCAD SHX Text
END ROAD WORKS CH:260.00
AutoCAD SHX Text
FFL RETAIL RL 2.6m
AutoCAD SHX Text
FFL CARPARK RL 3.0m
AutoCAD SHX Text
FFL RETAIL RL 2.6m
AutoCAD SHX Text
FFL CARPARK RL 3.0m
AutoCAD SHX Text
FFL RETAIL RL 2.6m
AutoCAD SHX Text
FFL CARPARK RL 3.0m
AutoCAD SHX Text
19.0
AutoCAD SHX Text
19.1
AutoCAD SHX Text
20.0
AutoCAD SHX Text
20.1

BO

UN

DA

RY

EXISTING

PUMP STATION

TP: 72.0

Mid

: 90.

3

TP: 1

08.5

C301

K

&

N

K

&

N

K

&

N

K&

N

K&N

K&

N

K&

N

K&N

K

&

N

K

&

N

EXDCP

EXDCP

EXDCP

K

&

N

K

&

N

3

C311

4

C

3

1

1

E

X

C

P

CH: 8.0

C

h

:

5

0

.

0

0

C

h: 100.00

Ch

: 1

50

.0

0

1.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

3.00

3.00

3.00

3.00

3.00

4.00

4.00

4.00

4.00

5.00

5.00

5.00

5.00

6.00

6.00

6.00

7.00

7.00

7.00

8.00

8.00

8.00

9.00

9.00

9.00

10.00

10.00

10.00

11.00

11.00

11.00

12.00

12.00

12.00

13.00

13.00

13.00

14.00

14.00

15.00

15.00

16.00

16.00

17.00

3.00

4.00

2.803.

20

3.40

3.60

3.80

4.20

3.00 3.

00

3.00

2.80

CH: 0.0

CH: 10.0

CH: 20.0

CH: 30.0

CH: 40.0

CH: 50.0

CH: 60.0

CH: 70.0

CH: 80.0

CH: 9

0.0

CH: 1

00.0

CH: 1

10.0

CH: 1

20.0

CH: 1

30.0

CH: 1

40.0

CH: 1

50.0

LEGEND

C301

1:500

1:250

ROADING PLAN

EXISTING CONTOURS

VC07/07/16

PROPOSED KERB

PROPOSED FOOTPATH

PROPOSED CHANNEL

DRAWING No REVISION

TITLE

PROJECT

CLIENT

SCALE

This document and the copyright in this document remain the

property of Crang Consulting Ltd. The contents of this document

may not be reproduced either in whole or in part by any means

whatsoever without the prior written consent of Crang Consulting.

COPYRIGHT:

A1

A3DESIGNED

DRAWN

DATE

REVISION CHANGES CHECKED DATE

Unit 4, 517 Mount Wellington Highway, Auckland

PO Box 42-089, Orakei, Auckland 1745, NZ

+64 09 320 3325

www.crangcivil.co.nz

PINE HARBOUR

COMMERCIAL/RESIDENTIAL

JULY 2017

SA

CG

phone

web

address

post

PROJECT No

1194

SA

VE

D: P

:\1

19

4 - P

in

e H

arb

ou

r - C

om

me

rcia

l B

uild

in

gs\D

RA

WIN

GS

\C

30

0 R

OA

DIN

G P

LA

N.d

wg - Ju

ly 1

3, 2

01

7. P

RIN

TE

D: Ju

ly 1

3, 2

01

7

PINE HARBOUR

MARINA DEVELOPMENT

0 ORIGINAL ISSUE

A S92 COMMENTS MC

13/09/16

VC

07/07/16

BUILDINGS

PROPOSED CONTOURS

EXCP = EXISTING CESSPITS

K & N = VERTICAL KERB & NIB

EXDCP = EXISTING DOUBLE CESSPITS

DC = DISHED CHANNEL

EXISTING KERB TO BE REMOVED

MC 31/03/17REVISIONB

D

CG 20/06/17FINISHED FLOOR LEVELSC

CG 13/07/17PROJECT TITLE UPDATEDD

AutoCAD SHX Text
PROPOSED CONCRETE BLOCK WALL FOR FLOOD PROTECTION
AutoCAD SHX Text
EXISTING KERB TO BE REMOVED
AutoCAD SHX Text
PROPOSED KERB
AutoCAD SHX Text
EXISTING KERB TO BE REMOVED
AutoCAD SHX Text
PROPOSED KERB
AutoCAD SHX Text
START ROAD WORKS CH:8.00
AutoCAD SHX Text
FINISHED FLOOR LEVEL = RL 3.0m
AutoCAD SHX Text
FFL RETAIL RL 2.6m
AutoCAD SHX Text
FFL CARPARK RL 3.0m
AutoCAD SHX Text
19.0
AutoCAD SHX Text
19.1
AutoCAD SHX Text
20.0
AutoCAD SHX Text
20.1

DATUM 0.00mDESIGN LEVELS

EXISTING LEVELS

CUT(-) / FILL(+)

HORIZONTAL

VERTICAL

CHAINAGE

CL - RIGHT OF WAYSCALE 1H:5V

4.35

4.31

4.08

3.86

3.64

3.62

3.44

3.27

3.14

3.13

3.11

3.01

2.90

2.89

2.79

2.75

2.74

2.73

2.73

2.74

2.76

2.79

2.82

2.85

2.88

2.91

2.92

2.94

2.97

2.98

3.02

3.16

3.17

3.41

3.63

3.75

3.91

4.11

4.47

4.55

4.31

4.13

3.95

3.77

3.59

3.40

3.22

3.20

3.11

3.01

3.01

2.94

2.91

2.91

2.86

2.90

2.95

2.96

3.02

3.10

3.14

3.18

3.23

3.32

3.33

3.38

3.55

3.56

3.80

4.05

4.16

4.27

4.47

4.53

4.80

4.91

4.93

5.00

0.00

-0.0

1

-0.0

5

-0.0

9

-0.1

3-0

.13

-0.1

6

-0.1

4

-0.0

9-0

.09

-0.1

0

-0.1

2-0

.12

-0.1

5

-0.1

6

-0.1

4-0

.13

-0.1

3

-0.1

4

-0.1

6

-0.1

5

-0.1

8

-0.2

3

-0.2

3

-0.3

0

-0.3

5-0

.36

-0.3

6

-0.3

9

-0.3

9

-0.3

4-0

.30

-0.1

6

0.00

L: 72.00 L: 36.50R: 59.93

L: 77.01 L: 34.06R: 40.73

L: 24.78 L: 34.10R: 41.29

L: 11.54

G: -2.21%L: 32.85

K: 28.00L: 28.30

K: 10.00L: 33.01

G: -1.20%L: 19.76

G: 0.31%L: 78.41

K: 24.00L: 36.17

G: 3.61%L: 23.49

0.00

8.00

10.0

0

20.0

0

30.0

0

40.0

040

.85

50.0

0

60.0

0

69.1

570

.00

72.0

0

80.0

0

88.9

290

.00

100.

00

108.

5011

0.00

117.

7612

0.00

125.

08

130.

00

140.

00

150.

00

160.

00

170.

00

180.

00

185.

5119

0.00

200.

0020

3.49

210.

00

219.

5722

0.00

230.

00

236.

5124

0.00

244.

35

250.

00

260.

00

270.

00

278.

4628

0.00

290.

00

IP

3.310

IP

3.030

IP

2.685

28.304 36.169 33.011

LEGEND

C305 C

1:1000

1:500

ROADING

LONGSECTION

VC07/07/16

FINISHED LEVELS

RL 3.0m FLOOR LEVEL

DRAWING No REVISION

TITLE

PROJECT

CLIENT

SCALE

This document and the copyright in this document remain the

property of Crang Consulting Ltd. The contents of this document

may not be reproduced either in whole or in part by any means

whatsoever without the prior written consent of Crang Consulting.

COPYRIGHT:

A1

A3DESIGNED

DRAWN

DATE

REVISION CHANGES CHECKED DATE

Unit 4, 517 Mount Wellington Highway, Auckland

PO Box 42-089, Orakei, Auckland 1745, NZ

+64 09 320 3325

www.crangcivil.co.nz

PINE HARBOUR

COMMERCIAL/RESIDENTIAL

JULY 2017

SA

CG

phone

web

address

post

PROJECT No

1194

SA

VE

D: P

:\1

19

4 - P

in

e H

arb

ou

r - C

om

me

rcia

l B

uild

in

gs\D

RA

WIN

GS

\C

30

0 R

OA

DIN

G P

LA

N.d

wg - Ju

ly 1

3, 2

01

7. P

RIN

TE

D: Ju

ly 1

4, 2

01

7

PINE HARBOUR

MARINA DEVELOPMENT

0 ORIGINAL ISSUE

A S92 COMMENTS MC

13/09/16

VC

07/07/16

BUILDINGS

EXISTING LEVELS

MC 13/09/16S92 COMMENTSA

MC 31/03/17REVISIONB

CG 13/07/17PROJECT TITLE UPDATEDC

AutoCAD SHX Text
END ROAD WORKS CH:260.00
AutoCAD SHX Text
START ROAD WORKS CH:8.00

DRAWING No REVISION

TITLE

PROJECT

CLIENT

SCALE

This document and the copyright in this document remain the

property of Crang Consulting Ltd. The contents of this document

may not be reproduced either in whole or in part by any means

whatsoever without the prior written consent of Crang Consulting.

COPYRIGHT:

A1

A3DESIGNED

DRAWN

DATE

REVISION CHANGES CHECKED DATE

Unit 4, 517 Mount Wellington Highway, Auckland

PO Box 42-089, Orakei, Auckland 1745, NZ

+64 09 320 3325

www.crangcivil.co.nz

PINE HARBOUR

COMMERCIAL/RESIDENTIAL

JULY 2017

SA

CG

phone

web

address

post

PROJECT No

1194

SA

VE

D: P

:\1194 - P

ine H

arbour - C

om

mercial B

uildings\D

RA

WIN

GS

\C

310 R

OA

DIN

G T

YP

IC

AL C

RO

SS

S

EC

TIO

NS

.dw

g - July 13, 2017. P

RIN

TE

D: July 13, 2017

PINE HARBOUR

MARINA DEVELOPMENT

0 ORIGINAL ISSUE

BUILDINGS

C310 B

1:50

1:25

ROADING TYPICAL

CROSS SECTIONS

CGPROJECT TITLE UPDATEDB

A S92 COMMENTS MC

13/09/16

VC

07/07/16

13/07/17

AutoCAD SHX Text
100mm Min. AP40
AutoCAD SHX Text
150mm THICK 25Mpa POURED IN-SITU CONCRETE WITH 663 MESH CENTRALLY PLACED (ON CHAIRS).
AutoCAD SHX Text
SUBGRADE TO BE PROOF ROLLED UNDER OBSERVATION OF ENGINEER
AutoCAD SHX Text
97*97*60 SPLIT FACED BASALT SETTS OVER 30mm STIENTEC 'TUFFBED' WITH STIENTEC 'TUFFBED' PRIMER TO MANUFACTURERS SPECIFICATION. ALLOW 10mm STIENTEC 'TUFFGROUT' BETWEEN SETTS.
AutoCAD SHX Text
3% CROSSFALL
AutoCAD SHX Text
3% CROSSFALL
AutoCAD SHX Text
3% CROSSFALL
AutoCAD SHX Text
NEW 600mm STANDARD DISH CHANNEL TO REPLACE EXISTING KERB & CHANNEL
AutoCAD SHX Text
CROSSFALL 2%
AutoCAD SHX Text
100mm THICK 20 MPa (28 DAY) BROOM FINISH WITH BLACK OXIDE CONCRETE FOOTPATH ON 25mm COMPACTED GRANULAR BEDDING
AutoCAD SHX Text
SECTION 1
AutoCAD SHX Text
C310
AutoCAD SHX Text
BLOCK WALL REFER SHEET C400 & C401 FOR TOP OF WALL AND ARCHITECTURAL DRAWINGS FOR DETAILS
AutoCAD SHX Text
RL=2.74m
AutoCAD SHX Text
100 YEAR
AutoCAD SHX Text
1.5
AutoCAD SHX Text
1.0
AutoCAD SHX Text
NEW 600mm STANDARD DISH CHANNEL TO REPLACE EXISTING KERB & CHANNEL
AutoCAD SHX Text
EXISTING WATERCOURSE
AutoCAD SHX Text
FOOTPATH
AutoCAD SHX Text
LANDSCAPE AREA
AutoCAD SHX Text
FOOTPATH
AutoCAD SHX Text
EXISTING ROAD
AutoCAD SHX Text
3% CROSSFALL
AutoCAD SHX Text
3% CROSSFALL
AutoCAD SHX Text
3% CROSSFALL
AutoCAD SHX Text
SECTION 2
AutoCAD SHX Text
C310
AutoCAD SHX Text
BLOCK WALL REFER SHEET C400 & C401 FOR TOP OF WALL AND ARCHITECTURAL DRAWINGS FOR DETAILS
AutoCAD SHX Text
RL=2.86m
AutoCAD SHX Text
100 YEAR
AutoCAD SHX Text
1.5
AutoCAD SHX Text
1.0
AutoCAD SHX Text
150mm THICK 20 MPa (28 DAY) BROOM FINISH WITH BLACK OXIDE CONCRETE (TO BE CONFIRMED) VEHICLE CROSSING ON 25mm COMPACTED GRANULAR BEDDING
AutoCAD SHX Text
BUILDING WALL
AutoCAD SHX Text
GARAGE DOOR
AutoCAD SHX Text
VEHICLE CROSSING
AutoCAD SHX Text
CROSSFALL VARIES
AutoCAD SHX Text
200mm AP 65
AutoCAD SHX Text
30mm ASPHALTIC CONCRETE (MIX 10) TO NRB M10 AND P9
AutoCAD SHX Text
100mm Min. AP40
AutoCAD SHX Text
SUBGRADE TO BE PROOF ROLLED UNDER OBSERVATION OF ENGINEER
AutoCAD SHX Text
CARPARK
AutoCAD SHX Text
NEW 600mm STANDARD DISH CHANNEL TO REPLACE EXISTING KERB & CHANNEL
AutoCAD SHX Text
NEW 600mm STANDARD DISH CHANNEL TO REPLACE EXISTING KERB & CHANNEL
AutoCAD SHX Text
EXISTING WATERCOURSE
AutoCAD SHX Text
LANDSCAPE AREA

DRAWING No REVISION

TITLE

PROJECT

CLIENT

SCALE

This document and the copyright in this document remain the

property of Crang Consulting Ltd. The contents of this document

may not be reproduced either in whole or in part by any means

whatsoever without the prior written consent of Crang Consulting.

COPYRIGHT:

A1

A3DESIGNED

DRAWN

DATE

REVISION CHANGES CHECKED DATE

Unit 4, 517 Mount Wellington Highway, Auckland

PO Box 42-089, Orakei, Auckland 1745, NZ

+64 09 320 3325

www.crangcivil.co.nz

PINE HARBOUR

COMMERCIAL/RESIDENTIAL

JULY 2017

SA

CG

phone

web

address

post

PROJECT No

1194

SA

VE

D: P

:\1194 - P

ine H

arbour - C

om

mercial B

uildings\D

RA

WIN

GS

\C

310 R

OA

DIN

G T

YP

IC

AL C

RO

SS

S

EC

TIO

NS

.dw

g - July 13, 2017. P

RIN

TE

D: July 13, 2017

PINE HARBOUR

MARINA DEVELOPMENT

0 ORIGINAL ISSUE

BUILDINGS

C311 B

1:50

1:25

ROADING TYPICAL

CROSS SECTIONS

CGPROJECT TITLE UPDATEDB

A S92 COMMENTS MC

13/09/16

VC

07/07/16

13/07/17

AutoCAD SHX Text
SECTION 4
AutoCAD SHX Text
C311
AutoCAD SHX Text
CROSSFALL VARIES
AutoCAD SHX Text
200mm AP 65
AutoCAD SHX Text
30mm ASPHALTIC CONCRETE (MIX 10) TO NRB M10 AND P9
AutoCAD SHX Text
100mm Min. AP40
AutoCAD SHX Text
SUBGRADE TO BE PROOF ROLLED UNDER OBSERVATION OF ENGINEER
AutoCAD SHX Text
SIT BOUNDARY
AutoCAD SHX Text
CARPARK
AutoCAD SHX Text
EXISTING ROAD
AutoCAD SHX Text
3% CROSSFALL
AutoCAD SHX Text
NEW 600mm STANDARD DISH CHANNEL TO REPLACE EXISTING KERB & CHANNEL
AutoCAD SHX Text
EXISTING ROAD
AutoCAD SHX Text
3% CROSSFALL
AutoCAD SHX Text
3% CROSSFALL
AutoCAD SHX Text
3% CROSSFALL
AutoCAD SHX Text
SECTION 3
AutoCAD SHX Text
C311
AutoCAD SHX Text
BLOCK WALL REFER SHEET C400 & C401 FOR TOP OF WALL AND ARCHITECTURAL DRAWINGS FOR DETAILS
AutoCAD SHX Text
RL=3.70m
AutoCAD SHX Text
100 YEAR
AutoCAD SHX Text
1.5
AutoCAD SHX Text
1.0
AutoCAD SHX Text
BUILDING WALL
AutoCAD SHX Text
GARAGE DOOR
AutoCAD SHX Text
FOOTPATH
AutoCAD SHX Text
CROSSFALL VARIES
AutoCAD SHX Text
200mm AP 65
AutoCAD SHX Text
30mm ASPHALTIC CONCRETE (MIX 10) TO NRB M10 AND P9
AutoCAD SHX Text
100mm Min. AP40
AutoCAD SHX Text
SUBGRADE TO BE PROOF ROLLED UNDER OBSERVATION OF ENGINEER
AutoCAD SHX Text
CARPARK
AutoCAD SHX Text
CROSSFALL 2%
AutoCAD SHX Text
150mm THICK 20 MPa (28 DAY) BROOM FINISH WITH BLACK OXIDE CONCRETE (TO BE CONFIRMED) VEHICLE CROSSING ON 25mm COMPACTED GRANULAR BEDDING
AutoCAD SHX Text
NEW 600mm STANDARD DISH CHANNEL TO REPLACE EXISTING KERB & CHANNEL
AutoCAD SHX Text
NEW 600mm STANDARD DISH CHANNEL TO REPLACE EXISTING KERB & CHANNEL
AutoCAD SHX Text
EXISTING WATERCOURSE
AutoCAD SHX Text
150mm THICK 20 MPa (28 DAY) BROOM FINISH WITH BLACK OXIDE CONCRETE (TO BE CONFIRMED) VEHICLE CROSSING ON 25mm COMPACTED GRANULAR BEDDING
AutoCAD SHX Text
LANDSCAPE AREA

Datum: 0.00

PROPOSED LEVELS

EXISTING LEVELS

LEVEL DIFFERENCE

OFFSETS

CH: 50.000

Datum: 0.00

PROPOSED LEVELS

EXISTING LEVELS

LEVEL DIFFERENCE

OFFSETS

CH: 100.000

Datum: 0.00

PROPOSED LEVELS

EXISTING LEVELS

LEVEL DIFFERENCE

OFFSETS

CH: 150.000

Datum: 0.00

PROPOSED LEVELS

EXISTING LEVELS

LEVEL DIFFERENCE

OFFSETS

CH: 200.000

Datum: 0.00

PROPOSED LEVELS

EXISTING LEVELS

LEVEL DIFFERENCE

OFFSETS

CH: 250.000

3.18

3.18

0.00

4.00

3.23

0.77

3.63

3.63

0.00

3.44

3.62

-0.1

8

3.33

3.48

-0.1

5

3.44

3.59

-0.1

6

3.33

3.51

-0.1

8

3.44

3.60

-0.1

73.

623.

590.

03

-9.7

68-9

.667

-8.9

00-7

.700

-3.5

50

0.00

0

3.55

0

7.70

08.

636

2.88

2.86

0.02

2.84

2.86

-0.0

22.

912.

870.

04

2.85

2.91

-0.0

52.

922.

93-0

.01

2.81

2.81

0.00

2.68

2.85

-0.1

8

2.78

2.94

-0.1

6

2.68

2.81

-0.1

32.

812.

93-0

.13

3.00

2.97

0.03

3.00

2.87

0.13

2.60

2.76

-0.1

62.

602.

69-0

.09

2.60

2.69

-0.0

9

-10.

165

-9.6

61-8

.397

-5.8

60-5

.150

-4.3

99-3

.550

0.00

0

3.55

04.

268

5.78

6

10.6

90

14.8

1616

.713

16.8

18

2.71

2.72

-0.0

14.

002.

741.

263.

002.

880.

122.

933.

05-0

.12

2.86

3.25

-0.3

8

2.97

3.32

-0.3

5

2.86

3.21

-0.3

4

2.98

3.18

-0.2

03.

003.

16-0

.16

2.97

3.06

-0.0

9

2.95

2.98

-0.0

2

2.92

2.80

0.12

2.80

2.71

0.09

2.60

2.58

0.02

2.60

2.58

0.02

4.08

3.80

0.28

4.23

3.86

0.37

4.15

3.93

0.22

4.01

4.19

-0.1

8

4.11

4.27

-0.1

6

4.01

4.17

-0.1

64.

074.

15-0

.07

4.08

4.12

-0.0

4

-10.

586

-9.7

55-8

.850

-3.5

50

0.00

0

3.55

04.

259

4.53

0

2.48

2.48

0.00

4.00

2.52

1.48

2.83

2.83

0.00

2.89

2.87

0.02

2.86

2.93

-0.0

7

2.71

2.92

-0.2

0

2.82

2.96

-0.1

4

2.71

2.80

-0.0

82.

953.

00-0

.06

2.96

2.97

-0.0

12.

952.

920.

03

2.93

2.83

0.09

2.65

2.63

0.03

2.60

2.59

0.01

-14.

343

-14.

239

-13.

466

-12.

386

-8.8

50

-3.5

50

0.00

0

3.55

04.

881

9.39

710

.427

12.1

36

16.6

5017

.437

-8.3

51-8

.249

-7.4

20-6

.350

-3.5

50

0.00

0

3.55

0

7.78

38.

486

11.3

47

13.4

13

16.3

38

18.3

43

21.4

7221

.561

100YR OLFP Q=0.34m

3

/s

100YR OLFP Q=0.34m

3

/s

100YR OLFP Q=0.34m

3

/s

100YR OLFP Q=0.34m

3

/s

100YR OLFP Q=0.34m

3

/s

C315

1:1000

1:500

ROADING

CROSS SECTIONS

VC07/07/16

DRAWING No REVISION

TITLE

PROJECT

CLIENT

SCALE

This document and the copyright in this document remain the

property of Crang Consulting Ltd. The contents of this document

may not be reproduced either in whole or in part by any means

whatsoever without the prior written consent of Crang Consulting.

COPYRIGHT:

A1

A3DESIGNED

DRAWN

DATE

REVISION CHANGES CHECKED DATE

Unit 4, 517 Mount Wellington Highway, Auckland

PO Box 42-089, Orakei, Auckland 1745, NZ

+64 09 320 3325

www.crangcivil.co.nz

PINE HARBOUR

COMMERCIAL/RESIDENTIAL

JULY 2017

SA

CG

phone

web

address

post

PROJECT No

1194

SA

VE

D: P

:\1

19

4 - P

in

e H

arb

ou

r - C

om

me

rcia

l B

uild

in

gs\D

RA

WIN

GS

\C

30

0 R

OA

DIN

G P

LA

N.d

wg - Ju

ly 1

3, 2

01

7. P

RIN

TE

D: Ju

ly 1

3, 2

01

7

PINE HARBOUR

MARINA DEVELOPMENT

0 ORIGINAL ISSUE

A S92 COMMENTS MC

13/09/16

VC

07/07/16

BUILDINGS

MC 31/03/17REVISIONB

D

CG 20/06/17FINISHED FLOOR LEVELSC

CG 13/07/17PROJECT TITLE UPDATEDD

AutoCAD SHX Text
FINISHED FLOOR LEVEL CARPARK @ 3.00m
AutoCAD SHX Text
FINISHED FLOOR LEVEL RETAIL @ 2.60m
AutoCAD SHX Text
FOOTPATH

SW

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

SW

SW

SW

SW

SW

SW

SW

SW

SW

EXISTING RIGHT OF WAY

BOUNDARY

BO

UN

DA

RY

MARINA BASIN

EXISTING

PUMP STATION

C400

1.00

1.001.00

1.00

1.00 1.00 1.00

2.00

2.00

2.00

2.00

2.00

2.00

2.002.00 2.00

3.003.003.003.00

3.003.00

3.00

3.00

3.003.00

3.00

3.00

3.00

4.00

4.00

4.00

4.00

4.00

5.00

5.00

5.00

6.00

6.00

6.00

7.00

7.00

7.00

8.00

8.00

8.00

9.00

9.00

9.00

10.00

10.00

10.0

0

11.00

11.00

11.0

0

12.00

12.00

12.0

0

13.00

13.00

13.0

0

14.00

14.00

14.0

0

15.00

15.00

15.0

0

16.00

16.00

17.00

17.00

18.00

18.0

0

18.00

3.00

4.00

2.80

3.20

3.40

3.60

3.80

4.20

4.40

C400

1:500

1:250

STORMWATER

PLAN

VC 07/07/16

MC 31/03/17REVISIONB

DRAWING No REVISION

TITLE

PROJECT

CLIENT

SCALE

This document and the copyright in this document remain the

property of Crang Consulting Ltd. The contents of this document

may not be reproduced either in whole or in part by any means

whatsoever without the prior written consent of Crang Consulting.

COPYRIGHT:

A1

A3DESIGNED

DRAWN

DATE

REVISION CHANGES CHECKED DATE

Unit 4, 517 Mount Wellington Highway, Auckland

PO Box 42-089, Orakei, Auckland 1745, NZ

+64 09 320 3325

www.crangcivil.co.nz

PINE HARBOUR

COMMERCIAL/RESIDENTIAL

JULY 2017

SA

CG

phone

web

address

post

PROJECT No

1194

SA

VE

D: P

:\1

19

4 - P

in

e H

arb

ou

r - C

om

me

rcia

l B

uild

in

gs\D

RA

WIN

GS

\C

40

0 S

TO

RM

WA

TE

R P

LA

N.d

wg - Ju

ne

2

0, 2

01

7. P

RIN

TE

D: Ju

ly 1

3, 2

01

7

PINE HARBOUR

MARINA DEVELOPMENT

0 ORIGINAL ISSUE

A S92 COMMENTS MC

13/09/16

VC

07/07/16

BUILDINGS

D

CG 20/06/17FINISHED FLOOR LEVELSC

CG 13/07/17PROJECT TITLE UPDATEDD

AutoCAD SHX Text
EXISTING DOUBLE CESSPIT 2 TO BE REMOVED
AutoCAD SHX Text
EXISTING DOUBLE CESSPIT 1 TO BE REMOVED
AutoCAD SHX Text
ABANDON EXISTING SW PIPE
AutoCAD SHX Text
225mm SW PIPE
AutoCAD SHX Text
225mm SW PIPE
AutoCAD SHX Text
225mm SW PIPE
AutoCAD SHX Text
225mm SW PIPE
AutoCAD SHX Text
ABANDON EXISTING SW PIPE
AutoCAD SHX Text
SWMH 1.2
AutoCAD SHX Text
SWMH 1.3
AutoCAD SHX Text
SWMH 2.3
AutoCAD SHX Text
SWMH 2.2
AutoCAD SHX Text
SWMH 2.1
AutoCAD SHX Text
EXSWMH 2.4
AutoCAD SHX Text
EXISTING SW MANHOLE TO BE REMOVED
AutoCAD SHX Text
EXISTING SW MANHOLE TO BE REMOVED
AutoCAD SHX Text
CONNECT TO EXISTING SW PIPE
AutoCAD SHX Text
SWMH 1.1
AutoCAD SHX Text
225mm SW PIPE
AutoCAD SHX Text
CONNECT TO EXISTING SW PIPE
AutoCAD SHX Text
ABANDON EXISTING SW PIPE
AutoCAD SHX Text
EXISTING STREAM
AutoCAD SHX Text
-0.5%
AutoCAD SHX Text
-0.5%
AutoCAD SHX Text
PROPOSED CESSPIT
AutoCAD SHX Text
SW OUTLET 1.4
AutoCAD SHX Text
SW OUTLET 2.5
AutoCAD SHX Text
RELOCATE EXISTING MANHOLE AWAY FROM PROPOSED STRUCTURES
AutoCAD SHX Text
PROPOSED CONCRETE BLOCK WALL FOR FLOOD PROTECTION
AutoCAD SHX Text
BEGIN WALL SEE SHEET C415 FOR WALL LONGSECTION
AutoCAD SHX Text
%%uLEGEND
AutoCAD SHX Text
19.0
AutoCAD SHX Text
20.0
AutoCAD SHX Text
19.1
AutoCAD SHX Text
20.1
AutoCAD SHX Text
EXISTING CONTOURS
AutoCAD SHX Text
PROPOSED CONTOURS
AutoCAD SHX Text
EXISTING STORMWATER
AutoCAD SHX Text
PROPOSED STORMWATER
AutoCAD SHX Text
NOTES 1.ALL STORMWATER LINES SHALL BE 225 ALL STORMWATER LINES SHALL BE 225 RCRRJ CLASS 2 UNLESS SHOWN OTHERWISE. 2.INSTALL SMARTSPONGE FILTER ENVIROPODS INSTALL SMARTSPONGE FILTER ENVIROPODS IN EXISTING AND PROPOSED CESSPITS. 3.ALL STORMWATER WORKS SHALL BE IN ALL STORMWATER WORKS SHALL BE IN ACCORDANCE WITH AUCKLAND COUNCIL CODE OF PRACTICE. 4.OPEN CHANNEL CROSS SECTIONS SHOWN OPEN CHANNEL CROSS SECTIONS SHOWN WERE SURVEYED BY SURVEYWORX ON AUG 2016 AND MODELLED IN HEC-RAS TO ESTABLISH 100 YR ARI FLOOD LEVELS FOR THIS PROPOSAL AND ARE INCLUDED IN C110. 5.TOP OF FLOOD PROTECTION WALL TOP OF FLOOD PROTECTION WALL ELEVATIONS INCLUDE A 500 MM FREEBOARD FROM 100YR ARI FLOOD LEVELS. 6.PROPOSED WALL ARCHITECTURAL FEATURES PROPOSED WALL ARCHITECTURAL FEATURES TO BE SHOWN IN ARCHITECTURAL DRAWINGS. 7.ALL PIPES LOCATED UNDERNEATH THE ALL PIPES LOCATED UNDERNEATH THE ROAD TO BE RCRRJ CLASS 4. 8.ALL MANHOLES ARE 1050mm UNLESS ALL MANHOLES ARE 1050mm UNLESSOTHERWISE NOTED
AutoCAD SHX Text
EXISTING STORMWATER
AutoCAD SHX Text
MANHOLE
AutoCAD SHX Text
PROPOSED STORMWATER
AutoCAD SHX Text
MANHOLE
AutoCAD SHX Text
EXISTING WATERCOURSE/
AutoCAD SHX Text
OPEN CHANNEL
AutoCAD SHX Text
OPEN CHANNEL CROSS
AutoCAD SHX Text
SECTIONS (REFER TO C410)
AutoCAD SHX Text
WASTEWATER PIPES, CESSPIT
AutoCAD SHX Text
AND MANHOLE TO ABANDON

SW

SW SW SW SW SW SW SW SW SW SW

SW

SW

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

S

W

SW

SW

SW

SW

SW

SW

SW

SW

SW

BO

UN

DA

RY

EXISTING

PUMP STATION

SHEET 2

1.00

2.00

2.00

2.00

2.00

2.00

3.003.00

3.00

3.00

3.00

4.00

4.00

5.00

5.00

6.00

6.00

7.00

7.00

8.00

8.00

9.00

9.00

10.00

10.00

11.00

11.00

12.00

12.00

13.00

13.00

14.00

14.00

15.00

15.0016.00

17.00

3.00

4.00

2.80

3.20

3.40

3.60

3.80

4.20

C401

1:500

1:250

STORMWATER

PLAN

VC 07/07/16

MC 31/03/17REVISIONB

DRAWING No REVISION

TITLE

PROJECT

CLIENT

SCALE

This document and the copyright in this document remain the

property of Crang Consulting Ltd. The contents of this document

may not be reproduced either in whole or in part by any means

whatsoever without the prior written consent of Crang Consulting.

COPYRIGHT:

A1

A3DESIGNED

DRAWN

DATE

REVISION CHANGES CHECKED DATE

Unit 4, 517 Mount Wellington Highway, Auckland

PO Box 42-089, Orakei, Auckland 1745, NZ

+64 09 320 3325

www.crangcivil.co.nz

PINE HARBOUR

COMMERCIAL/RESIDENTIAL

JULY 2017

SA

CG

phone

web

address

post

PROJECT No

1194

SA

VE

D: P

:\1

19

4 - P

in

e H

arb

ou

r - C

om

me

rcia

l B

uild

in

gs\D

RA

WIN

GS

\C

40

0 S

TO

RM

WA

TE

R P

LA

N.d

wg - Ju

ne

2

0, 2

01

7. P

RIN

TE

D: Ju

ly 1

3, 2

01

7

PINE HARBOUR

MARINA DEVELOPMENT

0 ORIGINAL ISSUE

A S92 COMMENTS MC

13/09/16

VC

07/07/16

BUILDINGS

D

CG 20/06/17FINISHED FLOOR LEVELSC

CG 13/07/17PROJECT TITLE UPDATEDD

AutoCAD SHX Text
EXISTING DOUBLE CESSPIT 2 TO BE REMOVED
AutoCAD SHX Text
ABANDON EXISTING SW PIPE
AutoCAD SHX Text
225mm SW PIPE
AutoCAD SHX Text
225mm SW PIPE
AutoCAD SHX Text
SWMH 1.2
AutoCAD SHX Text
SWMH 1.3
AutoCAD SHX Text
EXISTING SW MANHOLE TO BE REMOVED
AutoCAD SHX Text
CONNECT TO EXISTING SW PIPE
AutoCAD SHX Text
SWMH 1.1
AutoCAD SHX Text
225mm SW PIPE
AutoCAD SHX Text
EXISTING STREAM
AutoCAD SHX Text
SW OUTLET 1.4
AutoCAD SHX Text
END WALL
AutoCAD SHX Text
PROPOSED CONCRETE BLOCK WALL FOR FLOOD PROTECTION
AutoCAD SHX Text
%%uLEGEND
AutoCAD SHX Text
19.0
AutoCAD SHX Text
20.0
AutoCAD SHX Text
19.1
AutoCAD SHX Text
20.1
AutoCAD SHX Text
EXISTING CONTOURS
AutoCAD SHX Text
PROPOSED CONTOURS
AutoCAD SHX Text
EXISTING STORMWATER
AutoCAD SHX Text
PROPOSED STORMWATER
AutoCAD SHX Text
NOTES 1.ALL STORMWATER LINES SHALL BE 225 ALL STORMWATER LINES SHALL BE 225 RCRRJ CLASS 2 UNLESS SHOWN OTHERWISE. 2.INSTALL SMARTSPONGE FILTER ENVIROPODS INSTALL SMARTSPONGE FILTER ENVIROPODS IN EXISTING AND PROPOSED CESSPITS. 3.ALL STORMWATER WORKS SHALL BE IN ALL STORMWATER WORKS SHALL BE IN ACCORDANCE WITH AUCKLAND COUNCIL CODE OF PRACTICE. 4.OPEN CHANNEL CROSS SECTIONS SHOWN OPEN CHANNEL CROSS SECTIONS SHOWN WERE SURVEYED BY SURVEYWORX ON AUG 2016 AND MODELLED IN HEC-RAS TO ESTABLISH 100 YR ARI FLOOD LEVELS FOR THIS PROPOSAL AND ARE INCLUDED IN C110. 5.TOP OF FLOOD PROTECTION WALL TOP OF FLOOD PROTECTION WALL ELEVATIONS INCLUDE A 500 MM FREEBOARD FROM 100YR ARI FLOOD LEVELS. 6.PROPOSED WALL ARCHITECTURAL FEATURES PROPOSED WALL ARCHITECTURAL FEATURES TO BE SHOWN IN ARCHITECTURAL DRAWINGS. 7.ALL PIPES LOCATED UNDERNEATH THE ALL PIPES LOCATED UNDERNEATH THE ROAD TO BE RCRRJ CLASS 4. 8.ALL MANHOLES ARE 1050mm UNLESS ALL MANHOLES ARE 1050mm UNLESSOTHERWISE NOTED
AutoCAD SHX Text
EXISTING STORMWATER
AutoCAD SHX Text
MANHOLE
AutoCAD SHX Text
PROPOSED STORMWATER
AutoCAD SHX Text
MANHOLE
AutoCAD SHX Text
EXISTING WATERCOURSE/
AutoCAD SHX Text
OPEN CHANNEL
AutoCAD SHX Text
OPEN CHANNEL CROSS
AutoCAD SHX Text
SECTIONS (REFER TO C410)
AutoCAD SHX Text
WASTEWATER PIPES, CESSPIT
AutoCAD SHX Text
AND MANHOLE TO ABANDON

CH: 3.6

CH: 20.0

CH: 40.0

CH: 60.0

CH: 8

0.0

CH: 1

00.0

CH: 1

20.0

CH: 140.0

CH: 160.0

CH: 180.0

CH: 200.0

CH: 220.0

CH: 240.0

CH: 260.0

CH: 2

80.0

CH: 3

00.0

CH: 3

20.0

CH: 3

40.0

CH: 3

60.0

CH: 3

80.0

CH: 400.0

CH: 420.0

CH: 4

40.0

CH: 4

60.0

C

h

:

3

.

5

5

C

h

:

2

1

.

8

2

C

h

:

5

3

.

8

1

C

h

: 9

5

.2

4

C

h

: 1

2

5

.9

4

C

h

:

1

4

8

.

3

8

C

h

:

1

7

3

.

0

1

C

h

:

2

0

0

.

3

0

C

h

:

2

3

0

.

6

6

C

h

:

2

6

1

.

7

8

C

h

:

2

9

7

.

8

4

C

h

:

3

1

0

.

0

0

C

h

:

3

2

0

.

0

0

C

h

:

3

3

0

.

9

9

C

h

:

3

4

3

.

9

2

Ch: 359.99

C

h

:

3

9

4

.

9

3

C

h

:

4

1

4

.

3

0

0.00

0.00

2.50

2.502.50

2.50

2.50

2.50

5.00

5.00

5.00

5.00

7.50

7.50

7.50

7.50

10.00

10.00

10.00

12.50

12.50

12.50

15.00

15.00

15.00

17.50

17.50

17.50

17.5017.50

20.00

2.502.

50

5.00

7.50

10.0

012

.50

15.0

0

17.5017.50

17.5

0

20.0

0

DRAWING No REVISION

TITLE

PROJECT

CLIENT

SCALE

This document and the copyright in this document remain the

property of Crang Consulting Ltd. The contents of this document

may not be reproduced either in whole or in part by any means

whatsoever without the prior written consent of Crang Consulting.

COPYRIGHT:

A1

A3DESIGNED

DRAWN

DATE

REVISION CHANGES CHECKED DATE

Unit 4, 517 Mount Wellington Highway, Auckland

PO Box 42-089, Orakei, Auckland 1745, NZ

+64 09 320 3325

www.crangcivil.co.nz

JULY 2017

SA

MC

phone

web

address

post

PROJECT No

1194

SA

VE

D: P

:\1

19

4 - P

in

e H

arb

ou

r - C

om

me

rcia

l B

uild

in

gs\D

RA

WIN

GS

\C

40

2 H

EC

-R

AS

C

RO

SS

S

EC

TIO

NS

L

AY

OU

T.d

wg - Ju

ly 1

3, 2

01

7. P

RIN

TE

D: Ju

ly 1

4, 2

01

7

PINE HARBOUR

MARINA DEVELOPMENT

0 ORIGINAL ISSUE

A S92 COMMENTS MC

13/09/16

VC

07/07/16

PINE HARBOUR

COMMERCIAL/RESIDENTIAL

BUILDINGS

HEC-RAS

CROSS SECTIONS

LAYOUT

AC402

1:250

1:500

MC 18/04/17

CG 13/07/17PROJECT TITLE UPDATEDA

Datum 0.00mFINISHED LEVEL

PIPE INVERT LEVEL

PIPE COVER

PIPE DETAILS

DISTANCE

SWMH 1.1 TO SW OUTLET 1.4SCALE 1H:2V

2.60

2.67

2.79

1.12

1.27

1.35

1.50

1.55

1.67

-0.1

8

1.00

1.00

0.92

0.87

0.86

300 mm RCRRJ@ 2.20%

225 mm RCRRJ@ 1.00%

225 mm RCRRJ@ 0.76%

6.7m 14.5m 16.9m

Datum 0.00mFINISHED LEVEL

PIPE INVERT LEVEL

PIPE COVER

PIPE DETAILS

DISTANCE

SWMH 1.2 TO 1.3SCALE 1H:2V

SWM

H 1

.110

50m

m∅ M

ANH

OLE

TOP

LL =

2.7

9m

2.67

2.75

1.55

1.88

0.87

0.62

225 mm RCRRJ@ 0.80%

SWM

H 1

.210

50m

m∅ M

ANH

OLE

TOP

LL =

2.6

7m

SWM

H 1

.310

50m

m∅ M

ANH

OLE

TOP

LL =

2.7

5m

41.5m

SWM

H 1

.210

50m

m∅ M

ANH

OLE

TOP

LL =

2.6

7m

Datum 0.00mFINISHED LEVEL

PIPE INVERT LEVEL

PIPE COVER

PIPE DETAILS

DISTANCE

EXSWMH 2.4 TO SW OUTLET 2.5SCALE 1H:2V

2.60

2.87

2.93

3.20

3.00

0.83

1.05

1.14

1.30

1.35

1.53

1.58

1.76

1.81

1.89

-0.1

8

1.21

1.21

1.31

1.26

1.15

1.10

1.18

1.13

0.86

300 mm RCRRJ@ 3.05%

225 mm RCRRJ@ 1.12%

225 mm RCRRJ@ 1.00%

225 mm RCRRJ@ 1.00%

225 mm RCRRJ@ 1.00%

7.3m 14.7m 17.7m 18.3m 7.9m

SWM

H 2

.110

50m

m∅ M

ANH

OLE

TOP

LL =

2.8

7m

SWM

H 2

.210

50m

m∅ M

ANH

OLE

TOP

LL =

2.9

3m

SWM

H 2

.310

50m

m∅ M

ANH

OLE

TOP

LL =

3.2

0m

EXSM

H 2

.410

50m

m∅ M

ANH

OLE

TOP

LL =

3.0

0m

C405

1:500

1:250

STORMWATER

LONGSECTIONS

VC 07/07/16

MC 31/03/17REVISIONB

DRAWING No REVISION

TITLE

PROJECT

CLIENT

SCALE

This document and the copyright in this document remain the

property of Crang Consulting Ltd. The contents of this document

may not be reproduced either in whole or in part by any means

whatsoever without the prior written consent of Crang Consulting.

COPYRIGHT:

A1

A3DESIGNED

DRAWN

DATE

REVISION CHANGES CHECKED DATE

Unit 4, 517 Mount Wellington Highway, Auckland

PO Box 42-089, Orakei, Auckland 1745, NZ

+64 09 320 3325

www.crangcivil.co.nz

PINE HARBOUR

COMMERCIAL/RESIDENTIAL

JULY 2017

SA

CG

phone

web

address

post

PROJECT No

1194

SA

VE

D: P

:\1

19

4 - P

in

e H

arb

ou

r - C

om

me

rcia

l B

uild

in

gs\D

RA

WIN

GS

\C

40

0 S

TO

RM

WA

TE

R P

LA

N.d

wg - Ju

ly 1

3, 2

01

7. P

RIN

TE

D: Ju

ly 1

3, 2

01

7

PINE HARBOUR

MARINA DEVELOPMENT

0 ORIGINAL ISSUE

A S92 COMMENTS MC

13/09/16

VC

07/07/16

BUILDINGS

D

CG 20/06/17FINISHED FLOOR LEVELSC

CG 13/07/17PROJECT TITLE UPDATEDD

AutoCAD SHX Text
EXISTING 300 SW PIPETO REMAIN
AutoCAD SHX Text
SW OUTLET 1.4
AutoCAD SHX Text
EXISTING SW MANHOLE TO BE REMOVED
AutoCAD SHX Text
EXISTING 300 SW PIPETO REMAIN
AutoCAD SHX Text
SW OUTLET 2.5
AutoCAD SHX Text
RELOCATE EXISTING SW MANHOLE AWAY FROM PROPOSED STRUCTURES
AutoCAD SHX Text
EXISTING SW MANHOLE TO BE REMOVED

DRAWING No REVISION

TITLE

PROJECT

CLIENT

SCALE

This document and the copyright in this document remain the

property of Crang Consulting Ltd. The contents of this document

may not be reproduced either in whole or in part by any means

whatsoever without the prior written consent of Crang Consulting.

COPYRIGHT:

A1

A3DESIGNED

DRAWN

DATE

REVISION CHANGES CHECKED DATE

Unit 4, 517 Mount Wellington Highway, Auckland

PO Box 42-089, Orakei, Auckland 1745, NZ

+64 09 320 3325

www.crangcivil.co.nz

PINE HARBOUR

COMMERCIAL/RESIDENTIAL

JULY 2017

SA

CG

phone

web

address

post

PROJECT No

1194

SA

VE

D: P

:\1194 - P

ine H

arbour - C

om

mercial B

uildings\D

RA

WIN

GS

\C

410 S

TO

RM

WA

TE

R C

HA

NN

EL C

RO

SS

S

EC

TIO

NS

.dw

g - M

arch 31, 2017

. P

RIN

TE

D: July 13, 2017

PINE HARBOUR

MARINA DEVELOPMENT

0 ORIGINAL ISSUE

BUILDINGS

C410 C

1:1000

1:500

STORMWATER

CHANNEL

CROSS SECTIONS

MC

VC

13/09/16

07/07/16

S92 COMMENTSA

MC 31/03/17REVISIONB

CG 13/07/17PROJECT TITLE UPDATEDC

AutoCAD SHX Text
100YR FL 2.44
AutoCAD SHX Text
100YR FL 2.76
AutoCAD SHX Text
100YR FL 3.14
AutoCAD SHX Text
100YR FL 3.35
AutoCAD SHX Text
100YR FL 3.30
AutoCAD SHX Text
100YR FL 3.33
AutoCAD SHX Text
100YR FL 3.74
AutoCAD SHX Text
100YR FL 3.53
AutoCAD SHX Text
100YR FL 3.90
AutoCAD SHX Text
CROSS SECTIONS SCALE 1H:10V

DATUM 0.00mTOP OF WALL

DUCKIE 100YR 40% IMP.

EXISTING GROUND

WALL HEIGHT

CHAINAGE

PROPOSED WALL LONGSECTIONSCALE 1H:5V

3.55

10.0

0

20.0

0

30.0

0

40.0

0

50.0

0

53.0

0

60.0

0

70.0

0

80.0

0

90.0

0

95.0

0

100.

00

110.

00

120.

00

125.

00

130.

00

140.

00

148.

0015

0.00

160.

00

170.

00

2.44

2.42

2.39

2.50

2.61

2.73

2.76

2.82

2.91

3.00

3.09

3.14

3.18

3.25

3.32

3.36

3.35

3.32

3.30

3.30

3.31

3.33

3.86

3.62

3.59

3.21

3.03

2.99

2.90

2.89

2.70

1.98

2.31

2.66

2.87

2.40

2.56

2.78

2.99

2.88

2.97

2.98

2.87

2.86

3.10

3.13

3.20

3.30

3.40

3.50

3.55

3.58

3.62

3.68

3.70

3.74

3.81

3.87

3.88

3.96

4.03

0.11

0.23

0.31

0.59

1.42

1.19

0.89

0.70

1.22

1.12

0.92

0.75

0.93

0.90

0.90

1.09

1.17

EXISTING GROUND PROPOSED TOP OF WALL

DUCKIE 100YR 40% IMP.WATER LEVEL

170.

00

173.

00

180.

00

190.

00

200.

00

210.

00

220.

00

230.

00

240.

00

244.

00

250.

00

260.

0026

1.00

270.

00

280.

00

290.

00

297.

00

300.

00

310.

00

3.33

3.33

3.43

3.58

3.72

3.76

3.80

3.84

3.86

3.87

3.89

3.91

3.91

3.92

3.94

3.96

3.97

3.96

3.92

2.86

2.86

3.02

2.71

2.77

2.64

3.06

3.44

3.92

3.97

4.04

4.23

4.24

4.32

4.40

4.52

4.80

4.94

5.06

4.03

4.05

4.10

4.18

4.25

4.25

4.25

4.25

4.25

4.25

1.17

1.19

1.09

1.47

1.48

1.61

1.19

0.81

0.33

0.28

EXISTING GROUND

PROPOSED TOP OF WALL

DUCKIE 100YR 40% IMP.WATER LEVEL

DATUM 0.00mTOP OF WALL

DUCKIE 100YR 40% IMP.

EXISTING GROUND

WALL HEIGHT

CHAINAGE

PROPOSED WALL LONGSECTION

3.55

2.44

3.86

PROPOSED WALL LONGSECTIONSCALE 1H:5V

DRAWING No REVISION

TITLE

PROJECT

CLIENT

SCALE

This document and the copyright in this document remain the

property of Crang Consulting Ltd. The contents of this document

may not be reproduced either in whole or in part by any means

whatsoever without the prior written consent of Crang Consulting.

COPYRIGHT:

A1

A3DESIGNED

DRAWN

DATE

REVISION CHANGES CHECKED DATE

Unit 4, 517 Mount Wellington Highway, Auckland

PO Box 42-089, Orakei, Auckland 1745, NZ

+64 09 320 3325

www.crangcivil.co.nz

PINE HARBOUR

COMMERCIAL/RESIDENTIAL

JULY 2017

SA

CG

phone

web

address

post

PROJECT No

1194

SA

VE

D: P

:\1

19

4 - P

in

e H

arb

ou

r - C

om

me

rcia

l B

uild

in

gs\D

RA

WIN

GS

\C

41

5 W

AL

L L

ON

GS

EC

TIO

N.d

wg

- M

ay 1

2, 2

01

7. P

RIN

TE

D: Ju

ly 1

3, 2

01

7

PINE HARBOUR

MARINA DEVELOPMENT

0 ORIGINAL ISSUE

A S92 COMMENTS MC

13/09/16

VC

07/07/16

BUILDINGS

PROPOSED WALL

LONGSECTION

EC415

1:250

1:500

MC 17/02/17

LON

GSEC

TIO

N C

ON

TIN

UED

BEL

OW

LON

GSECTION

CON

TINU

EDFRO

M ABO

VE

DUCKIE 100YR FLOWS W/ C.C. (POST DEVELOPMENT, NEW DESIGNED CHANNEL AND JACK LACHLAN POND)40% Q = 20.7m3/s @ CH 3.55IMP. Q = 38.9m3/s @ CH 359.99

Q = 36.6m3/s @ CH 660 (AT DUCKIE'S POND)

MC 23/03/17REVISED WALLB

NOTES:100YR WATER LEVELS BASED ONBEACHLANDS MODEL STEWARDSHIP: 110 JACK LACHLAN DRIVEBY WATERSHED ENGINEERING FOR DUCKIE DEVELOPMENTAND HEC-RAS MODEL BY CRANG CIVIL

MC 18/04/17REVISIONC

MC 12/05/17REVISIOND

CG 13/07/17PROJECT TITLE UPDATEDE

R

R

R

R

R

R

R

RR

R

EXISTING RIGHT OF WAY

BOUNDARY

BO

UN

DA

RY

MARINA BASIN

EXISTING

PUMP STATION

C500

C500 D

1:500

1:250

SANITARY SEWER

PLAN

VC07/07/16

MC 31/03/17REVISIONB

DRAWING No REVISION

TITLE

PROJECT

CLIENT

SCALE

This document and the copyright in this document remain the

property of Crang Consulting Ltd. The contents of this document

may not be reproduced either in whole or in part by any means

whatsoever without the prior written consent of Crang Consulting.

COPYRIGHT:

A1

A3DESIGNED

DRAWN

DATE

REVISION CHANGES CHECKED DATE

Unit 4, 517 Mount Wellington Highway, Auckland

PO Box 42-089, Orakei, Auckland 1745, NZ

+64 09 320 3325

www.crangcivil.co.nz

PINE HARBOUR

COMMERCIAL/RESIDENTIAL

JULY 2017

SA

CG

phone

web

address

post

PROJECT No

1194

SA

VE

D: P

:\1

19

4 - P

in

e H

arb

ou

r - C

om

me

rcia

l B

uild

in

gs\D

RA

WIN

GS

\C

50

0 S

AN

IT

AR

Y S

EW

ER

P

LA

N.d

wg

- Ju

ne

2

0, 2

01

7. P

RIN

TE

D: Ju

ly 1

3, 2

01

7

PINE HARBOUR

MARINA DEVELOPMENT

0 ORIGINAL ISSUE

A S92 COMMENTS MC

13/09/16

VC

07/07/16

BUILDINGS

MC 18/05/17WATERCARE COMMENTSC

CG 13/07/17PROJECT TITLE UPDATEDD

AutoCAD SHX Text
NEW PRIVATE 150mm uPVC SN16 SS PIPE
AutoCAD SHX Text
SSMH 1.1 NEW PUBLIC 1050mm MANHOLE
AutoCAD SHX Text
SSMH 1.2 NEW PRIVATE 1050mm MANHOLE
AutoCAD SHX Text
SSMH 1.3 NEW PRIVATE 1050mm MANHOLE
AutoCAD SHX Text
SSMH 1.4 NEW PRIVATE 1050mm MANHOLE
AutoCAD SHX Text
EXSSMH 1.5
AutoCAD SHX Text
EXISTING STREAM
AutoCAD SHX Text
EXSSMH 1.8
AutoCAD SHX Text
EXSSMH 1.6
AutoCAD SHX Text
NEW SS CONNECTION FOR BUILDING
AutoCAD SHX Text
EX SS PIPE TO BE ABANDONED (NOT IN LONGSECTIONS)
AutoCAD SHX Text
EX SS MANHOLE TO BE REMOVED (NOT IN LONGSECTIONS)
AutoCAD SHX Text
EX PUBLIC 150mm PVCSS PIPE TO REMAIN
AutoCAD SHX Text
EX PUBLIC SS MANHOLE TO REMAIN
AutoCAD SHX Text
EXSSMH 1.7 EX PUBLIC SS MANHOLE TO BE REMOVED
AutoCAD SHX Text
EX PUBLIC SS MANHOLE TO REMAIN
AutoCAD SHX Text
INSTALL NEW PUBLIC MANHOLE ON EX PUBLIC SS PIPE
AutoCAD SHX Text
NEW PRIVATE 150mm uPVC SN16 SS PIPE
AutoCAD SHX Text
NEW PRIVATE 150mm uPVC SN16 SS PIPE
AutoCAD SHX Text
EX PRIVATE SS MANHOLE TO REMAIN
AutoCAD SHX Text
EX PRIVATE SS PIPE TO REMAIN
AutoCAD SHX Text
EX PRIVATE SS PIPE TO BE ABANDONDED
AutoCAD SHX Text
EX PRIVATE SS MANHOLE TO BE REMOVED
AutoCAD SHX Text
EX PRIVATE SS PIPE TO BE ABANDONDED
AutoCAD SHX Text
EX PRIVATE SS PIPE TO BE ABANDONDED
AutoCAD SHX Text
ABANDONED 150mm PVCRISING MAIN
AutoCAD SHX Text
EX PUBLIC 150mm PVCSS PIPE TO REMAIN
AutoCAD SHX Text
EX PUBLIC 350mm PESS PIPE
AutoCAD SHX Text
225mm PERISING MAIN
AutoCAD SHX Text
NEW PUBLIC 150mm uPVC SN16 SS PIPE
AutoCAD SHX Text
%%uLEGEND
AutoCAD SHX Text
SANITARY SEWER PIPES AND
AutoCAD SHX Text
MANHOLE TO ABANDON
AutoCAD SHX Text
NOTES 1.ALL SANITARY SEWER LINES SHALL BE ALL SANITARY SEWER LINES SHALL BE 150mm uPVC SN16 UNLESS SHOWN UNLESS SHOWN OTHERWISE. 2.ALL WASTEWATER WORKS SHALL BE IN ALL WASTEWATER WORKS SHALL BE IN ACCORDANCE WITH WATERCARE STANDARDS. 3.ALL MANHOLES ARE 1050mm UNLESS ALL MANHOLES ARE 1050mm UNLESS OTHERWISE NOTED. 4.ALL BUILDING CONNECTIONS SHALL BE ALL BUILDING CONNECTIONS SHALL BE 100mm uPVC UNLESS OTHERWISE NOTED.
AutoCAD SHX Text
EXISTING SANITARY SEWER
AutoCAD SHX Text
EXISTING SEWER MANHOLE
AutoCAD SHX Text
PROPOSED SANITARY SEWER
AutoCAD SHX Text
PROPOSED SEWER MANHOLE
AutoCAD SHX Text
EXISTING RISING MAIN

R

R

R

R

R

R

R

R

R

R

R

R

R

RR

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

RR

R

R

R

R

R

R

R

R

R

R

R

R

R

R

BO

UN

DA

RY

EXISTING

PUMP STATION

C501

C501 D

1:500

1:250

SANITARY SEWER

PLAN

VC07/07/16

MC 31/03/17REVISIONB

DRAWING No REVISION

TITLE

PROJECT

CLIENT

SCALE

This document and the copyright in this document remain the

property of Crang Consulting Ltd. The contents of this document

may not be reproduced either in whole or in part by any means

whatsoever without the prior written consent of Crang Consulting.

COPYRIGHT:

A1

A3DESIGNED

DRAWN

DATE

REVISION CHANGES CHECKED DATE

Unit 4, 517 Mount Wellington Highway, Auckland

PO Box 42-089, Orakei, Auckland 1745, NZ

+64 09 320 3325

www.crangcivil.co.nz

PINE HARBOUR

COMMERCIAL/RESIDENTIAL

JULY 2017

SA

CG

phone

web

address

post

PROJECT No

1194

SA

VE

D: P

:\1

19

4 - P

in

e H

arb

ou

r - C

om

me

rcia

l B

uild

in

gs\D

RA

WIN

GS

\C

50

0 S

AN

IT

AR

Y S

EW

ER

P

LA

N.d

wg

- Ju

ne

2

0, 2

01

7. P

RIN

TE

D: Ju

ly 1

3, 2

01

7

PINE HARBOUR

MARINA DEVELOPMENT

0 ORIGINAL ISSUE

A S92 COMMENTS MC

13/09/16

VC

07/07/16

BUILDINGS

MC 18/05/17WATERCARE COMMENTSC

CG 13/07/17PROJECT TITLE UPDATEDD

AutoCAD SHX Text
NEW PRIVATE 150mm uPVC SN16 SS PIPE
AutoCAD SHX Text
SSMH 1.1 NEW PUBLIC 1050mm MANHOLE
AutoCAD SHX Text
EXISTING STREAM
AutoCAD SHX Text
EXSSMH 1.8
AutoCAD SHX Text
EXSSMH 1.6
AutoCAD SHX Text
NEW SS CONNECTION FOR BUILDING
AutoCAD SHX Text
EX SS PIPE TO BE ABANDONED (NOT IN LONGSECTIONS)
AutoCAD SHX Text
EX SS MANHOLE TO BE REMOVED (NOT IN LONGSECTIONS)
AutoCAD SHX Text
EX PUBLIC 150mm PVCSS PIPE TO REMAIN
AutoCAD SHX Text
EX PUBLIC SS MANHOLE TO REMAIN
AutoCAD SHX Text
EXSSMH 1.7 EX PUBLIC SS MANHOLE TO BE REMOVED
AutoCAD SHX Text
EX PUBLIC SS MANHOLE TO REMAIN
AutoCAD SHX Text
INSTALL NEW PUBLIC MANHOLE ON EX PUBLIC SS PIPE
AutoCAD SHX Text
EX PRIVATE SS PIPE TO BE ABANDONDED
AutoCAD SHX Text
ABANDONED 150mm PVCRISING MAIN
AutoCAD SHX Text
ABANDONED 150mm PVCRISING MAIN
AutoCAD SHX Text
EX PUBLIC 150mm PVCSS PIPE TO REMAIN
AutoCAD SHX Text
EX PUBLIC 350mm PESS PIPE
AutoCAD SHX Text
EX PUBLIC 350mm PESS PIPE
AutoCAD SHX Text
225mm PERISING MAIN
AutoCAD SHX Text
225mm PERISING MAIN
AutoCAD SHX Text
NEW PUBLIC 150mm uPVC SN16 SS PIPE
AutoCAD SHX Text
%%uLEGEND
AutoCAD SHX Text
SANITARY SEWER PIPES AND
AutoCAD SHX Text
MANHOLE TO ABANDON
AutoCAD SHX Text
EXISTING SANITARY SEWER
AutoCAD SHX Text
EXISTING SEWER MANHOLE
AutoCAD SHX Text
PROPOSED SANITARY SEWER
AutoCAD SHX Text
PROPOSED SEWER MANHOLE
AutoCAD SHX Text
EXISTING RISING MAIN
AutoCAD SHX Text
NOTES 1.ALL SANITARY SEWER LINES SHALL BE ALL SANITARY SEWER LINES SHALL BE 150mm uPVC SN16 UNLESS SHOWN UNLESS SHOWN OTHERWISE. 2.ALL WASTEWATER WORKS SHALL BE IN ALL WASTEWATER WORKS SHALL BE IN ACCORDANCE WITH WATERCARE STANDARDS. 3.ALL MANHOLES ARE 1050mm UNLESS ALL MANHOLES ARE 1050mm UNLESS OTHERWISE NOTED. 4.ALL BUILDING CONNECTIONS SHALL BE ALL BUILDING CONNECTIONS SHALL BE 100mm uPVC UNLESS OTHERWISE NOTED.

Datum 0.00mFINISHED LEVEL

PIPE INVERT LEVEL

DEPTH TO INVERT

PIPE COVER

PIPE DETAILS

DISTANCE

SSMH 1.1 TO EXSSMH 1.5SCALE 1H:2V

2.70

2.73

2.79

2.87

2.98

3.26

3.00

0.36

1.14

1.19

1.40

1.45

1.63

1.68

1.75

2.19

1.58

1.54

1.43

1.38

1.48

1.42

1.10

150 mm uPVC SN16@ 1.11%

150 mm uPVC SN16@ 1.00%

150 mm uPVC SN16@ 1.00%

150 mm uPVC SN16@ 1.00%

11.9m 26.0m 32.1m 21.3m 17.8m 6.7m

SSM

H 1

.110

50m

m∅ M

ANH

OLE

TOP

LL =

2.7

0m

SSM

H 1

.210

50m

m∅ M

ANH

OLE

TOP

LL =

2.8

7m

SSM

H 1

.310

50m

m∅ M

ANH

OLE

TOP

LL =

2.9

8m

SSM

H 1

.410

50m

m∅ M

ANH

OLE

TOP

LL =

3.2

6m

EXSS

MH

1.5

1050

mm∅

MAN

HO

LETO

P LL

= 3

.00m

2.34

1.73

1.69

1.58

1.53

1.63

1.57

1.25

0.28

Datum 0.00mFINISHED LEVEL

PIPE INVERT LEVEL

DEPTH TO INVERT

PIPE COVER

PIPE DETAILS

DISTANCE

EXSSMH 1.8 TO EXSSMH 1.6SCALE 1H:2V

2.92

2.70

3.00

0.14

0.28

0.31

0.35

0.35

0.49

2.63

2.27

2.24

2.50

2.50

-0.0

8

150 mm uPVC SN16@ 0.59%

150 mm uPVC SN16@ 1.20%

150 mm uPVC SN16@ 0.59%

11.5m 6.0m 23.6m

EXSS

MH

1.8

1050

mm∅

MAN

HO

LETO

P LL

= 2

.92m

SSM

H 1

.110

50m

m∅ M

ANH

OLE

TOP

LL =

2.7

0m

EXSS

MH

1.7

1050

mm∅

MAN

HO

LETO

P LL

= 2

.87m

EXSS

MH

1.6

1050

mm∅

MAN

HO

LETO

P LL

= 2

.91m

2.91

2.78

2.42

2.39

2.65

2.65

0.07

2.42

2.27

C505 E

1:500

1:250

SANITARY SEWER

PLAN

VC07/07/16

MC 31/03/17REVISIONB

DRAWING No REVISION

TITLE

PROJECT

CLIENT

SCALE

This document and the copyright in this document remain the

property of Crang Consulting Ltd. The contents of this document

may not be reproduced either in whole or in part by any means

whatsoever without the prior written consent of Crang Consulting.

COPYRIGHT:

A1

A3DESIGNED

DRAWN

DATE

REVISION CHANGES CHECKED DATE

Unit 4, 517 Mount Wellington Highway, Auckland

PO Box 42-089, Orakei, Auckland 1745, NZ

+64 09 320 3325

www.crangcivil.co.nz

PINE HARBOUR

COMMERCIAL/RESIDENTIAL

JULY 2017

SA

CG

phone

web

address

post

PROJECT No

1194

SA

VE

D: P

:\1

19

4 - P

in

e H

arb

ou

r - C

om

me

rcia

l B

uild

in

gs\D

RA

WIN

GS

\C

50

0 S

AN

IT

AR

Y S

EW

ER

P

LA

N.d

wg

- Ju

ne

2

0, 2

01

7. P

RIN

TE

D: Ju

ly 1

3, 2

01

7

PINE HARBOUR

MARINA DEVELOPMENT

0 ORIGINAL ISSUE

A S92 COMMENTS MC

13/09/16

VC

07/07/16

BUILDINGS

MC 18/05/17WATERCARE COMMENTSC

CG 20/06/17DFINISHED SURFACE PROFILE

CG 13/07/17PROJECT TITLE UPDATEDE

AutoCAD SHX Text
EX PRIVATE MANHOLE TO REMAIN
AutoCAD SHX Text
NEW PUBLIC MANHOLE
AutoCAD SHX Text
NEW PRIVATE MANHOLE
AutoCAD SHX Text
NEW PRIVATE MANHOLE
AutoCAD SHX Text
NEW PRIVATE MANHOLE
AutoCAD SHX Text
NEW PRIVATE SS PIPE
AutoCAD SHX Text
NEW PRIVATE SS PIPE
AutoCAD SHX Text
NEW PRIVATE SS PIPE
AutoCAD SHX Text
NEW PRIVATE SS PIPE
AutoCAD SHX Text
100mm uPVCCONNECTION
AutoCAD SHX Text
100mm uPVCCONNECTION
AutoCAD SHX Text
100mm uPVCCONNECTION
AutoCAD SHX Text
100mm uPVCCONNECTION
AutoCAD SHX Text
100mm uPVCCONNECTION
AutoCAD SHX Text
100mm uPVCCONNECTION
AutoCAD SHX Text
EX PUBLIC MANHOLE TO BE REMOVED CONNECT NEW PUBLIC SS PIPE TO EX PUBLIC SS PIPE
AutoCAD SHX Text
EX PUBLIC MANHOLE TO REMAIN
AutoCAD SHX Text
EX PUBLIC MANHOLE TO REMAIN
AutoCAD SHX Text
NEW PUBLIC MANHOLE
AutoCAD SHX Text
EX PUBLIC SS PIPE TO REMAIN
AutoCAD SHX Text
EX PUBLIC SS PIPE TO REMAIN
AutoCAD SHX Text
NEW PUBLIC SS PIPE

DRAWING No REVISION

TITLE

PROJECT

CLIENT

SCALE

This document and the copyright in this document remain the

property of Crang Consulting Ltd. The contents of this document

may not be reproduced either in whole or in part by any means

whatsoever without the prior written consent of Crang Consulting.

COPYRIGHT:

A1

A3DESIGNED

DRAWN

DATE

REVISION CHANGES CHECKED DATE

Unit 4, 517 Mount Wellington Highway, Auckland

PO Box 42-089, Orakei, Auckland 1745, NZ

+64 09 320 3325

www.crangcivil.co.nz

PINE HARBOUR

COMMERCIAL/RESIDENTIAL

JULY 2017

SA

CG

phone

web

address

post

PROJECT No

1194

SA

VE

D: P

:\1194 - P

ine H

arbour - C

om

mercial B

uildings\D

RA

WIN

GS

\C

700 S

TA

ND

AR

D D

ET

AILS

.dw

g - July 13, 2017

. P

RIN

TE

D: July 13, 2017

PINE HARBOUR

MARINA DEVELOPMENT

0 ORIGINAL ISSUE

BUILDINGS

C700 B

N.T.S

N.T.S

STANDARD

DETAILS

CGPROJECT TITLE UPDATEDB

A S92 COMMENTS MC

13/09/16

VC

07/07/16

13/07/17